Date Shift Engineer Name

01.01.2021 A Deepak Chand

Date Shift Engineer Name

01.01.2021 B Sanjay Garg


Ajaya kumar

01.01.2021 C

Gajendra Pandya

Date Shift Engineer Name


02.01.2021 A Deepak Chand

Date Shift Engineer Name

B
02.01.2021 Sanjay Garg
Ajaya kumar

02.01.2021 C

Anurag Chowdhury
Anurag Chowdhury

Date Shift Engineer Name

03.01.2021 A Gajendra Pandya

Date Shift Engineer Name

B Sanjay Garg / Deepak


03.01.2021
Chand
Ajaya kumar

03.01.2021 C

Anurag Chowdhury
Date Shift Engineer Name

04.01.2021 A Gajendra Pandya

04.01.2021 B Anurag Chowdhury


Sanjay Garg

Deepak Chand

Date Shift Engineer Name

05.01.2021 A Gajendra Pandya


05.01.2021 A Gajendra Pandya

Ajaya kumar

05.01.2021 B

Anurag Chowdhury

Shift Engineer Name


Sanjay Garg

05.01.2021 C

Deepak Chand

06.1.2021 A Anurag Chowdhury


06.1.2021 A Anurag Chowdhury

06.1.2021 B Ajaya kumar


C
07.01.2021 Gajendra Pandya

Date Shift Engineer Name

08.01.2021 A Deepak Chand

Date Shift Engineer Name


08.01.2021 B Sanjay Garg

Date Shift Engineer Name

Ajaya kumar

08.1.2021 C
08.1.2021 C

Gajendra Pandya

Date Shift Engineer Name

09.01.2021 A Deepak Chand

Date Shift Engineer Name


09.01.2021 B Sanjay Garg

Ajaya kumar

09.01.2021 C
09.01.2021 C

Anurag Chowdhury

Date Shift Engineer Name

10.01.2021 A Gajendra Pandya

Date Shift Engineer Name

Sanjay Garg

B
10.01.2021
Sanjay Garg

10.01.2021 B

Deepak Chand

Ajaya kumar

10.01.2021 C

Anurag Chowdhury
Date Shift Engineer Name

11.01.2021 A Gajendra Pandya

Date Shift Engineer Name

11.01.2021 A Deepak Chand


Date Shift Engineer Name

Sanjay Garg

11.01.2021 C

Anurag Chowdhury

Date Shift Engineer Name


12.01.2021 A Gajendra Pandya

Ajaya kumar

12.01.2021 B

Anurag Chowdhury
Date Shift Engineer Name

Sanjay Garg

12.01.2021 C

Deepak Chand

13.01.2021 A Anurag Chowdhury


13.01.2021 A Anurag Chowdhury

Date Shift Engineer Name

Sanjay Garg

B
13.01.2021

Gajendra Pandya
Gajendra Pandya

C Ajaya kumar / Deepak


13.01.2021
Chand

14.01.2021 A Anurag Chowdhury


14.01.2021 A Anurag Chowdhury

14.01.2021 B Ajaya Kumar

14.01.2021 C Gajendra Pandya


14.01.2021 C Gajendra Pandya

Date Shift Engineer Name

15.01.2021 A Sanjay Garg


Date Shift Engineer Name

B
15.01.2021 Deepak Chand

15.01.2021 C Ajaya kumar /


Gajendra Pandya
15.01.2021 C Ajaya kumar /
Gajendra Pandya

Date Shift Engineer Name

16.01.2021 A Deepak Chand

Date Shift Engineer Name

B
16.01.2021 Sanjay Garg
B
16.01.2021 Sanjay Garg

Ajaya kumar / Anurag


Chaudhary

C
16.01.2021
17.01.2021 A Gajendra Pandya

Ajaya kumar

17.01.2021 C

Anurag Chowdhury
Anurag Chowdhury

Date Shift Engineer Name

18.01.2021 A Gajendra Pandya

Date Shift Engineer Name

18.01.2021 B Deepak Chand


Date Shift Engineer Name

Sanjay Garg

C
18.01.2021

Anurag Chowdhury

Date Shift Engineer Name

19.01.2021 A Gajendra Pandya


19.01.2021 A Gajendra Pandya

19.01.2021 B Anurag Chowdhury

Date Shift Engineer Name

Sanjay Garg
Sanjay Garg

19.01.2021 C

Deepak Chand

20.01.2021 A Anurag Chowdhury


20.01.2021 B Gajendra Pandya

Date Shift Engineer Name

Sanjay Garg

20.01.2021 C

Deepak Chand
21.01.2021 A Anurag Chowdhury

Date Shift Engineer Name

21.01.2021 B Purushottam
Date Shift Engineer Name

C
21.01.2021 Gajendra Pandya

Date Shift Engineer Name

22.01.2020 A Deepak Chand


22.01.2020 A Deepak Chand

Date Shift Engineer Name

B
22.01.2021 Sanjay Garg
Date Shift Engineer Name

C
22.01.2021 Gajendra Pandya

Date Shift Engineer Name

22.01.2020 A Deepak Chand


Date Shift Engineer Name

B
23.01.2021 Sanjay Garg
Ajaya kumar

C
23.01.2021

Anurag Chowdhury
Date Shift Engineer Name

24.01.2020 A Gajendra Pandya

Date Shift Engineer Name

B Sanjay Garg / Deepak


B Sanjay Garg / Deepak
24.01.2021 Chand

Ajaya kumar

C
24.01.2021

Anurag Chowdhury
Anurag Chowdhury

Date Shift Engineer Name

C Sanjay Garg / Deepak


25.01.2021 Chand
Date Shift Engineer Name

26.01.2020 A Gajendra Pandya

Anurag
26.01.2021 B Chowdhury/Ajaya
Kumar

Date Shift Engineer Name


26.01.2021 C Sanjay Garg / Deepak
Chand

27.01.2021 A Anurag Chowdhury


27.01.2021 A Anurag Chowdhury

27.01.2021 B Ajaya Kumar

Date Shift Engineer Name


C Sanjay Garg / Deepak
27.01.2021 Chand

28.01.2021 A Anurag Chowdhury

Date Shift Engineer Name


28.01.2021 C Gajendra Pandya

Date Shift Engineer Name

A
29.01.2021 Sanjay Garg
A
29.01.2021 Sanjay Garg

Date Shift Engineer Name

29.01.2021 B Deepak Chand


Date Shift Engineer Name

C Gajendra
29.01.2021 Pandya/Ajaya

Date Shift Engineer Name

30.01.2020 A Deepak Chand

Date Shift Engineer Name


30.01.2021 B Sanjay Garg

Ajaya kumar
Ajaya kumar

24.01.2021 C

Anurag Chowdhury

Date Shift Engineer Name

3101.2021 A Gajendra Pandya


Date Shift Engineer Name

31.01.2021 B Sanjay Garg / Deepak


Chand

Ajaya kumar

C
31.01.2021
31.01.2021 C

Anurag Chowdhury

Date Shift Engineer Name

01.02.2021 A Gajendra Pandya


Shift Regular jobs carried
General Plant Round taken found all drive running normal.

During Morning round all Light made off.


2 Vibrating Screen-2
3 BC-6
4 Coal Feeder-1A
5 Coal Feeder 1A pneumatic gate
P&V in stop condition

DT-2, DT-4 and DT-6 is in charge condition


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

all the manual light to OFF Condition.

Shut down to cleared BAC # 1B Inst. Air valve.Also Covy. Valve

Cooling tower forebay level Guage is not working condition. So Glass Tube and magnetic float cleaned. Also reset by magnet. Now Ok
Coal Feeder # 1A pneumatics Valve Shutdown to cleared.
In Fly ash Silo No.# 1 Fork Level Switch acted. So cleaned the
Probe. Now Ok.
In CHP - T-1 Tower Inst. Panel , JB and Field Inst. Cleaning to
done.
In CHP - T-2 Tower Inst. Panel , JB and Field Inst. Cleaning to
done.
RNRP all nodes found UP except SPC 007 , SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdown Cleared-
1 Coal Crusher-1
2 Vibrating Screen-2
Following shutdown Given-
1 Coal Crusher-2,

all the manual light to ON Condition.


InUnit No. # 1 and 2 Sootblower Power Reset as per
Operation requirement.
In CHP - T-1 Tower Motor , Repair Supply Box , Motor JB
Cleaning to done.
In CHP - T-2 Tower Motor , Repair Supply Box , Motor JB
Cleaning to done.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
P&V in stop condiiton.
Plant performance
CPCB & ETP data updating at PC.Web site not open.
Daily APC,plant performane & Plant report send to concern
person.
Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

4.5m MCC room P&V system in stop condition.


New year report prepared.
Unwanted lights at coal shed made off
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

During Morning round all Light made off.


Following shutdown Given-
1 Bucket Elevator-1
2 CT fan-2
3 BC-6
4 Coal Feeder-1D
5 Coal Feeder 1D pneumatic gate

TG-2, taken in Base Load at 13:00 Hrs


P&V in stop condition
DT-2, DT-4 and DT-6 is in charge condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift abnormality  digital log book filled.

Shift Regular jobs carried


General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CCR MV drive is in manual mode. So Put into auto mode with


SP=26 Degree.
Jocky Pump No. # 2 is started due to Pr. Low Condition. So
Informed to Shift Incharge. After normalized Jocky Pump No.
# 2 is stopped.
In 26 M- BRC Changed over from Secondary to Primary.
In 31 M- BRC Changed over from Secondary to Primary.
In Fly ash Silo No. # 1 Panel and Field Inst. Blowering and
Cleaning to done.
In Fly ash Silo No. # 2 Panel and Field Inst. Blowering and
Cleaning to done.
RNRP all nodes found UP except SPC 007 , SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdownCleared-
1 Bucket Elevator-1
2 CT fan-2
TG# 2 removed from Base Load as per Operation
requirement.
Boiler # 2 WTP side Top All light ON as per operation
requirement.
Boiler # 2 WTP side Top All light ON as per operation
requirement.
all the manual light to ON Condition.
Fly ash silo light ON as per operation requirement.
CHP coal shed light ON as per operation requirement.
In Temple path way light ON as per security Person.
In Electrical workshop LED light Plug Top to changed.
In Electrical workshop Blower Plug Top to changed.
In CT # 2 VFD Panel Blowering and Cleaning to done.
Shift abnormality  digital log book filled.
Coal Feeder # 1D Clean Run Motor Tripped due to overload.
So Reset it. Also inform to shift incharge for checking of
Jamming in coal feeder.
Following shutdown Given-
1 CoalFeeder -1D,
2. Coal feeder O/L MOV (01MV912),

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
P&V in stop condiiton.
CPCB & ETP data updating at PC.
Daily APC,plant performane & Plant report send to concern
person.
Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

4.5m MCC room P&V system in stop condition.


DG remaining report uploaded for last day.

Unwanted lights at coal shed made off and Boiler-2 area top
side.
Coal feeder area one 24V lamp provided.
AVI given for coal feeder-1D.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

During Morning round all Light made off.


BC-4 shutdown given
P&V in stop condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In PRDS Floor TCV3201 Temp. control Valve showing 45 %


feedback when 0% Command. So checked and found that
Positioner link is open condition. So connected and tighten it.
Also Air Pr. Adjusted in air regulator. Trial taken. Now Ok.

In PRDS Floor TCV3202 Temp. control Valve showing Violet


feedback when 0% Command. So checked and found that
Feedback wire having 1.4 Volts DC Supply.
in Unit No. # 2 BAC-2B Dome valve is not operating. So
Manually operated 2 to 3 Times. Now Ok.
In Unit No.# 1 FW Station CV and MOV Blowering and
Cleaning to done.
In Unit No.#2 De Superheater Station CV and MOV Blowering
and Cleaning to done.
RNRP all nodes found UP except SPC 007 , SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General plant round taken found normal
Switch yard round taken
BC-4 shutdownCleared
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

P&V in stop condiiton.

CPCB & ETP data updating at PC.

Daily APC,plant performane & Plant report not send due to


CD not working.
Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

4.5m MCC room P&V system in stop condition.

Silo side street lights made ON as per operation requirement.

Unwanted lights made off and Boiler-2 area top side.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

During Morning round all Light made off.

Following shutdown given


1 J valve-1A
2 Reclaimer
3 Coal crusher-1
4 BC-5
5 Silo-1 Dry unloding
6 BC-7A
7 BC-7B
8 soot blower-2
9 coal feeder-1B
10 coal feeder-1B pnumatic
11 MOV -0920 J valve1A discharge

P&V in stop condition

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 Crusher-1
2 BC-7B
3 BC-7A
4 Reclaimer
5 Soot blower-2
6 Coal feeder-1B
7 Jvalve-1A
8 J valve-1A MOV
9 Fly ash silo-1

SH room AC made ON as per requirement and then made off.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

In Unit No. # 1 Soot Blower No.-14 is not started from DCS


end. So checked and found that DCS command is going to
Panel But not started. So checked at field JB found that A/M
Switch is not working condition. So replaced the switch. Trial
taken. Now Ok.
In Unit No. # 1 Oil centrifuse Panel one Nos earthing wire is
broken condition. So Connected it. Now Ok.
In Unit No. # 1 Fly ash system Vessel No.-12 Dome Valve PU
Tube and Limit switch cable Proper dessing to done.
In Chimney analyser SPM JB , remote calibration JB No. # 1
and 2 Cleaning and Packing Tape to done.
CPCB Report on dated @04/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Boiler -1 and Boiler -2 , Lights switch ON and OFF as per


operation requirement.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

During Morning round all Light made off.


Following shutdown given
1 Reclaimer
2 BC-6
3 BC-7A
4 soot blower-1
5 IBD pumps

Soot blower-11 boiler-1 cable and JB removed as per


requeirment of Mech deptt.
P&V in stop condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
P&V in stop condiiton.
CPCB & ETP data updating at PC.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 BC-6
2 Boiler drainage pump-1 and 2
3 BC-7A
4 Reclaimer
5 Soot blower-1
Switchyard Round taken found normal
Manually lights made ON at evening.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In SWAS Room Unit No. # 1 Drum water PH and Conductivity


Sample not coming in rotameter. So adjust the Flow . Now Ok.

In SWAS Room Unit No. # 2 Drum water PH and Conductivity


Sample not coming in rotameter. So adjust the Flow . Now Ok.

In SWAS Room Unit No. # 1 Drum Conductivity Not showing


at DCS end. So Cleaned the sensor. Now Ok.
In LHS , all the DCS Panel Blowering and Cleaning to done.
In LHS , 220 Volts Power Supply Panel Blowering and
Cleaning to done.
In LHS , LHS Control desk Blowering and Cleaning to done.
CPCB Report on dated @05/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Boiler -1 and Boiler -2 , Lights switch ON and OFF as per


operation requirement.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.


Following shutdown Cleared-
1 Crusher-1
2 Vib screen-1
3 BC-2
4 BC-4
5 BC-5
6 BC-3
7 Chiller pump-2
8 FAS-2

P&V in stop condiiton.


RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
Morning round all light made off.
Following shutdown Cleared-
1 Reclaimer
2 Vib screen-1
3 BC-2
4 BC-4
5 BC-5
6 BC-3
7 BAS

P&V in stop condiiton.


RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
CPCB Report on dated @05/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Boiler -1 and Boiler -2 , Lights switch ON and OFF as per
operation requirement.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

During Morning round all Light made off.

Following shutdown Given-


1 DM Water Pump-2

Chiller-2, AVI given and close.

BC-7A, 7B light ON manually as per requirement then OFF

DT-2, DT-4 and DT-6 is in charge condition


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Unit No. # 2 Vessel No.-12/22 PU Tube of Dome Valve and


Seal Pr. And Cable dressing to done.
Unit No. # 2 Vessel No.-12/22 SOV Box earthing is loose
condition. So Tightness to done also dressing to done.

All the auto drain valve checked in compressor checked and


working Normally.
In Unit no. # 1 ID Fan O/L Pr. (01PIC0907) is violet at DCS
end. So checked the Tx side Supply is zero. So we have
checked at DCS end. Supply is Ok. But colour of wire is
different. There is JB at field end. In this JB ID Fan Bearing
RTD signal going to DCS. So need to check.

In Compressor House , SAC No. # 2 Showing shutdown


warning due to EPB is in Pressed condition. So Informed to
shift Incharge.
In CHP DCS Panel Blowering and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdownCleared-
1 VAM Chiller No.-2,
2 DM Transfer Pump No.-2

In Unit No. # 1 30 m3 Tank Pump Motor Polythen Cover to


done.
In WTP Chemical dosing Room Light is not working condition
So the Lamp changed.
BC-7A / 7B light ON as per operation requirement.
at BC-5 area 24 Volts Lamp to changed.
ACW Pump house Lighting timer to be taken in line.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

P&V in stop condiiton.

CPCB & ETP data updating at PC.

Daily APC,plant performane & Plant report send.


Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
both boiler lights made OFF from third floor to top
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

During Morning round all Light made off.

Following shutdown Given-


1 BFP-3
2. BFP Main MOV
3. BFP by pass MOV
4. En mass-1
5. Vibrating Screen-2

BFP-2 Change over from DOL to VFD room

En- Mass conveyour-2 taken in local mode as per


requirement.

BC-7A, 7B light ON manually as per requirement then OFF.


24 Volt , Led lamp given at En- Mass floor

DT-2, DT-4 and DT-6 is in charge condition


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Unit No. # 2 APH Back Pr. Switch and Transmitter is not


showing at DCS. So cleaned the impluse line. Now Ok.

In CHP AC HP/LP alarm. So Reset it. Now Under observation.


All the auto drain valve checked in compressor checked and
working Normally.
In Unit No. # 1 APH SOV JB and Field Inst. Blowering and
Cleaning to done.
In Unit No. # 1 vessel No.-11/21 SOV JB and Field Inst.
Blowering and Cleaning to done.
In Unit No. # 1 vessel No.-12/22 SOV JB and Field Inst.
Blowering and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdown Cleared-
1 BFP-3
2. BFP Main MOV
3. BFP by pass MOV
4. En mass-1
5. Vibrating Screen-2
6. Coal Crusher No.-2,

BFP-2 Change over from VFD to DOL mode.


In IAC No. # 1 motor and Panel Blowering and Cleaning to
done.
In IAC No. # 2 motor and Panel Blowering and Cleaning to
done.
In IAC No. # 3 motor and Panel Blowering and Cleaning to
done.
BC-5 area Hand Lamp to changed.
In Mechanical workshop area Drill machine Plug Top to
changed.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
P&V in stop condiiton.
CPCB & ETP data updating at PC.
Daily APC,plant performane & Plant report send.
Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made off and Boiler-2 area top side.
All Energy Meter manual Reading taken for Power Report.

Power report prepared and mail


4.5m MCC room P&V system in stop condition.
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Following shutdown given.


1 Bucket elevator-1
2 enmass-1
3 bed ash cooler-1B

AVI given for Bucket elevator-1 and put in Local mode

During Morning round all Light made off.


DT-2, DT-4 and DT-6 is in charge condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Unit No. # 2 ACC Fan -2F Tripped due to Flow Low Switch. So
checked the flow Switch contact. It is working Ok for 1/2 hrs
when LOP is Started. Flow Switch is working Normally. Then
started the Pump. It is running Normally.

All the auto drain valve checked in compressor checked and


working Normally.
In Unit No. # 2 drain MOV ( 06 Nos. ) Blowering and Cleaning
to done.
In Unit No. # 2 APH SOV JB and Field Inst. Blowering and
Cleaning to done.
In Unit No. # 2 vessel No.-11/21 SOV JB and Field Inst.
Blowering and Cleaning to done.
In Unit No. # 2 vessel No.-12/22 SOV JB and Field Inst.
Blowering and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdown Cleared-
1 Bucket Elevator-1
2. En mass-1
BAC-1B AVI given and close
BC-5 area Hand Lamp to changed.
In Mechanical workshop area Drill machine Plug Top to
changed.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
P&V in stop condiiton.
CPCB & ETP data updating at PC.
Daily APC,plant performane & Plant report send.
Daily enviroment report send to concern person.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

Unwanted lights made off.

All Energy Meter manual Reading taken for Power Report.


Lighr started for Silo side street.
Power report prepared and mail
DG report not filled for day before yesterday so filled
4.5m MCC room P&V system in stop condition.
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Following shutdown given.


1 Bucket elevator-1
2 enmass-2
3 bed ash cooler-1B
4 ACC washing pump-1
5 ACC washing pump-2
6 degessor pump-1
7 MB feed pump-1
8 MB feed pump-2

AVI given for Bed ash cooler-1B

During Morning round all Light made off.


DT-2, DT-4 and DT-6 is in charge condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Following shutdown given.


1 Bucket elevator-1
2 En-mass-2
3 Bed ash cooler-1B
4 ACC washing pump-1
5 ACC washing pump-2
6 Degasser pump-1
7 MB feed pump-1
8 MB feed pump-2

All Lights made ON during evening lights.

DT-2, DT-4 and DT-6 is in charge condition

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
e) VAM Checklist
d) Switchyard logbook
f) UPS checklist
g) SWAS Checklist

Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In Unit No. # 2 Vessl No.-22 Showing HH signal at DCS. So


checked at field side found that Dust on the Probe. So cleaned
it. Now Ok.
In Unit No. # 2 Vessl No.-12 Showing H signal at DCS. So
checked at field side found that material availble in the vessel.
So inform to Shift Operator.
In 11 M- BRC Changed over from Primary to Secondary.
In 31 M- BRC Changed over from Secondary to Primary.

All the auto drain valve checked in compressor checked and


working Normally.
In Unit No. # 1 ACC Fan -1C Flow switch cable dressing to
done.
CPCB Report on dated @11/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF as per requirement.

4.5m MCC room P&V system in stop condition.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Following shutdown given.


1 vibrating screen-2
2 P&V boiler side
3 silo-2 pnumatic valve inst. Air
Following shutdown cleared:
1 ACC washing pump-1
2 ACC washing pump-2

AVI closed for Bed ash cooler-1B

silo-2 pnumetic inst air line hose opened and tight with cable
tie due to its shutdown

During Morning round all Light made off.


DT-2, DT-4 and DT-6 is in charge condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

CPCB & ETP data updating at PC.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 Vib screen-1
2 Fly ash-1 dry unloading
Fly ash silo light ON as per operation requirement.
Switchyard Round taken found normal
Manually lights made ON at evening.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 1 APH Main Air Valve ( SV-8127) not operating


from DCS end. So found that SOV is in manual mode. So put
into Auto mode. Now Ok.
Unit No. # 2 Vessel No.-12/22 Back Pr. Switch and
Transmiiter is not showing at DCS end. So cleaned the
impluse Line. Now Ok.

In SWAS Room Unit No. # 2 Drum water PH and Conductivity


Sample not coming in rotameter. So adjust the Flow . Now Ok.

In Unit No. # 1 bed ash cooler -1A and 1B VFD panel


Blowering and Cleaning to done.
CPCB Report on dated @12/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.


Following shutdown Cleared-
1 ACW-1
2 Bucket elevator-1
3 CEP-1A
4 Enmass-1

P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 1 BAC-1B Level Probe showing at DCS end. So


checked and found that wet material on the level Probe. So
cleaned the level probe. And checked and working normally.
Again inserted level high is showing at DCS end. So informed
to shift operator that wet material jammed in the vessel.

Unit No. # 2 CO analyser group fault is showing at DCS end. So


reset it. Now Ok.
Unit No. # 1 Zero mtrs all the Pressure guage cleaning to
done.
Unit No. # 2 Zero mtrs all the Pressure guage cleaning to
done.
Unit No. # 2 Vessel No.-11 seal Pr. PU tube damaged
condition. So replaced it. Now Ok.
Unit No. # 1 BAC-1B Dome Valve air valve closed condition.
( PTW given to Operation Team )

Unit No. # 1 P-Fan RTD JB Cleaning and Packing Tape to done.


RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following shutdown cleared
1 Bucket Elevator-1
Following shutdown given
1 Bed ash cooler-1B
A LED light provided at Bed ash cooler area
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Unit No. # 2 Vessel No.-11 Back Pr. Switch and Transmiiter is


not showing at DCS end. So cleaned the impluse Line. Now Ok.

CPCB Report on dated @12/01/2021  mail to all.

All the Report ( APC, Plant Performance , Power Report ) mail


to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 Enmass-1
2 Reclaimer
3 BC-1
Following shutdown Cleared-
1 ACW-1

P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 Enmass-1
2 Reclaimer
3 BC-1

Following shutdown Cleared-


1 BAC-2B 2.
Reclaimer 3.
BC-1

P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

CPCB Report not copied due to CD not operated


All the Report ( APC, Plant Performance , Power Report ) mail
to all.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In Unit No. # 2 CO analzer showing group fault at DCS end.So


Mainences work is U/P. Found one Nos SS Tube is chocking
condition.
All the auto drain valve checked in compressor checked and
working Normally.
In Fly Ash Silo No. # 1 Panel and Field Inst. Blowering and
Cleaning to done.
In Unit No. #1 LCV3301 and 3304 Gland tightness to done.
In Fly Ash Silo No. # 2 Panel and Field Inst. Blowering and
Cleaning to done.
In 11 M- BRC Changed over from Secondary to Primary.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdown Given-
1 reclaimer,
2. BC-5,
3. BC-5 Ground hooper.

Unit No. # 2 PA Fan Motor DE side abonormal sound found.


So Informed to H.Sharma.
Temp. Gun given to Shift incharge and taken back and placed
at almirah.

ACW Pump house Lighting ON as per Operation requirement

Grinder Machine ( Suresh ) green tag to Provided. And 10


Amps Top to Provided.
In ACW pump House dewaterning Pump is not working
Condition. So New pump is Provided given by Mech. Dept.
Now Ok.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the auto drain valve checked in compressor checked and


working Normally.
Following Shut Down Given -
1. BC-7A
2. BC-7B
Following shutdown Cleared-
1. Reclaimer
2. BC-7A
3. BC-7B
4. BAC -1B
5. En-Mass-1
6.BC-5
7.BC- ground Hopper
8. BAC-1 B Dome Valve

All Required Lights Switch ON during Evening round

RNRP all nodes found UP except SPC008 and OPX01.


1.Shift instrument digital log book filled
2. UPS log digital log book filled.
3. Shift abnormality  digital log book filled.
4. VAM log digital log book filled.
5. Generator-1  checklist
6. Generator-2  checklist
7. Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
PC not responding to CD .So report unable to send.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

During Morning round all Light made off.

Following shutdown Given-


1. BC-1 (2 Nos)
2. BC-2
3. BAC 2B Dome valve
4. Degasser -2

BC-7A, 7B light ON manually as per requirement then OFF.


24 Volt , Led lamp given at En- Mass floor
DT-2, DT-4 and DT-6 is in charge condition
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


In Unit No. # 1 CO maintences work to done.
TG # 1 Lift IR Sensor Sticker pasted.
Unit No. # 1 Firing Floor area Blowering and cleaning to
done.
Unit No. # 2 Firing Floor area Blowering and cleaning to
done.
In Unit No. # 1 Dilution Damper Cover to Provided.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following shutdown Cleared-
1. BC-1 (2 Nos)
2. BC-2
3. BAC 2B Dome valve
4. Degasser -2
In CHP En-mass Conveyor No.-2 overreset 02 times as per
operation requirement. Also current taken it is 5.0 Amps.
In Compressor House Lighting Timer ON time 5.30 PM to 6
PM , China Road side Lighting Timer ON time 5.30 PM to 6
PM , CHP DCS Road side Light Lighting Timer ON time 5.30
PM to 6 PM done.
CHP AHF Panel Filter Blowering and cleaning to done.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
CPCB Report send to concern person.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.

Silo street lights made ON as per requirement.


EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Engg room AC MCB made ON


Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
Following Shut Down Given -
1. BC-7A
2. BC-7B
3. Reclaimer

Work shop power made OFF from (MPDB-5302-F)

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under 60
Deg. C.

CPCB Report send to concern person.

All the Report ( APC, Plant Performance , Power Report ) mail


to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


DG old report was found pending so uploaded and corrected
in SAP and excel.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Silo street lights made ON as per requirement.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All AC MCB made ON
Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
En mass-2 shutdown given
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Following shutdown Cleared-


1. BC-1
2. Reclaimer
3. En Mass-1
4. En- Mass-2

All Required Lights made On in evening


Coal Shed Lights Made On
Silo street lights made ON as per requirement.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Unit No. # 2 air leakage from Vessel No.-11 isolation valve (


SA1046) found. So tightness done at fitting side. Now Ok.

In Unit No. # 2 Popeet Valve of Vessel No.-12 SOV Coil Bolt


missing condition. So New Bolt is Provided. Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.
In Unit No. # 1 TG Ground Floor area all the field inst.
Cleaning to done.
In Unit No. # 2 TG Ground Floor area all the field inst.
Cleaning to done.

Online ETP data is not updated from 16.01.2021 @6.59 PM.


CPCB Report on dated @18/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made ON

Chimney analyzer room round taken & found system healthy.


4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
Following shutdown given
1 Enmass-1
2 BC-3
3 soot blower-2
4 ACW-1
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Err:509

Switchyard Round Taken found normal

Following shutdown Cleared-


1 Soot blower-2
2 Enmass-1
3 ACW-1

Enmass -2 reset after jam clearing as per Operation


requirement.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Chimney analyser Boiler # 1 SOX analyser heat trace MCB


is in OFF Condition. So ON the MCB. Now Ok.
In Unit No. # 2 APH seal pr. Is not showing at DCS end. So
clean the impluse line. Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.
In Fly ash silo No. # 1 all the field inst. And Panel Cleaning to
done.
In Fly ash silo No. # 2 all the field inst. And Panel Cleaning to
done.

