CGPV INDUSTRIAL BUILDING SYSTEM SDN

1 BHD

LAKE CITY KEPONG

REPORT

- REPORT FOR DRAWING PILECAP AND STRUCTURE DRAWING HAVE DIFFERENT.

- DIFFERENT BETWEEN CENTER PILECAP (FROM PILECAP DRAWING) AND CENTER COLUMN (FROM
STRUCTURE DRAWING) NOT SAME.

- THIS ISSUE EFFECTED FOR THE SMALL COLUMN ONLY (500 MM X 500 MM).

- FOR REFERENCE , NUMBER DRAWING FOR PILECAP DRAWING


(GC/2020/KL/9216/PC-P/04/REV.0 ) AND NUMBER DRAWING FOR STRUCTURE DRAWING (1905-
STR-PD-LP-GF-001_003_REV07).

- I ALREADY SUPERIMPOSE THIS TWO DRAWING (GREEN COLOUR FROM PILECAP DRAWING AND
RED COLOUR FROM STRUCTURE DRAWING.

*FOR EXAMPLE THIS TWO COLUMN D250 AND D251 HAVE DIFFERENT

- ON SITE THIS COLUMN ALREADY HAVE THIS ISSUE D250 AND D251.

150MM
CGPV INDUSTRIAL BUILDING SYSTEM SDN
2 BHD

LAKE CITY KEPONG

* CHECK ON SITE COLUMN D250, SUPPOSED TO BE FROM GRIDLINE(P) TO COLUMN


EDGE 1300 MM NOW ON SITE ALREADY 150 MM DIFFERENT.

- WE NEED TO COMFIRM WHICH DRAWING NEED TO FOLLOW ON SITE .

- NEED TO TAKE ACTION AFTER THIS, THANKS.