TATA
TATA PROJECTS
Lifting Plan
Simplify.Create
Site / Project Site
Bres
Date= OZ Jol [zea
Unloading/Liting Location:- >, =
Sheet
‘Materials part mark/Desc
Load Details / Crane Detai
Piling
iad indude Load Dimensions
Maximum Materaltosd~ CT
tau
oH
‘Maximum Length ~
Maximum Width —
Design hook height: JO) H
Maximum hook height: LH,
‘Type of Crane &
configuration/mode:
Crowle Crome
BST xg
Gross lift weight/max. hook load:
‘Maximum radius SW at this radius:
Design itt conditions (Specify max.
Wind velocity allowed in KMPH}:
When lifted: Actual - Accessories \SH { Wom Vo-m|
ST Current Wind (KOMP):
Total toad~ Swat this radius other information: Signal Man /
Bankeman
NA GTLwST noble
“SAFETY MEASURES TO BE CONSIDERED
age eed Thing apenas cqipment eas
go Oe cats ¢
PCa Rade ed iv ane sity PPro
sapetent and efile personnel Tackng protein Wosaifing
Jo Conrrerond sie Piper oes A? suai ads rperion
IP? rorecoecsremovectomiss | conrect 6 Pron ives requires
Working space adequate and Tecan Tor
cP __rearorthreaured 7 obstactea ey rose Sa
mergency/rescue plans
vironment: visibity/wind speed
JP trained/competent personne!
|
ef Seal an deployed fortis atty
“Soft barricade shouldbe aranged
~
before commencing the athity
ommuricatons (sed supervision
of and seral wit gs nd iste)
Supervisor / Engineer
‘Signal Man,
(Operator
Riggers
Flag Man
Man Power Engaged
@ scanned with OKEN ScannerLifting Plan
Tools e racktes:
r. 9¢ of Tools & Identification | _ Diameter of Wire Condition _
vo.| "™raaie | “numer” [Pnefatene | sm) xyucron | FM
1. |D-Ghawe | Tiutae = 9-5T |a}os-2a]| OK
le. y Thu:30 = OST [ef-s] OK
3 lysine Rafe Sing | M1S—208, |"annn aM (27 __p}os-a| oft
a 4 See eo heen GH YT [Mews-23|_ Oo
L Beil feohtar GH ut hees-a3] ow
A SRE MESS Feotibn GH YT M-og23] eK
L
@ scanned with OKEN ScannerLifting Plan
Lifting Material Sketch:
1. Lifting of Sheet Pile & Fixing
Boom Length Radius SWL [Material Weight | Load %
254 aM \qut. usar | 28s
2. Lifting of Vibro Hammer & Fixing
Material Weight | Load %
, “é a
Oy Sos
Name & Sign Name & Sign__| Namo &
Site Execution | Aron-in charge | P&M _
@ Scanned with OKEN Scanner