Professional Documents
Culture Documents
ករគណន ពន
ទំព័រ
១. គណនក្រមស់ក្រមល ព ន ................................................................. ២
៣. ករគណនភពធន់កំណត់ .................................................................... ៧
៤. ករគណនសរៃសែដក ........................................................................... ៨
៥. ករគណនធនឹមទ្រម .............................................................................. ១០
៦. ករគណនេទេលើតៃម្លេសចក្តី ............................................................. ២២
ម ទយល័យសំណង់សីុ ល ស្វកមមសំណង់ ពន
លំ ត់ឧទហរណ៍ៈ
- TMgn;maDéneebtug 2500kg/m 3
- ersuIsþg;sgát;énebtug 30MPa
- PaBFn;yWténEdk 400MPa
- m:UDulPaByWténEdk 200000MPa
- TTwgs<ansrub 10760mm
- épÞbgáan;éd ( A ) 0.19608mm 2
bgáan;édsþg;darrbs;bTdæan AASHTO
ករគណន ព នធនឹមអក រ T េបតុង រេម៉ ទំពរ័ -1-
Bridge Engineering Civil Engineering Faculty
1-karKNnakMras;kMrals<an
tamrUbmnþ cMeBaHTMrFmμta
hmin =
(S + 3000 ) ≥ 165 mm
30
hmin =
(2200 + 3000 ) = 173 .33mm
30
hmin = 175 mm
brimaNebtugénbgáan;éd 5m 3
2-karKNnabnÞúk nigm:Um:g;
2-1-cMeBaHbnÞúkefr (dead load)
2-1-1-kMrals<an
WSlab = 0.19m×2500kg/m3×9.81×10-3 = 4.66kN/m2
R200 = 4.254kN
M200 = 0.000kN.m
M204 = 1.883kN.m
M300 = -2.934kN.m
2-1-2-kugs‘ul¬kMrally¦
WOverhang = 0.215m×2500kg/m3×9.81×10-3 = 5.27kN/m2
2-1-4-ekAs‘U
WWS = 0.075m×2250kg/m3×9.81×10-3 = 1.66kN/m2
R200 = 2.528kN
M200 = -0.260kN.m
M204 = 0.505kN.m
M300 = -0.802kN.m
2-2-cMeBaHbnÞúkyanþynþ
bnÞúkénkg;rfynþEdlenAcMGk½Ssnμt;favamancMgayesμI 1800mm BIGk½Skg;rfynþmYyeTAmYy
eTotkarKNna Truck KWdak;EkgeTAnigmuxkat;s<anedIm,IbegáItkMlaMgFMbMputKWcMgay 300mm BIépÞb:H
bgáan;éd eTAGk½SrfynþehIysMrab;karrkkMras;s<aneKdak;cMgay 600mm. enAkñúgkarKNna Lane KW
kMNt;yk 1Lane = 3600mm. TTwgénkarEbgEckbnÞúkrfynþ sgát;eTAelIkMrals<anKWkMNt;dUcrUbmnþ
xageRkam³
cMeBaHkugs‘ul 1140 + 0.833X = 1350mm
cMeBaHm:Um:g; ( + ) 660 + 0.55S = 1880mm
cMeBaHm:Um:g; ( - ) 1220 + 0.25S = 1780mm
épÞb:Hénkg;rfynþeKsnμt;ykragCactuekaNEkgEdlmanTTwgesμI 510mm nigRbEvg L kMNt;
tamrUbmnxageRkam :
L = 2.28γ(1+IM/100)P (1)
γ : emKuNesμI 1.75
IM : CapleFobPaBdabDINamicnigPaBdabsþáaTic
Component IM (%)
Deck joints, all limit states 75
All other components
Fatigue and fracture limit states 15
All other limit states 33
bnÞúkDINamicEdlGnuBaØat : IM = 33%
P : bnÞúkkg;rfynþesμI 72.5 KN
(1) L = 2.28×1.75× (1+33/100) ×72.5 = 385mm
dUecñH épÞb:Hénkg;rfynþKW (510×385)mm 2
Mz.j [kN-
Ggát; Mz.i [kN-m] Mz.pos [kN-m]
m]
tMN Fy [kN]
1 0.000 0.000 0.000 200 16.217
2 0.000 20.731 -29.248 300 109.529
3 -29.248 18.035 -6.741 400 23.049
4 -6.741 1.685 1.685 500 -4.555
5 1.685 1.685 0.000 600 0.759
6 0.000 0.000 0.000 0.000 0.000
M300 = -(1.2×29.248)/1.78 = -19.718kNm
3-karKNnaPaBFn;kMNt;
ηΣγiQi ≤ φRn
ηΣγiQi = η[γpDC+γpDW+1.75(LL+IM)]
Qi : bnÞúkEdleFVIGMeBI
γI : Statistically basded load factor.
