Serial No: 9416
ssnlgeere
status: ‘Submitted
viInfo
Job Title: MUNG 3- MODULE 7 & 8 , UNIT STAB 5 ,SLUG CATCHER 3 FOR DOSH
SHUTDOWN 2015:
Bolting & Unbelting 8 Servicing activities
Revision Number: 0
Date Created 22/03/2015
owner: PDD/6
Author:
Job Hazard Analysis Members
Job Hazard Analysis Members Chal Set Lee (PLM/MLNG); Jedidiah Johnny (PLM/MLNG); M Hafiz Maamor
(PLM/MLNG); Chong Wei Lung (PLM/MLNG); Larry Albert Jaiak (PLM/MLNG);
Rall B Sebil (PLM/MLNG); Pawie Ak Jami (PUM/MLNG); Zainuddin Lil
(PLM/MLNG); Sigo Sadok-llyssa B Abdullah (PLM/MLNG)
¥ Contractors
Contractors: AMALGAMATED PLANT ENG.SDN.BHD.
\WELFIELD SERVICES SDN.BHO.
RAKANNUSA ENG SERVICES SDN.
Worksheet
Job Safety Analysis Worksheet
No|Description ]Potential hoor [Control Measure Action Party
lof Job Step |hazard/risk what might
be harmed
1. |Cleaning, de-|-injurydueto [People _|- To cover the sharp [Work Leader
rust and _|sharp edges while ledges
remove —_|doing manual wirel
lexisting paint|brushing/cleaning | To wear cotton /
lusing wire (sharp corroded \semi leather hand
brush, parts and loose \gloves
scrappers & |rust).
other small |. Dust and flying |People |: To wear dust mask |Work Leader
hand tools. | particles while type NOS
doing wire
brushing/cleaning| |. To wear face shield
|: Working at People ls To use full body — /Work Leader
height. harness with double
lanyard and 100%
lhooked up when
lworking above 2
imeters (HARNESSS|standard CE1019
EN335) (LANYARD
STANDARD EN361}
|e Personnel to
lattend WAH training
land possess valid
|WAH card, sticker
ls To apply 3 point
lcounted while
jascending
descending
[To use "Ready to
luse "scaffold.
|: Material fall
ifrom height.
People
Asset
> Materials to be
secured by latching
lon existing work
platforms.
l* Only for immediate|
installations
materials to be
mobilized to site and
Iminimizing material
placed at height.
'» Removed material
ho be lowered down
immediately while
|work progress,
{To barricade work
larea & display
warning sign
“Unauthorized Entry
is not allowed” and “
[Beware of Falling
Objects
Work Leader
Bolting and
lunbolting for!
(2) Alternate
lunbolting,
land bolt and
nut servicing
Spark
People
Asset
To use non spark
tools for highly
iflammable gas area
| Clear all source of
ignition,
Work
ISupervisor/Wor
Leader
Falling object
Fall down of
People
Asset
J Secure tools with
lanyards.
|Work
|Supervisor/Work
Leader|tools/hand tools
land small
materials.
ls Use canvas sheet
lunderneath,
\e To store tools in
lheavy duty bag
le Loose tools
keep in container,
Barricades work
larea at ground
level (Falling
lobject signage)
Exposed to
chemical vapor
(anti-rust &
lubricant spray)
People
- SDS shall be
lavailable at site
| workers to wear N-
195 mask
To wear semi-
leather glove
lWork Leader
ITripping hazards
People
+ Remove all
lunnecessary tools
land materials from
work area.
- Hoses to be laid
properly
Work
\Supervisor/Wort
Leader
Noise
People
To Wear ear
Iprotection (ear plug,
lear muff etc.)
[Work Leader
Working at height
People
To use full body
harness with double
lanyard and 100%
lhooked up when
[working above 2
meters (HARNESSS
|standard CE1019
IEN335) (LANYARD
STANDARD EN361)
i# Personnel to
lattend WAH training
land possess valid
WAH card, sticker
Work Leader|» To apply 3 point
counted while
ascending
descending
|To use "Ready to
luse scaffold.
Sharp edges People Workers to wear —_|Work Leader
Isemi leather glove
Slip, Trip and fall [People |- Maintain good [Work Leader
housekeeping at all
|time
|: Materials must be
Jarranged in orderly
& properly manner.
- Work materials
must not block road
lor access way.
| To clear
surrounding debris
lat each end of
Iworking day.
| To lay welding
lcables properly so
ithat it does not
linterfere when
lworking on scaffold /|
platform
Scheduled waste [Environment|-Segregate non- [Work Leader
lscheduled waste and
Ischeduled waste
properly
To declare
Ischeduled waste
lwith ENV to disposal
| All scheduled waste)
material to be
labelled
GENERAL NOTES:
1. Conduct Too! Box Talk prior to start work.
2. Do GOOD housekeeping at all times.
3, Do not block Access Way inside the Plant.EIMEERGENCY RESPONSE PLAN:
In case of any emergency please contact any of
1, Operation Shutdown Radio Channel
2. Operation Process 3 $$ Radio Channel.
the following:
3, Industrial Clinic at 086-853911 or Ext. 3912 for any personnel emergency.
Reviewed by
tonatre A Le
,
eo
Name CONTRACTOR: paore rear : JOPS/o. Hi he
SUPER\ : |B 28.
fama iP 5 u hbk hk Cfo)
mauace B. : 3453 Bbq we
Armwe 2 Aoomer| 3 8m duale
be 3 Sj |
mel efalic| hie [om [nial saypaer
t
cmon [| ahh
Name WICCSon?| walks ANE
Weed) dereees
Hse Yee
Date ar/ssis| »//s