Online ETP data is not updated from 16.01.2021 @6.59 PM.


CPCB Report on dated @19/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 Reclaimer

P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
All AC made OFF

Following shutdown cleared


1 Reclaimer
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

BAC-2B Dome Valve is not operating. So manually operated 2


to 3 times. Now under observation.
BAC-2B Back Pr. Transmiiter impluse line cleaned as per
operation requirement.
All the auto drain valve checked in compressor checked and
working Normally.
In Reclaimer PLC and VFD Panel Blowering and Cleaning to
done.

In BAC-2A and 2B VFD Panel Blowering and Cleaning to done.

Online ETP data is not updated from 16.01.2021 @6.59 PM.


CPCB Report on dated @20/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


BAC-2B , shut down given and close
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 Reclaimer
2 BC-7A & 7B
3 BC-2
4 Enmass-1 and 2
5 Oil purifier-1
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.


All AC made OFF

Following shutdown cleared-


1 Reclaimer
2 BC-7A & 7B
3 BC-2
4 Enmass-1 and 2
5 Oil purifier-1

Bioiler-2 Beadsh cooler area 24V transformer,Hand lamp&


LED light provided
Streetlight timing adjusted from 5.45PM to 6.15PM at
1.Compressor house area
2.CHP DCS side road
3.China yard road
4.ACC side road

P&V in stop condiiton.

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


CPCB Report on dated @20/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
Following shutdown given
1 BC-4 ( 2 Nos)
2 BC-7A
3 BC-7B
4 CT-3
5. CT- MOV
6. BC-1
7. Reclaimer (2 Times)
8. Oil Centrifugal pump-1
9. Vibrating scrren-1

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 1 all the Bunker Level Transmitter Probe cleaing


to done.
In Unit No. # 2 all the Bunker Level Transmitter Probe cleaing
to done.
All the auto drain valve checked in compressor checked and
working Normally.
In CHP, BC-5 VFD Panel Blowering and cleaning to done.
In CHP, BC-5 PA System Panel Blowering and cleaning to
done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Following shutdown Cleared


1 BC-4 ( 2 Nos)
2 BC-7A
3 BC-7B
4 CT-3
5. CT- MOV
6. BC-1
7. Reclaimer (2 Times)
8. Oil Centrifugal pump-1
9. Vibrating scrren-1

all the manual light to ON Condition.


In ACW pump House ACW Motor No. # 1 , 2 and 3 Motor
Cleaning and Blowering to done.
In Coal Feeder- 2A 24 Volts Head Lamp to changed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

Following shutdown given


1 Oil Centrifugal -2
2 CT-1
3 MOV 4301
4 Reclaimer
5. BC-4
6. V . Screen-2
7. BC-1
8. BC7B
9. Vibrating scrren-2
10. Coal Crusher-2

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 1 Coal Bunker Level Probe -1B Cleaned and


Power Reset. Now Ok.
In Unit No. # 2 Screw Conveyor -2A VFD Tripped on F0012
fault. Field side jamming condition. So Informed to Shift
operator.

All the auto drain valve checked in compressor checked and


working Normally.

In Unit No. # 2 vessel No.-21 Level probe cleaned and


calibrated . Now Ok.

In Fly ash silo No. # 2 Fork level switch acted so checked and
found that Controller wire TB damaged condition. So Changed
the Controller. And trial taken something it is working
normally. Since small bend in the level probe orientation
when shoute down limit switch comes at site. So informed to
shift Incharge.

In BC-4 Belt is tripped when it is started . At manual it is


working Normally. So checked the logic found that ZSS is not
healthy condition. So at field side ZSS supply is not ok. Due to
Tial end Guard limit switch is not healthy condition. Need to
Replace Guard Limit switch.
In Unit No. # 2 BAC-2A Level probe cleaned and calibrated .
Now Ok.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following shutdown given
1 CT-1
2 MOV 4301
3 Reclaimer
4. BC-4
5. V . Screen-2
6. BC-1
7. BC7B
8. Vibrating scrren-2
9. Coal Crusher-2

all the manual light to ON Condition.


In Unit No. # 2 Soot Blower Power reset as per operation
requirement.
In Coal Feeder- 2A welding machine plug Top to changed.
In E-mass Conv. # 2 Power reset as per operation
requirement.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under 60
Deg. C.

CPCB Report send to concern person.

All the Report ( APC, Plant Performance , Power Report ) mail


to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Silo street lights made ON as per requirement.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
Screw feeder-1A found trip , checked feeder is mechanically
jam
Bed ash silo RAV found trip, so checked it is mechanically jam,
so informed to operation deptt. For jam clearing

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In BC-4 Belt is tripped when it is started . At manual it is is not


started found that EPB is in pressed condition. So released it.
then it is started in Local mode. In Remote condition it is
tripped. So checked and found that ZSS is not healthy
condition. So at field side ZSS supply is not ok. Due to Taill
end Guard limit switch is not healthy condition.So changed
the contact in guard limit switch NC when rope is in released
condition. Need to Replace Guard Limit switch.

In Unit No. # 1 Zero mtrs field Inst. And JB Blowering and


cleaning to done.
In Unit No. # 1 Zero mtrs drain MOV and J- valve MOV
Blowering and cleaning to done.
All the auto drain valve checked in compressor checked and
working Normally.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Following shutdown given


1 CT-1
2 MOV 4301
3 Reclaimer
4. BC-4
5. V . Screen-2
6. BC-1
7. BC7B
8. Vibrating scrren-2
9. Coal Crusher-2

all the manual light to ON Condition.


In Unit No. # 2 Soot Blower Power reset as per operation
requirement.
In Coal Feeder- 2A welding machine plug Top to changed.
In E-mass Conv. # 2 Power reset as per operation
requirement.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under 60
Deg. C.
CPCB Report send to concern person.
CD drive not working so alll the Report ( APC, Plant
Performance , Power Report ) unable to mail..
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


Silo street lights made ON.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Silo street lights made ON as per requirement.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Unit No. # 1 TG Stopped due to steam leakage at Control


Valve. After completion of mech. Work again started and
synchronised.
All the auto drain valve checked in compressor checked and
working Normally.
At Unit No. # 1 Bag House Top Vessel No.-22 service air valve
limit switch gland open condition. So gland is provided. Now
Ok.
At Unit No. # 1 Bag House Top Vessel No.-11 Popette Valve
SOV open condition. So Cover to Provided.
In Unit No. # 2 DSH Control Valve ( 04 Nos. ) , FW CV and MOV
Blowering and cleaning to done.
CPCB Report on dated @25/01/2021  Not sent due to CD is
not open.
All the Report ( APC, Plant Performance , Power Report )Not
sent due to CD is not open.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
BAC-2B , shut down given and close
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

all unwanted lights made OFF

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

RNRP all nodes found UP except SPC008 and OPX01.

LED lights collected from Bed ash cooler area

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Plant round taken found drives normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 Soot blower-2
2 Enmass-1
3 ACW-1
Enmass -2 trial taken after making feeder healthy.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.
Unit No. # 1 Sox analyzer moisture fault. So reset it. Now Ok.

All the auto drain valve checked in compressor checked and


working Normally.
CCR MV drive AHU/ VFD Panel Cleaning and Blowerning to
done.
4.5 Mtrs. MV drive AHU/ VFD Panel Cleaning and Blowerning
to done.
Work shop MV drive AHU/ VFD Panel Cleaning and
Blowerning to done.
BFP MV drive AHU/ VFD Panel Cleaning and Blowerning to
done.
CPCB Report on dated @26/01/2021  Not sent due to CD is
not open.
All the Report ( APC, Plant Performance , Power Report )Not
sent due to CD is not open.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
Silo Lights made ON and OFF as per operation requirement
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-7A
2 BC-6
3 IBD drainage pump
4 ACW-2
5 P&V-4
6 Oil centrifuge-1
7 Enmass-2
8 BC-1
9 FAS-1
P&V in stop condiiton.
AVI given for Boiler-2 Enmass feeder and cleared.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown cleared-


1 BC-7A
2 BC-6
3 IBD drainage pump
4 ACW-2
5 P&V-4
6 Oil centrifuge-1
7 BC-1
8 FAS-1

P&V in stop condiiton.


AVI given for Boiler-2 Enmass feeder and cleared.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Unit No. # 1 APH Seal Pr. Is not showing at DCS. So impluse


line is cleaned. Now Ok.
Unit No. # 2 vessel No.-11 Level Probe Cleaned as per
operation requirement.
In WTP DCS ( 04 Nos. ) Panel Cleaning and Blowerning to
done.

In WTP MOV Feeder Panel Cleaning and Blowerning to done.


In WTP 220 Volts Power Supply Panel Cleaning and
Blowerning to done.
All the auto drain valve checked in compressor checked and
working Normally.
CPCB Report on dated @27/01/2021  mail to all.
All the Report ( APC, Plant Performance , Power Report ) mail
to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-7A
2 BC-6
3 FAS-1 dry unloading(cleared)
4 Reclaimer
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

crusher building street lights made ON

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
WWTP side lights made OFF
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In Unit No. # 2 BAC-2A Dome Valve seal Pr. is not showing. So


Changed the SOV of Dome Valve. Still Dome valve seal Pr. Is
showing less than 4 Kg/cm2. So informed to shift incharge.

In Unit No. # 2 APH Conveying is not happen. Found that MCB


is in Tripped condition. So ON the MCB. Now ok.
In Unit No. # 2 Coal feeder -2A started in Manual mode as per
operation requiement.
All the auto drain valve checked in compressor checked and
working Normally.
In Unit No. # 2 BAC-2A Inst. Local JB and Field Inst. Blowering
and Cleaning to done.
In Unit No. # 2 BAC-2B Inst. Local JB and Field Inst. Blowering
and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following shutdown given
1 Oil centrifuse Pump-1
2 Reclaimer
3 Soft Water Pump No.-2
4.Soft Water Pump No.-3
5. BC-6
6. BC-1
7. BC-7B
8.BC-4

all the manual light to ON Condition.


24 Volt hand lamp and Transformer given at Oil Centrifuse
Pump No. # 1.
Repair Supply Box No.-74 ( HSD area) Inside earthing broken
condition. So reconnected it.
Repair Supply Box No.-71 ( LHS area) hole open condition. So
silver Tape is provided.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried

Plant round taken found drives normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 Oil centrifuge Pump-1
2 Reclaimer
3 Soft Water Pump No.-2
4.Soft Water Pump No.-3
5. BC-6
6. BC-1
7. BC-7B
8.BC-4
9. BAC 1B dome valve

Following Isolation given-


1. Reclaimer
2. BAC 1B dome valve

Silo Lights made ON and OFF as per operation requirement

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried

General Plant Round taken found all drive running normal.

crusher building street lights made ON


RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
WWTP side lights made OFF
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All AC MCB made ON
Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

Following shutdown given


1 BC-1
2 BC-4
3 DM Transfer-2
4 DM Transfer-3
5. BAC 2A
6. BAC 2A Dome Valve

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 2 BAC-2A Dome Valve seal Pr. is not showing.


Still Dome valve seal Pr. Is showing less than 4 Kg/cm2. So
Changed the air limit switch of dome valve from BAC-2B. Now
it is under observation.

In Unit No. # 2 BAC-2B Dome Valve seal Pr. Switch Changed .


Now it is working Normally.

All the auto drain valve checked in compressor checked and


working Normally.
Unit No. # 1 Soot Blower Panel Blowering and Cleaning to
done.
Unit No. # 2 Soot Blower Panel Blowering and Cleaning to
done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Following shutdown Cleared.


1 BC-1
2 BC-4
3 DM Transfer-2
4 DM Transfer-3
5. BAC 2A
6. BAC 2A Dome Valve

all the manual light to ON Condition.

In WTP DM Transfer Pump No. # 2 Feeder maintences ,


connection tightness and Blowering to done.
In WTP DM Transfer Pump No. # 3 Feeder maintences ,
connection tightness and Blowering to done.
TG # 1 Hoist Power ON as per Mech. Requirement.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Chimney analyzer room round taken & found system healthy.


4.5 Mtr all VFD drives inverter temp check & found under 60
Deg. C.
CPCB Report send to concern person.
CD drive not working so alll the Report ( APC, Plant
Performance , Power Report ) unable to mail..
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

Silo street lights made ON.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Silo street lights made ON as per requirement.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-4
2 Reclaimer

P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Fly ash silo No. # 1 Fork level switch acted so checked and
found that dust on the Probe. So cleaned the Probe. Now Ok.

All the auto drain valve checked in compressor checked and


working Normally.
PRDS Floor area MOV , CV and Transmitter Blowering and
Cleaning to done.
CHP Bucket elevator ZSS Proxy and Controller , JB Blowering
and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Following shutdown Cleared.


1 BC-1
2 Reclaimer
all the manual light to ON Condition.
In WTP DM Transfer Pump No. # 2 Feeder maintences ,
connection tightness and Blowering to done.
In WTP DM Transfer Pump No. # 3 Feeder maintences ,
connection tightness and Blowering to done.
TG # 1 Hoist Power ON as per Mech. Requirement.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Chimney analyzer room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under 60
Deg. C.
CPCB Report send to concern person.
Report ( APC, Plant Performance , Power Report ) mail. To all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

Power report balaced for month end data.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Silo street lights made ON as per requirement.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 DM water pump-1
2 TG-1 Exhaust fan
3 TG-1 inlet MOV 2305
4 Bag house-2 inst air
5 BC-1
P&V in stop condiiton.
TG-1 stop at 10.30 a.m, and rack out Generator-1 breaker
pedestal cooling fan conection done at TG-1 Encloser
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Abnormality jobs attended
Boiler-1, UF & RO flow Impulse line flushing working under progress

P&V no-2, water line valve leakage so leakage arrested

WTP hall Repair Supply box , Lock found damage replace lock with
new one
Mechanical work shop hand grinder Top changed and green tag
provided.
Mechanical work shop Welding machine earthling found damage so
new lugging done

Abnormality jobs attended


Shut down to cleared BAC # 1B Inst. Air valve.Also Covy. Valve is not
operating found that SOV Coil loose condition. So Tightness done.
Now Ok.

Cooling tower forebay level Guage is not working condition. So Glass


Tube and magnetic float cleaned. Also reset by magnet. Now Ok.

In Fly ash Silo No.# 1 Fork Level Switch acted. So cleaned the Probe.
Now Ok.

condition. So Glass Tube and magnetic float cleaned. Also reset by magnet. Now Ok.
Boiler-1fly ash unloading syatem pressure gauge ,broken glass
replaced.

CT- fan-3 trial done as per operation requirement.

Crusher building all floor instrument JB cleaning & blowering done.

screen motor earthing lid tightness found loose, so tight it

Abnormality jobs attended


Coal Feeder 1D, Load cell air purging air leakage found , leakage
areeseted.
Coal Feeder 2C, Load cell air purging air leakage found , leakage
areeseted.
Coal Feeder 2C, Load cell inspection door is with 2 bolts only so new
bolts arrange and fixed.

Abnormality jobs attended


CCR MV drive is in manual mode. So Put into auto mode with SP=26
Degree.

In 26 M- BRC Changed over from Secondary to Primary.

In 31 M- BRC Changed over from Secondary to Primary.


Boiler-2 DSH CV 02TCV3203 Gland leakage arrested by gland
tightness.
Boiler-2 BAC 2B tripped due to flow switch water leakage,found
diaphragm damage.Isolate the same, remove Flow switch & installed
another flow switch by removing fron service air compressor-2,That
is already in Stopped condition.

BAC-2B level probe was mulfunctioning so calibration done.

Coal feeder-2D VFD panel incoming power MCB found wothout the
internal connector of pole so new connector taken from spare and
fitted into it.

All Boiler 0m motors found dusty so cleaning and blowering done.

Coal feeder-1D motor tripped one time on overload, checked motor


found OK, field coal jamming still there so informed to CCR.
Abnormality jobs attended

Service compressore-2 cooling water flow switch opening found, so a


dummy arrangement made by welding and apply the dummy on
opening

CEP-1B discharge pressure gauge glass found broken so changed it


and marking done
coal feeder-1D close limit lever not engaged properly, so set it
Bed ash cooler flow switch-2B flow low indication come, so set the
switch now OK

Abnormality jobs attended


In PRDS Floor TCV3201 Temp. control Valve showing 45 % feedback
when 0% Command. So checked and found that Positioner link is
open condition. So connected and tighten it. Also Air Pr. Adjusted in
air regulator. Trial taken. Now Ok.

In PRDS Floor TCV3202 Temp. control Valve showing Violet feedback


when 0% Command. So checked and found that Feedback wire having
1.4 Volts DC Supply.

in Unit No. # 2 BAC-2B Dome valve is not operating. So Manually


operated 2 to 3 Times. Now Ok.
Boiler-2, Bage House vessel 21, Vibrator motor , base bolt came out so
new bolt arranged and re fit properly.

FAS-2 fork level showing high,cleaned & trial done, working OK.

FAS-2 plate valve not operating ,found jamm,Cleared the same ,Now
OK.

BAC-2B level probe was mulfunctioning so calibration done.

Boiler-1 hopper level checked for 12 found Ok from instrument side.

Boiler-1 hopper level checked for 22 found Ok from instrument side.

Boiler-1 bag house all four vibrator motors checked for proper
tightness and functioning found all working normal.
Some heating in the 21 no. vessel so new lugging and termination
done, checked OK.

CEP-2B motor gland side packing done with brown tape for proper
packing.
Abnormality jobs attended
soot blower-14 of boiler-1, checked and found that it is taking 2.5 amp
in stead of 0.8 amp, also motor winding resistance checked found
balanced, so inform to operation for jamming checking
CHP DCS D-Link supply not comimg so changed its adopter

CHP DCS AC HP-LP fault comimg, so reset it

Ash and compressor MCC back side some cables found undressed, so
dressing them

EMS report started after backup, found logger and viewer was
stopped so made normal.

Crusher house one RSB cleaning done and faulty socket replaced with
spare one.

Soot blower-11 of Boiler-1 checked and found that high steam


leakage, on starting local it was tripping so motor megger taken and
TB hot blower. When megger normalized then started found the
puppet valve was not operating for any position of rotation of rotary
line so shown Mr. Hansraj and informed mech for further work.

Soot blower-14 of Boiler-1 checked and found not running in remote


or local, found TB condition rusted all add-on and contacts inside local
JB, one NO contact replaced but still not operational, need to check.
In Unit No. # 1 Soot Blower No.-14 is not started from DCS end. So
checked and found that DCS command is going to Panel But not
started. So checked at field JB found that A/M Switch is not working
condition. So replaced the switch. Trial taken. Now Ok.

In Unit No. # 1 Oil centrifuse Panel one Nos earthing wire is broken
condition. So Connected it. Now Ok.

In Unit No. # 1 Fly ash system Vessel No.-12 Dome Valve PU Tube and
Limit switch cable Proper dessing to done.

Crusher Building RSB no-83, inner cover found loose without screw ,
so new screw arrange and tighten it.
Crusher Building RSB no-83,Door lock found damage , replace the
lock with new one.

Abnormality jobs attended


Boiler-1 5th floor Light bulb found damaged and its dome fitting
found damaged, so removed the damaged bulb and dome also remove
the light connection from ckt.
ACC-1 &2 Light fittings found water accumulation, so drain the water
from light fittings
screen floor duct opening found , so covered it
cable dressing not found in crusher-1 hydraulic, so dressing it
Desuperheating of boiler-2 main MOV(3210) gland tightness done
cable dressing done at boiler-1 hoist 22 mtr

Boiler-1 Soot blower 11 limit switch,broken lever modified ,adjust


limit & successful trial done.

Boiler-1 Soot blower 14 ,adjust limit & successful trial done.

BC-1 pullcord switch rope found broked front off crusher building.
Service air IFC oil cleaned from inside & out side the panel.
APH-1 intine valve operate manually & kept in open mode as per
operation.

CT fan-1 was not starting from local or remote so checked feeder was
OK, from field side checked the limit of door found contact was not
proper. So adjusted the position, then trial taken running normal.

Boiler-1 bucket elevator panel was found open so packed with brown
tape and door sealed.

Soot blower 11 of Boiler-1 motor connection done after work, then


some cable found heated so provided LT insulation tape and then
sealed the JB with putty.
Then the limit lever also adjusted and trial taken, found OK.

Abnormality jobs attended


In SWAS Room Unit No. # 1 Drum water PH and Conductivity Sample
not coming in rotameter. So adjust the Flow . Now Ok.
In SWAS Room Unit No. # 2 Drum water PH and Conductivity Sample
not coming in rotameter. So adjust the Flow . Now Ok.

In SWAS Room Unit No. # 1 Drum Conductivity Not showing at DCS


end. So Cleaned the sensor. Now Ok.

One faulty Tube light found inside LS MCC Room , collect it and
shifted to scrap yard
Coal Feeder 2A, MOV 02MV905 not opearting check and found its O/L
Relay get over load, check and reset it.

Bed ash silo RAV tripped on overload due to material jamming so


reset done after clearance.

T-2 tower flap gate connection removed from feeder end and cable
insulated, feeder already off condition.
Limestone MCC and DCS room cleaning done in morning round, floor
cleaning work is under progress.

Bed ash silo RAV motor connection done & earthing done & covered.
Welding M/C at T1 Tower double earthing done.

Bag filter 7A-B panel broken lug replaced.


Bag filter 7A-B lighting timer adjust.
Boiler-2 Seal & filling valve showing fault ,Checked with maintenance
depart. Work U/P.

Boiler-2 vessel 12-22 SOV JB having air leakage, arrested the same.

Boiler-1 11-21 back pressure showing fault, Transmitter & switches


chocked line cleared.
ACW VFD cables identification,done by checking continuity.
Boiler-1bag house hopper 12 vibrator fall.power made OFF. Need to
install.

vibrator motor of 22 vessele boiler-1 found its foundation plate


broken from hopper, so remove motor and put in instrument lab
Abnormality jobs attended
Mechanical Workshop RSB -98, earthling wire came out so new
lugging and tighten done.
Mechanical Workshop Welding machine checked and green tag
provided, also 1 machine Top missing so new top installed.

BC-5, Tail end 24 V hand lamp given.

Coal Feeder 2A, feed back problem, Techo switch adjusted and trial
taken now OK
Boiler-1, CO analyse fault so filter cleaning done and moisture
drained, now OK

Reclaimer left right moment VFD trip due to o/c so check and reset
Chiller-2, pump start in local as per maintenance requirement
Boiler-2, APH back pressure fault so impulse line cleaning done and
made healthy

Abnormality jobs attended


Unit No. # 2 Vessel No.-12/22 PU Tube of Dome Valve and Seal Pr.
And Cable dressing to done.
Unit No. # 2 Vessel No.-12/22 SOV Box earthing is loose condition. So
Tightness to done also dressing to done.
All the auto drain valve checked in compressor checked and working
Normally.
In Unit no. # 1 ID Fan O/L Pr. (01PIC0907) is violet at DCS end. So
checked the Tx side Supply is zero. So we have checked at DCS end.
Supply is Ok. But colour of wire is different. There is JB at field end. In
this JB ID Fan Bearing RTD signal going to DCS. So need to check.

Abnormality jobs attended


BAC 1B water valve SOV check found normal ,but valve found
Jam ,inform to operation.
IAC-2 load-lnloading problem,Check & found SOV,coil found loose,Bolt
tight nesss done now, Ok.
Degassor pump motor one earthing lid found damaged, so repaire it

boiler-2 near wind box lighting jB cover found open, so tight the cover
ACW lighting timer not working proper, so correct it,

Abnormality jobs attended

BC-7A bag Filer cable dressing done

BC-7B bag Filer cable dressing done

BC-6, one cable found open so insulation tape provide

IAC no -2 , loading problem found SOV connector loose, tighten the


connector and make OK

Boiler -1 SOX analyser heat trace supply trip so made it healthy

Boiler-1 Firing floor , controller cable dressing done


ID fan -1, Pressure gauge cable tracing work under progress
WTP weigh bridge display came out so re-fix it

Abnormality jobs attended


Unit No. # 2 APH Back Pr. Switch and Transmitter is not showing at
DCS. So cleaned the impluse line. Now Ok.

In CHP AC HP/LP alarm. So Reset it. Now Under observation.


0

FAS-2 plate valve not operating ,found no air inside SOV ,Cleared the
same ,Now OK.

Boiler-1 SA fan bearing JB hole packed.


Boiler-2 SA fan bearing JB cable gland pack..
ACC vent pipe -1RTD loose cable dressing done,
ACC- fan 2F flow switch cable dressing done.
BAC-2B flow switch polythene covered.

Coal feeder of Boiler-1 all motors found dusty so cleaning and


blowering work done.
CHP MCC room back door closed as locking not found.

Abnormality jobs attended

cooling tower side light sitch found on , so off it

Earthing Pit cover found open near ACC side, so close the cover

Abnormality jobs attended


Unit No. # 2 ACC Fan -2F Tripped due to Flow Low Switch. So checked
the flow Switch contact. It is working Ok for 1/2 hrs when LOP is
Started. Flow Switch is working Normally. Then started the Pump. It is
running Normally.
Boiler-1 , Firing floor 24V Transformer incoming suppy cable loose so
cable dressing done

Boiler-1 Hopper -21 HH not showing .check & found level faulty,try to
calibrate but ,relay not working. So need to install other probe.

Boiler-1 load cell purging done.


Boiler-2 load cell purging done.
BAC 1B level showing H ,check & found material inside the vessel,So
inform to operation.

DG report not filled for dat before yesterday so filled.

Coal feeder of Boiler-2 all motors found dusty so cleaning and


blowering work done.
Abnormality jobs attended

Drain pot pump unit-2 pump not stop even after level down to-150, so
checked and found that level switch got stuck so adjust it, now ok.

Earth pit name plat found dislocated at ACC and chimny area, so fix
the plates by screws

Abnormality jobs attended


Boiler-2 soot Blower Get overload so check and reset

BC-4, bag filter circuit modification work under progress

BC-7A, lights not started found lightning timer get stuck up, so attend
it and made Lights ON

Boiler-2, Conveying pressure not showing in back pressure


transmitter, so transmitter, back pressure line cleaning done now OK
Abnormality jobs attended

In Unit No. # 2 Vessl No.-22 Showing HH signal at DCS. So checked at


field side found that Dust on the Probe. So cleaned it. Now Ok.

In Unit No. # 2 Vessl No.-12 Showing H signal at DCS. So checked at


field side found that material availble in the vessel. So inform to Shift
Operator.

In 11 M- BRC Changed over from Primary to Secondary.

In 31 M- BRC Changed over from Secondary to Primary.


All the auto drain valve checked in compressor checked and working
Normally.

In Unit No. # 1 ACC Fan -1C Flow switch cable dressing to done.

Muffle furnace Inidan was not raising temp, so checked and found coil
got open so made ready the Chinese furnace and handover o WTP
person.
Indian furnace heater indication lamp was not working so control
wiring corrected.
Dosing panel of HP found one earthing lead lug borken so replaced
with new one and corrected.

Abnormality jobs attended


AOP-1A motor one earthing found loose, so tight it

ACC fan-2F trip in flow low, so checked and found that its flow switch
malfunctioned so set the flow switch, now OK

Calibration stickers got expired.Update the same.

FAS-2 plate valve open & close air tubing done.

Boiler-2 ground floor all instrument cleaning & blowering done.

ACC-2 trolley no. 3 checked motor and found wheel jamming of left
motor so informed Mr. Tauqir.
WTP area Degassear water pump-1 was not starting so checked and
manually command given from local, found the stop relay was faulty
so replaced with spare one. Then trial taken found OK.

Soot blower-14 of Boiler-2 tripped on overload so reset it on


operation requirement.

ACC fins cleaning JB new bolt connected for cover.


Abnormality jobs attended
In Unit No. # 1 APH Main Air Valve ( SV-8127) not operating from DCS
end. So found that SOV is in manual mode. So put into Auto mode.
Now Ok.
Unit No. # 2 Vessel No.-12/22 Back Pr. Switch and Transmiiter is not
showing at DCS end. So cleaned the impluse Line. Now Ok.

In SWAS Room Unit No. # 2 Drum water PH and Conductivity Sample


not coming in rotameter. So adjust the Flow . Now Ok.

Unit-2 Soot Blower, get overload so chack and reset

APH-2 back pressue TX, switch & it's seal pressure air leakage from
line so new PU tube connected and one fitting replaced.
Bag house 11-21 back pressure line cleaning done due to material
ingress.
ACC-1 trolley no. 3 left side motor connection removed as motor was
found jammed on bearing.

CT fan-3 VFD room lock was faulty so removed from site.

Side stream room all LDB cleaning done durrng Jizu-Hozen.

Abnormality jobs attended


In Unit No. # 1 BAC-1B Level Probe showing at DCS end. So checked
and found that wet material on the level Probe. So cleaned the level
probe. And checked and working normally. Again inserted level high
is showing at DCS end. So informed to shift operator that wet material
jammed in the vessel.
Unit No. # 2 CO analyser group fault is showing at DCS end. So reset it.
Now Ok.

Unit-2 Soot Blower, get overload so chack and reset


Bag house -2 Vessel-11 level not showing at DCS calibration done for
the same.
Enmass -1 showing running feed back at SO, crusher was not stopped
in I/L, Check & found run f/b contactor malfunctioning. Rectified the
same.