φ : Statistically based resistance factor.
Rn : Nominal resistance.
η : Load modification factor, is the load factor that takes into account the
ductility, redundancy and operational importance of the bridge and For all non-strength limit
vaRtUv)ankMNt;tamrUbmnþxageRkam³
states =1
η = ηDηRηI ≥ 0.95
ηD : esμI 0.95 sMrab;karKNnaEdkdl;PaByar
ηR : esμI 1.0 sMrab;TMrsamBaØ
ηI : esμI 1.0 sMrab;s<aneRbIR)as;Fmμta
η = 0.95×1.0×1.0 = 0.95
DC bnÞúkefréneRKOgbgÁúMkMral
:
DW :bnÞúkefrénekAs‘U
LL :bnÞúkGefryanynþ
IM :bnÞúkrMjr½ IM = 33% énbnÞúkGefryanynþ
M M M300 R200
RbePTbnÞúk kN.m
200
kN.m
204
kN.m kN
kMrals<an 0.000 1.883 -2.934 4.254
M200 = -0.95[1.25(3.911+2.328)+(1.5×0.260)+1.75(16.760+5.531)]
= -44.838kN.m
M204 = 0.95[(1.25×1.883)-0.9(1.899+1.131)+(1.5×0.505)+1.75(18.273+6.030)]
= 40.768kN.m
M300 = -0.95[(1.25×2.934)-0.9(1.117+0.665)+(1.5×0.808)+1.75(19.718+6.507)]
= -46.711kN.m
eyIgeXIjfam:Um:g;EdlmansBaØa (-) esÞIrEtesμIKñaKWedaysarkarykRbEvgkugs‘ulesμI 0.4S .
4-karKNnasésEdk
M U , b, d , f y , f c'
MU
RU =
bd 2
f c' 2 RU
ρ = 0.85 1 − 1 −
fy 0.85φf c'
No ρ ≤ ρ ≤ ρ Yes A S = ρ bd
Change Section min max
4-1-karKNnasésEdkcMeBaHmU:m:g;viC¢man
RU = 2.02200MPa
ρ = 0.00589
ρ min = 0.00350
ρ max = 0.02397
AS − Posit = 836.112mm2/m = 0.836112mm2/mm
f y db
lhd = = 281.6mm
4.15 × f c'
φ = 0 .7
ldh = lhd × 0.7 = 197 .12 mm
6 d b = 96 mm
srubbrimaNEdkesμI (17.12× 54) = 925kg
4-2- karKNnasésEdkcMeBaHmU:m:g;mansBaØadk
RU = 1.89500MPa
ρ = 0.00550
ρ min = 0.00350
ρ max = 0.02397
AS − Posit = 863.535mm2/m = 0.863535mm2/mm
l dh = l hd × 0.7 = 148 mm
6d b = 72mm
mg: emKuNEbgEckbnÞúkeTAelIFñwm
SI : bnÞúkmYy Lane (Fñwmkñúg)
M : m:Um:g;
Page -10- Reinforced Concrete T-Beam Bridge Design
ម ទយល័យសំណង់សីុ ល ស្វកមមសំណង់ ពន
S : KMlatFñwm = 2220mm
L : RbEvgs<an = 12000mm
tS : kMras;kMrals<an = 190mm
Kg : )a:raEm:RtPaBrwgtambeNþays<an (mm)
Kg = n( Ig + eg2A )
n : pleFobm:UDul ( E /E ) = 1
girder deck
Ig : m:Um:g;GIuEnsIuénFñwm = 10777340833mm 4
eg : cMgayBIrTIRbCMuTMgn;FñwmmkTIRbCMuTMgn; = 430mm
A : muxkat;Fñwm = 288100mm 2
krNIbnÞúkBIr Lane
mg MME = e × mg MMI
de
e = 0.77 + ≥1
2800 e =1
d e = 940 mm − 380 mm = 560 mm
mg MME = 0.668
5-2-2-emKuNsMrab;kMlaMgkat;TTwg
5-2-2-1- cMeBaHFñwmkñúg
krNIbnÞúkmYy Lane
S
mgVSI = 0.36 + = 0.652
7600
krNIbnÞúkBIr Lane
2
S S
mgVMI = 0.2 + − = 0.774
3600 10700
dUecñHykemKuNbnÞúkBIr lane = 0.774 mkKNna .
