You are on page 1of 1

IRM

INFRASTRUCTURE AND ROAD MAINTENANCE Doc No.:


Bridge inspection report Rev. No. :0
General Inspection Report By. : Rafael Obusan
Date : 25/02/2023

Project Name: Nammo Bridge condition inspection

Project No. : Location: Nammo bridge

PHOTOS INSPECTION REPORT


Final Inspection Picture Comments and recommendation

Install new wooden planks as replacement for the missing


or severely damaged parts to eliminate risk of falling into
the hole on the bridge deck for pedestrians and
motorcycles

Item 1) Dilapidated and severely damaged wooden planks


resulting to a gaping hole at the wooden deck slab

Final Inspection Picture Comments and recommendation

Replace the dilapidated and damaged wooden planks to


improve the state of the wooden deck

Item 2) Portions of the wooden deck near the west side


abutment are severely damaged and dilapidated that they
are deemed unsafe or unfit for use

Final Inspection Picture Comments and recommendation

Nail down new wooden planks to prevent it from


coming loose during the passing of vehicles.

Item 3) Loose wooden planks that may move and


come loose during passing of vehicles

Page 1 of 1

You might also like