Chimney analyzer SOX-1 heat trace line not heating ,check & found
MCB got tripped ,mase on now Ok

BAC 2B dome valve not opening ,found SOV problem,SOV overhauling


done. Now OK
Boiler Lights made ON and OFF as per operation requirement

02TCV3203 D-superheater control valve leakage from gland side so


arrested.

02TCV3204 D-superheater control valve leakage from gland side so


arrested.

Boiler-2 bag house vibrator-21 was found loose from frame, so new
bolt fitted with 3 check nuts and spring washer.
Soot blower-14 of Unit-2 was tripping repeated on overload so
connection open from panel relay output, also informed CCR.

Coal bunker-1B temp not Ok so reset once power then normalised.

Boiler-2 soot blower motor check as maint have doubt that motor not
running, so separate motor from gearbox & trial done ,found Ok
Nominal current 0.4 Amp.motor connection not done at panel as well
as field motor as per operation request.

BAC 2B dome valve air tubing connection done. Now OK

BAC 1B dome valve air tubing connection remove pressure gauge


removed & kept in Local panel.

ACC-2F lube oil flow came FL when fan was running ,So checkthe
functioning of flow switch ,working normal.

ACF -2 valve air connection after maint department. Limit switch also
installed.

IR sensor modification done at TG building Lift.


Hand lamp provide at BAC 1

Silo-2 level sensor was giving high alarm continiously, so checked and
found that its fork sensor strip got pinched by bulker operation below
it, so correct the distance between the fork strip and alarm gone, now
ok.
dosing room one motor earthing lid found loose , so tight it
Abnormality jobs attended
In Unit No. # 2 CO analzer showing group fault at DCS end.So
Mainences work is U/P. Found one Nos SS Tube is chocking
condition.

In 11 M- BRC Changed over from Secondary to Primary.

In Unit No. #1 LCV3301 and 3304 Gland tightness to done.

In ACW pump House dewaterning Pump is not working Condition. So


New pump is Provided given by Mech. Dept. Now Ok.
0

Abnormality jobs attended

BC-7A, not Off from DCS , pull cord as well as from Feeder , Check and
Found Relay problem then replace the relay also found OFF Push
button connection loss tighten the same and made OK , Trail taken

Reclaimer Boom Belt pull cord rope found damage so joint the rope

BAC-1B dome valve not operated, check and found pneumatic


connection found reverse corrected it , now OK

EMS PC not started so check and restart the PC and its Logger

BAC-2B dome valve not operated, manually operated it working ok


same inform to CCR.
At Mechanical Workshop , Soot Blower Motor Connection done and
Trial taken, Motor is OK abnormal sound from Gear Box
BC-1 , T1 Tower - 3 phase extension board plug replace
Reclaimer, hand grinder machine 10Amp top changed
Reclaimer, one extension board given to maintenance team

BAC-2B dome valve limit not showing at DCS ,Checked ,that valve not
closing completely,inform to operation., they will check in the
morning.
Boiler-1 & 2 Load cell purging done.
All aoto drain valves check & drained .

IFC moisture & oil filter drained.


Abnormality jobs attended

Boiler-1 Soot blower get trip so check and reset

ACC -2 , Fins Cleaning Trolley Direction found reverse, so Direction


corrected done

Compressor House , water cooler auto drain valve get stuck up so


clean the SOV plunger and made OK

BAC 2B, Dome Limit adjusted as per maintenance requirement


Compressor House external cooling fan top replaced

Abnormality jobs attended


In Unit No. # 1 Dilution Damper Cover to Provided.
FAS-2 level showing wrong ,SO clean the level transmitter Now Ok.

FAS-2 plate valve not operating, found jam inform to operation for
clearance.

All auto drain valves check & drained .

IFC moisture & oil filter drained.


APH conveying linediverting valve air leakage arrested.

4.5m MCC room to VFD room door bottom side one metal strip was
coming out so packed that with tape.

Tag pasted for name and power source for Bucket elevator-2 VFD
panel.

CHP substation back door was found unlocked so locked it.


MV drive room fall celling found damaged due to water came from
mech workshop cleaning done by mech deptt, so clean the MV drive
room and rermoved the damaged fall celling

Boiler-2 bag house dome valve PU tube dressing work done.

Boiler-2 bag house dome valvelimit switches cable dressing work


done.

All auto drain valves check & drained .

IFC moisture & oil filter drained.


APH conveying linediverting valve air leakage arrested.

DG old report was found pending so uploaded and corrected in SAP


and excel.
Street side near BC-4 value board 2 nos. checked and found following
problem:-
a) 4th no. board internal cable found open and no voltage on light end.
Also both lights are faulty and kept in WTP lab.
B) 5th number board both lights are faulty.
Neutral problem of TB in pole (causing flickering of street lights) of
4th board so shorted the neutral with incoming.

Abnormality jobs attended

Abnormality jobs attended


Boiler-1, Soot Blower Get Trip twice so checek and reset

Reclaimer Boom belt not started chcek from our side found all is OK ,
then inform to operator to check Pull cored pull cord is acted

Street Light no glowing till 7:00 PM, found its timer stuck up attend
the same
Abnormality jobs attended
In Unit No. # 2 air leakage from Vessel No.-11 isolation valve
( SA1046) found. So tightness done at fitting side. Now Ok.

In Unit No. # 2 Popeet Valve of Vessel No.-12 SOV Coil Bolt missing
condition. So New Bolt is Provided. Now Ok.

All the auto drain valve checked in compressor checked and working
Normally.

Boiler-1 and 2 area top all unwanted lights were made off.

Wall fan near electrical PC of Inst lab found power source without any
top so new domestic power top replaced.
Motor cleaning and blowering done at WTP root blowers.

Abnormality jobs attended

En mass-2 trip so checked and found that it is actuaaly taking mare


current 6.9 amp, so inform to operation deptt
Unit-2 trolley no. 3 down limit checked and found OK and operating,
but up limit is not giving NC contact need to change.

Soot blower-14 of Boiler-2 JB mounted after mech work and limit


connected.

Boiler-2 drum floor one MOV cover was found outside so placed and
spot.

Enmass-1 tripped when started from CCR, so checked and found the
fuse OK, motor resistance 4.8ohm balance and megger >500Mohm.
Found CT incoming cable was melted, so replaced the CT with new
10A/5A. Now replaced with spare, output cable was opened for trial.
Need to check on remote in morning.

Coal bunker-1B level was not showing so checked in field cleaned the
transmitter now OK.

Abnormality jobs attended


In Chimney analyser Boiler # 1 SOX analyser heat trace MCB is in OFF
Condition. So ON the MCB. Now Ok.
In Unit No. # 2 APH seal pr. Is not showing at DCS end. So clean the
impluse line. Now Ok.
Silo -1 , Motor cooling fan cover cover found loose tighten it properly

Bed Ash Silo Rav motor guard missing , arrange it

APH divertingvalve checked for jamming found normal from


instrument side informed operation for further check.
Boiler-1 soot blower-14 was tripping on G-fault so checked and found
the Y-phase cable TB was shorting to ground due to continuos heating
of terminals on steam exposure, so opened and direct conection done
instead of TB, now OK.
ACC-1 trolley no. 4 circuit modification done for auto operation of up
and down nozzle movement of single command.
Enmass-1 checked from feeder for local trial(motor connection
removed), found Y-phase pole not making of contactor so need to
change the same.
Boiler-2 soot blower-11 connection done as per operation, limit to be
set now.

En mass-1 faulty contactor changed


Engg room socket power not coming , so rectify the problem

Abnormality jobs attended


BAC-2B Dome Valve is not operating. So manually operated 2 to 3
times. Now under observation.
BAC-2B Back Pr. Transmiiter impluse line cleaned as per operation
requirement.

Reclaimer travel motor earthing found loose , tighten it


BAC-2B puppet valve air tube removed as per mech requirement
dummy line tube.

Enmass -1 checked for not staring found the add-on of contactor was
not properly placed so f/b contact not going to DCS, so rectified.

Boiler-2 soot blower-14 limit adjusted and trial taken found running
normal, current OK.

Abnormality jobs attended


Flyash silo-2 unloading system RAV tripped on Over load ,after
clearing jam overload reset and started
BC-7A Bagfilter not starting from DCS checked the circuit and trial
taken found OK

Boiler-1 Bedash cooler area hand lamp light found damage same was
replaced
Boiler-2 Bedashcooler -2A damaged poppet valve pneumatic fittings
replaced and trial taken

Boiler-1 Conveying SOV maintenance done and trial taken

Flyash silo-2 Bowser level high switch maintenance and functional


check done

Boiler-1 lift zero meter door not closing properly,sensor cleaning and
dust cleaning done and door open open close operation checked

Boiler-1 Lift door not opening at zero meter maintenance done and
trial taken
Abnormality jobs attended
Bed ash cooler 2A , back pressure problem informed by CCR, so check
and found that transmitter is correct but line back pressure is not
enough

Abnormality jobs attended

Bed ash cooler 2A , back pressure problem informed by CCR, so check


and found that transmitter is correct but line back pressure is not
enough, convey material 2-3 time now OK
Instrument Air Receiver 2, auto drain valve not working check and
found manually valve found close , open it made made OK
Oil Separator auto drain valve not working found its SOV connector
found loose, tighten it

Crusher building bucket elevator - 2 cable Dressing done


Boiler MCC 5325-Glassdoor lock found damage so change the lock

Oil Centrifugal pump 1 transformer and hand lamp given

Abnormality jobs attended


In Unit No. # 1 all the Bunker Level Transmitter Probe cleaing to done.

In Unit No. # 2 all the Bunker Level Transmitter Probe cleaing to done.
Abnormality jobs attended
Gland sealling control valve(01PCV2501) air leakage found so arrest it
and change the air tube

Abnormality jobs attended


Bed Ash siloRAV motor Trip , so chcek and found material jamming
after jam clear reset th RAV motor

Near SA fan-2, RSB-23 door lock found damage so replace the door
lock

24 V Hand lamp given at Oil Centrifugal -2.

4.5 Mtrs MOV 3201 found earthing break , earthing properly done

Fly Ash Silo-1, plate valve operate continously found fork switch
bend , presently arrangemt done to be check in next shift

Coal bunker-1B level was not showing so checked in field cleaned the
transmitter now OK.
BAC 2A, Showing false H:H , level sensor transmitter cleaning and
calibration done
Abnormality jobs attended
In Unit No. # 1 Coal Bunker Level Probe -1B Cleaned and Power Reset.
Now Ok.
In Unit No. # 2 Screw Conveyor -2A VFD Tripped on F0012 fault. Field
side jamming condition. So Informed to Shift operator.
All the auto drain valve checked in compressor checked and working
Normally.

In Unit No. # 2 vessel No.-21 Level probe cleaned and calibrated . Now
Ok.

In Fly ash silo No. # 2 Fork level switch acted so checked and found
that Controller wire TB damaged condition. So Changed the
Controller. And trial taken something it is working normally. Since
small bend in the level probe orientation when shoute down limit
switch comes at site. So informed to shift Incharge.

In BC-4 Belt is tripped when it is started . At manual it is working


Normally. So checked the logic found that ZSS is not healthy condition.
So at field side ZSS supply is not ok. Due to Tial end Guard limit switch
is not healthy condition. Need to Replace Guard Limit switch.

In Unit No. # 2 BAC-2A Level probe cleaned and calibrated . Now Ok.
Bc-4 tail end pully guard pull chord switch not changing contact,
(continuously NO). SO removed faulty switch & installed new pull pull
chord switch. Termination done ,working Ok.
BC-4 proxy switch cover found open, packed with screws .
BAG house -2 hopper-21 level showing H at DCS found material
available in hopper.
Bag house-2 hoppper 11 level not showing H at DCS found DI signal
connector malfunctioning. Connected.
FAS-2 fork level showing showing full indication,need to replace other
fork switch with cable.

All auto drain valves check & drained .


IFC moisture & oil filter drained.

Boiler-1 lift door was not opening at 0m floor so checked the door
lock and clamping lock was not properly placing on the inside so
lossened the lock with clamp arrangement, now OK.

P&V no. 4 power cable front end found without any protection so one
acyrlic sheet placed in front of the electrical cable.
Abnormality jobs attended
Bc-4 tail end pully guard pull chord switch contacts not in line, so
taken in line

Fly ash silo-2 level fork switch operated in empty comdition, so


disconected it

reclaimer left right motor cooling fan direction found wrong, so


correct it

Abnormality jobs attended

In BC-4 Belt is tripped when it is started . At manual it is is not started


found that EPB is in pressed condition. So released it. then it is started
in Local mode. In Remote condition it is tripped. So checked and found
that ZSS is not healthy condition. So at field side ZSS supply is not ok.
Due to Taill end Guard limit switch is not healthy condition.So
changed the contact in guard limit switch NC when rope is in released
condition. Need to Replace Guard Limit switch.

All the auto drain valve checked in compressor checked and working
Normally.

BC-4 motor . JB and Panels Cleaning and Bloweing done

Vibrating Screeen -1 motor . JB and Panels Cleaning and Bloweing


done
Vibrating Screeen -2 motor . JB and Panels Cleaning and Bloweing
done
24 Volt hand lamp given at BC7A Belt
Silo lights not glowing found timer stuck uop correc it

Bc-4 tail end pully guard pull chord switch not changing contact,
(continuously NO). SO removed faulty switch & installed new pull pull
chord switch. Termination done ,working Ok.

All auto drain valves check & drained .

IFC moisture & oil filter drained.

Boiiler-1 RSB near PA-1 found one 1-phase elcb was faulty so replaced
with new one.
Near ACC one RSB-61 found earthing cable broken of door so replaced
with new
Abnormality jobs attended
At Unit No. # 1 Bag House Top Vessel No.-22 service air valve limit
switch gland open condition. So gland is provided. Now Ok.

At Unit No. # 1 Bag House Top Vessel No.-11 Popette Valve SOV open
condition. So Cover to Provided.
Abnormality jobs attended

BED ash cooler-1B dome valve seal pressure not coming in DCS , so
checked and found leakage from hose pipe in mech limit switch, so
apply teflon tap and leakage arrested and seal pressure came in DCS

screen floor RSB socket fault rectified

Reclaimer gyration motor cooling fan found trip, So checked and


found that its winding resistance is unbalanced more and current is
unbalaced, in one phase current exeeds upto 1.5 amp.

Crusher RAV motor TB packed with brown tape after connection


work, power is in off condition as cooling fan need to be fitted.

Enmass-2 motor TB packed gland with glas putty for proper sealing,

FAS-2 fork switch not working ,So other fork switch installed but not
working, So old signal cable removed & new cable layed & trial done
by manually touching fly ash to fork ,working fine. Bulker trial work
pending.

Abnormality jobs attended


Unit No. # 1 Sox analyzer moisture fault. So reset it. Now Ok.
Bed ash cooler-1A dome not operated so checked and informed
operation and maintenance about jamming.

FAS-1 RAV tripped on overload so reset on operation requirement,


then OK.

BC-3 guard limit and ZSS limit not acting when motor run so checked
and found the guard limit not changing contact, so bypassed it for belt
run and need to be replaced with new one in 2nd half, informed to
Purushottam.
Bed ash cooler-1A dome not operated so checked & found pneumatic
cylinder air passing from inside "O" ring, inform to operation & maint.

Coal Crusher bag filter RAV cable termination done & trial done with
opertion working normal.

Boiler-1 bag house poppet valve-11 SOV fitting air leakage, So arrest
the same.

Boiler-1 bag house poppet valve -21 SOV fitting air leakage, So arrest
the same.
FAS-1 chute movement motor connection done.DE-RYB.

Abnormality jobs attended


Unit No. # 1 APH Seal Pr. Is not showing at DCS. So impluse line is
cleaned. Now Ok.
Unit No. # 2 vessel No.-11 Level Probe Cleaned as per operation
requirement.

Coal Shed Lights made On as per requitrement

Silo Lights made ON and OFF as per operation requirement

BC-6 belt not started from DCS , check from E&I side found everthing
OK , same informed
VAM control valve f/b showing wrong value so closed completely and
then slwoly opened for each feedback checked, now at 35% feedback.

Relacimer one cooling fan motor gland cable was loose and slightly
open so additional insulation provided and packing done.

Reclaimer area some cable found hanging so cable dressing done and
all lights cleaning done with cloth for dust accumulation.

Abnormality jobs attended


Boiler-2 wind box lights dome found water accumulation , so removed
the water

Dosing room(9.5 mtr) LP dosing tank inlet solenoid valve coil found
continiously ON and heat up, So stop the solenoid valve manually

silo-1 plate valve closed frequently , so checked and set the chut up
now OK

Abnormality jobs attended


In Unit No. # 2 BAC-2A Dome Valve seal Pr. is not showing. So
Changed the SOV of Dome Valve. Still Dome valve seal Pr. Is showing
less than 4 Kg/cm2. So informed to shift incharge.

In Unit No. # 2 APH Conveying is not happen. Found that MCB is in


Tripped condition. So ON the MCB. Now ok.

In Unit No. # 2 Coal feeder -2A started in Manual mode as per


operation requiement.
Repair Supply Box No.-74 ( HSD area) Inside earthing broken
condition. So reconnected it.
Repair Supply Box No.-71 ( LHS area) hole open condition. So silver
Tape is provided.
Abnormality jobs attended
Coal Feeder 2B, air leakage found, at Load cell purging box, leakage
arrested
Coal Feeder 1D, air leakage found, at Load cell purging box, leakage
arrested

BAC-2A, Seal pressure gauge faulty replaced the gauge with new one

BAC-1B, open limit fault founds seal pressure low same inform to
maintenance team

BAC1B , 24 V Temporary hand lamp given

ACC-2, Mist fan found trip so check and reset


Root Blower Room one extension boar given
Abnormality jobs attended

Abnormality jobs attended


Silo Top , Diverting gate not operating , check from our side it it OK,
Diverti9ng Gate is physically Jam same inform to S/I
Coal Feeder 1A, screw conveyor get trip so check and reset
Coal Feeder 1A, started in Local as per requirement

24 V Hand lamp and 24 V Transformer given at TG-1

Crusher building Lightning JB found Open , tighten it with new screw

Reclaimer Welding machine earthing lead found without lug , proper


lugging done
Silo Lightning, Lights not Stop ion morning found timer get stuck up ,
correct it
BC-4 Pull cord modification work under progress

Abnormality jobs attended


In Unit No. # 2 BAC-2A Dome Valve seal Pr. is not showing. Still Dome
valve seal Pr. Is showing less than 4 Kg/cm2. So Changed the air limit
switch of dome valve from BAC-2B. Now it is under observation.

In Unit No. # 2 BAC-2B Dome Valve seal Pr. Switch Changed . Now it is
working Normally.

Boiler-1 Coal feeder 1B load cell purging point air leakage arrested.

Boiler-2 Coal feeder 2D load cell purging point air leakage arrested.

Boiler-1 Coal feeder 1Dplate valve SOV fitting air leakage arrested.
Boiler-2 Coal feeder 2D load cell cable gland packed with tape.

Power report checked for month end balancing and correcyed for
shutdown power for 25.01.2021

CHP front street lights not glowing so checked and found timer was
stucked so corrected.
Limestone area cable cellar door lock was open and hanging so locked
the room again

Abnormality jobs attended


Unit-1 11-21 seal pressure fault

Bed ash cooler-2A dome valve stuicking, so purging

coal bunker-1D level false value coming, so cleaning the level


transmitter, now level Ok

Bed ash cooler-2A water valve SOV air leakage found, so change the
air tube
ACC-2 trolly2 not going UP, so checked and found that upper limit
switch not making NC contact
Abnormality jobs attended
Reclaimer RSB , 3 Phase Socket cable found heated, so new wiring
done

Reclaimer RSB , 1 Phase ELCB not working so clean it with klinit and
made OK

2 Nos 24Volt hand lamp given at crusher floor

BC-7A, LSC switch found looose without bolt so new bolt provided

In Fly ash silo No. # 1 Fork level switch acted so checked and found
that dust on the Probe. So cleaned the Probe. Now Ok.

Boiler-1 DSH CV 01TCV3203 gland leakage tightness done.

Boiler-2 Enmass conveyor not running,found jamming ,after jam


clearance running normal,current taking around 4.5 A.

VAM temp got incresased & TPh got zero, check & found CV got closed
due to no air in CV.Operator closed main CV, So rectified,Now Ok
2 nos. of cooling fan made ready for keeping inisde TG-1 acoustic
hood area:-
a) One fan has no plug top so new arranged amd cable insulation
done, checked running OK.
B) 2nd fan also has no plug top so arranged from welding machine top
and trial taken running OK.

Boiler-2 coal feeder-2A screw conveyor power was off so made ON


and later when taking more load informed operation, after jam
clearing run again in remote by operation dept.

One hand lamp given for coal feeder area.

Abnormality jobs attended


Coal Feeder-2B coal feeder temprature increase upto 56 degree, so
checked and tight its RTD now temp is OK

VAM trip , so checked and found that its HTG temp increase, so reset it
once
PM Jobs carried
Unit -1 CEP Motor, Drain Pot Pump, JB's Cleaning and
Bowering done
Unit -1 CEP Motor, Drain Pot Pump, JB's Cleaning and
Bowering done

Unit-1, DCS Room House keeping done

Unit-2, DCS Room House keeping done

Compressor House Lightning timer ON time increase


from 5:45 to 6:00 AM

PM Jobs carried

In CHP - T-1 Tower Inst. Panel , JB and Field Inst.


Cleaning to done.

In CHP - T-2 Tower Inst. Panel , JB and Field Inst.


Cleaning to done.

In CHP - T-1 Tower Motor , Repair Supply Box , Motor JB


Cleaning to done.
In CHP - T-2 Tower Motor , Repair Supply Box , Motor JB
Cleaning to done.
Bag filter BC-4 Panel packed with packing tape.

Crusher building equipments cleaning and blowring


done as:
1 BC-4 top floor all motors and JB
2 En-mass floor all motors and JB
3 Screen floor all motors and JB
4 BC-6 tail end floor all JB

PM Jobs carried
Coal Crusher-1 Motor, Cleaning and Bloweing done

Coal Crusher-2 Motor, Cleaning and Bloweing done


BC-4 Spare motor covering done and sticker pasted

Crusher Building ground floor cleaning and blowering


done
Crusher Building coal Sample motor cleaning done
Crusher Building RSB , gap filled with packing tape
Crusher Building RSB , Hoist Power colour sticker
pasted
ID-2 old motor, spare motor sticker pasted
PA-2 old motor, spare motor sticker pasted

PM Jobs carried
In Fly ash Silo No. # 1 Panel and Field Inst. Blowering
and Cleaning to done.
In Fly ash Silo No. # 2 Panel and Field Inst. Blowering
and Cleaning to done.

In CT # 2 VFD Panel Blowering and Cleaning to done.


DSH of Boiler-2 FWS cleaning and blowering work done.

Boiler-1 and 2 following motors cleaning and blowering


done due to dusty condition:-
a) ID-1 and 2
b) PA-1 and 2
c) SA-1 and 2
d) J valve-1A, 2A, 1B and 2B.
PM Jobs carried
coal feeder blowring and cleaning done both unit
1 all coal feeders motor
2 Loacal panels
3 Repaire supply box
4 24 volts transformers
5 screw feeders motors

sticker pasting done at WTP MCC area Boiler-2 area


coal feeder unit-1&2 instrument JBs cleaning done

PM Jobs carried

In Unit No.# 1 FW Station CV and MOV Blowering and


Cleaning to done.

In Unit No.#2 De Superheater Station CV and MOV


Blowering and Cleaning to done.
Fire Pump House all Motor Cleaning and blowering
done
Illumination level of following area chceked -
1 . Compressor House
2. Pump House
3. WTP
4. CHP
5. switch yard

TG-1 -mtr 0-mtrfloor all CV & MOV cleaning work done

TG-2 -mtr 0-mtrfloor all CV & MOV cleaning work done

Motor greasing done for :-


a) CEP-1A
b) CEP-2B
c) ACW-2
Boiler-1 all bag house vibrator motors checked and base
bolt tightness done, all operations checked and earthing
tightness work done.
PM Jobs carried

CHP DCS panels cleaning done, and CHP desk panel


cleaning

Bag house-2 vessel-12-22 level prob cleaning done

Boiler-1 Motors cleanig done as,


1 ID-1
2 PA-1
3 SA-1
4 J valve-1A &1B

Boiler-1 Repair supply box claning done from 3rd floor


to top floor

CHP MCC Room cleaning underprogress


one ladder shifted from WTP to WWTP room

Motor connection removed and later done for FAS-1


RAV motor and packing done with brown tape.
Greasing work done for :-
a) Crusher-1
Report will be send after updation of file.

Soot blower-11 of Boiler-1 motor packed with glas


putty for sealing and local JB with brown tape.
In Chimney analyser SPM JB , remote calibration JB No.
# 1 and 2 Cleaning and Packing Tape to done.

Boiler-1 , soot blower no-11 motor cover arrange and


re-fit it.
Illumination level checked at different location and
checklist prepared ( Sept-20 and Dec 20)

PM Jobs carried

WTP cable celler room cleaning done

Boiler-1 light cleaning done at 5th floor


blowring and cleaning done in,
1 unit-2, 6 transmitter Panel
2 Unit-2, 12 nos hoping device cleaning
3 Unit-2, Panel-4 transmitter cleaning done
5 Feed water station and Desuperheating station MOV
cleaning done 5 Nos and 7 nos control valve cleaning
done

Service IFC panel oil removed from in side & out the
panel & made it clean.

Soot blower-11 of Boiler-1 JB fixed with armoured wire.

Motor connection done for Soot blowe-11 of Boiler-1


motor.

CT fan-2 started and checked with operation, running


normal.

Security tower T-1 light was not glowing so checked &


found the incoming power was not coming so started
from side stream filter RSB, cofirmed at evening now
OK.

PM Jobs carried
In LHS , all the DCS Panel Blowering and Cleaning to
done.
In LHS , 220 Volts Power Supply Panel Blowering and
Cleaning to done.

In LHS , LHS Control desk Blowering and Cleaning to


done.

Lime Stone and WWTP MCC cleaning and blowering


done

Coal Crusher-1 motor direction changed, breaker output


cable reversed R and B phase as per Mr. AP Shrivatava
requirement.

Boiler-2 drain MOV cleaning done with brush.


T-2 tower diverter actuator assembly power
disonnected from field and insulated both power & limit
cable as per instruction of AP Shrivastava, manual gate
valve in in line now.

Boiler-2 vessel 11-21 SOV JB oil & dust cleanig done


Boiler-2 vessel 12-22 SOV JB oil & dust cleanig done

WTP pump house cleaning & blowering done.

coal feeder-2A load cell changed, but not given correct


output
PRDS floor instrument equipment cleaning done
bag house vibrator motor tightness done

Vam cooling water booster pump motor painting and


cleaning done at boiler-1 o mtr

PM Jobs carried
Jesu - Hozen done at coal feeder 1&2 area.

PM Jobs carried
In CHP DCS Panel Blowering and Cleaning to done.
PM Jobs carried
Boiler-1 APH SOV JB dust & dirt cleaning done,

Boiler-1 Bag house 11-21 SOV JB dust & dirt cleaning


done,
Boiler-1 Bag house 12-22SOV JB dust & dirt cleaning
done,

Boiler-1 BAC 1A Local panel & conveying panel cleaned.

Boiler-1 BAC 1B Local panel & conveying panel cleaned.


Boiler-2 APH SOV JB dust & dirt cleaning done,
ACW all motors cleaning with brush and cloth

PM Jobs carried

Jesu - Hozen done at BC-7A and 7B area

PM Jobs carried
In Unit No. # 1 APH SOV JB and Field Inst. Blowering
and Cleaning to done.
In Unit No. # 1 vessel No.-11/21 SOV JB and Field Inst.
Blowering and Cleaning to done.
In Unit No. # 1 vessel No.-12/22 SOV JB and Field Inst.
Blowering and Cleaning to done.
In IAC No. # 1 motor and Panel Blowering and Cleaning
to done.
In IAC No. # 2 motor and Panel Blowering and Cleaning
to done.
In IAC No. # 3 motor and Panel Blowering and Cleaning
to done.

Boiler-1 SA fan bearing JB hole packed.

Boiler-2 SA fan bearing JB cable gland pack..


ACC vent pipe -1RTD loose cable dressing done,
ACC- fan 2F flow switch cable dressing done.
BAC-2B flow switch polythene covered.

All MCC rooms authorization format pasting done for


updated sheet.
All coal feeder motors following things checked for
Boiler-1 :-
a) Double earthing checked and ensured.
B) Motor fins cleaning with brush.
C) Blowering done.

PM Jobs carried

silo-2 pnumetic valve not closed so set the limt

Earthing pit painting work

bag house-12-22 boiler line flushing of transmitter in


pressure switch

bunker level transmitter cleaning both unit

PM Jobs carried

In Unit No. # 2 drain MOV ( 06 Nos. ) Blowering and


Cleaning to done.

In Unit No. # 2 APH SOV JB and Field Inst. Blowering


and Cleaning to done.

In Unit No. # 2 vessel No.-11/21 SOV JB and Field Inst.


Blowering and Cleaning to done.
In Unit No. # 2 vessel No.-12/22 SOV JB and Field Inst.
Blowering and Cleaning to done.
BC-7A, 7B motor and panel cleaning and blowering
done

Street Light Lightnimng timer adjusted

Boiler-1 hopper-21 HH probe installaed.

PRDS floor instrument equipment cleaning done

All coal feeder motors following things checked for


Boiler-2 :-
a) Double earthing checked and ensured.
B) Motor fins cleaning with brush.
C) Blowering done.
All VFD room doors and MCC doors authorization
format pasting done for updated sheet.
PM Jobs carried

Boiler 1&2 bag house level prob clean and calibrate

APH -2 back presure switch line flushing done

Turbine zero meter BFP motors cleaning and lub oil


motors cleaning done
Turbine zero meter repair supply box and lighting ,JB
ACC JB cleaning done

PM Jobs carried
Pump Hose following equipment cleaning and bowering
done-
1. Instrument JB
2. Fire Panel
3. MOV - 5 No's
4. Transmitter - 4 No's
5. Pressure Gauge- 6 No's
6. Pressure Switch - 16 no's

Crushre Building 24 Volt hand lamp given-2 Nos


`
PM Jobs carried

HP dosing room all panels and blowers cleaning


blowering and terminal tightness done.

Chinese muffle furnace made ready.

PM Jobs carried
Earthing pit painting work

ACC unit-2 trolly-3 polythen covered

DCS -1 cable dressing done

4.5 meter switchgear room outside equipmts cleaning


and blowring done

Chimney analyzer room & panel cleaning & blowering


work done.

Chimney analyzer room 5S done.

Boiler-2 ground floor all instrument cleaning &


blowering done.
Boiler-2 APH ground floor all instrument cleaning &
blowering done.
Boiler-2 Bag house ground floor all instrument cleaning
& blowering done.

4.5m MCC room ACW-1 VFD control trial under


progress with instrument.

Temporary supply of ACW-1 trial given from P&V MCC


and later restored.
PM Jobs carried

In Unit No. # 1 bed ash cooler -1A and 1B VFD panel


Blowering and Cleaning to done.

Unit-1 Oil Centrifugal Panel cleaning and Blowering


done
Unit-2 Oil Centrifugal Panel cleaning and Blowering
done
Shift Almirah 5s done

CEP-1A brekaer was jamming so opened breaker and


maintenance done
CT fan-3 VFD cleaning done during Jizu-Hozen round
and panel closed.
4.5m MCC room ACW-1 VFD control trial completed for
start/stop, transformer also grounded.

Temporary supply of ACW-1 trial given from P&V MCC


panel from AC supply of Unit-2 side of 4.5m MCC.

PM Jobs carried

Unit No. # 1 Zero mtrs all the Pressure guage cleaning to


done.

Unit No. # 2 Zero mtrs all the Pressure guage cleaning to


done.

Unit No. # 2 Vessel No.-11 seal Pr. PU tube damaged


condition. So replaced it. Now Ok.

Unit No. # 1 P-Fan RTD JB Cleaning and Packing Tape to


done.

ACW-1 VFD panel blowring and cleaning done


ACW-1 VFD panel megger value done

ACC unit-2 trolly-3 motor cable connection done and


cable dressing done

Tg-1 -4.5 mtr floor all CV & MOV cleaning work done

Tg-2 -4.5 mtr floor all CV & MOV cleaning work done

ACW all motors cleaning and Blowering done

Soot blower-14 of Unit-2 motor connection removed as


per Maint requirement,
DE-Black, Blue, Red
Also total local panel removed with limit assembly.
ACW-1 started today on VFD so motor greasing work
done.

BAC-2B limit not showing healthy so informed CCR


about dome jamming, also permit given for the same
valve to maint.
Jizu-Hozen round done at Fire pump house.

WTP dcs panel cleaning & blowering work done.

Fire Pump House all Motor Cleaning and blowering


done

Dosing room electrical and instruments blowring and


cleaning done
PM Jobs carried

In Fly Ash Silo No. # 1 Panel and Field Inst. Blowering


and Cleaning to done.

In Fly Ash Silo No. # 2 Panel and Field Inst. Blowering


and Cleaning to done.
PM Jobs carried

Reclaimer Boom Belt Guard Limit switch cable re-round


and cable dressing done

Boiler-1 Steam header MOV cleaning & blowering done.

Common header MOV cleaning & blowering done.


PRDS floor CV,MOV & instrument equipment cleaning
done
Unit-1&2 soot blower panels cleaning and blowring
done, ,panel wiring tightness done
PM Jobs carried

Jesu - Hozen done at Compressor houes area

All Bunker Level Transmitter cleaning done

Boiler-1, CO panel Room AC made ON

PM Jobs carried
Unit No. # 1Firing Floor area Blowering and cleaning to
done.
Unit No. # 2 Firing Floor area Blowering and cleaning
to done.

CHP AHF Panel Filter Blowering and cleaning to done.


Boiler-1 Coal feeder MOV cleaning & blowering done.

Boiler-1 Coal feeder SOV cleaning & blowering done.

Boiler-1 Bunker MOV cleaning & blowering done.

BAC-1B level probe covered by polythene.

Boiler-1 and 2 following motors cleaning and blowering


done due to dusty condition:-
a) ID-1 and 2
b) PA-1 and 2
c) SA-1 and 2
d) J valve-1A, 2A, 1B and 2B.

Following MCC all doors and panels checked for any


abnormality and proper closure:-
a) 4.5m MCC all panel door
b) CHP MCC room
Boiler1&2 Feed water station equipment cleaning done

Unit-1 HSD control valve at boiler-1 cleaning done


Both boiler ground floor JB cleaning anf packing done

Painting work at the both PA fan plateform and railing,


work under progress

Both boiler JB cleaning done at zero mtr and 4.5 mtr

Both boiler new PA Fan motors fins cleaning done with


cloth
old polythen removed from washing pump panel at unit
-2 ACC

Boiler-1 BAC 1A & 1B panel & field instrument cleaning


done. MOV cleaning & blowering done.

Boiler-1 drain MOV cleaning & blowering done.

Boiler-2 BAC 2A & 2B panel & field instrument cleaning


done. MOV cleaning & blowering done.

Boiler-2 drain MOV cleaning & blowering done.

Boiler-2 coal feeder all MOV & SOV cleaning work done.

TF-om all ACC JB checking done and clenaing done of all


JBs.

Following MCC all doors and panels checked for any


abnormality and proper closure:-
a) WTP MCC room
b) Limestone MCC room
PM Jobs carried
ID Fan 1&2 motors fins cleaning done
BFP 1,2,3 motors cleaning done
both boiler o mtr field instrument cleaning work

Both DCS units panel doors checking done


STG building lift stickring done
Grass removing work done in switchrard
workshop MV drive room cleaning done

PM Jobs carried
Houise Keeping work for COO Visit
PM Jobs carried
In Unit No. # 1 TG Ground Floor area all the field inst.
Cleaning to done.

In Unit No. # 2 TG Ground Floor area all the field inst.


Cleaning to done.

WTP area root blower motors-1 and 2 following things


checked:-
a) Dust over the motor surface cleaned
b) Double earthing checking and tightness done.

PM Jobs carried
Boiler-1 CO Low value came , so checked actuator
checked and sample points checked, flow checked and
applied teflon tap on all sampling point, calibration is
pending
fins cleaning trolly checked-1 and 3 in unit-2 ACC,
running normal

china office small tree and bushes cutting work


Soot blowe-11 of Unit-1 connection removed from
feeder as it was tripping, as per Operation requirement.

Soot blower-14 of Boiler-2 & motor connection done


both from motor and feeder end.

PM Jobs carried
In Fly ash silo No. # 1 all the field inst. And Panel
Cleaning to done.
In Fly ash silo No. # 2 all the field inst. And Panel
Cleaning to done.
Fly ash silo No. # 1 all Motors & JB Cleaning done

Fly ash silo No. # 2 all Motors & JB Cleaning done

Bed ash silo all Motors & JB Cleaning done

IFC panel cleaning and blowering work done and panel


packed with brwon tape.

CHP MCC room blowering work done of panels.

Crusher house bag filter panelVFD cleaning and


blowering work done.

En mass-1 motor conction done


Reclaimer boom belt pull card rope joint wire removed
and fix clamp
drum emergency discharge mov(02MN0501) fix GI
cover on it
BC-4 deluge station module JB fix with cover.
ACW dewatering pump checking done

PM Jobs carried
In Reclaimer PLC and VFD Panel Blowering and
Cleaning to done.
In BAC-2A and 2B VFD Panel Blowering and Cleaning to
done.

Reclaimer Panel Cleaning and Blowering done

Reclaimer Boom and Travel Motor Cleaning and


Blowering done
Reclaimer all Termination tighten done
BAC 2B, 2 Nos LED Lamp Given
Silo Lights made ON as per requirement.
CHP area lights made OFF.
ACC-2 trolley no. 4 problem rectified of up command
and auto command made for continos up-down
operation.(Only down taken in line)

WTP lab to China yard spare cell material shifted.

BAC-2 area LED light and hand lamp shifted to


workshop area and 4.5m MCC room.

PM Jobs carried
BC-7A bagfilter panel blowering ,Cleaning and packing
done
BC-7B bagfilter panel blowering ,Cleaning and packing
done
PM Jobs carried

Pump house all motors blowring and cleaning done

Pump house all instrument cleaning done


Pump house all MOV cleaning done-5nos
Pump house battary charger cleaning done
Pump house Battary cleaning done
Pump house exhaust fan panel cleaning done

PM Jobs carried

Jesu - Hozen done at Silo ground Floor to Top Floor

ACW pump house motor cleaning done

Reclaimed RSB no96, Check and green tag Provided


PM Jobs carried
In CHP, BC-5 VFD Panel Blowering and cleaning to
done.
In CHP, BC-5 PA System Panel Blowering and cleaning
to done.

In ACW pump House ACW Motor No. # 1 , 2 and 3 Motor


Cleaning and Blowering to done.
PM Jobs carried
PA SA and J valve fan motors of both boiler cleaning
done
Unit-2 0mtr drain MOV cleaning-6nos
Unit-2 0mtr J valve MOV cleaning-3nos
Bed ash cooler JB cleaning-2 nos
APH and Bag hose JB cleaning done

PM Jobs carried

Jesu - Hozen done at China yard Electrical Rooms

PA system Mic not working in CCR, attend it.


PM Jobs carried
P&V local panel checking, cleaning and tightness
checked for no. 2 and 4.

Muffle furance Indian type checked for coil problem and


found that the coil is internally opened so need to
replace.
PM Jobs carried

Silo instrument equipmets cleaning job done

T1 tower T2 tower RSB cleaning done

BC-7A 7B RSB JB cleaning done

PM Jobs carried

In Unit No. # 1 Zero mtrs field Inst. And JB Blowering


and cleaning to done.

In Unit No. # 1 Zero mtrs drain MOV and J- valve MOV


Blowering and cleaning to done.
Boiler1 FWS all 03 CV & 3 MOV cleaning & blowering
work done.

Boiler1 DSH station all 04 CV cleaning & blowering


work done.

Boiler-1bed T?C JB cleaning & blowering work done.

AC JB outside CCR cable dressing work done and


corrected with cable tye.
PM Jobs carried
In Unit No. # 2 DSH Control Valve ( 04 Nos. ) , FW CV
and MOV Blowering and cleaning to done.

En mass-1, Feeder Power contactor replace with new


one.

TG-1, taken in base load and after normalise base load


remove.
PM Jobs carried

Crusher floor RAV motor conection done, and its


earthing lid connection done

PRDS floor blowring and cleaning done

coal feeder lights cleaning work done

Enmass-2 trial taken after mech dept coupling of


gearbox, current taken now 4.2A balance in all phases.

Silica gel replaced for:-


a) GT-1 OLTC
b) GT-2 OLTC

DCS room -1 panel filter cleaning work done

PM Jobs carried
CCR MV drive AHU/ VFD Panel Cleaning and
Blowerning to done.
4.5 Mtrs. MV drive AHU/ VFD Panel Cleaning and
Blowerning to done.
Work shop MV drive AHU/ VFD Panel Cleaning and
Blowerning to done.
BFP MV drive AHU/ VFD Panel Cleaning and
Blowerning to done.

CHP MCC Cleaning and Bklowering done

CHP PCC cleanimng and blowering done

GT-2 main trafo silica gel replaced with new one, old
one removed from site.
Cooling fan new mounted for Coal crusher bag filter
RAV, power to be restored and checked onece with trial
run.

FAS-1 chute movement motor connection removed


DE-RYB.
Jisu-Hozen round done in Coal feeder area.
Water cooler compressor house SOV plunger cleaning
done due to jamming, now OK.

Cooling fan new mounted for Coal crusher bag filter


RAV, power connection done & checked with trial run.

02 no's 24 V lamp provded.

Plug top changed at BC 7A

PM Jobs carried
In WTP DCS ( 04 Nos. ) Panel Cleaning and Blowerning
to done.
In WTP MOV Feeder Panel Cleaning and Blowerning to
done.
In WTP 220 Volts Power Supply Panel Cleaning and
Blowerning to done.

Pump house all motors blowring and cleaning done

Pump house all Panel and JB blowring and cleaning


done
Camera of middle gate removed , connection opened
and shifted to instrument lab.
Checking and frequency of camera is under progress.

Reclaimer area JIZU-Hozen done at morning round with


team.

Bucket elevator-1 power contactor MNX40 replaced


with spare one as a purpose of predictive maintetance
and old one mounted on spare panel again.

PM Jobs carried
Boiler-2 Lights cleaning work done,at wind box and
furnace floor

Both boiler feed water station and desuperheating


valves cleaning work done

PM Jobs carried

In Unit No. # 2 BAC-2A Inst. Local JB and Field Inst.


Blowering and Cleaning to done.

In Unit No. # 2 BAC-2B Inst. Local JB and Field Inst.


Blowering and Cleaning to done.
PM Jobs carried
PM Jobs carried

Bed ash cooler-2A dome valve checking work

LP heater control valve (2906) not working , so check


and correct it
cleaning and blowring at 4.5 mtr
Mist system motors cleaning and blowring work

PM Jobs carried
Jesu - Hozen done at Silo ground Floor to Top Floor

PM Jobs carried
Unit No. # 1 Soot Blower Panel Blowering and Cleaning
to done.

Unit No. # 2 Soot Blower Panel Blowering and Cleaning


to done.

In WTP DM Transfer Pump No. # 2 Feeder maintences ,


connection tightness and Blowering to done.

In WTP DM Transfer Pump No. # 3 Feeder maintences ,


connection tightness and Blowering to done.

Boiler-1 APH SOV JB dust & dirt cleaning done,

Boiler-1 Bag house 11-21 SOV JB dust & dirt cleaning


done,
Boiler-1 Bag house 12-22 SOV JB dust & dirt cleaning
done,
Motor cleaning and blowering done for following area
and motor earthhing checked:-
a) CEP-1A
b) CEP-1B
c) Fins cleaning motor

PM Jobs carried
Unit-2 bag house 11-21 line cleaning done

coal bunker Unit-1&2 all level transmitter cleaning done

Screen-2 power contactor changed from MNX-80 to


MNX50
PM Jobs carried
PRDS Floor area MOV , CV and Transmitter Blowering
and Cleaning to done.

CHP Bucket elevator ZSS Proxy and Controller , JB


Blowering and Cleaning to done.

TG-1 -4.5 mtr floor all CV & MOV cleaning work done

TG-2 -4.5 mtr floor all CV & MOV cleaning work done

Coal feeder 1A RTD polythene covered.


Motor cleaning and blowering done for following area
and motor earthhing checked:-
a) CEP-2A
b) CEP-2B
c) Fins cleaning motor and all JBs

Power report checked for month end balancingfor


following data:-
a) Net generation
b) Auxilary
c) Stacker and AFR power
d) DG power
All balanced and no error ensured.

2 nos RSB in ACC-2 areano. 62 and 63 cleaning and


blowering done and all ELCB test operation checked.

PM Jobs carried
Silo-2 fork switch cleaning done and its controller clean

Bed ash cooler-2A dome valve checking work


Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 DM water pump-1
2 TG-1 Exhaust fan
3 TG-1 inlet MOV 2305
4 Bag house-2 inst air
5 BC-1
P&V in stop condiiton.
01.02.2021 A Gajendra Pandya TG-1 stop at 10.30 a.m, and rack out Generator-1 breaker
pedestal cooling fan conection done at TG-1 Encloser
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Switchyard Round Taken found normal

Following shutdown Cleared-


1 BC-1
2 DM transfer pump-1
3 Bag house-2 inst air and 11-21 bag house 0m

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.

B Shift instrument digital log book filled


01.02.2021 Anurag
UPS log digital log book filled.

Shift abnormality  digital log book filled.


VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
TG-1 synchronised at 1.00 AM.
Unit No. # 2 APH Seal Pr. not showing at DCS. So Impluse line
is cleaned.

Sanjay Garg
All the auto drain valve checked in compressor checked and
working Normally.

TG-1 Zero mtrs Field Inst. Cleaning and Blowering to done.

TG-2 Zero mtrs Field Inst. Cleaning and Blowering to done.


Sanjay Garg
CPCB Report on dated @01/02/2021  not sent because CD is
not available.
All the Report ( APC, Plant Performance , Power Report )  not
sent because CD is not available.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
01.02.2021 C Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Deepak Chand
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 Degessor pump-1
2 Degessor pump-2
3 En mass-2
4 BC7A
5 BC-7B
6 BC-1

Following shutdown cleared:-


1 En mass-2
02.02.2021 A Gajendra Pandya 2 BC7A
3 BC-7B
P&V in stop condiiton.
compresser house auto drain valve manual draining done
LED lights and transformers collected from TG-1
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

Evening round all required light made on.

Following shutdown Cleared-


1 Degessor pump-1
2 Degessor pump-2
3 BC-1 O & M

P&V in stop condiiton.

B compresser house auto drain valve manual draining done


02.02.2021 Ajaya kumar
LED lights and transformers collected from TG-1
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In SWAS Room U# 1 Drum Water Conductivity is not showing


at DCS end. So checked and found that sample is not coming
in rotameter. So adjust it. Also cleaned the sensor. Now OK.

In SWAS Room U# 1 Drum Water PH is showing at DCS end.


So Glass water tube is very dusty. So cleaned it. Also cleaned
the sensor. Now OK.
All the auto drain valve checked in compressor checked and
Sanjay Garg working Normally.
In Unit No. # 1 Boiler Firing floor area Field Inst. And JB
Cleaning and Blowering to done.
Sanjay Garg

In Unit No. # 2 Boiler Firing floor area Field Inst. And JB


Cleaning and Blowering to done.
CPCB Report on dated @02/02/2021  not sent because CD is
not available.
All the Report ( APC, Plant Performance , Power Report )  not
C sent because CD is not available.
02.02.2021
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Power report prepared and mail
FH & HOD Report prepared and mailed
Deepak Chand
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BAC-2B
Anurag 2 Boiler-2 bag house inst air and puppet valve isolation air
03.02.2021 A Chowdhury
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

Evening round all required light made on.

Following shutdown Cleared-


1 BAG haouse-2 Poppet valve 12
2 Bag house -2 Inst air 21
S/D given BAC 2B

P&V in stop condiiton.

B Gajendra
03.02.2021 Pandya/Ajaya
kumar compresser house auto drain valve manual draining done

LED lights and transformers collected from TG-1


RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Bed ash Silo Plate valve Close Limit Switch is in hanging


condition. So Bolt tightness to done. Now Ok.
Unit No. # 2 Vessel No.-12/22 Back Pr. / Transmitter not
showing at DCS. So Impluse line is cleaned.
All the auto drain valve checked in compressor checked and
working Normally.
In Fly ash Silo No.. # 1 Field Inst. And Panel Cleaning and
Blowering to done.

Sanjay Garg In Fly ash Silo No.. # 2 Field Inst. And Panel Cleaning and
Blowering to done.
In Bed ash Silo Field Inst. And Panel Cleaning and Blowering
to done.
CPCB Report on dated @03/02/2021  not sent because CD is
not available.
All the Report ( APC, Plant Performance , Power Report )  not
sent because CD is not available.
03.02.2021 C
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
03.02.2021 C

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Deepak Chand DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 APH-1 inst air line and all fittings
2 BC-1
3 Reclaimer
Anurag 4 Washing pump-2
04.02.2021 A Chowdhury
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

Evening round all rquired light made on.

B
04.02.2021 Ajaya kumar
Following shutdown given-
1 APH-1 inst air line and all fittings
2 BC-1
3 Reclaimer
B 4 Washing pump-2
04.02.2021 Ajaya kumar
P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @03/02/2021  not sent because CD is


not available.

All the Report ( APC, Plant Performance , Power Report )  not


sent because CD is not available.
04.02.2021 C Gajendra Pandya RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

Following shutdown given


1 En Mass-2
2 Reclaimer
3 Bed ash cooler-2
4 Coal Feeder 2B
5. Coal Feeder 2B pnumatic valve
05.02.2020 A Deepak Chand

Coal Feeder 2B AVI given

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Silo Top U# 1 APH Diverting Valve (SV-8150) open Feedback


is not showing at DCS end. So checked and found that open
limit is Ok. But Relay is faulty. So changed the Relay. Now Ok.

In reclaimer PLC Supply is not ON. Due to Breaker Shutdown


to taken. Also UPS battery is drain condition. When UPS
battery is charged. Then UPS comes in Service. Now Ok.

All the auto drain valve checked in compressor checked and


working Normally.
In Side Stream Filter CT fan VFD Panel Blowering and
Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
05.02.2021 B Sanjay Garg
B UPS log digital log book filled.
05.02.2021 Sanjay Garg
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Following shutdownCleared
1 En Mass-2
2 Reclaimer
3 Bed ash cooler-2
4 Coal Feeder 2B
5. Coal Feeder 2B pnumatic valve
all the manual light to ON Condition.
Unit No. # 1 Fins Cleaning System not operating. So found
that Down limit Switch is not operating. So adjust the lever of
the limit switch. Now Ok.
In Silo street light ON as Per Operation requirement.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @05/02/2021  mail sent to concern


person.
All the Report ( APC, Plant Performance , Power Report )  mail
sent to concern person.

Chimney analyser room round taken & found system healthy.


CPCB date updating at site @ analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled

Gajendra UPS log digital log book filled.


05.02.2021 C Pandya/Ajaya
kumar Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

Following shutdown given


1 Regeneration Pump-1
2 Regeneration Pump- 2
3 BAC-2B
05.02.2020 A Deepak Chand 4 BC-1
5 BC-2
6. CT fan-1
7. CT fan MOV
8. Washer pump -2

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Temple DVD is not working condition. So inside connector


loose condition. So Tightness to done.

In CT fan -1 is not started as Local as well as Remote. So Door


Limit switch is not cut . So adjust the door limit Switch. Now
Ok.
All the auto drain valve checked in compressor checked and
working Normally.
In Chimney analyser PC CPCB data is not updated. So Restart
the PC also contact to adage Person. Now Ok.
Online ETP data ia hang condition@5 Feb.5.01 PM.
OnlineCPCB data ia hang condition@6 Feb.10.00 AM.
In Chimney analyser Panel Blowering and Cleaning to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
06.02.2021 B Sanjay Garg VAM log digital log book filled.
06.02.2021 B Sanjay Garg
General Plant Round taken found all drive running normal.

Following shutdown Cleared.


1 Regeneration Pump-1
2 Regeneration Pump- 2
3 BC-1
4 BC-2
5 CT fan-1
6 CT fan MOV
7 Washer pump -2

all the manual light to ON Condition.


In CHP , AFR Breaker of Cement Plant is Tripped 02 times. So
checked and found that ir1 acted and fault reading 3.83 and
3.28 on the display. So reset the breaker. After this ON the
breaker when clearence given by Cement Plant Person. Now
Ok.
In Silo street light ON as Per Operation requirement.
In Unit No. # 2 Cyclone floor area welding Machine JB double
earthing to done.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @06/02/2021  mail sent to concern


person.

All the Report ( APC, Plant Performance , Power Report )  mail


sent to concern person.

Chimney analyser room round taken & found system healthy.


CPCB date updating at site @ analyzer PC also.
Gajendra RNRP all nodes found UP except SPC008 and OPX01.
06.02.2021 C Pandya/Ajaya Shift instrument digital log book filled
kumar UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Unit No. # 1 Coal Bunker Level Transmitter Probe cleaning to


done.
Unit No. # 2 Coal Bunker Level Transmitter Probe cleaning to
done.
Unit No. # 1 CO analyser showing moisture fault. So Reset it.
Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.

Unit No. # 2 vessel No.-12/22 Back Pr. Switch / Transmitter


impluse line cleaned as per opeation requirement.

Online ETP data ia hang condition@5 Feb.5.01 PM.


OnlineCPCB data ia hang condition@6 Feb.10.00 AM.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
A
07.02.2021 Sanjay Garg Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Following shutdown given


1 BC-6
2Vibrating Screen -1

all the manual light to OFF Condition.


In CHP , AFR Breaker of Cement Plant is Tripped 01 times. So
checked and found that ir1 acted and fault reading 1084 Amp
+ 4.14 Sec. on the display. So reset the breaker. After this ON
the breaker when clearence given by Cement Plant Person.
Now Ok.
In WTP MCC Blowerning and Cleaning to done.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Following shutdown cleared:-


1 BC-6
2Vibrating Screen -1

hand lamp given at BC7AB


B
07.02.2021 Gajendra Pandya RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @07/02/2021  mail sent to concern


person.

All the Report ( APC, Plant Performance , Power Report )  mail


sent to concern person.

Chimney analyser room round taken & found system healthy.

CPCB date updating at site & analyzer PC also.

Deepak RNRP all nodes found UP except SPC008 and OPX01.


07.02.2021 C Chand/Ajaya
kumar Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to on Condition.

Mail sent to Adage concern support team person for CPCB


data display at server

Chimney analyser room round taken & found system healthy.


CPCB date updating at our analyzer & PC also.

A
08.02.2021 Jaswant Singh
Following shutdown given:-
1 BC-1, BC-1
2 Vibrating Screen -1
3 BC-4
4 BFP-3,O/L MOV, BYPASS MOV
5 RECLAIMER(again PTW closed)
A 6 MGF-1
08.02.2021 Jaswant Singh
7 MGF-2
8 BC-7A, BC-7B,ENMASS-2
9 COAL FDR-2B,2B MOV
10 BFP-3 FITTINGS
11 BC-2

BFP-2 made ready for VFD operation and changeover done as


per operation team strainer cleaning purpose
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
All the AC MCB to oFF Condition.
1 No's light provide IFC Compressor after work complete
return
BFP-2 Changeover in DOL Mode as per requirement of
operation deptt.

TG Building lights manually ON

Following shutdown cleared:-


1 BC-1, BC-1
2 Vibrating Screen -1
3 BC-4
4 BFP-3,O/L MOV, BYPASS MOV
5 RECLAIMER(again PTW closed)
6 MGF-1
B 7 MGF-2
08.02.2021 Tarun Gaur
8 BC-7A, BC-7B,ENMASS-2
9 COAL FDR-2B,2B MOV
10 BFP-3 FITTINGS
11 BC-2

BFP-2 made ready for VFD operation and changeover done as


per operation team strainer cleaning purpose
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In Unit No. # 1 Right Side Boiler O2 (01QI1102) is violet at


DCS end. So checked and found that Error-2 Heater Temp. is
showing in Display. So reset the Power Supply. After 2 to 3
minutes again it is showing same Error. Probe may be
replace.

Unit No. # 1 Bunker Level Transmitter -1B is not showing at


DCS. So Reset the Power Supply and Cleaned the Level Probe.
Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.
Sanjay Garg In Unit No. # 1 Drain MOV , J-valve Fan MOV Cleaning and
Blowering to done.
In Unit No. # 1 APH Field Inst. And JB Cleaning and
Blowering to done.
Online ETP data ia hang condition@5 Feb.5.01 PM.
OnlineCPCB data ia hang condition@6 Feb.10.00 AM.
CPCB Report on dated @08/02/2021  sent to all person.
All the Report ( APC, Plant Performance , Power Report )  sent
08.02.2021 C to all Person.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Deepak Chand
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
A
09.02.2021 Gajendra Pandya b) Generator-2  checklist
c) Elect .Shift checklist

Following shut down given:-


1 BC-1
2 BC-2
3 vibrating screen-1
4 BC-4
5 coal crusher-1
6 Coal crusher-2
7 BC-7B
8 P&V-4 boiler side
9 coal feeder-2B
10 ACC washing Pump-1
11 ACC washing Pump-2
12 Pnumetic plate valve Coal feeder-2B

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
B a) Generator-1  checklist
09.02.2021 Ajaya kumar
b) Generator-2  checklist
c) Elect .Shift checklist
09.02.2021 B Ajaya kumar

Following shut down given:-


1 BC-1
2 BC-2
3 vibrating screen-1
4 BC-4
5 coal crusher-1
6 Coal crusher-2
7 BC-7B
8 Pnumetic plate valve Coal feeder-2B
9 Coal feeder-2B

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In SWAS Room U# 1 Drum Water PH / Conductivity is not


showing at DCS end. So checked and found that sample is not
coming in rotameter. So adjust it. Also cleaned the sensor.
Now OK.
In SWAS Room U#2 Drum Water PH isnot correct showing at
DCS end. because Glass water tube is very dusty. So cleaned
it. Also cleaned the sensor. Now OK.
In SWAS Room U#2 Drum Water Condicivity is not correct
showing at DCS end.because sensor is very dusty.So cleaned
the sensor. Now OK.
All the auto drain valve checked in compressor checked and
working Normally.
Sanjay Garg
In WTP Ultrafilitration SOV Panel Cleaning and Blowering to
done.
In WTP multi grade filter SOV Panel Cleaning and Blowering
to done.
In WTP activated carbon filter SOV Panel Cleaning and
Blowering to done.
CPCB Report on dated @09/02/2021 not  sent because CD
C having not free Space.
09.02.2021
All the Report ( APC, Plant Performance , Power Report ) not
 sent because CD having not free Space.
Online ETP data ia hang condition@5 Feb.5.01 PM.
OnlineCPCB data ia hang condition@6 Feb.10.00 AM.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC007, SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Deepak Chand
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Deepak Chand DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
Auto Drain manually checked
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
10.02.2021 A Tarun Gaur a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Following shut down given:-


1 BC-4
2 BC-6
3 vibrating screen-2
4 CEP- 1A
5 BED Ash Cooler- 2A
6 Coal crusher-2

Following shut down Cleared:-


1 CEP-1A

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.

10.02.2021 B Gajendra Pandya


Following shut down Cleared:-
1 BC-4
2 BC-6
3 vibrating screen-2
4 BED Ash Cooler- 2A
5 Coal crusher-2
6 ACC washing pump-1
7 ACC washing pump-2

B
10.02.2021 Gajendra Pandya Following shut down given:-
1 ACC washing Pump-2
AVI given for ACC washing Pump-2 and cleared after some
time
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive running normal.

Unit No. # 1 bed ash cooler -1B Seal Pr. Guage is not working
condition. So Replace with new guage. Now Ok
Unit No. # 1 Vessel No.-11/21 Back Pr. Switch and
Transmitter not showing at DCS. So cleaned the impluse line.
Now Ok.
Unit No. # 2 CO analyser showing fault. So check and found
that moisture fault at DCS end. So reset it. Now Ok.

In HP Dosing Pump Panel Cleaning and Blowering to done.

In LP Dosing Pump Panel Cleaning and Blowering to done.


Sanjay Garg
In Marpholine Dosing Pump Panel Cleaning and Blowering to
done.

CPCB Report on dated @10/02/2021 and sent to all Person.

All the Report ( APC, Plant Performance , Power Report ) and


sent to all Person.
C Service air driyer Moisture drained.
09.02.2021
RNRP all nodes found UP except SPC007, SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Deepak Chand
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


all office AC ON
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
A c) Elect .Shift checklist
11.02.2021 Tarun Gaur

Following shut down given:-


1 BC-4
2 BC-6
3 Jockey -1
4 Oil Purifier - unit 2
5 BED Ash Cooler- 2A
6 Oil Purifier unit 1
7 BC-1
8 BC-2
9 ro High Pressure 1,2 &3 Panel

Following shut down Cleared:-


1 Jockey -1 ( Electrical side)
2 Oil Purifier Unit -2

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.

Shift instrument digital log book filled


All office AC made OFF ON

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
11.02.2021 B Ajaya kumar Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Following shut down Cleared:-


1 BC-4
2 BC-6
3 Jockey -1
4 Oil Purifier - unit 1
5 BED Ash Cooler- 2A
6 RO High Pressure 1,2 &3 Panel
7 BC-1
8 BC-2

AVI given Oil centrifuge -1

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

CPCB Report on dated @10/02/2021 and sent to all Person.

All the Report ( APC, Plant Performance , Power Report ) and


sent to all Person.

RNRP all nodes found UP except SPC007, SPC008 and OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
11.02.2021 C Gajendra Pandya Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made ON


Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
Following shutdown given
1 BC-4
2 P&V -4
3 Oil Purifier-1
12.02.2021 A Deepak Chand 5 ACW pump-1

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Unit No. # 1 Bag House Vessel No.-21 Level Probe HH


showing high value. So cleaned the Level Probe. Now Ok.

Unit No. # 1 SOX analzer showing moisture fault. So reset it.


Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.
In Fly ash silo No. # 2 Fork level switch acted So checked the
Supply Voltage at Controller and Probe side . It is showing 96
Volts DC. Also cleaned the Level Probe. Now it is under
observation.
In Unit No. # 2 Firing Floor Panel Cleaning and Blowering to
done.

RNRP all nodes found UP except SPC007, SPC008 and OPX01.

B Shift instrument digital log book filled


12.02.2021 Sanjay Garg
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following shutdownCleared
1 BC-4
2 Chemical Cleaning Pump for RO
3 Oil Purifier-1
4 ACW pump-1
all the manual light to ON Condition.
11 KV Danger Sticker pasted at CHP MCC Main gate , BFP/ 4.5
mtrs / Workshop MV Room entrance door.
In Unit No. # 2 ACC / Ejector Floor area ON as Per Operation
requirement.
In Unit No. # 2 Double earthing done at O2 analyser JB at
Cyclon floor area.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
All the AC MCB to OFF Condition.

CPCB Report on dated @12/02/2021  mail not sent due to CD


not working.

All the Report ( APC, Plant Performance , Power Report )  mail


not sent due to CD not working.

Chimney analyser room round taken & found system healthy.


CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
C Gajendra UPS log digital log book filled.
12.02.2021 Pandya/Ajaya
kumar Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


In Fly ash silo No. # 2 Fork level switch, new cable received
from store So laid the cable from panel to fork switch & also
cleaning done of switch & made it ready, installation job is
U/P

RNRP all nodes found UP except SPC007, SPC008 and OPX01.


Shift instrument digital log book filled
B
13.02.2021 Jaswant Singh UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following shutdownCleared
1 BC-4
2 BC-2
3 BFP-1
AVI given for BFP-1 oil system for oil system trial and cleared
after some time
All the manual light to ON Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @13/02/2021  mail not sent due to CD


not working.
All the Report ( APC, Plant Performance , Power Report )  mail
not sent due to CD not working.

Chimney analyser room round taken & found system healthy.


CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
C Tarun Gaur/Ajaya
13.02.2021 kumar UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
All the AC MCB to OFF Condition.
Chimney analyser room round taken & found system healthy.
CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
14.02.2021 A Gajendra Pandya UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Fly ash silo No- 2 Fork level switch, control card not
working also relay not acted, so removed from site & test at
inst lab, changed with spare one & checked at site working
normal.

RNRP all nodes found UP except SPC007, SPC008 and OPX01.

14.02.2021 B Jaswant Singh


Shift instrument digital log book filled

DT Transformer panel temp noted: DT-2: 82deg, DT-4: 84deg,


DT-6: 80deg
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to ON Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC007, SPC008 and OPX01.

15.02.2021 A Gajendra Pandya


Following shutdown given:-
1 BC-3
2 BC-4
3 BC-7A
4 BC-7B
5 RECLAIMER
6 ACW-2
7 ACW-2 discharge MOV

DT Transformer panel temp noted: DT-2: 82deg, DT-4: 85deg,


15.02.2021 A Gajendra Pandya DT-6: 75deg
Chimney analyser room round taken & found system healthy.
CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

Plant round taken found drives normal.

Switchyard Round Taken found normal

Following shutdown Cleared-


1 BC-3
2 BC-4
3 BC-7A
4 BC-7B
5 RECLAIMER
15.02.2021 B Deepak Chand
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


CPCB Report on dated @15/02/2021  mail send to concern
person.
All the Report ( APC, Plant Performance , Power Report )
  mail send to concern person..

Chimney analyser room round taken & found system healthy.

CPCB date updating at site & analyzer PC also.


Anurag RNRP all nodes found UP except SPC008 and OPX01.
15.02.2021 C Chowdhury/Ajaya Shift instrument digital log book filled
kumar UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC007, SPC008 and OPX01.

Following shutdown given:-


1 BC-4
2 Coal crusher-2
3 BC-7A
4 jokey pump-1
5 Bed ash cooler-1B

Chimney analyser room round taken & found system healthy.


15.02.2021 A Gajendra Pandya

CPCB date updating at site & analyzer PC also.


RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Switchyard Round Taken found normal

Following shutdown Cleared-


1 BC-4
2 Jockey pump-1
3 Coal Crusher-2
4 BAC-1B
RNRP all nodes found UP except SPC 007, SPC008 and
16.02.2021 B Anurag OPX01.
Chowdhury
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @16/02/2021  mail send to concern


person.
All the Report (APC, Plant Performance , Power Report )   mail
send to concern person..

Chimney analyser room round taken & found system healthy.


CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
Jaswant UPS log digital log book filled.
16.02.2021 C Singh/Deepak Shift abnormality  digital log book filled.
chand VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-1
2 BC-2
3 BC-3
4 Reclaimer
5 BC-4
6 BAC-1A

Anurag
17.02.2021 A Chowdhury P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


Al VFD drives inverter temp checked.

Chimney analyser room round taken & found system healthy.


CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

Plant round taken found drives normal.

Ajaya Switchyard Round Taken found normal


17.02.2021 B Kumar/Deepak
Chand
B Ajaya
17.02.2021 Kumar/Deepak
Chand
Following shutdown Cleared-
1 BC-1
2 BC-2
3 BC-3
4 Reclaimer
5 BC-4
6 BAC-1A

Shift abnormality  digital log book filled.

VAM log digital log book filled.

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @17/02/2021  mail send to concern


person.
All the Report (APC, Plant Performance , Power Report )   mail
send to concern person..

Chimney analyser room round taken & found system healthy.


Boiler-1 unwanted lights made OFF
LED light provided at bed ash cooler-2B, remove it in next shft
CPCB date updating at site & analyzer PC also.
Jaswant RNRP all nodes found UP except SPC008 and OPX01.
C
17.02.2021 Singh/Gajendra Shift instrument digital log book filled
Pandya UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
Morning round all light made off.

Following shutdown given-


1 BC-7A
2 BC-7B
3 BC-3
4 Reclaimer
5 Vib screen-1

18.02.2021 A Anurag
Chowdhury P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Following shutdown given clear-


1 BC-7A
2 BC-7B
3 BC-3
4 Reclaimer
5 Vib screen-1
6 BAC-2B

GSC-2A AVI given & close as per requirement

GSC-2A motor termination done as per requirement , during


18.02.2021 B Jaswant Singh trial again tripped on overload(taking High current:27A),
megger done found normal, maintenance work is
underprogress
24v hand lamp Light arrangement done at BAC-2B as per
O&M team requirement
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @18/02/2021  mail send to concern


person.
All the Report (APC, Plant Performance , Power Report )   mail
send to concern person..

Chimney analyser room round taken & found system healthy.


Boiler-1 and pump house unwanted lights made OFF
CPCB date updating at site & analyzer PC also.
RNRP all nodes found UP except SPC008 and OPX01.
Ajaya Shift instrument digital log book filled
18.02.2021 C Kumar/Gajendra
Pandya UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-4
2 Boiler-2 Enmass Conveyor
4 Reclaimer

Following Enuipment AVI Given & Closed


1/ GSC Blower- 2A
19.02.2021 A Tarun Gaur
P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Unit No. # 2 bed ash cooler -2B Seal Pr. Guage is not working
condition. So Replace with new guage. Now Ok
Unit No. # 1 Vessel No.-11/21 Seal Pr. Switch PU air leakage
found. So Changed the PU Tube. Now Ok.
In CCR Lift One sensor is not Ok. So adjust the sensor. Now
Ok.
All the auto drain valve checked in compressor checked and
working Normally.
In WTP DCS Panel Cleaning and Blowering to done.
In WTP MOV Panel Cleaning and Blowering to done.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
20.02.2021 B Sanjay Garg General Plant Round taken found all drive running normal.

Following shutdownCleared
1 ACW Pump-2
2 ACW Discharge MOV
3 BC-7A,
4 BC-7B,
5. BC-6,
6. En Mass Conveyor No.-2,

all the manual light to ON Condition.


In ACW Pump House Welding machine 3 phase Plug top to
changed.
01 Nos LED Light shifted to 4.5 Mtrs.
In Compressor House , all the IAC No.-1 , 2 and 3 Motor
Cleaning to done.
In Fore Pump House battery Charger ON Condition. Also
Current- 8 amps and Battery Voltage- 13.4 Volts.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

21.02.2021 A Gajendra Pandya


Fire Engine battary checked and found charging at 2A and
Battary green indication coming. Battary voltage 14.3 volt

21.02.2021 A Gajendra Pandya All AC MCB in OFF condition


P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument log book filled
Shift abnormality  digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Unit No. # 2 APH Slave Vessel Seal Pr. line PU air leakage
found. So Changed the PU Tube. Now Ok.
Fly ash silo No. # 2 gate Valve is closed. So found that Fork
level switch is dusty. So cleaned it. Now Ok.
Unit No. # 1 DCS Panel No.-11M BRC Changed over from
Secondary to Primary.
All the auto drain valve checked in compressor checked and
working Normally.
In Unit No. # 2 Boiler Zero mtrs, Drain MOV , J-Valve MOV ,
APH , Veseel No.- 11/21 and 12/22 JB and field Inst. Cleaning
and Blowering to done.
RNRP all nodes found UP except SPC008 and OPX01.
B Shift instrument digital log book filled
21.02.2021 Sanjay Garg
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

In Fore Pump House battery Charger ON Condition. Also


Specific Gravity checked and found 1280 to 1300.
all the manual light to ON Condition.
In BC-5 , BC-2 Motor and VCS Panel and Repair Supply Box
Cleaning and Blowering to done.
In Unit No. # 1 ID Fan welding machine connection to done
also Plug top connection tightness to done.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.


CPCB Report on dated @21/02/2021  mail send to concern
person.
All the Report ( APC, Plant Performance , Power Report )
  mail send to concern person..

Chimney analyser room round taken & found system healthy.

CPCB date updating at site & analyzer PC also.


Anurag RNRP all nodes found UP except SPC008 and OPX01.
C
21.02.2021 Chowdhury/Ajaya
kumar Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

All AC MCB ON as per requirment


22.02.2021 A Gajendra Pandya
P&V in stop condiiton.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX01.
Shift instrument log book filled
Shift abnormality  digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

STG Building light ON

22.02.2021 B Tarun Gaur All AC MCB ON as per requirment


P&V in stop condiiton.
B
22.02.2021 Tarun Gaur

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument log book filled
Shift abnormality  digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In CHP Crusher No. # 2 is Tripped at 21.48 PM. So checked


and found that Fan Bearing Temp. ( TI1602B ) is increased up
to 104 Degree. Tripping Value is 95 Degree. So connection
tightness done at field side as well as DCS side. Also RTD is in
hot condition. So Informed to shift Incharge.

In IAC No. # 3 is showing alarm on the display. Found that


Cooling water outlet Temp. is increased up to 70 degree. So
informed to shift Incharge.
Sanjay Garg
Unit No. # 1 BAC- 1A / 1B VFD Panel Cleaning and Blowering
to done.
Unit No. # 2 BAC- 2A / 2B VFD Panel Cleaning and Blowering
to done.

CPCB Report on dated @22/02/2021 and sent to all Person.

All the Report ( APC, Plant Performance , Power Report ) and


sent to all Person.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
22.02.2021 C
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Anurag
Chowdhury Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Switchyard Round Taken found normal

Following shutdown Cleared-


1 BC-1
2 ACWP-1
3 Coal Crusher-2
4 ACWP-1 outlet MOV
5 BC-2
6 P&V-2

B Anurag RNRP all nodes found UP except SPC 007, SPC008 and
23.02.2021 Chowdhury OPX01.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Unit No.# 2 vessel No.-21 Showing High value. So checked


and field side material inside the vessel. Now Ok.

In ACW Pump No.-2 VFD showing alarm 2052 ( Colling .) .


Means Drive Module temp. is excessive. When started the
VFD. It is showing Normally. When Stop the VFD. It is again
showing the alarm.
Boiler No. # 1 SOX analyser Heat Trace line MCB is in OFF
Condition. So ON the MCB . Now Ok.

Sanjay Garg Unit No. # 1 Coal Feeder area JB , field Inst. Cleaning and
Blowering to done.
Unit No. # 2 Coal Feeder area JB , field Inst. Cleaning and
Blowering to done.
CPCB Report on dated @23/02/2021 not sent because CD is
not open in PC.
All the Report ( APC, Plant Performance , Power Report )not
sent because CD is not open in PC.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
23.02.2021 C
UPS log digital log book filled.
Shift abnormality  digital log book filled.
23.02.2021 C

VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

Gajendra Pandya All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


1 BC-7A
2 BC-7B
3 BAC-2B
4 Reclaimer
5 BC-4
Anurag 6 P&V-4
24.02.2021 A
Chowdhury
P&V in stop condiiton.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round

CPCB Report on dated @24/02/2021 and sent to all Person.

All the Report ( APC, Plant Performance , Power Report ) and


sent to all Person.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
C Shift abnormality  digital log book filled.
24.02.2021 Gajendra Pandya
VAM log digital log book filled.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Lighting timer adjusted to 6.45 P.m of switchyard, street


lights
Following shutdown given
1 Coal feeder-1A
2 limestone bucket elevator-2

following shutdown cleared


25.02.2021 B Gajendra Pandya 1 reclaimer
2 BC-4
3 T1 tower bag filter
4 Coal crusher-2
5 limestone bucket elevator-2
AVI given for Coal feeder-1A
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

P&V no. 4 made stop.

Unwanted lights made OFF during Plant Round

Environment Report on dated @25/02/2021 and sent to all


Person.
All the Report ( APC, Plant Performance , Power Report ) and
sent to all Person.
Shutdown cleared for Coal feeder-1A.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
C Anurag
25.02.2021 Chowdhury UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
WWTP side lights made OFF
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Lighting timer of silo adjusted to in the morning 6.45 a.m

following shutdown given


1 reclaimer
26.02.2021 A Gajendra Pandya 2 BC-1
3 ACW-1

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No.# 2 vessel No.-11 Showing High value. So Cleaned


the Level Probe. Now Ok.
Fly ash silo No. # 1 System is not operating in Auto Mode.So
checked and found that Auto switch wire is in loose condition.
So connection tightness to done. Now Ok.
All the auto drain valve checked in compressor checked and
working Normally.

BC-7A Belt Pull Chord Switch Preventive Maintences to done.


( Cleaning , Tightness and Polythene Packing to done.)

CPCB Online website is not open condition.


RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
B Shift abnormality  digital log book filled.
26.02.2021 Sanjay Garg
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Fire Engine battary checked and found ON Condition.

all the manual light to ON Condition.


In Unit No. # 1 J-valve Fan -1A and 1B Motor Cleaning and
Blowering to done.
following shutdown Cleared.
1 reclaimer
2 BC-1
3 ACW-1
4. U # 2 Bucket Elevator.

Unit No. # 2 Bucket elevator Shut down to cleared. But


Operation Lock is not removed. So Feeder is not Charged
Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to ON Condition.


In WTP MGF No. # 1 SV-4805 ( Rinse Drain Valve ) is not
operating at DCS as well as Manual. So checked and found
that SOV is not operating condition. So changed the SOV. Now
it is working Normally.

In WTP MGF No. # 1 SV-4803 ( Backwash Air Inlet Valve ) is


not operating at DCS as well as Manual. So checked and found
that SOV is working condition. But Mech. Valve is in Jammed
Condition. So Informed to Shift Operator.
CPCB Online website is not open condition.
RNRP all nodes found UP except SPC008 and OPX01.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
27.02.2021 A Sanjay Garg
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Fire Engine battary checked and found ON Condition.
all the manual light to OFF Condition.
Fly ash Silo Light is ON Condition. Found that Lighting Timer
is in Bypass Condition. So taken in line.
BC-7A and 7B Light is ON Condition. Found that Lighting
Timer is in Bypass Condition. So taken in line.

following shutdown Given.


1 reclaimer
2 BC-6
3 BAC-1B
4. Vibrating Screen No.-2,
5. Potable Pump No.-1.

In Bed ash silo wet unloading System RAV Motor one nos
earhing is missing condition. So earthing is Provided.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

RNRP all nodes found UP except SPC008 and OPX01.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
28.02.2021 A Gajendra Pandya
Fire Engine battary checked and found ON Condition.
all the manual light to OFF Condition.
following shutdown Given.
1 BC-7A
2 BC-7B
In Bed ash silo wet unloading System RAV Motor one nos
earhing is missing condition. So earthing is Provided.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Abnormality jobs attended
Coal Feeder-2B coal feeder temprature increase upto 56 degree, so
checked and tight its RTD now temp is OK

VAM trip , so checked and found that its HTG temp increase, so reset it
once

Space heater of Generator-1 was found off so made ON from DCS end.

Bed ash silo RAV tripped ne time on overload so reset and current
checked found normal.

VAM tripped once on high vapour temp and found condensate tank
overflow but pump was already running, so adjusted the conrol valve
opening by Jaswant sir and tuning done.
Boiler-2 11-21 TX and switch line flushing work done.

TG-1 hood spray TCV2902 & TCV2903 cross checked for proper
feedback and air increased regulaor side.

Abnormality jobs attended


AOP-1B get trip due to overload so check and reset it.
Generator-1, Breaker rack in problem so made it ok.
Coal Feeder -1A, run in Local mode as per operation requirement.
Coal Feeder 1A Clean run motor get trip so reset it
TG-1 remove form base load after load normalise

Abnormality jobs attended

WTP Lab furnace temprature not increases, so checked and found that
furnace coil broken, so joint the heating coil and rectify the problem
WTP Lab furnace temprature fluctuating , so checked and found that
furnaceT/C junction got open, so joint the T/C and rectify the problem

02 no's cooling fan shifted to zero mtr floor , after completing TG-1
maintenance work.

01 No Hand lamp rapair at work shop.

Abnormality jobs attended


In SWAS Room U# 1 Drum Water Conductivity is not showing at DCS
end. So checked and found that sample is not coming in rotameter. So
adjust it. Also cleaned the sensor. Now OK.
In SWAS Room U# 1 Drum Water PH is showing at DCS end. So Glass
water tube is very dusty. So cleaned it. Also cleaned the sensor. Now
OK.
AFR breaker get tripped and didn’t ON, so rack the breaker out and
rack in again and ON it normally
Coal Feeder 2A Screw Conveyour motor having loose cabless, Cable
dressing done
Coal Feeder 2B Clean Run motor earthing found removed , Earthing
done.

BAC-2B was found running LHS motor(towards cable cellar) free


without rotation of BAC drum and total load was on RHS motor so
found cooling fan damaged and melted due to continuos heat. So
checked motor found resistance and megger normal. Now cooling fan
replaced with spare, need to check motor on decouple after mech
work.

BAC-2A was also not running on CCR command so checked local


operation and was running so all power reset and then started in
rmeote, now OK.

BC-7B bag filter was not running so found main MCB tripped so reset
and started running normal, checked by Mr. Purushottam
Reclaimer not moving forward & reverse direction , found PLC UPS
battery got discharged due to S/D given from Breaker.
BAC-2A dome valve showing fault ,check & found pneumatic cylinder
not opening completely inform to operation.

CCR AHU set point increase from 27 to 28 to optimised power

Bed ash cooler-2B trip in over current, so checked and found that its
one motor became very hot and its fan found melt, also checked in
decoupling mode motor again trip , so remove the motor from its
Location and put in workshop. Need other motor for installation.

AFR breaker get tripped , so checked and found that it became trip
in( Fault Ir1-1500Amp) overload, so inform to MPSS electrical person
Mr Shaktawat

Abnormality jobs attended


In Bed ash Silo Plate valve Close Limit Switch is in hanging condition.
So Bolt tightness to done. Now Ok.
Unit No. # 2 Vessel No.-12/22 Back Pr. / Transmitter not showing at
DCS. So Impluse line is cleaned.
Bed ash cooler-2B trip due to overcurrent in previous shift so search
new motor at China yard and shift it at workshop , then no load trial
taken at workshop found ok.
Motor Resistance - 7.1 , 7.1 , 7.2 Ohms
No Load Current - 2.1 , 2.1 2.2 Amp.
Motor to be replace in next Shift.

Silo top APH-1 main incoming line air tapping found air leakage from
fitting of PU tube so replaced with new fitting and leakage arrested.

BAC-2B LHS motor(towards cable cellar) new motor mounted and no


load trial taken without coupling and found 1.8A balance in all phases,
later when coupled on position found motor RHS again not cooler
wheel not linking to roller. Need to check by maint again, informed
Jitesh sir.

Silo top APH-1 diverting valve limit switch assembly installed. Both
air tubing done for valve open & close.

BAC-2B LHS motor (towards cable cellar) new motor mounted and no
load trial taken with coupling and found 5 A balance in all phases,
After 20 min check current again & found taking 9A on each moter,
Check & found TG building side motor pully moving but workshop
side motor not running ,So immediately stopped the BAC & inform to
operation. Need to check by maint again, informed to Mr. Jitesh .BAC
2B power made off, & connection removed from motor. Motor need to
check.
SPM anlyzer & enviroment department sampling value having
daviation So calibration done & system under observation.

Reclaimer not moving forward & reverse direction , found PLC UPS
battery got discharged due to S/D given from Breaker.
Reclaimer not movingleft & right direction , found VFD tripped on
overcurrent ,reset & running normal.
BAG house 21 level probe signal wire directly joined,so male female
connaector fixed.
BAG house 21 level probe cable gland found open fixed the same.
Transformer & hand lamp provide at silo.

Abnormality jobs attended


AFR breaker get tripped , so checked and found that it became trip
in( Fault Ir1-1500Amp) overload, so inform to MPSS electrical person
and reset the fault.
Clean run 2B motor taking more current , so inform to opration for
checking jam, and also OFF the MCB of Clean Run motor-2B
Abnormality jobs attended
Bed Ash Silo RAV tripped due to overload, so reset it also found RAV
NC contact wire loose , attend it
BAC 2B , old motor remove form site and shift to workshop, check the
motor , megger valve is ok and its no load current is balance i.e. 2.1,
2.1 , 2.2 Amp
ACC-2 fins cleaning trolley no-1 , up down problem foud trip due to
overload , reset it
ACC-1 fins cleaning trolley no-1 , up down problem found trip due to
overload , reset it

BAC 2B , RHS motor Earthing cable found open so reconnect it

Boiler-1, APH SV8127 "Common outlet Conveying Valve" Open limit


not showing so check and found limit switch bolt missing and its
internal wire also break then new bolt arrange and wire re connection
done. Now OK
Silo Top , APH-1 Diverting valve , seal air fitting damage so new fitting
provided. Under progress..
Silo Top , APH-1 Diverting valve , shutdown clear and reconnection
done

Abnormality jobs attended


Silo Top U# 1 APH Diverting Valve (SV-8150) open Feedback is not
showing at DCS end. So checked and found that open limit is Ok. But
Relay is faulty. So changed the Relay. Now Ok.
In reclaimer PLC Supply is not ON. Due to Breaker Shutdown to taken.
Also UPS battery is drain condition. When UPS battery is charged.
Then UPS comes in Service. Now Ok.

Unit No. # 1 Fins Cleaning System not operating. So found that Down
limit Switch is not operating. So adjust the lever of the limit switch.
Now Ok.
Boiler-1 APH intine valve SV8127 not showing open F/B ,Check &
rectified the same.
U-1Coal feeder O/L SOV limit switch switches ,liver tightness checking
work done.
U-2 Coal feeder O/L SOV limit switch switches ,liver tightness
checking work done.
CT fan area Light not glowing, so checked and found that nutral wire
loose in JB, now rectify it

Abnormality jobs attended


BAC -2B, Motor Checked found motor is OK

BC-7B bag filter was not running so found main MCB tripped so reset
and started running normal.

BAC 2A, dome valve not operating , manually operate it three times
and made it free , now OK

Boiler -1, SOX moisture fault , clean the filter and reset main power
now OK

Bunker 1B , level not showing correct, clean its transmitter and power
reset done

Abnormality jobs attended


In Temple DVD is not working condition. So inside connector loose
condition. So Tightness to done.
In CT fan -1 is not started as Local as well as Remote. So Door Limit
switch is not cut . So adjust the door limit Switch. Now Ok.
In CHP , AFR Breaker of Cement Plant is Tripped. So checked and
found that ir1 acted and fault reading 3.83 on the display. So reset the
breaker. After this ON the breaker when clearence given by Cement
Plant Person. Now Ok.
Boiler-2 BAC 2A dome valve not working ,check & found SOV fitting
havinf heavy leakage, arrest the leakage @ trial done ,working normal.

Boiler-1 lift phone not working,So check & found receiver as female
connector got damaged ,SO open the hand set @ rectified the same.

BAC 2B level probe signal termination,joined directly,so it is replaced


with male female connector.
In CHP , AFR Breaker of Cement Plant is Tripped. So checked and
found that ir1 over load trip in 1548amp and 2.4sec. So inform to
MPSS for to do not overloading the system. And reset it.
Abnormality jobs attended

Abnormality jobs attended


Coal Feeder-2B coal feeder temprature showing voilet, so checked and
tight its RTD but still voilet showing and also RTD condition found
weak, so need to replace the RTD
bed ash cooler-2A dome valve not operating, so checked and found
that dome valve not closing properly due to Jam, so inform to
operation for clearing jam
coal bunker-2C level not properly shown, so clean the level
transmitter, now OK
Coal 2B Feeder O/L temperature 02TI0954 showing voilet , Check &
found ,RTD damaged.Faulty RTD removed & new RTD installed, trial
done ,working normal.
Boiler-1 & 2 load cell cleaning work done.
Boiler-1 bag house hopper 21 showing level H & HH with out back
pressure, found material inside hopper ,but stuck,So inform to
operation.
BAC 2A, dome valve limit not showing ,So adjust limit, & trial done
working ok.
BAC2A, dome valve SOV leakage from exhaust continuously, Check &
found air coming from Cylinder seal,inform to operation for
maintenance of cylinder seal.
AC and Vent MCC 00MCC 5355 , Panel door lock found damage , so
replace the lock with new one.
WTP hall RSB No-76, ELCB not trip so check and clean it with klin it
and made OK

Abnormality jobs attended


Stack data is not updating at CPCB protal so mail given to support
team, their work is U/P
BAC2A, dome valve SOV leakage from exhaust continuously, as per
maintenance requirement sov replacement done from BAC-2B just for
confirmation, still air passing from cylinder, so inform & shown to
operation for cylinder travel correction.
71 Card BRC Top controller reset done
BED Ash cooler 2A exhaust filter leakage arrest work

BFP-3 Line connection work

Comprssor house IFC Air leakage arrest done


MGF -1 Feeder not Rack out so check & found locking strip jammed so
Lubrication & maintenance done now ok

Crusher-1 start Permission not comes due to Crusher DE Side


temprature goes upto 93 degree so neede to check RTD

2 NO's handlamp found holder damaged now replaced by new one &
made ready at Electrical Workshop
Abnormality jobs attended
In Unit No. # 1 Right Side Boiler O2 (01QI1102) is violet at DCS end.
So checked and found that Error-2 Heater Temp. is showing in
Display. So reset the Power Supply. After 2 to 3 minutes again it is
showing same Error. Probe may be replace.

Unit No. # 1 Bunker Level Transmitter -1B is not showing at DCS. So


Reset the Power Supply and Cleaned the Level Probe. Now Ok.

Coal feeder-1A, started and Stop in Local as per operation


requirement.
Root Blower Panel Inside Door lock was damage from last few days,
so replace the door locjk with new one
One 24V hand lamp given at Coal Feeder floor
TG building, 22 mtrs floor light made ON as per requirement
ACC-2 , Light Made ON as per requirement and OFF after work
completed

Abnormality jobs attended


BFP Suction temp found low 120 degree, checked and found that RTD
is not properly inserted, so inset the RTD, now temp is 145 degree

Coal feeder-2B incomer MCB in panel at CCR found defective, so


replace the MCB
IFC panel door handel found damaged outside comprssor house, so
replaced the door handel
IFC panel oil leakage found so clean it

Coal feeder-2B incomer MCB in panel at CCR found defective, so


replace the 16 A MCB with Clean run MCB 6A,trial done by running
coal feeder ,working normal.
BAC 2B both motor running trail done after maintenance work
current also checked on load, found 2.8 to 3.1 A on each motor.
BAC-1A cooling water valve jamming cleared by maint.
Department ,so limit switches connection & air tubing done.
BC-1 pull chord switch maint done with general shift engineer.
Coal crusher-1 RTD elmax replaced with old one.
AFR braker check & found ,running normal.
Abnormality jobs attended

In SWAS Room U# 1 Drum Water PH / Conductivity is not showing at


DCS end. So checked and found that sample is not coming in
rotameter. So adjust it. Also cleaned the sensor. Now OK.

In SWAS Room U#2 Drum Water PH isnot correct showing at DCS


end. because Glass water tube is very dusty. So cleaned it. Also
cleaned the sensor. Now OK.

In SWAS Room U#2 Drum Water Condicivity is not correct showing at


DCS end.because sensor is very dusty.So cleaned the sensor. Now OK.

Oil Centrifugal pump panel no-1 , Cable dressing done.


TG building Lift get hang with man inside the lift, so reset it main
power.

RSB 61 near ACC -1 3 phase W/M Plug Top flash occur now check &
found R Phase cable damaged at cable now cut damaged portion &
RSB Top replacement done now ok
2 no's lighting JB at ACC-1 Hole packing work
RSB-21 at ACC-1 & 0mtr near CEP -1 suply socket Green Tag Provided

Bolier-1 B Bunker level not show healthy now transmittor cleaning


Done

coal feeder -2A limt cover found missing, so find and fix it.

coal feeder-1B RTD cover found damaged, so packed with polythen


Abnormality jobs attended
Unit No. # 1 bed ash cooler -1B Seal Pr. Guage is not working
condition. So Replace with new guage. Now Ok
Unit No. # 1 Vessel No.-11/21 Back Pr. Switch and Transmitter not
showing at DCS. So cleaned the impluse line. Now Ok.

Unit No. # 2 CO analyser showing fault. So check and found that


moisture fault at DCS end. So reset it. Now Ok.
1 no's 24 V transformer output not comes so check & found MCB
neutral wire melt so cut & rejoint now voltage normal
1 no's handlamp plug top found damaged at mech. Workshop now
repalced by new one
Mech. Workshop Grinder not work so check & found neutral missing
now correct & ok

Boiler-1 Bed T/C 01TI1115 showing voilet , Other pair take in line &
tightness one. Showing normal value.
Boiler-2 Bag house vessel 11 fluidising valve SV8121 not operating
from DCS ,Heavy air leakage from fitting , rectified the same & trial
done.
BC-4 belt got tripped as started, found tail end side guard limit switch
rope loose. Rectified the same now Ok.
ACW-1 VFD inverter temperature showing 76 Deg. So inform to SH
E&I,& open panel door for 2 hours,then closed.
O2 analyzer installed by General shift engineer,So system under
observation & running normal.
RSB-98 opening packed.
P Fan-2 VFD panel opening packed with tape.
BAC 2B flow switch malfunctioning ,found stucked ,made free. Now
Ok.

Abnormality jobs attended

Boiler-1 bucket elevator panel was found opened so packed with


brown tape

Abnormality jobs attended


Boiler-1, APH SV8127 "Common outlet Conveying Valve" Open limit
not showing so check and found Limit Switch connection looses, re
connection done. Now OK
BAC -2B, Flow low alarm, flow low switch adjusted
ACWP-1, discharge MOV close limit not showing so limit switch
adjustment done
Fly Ash Silo No-2, Level high indication appears during loading, clean
the fork switch and made OK

Standard Sticker prepare and pasted at Following location-


1. ACC-1 , Fins Cleaning trolley 1,2,3 & 4.
2. ACW Pump VFD panel

11 KV Danger Sticker pasted at 4.5 Mtrs Switch gear room entrance


door and Unit-2 MV drive door
Jockey Pump-1, pressure switch connection done
Bag House No-2, H:H alarm ,so remove and clean the level probe and
made ok

Abnormality jobs attended


Unit No. # 1 Bag House Vessel No.-21 Level Probe HH showing high
value. So cleaned the Level Probe. Now Ok.

Unit No. # 1 SOX analzer showing moisture fault. So reset it. Now Ok.

In Fly ash silo No. # 2 Fork level switch acted So checked the Supply
Voltage at Controller and Probe side . It is showing 96 Volts DC. Also
cleaned the Level Probe. Now it is under observation.

11 KV Danger Sticker pasted at CHP MCC Main gate , BFP/ 4.5 mtrs /
Workshop MV Room entrance door.
In Unit No. # 2 Double earthing done at O2 analyser JB at Cyclon floor
area.

Boiler-2 vessel -1 showing HH continuously, found material physically


available in vessel.
Boiler-1 & 2 load cell cleaning work done.
Boiler-1 bag house hopper 21 showing level H & HH with out back
pressure, found material inside hopper ,but stuck,So inform to
operation.
BAC 2A, dome valve limit not showing ,So acheck & found mech
jamm,Operate manually 2-3 times & made free.

BfP-3 come in manual mode while ,cement mill restart.


Boiler-1 RSB-14 socket board found loose, so tight it

Abnormality jobs attended


In Fly ash silo No- 2 Fork level switch, new cable received from store
so laid the cable from panel to fork switch, lugging done at both end of
cable & also cleaning done of switch & made it ready, installation job
is U/P.
24 v Hand lamp & LED Light recover from chp crusher house 0 mtr
area, repaired & made it ready
BC-7A & 7B lighting was not glowing, checked the same & found
lighting timer was not working, checked the same & rectified the
problem.

In Fly ash silo No- 2 Fork level switch, cable layed & inserted inside
the chute,Termination done in the fork.physical trial not done due to
unavialability.

Boiler-1 & 2 load cell cleaning work done.

All auto drain vaves checked,

Service air receiver tank -2 auto drain not shut off, o rctified the same.
Now ok.

2 no's spout door lock rpaired at CHP MCC

Fly ahs silo-2 found overflow, so checked and found that its level
sensor card relay output not comming. So change the card.
Fly ahs silo-2 panel push button found loose, so tight it
Abnormality jobs attended
In Fly ash silo No- 2 Fork level switch, control card not working also
relay not acted, so removed from site & test at inst lab, changed with
spare one & checked at site working normal.
Auto drain valve filter cleaning & maintenance activity done for dryer
panel

Abnormality jobs attended


Boile-1 coal feeder sealing air flow showing low value 22m3/hr, so
checked its transmitter and clean its input tubes, now showing
570m3/hr
Abnormality jobs attended

T1 tower Repair supply box found main door support came out due to
bolt missing so new bolting done and made it ready

T1 tower, BC-1 Bag Filter panel found in very dirty condition so


cleaned it and gray painting done

Instrument technician is involve in CO-1&2 analyser sample probes


cleaning & sov maintenance

COF PCC III-B TO COMP AND ASH , ALARM APPEAR CHECK BUT NOT
FOUND ANY ABNORMALITY

Boiler-1 bed T/C 01TI1117 showing voilet , Other pair take in line &
tightness one. Showing normal value.

Boiler-1 CO analyzer value stucked , so clean sample line Now .ok


Chimney analyzer Nox value showing high ,Physically check anlyzer
found normal, need to check value by testo analyzer.
All auto drain vaves checked,

Jockey pump -2 motor and feeder checking and maintenance work


done:-
a) Fuse base of feeder was found open and uninsulated so insulation
done.
B) Motor TB checked and tightness done.

Abnormality jobs attended


COF PCC III-B TO COMP AND ASH , ALARM APPEAR CHECK BUT NOT
FOUND ANY ABNORMALITY

WTP area second floor LDB cover found loose , so tight with screw
Jockey pump-1 VFD side and feeder side checked for any heating and
tightness work done.

Boiler-2 APH all panels and instrument blowering work done.

Bag house area of Boiler-2 cleaning and blowering done.

One shrouding back of BC-4 feeder was loose to properly mounted it.

Abnormality jobs attended


Bed ash silo panel door lock not working so new manual lock
arrangement done
FAS-2 Gate valve sov found in hanged condition so two no's of screw
provided & fixed it

All auto drain vaves checked,

Fly Ash Silo No-2, RAV motor get trip due to material jamming , so
reset it after jam clear.
Silo Lights made ON and OFDF as per operation requirement.
APH-1 vessel no. 2 dome limit not coming so manually operated 2
times from local from SOV then checked from CCr now OK.

BAC-1B dome limit not coming so manualy operated from field SOV
the clear the problem.

Compressor house room RSB found one phase voltage not coming so
checked and found R-phase fuse was blown so replaced with new one
and operation of ELCB ensured.

Compressor house room found one cable of telephone stuck inside the
cable cellar door, so removed the cable and dressing done in the wall
area.

Boiler-2 APH dome valve not operating ,Check @ found that power
supply not available in SOV box, Found MCB got tripped & run system,

WTP Back wash SOV having air leakage,So arrest the air leakage.
BC-4 pull chord switch not changing contact, so remove faulty switch
& installed other pull chord switch.
Boiler-1 APH intine valve SV8127 not showing open F/B ,Check &
rectified the same.
All auto drain vaves checked,

Work Shop Bearing heater not working and continuous trip, so check
its top it is ok then open the bearing heater coil found it get earth , so
cut the extra coil and re joined it properly and made ready then
handed to Maintenance team

Soot Blower-1 , not healthy at CCR found its main control MCB trip ,
reset the MCB and made it healthy
GSC-2A, motor get trip due to overload , physically check the motor
found motor is heated then further check it wing that is OK, again trial
taken observe abnormal sound from impeller , same inform to
Maintenance team. Presently maintenance team working on it.

BC-4, run feedback not showing at CCR, check and found its control TB
is loose , tighten it and made Ok

BC-1, run feedback not showing at CCR, check and found its control TB
is loose , tighten it and made Ok

Abnormality jobs attended


Unit-1 bag house top area field JB GI protection covering fixed at place
on 04 no's of JB
unit-1 11-21 conveying extra air sov(8137) close limit micro switch
replacement & trial through dcs

AOP area Motor JB found dusty , so clean them

ACC-2 washing pump power source pasted and new polythene


covering done.
BC-7A feeder was having problem in SFU operation so checked and
found the shaft was having problem so replaced with spare.
Also the feeder cover spring lock was not engaging so corrected.

GSC-2A feeder side auxiliary supply given and control trial taken
working normal and also power cable continuity taken, also OK.
Motor was found having bearing sound so new motor provided to
maint of 3KW for replacement. Old motor removed of 3.7KW and
taken for bearing replacement.

Compressor house outside cable area excavated for undergrounding


yesterday, so civil work filling done today.

Abnormality jobs attended


FAS-1 pneumatic gate was not opened, checked the same & found fork
switch leg got tilted so adjusted the same & trail taken, now working
normal
BAC-2B level showing high so checked the same & found wet material
inside the vessel so informed to ccr, after maintenance team job
completed again cleaning done, now ok

RSB-26 (boiler-2) inside earthing wire found broken so reconnect the


same

ACC-1 fins cleaning trolley no-4 , up-down problem checked the same
found contactor stuckup , cleaning done now ok
Instrument lab locker no. 17 faulty pressure gauges check & removed,
also 02 no's PG repared. 5S done for this coupboard.

Instrument lab locker no.11 5S done.

Instrument lab locker no.21 5S done.

MPDB panel outgoing terminal insulating support in one feeder found


loose. So off the feeder and tight it

GSC Blower- 2A Motor take high current 27A & motor found Jammed
then motor shaft adjusment by mech. Deptt. motor running normally
take current R-2 amp. Y- 2amp & B- 2amp.

GSC-2A feeder was having problem in SFU operation so checked and


found SFU handle lock broken now replace by spare now ok

WTP Pump House Raw water Pump motor Push Button JB found hole
now Packing by silver tap

DG-9 Exciler Chamber Inspection work found one pole wiring heating
now coverd by sleeve & dressing done
BAC-2B level Probe Malfunctioning so check & calibration done now
ok

Boiler-1 J Valve transmittor Panel found dirty so cleaning done


Abnormality jobs attended
Unit No. # 2 bed ash cooler -2B Seal Pr. Guage is not working
condition. So Replace with new guage. Now Ok
Unit No. # 1 Vessel No.-11/21 Seal Pr. Switch PU air leakage found. So
Changed the PU Tube. Now Ok.

In CCR Lift One sensor is not Ok. So adjust the sensor. Now Ok.

Abnormality jobs attended


ACC-1 fins cleaning system cable hanging found in middile, so made
new hooks and hang cable where hanging more

coal feeder2D close limit not coming, so checked and tight the limit
switch frame, now limit came
Reclaimer left right drive trip in overload, so reset it once

Abnormality jobs attended

Unit No. # 2 APH Slave Vessel Seal Pr. line PU air leakage found. So
Changed the PU Tube. Now Ok.

Fly ash silo No. # 2 gate Valve is closed. So found that Fork level
switch is dusty. So cleaned it. Now Ok.
Unit No. # 1 DCS Panel No.-11M BRC Changed over from Secondary to
Primary.

Boiler-2 soot blower no. 4 earth lug found broken so new connection
done and also LCS earthing connected.

Motor single earthing found for 12, 14 and 16 so new cable laying and
connection done.
Unit No. # 1 APH SOV box main PU tubehave heavy air leakage found.
So Changed the PU Tube with fitting. Now Ok.
at 4.5 mtr all Fly ash & bad ash Bag filter SOV coil connector's check &
tightness done.

Fly ash silo-1 water valve SOV connector found loose, so checked and
tight its connector screw
Fly ash Silo-2 RAV motor cover found outside, so placed it properly on
motor body

Fly ash silo Top APH-1 cylinder valve air fitting leakage found, so
change the damaged air tubes with new tubes, leakage arrested.

Crusher-2 not running so check & found in DCS logic Protection acted
not reset so bypass relay not reset again then CHP DCS room panel
feedback cable remove & again connect now fault reset

FAS-2 For switch full indication limit comes not reset so taken in
bypass inform to shift incharge for bulker loading
BC-2 Feeder feedback not comes in DCS so check & found feeder side
feedback cable loose now tight normal & feeder healthy
BC-1 Cable tray Welding M/C Power Cable loose in 3 protion now
dressing by armour cable
Abnormality jobs attended
In CHP Crusher No. # 2 is Tripped at 21.48 PM. So checked and found
that Fan Bearing Temp. ( TI1602B ) is increased up to 104 Degree.
Tripping Value is 95 Degree. So connection tightness done at field side
as well as DCS side. Also RTD is in hot condition. So Informed to shift
Incharge.

In IAC No. # 3 is showing alarm on the display. Found that Cooling


water outlet Temp. is increased up to 70 degree. So informed to shift
Incharge.

Boiler-1 lift was found not responding to call so checked and taken in
inspection mode and brought to 2nd floor and found door not closing
itself. So applied emergency stop at 2nd floor.

Motor single earthing found for 11, 13 and 15 so new cable laying and
connection done.

Boiler-2 soot blower no. 4 earth lug found broken so new connection
done and also LCS earthing connected.
Crusher-2 tripping at B-shift analyzed from trend that it is actual
value showing in temp trend so informed shift incharge.
Scissor lift was not operrating so checked and found the direction was
opposite so changed top position in RSB.

BC-1 feeder found SFU broken from inside and not operating.
So opened the old SFU arrangement completely and replaced with
chinese SFU. Stud was cut and drill done on feeder for new SFU. All
arrangement made to be fitted tomorrow.

Abnormality jobs attended


In Unit No.# 2 vessel No.-21 Showing High value. So checked and field
side material inside the vessel. Now Ok.

In ACW Pump No.-2 VFD showing alarm 2052 ( Colling .) . Means


Drive Module temp. is excessive. When started the VFD. It is showing
Normally. When Stop the VFD. It is again showing the alarm.

Boiler No. # 1 SOX analyser Heat Trace line MCB is in OFF Condition.
So ON the MCB . Now Ok.
unit-1 coal feeder motor-1B JB cover found dusty and loose, so tight
and pack with packing tape

BC-1 feeder new SFU mounted and stud replaced and trial taken for
control running normal.
P&V no. 2 started at first. Then no. 4 lineup done and started P&V-4.
Also damper of no. 4 opened and closed for no. 2. Current taken for
blower 10.5A and pump 1.5A.
Please start the P&V from 9am to 5pm as temp is on higher side in
4.5m MCC.

Hand lamp and LED light removed and shifted from pump house to
workshop.

Abnormality jobs attended


ACC-2 lights not glowing so checked and found that switch is not
working , so orrect it
Air drayer auto drain valve leakage found , so tight its fitting and
arrest the leakage

Abnormality jobs attended

crusher-2 protection fault was coming, so remove its wire from motor
relay output (Block E) terminals(5 and6) wire(X5-11 and X5-13), Now
protection fault is reset showing pink colour, at 6 pm crusher-2 trial
taken but again it stop imidiatly, so trial taken in Local same problem
observed, so finally change its breaker from limestone breaker, trial
take in Local OK, now trial taken in Remote is pending.

T1 tower bag filter fan impeller found jamming, so open its cover and
free impeller jamming, trial taken running normal

Abnormality jobs attended


Coal feeder-1A was not starting after permit clear, so checked all
permissives in DCS found the plough dicharge limit was not coming so
adjusted the limit from field, then normailsed the permissive.

Dusty conditions of 0m meter instruments and motor of Boiler-2 so


cleaning and blowering done.

Abnormality jobs attended

Crusher-2 faulty breaker checked over breaker trolly, but still it is


trip, so open the breaker cover and found that its laching mechanism
not working properly, need further rectification under progress

Fire house pipe box door lock found damaged, so changed the door
lock
Abnormality jobs attended

In Unit No.# 2 vessel No.-11 Showing High value. So Cleaned the Level
Probe. Now Ok.

Fly ash silo No. # 1 System is not operating in Auto Mode.So checked
and found that Auto switch wire is in loose condition. So connection
tightness to done. Now Ok.

Abnormality jobs attended

In WTP MGF No. # 1 SV-4805 ( Rinse Drain Valve ) is not operating at


DCS as well as Manual. So checked and found that SOV is not
operating condition. So changed the SOV. Now it is working Normally.

In WTP MGF No. # 1 SV-4803 ( Backwash Air Inlet Valve ) is not


operating at DCS as well as Manual. So checked and found that SOV is
working condition. But Mech. Valve is in Jammed Condition. So
Informed to Shift Operator.
In Bed ash silo wet unloading System RAV Motor one nos earhing is
missing condition. So earthing is Provided.

Abnormality jobs attended

Unit-1 Bag house vessel 11-21, conveying stopped at 1.8 kg pressure,


checked and found that back pressure switch not operating correcltly,
so try to set it from 0 to 4kg pressure but still its contacts not
changing, need further calibration or replacement

welding machine internal conections found open so rectify it


PM Jobs carried
Silo-2 fork switch cleaning done and its controller clean

Bed ash cooler-2A dome valve checking work

2 nos. blower given at TG-1 area for cooling.

Generator-1 breaker checking, cleaning, manual operation


check and mainteanace wrk done and racked IN.

One LED, one hand lamp and 24V trafo given at TG-1
acounstic hood inside.

BAC-2A area one LED light given.


Generator-1 exciter carbon brush checking cleaning and
blowering done and brush position corrected and tightness
done.

PM Jobs carried
PM Jobs carried

Bed ash cooler-2A dome valve checking work

Bag House 12-22 line flusing done

Pump house instrument cleaning done

4.5mtr switchgear room cleaning work


Bed ash cooler-2A field JB &,valves SOV & PG cleaning work
done.

Bed ash cooler-2B field JB &,valves SOV & PG cleaning work


done.

Bed ash cooler-1A field JB &,valves SOV & PG cleaning work


done.

Bed ash cooler-1B field JB &,valves SOV & PG cleaning work


done.
Boiler-1 06 no's drain MOV cleaning work done.
Boiler-2 06 no's drain MOV cleaning work done.
Boiler-1 PA ,SA & J valve motor clening & blowering work
done.
Boiler-2 PA ,SA & J valve motor clening & blowering work
done.

PM Jobs carried

In Unit No. # 1 Boiler Firing floor area Field Inst. And JB


Cleaning and Blowering to done.

In Unit No. # 2 Boiler Firing floor area Field Inst. And JB


Cleaning and Blowering to done.
Unit -1, Coal Feeder all Motors, JB cleaning and blowering
done
Unit -2, Coal Feeder all Motors, JB cleaning and blowering
done

WTP room all three VFDs of high pressure pump cleaning and
blowering work done.

Arc flash suite of 51Cal photo taken with complete suitr and
send to Hemant sir.

Jizu-Hozen done at WTP MCC room.


Boiler-1 Sox analyzer sample line cleaning & PM work done.

Boiler-2 Sox analyzer sample line cleaning & PM work done.

TG building zero mtr floor field instrument cleaning &


blowering work done.

Boiler-2 HT motors cleaning work done

PM Jobs carried
In Fly ash Silo No.. # 1 Field Inst. And Panel Cleaning and
Blowering to done.
In Fly ash Silo No.. # 2 Field Inst. And Panel Cleaning and
Blowering to done.
In Bed ash Silo Field Inst. And Panel Cleaning and Blowering
to done.
Old motor shited at proper location in workshop

Polythene covering of all pressure switch and hopper level


switch of Silo top of both Silo-1 and 2.

Jizu Hozen done at Silo top and cleaning and blowering of all
instruments.

Bucket elevator-1 motor feeder power contactor replaced


with spare as a measure of predictive maintenance.

AVI given for BAC-2B and cleared and then given again.

AVI Cleared for BAC-2B and cleared and then given again.

BAC-2B both motor's double earthing done.


AHF panel CHP MCC cleaning & blowering work done.

PM Jobs carried

Boiler-2 furnace floor and 0mtr lights cleaning work done

Bed ash cooler-2B one motor megger done found 5GOhm

Boiler-2 instruments cleaning done as


1 Drain MOV
2 J valve MOV
3 Bed ash cooler local JB
4 APH JB and APH Equipments
5 Vessele 11-21 JB and its equipments
6 Vessele 12-22 JB and its Equipments
7 recever tank auto drain JB and Bag house DP transmitter JB
PM Jobs carried

Jesu - Hozen done at China Yard

Jesu - Hozen done at China Yard Motor Room

PM Jobs carried

In Side Stream Filter CT fan VFD Panel Blowering and


Cleaning to done.
Unit -1 Coal feeder area 04 no's local JB ceaning & blowering
work done.

04 no's feeder MOV ceaning & blowering work done.

4 no's Bunker MOV ceaning & blowering work done.

4 no's feede SOV ceaning & blowering work done.

Unit -2 Coal feeder area 04 no's local JB ceaning & blowering


work done.
04 no's feeder MOV ceaning & blowering work done.
4 no's Bunker MOV ceaning & blowering work done.
4 no's feeder SOV ceaning & blowering work done.
BFP-1,2,3 motors cleaning work done, outer boby cleaning
and fins cleaning work

TG 0mtr ACC fan power JBs on wall 1A,1B,1E cleaning done


oil centrifuse 1&2 motor JB packing done

PM Jobs carried
Jhesu - Hozen done at Boiler-1 Zero Mtrs

Jhesu - Hozen done at Boiler-2 Zero Mtrs

SA-1, ID-1 and PA-1 fan Motor and JB Cleaning and blowering
done

SA-2, ID-2 and PA-2 fan Motor and JB Cleaning and blowering
done

APH 12-22 and 11-21 , panel cleraning and blowering done

PM Jobs carried
In Chimney analyser Panel Blowering and Cleaning to done.
UPS room all panels cleaning done,

Boiler-2 Lift phone cleaning done.

4.5mtr Both AHF panel blowring and filter cleaning done


PM Jobs carried

PM Jobs carried

at 4.5 mtr, new contactor M80,fixed in new feeder panel

Instrument compressor all motors and its panel blowring &


cleaning done

Lighting JB ,Timer JB, Exhaust fan panel, hoist JB cleaning in


comprssor house
WTP DCS blowring and cleaning done
WTP MOV panel blowring done
WTP Protection cabinate panel blowring done
FAS-1 & 2 fork switches cleaning done.

Firing floor Panels cleaning work done.

WTP Root Blower 1&2 , cleaning and blowering done

PM Jobs carried
ETP controller & field SOV box panel cleaning & blowering
job done

ID fan-1 motor cleaning & blowering

ID fan-2 motor cleaning & blowering

Coal feeder area field equipment's cleaning & blowering job


done
BC-1 Pull Chord checking with mr. Purushttom
MGF Backwash -1 &2 Feeder Maintenance work
Compressor house compressor - 1 ,2 & 3 motors & control
panel blowering & cleaning work
PM Jobs carried

In Unit No. # 1 Drain MOV , J-valve Fan MOV Cleaning and


Blowering to done.

In Unit No. # 1 APH Field Inst. And JB Cleaning and


Blowering to done.

Silo Root Blower Room Motor and panel cleaning and


blowering done.

PM Jobs carried
crusher floor RTD JB cleaning done

BC-7AB RSB cleaning done

BFP-1,2,3 motors cleaning work done, outer boby cleaning


and fins cleaning work

Both FAS Fork swithes & panels cleaning work done.

Welding M/C faulty 15 A plug top replaced at ACC-2.


PM Jobs carried

In WTP Ultrafilitration SOV Panel Cleaning and Blowering to


done.

In WTP multi grade filter SOV Panel Cleaning and Blowering


to done.

In WTP activated carbon filter SOV Panel Cleaning and


Blowering to done.

P&V no 1,2,3 & 4 Panel cleaning and blowering done also all
termination tighten done.
TG Building Repair Supply Box No 47-49 cleaning and
blowering done.

Fire Pump house All E&I Euipments Blowering & Cleaning


done

Zishu Hozen at ACC-1 &2 & CEP Area


RSB-21 & 22 all ELCB Functioning checked work

Crusher-1 RTD JB wiring paire changed, now temp is ok

Panel cleaning done of ACC washing pump-2


Danger stcker Pasting work done in:-
1 switchyard
2 boiler 11 kv motors and BFP motors
3 WTP area 415 v and compressor house, LDB and exhaust
fan panel and RSB JB
4 compressor house 11Kv motors

PM Jobs carried
In HP Dosing Pump Panel Cleaning and Blowering to done.

In LP Dosing Pump Panel Cleaning and Blowering to done.

In Marpholine Dosing Pump Panel Cleaning and Blowering


to done.