5-2-2-2- cMeBaHFñwmxag
krNIbnÞúkmYy Lane (c,ab;bgVil )
mgVSE = 0.692
krNIbnÞúkBIr Lane
de
mgVME = e × mgVMI , e = 0.6 + = 0.787
3000
mgVME = e0.609
0.85m 0.85m
3m
MTruck = 0.85(35+145) + (3×145) = 588kN.m
2- Tandem
2.4m 3m
MTandem = (2.4×110) + (3×110) = 594kN.m
5-2-4-KNnakMlaMgkat;TTwg
1- Truck
0.221m
0.580m
0.938m
VTruck = (145×0.938) + (145×0.580) + (35×0.221) = 228kN
2- Tandem
0.938m 0.838m
0.938m
VLaneload = 0.5×0.938× (12 – 0.745) ×9.3 = 49.1kN
5-3-1-cMeBaHFñwmkñúg
bnÞúkkMral
= (0.2566+0.2788) × (1.11/2) ×2500×9.81×10-3×2 = 14.575kN/m
bnÞúkFñwm
= (0.86-0.19) ×0.43×2500×9.81×10-3 = 7.07kN/m
bnÞúkekAsU‘
= 0.075×2.22×2250×9.81×10-3 = 3.675kN/m
bnÞúkFñwmkat;TTwg Diaphram
kMNt;ykTTwg nigbeNþay Diaphram B = 200mm , H = 860mm
-3
= 0.2×0.86×2.22×2500×9.81×10 = 9.36kN
3m
0.5m
0.938m
MDiaphram1 = 9.36×3 = 28.08kN.m
VDiaphram1 = 9.36×0.5 = 4.68kN
taragtMélsrubm:Um:g;nigkMlaMgkat;TTwgrbs;Fñwmkñúg
RbePTbnÞúk TMgn; ( kN/m ) m:Um:g; ( kN.m ) kMlaMgkat;TTwg ( kN )
DC 21.645 389.61 129.87
DW 3.675 66.15 22.05
LL+IM N/A 639.37 272.34
5-3-2-cMeBaHFñwmxag
bnÞúkkMral
= 4.254kN/m
bnÞúkkugsu‘l
= 6.302kN/m
bnÞúkbgáan;éd
= 7.075kN/m
bnÞúkFñwm
= 7.07kN.m
bnÞúkekAsU‘
= 1.67×0.075×2250×9.81×10-3 = 2.764kN/m
bnÞúkFñwmkat;TTwg = 9.36/2 = 4.68kN
3m
0.5m
0.938m
MDiaphram2 = 4.68×3 = 14.04kNm
VDiaphram2 = 4.68×0.5 = 2.34kN
taragtMélsrubm:Um:g;nigkMlaMgkat;TTwgrbs;Fñwmxag
RbePTbnÞúk TMgn; ( kN/m ) m:Um:g; ( kN.m ) kMlaMgkat;TTwg ( kN )
DC 24.701 444.618 148.206
DW 2.764 49.752 16.584
LL+IM N/A 662.43 243.57
= 11 edIm
f y db
lhd = = 528mm
4.15 × f c'
φ = 0 .7
l dh = l hd × 0.7 = 370 mm
12 d b = 360 mm
srubbrimaNEdkesμI 3[(74.64 × 11) + (11.56 × 3)] = 2568kg
5-4-1-2-cMeBaHFñwmxag
dUckarbBa¢ak;xagelI
M = 1716.84kN.m < M = 4875.039kN.m G½kSNWk (NA) sßitenAkñúgsøab
U-Ext uft
karKNnaFñwmKWeFVItamkarKNnaFñwmctuekaNEkg .
RU = 7.1934MPa
ρ = 0.0248
ρ min = 0.0035
ρ max = 0.0240
AS 1= 7680.25mm2
ρ max f y 0.024 × 400
Ru − max = φρ max f y 1 − = 0.9 × 0.024 × 400 × 1 −
' = 7.013
1 .7 f C 1.7 × 30
AV f y 100.48 × 400
KMlatEdkkgFMbMput S max 1 =
0.345bW
=
0.345 × 430
= 271mm
cMgaydak;EdkkgelIkTImYy 4146mm
cMgaydak;EdkkgelIkTIBIr 2223mm
KMlatelIkTImYy 60mm
cMnYnEdkkgesμI 70kg
KMlatelIkTIBIr 270mm
cMnYnEdkkgesμI 8kg
srubbrimaNsésEdk 3(1.3Kg ×156 ) = 609kg
5-4-2-2-cMeBaHFñwmxag
dUc)anbBa¢ak;xagelI V = 607.34kN > φV = 239kN
U − Ext C
607.34
VS = − 281 = 433.5kN < 0.66 f C' bW d = 1158kN
0.85
eRbIGgát;p©itEdk 8mm A = 100.48mm
V
2
AV f y 100.48 × 400
KMlatEdkkgFMbMput S max 1 =
0.345bW
=
0.345 × 430
= 271mm
5-4-3-sésEdksMrab;Fñwmkat;TTwg Diaphragm
kMNt;ykesμIBak;kNþalsésEdkFñwm = 8026mm /2 2
= 4013mm2
eRbIGgát;p©itEdkbeNaþyesμI12mmkMNt;yk12edIm
(4013-1356.48) = 2657mm2
cMeBaHEdkkgeRbIGgát;p©it10mm cMnYnEdkkgesμI
2657/78.5 = 36kg KMlatesμI 200mm
srubbrimaNsésEdk
3[(9.1× 12 ) + (1.022 × 36 )] = 438kg
5-4-4-sésEdksMrab;bgáan;éd
bTdæan AASHTO-BARRIER
brimaNsésEdk
= (4.657×114) + (7.85×14)
= 641kg
ប្លងព
់ ្រងងសរៃសែដក
420mm 12000mm 420mm
10760mm
4 2 3
10
1
2
3
4
5
6
7
8
9
10
11
Diaphram Reinforcement
6-karKNnaeTAelItMélesdækic©
1-tMeLIgBum<Fñwm
brimaN ( Éktþa :100m ) = 1.165
2
eQIkMNl; m3
0.473 0.550 0.079 7 $137.624
eQICnÞl; m3
2.393 2.787 0.398 7 $696.857
srubrYm $1817.628
2-tMeLIgBum<Fñwmkat;TTwg diaphram
brimaN ( Éktþa :100m ) = 0.331
2
eQIkMNl; 3
m 0.473 0.156 0.078 2 $39.075
eQICnÞl; 3
m 2.393 0.791 0.396 2 $197.855
srubrYm $516.683
3-tMeLIgBum<kMral
brimaN ( Éktþa :100m ) = 1.290
2
eQIkMNl; m 3
0.280 0.361 0.072 5 $90.266
eQICnÞl; m 3
1.670 2.153 0.431 5 $538.374
srubrYm $1613.683
4-tMeLIgsésEdkFñwm
brimaN ( Éktþa :1t ) = 5.434
elxsMKal; kargarsagsg; smasPaBGnuvtþ karcMNay( $ )
Ékta bTdæan tMrUvkarsMrab;KMerag GnuvtþRbcaMéf¶ ryHeBl
AF.6154 tMeLIgsésEdkFñwm sMParH Blkmμ sMPar³nigeRKOgcRk
EdkmUl Kg 2856.0 15519.504 2586.584 6 $8535.727
eRKOgcRk
ma:sIunpSar 23KW evn 3.640 24 4 6 $120.000
CBaÚ¢nRtg; 3T evn -
eRKOgcRkepSg² % -
srubrYm $9265.166
5-tMeLIgsésEdk diaphram
brimaN ( Éktþa :1t ) = 0.438
elxsMKal; kargarsagsg; smasPaBGnuvtþ karcMNay( $ )
Ékta bTdæan tMrUvkarsMrab;KMerag GnuvtþRbcaMéf¶ ryHeBl
AF.6155 tMeLIgsésEdkFñwm sMParH Blkmμ sMPar³nigeRKOgcRk
EdkmUl Kg 2856.0 1250.303 1250.303 1 $687.666
eRKOgcRk
ma:sIunpSar 23KW evn 3.640 2 2 1 $10.000
CBaÚ¢nRtg; 3T evn -
eRKOgcRkepSg² % -
srubrYm $748.895
6-tMeLIgsésEdkkMral
brimaN ( Éktþa :1t ) = 2.904
elxsMKal; kargarsagsg; smasPaBGnuvtþ karcMNay( $ )
Ékta bTdæan tMrUvkarsMrab;KMerag GnuvtþRbcaMéf¶ ryHeBl
AF.6176 tMeLIgsésEdkkMral sMParH Blkmμ sMPar³nigeRKOgcRk
Edk Kg 2550.0 7405.212 2468.404 3 $4072.867
eRKOgcRk
ma:sIunpSar 23KW evn 2.808 9 3 3 $45.000
CBaÚ¢nRtg; 3T evn -
srubrYm $4494.453
7-cak;ebtugFñwm
brimaN ( Éktþa : 1m ) = 21.373
3
eRKOgcRk
ma:suInlay 250l evn 0.238 20 2 10 $130.000
srubrYm $3063.229
8-cak;ebtugkMral
brimaN ( Éktþa : 1m ) = 31.868
3
eRKOgcRk
ma:suInlay 250l evn 0.238 20 2 10 $130.000
srubrYm $4140.743
9-tMeLIgsésEdkbgáan;éd
brimaN ( Éktþa :1t ) = 0.641
elxsMKal; kargarsagsg; smasPaBGnuvtþ karcMNay( $ )
Ékta bTdæan tMrUvkarsMrab;KMerag GnuvtþRbcaMéf¶ ryHeBl
AF.6139 sésEdkbgáan;éd sMParH Blkmμ sMPar³nigeRKOgcRk
EdkmUl Kg 2550.0 1634.550 1634.550 1 $899.003
eRKOgcRk
ma:sIunpSar 23KW evn 2.800 2 2 1 $10.000
CBaÚ¢nRtg; 3T evn -
eRKOgcRkepSg² % -
srubrYm $1003.970
10-tMeLIgBum<bgáan;édelIkTImYy
brimaN ( Éktþa :100m ) = 0.188
2
eQIkMNl; m 3
0.373 0.070 0.070 1 $17.527
eQICnÞl; m 3
1.240 0.233 0.233 1 $58.345
srubrYm $230.537
11-cak;ebtugbgáan;édelIkTImYy
brimaN ( Éktþa : 1m ) = 2.631
3
eRKOgcRk
ma:suInlay 250l evn 0.238 2 1 2 $13.000
srubrYm $400.491
12-tMeLIgBum<bgáan;édelIkTIBIr
brimaN ( Éktþa :100m ) = 0.279
2
eQIkMNl; m 3
0.373 0.104 0.052 2 $25.991
eQICnÞl; m 3
1.240 0.346 0.173 2 $86.521
srubrYm $341.014
13-cak;ebtugbgáan;édelIkTIBIr
brimaN ( Éktþa : 1m ) = 2.404
3
eRKOgcRk
ma:suInlay 250l evn 0.238 2 1 2 $13.000
srubrYm $362.952
14-edaHBum<bgáan;éd
brimaN ( Ékta : nak; / m ) = 1.679
3
srub $12.000
15-edaHBumFñwmnigkMral
brimaN ( Ékta : nak; / m ) = 12.315
3
srub $264.000
16-RkalebtugekAs‘U
brimaN ( Ékta : 100m ) = 1.284
2
eRKOgcRk
ma:sIunRkal 130-140CV evn 0.063 1 1 1 $300.00
srubrYm $1892.477
taragRbtiTinkargarsMrab;sagsg;
ryHeBl tMél ( $ ) tMrUvkarBlkmμ/éf¶
l-r elxsMKal; eQμaHkargar Ékta brimaN TMnak;TMngkargarmun
éf¶ sMPar³nigeRKOgcRk Blkmμ/éf¶ nak;
1 AF.8111 tMeLIgBum<Fñwm m2 116.507 7 $1474.628 $49.000 14