Professional Documents
Culture Documents
HOME
NEWS
VIDEOS
MARINE TECH
NAVIGATION
MARITIME LAW
MORE
PREMIUM E-BOOKS
FREE E-BOOKS Search In Marine Insight
AD
Boiler is one of the most important machinery systems on the ship. An economic and efficient working of
a marine boiler on a ship requires timely maintenance and special care in starting and stopping the boiler.
Routine cleanup is extremely helpful in increasing the working life of a marine boiler.
In this article we have brought to you one such important procedure – boiler blow down, which has to be
performed at a regular interval of times in order to increase the performance of the boiler.
Different dissolved and undissolved solids lead to scaling, corrosion, erosion etc. The solid impurities will
also be carried over with the steam into the steam system, leading to deposits inside the heat exchanger
surface where the steam is the primary heating medium.
To minimise all these problems, boiler blowdown is done, which helps in removing the carbon deposits
and other forms of impurities.
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 1/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Ziyaret Et.
Gündoğdu Mobilya
Blow down of the boiler is done to remove two types of impurities – scum and bottom deposits. This
means that blow down is done either for scum or for bottom blow down. Moreover, the reasons for boiler
blow down are:
1. To remove the precipitates formed as a result of chemical addition to the boiler water.
2. To remove solid particles, dirt, foam or oil molecules from the boiler water. This is mainly done by
scum valve and the procedure is known as “scumming.”
Inside a marine boiler, the blowdown arrangement is provided at two levels; at a bottom level and the
water surface level known as “scum blowdown”.
Hence, when the bottom valve is used, the procedure is known as boiler blowdown, and when the Scum
valve is used, the process is known as “scumming.”
Related Read: Video Tutorial: How Ship’s Boiler and Steam System Works?
The boiler water blowdown can be done in two ways depending upon the type, design, automation used,
the capacity and the characteristics of the boiler feedwater system:
The major drawback of manual blowdown is the heat loss due to hot water going out of the water drum.
The valve is opened slightly making a small quantity of water to go into the blowdown. Still, there is
significant heat and pressure loss.
Continuous blowdown:
Many modern boilers are nowadays provided with blowdown automation.
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 2/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
They allow the continuous blowdown of the boiler water, which helps in keeping the dissolved and
AD
suspended solids under boiler operating limits. This system is known as continuous blowdown.
In this system, the automation monitors the blowdown continuously and in turn checks the quality of feed
water and the quality of water inside a boiler shell for dissolved and undissolved impurities. Accordingly,
it will automatically open the blowdown valves if the boiler water TDS exceeds the permissible operating
limit.
Avantajlı Sezon Fırsatları Başladı.
As the blowdown valves are precisely controlled, the water discharged from the blowdown removes the Ziyaret Et.
Gündoğdu Mobilya
maximum amount of dissolved impurities with minimum heat and water loss from the boiler water,
maintaining the boiler efficiency.
Most of the boiler with continuous blowdown automation are fitted with heat recovery systems, i.e. the hot
water from the boiler blowdown is first sent to a heat exchanger unit which utilises the heat of the water
(e.g. to preheat the feedwater by installing a heat exchanger or heat recovery equipment in the path)
before it goes overboard.
The choice of blowdown system, i.e. either manual or continuous and automatic, will depend on various
factors and the blowdown valves will be fitted with suitable accessories as per the system.
A modern boiler should never be blown down while the boiler is steaming at high rates. While performing
the blowdown, the shipside valve should always be open first, then the blowdown valve. This will allow
control to the operator in case a pipe burst.
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 3/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
2. Open the blow down valve (2), this valve is a non-return valve.
AD
3. The blow down valve adjacent to the boiler (2) should be opened fully so as to prevent cutting of
the valve seat or the “Wire drawing effect”.
5. After blow down close the valve in reverse order. Avantajlı Sezon Fırsatları Başladı.
Ziyaret Et.
6. A hot drain pipe even when all valves are closed indicates a leaking blow down valve. Gündoğdu Mobilya
If the boiler is blown down for inspection, first the firing needs to be stopped and allow the boiler to cool
off. Open the boiler vent plug which will allow natural cooling at atmospheric pressure.
Ensure the overboard valve (non-return) is functioning properly so that no seawater can enter the boiler
pipeline else it will create a vacuum due to sudden steam cooling leading to a pipe burst.
Once the boiler blowdown is completed, open the belly plug to remove the remaining content in the
engine room bilges.
*Make sure to do ‘Scum Blowdown’ before ‘Bottom Blowdown’ otherwise while doing bottom blowdown
the scum settled on water surface or if any oil content it will get agitated, contaminating the boiler water.
(Hat Tip – Gokul Nair)
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 4/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
Related Read: 6 Practical Tips On Improving Boiler Efficiency for Professional Marine Engineers
AD
Ensure the operator knows the Vessel General Permit areas and complies with chapter 12 of VGP Kaçırmamak İçin Şimdi Sitemizi
Ziyaret Et.
and do not discharge any wastewater from the boiler blowdown in the restricted areas except for
Gündoğdu Mobilya
safety reasons.
The vessel must ensure not to discharge any boiler water via boiler blowdown in port waters. This is
because the water consists of different chemicals or other additives which are added to reduce
impurities or prevent scale formations.
The boiler blowdown must be done as far from shore as possible.
The Master and the duty officer on the bridge must be informed before commencing the blowdown
operation.
The boiler blowdown operation must be recorded in the Engine Room Logbook which must include
the starting and the stopping time operation
If the boiler blowdown or hot well water is transferred to the bilges, the same must be recorded in
ORB and engine room logbook
Related Read: Safety of Life at Sea (SOLAS) & Convention for Prevention of Marine Pollution
(MARPOL): A General Overview
The boiler blowdown can be done in territorial water or harbour only in the following conditions:
If the ship is entering the dry dock, it will need to blowdown boiler
For any safety reasons
The main aim of doing a boiler blowdown is to reduce the dissolved impurities in the boiler water, which
leads to scale formation.
The scale formation will directly lead to heat transfer within the internal surface of the boiler leading to a
reduction in boiler efficiency.
If the boiler water can be tested regularly and accordingly treated effectively using various chemicals in
the hot well, the feed water will have fewer impurities making it good for the use.
The need for the boiler blowdown will inturn reduce leading to saving of water and reduction in heat and
pressure losses.
With an increase in boiler blowdown, the water and fuel consumption of the boiler water will increase. The
best practice is to remove the manual blowdown system and to install an automatic boiler water
measurement and blowdown system.
This system will effectively monitor the impurities in the boiler and open the discharge blowdown valve
accordingly, as explained in the continuous blowdown system above.
You may also like to read: Procedure for Boiler gauge glass maintenance.
Report an Error
Related Posts
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 5/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
Real Life Incident: Boiler Overpressure How to Minimize the Risks of an
On Ship Causes Three Fatalities Electrical Shock on a Ship? AD
Tags: boiler Image Credits marine boiler procedure Kaçırmamak İçin Şimdi Sitemizi
Ziyaret Et.
Gündoğdu Mobilya
Want to share your tips and advice? Got questions? Visit the community forum to ask questions,
get answers, meet people, and share your tips!
AD
About Anish
An ardent sailor and a techie, Anish Wankhede has voyaged on a number of ships as
a marine engineer officer. He loves multitasking, networking, and troubleshooting. He
is the one behind the unique creativity and aesthetics at Marine Insight.
Comments
exact and to the point.had been looking for the correct procedure.
thanx
ajay
parin says
MARCH 31, 2011 AT 3:45 PM
wen v carry out partial blow down do v stop steam to various services????
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 6/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Mohit says
APRIL 10, 2011 AT 10:20 PM
Hi Parin,
no we dont close any service steam during blowdown either its scum or bottom blowdown of
boiler. Avantajlı Sezon Fırsatları Başladı.
Ziyaret Et.
Gündoğdu Mobilya
parin says
APRIL 16, 2011 AT 3:05 PM
thank u mohit.
prakash says
NOVEMBER 27, 2011 AT 11:38 PM
Anish says
NOVEMBER 28, 2011 AT 10:44 AM
Bijen says
DECEMBER 1, 2011 AT 4:30 AM
Very usefull.but i want to know more about boiler flame failure alarm check @Mohit.
Roslan says
APRIL 29, 2012 AT 9:11 AM
Asked by my leturer.
koushik says
MAY 9, 2012 AT 1:19 PM
During blow down the shipside blow down valve is required to open first, otherwise complete
blow down line (from boiler to shipside v/v will come under boiler pressure ( 6 to 10 bar)), most
of the time this line is weak and corroded, so chances of failure and consequential accident is
high.