Following Area 415V Danger Sticker Pasted- 19 Nos


1. Unit-1 ACC Fan Motor Power JB - 3 Nos
2. Unit-2 ACCFan Motor Power JB - 5 Nos
3. Unit-1 ACC-Fins Cleaning trolley - 1 Nos
4. Unit-2 ACC-Fins Cleaning trolley - 4 Nos
5. P Fan Hoist Power JB - 1 Nos
6. Boiler 1 repair supply Box- 5 Nos

Following Area 11KV & 415V Danger Sticker Pasted

1. Crusher -1 &2 Motor( 11KV)

2. ACC Fan 2A Power JB( 415 V)


3. RSB- 84 , 85 , 86 & 87 (Crusher Building)(415 )
4. BC- 4 Power JB ( 415 v)

Crusher House Screen floor motors ; Power JB , RSB Cleaning


work
WTP DCS Panel cleaning work
Zishu Hozen at STG 0mtr area

Following Area 415V Danger Sticker Pasted

1. RO Pump-2 ( 415 V)

2. Back wash water pump-1 ( 415 V)


2. Back wash water pump-2 ( 415 V)

4. ACW-1 VFD panel ( 415 v)

PM Jobs carried

Swas room instrument panels cleaning work done, control


panel 1&2, Tank lines cleaning, sensor cabinate cleaning,
panel display cleaning done. Packing with tape pending

Swas room UPS blowring and cleaning done

Swas room boilers all water sample line SOV panel cleaning

compressor auto drain valve manual checking work done

Dosing room panels motor terminals tightness checking work

PM Jobs carried
Jhesu - Hozen done at 4.5 Mtrs Substation

PM Jobs carried
In Unit No. # 2 Firing Floor Panel Cleaning and Blowering to
done.
Boiler-1 zero mtr field instruments, cleaning done.
Boiler-2 zero mtr field instruments, cleaning done.

Boiler-1 sootblower Panel blowring done and contactor


cleaning done with CTC and tightness checking done

Boiler-2 sootblower Panel blowring done and contactor


cleaning done with CTC and tightness checking done

PM Jobs carried

At chp new transformer 24v shifted at bc-4, crusher floor &


screen floor area

Cleaning & blowering done in pump house area


FAS-2 fork switch cleaning & blowering job

Putty provided in pump house area in 03 no's of pressure tx

Bed ash cooler Motors & Field Panels cleaning &Blowering


done

Boiler- 1&2 J Valve motors & Panels cleaning & Blowering


done

Fly ash silo all motors blowring done


Fly ash silo all Panels blowring done from inside
Fly ash silo area instrument equipments blowring done
11KV danger sticker pasted at pending equipments

PM Jobs carried

Rapair supply box 03 no's Cleaning & blowering done at BC-6,


BC-7A & BC-7B

Cleaning & blowering done BC-6

Cleaning & blowering done BC-7A& BC-7B

Local LCS panel cleaning & blowering at chp area

Danger stcker Pasting work done in:-


1 Mandir lighting wash tower
2 side stream loghting JB(street light)
3 Lime stone mcc door & repair supply box
4 Exhaust fan panel
5 Bunker floor (repair supply box)

PM Jobs carried

ACW-2 VFD cleaning and blowring done

ACW-2 motor cleaning done


Danger stcker Pasting work done in:-
1 CHP MCC and its celler room
2 4.5 mtr cable celler room
3 Generator-1&2
4 WTP MCC and its cable celler

PM Jobs carried

Coal feeder -2A,2B,2C and 2D belt motor, clean run motor


and panel cleaning and blowering done

Boler-2 Coal feeder area cleaning a7 blowering work done.

Fly ash area root blower panel and blower motors cleaning,
blowering and checking done.
PM Jobs carried
Boiler-2 feed water station all MOV and all control valve
cleaning

Boiler-2 transmitter panel cleaning work

Boiler-2 drum parameter meter cleaning done

Danger stcker Pasting work done in:-


1 4.5 mtr celler room
2 Lime stone MCC
3 WWTP Celler
4 BFP-2
Boiler-1 near SFU JB covered with polythen
Boiler-1 24 volt socket cleaning work done
Silo area street light timer modification work done:-
a) Timer circuit sepearated from Crusher building circuit
b) Timer supply of aux contact given from main incomer
supply for continuos timer operation.

Boiler-1 and Boiler-2 both firing floor all panels and SOV,
instrument cleaning and blowering work done.

pH sensor calibration work done of WTP area.

NOx setpoint changed from 0.50 to 0.44 as per Operation


requirment and with consent of both HODs.

PM Jobs carried
FAS-1 field panel cleaning & blowering job

FAS-1 fork & limit switches cleaning & blowering done.

FAS-2 field panel cleaning & blowering job

FAS-2 fork & limit switches cleaning & blowering done.

FAS-1 All Motors cleaning and blowering done


FAS-2 All Motor cleaning and blowering done
BAS-1 All Motor cleaning and blowering done
Silo area Repair Suppy box Cleaning and Blowering done
Compressor house outside IFC panel polythene covering
work done.

Excitation voltage adjusted of both Generator for 132KV


output voltage as required by the MPSS.

Unit-1 all fins cleaning trolleys checked for earthing cable


dressing and found some cable hanging in all 4 trolley motor
earthing cable, so properly dressing done.

BC-5 VFD panel & auxillary cleaning @ blowering work done.


PM Jobs carried
TG building 4.5 mtr area control valves, field equipments LP
heater area cleaning & blowering job
TG building 4.5 mtr motorised operated valves & field
equipments HP heater area cleaning & blowering job

Unit-1 bag house top area field sov & JB cleaning done

AOP area AOP all motors blowring and cleaning done and its
JB cleaning, motor earting tightness checked

Compressor house both VFD danger sticker pasted and both


VFD and DCS outside blowering done.
Comp house all auto drain manual operation check and drain
done.

MPSS end both capacitor bank was stopped for maintenance


and hence the voltage excitation was increased.

Jizu hozen done CEP area.

PM Jobs carried

FAS-1 fork switch leg distance adjustment & cleaning job

BAC-2B level probe cleaning done as per operation


requirement

WTP dcs all module & termination unit panels cleaning &
blowering job

CHP dcs all module & termination unit panels cleaning &
blowering job

Comp house & receiver area all auto drain manual operation
check and moisture drain.
Cleaning & blowering work done for U#1 FWS all CV & MOV.

Cleaning & blowering work done for U#1 DSH ,all CV & MOV.

U#1 Soot Blower Panel.


at 4.5 mtr MPDB panel blowring work from front and back
side.
MPDB panel temprature outgoing terminal temprature taken,
found below 30 degree

ACW Pump House E&I Field euipment cleaning & Blowering


work done

DG House DG-9 Exciter chamber inside Diode Inspection


work done cleaning work U/P

Jizu hozen done WTP Pump House Area


PM Jobs carried
In WTP DCS Panel Cleaning and Blowering to done.

In WTP MOV Panel Cleaning and Blowering to done.

In Compressor House , all the IAC No.-1 , 2 and 3 Motor


Cleaning to done.

PM Jobs carried
Unit-1&2 UPS blowring and cleaning done from outside

Unit-1&2 Battary charger panel blowring and cleaning done


from inside & outside
old silica gel heated in oven and recharge it

Transformer 1 silica gel changed and oil top up in breather

PM Jobs carried
In Unit No. # 2 Boiler Zero mtrs, Drain MOV , J-Valve MOV ,
APH , Veseel No.- 11/21 and 12/22 JB and field Inst. Cleaning
and Blowering to done.

In BC-5 , BC-2 Motor and VCS Panel and Repair Supply Box
Cleaning and Blowering to done.

Coal feeder of Boiler-2 al 8 motors cleaning and blowering


done and double earthing tightness also ensured.
A) Main motor coal feeder
b) Clean run motor

Soot blower motors of Boiler-2 checked for earthing


connection and tightness for 2,4,6,8,10,12,14 and 16 nos.
FAS-1 panel ,SOV & limit switches cleaning & blowering work
done.
FAS-2 panel ,SOV & limit switches cleaning & blowering work
done.
BAS panel ,SOV & limit switches cleaning & blowering work
done.

BC7AB motors cleaning done with power JB

All four Bag filter JB cleaning and blowring done

WTP DCS Panel cleaning work


PM Jobs carried

Unit No. # 1 BAC- 1A / 1B VFD Panel Cleaning and Blowering


to done.

Unit No. # 2 BAC- 2A / 2B VFD Panel Cleaning and Blowering


to done.

Soot blower motors of Boiler-2 checked for earthing


connection and tightness for 1,3,5,7,9,11,13 and 15 nos.

Coal feeder of Boiler-1 al 8 motors cleaning and blowering


done and double earthing tightness also ensured.
A) Main motor coal feeder
b) Clean run motor
ACWP-1 VFD panel cleaning and blowering work done.

ACWP-1 after maint. work started and found the KW load was
not increasing even when rpm was 1500. So stoppped and
then started once in DOL mode and found that pump building
pressure and load was 122KW. So again stopped and started
in VFD with 70% command, now running OK at 31KW.

FAS-2 fork switch mounting done and checked in lab found


working OK on material sensing but when connected in field
and during bulker filling worked normal for 15mins and then
high level coming so need to check the switch and replace.

PM Jobs carried
Unit No. # 1 Coal Feeder area JB , field Inst. Cleaning and
Blowering to done.

Unit No. # 2 Coal Feeder area JB , field Inst. Cleaning and


Blowering to done.
Coal feeder of Boiler-1 all 8 motors cleaning and blowering
done and double earthing tightness also ensured.
A) Main motor coal feeder
b) Clean run motor

Coal feeder of Boiler-2 all 8 motors cleaning and blowering


done and double earthing tightness also ensured.
A) Main motor coal feeder
b) Clean run motor

Fire pump house 5 nos. MOV and instrument cleaning and


blowering work done.

Jizhu-Hozen done at pump hiuse area.

BC-7A and 7B male-female TB of backside of feeder


replacement work under progress.

Generator and DG reading statement sheet prepared for last 2


months for Electrical inspector visit.
Auto drain of compressor manually drain and operation
checking done.

PM Jobs carried
compressor house all instrument compressor motors
cleaning work done
compressor house all instrument compressor SOV, pressure
gauges, transmitters cleaning done

PM Jobs carried

Deluge station equipments cleaning and packing with packing


tape as following area:
1 T1 tower
2 T2 tower
3 BC-4

PM Jobs carried
P&V no. 2 and 4 local panel checking, all power terminal
tightness and panel blowering work done.

Boiler-2 area ID, PA, SA and J-valve both motors blowering


work done.
Boiler-2 0m area all instrument near APH cleaning and
blowering work done.
LED and 24V trafo given at Coal feeder area and ACC-1
number 0m area.
DG booking done for power generation of 100Kwh as per last
day running on load.

PM Jobs carried
Deluge station equipments cleaning and packing with packing
tape as following area:
1 BC-6
2 switchyard
3 ACC-20mtr near TG building gate

workshop MV drive room back side JB cable dressing done


properly and replace the dusty polythene covers on JB
PM Jobs carried

BC-7A Belt Pull Chord Switch Preventive Maintences to done.


( Cleaning , Tightness and Polythene Packing to done.)

In Unit No. # 1 J-valve Fan -1A and 1B Motor Cleaning and


Blowering to done.

PM Jobs carried
PM Jobs carried

Boiler-1&2 motors blowring and cleaning done


1 ID and PA both boilers
2 SA and J valve Both boilers

Bag house-2 level probs calibration done for 21 no vessele


Date Shift Engineer Name Shift Regular jobs carried

Plant round taken found all drives normal.

Switchyard Round Taken found normal

TG area all motors temp reading taken in round.

P&V-4 started and stopped in B shift.( Start the P&V in A shift


and stop at 6pm)

Following shutdown Cleared-


2 BC-2(Given also)
2 FAS-2
B 3 BC-7A and 7B
02.03.2022 Anurag Chowdhury 4 Vib screen-2
5 BC-3
6 Raw water pump-2 and 2

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Unit No. # 2 Vessel No.-22 Level Probe is showing High Value.


So Level Probe is cleaned and checked with material . It is
working Normally.

All the AC MCB to OFF Condition. SH Room and Conference


Room AC is running Condition. So OFF the AC MCB.

Unit No. # 2 and 2 Drain Pot Displacer transmitter Polythene


Packing to done.
Unit No. # 2 CO analyser Panel Cleaning and Blowering to
done.
Sanjay Garg
Unit No. # 2 CO analyser Panel Cleaning and Blowering to
done.
CPCB Report on dated @02/03/2022 not sent because CD is
not open in PC.
All the Report ( APC, Plant Performance , Power Report )not
sent because CD is not open in PC.
C Service air driyer Moisture drained.
02.03.2022
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
C
02.03.2022

VAM log digital log book filled.


General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
Gajendra Pandya
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC AC MCB made ON

Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
02.03.2022 A Deepak Chand
Following shutdown given
2 BC-6
2 BC-7A
3 BC-7B

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Unit No. # 2 Vessel No.# 22/22 Back Pr. Transmitter Cover


is not Present at site. So cover is Provided. Now Ok.
Unit No. # 2 SOX analyser showing moisture fault. So Reset it.
Now Ok.
In Unit No.# 2 FCV0920 MOV Cover is not Present at site. So
MOV Cover is Provided at site.
Unit No. # 2 APH field Inst. And JB Cleaning and Blowering to
done.

Sanjay Garg Unit No. # 2 vessel No.- 22 /22 field Inst. And JB Cleaning and
Blowering to done.
Unit No. # 2 vessel No.- 22 /22 field Inst. And JB Cleaning and
Blowering to done.
Online CPCB website is not opened.
CPCB Report on dated @02/03/2022 is sent to all.
All the Report ( APC, Plant Performance , Power Report ) is
sent to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX02.
02.03.2022 C
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

ACC-2 fins cleaning supply made OFF due to cleaning were


done with fire pump water, againg its power made ON

All Energy Meter manual Reading taken for Power Report.


Gajendra Pandya Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
All the AC MCB to OFF Condition.

Online CPCB website is not opened.


Following shutdown given
2 BC-2
2 BC-4
3 Coal feeder -2A from MCB
4 Coal feeder 2A MOV
5 Coal feeder 2A SOV
6 AHF Panel 2
7 AHF Panel 2
8 Bed ash silo dry system
03.03.2022 A Ajaya Kumar
9 Reclaimer
Shift instrument digital log book filled
03.03.2022 A Ajaya Kumar

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for Power Report.


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

Following shutdown Cleared-


2 BC-4
2 FAS-2
3 BC-2
4 Reclaimer
5 coal feeder-2A
6 AHF panel-2
7 AHF panel-2
03.03.2022 B Gajendra Pandya
Following shutdown given-
2 Bed ash cooler-2B

BAS silo dry unloading system motor cable connection Done.


Bed ash cooler -2A area LED light provided
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

In Unit No. # 2 Bed Ash Cooler- 2B Seal pr. Guage Broken


Condition. So Replaced the Pr. Guage. Now it is working
Normally.
In Unit No. # 2 Bed Ash Cooler- 2B Level Probe polythene
Packing to done.
Unit No. # 2 APH Seal Pr. Fault is showing at DCS end. So
cleaned the Impluse line. Now it is showing Normally.
In CHP T-2 Tower field Inst. And JB Cleaning and Blowering
Sanjay Garg to done.
Online CPCB website is not opened.
Sanjay Garg

CPCB Report on dated @03/03/2022 is sent to all.


All the Report ( APC, Plant Performance , Power Report ) is
sent to all.
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
03.03.2022 C
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
Anurag Chowdhury
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Following shutdown given

2 BC-2
2 BC-4
3 Reclaimer
4 P&V-2 boiler side
04.03.2022 A Gajendra Pandya Reclaimer shutdown cleared
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.
Evening round all required light made on.
Following shutdown Cleared-
2 BC-2
2 BC-4

AVI given for BAC-2B


P&V in stop condiiton.
compresser house auto drain valve manual draining done
B LED lights and transformers collected from TG-2
04.03.2022 Ajaya kumar
RNRP all nodes found UP except SPC 007, SPC008 and
OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

P&V no. 4 in stop condition.

Unwanted lights made OFF during Plant Round

Environment Report on dated @04/03/2022 and sent to all


Person.
All the Report ( APC, Plant Performance , Power Report ) and
sent to all Person.
C
04.03.2022 Anurag Chowdhury RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC AC MCB made ON


Chimney analyser room round taken & found system healthy.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

TG-2 Taken in base Load – 29.5 MW at 20:30 hrs and sync.


done at 23:50 hrs

05.03.2022 A Deepak Chand Following shutdown given


2 BC-2
2 Coal Crusher-2
3 BAC 2B
4. Bed Ash Silo
5. Reclaimer
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All the AC MCB to OFF Condition.
All the auto drain valve checked in compressor checked and
working Normally.
In Unit no. # 2 J-valve Fan MOV cable dressing done in cable
tray area.
In CPCB data is not showing in chimney analyser system. So
again started the website. Now Ok.
Fly ash silo No. # 2 and 2 Field Inst. And Panel Blowerning
and cleaning to done.
BAC-2B Inst. Air line isolation removed at site.
ETP Online data is no tshowing from 05/03/2022@ 2.27 PM
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Fire Engine battary checked and found ON Condition.
B all the manual light to ON Condition.
5.03.2022 Sanjay Garg
Following S/D to given.
2. Raw water Pump-3.
2. BC-4
5.03.2022 B Sanjay Garg

Following shutdownCleared.
2 BC-2
2 Coal Crusher-2
3 BAC 2B ( 02 Times )
4. Bed Ash Silo
5. BC-4,
6. Raw water Pump No.-3,

In Bed ash silo RAV Motor connection to done. Trial is


Pending.
Fly ash silo No. # 2 and 2 Motor Blowerning and cleaning to
done.
At coal feeder area 24 Volts Lamp to changed.

Silo to Middle gate street light is not ON Condition. Found that


TB connection is loose condition. So tightness to done.

Following check list prepared


a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

P&V no. 4 in stop condition.

Unwanted lights made OFF during Plant Round

Environment Report on dated @05/03/2022 and sent to all


Person.
All the Report ( APC, Plant Performance , Power Report ) and
sent to all Person.
RNRP all nodes found UP except SPC008 and OPX02.
05.03.2022 C Gajendra Pandya/
Ajaya choudhry Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made ON

Chimney analyser room round taken & found system healthy.


4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.
TG-2 Taken in base Load – 29.5 MW at 20:30 hrs and sync.
done at 23:50 hrs

Following shutdown given


2 BC-4 ( Elect)
2 BC-4 ( Mech)
3 BC-4 ( Operation)
06.03.2022 A Deepak Chand 4. Fly Ash Silo-2
5. BAC -2B
6. BFP-3 ( Elect)
7. BFP-3 ( Inst)
8. BFP-3 ( Maint)
9. BFP-3 Main MOV
20. BFP-3 By Pass MOV

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in compressor checked and


working Normally.

Unit no. # 2 vessel No.-22/22 Back Pr. Switch and Transmitter


is not showing at DCS. So Cleaned the Impluse line. Now Ok.

In on line CPCB website is not opened.


Unit no. # 2 vessel No.-22/22 Back Pr. Switch and
Transmitter SS Tube impluse line dressing to done.

Unit No. # 2 CO analyser showing at fault. So reset it. Now Ok.

In Fly ash silo No. # 2 Fork Level switch showing at site. So


level Probe cleaned at site. Now Ok.
In CHP T-2 Tower field Inst. And JB Cleaning and Blowering
to done.
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.
Fire Engine battary checked and found ON Condition.
B all the manual light to ON Condition.
6.03.2022 Sanjay Garg
B
6.03.2022 Sanjay Garg
Following S/D to given.
2. BC-7A
2. BC-7B

Following shutdownCleared.
2 BC-4 ( 03 Times )
2 BC-7A
3 BC-7B
4. Fly ash silo No. -2,
5. BFP-3, ( 02 Times )

In BFP-3 AVI to be given and Started it and running Normally.


Since PTW is not working condition. So Permit is closed
manually.

As Per HOD ( O&M.) BFP-2 Kept in DOL Mode.

New Spray Mist. Fan Power connection removed as per


requirement.
Hand Lamp / Transformer Provided at BFP-3 for Mech.
Work.
24 Volts LED to Provided at BAC-2B for Mech. Work.
In Cusher Building Light is not ON because Lighting Timer is
not working condition. So bypassed it.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @06/03/2022  mail send to concern


person.
All the Report ( APC, Plant Performance , Power Report )
  mail send to concern person..

Chimney analyser room round taken & found system healthy.

C Anurag CPCB date updating at site & analyzer PC also.


06.03.2022 Chowdhury/Ajaya
kumar
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log book filled.
Shift abnormality log book filled.
VAM log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Chimney analyser room round taken & found system healthy.


RNRP all nodes found UP except SPC008 and OPX02.
Following shutdown given:-
2 BC-6
2 Bucket elevator-2
3 Soot blower unit-2
4 soot blower MOV-02MV0702
5 soot blower top control valve-02PVC702

Following shutdown cleared:-


07.03.2022 A Gajendra Pandya 2 Soot blower unit-2
2 soot blower MOV-02MV0702
3 soot blower top control valve-02PVC702
soot blower top control valve-02PVC702 power supply cable
removed for maintenance deptt working, again reconnect
after shutdown cleared.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

As Per Operation requirement Unit No. # 2 Soot Blower MOV


( 02MV0702 ) Close Limit to set. And Trial taken. Now it is
working Normally.
All the auto drain valve checked in compressor checked and
working Normally.

Fly Ash Silo No. # 2 Gate valve is closed when fork level
switch acted. So Cleaned the Fork level switch. Now it is
running normally.

CHP DCS panel Blowerning and Cleaning to done.


In CHP Line # 2 is tripped. So checked and found that Bucket
elevator No. # 2 ZSS Proxy is not showing at DCS end. So
checked and found that ZSS Controller supply is OK. But there
is large gap between Proxy and Mech. Wheel. Since Line No. #
2 is started. So we can not set the Proxy.

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
7.03.2022 B Sanjay Garg /
Deepak Chand General Plant Round taken found all drive running normal.
Fire Engine battery checked and found ON Condition.
All the manual light to ON Condition.

Following shutdown Cleared.


2 BC-6
2 Bucket elevator-2

BAC-2B AVI to be given and close.

As Per HOD ( O&M.) BFP-2 Kept in DOL Mode.


New Spray Mist. Fan Power connection removed as per
requirement.
Hand Lamp / Transformer Provided at BFP-3 for Mech.
Work.
24 Volts LED to Provided at BAC-2B for Mech. Work.
In Cusher Building Light is not ON because Lighting Timer is
not working condition. So bypassed it.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

CPCB Report on dated @07/03/2022  mail send to concern


person.
All the Report ( APC, Plant Performance , Power Report )
  mail send to concern person..

Chimney analyser room round taken & found system healthy.

C Anurag
07.03.2022 Chowdhury/Ajaya
kumar
Anurag CPCB date updating at site & analyzer PC also.
C
07.03.2022 Chowdhury/Ajaya
kumar
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log book filled.
Shift abnormality log book filled.
VAM log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Chimney analyser room round taken & found system healthy.


RNRP all nodes found UP except SPC008 and OPX02.
Following shutdown given:-
2 BC-6
2 Reclaimer
3 Portable water-2

08.03.2022 A Gajendra Pandya AVI given for BAC-2B


Ladder and lighting transformer removed from field
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Switchyard Round Taken found normal

Following shutdown Cleared-


2 BC-6
2 Reclaimer

08.03.2022 B Anurag Chowdhury


AVI given for BAC-2B
B
08.03.2022 Anurag Chowdhury P&V no. 4 in made stop in evening.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All the AC MCB to OFF Condition.

In Fly ash silo No. # 2 Fork switch showing at site. Also found
that heavy material deposit on the level Probe . So we have
cleaned the Probe at site.Also Vibrate the Probe. But Trial is
not taken because Rope of the silo shute is not working
condition.

Sanjay Garg In Fly ash silo No. # 2 Fork switch showing at site. Also found
that heavy material deposit on the level Probe . So we have
cleaned the Probe at site. Now it is working normally.

at BC- 6 deluge tail end Station Field Inst. And JB Cleaning and
Packing Tape to done.
CPCB Report on dated @08/03/2022 is sent to all.
All the Report ( APC, Plant Performance , Power Report ) is
sent to all.
08.03.2022 C
Service air driyer Moisture drained.
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round


P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Anurag Chowdhury
DG report prepared and upload in SAP.
Anurag Chowdhury

EMS v/s manual Power Comparison Report prepared and


mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Chimney analyser room round taken & found system healthy.

RNRP all nodes found UP except SPC008 and OPX02.

Following shutdown given:-


2 coal crusher-2
09.03.2022 A Gajendra Pandya 2 BC-2
3 BC-3
4 BC-6
5 BC-4
6 DM Transfer pump-2
7 BC-7A
8 BC-7B
9 RSB Box WTP
20 RSB WTP Hall

AVI given for BAC-2B


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Switchyard Round Taken found normal

09.03.2022 B Ajaya kumar


Following shutdown Cleared-
2 coal crusher-2
2 BC-2
3 BC-3
4 BC-6
5 BC-4
6 DM Transfer pump-2
7 BC-7A
8 BC-7B
9 RSB Box WTP
20 RSB WTP Hall

B
09.03.2022 Ajaya kumar AVI given for BAC-2B & isolate again.

P&V no. 4 in made stop in evening.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Chimney analyser room round taken & found system healthy.

RNRP all nodes found UP except SPC008 and OPX02.


TG-2 put in base load at 9 am as load reduced, again taken in
line
TG-2 put in base load at 2.30pm , as load reduced

Following shutdown given:-


2 coal crusher-2
2 BC-2
3 BC-4
20.03.2022 A Gajendra Pandya 4 BC-6
5 High pressure Pump,223
6 coal crusher-2
7 Vibrating screen-2
8 BAC-2B

LED provided at crusher floor


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Switchyard Round Taken found normal

Following shutdown Cleared-


2 Coal crusher-2
2 BC-2
3 BAC-2B
4 Vib Sc-2
5 BC-4

AVI given for BAC-2B & isolate again.

B P&V no. 4 in made stop in evening.


20.03.2022 Ajaya kumar

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

In Unit No. # 2 Vessel No.-22 High Level Showing at DCS end.


So checked and found that material on the level Probe. So
cleaned the level probe also calibrated it. Now Ok.

In Unit No. # 2 Vessel No.-22 High Level Showing at DCS end.


So checked and found that material Inside the vessel. So
informed to the shift Operator.

Boiler # 2 SOX analser showing zero flow at controller side.


Sanjay Garg So checked and found that moisture fault. So cleaned the
moisture filter. Now Ok.

In Unit No. # 2 BAC-2A / 2B Local Inst. Panel Blowerning ,


Cleaning and Packing to done.
In Unit No. # 2 BAC-2A / 2B Local Inst. Panel Blowerning ,
Cleaning and Packing to done.
CPCB Report on dated @20/03/2022 is not sent to all
because CD is not open in PC.
20.03.2022 C
All the Report ( APC, Plant Performance , Power Report ) is is
not sent to all because CD is not open in PC.
Service air driyer Moisture drained.
20.03.2022 C

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Unwanted lights made OFF during Plant Round

P&V in stop condition.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
Deepak Chand FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 BC-2
2 Coal Crusher-2
3 BAC-2B
Shutdown of belt motor feeders is to be given now from SFU
off and MCB to be switched off, refer logbook for additional
information.
22.03.2022 A Anurag Chowdhury
P&V started at morning round.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Round taken & all office AC supply made off.


Following shutdown given-
2 BC-2
2 BC-4
3 BAC-2B
4 Screen-2

BAC-2B AVI given and close.


22.03.2022 B Jaswant Singh P&V -4 stopped at 6 pm
RNRP all nodes found UP except SPC 007, SPC008 and
OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

CPCB Report on dated @22/03/2022 sent to all

All the Report ( APC, Plant Performance , Power Report ) is


sent to all
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
C Shift abnormality  digital log book filled.
22.03.2022 Gajendra Pandya
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made ON


Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

TG-2 Taken in base Load – 29.5 MW at 20:30 hrs and sync.


done at 23:50 hrs

Following shutdown given


2 Reclaimer
2 BC-7A
06.03.2022 A Deepak Chand 3 BC-7B
4. ACW-3
5. Vibrating Screen-2
6. BAC-2B

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made off

Chimney analyser room round taken.

Following shutdown given & clear


2 Reclaimer
2 BC-7A
3 BC-7B
4. ACW-3
5. Vibrating Screen-2
22.03.2022 B Jaswant Singh 6. BAC-2B

RNRP all nodes found UP except SPC008 and OPX02.

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

CPCB Report on dated @22/03/2022 not send due to CD


problem.
All the Report ( APC, Plant Performance , Power Report ) not
send due to CD problem.

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled

Ajaya UPS log digital log book filled.


22.03.2022 C Kumar/Gajendra Shift abnormality  digital log book filled.
Pandya VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC AC MCB made ON

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check & found under
57Deg. C.

TG-2 Taken in base Load – 29.5 MW at 20:30 hrs and sync.


done at 23:50 hrs

Following shutdown given


23.03.2022 A Deepak Chand 2 Reclaimer
2 BC-7A
3 BC-7B
4. BC-2
5. BC-2
6. FAS -2

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All AC MCB made off

Chimney analyzer room round taken.

hand lamp provided at BAC-2B as per operation request

Following shutdown given & closed


2 Reclaimer
2 BC-7A
3 BC-7B
23.03.2022 B Jaswant Singh 4. BC-2
5. BC-2
6. FAS -2
7. BAC-2B

RNRP all nodes found UP except SPC008 and OPX02.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

CPCB Report on dated @22/03/2022 7 23/03.2022 send to


concern person.
All the Report ( APC, Plant Performance , Power Report ) send
to concern person.

RNRP all nodes found UP except SPC008 and OPX02.

Shift instrument digital log book filled

UPS log digital log book filled.

Shift abnormality  digital log book filled.


