Lion Group (Megasteel) Project Implementation Schedule
Lion Group (Megasteel) Project Implementation Schedule
Location Owner Responsible Completion Remarks Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
By %
18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov
Weekend
Weekend
3.2.2 Power up, machine testing and verification Megasteel Afiintra/Megasteel Afiintra
3.3 HP Storage Modular Smart A1000
3.3.1 Replace and install smart array controller along with the battery
Megasteel Afiintra/Megasteel Afiintra
3.3.2 Replace a faulty hard disk Megasteel Afiintra/Megasteel Afiintra
3.3.3 Replace faulty power supply and blower Megasteel Afiintra/Megasteel Afiintra
3.3.4 Power up, machine testing and verification Megasteel Afiintra/Megasteel Afiintra
3.4 HP Compaq 6000
3.4.1 System board replacement Megasteel Afiintra/Megasteel Afiintra
3.4.2 Power up, machine testing and verification Megasteel Afiintra/Megasteel Afiintra
3.5 HP ProLiant ML150
3.5.1 Replace a faulty hard disk Megasteel Afiintra/Megasteel Afiintra
3.6 ALPHA Server
3.6.1 Replace a faulty hard disk for Alpha Server DS10 Megasteel Afiintra/Megasteel Afiintra
3.6.2 Replace a faulty hard disk for Alpha Server 5-333 Megasteel Afiintra/Megasteel Afiintra
3.6.3 Power up machine and hardware connectivity verification Megasteel Afiintra/Megasteel Afiintra
4 UAT & Hardware verification
4.1 Verified all new hardware installation Megasteel Afiintra/Megasteel Afiintra/Megasteel
4.2 UAT and sign off project Megasteel Afiintra/Megasteel Afiintra/Megasteel
Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov
Public Holiday
Weekend
Weekend
Weekend