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 7/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Rohit says
AUGUST 30, 2013 AT 1:31 PM
if scum valve removes the floating oil from the boiler water by sending it directly through Avantajlı Sezon Fırsatları Başladı.
Frank says
OCTOBER 27, 2013 AT 7:42 PM
ACA says
OCTOBER 20, 2014 AT 12:54 PM
hosh says
NOVEMBER 5, 2014 AT 5:15 PM
What do we need to do with the fuel and feed water?? Do v need d boiler to b shut down?
tejaskumar says
DECEMBER 26, 2015 AT 2:20 AM
zaw says
JANUARY 29, 2016 AT 2:02 PM
Thank you very much! It’s very precisely and exactly explained .
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 8/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
ravi says
JUNE 21, 2016 AT 11:20 AM
Ziyaret Et.
Gündoğdu Mobilya
rocky says
NOVEMBER 8, 2017 AT 7:51 AM
when you make excessive blowdown, wat effects will occure in the boiler?
Anish says
NOVEMBER 13, 2017 AT 2:19 PM
@Rocky: Excessive blowdown will waste energy, water, and chemicals. It will also increase the
fuel consumption and increase the time to achieve required rated pressure.
Kalaap says
SEPTEMBER 5, 2018 AT 1:38 AM
Anish says
SEPTEMBER 6, 2018 AT 8:03 AM
@Kalap: A flash tank is installed and the boiler blowdown is connected to this flash tank. As
the blowdown water can be a high-temperature mixture, the heat energy of the blowdown is
taken into the flash tank from which it is used to heat the boiler making water.
as ( ACME) student of Maritime Academy of Nigeria. This platform have added value to my
carrier and exposed me to so many things which I did not know before l am so grateful
Anish says
JULY 29, 2019 AT 10:20 AM
@Aniedi: Glad you found the website helpful. Please do share the knowledge.
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 9/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Few points that came in my head while going through this well articulated article:
1.Make sure to do ‘Scum Blowdown’ before ‘Bottom Blowdown’ otherwise while doing bottom Avantajlı Sezon Fırsatları Başladı.
blowdown the scum settled on water surface or if any oil content it will get agitated,
Ziyaret Et.
contaminating the boiler water.
Gündoğdu Mobilya
2. Instead of the seat cutting effect we can mention ‘Wire drawing effect’.
Recently built ships boiler doesn’t have two blow down valves. Only one blowdown valve for
scum and one for bottom blow down. In that case, how the seat cut/erosion problem is
rectified.?
Anish says
JUNE 29, 2020 AT 8:14 AM
Please do check the blow down line valve if they have provided additional valves near the
discharge.
Anish says
JUNE 29, 2020 AT 8:18 AM
Hi Gokul
S.Lakshmanamurugan says
SEPTEMBER 29, 2020 AT 12:13 AM
I have been asked recently in an oral exam what to do if oil is found in the boiler drum. How to
get it out without breaking MARPOL regs? Can anyone give the full procedure on safely
removing this oil with out discharging overboard?
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 10/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Anish says
JANUARY 14, 2021 AT 2:43 PM
First, try to remove it by skimming oil from HOTWELL. If the contamination is more, boiling out
or acid cleaning should be performed immediately.
Avantajlı Sezon Fırsatları Başladı.
Ziyaret Et.
Gündoğdu Mobilya
John says
JANUARY 31, 2021 AT 3:03 AM
mohan says
FEBRUARY 3, 2021 AT 11:40 PM
i don’t think so .my query is to be practical .but i wanna know the answer… what to do when
the boiler in full load as well in need of blowdown
Ad
AD
Leave a Reply
Your email address will not be published. Required fields are marked *
Comment
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 11/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
Name *
AD
Email *
AD
AD
POPULAR NOW
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 12/13
5.01.2022 06:26 Boiler Blow-Down Produre for Marine Boilers
AD
Ziyaret Et.
Gündoğdu Mobilya
Privacy Policy | Refund Policy | Contact Us | Disclaimer | About Us | Team | Advertise | Send Us News
Copyright © 2010 - 2021 Marine Insight — All Rights Reserved | Made with ♥ in India
https://www.marineinsight.com/tech/boiler/blow-down-procedure-for-marine-boilers/ 13/13