Corrective Action Request (CAR) Page 1 / 3

Name of Responsible Unit (Project No.): Stephane DESAMBROIS (PTTLNG 012/2018)

CAR No.: 122018-SPCC-T-CO-CAR-0476 Olivier Digitally signed by


Olivier GRIERE

Responsible Unit Chief(Signature): Olivier GRIERE GRIERE Date: 2021.08.09


10:56:38 +07'00' Date: 09 August 2021
Construction Manager Issued by (Signature): Jose Joaquin Bosch Villar

Work
Breakage of 2 sets of strands during tendon stressing work
Item
1. Requirement of System Standards: Noncompliance of Procedure at site
122018-SPAC-T-CO-ITP-0001 Tank Post Tensioning Works Quality Control plan

2. Description of Non-conformance or Undesirable Situation

Date of Incident : 8 August 2021


Location : Tank 1 Vertical tendon V-236
Issuer

During stressing of vertical tendon V-236 Tank 1, SPAN was process stressing work with out
SPCC QC join witness inspection.

Therefore, SPAN is strongly requested to take necessary actions below and mitigation follow ITP
1) To investigate the root causes of this problem
2) To perform any inspection mush had SPCC QC to join inspection hold point all time
(see attachment)

Due Date to Reply in Writing: 16 August 2021

Cause Analysis:
Responsible Unit
Corrective Action Request (CAR) Page 2 / 3

Corrective Action/Completion Date:

Signed by Unit Chief:

* Risk Assessment of Corrective Action: N/A

Signed by Unit Chief:

Corrective Action: □ Verified OK □ Ineffective


effectiveness of corrective

Review Corrective Action


Verification the

Reason:
action

Signed by Issuer:

Corrective Action: □ Accepted □ Not accepted


Verification the effectiveness
of corrective action

Reason:

Signed by Chef of Issuer:


Corrective Action Request (CAR) Page 3 / 3

Attachment: