Calculations 

sheet based on document 122018‐SPCC‐T‐CV‐CAL‐0015 Thailand

LNG TANK

Ultimate 
Unit  No of  Tendon  Strand cross  Stress Average stress  Theoretical 
Sequence Tendon no. Location Radius strengh  Force E‐modulus elong ‐5% elong +10% SPAN Cab ref DELTA
size strands length sectional area (fp,max) in tendon elongation
( fpu )
SLAB 1 1B; 1D; 1A; 1C Base slab outer tendon 6‐19 19 47.71 m 156.53 m 1860 MPa 150 mm2 1488 MPa 4241 kN 1156 MPa 195000 MPa 928 mm 882 1021 1017 mm 1B 89 mm
2 2B; 2D; 2A; 2C Base slab inner tendon 6‐19 19 47.46 m 155.82 m 1860 MPa 150 mm2 1488 MPa 4241 kN 1116 MPa 195000 MPa 891 mm 847 981 1017 mm 1B 126 mm
H‐91‐1, H‐93‐1, H‐95‐1 860 996 983 mm H‐91‐1 77 mm
5 6 upper Horizontal wall cables, ring beam not included 6‐19 19 46.545 m 151.22 m 1860 MPa 150 mm2 1488 MPa 4241 kN 1168 MPa 195000 MPa 906 mm
H‐92‐2, H‐94‐2, H‐96‐2
6 Concreting of roof
WALL ‐ H Horizontal wall tendons 9.2 m to 44.7 m 860 996 983 mm H‐91‐1 77 mm
7
6‐19 19 46.545 m 151.22 m 1860 MPa 150 mm2 1488 MPa 4241 kN 1168 MPa 195000 MPa 906 mm
8 Horizontal tendons in ring beam
321 372 328 mm V2 ‐10 mm
9 6‐19 19 50.52 m 1860 MPa 150 mm2 1435 MPa 4090 kN 1305 MPa 195000 MPa 338 mm
WALL ‐ V
Vertical tendons min 11m away from axis of temporary opening
321 372
10 6‐19 19 50.52 m 1860 MPa 150 mm2 1435 MPa 4090 kN 1305 MPa 195000 MPa 338 mm
328 mm V2 328 mm
11 Concreting of temporary opening
321 372 328 mm V2 ‐10 mm
12 Vertical tendons inside of temporary opening 6‐19 19 50.52 m 1860 MPa 150 mm2 1435 MPa 4090 kN 1305 MPa 195000 MPa 338 mm

Horizontal wall tendons  +3.50 m to +8.90 m 860 996 983 mm H‐91‐1 77 mm


13 6‐19 19 46.545 m 151.22 m 1860 MPa 150 mm2 1488 MPa 4241 kN 1168 MPa 195000 MPa 906 mm

50.518