You are on page 1of 1
TABLESIV Contract Design Products US. Naval and Government Sips) ‘Sep specication [HVAC bad arassand dig rena wa, lf ropuion manne nng, ines ding Nenuiaioe a a consiceing systems ARERR ae performance Appendage rain _— sap aaa Suck gastow mays Geeral argent (autour pole, PIRES aps inboard poll devks aod hs)” Diagrammatic sangeet ofl piping Paton of ot sets of ag ly sooamoee = ‘Capacity plan ‘Fite control diagram by decks and profile Availability analysis (Ao) “Mechanical systems arrangemepts, for seinemeston wapummet get ieh xomt Mean ratiarsoett Spey ren oratisy — Cres Training Plan ce lnigcivisnent —«agerememmsGering. Tarn —— pene S coma parame hei rece gute bt Semmes cy ‘ete. Chon dates" gn sections, deckhowse) working spore sangements Inert commarication sem digram _ropubwonengins diesel generators, ary roam gears Tats pot mcr wee Maser Fens 1) ‘option an aay acter Moat ant Mestre ‘repenaerapie crs, Peay apni comet MM coon aed) Feat nt atm cen ‘roping genet tn codons —— ‘Propeller design ‘Ploodabte length curves Initial regulatory body review ‘ea ad ass “man ay bk alloy pan "acc power and gh systems Damage savy ana ‘Budget cont ist estimated wiht of ‘om i apa {aire ye eed mately a Fat cura analysis dodanie rel tet esas, fo family cot cde) Navan ye gram ‘snp usice epekropen rio TABLES Fanconi Design Pode ine aad poe ing ar Gent armponen Conprmetani SHER! Tecew aA ang Anse tang magnet ova pre Mocing aang TF ace bees |Lie-saving equipment arrangement : 1 pig rien eget ‘hydrostatics, cross curves of oer ‘Blectrical equipment and installation st, cing mig pasion Ric Spectoaomsrrsy Sasa (Block arrangement and ist “Advanced Matetial Ordering (AMO) ‘Switchboard drawings: Frame bpm ied sy tae Lite Pe cee opt Sota Mock dings ANNES set Lt rch a Maj fnmion ngs ent etn eo (FT) Weling an Macnee and Pine Adve Matera Orig AMO) ipa igs Mackay anngemen toe Aut weighs comers ad ck Staing genet ike oe Sethe pest eng nd ring ma Machin span toch HVAC agra nd gue is oe ings conan rare IWACinmion ede neooeointinee Machin ping syen dagranmatcs HVAC astm iy ithe caieroageer tect tec pecacanem 15) Samay achcoemgstewse Dees Adve Maal Onbrag AM) ‘Summary hal nsulation schedule ne pce meceingy pe tists i Mochi an ena ee ante Production Planing, Laos ae Uae mins ay sn ane mage Mechs mon gts — Accommadation arangemneet ‘Purchase technical specifications (PTS) Block outfiting and erection sched ‘Swsring gear sangoment ‘Advanced mari ordering (AMO) Ze oiting sche Rr ar stock arangemet tas “Bess and Tal sche

You might also like