Breakage of 2 sets of strands during tendon stressing work
Item
1. Requirement of System Standards: Noncompliance of Procedure at site
122018-SPAC-T-CO-ITP-0001 Tank Post Tensioning Works Quality Control plan
During stressing of vertical tendon V-236 Tank 1, SPAN was process stressing work with out
SPCC QC join witness inspection.
Therefore, SPAN is strongly requested to take necessary actions below and mitigation follow ITP
1) To investigate the root causes of this problem
2) To perform any inspection mush had SPCC QC to join inspection hold point all time
(see attachment)
Cause Analysis:
Responsible Unit
Corrective Action Request (CAR) Page 2 / 3
Reason:
action
Signed by Issuer:
Reason:
Attachment: