Professional Documents
Culture Documents
GI METAL
L 3
LONGSPAN ROOF RIB TYPE
PRE-PAINTED GI METAL
E 4 RAIN ROOF GUTTERS
PRE-PAINTED GI METAL
G
E
N
7
8
SLIDING TINTED
GLASS WINDOW
ALUMINUM METAL
RAILINGS
4 3 2 1
12 STRETCHER
D BRICK BOND
13 PERMANENT CONCRETE
RAMPS
2.08m 3m 3m
ROOF APEX 1
3
1.7m
ROOF BEAM
4
2ND FLR. CEILING LINE0.5m
7
2.7m
8
2ND FLOOR LINE
1ST FLR. CEILING LINE0.5m
12
2.7m
8
RIGHT-SIDE ELEVATION
SCALE: 1:100 MTS
PROPONENTS: CONSULTANT: PROJECT TITLE: PAGE CONTENT:
DATUGAN, RECCA D. A FEASIBILITY STUDY OF A PROPOSED 3
REPISO, JOHN CEDRIC Y.
SECTION: BSCE 4B:
ENGR. RESURRECCION GARROTE TWO-STOREY HACIENDA MULTIPURPOSE
BARANGAY HALL
RIGHT SIDE ELEVATION
4