You are on page 1of 4

A B C D E F G H

1 1

2 2

3 3

4 4

5 5

6 6

7 7

DATE REV NO REVISION HISTORY DRAWING NO - CLIENT - DESIGNED & MANUFACTURED BY

- - -
- - -
TITLE SPECIFCIATION CONSULTANT - RAYOTECH
PROJECT - ECOSYSTEMS &
8 QTY DATE SHEET DIM. SCALE DRAWN CHECKED 8
SOLUTIONS
CUSTOMER BLUE AIR SOLUTIONS PVT. LTD. - 31-05-2022 01 - 04 MM NTS SR VCR
A B C D E F G H
A B C D E F G H

INCOMING
1 400 200 3ɸ+N,415VAC,50HZ 1

2 KW x3 Heater Panel MCB


32A,FP
2 %
2
* R1 RST

- T1 PRG
SET
- H1 PRG
SET

ON OFF

3 400 H1 H2 TS1 400 3

CONTACTOR

CONTACTOR
TP,POWER

TP,POWER
ON OFF

C1 C2
H1 H2 TS1 12A 12A
4 4

FRONT VIEW SIDE VIEW


5 5
1.5 KW 1.5 KW 1.5 KW
400 HEATER HEATER HEATER

INDEX
6 INDICATION LIGHTS 6
200 DETACHABLE H1 HEATER ON INDICATION (RED)
GLANDPLATE
H2 HEATER OFF INDICATION (GREEN)
SWITCHES
QUANTITY : 1 NO TS1 ON/OFF ( TOGGLE SWITCH)

7
BOTTOM VIEW WITH INSTRUMENTS 7
GLANDPLATE DETAILS T1&H1
DIGITAL HUMITY&TEMPERATURE
CONTROLLERS

DATE REV NO REVISION HISTORY DRAWING NO - CLIENT - DESIGNED & MANUFACTURED BY

- - - HEATER PANEL GENERAL ARRANGEMENT


- - -
TITLE
DIAGRAM
CONSULTANT - RAYOTECH
8
PROJECT - ECOSYSTEMS & 8
QTY DATE SHEET DIM. SCALE DRAWN CHECKED
SOLUTIONS
CUSTOMER BLUE AIR SOLUTIONS PVT. LTD. - 31-05-2022 02 - 04 MM NTS SR VCR
A B C D E F G H
A B C D E F G H

415V,3ɸ+N,50Hz,4 WIRE
1 INCOMING 1
TB1 2 3 4

6A,SP
R Y B N MCB

R1 K1 K2 K2
K2
9 10
2 6A,FUSE AHU 2
INTERLOCK K3 K3
FP MCB N2
8
K2 SZH SZT

ROD 21
THERMOSTAT 22
K4 K6
N
N 1 K3
3 1 3
TOGGLE TOGGLE
N1 SWITCH1 SWITCH2
(LOCAL) (LOCAL)

R1

4 4
R N Y N B N K5 K7
1 1 1 1 1 1

K2
C1 C2
TP,POWER
5 CONTACTOR C1 C1 C2 C2 5

THERMAL
OVERLOAD K8 K9 K10 K11
RELAY

R N Y N B N
2 3 2 4 2 5 K3
6 6

RH T C1 C2
N2

TB5 6 7 TB 8 9 TB10 11 SUBZERO H1 H1 H1ON H1OFF H2 ON H2 OFF


THERMOSTAT CONT. CONT. LAMP LAMP LAMP LAMP
1ɸ,2WIRE, 1ɸ,2WIRE, 3ɸ+N,4WIRE,
HEATER 1&2 HEATER 3&4 HEATER 5&6
7 NOTE:- WIRING SHOWN IS FOR 7
230VAC COMPONENTS

DATE REV NO REVISION HISTORY DRAWING NO - CLIENT - DESIGNED & MANUFACTURED BY

- - -
TITLE HEATER WIRING SCHEMATIC DIAGRAM CONSULTANT - RAYOTECH
- - -
ECOSYSTEMS &
PROJECT -
8 QTY DATE SHEET DIM. SCALE DRAWN CHECKED SOLUTIONS 8

CUSTOMER BLUE AIR SOLUTIONS PVT. LTD. - 31-05-2022 03 - 04 MM NTS SR VCR


A B C D E F G H
A B C D E F G H

1 1
NOTE:- WIRING SHOWN IS FOR
230VAC COMPONENTS

R 1
SUBZERO T.CTRL. 1 Y 2 3ɸ+N,4WIRE
INCOMING
2 B 3 2
PROBE 230V SUPPLY RTD INPUT
1 2 3 5 6 7 8 N 4

R1 5
2ɸ,2WIRE
TM1 TM2 K2 N2 K4 K7 HEATER 1
N1 6

3 Y1 7 3
2ɸ,2WIRE
FROM AHU CTRL. FROM HEATER2 CTRL.
N1 8 HEATER 2
19 20
TO SZ-T75
B1 9
2ɸ,2WIRE
N1 10 HEATER 3

4 N 11 NEUTRAL 4

K2 12 AHU
13 INTERLOCK
K3

SUBZERO H.CTRL 2 K10 14 ROD


15 THERMOSTAT
H1
5 RH INPUT 230V SUPPLY RTD INPUT 5
RH1 16
1 2 3 3 5 10 11 12
RH2 17 HUMIDITY
PROB
RH3 18
RH1 RH2 RH3 K2 N2 K4 K7
TM1 19
TM2 20 TEMPERATURE
6 PROB 6
FROM AHU CTRL. FROM HEATER1 CTRL. TM3 21
16 19 18

7 7

DATE REV NO REVISION HISTORY DRAWING NO - CLIENT - DESIGNED & MANUFACTURED BY

- - -
TITLE
DOL STARTER WITH HEATER
CONSULTANT - RAYOTECH
- - - WIRING SCHEMATIC DIAGRAM
ECOSYSTEMS &
PROJECT -
8 QTY DATE SHEET DIM. SCALE DRAWN CHECKED SOLUTIONS 8

CUSTOMER BLUE AIR SOLUTIONS PVT. LTD. - 31-05-2022 04 - 04 MM NTS SR VCR


A B C D E F G H

You might also like