You are on page 1of 1

ROOF ROOF

0.300

0.300
CLG. CLG.

D1 D2 ACRYLIC CURTAIN
ENTRANCE
3.600

3.600
3.300

3.300
FFL. FFL.
0.400

0.400
GFL. GFL.

A SECTION - A B SECTION - B
002 SCALE 1:100
002 SCALE 1:100

3
3 16" THK HARDIFLEX ON 2"X3" METAL STUDS
16" THK HARDIFLEX ON 2"X3" METAL STUDS 0.60 OC HOR./VER.
0.60 OC HOR./VER. 3
16" THK HARDIFLEX ON 2"X3" METAL STUDS
LINTEL BEAM BRIDGING - B 0.60 OC HOR./VER.
LINTEL BEAM BRIDGING - B

ROOF ROOF
0.300

0.300
CLG. CLG.

D1 D2 D2 D2
3.600

3.600
3.300

3.300
FFL. FFL.
0.400

0.400
GFL. GFL.

C SECTION - C D SECTION - D
002 SCALE 1:100
002 SCALE 1:100

3
16" THK HARDIFLEX ON 2"X3" METAL STUDS
0.60 OC HOR./VER. EXISTING CONCRETE WALL
EXISTING CONCRETE WALL
EXISTING CONCRETE WALL
LINTEL BEAM BRIDGING - B
EXISTING CONCRETE WALL
LINTEL BEAM BRIDGING - B

ARCHITECT: ENGINEER: PROJECT TITLE: REVISIONS SHEET CONTENTS: OWNER: SHEET NO.

G/F PARTIAL FLOOR PLAN PROPOSED


LAYOUT
PROPOSED JTI-MAKATI DSO FG AND
DIOSDADO N. PINGUL NON-FG STORAGE RENOVATION JTI A-02
REG NO. : PTR NO. : REG NO. : PTR NO. : CADD BY. : APPROVED BY:
Mayapis St. Cor. Yakal St. San Antonio Makati City
TIN: 121 724 622 DATE: FEBRUARY 16, 2023 TIN: DATE: CHECKED BY: DATE:

You might also like