You are on page 1of 5

Cat-I, however Main Contractor to ensure complete compliance with requirements with Technical Specification, if arises out of this

document or
elsewhere

CONTROL SCHEME FOR MOTORS - RATED


30kW AND BELOW 75kW

Digitally signed
Signature Not Verified
by Sunny
Date: 2019.04.03 UTTAR PRADESH RAJYA VIDYUT
11:44:28 IST UTPADAN NIGAM LIMITED
(A UP GOVERNMENT UNDERTAKING)
Reason: CAT I
Location: DEVELOPMENT CONSULTANTS
PRIVATE LIMITED, KOLKATA
NTPCEOC DOOSAN POWER SYSTEMS
INDIA PVT. LTD

C&S ELECTRIC LTD.


C-59 NO IDA PHASE -II,NO IDA -201305
DIS T. G AUTA M BUDH NAGAR(U.P)

SUB-SUPPLIER NAME

OBRA'C' 2x660 MW THERMAL POWER


NOTES:- EXTENSION PROJECT

1. FOR LEGENDS REF DRG NO.-DP16004-YR02-90BGE-144581


A

III - IV - OWNER`S DRG. NO. DP16004-YS01-90BGE-144587


REV.
I - REVISED AS PER COMMENTS DATED : 16.11.18 I - REVISED AS PER COMMENTS DATED : 27.12.19 DRG. NO.

Date Name PROJECT:- Client DOOSAN POWER SYSTEMS INDIA LTD. DRG. NO. REV.
OBRA`C` 2X660MW THERMAL C&S ELECTRIC LTD.
POWER EXTENSION PROJECT DOL RATED 30kW AND BELOW 75kW DPSIL/J3275/521
F Drawn 19.03.19 SATENDRA C-59, NOIDA PHASE II, NOIDA - 201305 Work
MODULE TYPE-DK21 02
DIST. GAUTAM BUDH NAGAR (U.P)
Checked 19.03.19 SATYAM FORMAT No. : QAF-04/04 Details SCHEMATIC DIAGRAM
SHEET NO. 2
Approved 19.03.19 D. GIRI electric Order No. 2018000270, Dated:05.03.2018 SCALE: NTS
NO. OF SHEET 4
A

III - IV - OWNER`S DRG. NO. DP16004-YS01-90BGE-144587


REV.
I - REVISED AS PER COMMENTS DATED : 16.11.18 I - REVISED AS PER COMMENTS DATED : 27.12.19 DRG. NO.

Date Name PROJECT:- Client DOOSAN POWER SYSTEMS INDIA LTD. DRG. NO. REV.
OBRA`C` 2X660MW THERMAL C&S ELECTRIC LTD.
POWER EXTENSION PROJECT DOL RATED 30kW AND BELOW 75kW DPSIL/J3275/521
F Drawn 19.03.19 SATENDRA C-59, NOIDA PHASE II, NOIDA - 201305 Work
MODULE TYPE-DK21 02
DIST. GAUTAM BUDH NAGAR (U.P)
Checked 19.03.19 SATYAM FORMAT No. : QAF-04/04 Details SCHEMATIC DIAGRAM
SHEET NO. 3
Approved 19.03.19 D. GIRI electric Order No. 2018000270, Dated:05.03.2018 SCALE: NTS
NO. OF SHEET 4
Should be
in parallel
and
A
same
may be
corrected in
Jawaharpur
too
wherever
appliable

III - IV - OWNER`S DRG. NO. DP16004-YS01-90BGE-144587


REV.
I - REVISED AS PER COMMENTS DATED : 16.11.18 I - REVISED AS PER COMMENTS DATED : 27.12.19 DRG. NO.

Date Name PROJECT:- Client DOOSAN POWER SYSTEMS INDIA LTD. DRG. NO. REV.
OBRA`C` 2X660MW THERMAL C&S ELECTRIC LTD.
POWER EXTENSION PROJECT DOL RATED 30kW AND BELOW 75kW DPSIL/J3275/521
F Drawn 19.03.19 SATENDRA C-59, NOIDA PHASE II, NOIDA - 201305 Work
MODULE TYPE-DK21 02
DIST. GAUTAM BUDH NAGAR (U.P)
Checked 19.03.19 SATYAM FORMAT No. : QAF-04/04 Details SCHEMATIC DIAGRAM
SHEET NO. 4
Approved 19.03.19 D. GIRI electric Order No. 2018000270, Dated:05.03.2018 SCALE: NTS
NO. OF SHEET 4
NTPC COMMENTS RESPONSE SHEET
Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT
Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida
DPSI Correspondence No. Date:
NTPC Doc No. Date:

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*


Control Scheme for Motors ‐ Rated 30kW and below 
DP16004‐YS01‐90BGE‐144587 0 II
75kW

No. NTPC Comment C & S Response NTPC Resolution


Single phase preventer protection is inbuilt feature of O/L 
1 Then how single phase preventer protection shall be taken care relay. Refer ITB Vol IV, CH‐15 Clause 6.07.02.a, sheet  13/14 
of 35.
2 Built in CT operated O/L relay Mention specification clause if any Refer ITB Vol IV, CH‐15 Clause 6.07.02.C , sheet 14 of 35.
3 connection for this should be after EPB Provided as per JAWAHARPUR CAT‐I drawing.
Which is this document, please refer NTPC drawing number, MCC disturbed feedback to DDCMIS signal is series 
4
If it is so, then only EPB should also be looped in series combination provided as per JAWAHARPUR CAT‐I drawing.
* NTPC Approval Categories:
1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval
4 = For information and records
4R = Additional information / detail required. Revised drawings to be submitted (in  case of drawings required to be submitted to NTPC for information only).

You might also like