1. Concrete Strength Testing
Rebound Hammer Test on Concrete
Hammer
Camera
Tape Measure
Laser measure
February 2023
Lao Consulting Group Figure 3.1: Inspection Equipment and tools
Project No: P23310
2 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (P1 Column (R))
Figure 3.2: Rebound hammer test number 01
Figure 3.3: Rebound hammer test number 02
The pictures of the rebound hammer test at 2 Position
February 2023
Lao Consulting Group
Project No: P23310
3 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (P1 Column (L))
Figure 3.4 : Rebound hammer test number 01 & 02
The pictures of the rebound hammer test at 2 Position
February 2023
Lao Consulting Group
Project No: P23310
4 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (P1 Foundation)
Figure 3.5 : Rebound hammer test number 01 & 02
The pictures of the rebound hammer test at 2 February 2023
Lao Consulting Group Position
Project No: P23310
5 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (P1 Head stock)
Figure 3.6: Rebound hammer test number 01 ‐ 04
The pictures of the rebound hammer test at 4 Position
February 2023
Lao Consulting Group
Project No: P23310
6 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
Summary of Results
Lao Consulting Group
Project No: P23310 February 2023
7 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
COMPRESSIVE STRENGTH OF CONCRETE
REBOUND HAMMER TEST (ASTM C805)
Project Name: Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 47 44
Avg. used value: 42.0 MPa
1-B 42 46 Cube Fcu.Avg: 42.0 MPa
1-C 51 42 Cube Fcu.Min: 40.3 MPa
1-D 44 46
2-A 45 43
2-B 46 46
A B C D
2-C 46 45
2-D 49 44
1
3-A 47 43
2
3-B 44 44
3-C 45 35 3
3-D 37 43
4
4-A 46 44
4-B 49 41
4-C 39 40
4-D 42 43
Carb. Depth: 2.0 2.0
Fcu (MPa): 43.6 40.3
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 44 51
Avg. used value: 51.0 MPa
1-B 42 55 Cube Fcu.Avg: 51.0 MPa
1-C 45 50 Cube Fcu.Min: 42.1 MPa
1-D 45 52
2-A 44 52
2-B 42 57
A B C D
2-C 44 55
2-D 47 54
1
3-A 45 51
2
3-B 43 52
3-C 45 50 3
3-D 45 52
4
4-A 44 58
4-B 47 57
4-C 43 54
4-D 48 57
Carb. Depth: 2.0 2.0
Fcu (MPa): 42.1 60
Rebound Rebound
number number
Test point Test point
Direction of test: Horizontal /
Test No.1 Test No.2
Downwards
1-A 29 1-A 30
Avg. used value: 20.2 MPa
1-B 29 1-B 25
Cube Fcu.Avg: 20.2 MPa
1-C 27 1-C 28
Cube Fcu. Min: 19.6 MPa
1-D 28 1-D 21
2-A 30 1-E 26 A B C D
2-B 25 2-A 27 1
2-C 30 2-B 23
2
2-D 28 2-C 27
3-A 22 2-D 28 3
3-B 25 2-E 31
4
3-C 23 2-F 24
3-D 27 3-A 24 A B C D E F
4-A 27 3-B 21 1
4-B 26 3-C 30
2
4-C 24 3-D 25
4-D 28 3-E 31 3
Rebound number
Test point
Test No.1 Test No.2
Direction of test: Downwards
1-A 36 42
Avg. used value: 33.7 MPa
1-B 38 45 Cube Fcu.Avg: 33.7 MPa
1-C 40 37 Cube Fcu.Min: 31.6 MPa
1-D 39 36
2-A 39 38
2-B 37 40
A B C D
2-C 45 34
2-D 38 33
1
3-A 37 36
2
3-B 39 41
3-C 40 35 3
3-D 40 41
4
4-A 40 41
4-B 43 45
4-C 39 36
4-D 39 35
Carb. Depth: 2.0 2.0
Fcu (MPa): 35.7 34.3
Rebound number
Test point
Test No.3 Test No.4
Direction of test: Downwards
1-A 39 35
Avg. used value: 33.7 MPa
1-B 38 36 Cube Fcu.Avg: 33.7 MPa
1-C 37 34 Cube Fcu.Min: 31.6 MPa
1-D 38 36
2-A 41 35
2-B 37 38
A B C D
2-C 36 34
2-D 36 37
1
3-A 39 34
2
3-B 36 33
3-C 35 37 3
3-D 35 37
4
4-A 35 38
4-B 35 34
4-C 35 34
4-D 34 35
Carb. Depth: 2.0 2.0
Fcu (MPa): 33.2 31.6
The pictures of Concrete Strength Testing Equipment (P2 Column, Head stock & Foundation)
Figure 3.7: Rebound hammer test number 01 & 02 for Column & Foundation
The pictures of the rebound hammer test at 2 Position
February 2023
Lao Consulting Group
Project No: P23310
