GENERAL KEY PLAN: N

QIBLA

QIBLA
GENERAL NOTES:

N
S02 S04 S06 S08 S11 S13 S15 S17 S19 S20' S22 S25 S26 S27 S28 S29 S30 S31 S31' S32

JACKET 4
JACKET 2 JACKET 6

THE MONOPOD STRUCTURE FOR THE ROLLER


COASTER SUPPORT IS DESIGN UNDER PROGRESS

D
SAB
SAD'

SAE
SAF
SAG'
JACKET 10
SAH
SAJ'

SAK JACKET 8

SAL

SAM
SAN'
JACKET 11 JACKET 3

C SAP
SAQ'
SAR
SAS
SAT'

SAV

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF OPDC. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM OPDC.
JACKET 7
THE MONOPOD STRUCTURE FOR THE ROLLER
COASTER SUPPORT IS DESIGN UNDER PROGRESS
JACKET 9
SAX JACKET 3 JACKET 5

JACKET 1

SAY
JACKET 3
B A INTERIM FEED NB 15/02/23
REV DESCRIPTION APP DATE
PURPOSE OF ISSUE:
ISSUED FOR APPROVAL
EMPLOYER: OPDC PROJECT MANAGEMENT CONSULTANT:

Sky Rig - Piles Arrangement


1 1 : 350

CONTRACTOR: CONTRACTOR'S CONSULTANT:


Autodesk Docs://SA-SA3050UK-The Rig/11015-JCB-PAW-01-MDL-OMC-ZZ-900001.rvt

SPECIALIST CONSULTANT:

DESIGN CONSULTANT / CONTRACTOR: EMPLOYER'S REVIEW:


DRAWN BY: PM 13/02/23
CHECKED BY: FM 14/02/23 CHECKED BY:
APPROVED BY: NB 15/02/23 APPROVED BY:

SCALE: 1 : 350 SHEET SIZE: A0


A DISCIPLINE NAME:
OFFSHORE MARINE CONSULTANT
PILE LAYOUT AT MUDLINE

SKY RIG
PROJECT NAME:

THE RIG
16/02/2023 4:21:40 PM

JUBAIL, KINGDOM OF SAUDI ARABIA


PROJECT ORG. ASSET PACKAGE DOCUMENT DISCIPLINE LEVEL REV
SERIES NUMBER
CODE CODE CODE CODE TYPE CODE CODE CODE NO.

11015 JCB PAW 01 DRG OMC 01 000019 A