TABLESIV Contract Design Products US. Naval and Government Sips)
‘Sep specication [HVAC bad arassand dig rena wa, lf ropuion manne nng,
ines ding Nenuiaioe a a consiceing systems ARERR ae performance
Appendage rain _— sap aaa
Suck gastow mays
Geeral argent (autour pole, PIRES aps
inboard poll devks aod hs)” Diagrammatic sangeet ofl piping Paton of ot sets of ag
ly
sooamoee =
‘Capacity plan ‘Fite control diagram by decks and profile Availability analysis (Ao)
“Mechanical systems arrangemepts, for seinemeston
wapummet get ieh xomt Mean ratiarsoett Spey ren
oratisy — Cres Training Plan
ce lnigcivisnent —«agerememmsGering. Tarn
—— pene S
coma parame
hei rece gute bt
Semmes cy ‘ete. Chon dates" gn
sections, deckhowse) working spore sangements
Inert commarication sem digram _ropubwonengins diesel generators,
ary roam gears Tats pot mcr wee
Maser Fens 1)
‘option an aay acter Moat ant Mestre
‘repenaerapie crs, Peay apni comet MM
coon aed) Feat nt atm cen
‘roping genet tn codons ——
‘Propeller design ‘Ploodabte length curves Initial regulatory body review
‘ea ad ass “man ay bk alloy pan
"acc power and gh systems Damage savy ana ‘Budget cont ist estimated wiht of
‘om i apa {aire ye eed mately a
Fat cura analysis dodanie rel tet esas, fo family cot cde)
Navan ye gram ‘snp usice epekropen rio
TABLES Fanconi Design Pode
ine aad poe ing ar
Gent armponen Conprmetani SHER!
Tecew aA ang Anse tang magnet
ova pre Mocing aang
TF ace bees |Lie-saving equipment arrangement
: 1 pig rien eget
‘hydrostatics, cross curves of oer ‘Blectrical equipment and installation
st, cing mig pasion Ric Spectoaomsrrsy Sasa
(Block arrangement and ist “Advanced Matetial Ordering (AMO) ‘Switchboard drawings:
Frame bpm ied sy tae Lite Pe cee opt
Sota Mock dings ANNES set Lt rch a
Maj fnmion ngs ent etn eo (FT)
Weling an Macnee and Pine Adve Matera Orig AMO)
ipa igs Mackay anngemen toe
Aut weighs comers ad ck Staing genet ike
oe Sethe pest eng nd ring ma
Machin span toch HVAC agra nd gue
is oe ings conan rare IWACinmion ede
neooeointinee Machin ping syen dagranmatcs HVAC astm
iy ithe caieroageer tect tec pecacanem 15)
Samay achcoemgstewse Dees Adve Maal Onbrag AM)
‘Summary hal nsulation schedule ne pce meceingy pe tists
i Mochi an ena ee
ante Production Planing,
Laos ae Uae mins ay sn
ane mage Mechs mon gts —
Accommadation arangemneet ‘Purchase technical specifications (PTS) Block outfiting and erection sched
‘Swsring gear sangoment ‘Advanced mari ordering (AMO) Ze oiting sche
Rr ar stock arangemet tas “Bess and Tal sche