13 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (P2 Column, Head stock & Foundation)
3
Figure 3.8 : Rebound hammer test number 01 & 02 for Column & Foundation and Number 01 – 04 for Head stock
The pictures of the rebound hammer test at 2 & 4 Position February 2023
Lao Consulting Group
Project No: P23310
14 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
Summary of Results
Lao Consulting Group
Project No: P23310 February 2023
15 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
COMPRESSIVE STRENGTH OF CONCRETE
REBOUND HAMMER TEST (ASTM C805)
Project Name: Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 40 32
Avg. used value: 33.9 MPa
1-B 49 31 Cube Fcu.Avg: 33.9 MPa
1-C 39 29 Cube Fcu.Min: 24.7 MPa
1-D 48 29
2-A 38 30
2-B 43 31
A B C D
2-C 43 30
2-D 53 32
1
3-A 44 32
2
3-B 45 28
3-C 48 33 3
3-D 42 28
4
4-A 45 34
4-B 45 34
4-C 47 32
4-D 47 35
Carb. Depth: 2.0 2.0
Fcu (MPa): 43 24.7
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 43 43
Avg. used value: 38.6 MPa
1-B 34 45
Cube Fcu.Avg: 38.6 MPa
1-C 43 45
Cube Fcu.Min: 34.1 MPa
1-D 40 46
2-A 45 44
2-B 35 41
A B C D
2-C 40 48
2-D 38 44
1
3-A 31 46
3-B 37 37 2
3-C 36 43 3
3-D 40 47
4
4-A 36 47
4-B 41 52
4-C 38 46
4-D 30 42
Carb. Depth: 2.0 2.0
Fcu (MPa): 34.1 43
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Downwards
1-A 32 34
Avg. used value: 28.1 MPa
1-B 32 45 Cube Fcu.Avg: 28.1 MPa
1-C 33 32 Cube Fcu. Min: 28.1 MPa
1-D 32 30
2-A 33 29
2-B 33 33
2-C 29 32 A B C D
2-D 31 34
1
3-A 31 30
2
3-B 30 45
3-C 33 33 3
3-D 39 29
4
4-A 30 35
4-B 33 29
4-C 32 36
4-D 35 27
Carb. Depth: 2.0 2.0
Fcu (MPa): 28.1 28.1
Rebound number
Test point
Test No.1 Test No.2
Direction of test: Downwards
1-A 34 33
Avg. used value: 28.5 MPa
1-B 34 34 Cube Fcu.Avg: 28.5 MPa
1-C 35 34 Cube Fcu.Min: 25.8 MPa
1-D 33 33
2-A 33 38
2-B 38 36
A B C D
2-C 35 35
2-D 32 35
1
3-A 33 34
2
3-B 31 36
3-C 32 39 3
3-D 32 37
4
4-A 34 38
4-B 35 36
4-C 32 34
4-D 33 36
Carb. Depth: 2.0 2.0
Fcu (MPa): 29.1 31.6
Rebound number
Test point
Test No.3 Test No.4
Direction of test: Downwards
1-A 34 32
Avg. used value: 28.5 MPa
1-B 28 27 Cube Fcu.Avg: 28.5 MPa
1-C 33 28 Cube Fcu.Min: 25.8 MPa
1-D 34 28
2-A 32 33
2-B 27 36
A B C D
2-C 30 34
2-D 32 31
1
3-A 29 33
2
3-B 31 37
3-C 27 36 3
3-D 26 34
4
4-A 30 35
4-B 33 31
4-C 32 27
4-D 29 30
Carb. Depth: 2.0 2.0
Fcu (MPa): 25.8 27.3
The pictures of Concrete Strength Testing Equipment (Abutment A1)
Figure 3.9: Rebound hammer test number 01 & 02
The pictures of the rebound hammer test at 2 Position
21 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
The pictures of Concrete Strength Testing Equipment (Abutment A2)
Figure 3.10: Rebound hammer test number 01, 02 & 03
The pictures of the rebound hammer test at 3 Position
22 of 26
Inspection and Assessment of Bailey Bridge (Nam Mo Bridge)
Summary of Results
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 31 32
Avg. used value: 28.5 MPa
1-B 31 40 Cube Fcu.Avg: 28.5 MPa
1-C 31 35 Cube Fcu.Min: 27.3 MPa
1-D 32 32
2-A 37 31
2-B 35 41
A B C D
2-C 33 31
2-D 32 28
1
3-A 38 33
2
3-B 37 35
3-C 41 38 3
3-D 37 33
4
4-A 29 33
4-B 29 38
4-C 31 44
4-D 33 41
Carb. Depth: 2.0 2.0
Fcu (MPa): 27.3 29.6
Rebound number
Test point
Test No.1 Test No.2 Test No.3
Direction of test: Horizontal
1-A 47 38 35
Avg. used value: 42.2 MPa
1-B 44 42 39 Cube Fcu.Avg: 42.2 MPa
1-C 45 41 37 Cube Fcu.Min: 35 MPa
1-D 37 42 37
2-A 39 40 44
2-B 42 42 44
A B C D
2-C 39 42 31
2-D 40 42 40
1
3-A 36 39 44
2
3-B 34 36 45
3-C 34 37 38 3
3-D 31 39 37
4
4-A 46 37 42
4-B 32 35 47
4-C 41 38 38
4-D 37 33 44
Carb. Depth: 2.0 2.0 2.0
Fcu (MPa): 35 55.3 36.4