23.03.2022 C Ajaya Kumar/Anurag
Chowdhury
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB OFF condition, P&V boiler side made ON at 9.00


am

Chimney analyzer room round taken.


boiler-2 APH vessele-2 dome valve air shutdown given(Key-
TP-576) , its limit switch removed and air connection
24.03.2022 A Gajendra pandya removed on requirement of operation deptt.
Following shutdown given
2 Bucket elevator-2
switchyard side street light timer reduced to 6.25 am in
morning
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All AC MCB made off
Chimney analyzer room round taken.
hand lamp provided at BAC-2B as per operation request

Following shutdown closed


2 Bucket Elevator-2

24.03.2022 B Deepak Chand


RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

CPCB Report on dated @24/03/2022 send to concern person.

All the Report ( APC, Plant Performance , Power Report ) send


to concern person.
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.

VAM log digital log book filled.


24.03.2022 C Ajaya Kumar/Anurag
Chowdhury
Unwanted lights made OFF during Plant Round
P&V in stop condition.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All office AC MCB made On condition, P&V boiler side made


ON at 8.00 am

Chimney analyzer room round taken and CPCB site data & PM
trend checked

Following shutdown given


2 Bucket elevator-2
2 Silo-2 dry unloading system
3 Reclaimer
4 BC-2
5 BC-2
25.03.2022 A Jaswant Singh 6 Crusher-2
7 Vibrating screen-2
8 Soot blower-2
9 CHP MCC-B

light timer adjust at ACC-2, ACC-2, Compressor house & silo


RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist

Switchyard Round Taken found normal

Following shutdown Cleared-


2 BC-2
2 Reclaimer
3 FAS-2
4 Soot blower-2
5 Crusher-2
6 Bucket elevator-2
7 Vib screen-2

25.03.2022 B Anurag Chowdhury P&V no. 4 in made stop in evening.

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Power report prepared and mail

FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison Report prepared and
mailed
25.03.2022 C Deepak Chand Transmission Losses Report Prepared and mailed.
RNRP all nodes found UP except SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 BC-3
2 Reclaimer
3 Vib screen-2
4 CEP-2B and MOV 2902
5 BC-6
6 Coal feeder-2A

Shutdown of belt motor feeders is to be given now from SFU


26.03.2022 A Anurag Chowdhury off and MCB to be switched off, refer logbook for additional
information.
P&V started at morning round.
RNRP all nodes found UP except SPC 007, SPC008 and
OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
Morning round all light made off.

Following shutdown cleared-


2 BC-3
2 Reclaimer
3 Vib screen-2
4 BC-6
5 Coal feeder-2A

Shutdown of belt motor feeders is to be given now from SFU


off and MCB to be switched off, refer logbook for additional
information.
26.03.2022 B Ajaya Kumar
P&V stopped T 6;30 PM .

RNRP all nodes found UP except SPC 007, SPC008 and


OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Power report prepared and mail

FH & HOD Report prepared and mailed


Plant APC, Plant AUX & Env report not generated
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
C Jaswant Singh &
26.03.2022 Deepak Chand Transmission Losses Report Prepared and mailed.
RNRP all nodes found UP except SPC007, SPC008 and OPX02.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 BC-3
2 Reclaimer
3 Vib screen-2
4 DT-5 and DT-2(cleared)
5 PCC-2A and PCC-2B(cleared)
6 Bucket elevator-2
7 Jockey pump-2
27.03.2022 A Anurag Chowdhury
P&V started at morning round.
RNRP all nodes found UP except SPC008.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
Evening round required light made on.

Following shutdown Cleared-


2 BC-3
2 Reclaimer
3 Vib screen-2
4 Bucket elevator-2
5 Jockey pump-2
6. BC-5

27.03.2022 B Ajaya Kumar


P&V sttopped at 7:00 PM.
RNRP all nodes found UP except SPC008.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Power report prepared and mail

FH & HOD Report prepared and mailed

Plant APC, Plant AUX & Env report generated & mail to all
concerned
C Jaswant Singh & DG report prepared and upload in SAP.
27.03.2022 Deepak Chand
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
RNRP all nodes found UP

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 BC-2
2 BC-4
3 coal crusher-2
4 FAS-2 dry unloading
5 Boiler-2 soot blower

28.03.2022 A Tarun Mandawat P&V 4 started at morning round.


RNRP all nodes healthy
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Jockey pump VFD checked found working healthy.
ACC fins system supply on for operation requirement.
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown cleared-


2 BC-2
2 BC-4
3 coal crusher-2
4 FAS-2 dry unloading
5 Boiler-2 soot blower

P&V 4 started at morning round.


28.03.2022 B Ajaya Kumar
RNRP all nodes healthy
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Jockey pump VFD checked found working healthy.
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Plant APC, Plant AUX & Env report generated & mail to all
concerned
DG report prepared and upload in SAP.

EMS v/s manual Power Comparison Report prepared and


mailed

C Jaswant Singh & Transmission Losses Report Prepared and mailed.


28.03.2022 Anurag
Jockey pump VFD checked during shift round and found
working healthy at 40 deg C and 7 KW load.
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 ACC fan-2D
2 ACC fan lube oil pump 2D
3.BC-4
4.BC-2
5.BC-2
6.VS-2
7.VS-2
8.Soot blower-2
9.ACC-2D
20.Coal crusher-2

29.03.2022 A Tarun Mandawat


P&V 4 started at morning round.
RNRP all nodes healthy
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Jockey pump VFD checked found working healthy.
Boiler lighting off time changed from 6.50 am to 6.25 am
PM08 order closed for as per work completion
4.5 mtr Breaker changeover work as per requirement for DT
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Jockey pump VFD temp checked found 45 degc, working


healthy.

Following shutdown cleared-


2 ACC fan-2D
2 ACC fan lube oil pump 2D
3.BC-4
4.BC-2
5.BC-2
6.VS-2
7.VS-2
8.Soot blower-2
9.ACC-2D
29.03.2022 B Jaswant Singh 20.Coal crusher-2

P&V 4 stopped @7 pm.


RNRP all nodes healthy
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
PM07 order closed for TPI
Shift abnormality  digital log book filled.
General Plant Round taken found all drive running normal.
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

Plant APC, Plant AUX & Env report generated & mail to all
concerned

EMS v/s manual Power Comparison Report prepared and


mailed
29.03.2022 C Ajaya Kumar/Deepak
Chand Transmission Losses Report Prepared and mailed.
C Ajaya Kumar/Deepak
29.03.2022 Chand

RNRP all nodes found UP


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Morning round all light made off.

Following shutdown given-


2 ACC fan-2C
2 ACC-2c fan lube oil pump
3.BC-4
4.BC-4
5.BC-7A
6.BC-5
7.VS-2
20.03.2022 A Jaswant Singh 8.ACC-2C
9.ACC-2C lube oil

P&V 4 started at morning round.


RNRP all nodes healthy
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Jockey pump-2 VFD checked found working healthy, temp
@44.9 degc
Jockey pump-2 started two times due to low pressure
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made off

Chimney analyser room round taken.

20.03.2022 B Deepak Chand


20.03.2022 B Deepak Chand Following shutdown closed
2 ACC fan-2C
2 ACC-2c fan lube oil pump
3.BC-4
4.BC-4
5.BC-7A
6.BC-5

P&V no. 4 in made stop in evening.


RNRP all nodes healthy

General Plant Round taken found all drive running normal.


All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
Plant APC, Plant AUX & Env report generated & mail to all
concerned
EMS v/s manual Power Comparison Report prepared and
mailed

Transmission Losses Report Prepared and mailed.

C Ajaya Kumar/Anurag
20.03.2022 Chaudhary
RNRP all nodes found UP

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Switch Yard round Taken.

Chimney analyser room round taken.

21.03.2022 A Deepak Chand


Following shutdown given
2 ACC Fan2F
21.03.2022 A Deepak Chand 2 ACC Fan 2F lube oil

Following AVI given and Close.


2 ACC Fan2F
2 ACC Fan 2F lube oil

Following shutdown Clear


2 ACC Fan2F
2 ACC Fan 2F lube oil

RNRP all nodes found up


All AC AC MCB made ON
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Chimney analyzer system check ,found normal.

CPCB date updating at site & analyzer PC also.

P&V 4 stopped @7 pm.


RNRP all nodes healthy
21.03.2021 B Ajaya kumar
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
PM07 order closed for TPI
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

P&V no. 4 in stop condition.

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power Report and Env)


not send due to CD not detected.
C
21.03.2021 Anurag Chowdhury
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
P&V-4 started at 8 Am
Chimney analyser room round taken.

22.03.2022 A Jaswant Singh


Following AVI given and Close.
2 ACC Fan1A
2 ACC Fan 1A lube oil

Following shutdown Clear


1 ACC Fan1A
2 ACC Fan 1A lube oil
3 BAC-1B
RNRP all nodes found up
Compressor house all auto drain valve check manually
through test button.
All AC MCB made ON
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made off

22.03.2022 B Deepak Chand Chimney analyser room round taken.

Following shutdown closed


1. BC-6
2.BC-7A
3.BC-7B
P&V no. 4 in made stop in evening.
RNRP all nodes are healthy.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

P&V no. 4 in stop condition.

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power Report and Env)


not send due to CD not detected.
C RNRP all nodes found UP.
22.03.2021 Anurag Chowdhury
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report prepared and
mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
General Plant Round taken found all drive running normal.
P&V-4 started at 8 Am
Chimney analyser room round taken.

Following shutdown given


1 BC-1
2 BC-2
3 BC-4
4 BC-6
5 Jockey -Pump-1 Project & (TPP E&I)
6 Jockey -Pump-2 Project & (TPP E&I
7 Fire watr pump-1 Project &
(TPP E&I 8 Fire
23.03.2021 A Ajaya kumar watr pump-2 Project & (TPP E&I

Following AVI given and Close.


2 ACC Fan1A
2 ACC Fan 1A lube oil

Following shutdown Clear


1 ACC Fan1A
2 ACC Fan 1A lube oil
3 BAC-1B
RNRP all nodes found up
Compressor house all auto drain valve check manually
through test button.
All AC MCB made ON

Switchyard Round Taken found normal


Following shutdown Cleared-
1 BC-1
2 BC-2
3 BC-4
4 BC-6
5 Jockey -Pump-1 Project & (TPP E&I)
6 Jockey -Pump-2 Project & (TPP E&I
7 Fire watr pump-1 Project &
(TPP E&I 8 Fire
watr pump-2 Project & (TPP E&I
B
23.03.2021 Anurag Chowdhury
P&V no. 4 in made stop in evening.
RNRP all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Plant APC, Plant AUX & Env report generated & mail to all
concerned
CPCB & ETP report mail to all
RNRP all nodes found UP

C Jaswant Singh/ All Energy Meter manual Reading taken for Power Report.
23.03.2021 Deepak Chand
Power report prepared and mail
FH & HOD Report prepared and mailed
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Unwanted lights made OFF during Plant Round

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

Morning round all light made off.

24.03.2022 A Anurag Chowdhury


Following shutdown given-
2 BC-6
2 Reclaimer
3 Crusher-2
4 Bc-5
5 BAC-2A
24.03.2022 A Anurag Chowdhury 6 BC-4
P&V started at morning round at 7:00am.
RNRP all nodes found UP .
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

General Plant Round taken found all drive running


normal.

P&V-4 started at 8 Am

Chimney analyser room round taken.

Following shutdown given


1 BC-2
2 BC-4
3 BC-5 (Two times)
4 BC-6
24.03.2021 B Ajaya kumar 5 Reclaimer
6 BAC 2A
7 Coal Crusher-2

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
Plant APC, Plant AUX & Env report generated & mail to all
concerned
CPCB & ETP report mail to all
RNRP all nodes found UP
All Energy Meter manual Reading taken for Power Report.

24.03.2021 C Jaswant Singh/


Deepak Chand Power report prepared and mail

FH & HOD Report prepared and mailed


EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Unwanted lights made OFF during Plant Round

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.


Morning round all light made off.

Following shutdown given-


2 BC-7A
2 Reclaimer
3 Boiler-1 sootblower
4 Bc-5
5 BAC-2B
6 BAC-1B

25.03.2021 A Purushottam P&V started at morning round at 7:00am.


RNRP all nodes found UP .
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.

P&V-4 off at 6.30pm

Chimney analyser room round taken.


Following shutdown cleared
1.Reclaimer
2.BAC-1B
3.BAC-2B
4.Boiler-1 soot blower
5.BC-5
6.BC-7A

Shift abnormality  digital log book filled.


VAM log digital log book filled.
a) Generator-2  checklist
25.03.2021 B Tarun mandawat b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
CT fan area dewatering pump connection done & plug
top installed of 20 amp as per WTP operation
requirement
Hand lamp provided at BC-7A BC-7B
At 6pm checked DT temp found as below
DT-1 - 74deg C
DT-4 - 79degC
DT-6 - 80 degC

BC-6 belt tear connection cross checked & rectified ,


signal checked from field to DCS grahics working
healthy, logic prepared , download is pending.
ALL office AC stopped as per not in use for power
saving.
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Power report prepared and mail


FH & HOD Report prepared and mailed
Plant APC, Plant AUX & Env report generated & mail to all
concerned

DG report prepared and upload in SAP.


25.03.2021 C Jaswant Singh &
Anurag EMS v/s manual Power Comparison Report prepared and
mailed

Transmission Losses Report Prepared and mailed.


Anurag

Jockey pump VFD checked during shift round and found


working healthy at 40 deg C and 7 KW load.
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Unwanted lights made OFF during Plant Round
P&V in stop condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

All the AC MCB to ON Condition.

In Fly ash silo No. # 2 level is not correctly showing at DCS


end. So Reset the Power supply and Clean the level Probe.
Now Ok.
In Fly ash silo No. # 2 level probe Polythene Coverning to
done.

Unit no. # 1 HPH Drain Temp. is showing flucations at DCS


end. So RTD wire is connected to OK Channel. Still it is
showing Variation at DCS end. At field side Spare RTD Pair is
used also cable is directly connected. While RTD resistance is
showing normal. Still it is showing 3 to 5 degree variation at
DCS end.
Online CPCB website is not opened.
RNRP all nodes found normal except SPC001.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
26.03.2021 A Sanjay Garg
General Plant Round taken found all drive running normal.
Fire Engine battary checked and found ON Condition.
all the manual light to OFF Condition.
P & V System is started in morning time 7.00 AM.
BC-4 Belt is Tripped. So all the Feeder side connection and TB
Tightness to done. Also field Panel side tightness to done. Also
checked at DCS end due to belt tare signal is acted. After some
time it is normalized. Then it is started it is running normally.
Under Observation .
following shutdown Given.
1BC-6
2 BC-7A
3 BC-7B
4. BC-1 Magnetic Seperator,
5.BC-1 ( 02 Times ).

In RSB # 93 ( T-2 Tower ) inside one eathing wire is broken


condition. So connected it. Now ok.
In RSB # 92 (BC-5 )Panel hole sealing done by silver tape.
Now ok.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running


normal.

P&V-4 made off at 8.00pm

Chimney analyzer room round taken.

Following shutdown clear-


1BC-6
2 BC-7A
3 BC-7B
26.03.2021 B Jaswant Singh 4. BC-1 ( 02 Times )

Contractor removal from bed ash wet unloading system


for silo-2 bag filter controller woking normal
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 5pm checked DT temp found as below-
DT-1 - 74deg C
DT-4 - 79degC
DT-6 - 81 degC
ALL office AC stopped as per not in use for power
saving.

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Plant APC, Plant AUX & Env report generated & mail to all
concerned
CPCB & ETP report mail to all
C
26.03.2021 RNRP all nodes found UP
Deepak Chand
Power report prepared and mail
FH & HOD Report prepared and mailed
EMS v/s manual Power Comparison Report prepared and
mailed
Transmission Losses Report Prepared and mailed.
Unwanted lights made OFF during Plant Round
Compressor house all auto drain valve check manually
through test button.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.
All the AC MCB to ON Condition.
In Inst. Air Compressor No. # 1 Service required alarm at
Local Display. As per shift Incharge requirement Reset it. Now
Ok.
BC # 1 Magnetic seperator Cable dressing to done.
Unit No. # 1 APH Vessel Power Supply cable dressing to done.

Compressor house all auto drain valve checked and working


Normally.
RNRP all nodes found normal .
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running normal.

Fire Engine battary checked and found ON Condition.


27.03.2021 A Sanjay Garg
( Voltage- 13 Volts.)
all the manual light to OFF Condition.
P & V System No.-4 is started in morning time 8.00 AM.

following shutdown Given.


1BC-1
2 BC-3
3 BC-5

ACW Pump House Motor JB / Motor Cleaning and Blowerning


to done.
ACW Pump Repair Supply Box no.-66 ELCB checked and
working normally.
Compresoor House OFF Lighting Timer set to 6.15 AM ( Old
setting is = 6.30 AM)
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running


normal.

P&V-4 made off at 7.00pm


Chimney analyzer room round taken.
Following shutdown clear-
1BC-1
2 BC-3
3 BC-5

Lights made on manually

27.03.2021 B Jaswant Singh Shift abnormality  digital log book filled.


VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 3:30 pm checked DT temp found as below-
DT-1 - 74deg C
DT-4 - 79degC
DT-6 - 81 degC
ALL office AC stopped as per not in use for power
saving.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Plant APC, Plant AUX & Env report generated & mail to all
concerned

CPCB & ETP report mail to all

27.03.2021 C RNRP all nodes found UP


Deepak Chand

Power report prepared and mail


Deepak Chand

FH & HOD Report prepared and mailed

EMS v/s manual Power Comparison Report prepared and


mailed

Transmission Losses Report Prepared and mailed.

Unwanted lights made OFF during Plant Round


Compressor house all auto drain valve check manually
through test button.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running normal.

Coal Bunker Level Transmiiter # 1D Not showing correctly at


DCS end. So reset the Power Supply. Now Ok.
In Pump House area all the Inst. related Field Instruments
Cleaning and Blowerning to done.
Unit No. # 1 and 2 all the Bunker Level Transmitter Level
Probe Cleaning to done.
Online CPCB website is not opened.
Compressor house all auto drain valve checked and working
Normally.
RNRP all nodes found normal .
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
28.03.2021 A Sanjay Garg
General Plant Round taken found all drive running normal.

Fire Engine battary checked and found ON Condition.


( Voltage- 12.8 Volts.)
all the manual light to OFF Condition.
P & V System No.-4 is started in morning time 7.00 AM.
Fire Pump House area Motor JB / Motor Cleaning and
Blowerning to done.
Fire Pump House area Repair Supply Box no.-79 ELCB
checked and working normally.
In Fly ash silo system Lighting Timer is in Bypassed condition.
So taken in line.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running


normal.

P&V-4 made off at 7.00pm

28.03.2021 B Anurag Chowdhury


Chimney analyzer room round taken.
Lights made on manually
Shift abnormality  digital log book filled.
28.03.2021 B Anurag Chowdhury
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 3:30 pm checked DT temp found as below-
DT-1 - 74deg C
DT-4 - 79degC
DT-6 - 81 degC
ALL office AC stopped as per not in use for power
saving.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All Energy Meter manual Reading taken for Power Report.

Plant APC, Plant AUX & Env report generated & mail to all
concerned

Stack Emission report mail to all

RNRP all nodes found UP


28.03.2021 C Deepak Chand

Power report prepared and mail

FH & HOD Report prepared and mailed

EMS v/s manual Power Comparison Report prepared and


mailed

Transmission Losses Report Prepared and mailed.

Unwanted lights made OFF during Plant Round


Compressor house all auto drain valve check manually
through test button.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.

P&V-4 made on at 7.00Am

Chimney analyzer room round taken.

Recalimer boom up/down limit problem reported by


ccr team, checked & found command hanged so reset
29.03.2021 A Jaswant Singh the power .afterwards normal working

RNRP all nodes found UP

Lights made off manually


Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running normal.

All AC MCB made off

Chimney analyser room round taken.


29.03.2022 B Deepak Chand
RNRP all nodes found UP except SPC008 and OPX02.

Shift instrument digital log book filled

UPS log digital log book filled.

Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive running
normal.
In Unit No. # 2 Bag House Top Popette Valve SOV
Cover is Not Found. So SOV Cover to Provided. Now
Ok.
In Unit No. # 2 Bed ash cooler -2A air leakage
found from Dome Valve SOV fitting. So tightness
done at fitting side. Now Ok.
CCR AHU comes in Manual Mode. So Put into auto
mode. Also SP= 32 degree.
Unit No. # 1 and 2 , 4.5 Mtrs Turbine side all the
Sanjay Garg field Inst. Cleaning to done.

CPCB Report on dated @29/03/2021 is sent to all.

All the Report ( APC, Plant Performance , Power


Report ) is sent to all.
Service air driyer Moisture drained.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
29.03.2021 C Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running
normal.

Unwanted lights made OFF during Plant Round

P&V in stop condition.

All Energy Meter manual Reading taken for Power


Report.
Power report prepared and mail
Anurag
Chowdhury FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed

Transmission Losses Report Prepared and mailed.


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.
All AC AC MCB made ON

P&V Started at 7:00 AM


Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check

23.03.2022 A Deepak Chand Following shutdown given


1 DT-2
2 PCC 1B I/C
3 BC-4
4. BC-2
5. BC-2
6. Coal Crusher-2
7. Vibrating Screen-2
8. BC-6
9. BC 7B

RNRP all nodes found UP


Compressor House all Auto drain valve manually
Checked.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.

In SWAS Room Dissolved O2 in Deareator water is


not showing in Local Display. So cleaned the sensor
. Now Ok.

In SWAS Room Unit No. # 1 Drum water


Conductivity is not showing in Local display. So
found that flow is not showing in rotameter. Also
incoming flow is less. So informed to WTP shift
incharge.

In Unit No. # 2 SOX analyzer flow is showing less.


So checked and found that Rotameter O/L tube is in
Bend condition. So rectified it. Now Ok.
Sanjay Garg

All the Bag filter Panel ( total -08 Nos.) at BC-7A /


7B area cleaning and Blowerning to done.

All the AC MCB to OFF Condition.


CPCB Report on dated @30/03/2021 is sent to all.

All the Report ( APC, Plant Performance , Power


Report ) is sent to all.
Service air driyer Moisture drained.
RNRP all nodes found normal.
30.03.2021 C
C
30.03.2021 Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running
normal.

Unwanted lights made OFF during Plant Round

P&V in stop condition.

All Energy Meter manual Reading taken for Power


Anurag Report.
Chowdhury Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed

Transmission Losses Report Prepared and mailed.


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.
All AC AC MCB made ON
P&V No-4 & 2 Started at 7:00 AM
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp check

31.03.2022 A Deepak Chand Following shutdown given


1 BC-1
4. BC-1
5. Vibrating Screen-2
6. BAC-2A

RNRP all nodes found UP


Compressor House all Auto drain valve manually
Checked.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.

P&V-4 and 2 made off at 7.00pm

Chimney analyzer room round taken.

Lights made on manually


31.03.2021 B Anurag Chowdhury
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 3:30 pm checked DT temp found as below-
DT-2 - 49deg C
DT-4 - 80degC
DT-6 - 82 degC
ALL office AC stopped as per not in use for power
saving.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.
In Fly ash silo No. # 1 Air Leakage from Pneumatics
Valve SOV fitting. So Changed the SOV fitting. Now
Ok.

In workshop MV Drive AC No. # 9 one earthing is


broken condion. So reconnected it. Now Ok.

In Unit No. # 2 Vessel No.-12 /22 seal Pr. Is not


showing at DCS end. So cleaned the Impluse Line.
Now Ok.
All the CHP DCS Panel cleaning and Blowerning to
Sanjay Garg done.
Compressor House all the auto drain valve checked
and working normally.

CPCB Report on dated @31/03/2021 is sent to all.

All the Report ( APC, Plant Performance , Power


Report ) is sent to all.

31.03.2021 C
Service air driyer Moisture drained.
RNRP all nodes found normal.
C Shift instrument digital log book filled
31.03.2021
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive running
normal.

Unwanted lights made OFF during Plant Round

P&V -4 start at 11 p.m


All Energy Meter manual Reading taken for Power
Report.
Power report prepared and mail
Gajendra
Pandaya FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed

Transmission Losses Report Prepared and mailed.


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Abnormality jobs attended

BC-2 motor tripped on belt sway after CHP started so checked on field found
that belt was cutted from one end and acted the sway so infomed the operation.

Bunker-2A bag filter was not stopping from DCS so power made off and
contactor and control circuit checked and tightness done and restarted trial
taken from both local and remote now operating normal.

CT fan-2 VFD at side stream filter room found dusty so cleaning the panel done.

Abnormality jobs attended


Unit No. # 2 Vessel No.-22 Level Probe is showing High Value. So Level Probe is
cleaned and checked with material . It is working Normally.
Boiler-2 some soot blower motors double earthing lid not found, so conect the
earthing lids in soot blower motors-22,24,26
Boiler-2 soot blower motor-24 cover found dislocated, so cover provided

Abnormality jobs attended

BC-5, showing unhealthy at CCR , then check the feeder and replace the timer
relay still problem continue then rack out feeder and manual trial taken feeder
started normally then again rack in the feeder but still problem same then check
the control wiring found one wire loose retighten it and ON breaker normally.

BC 7B , breaker out problem , found lever problem attend the same

ACW Pump-2, not start in DOL as per CCR person, then change over from VFD to
DOL done, and trial taken found DOL contactor malfunctioning , to be check
further.

ACC-2, lights not OFF till 6:45 AM , check and found lightning timer stuck up, so
check the lightning timer and attend.

ACC-2, Welding machine 30Amp new socket provided.

BAC 2B, dome valve not opening , open it manually twice and operate the valve

Abnormality jobs attended


In Unit No. # 2 Vessel No.# 22/22 Back Pr. Transmitter Cover is not Present at
site. So cover is Provided. Now Ok.

Unit No. # 2 SOX analyser showing moisture fault. So Reset it. Now Ok.

In Unit No.# 2 FCV0920 MOV Cover is not Present at site. So MOV Cover is
Provided at site.
Middle gate street lights not glowing up to corner, so checked and found that
terminals were loose and heating, so clean the terminals and tight them and ON
the lights.

Boiler-2 bed ash cooler 2B level probe showing High, check & found nom
material available ,SO remove & calibrate the same.
Cooling fan removed from Lime stone UPS panel for DG. Opening packed .
Forbay level switch transmitter cover missing ,So prove cover for that.
Potable water tank low level not showing ,So checked & rectified.
Faulty tube light replaced with new one in 4.5 mtr MCC.
Welding M/C earthing done in CHP.
BAS silo dry unloading system motor cable connection removed.
Bed ash cooler-2B stopped immediately after start command, so checked and
found that its starting timer creating problem, so replace its timer with spare
timer, now OK
coal feeder-2A not taken cammand in remote, so check and find that its
controller parameter distubed due to shut down, so rectified by sati sir, now
running normal

Boiler-2 APH seal presure not coming, so checked and found that SOV solenoid
coil faulty not operating, so change the solenoid coil

Abnormality jobs attended


In Unit No. # 2 Bed Ash Cooler- 2B Seal pr. Guage Broken Condition. So Replaced
the Pr. Guage. Now it is working Normally.

In Unit No. # 2 Bed Ash Cooler- 2B Level Probe polythene Packing to done.

Unit No. # 2 APH Seal Pr. Fault is showing at DCS end. So cleaned the Impluse
line. Now it is showing Normally.
ACWP-2 found day consumption low in reading so analyzed found the KW not
coming actual. Checked found voltage of B-phase was not coming. Hance checked
breaker control box found fuse base was loose so properly tightened now OK.

One RSB in T-2 tower area found earthing missing so new earthing provided.
Coal feeder-2A area one hand lamp has faulty top so replaced with new one.
EMS found hang so restarted the viewer.

Abnormality jobs attended

Boiler-2 TCV valve(3202 and 3203) both not controlling proper as informed by
operation deptt, so calibrate the valves and verified by operation deptt OK

Boiler-2 APH coveying MCB trip once, so reset it and observed it in next cycle
running normal
Boiler-2 bed temp thermocouple(227) showing voilet, so checked it is showing-
225mv in one pair and other pair is previously faulty.

Service air IFC PU tube found damaged and air leakage so new tube installed and
leakage arrested.
Crusher-2 vibration probe checked and tightness work done.
Chimney analyzer PC found off so started PC and checked the data.

Abnormality jobs attended

Feed water stations all MOVs and instrument cleaning and blowering work done
due to dusty condition.

Soot blower-2 panel connection tightness and panel blowering work done as per
general checking.
Load management system cable was found connected to panel TG-2 port so
removed and placed in place.

Abnormality jobs attended

New Misting system power connection done from panel.

Bed Ash Silo RAV motor connection remove for overhauling work.
P&V -4 , Start at 8:00 AM,

P&V -3 and P&V -4 , Panel cleaning blowering and tightness done

ACC-2 - Earth pit-22, Testing date and Due date tag came out, paste it properly.

Boiler-2 & 2 . SOX and CO solenoid cleaning and blowering done ( work under
progress)

DCS-2, Coal Feeder 2A, 2B ,2C and 2D all VFD panel filter cleaning done
DCS-2, BAC 2A and 2B VFD panel filter cleaning done

Abnormality jobs attended


All the auto drain valve checked in compressor checked and working Normally.
In Unit no. # 2 J-valve Fan MOV cable dressing done in cable tray area.
In CPCB data is not showing in chimney analyser system. So again started the
website. Now Ok.

ETP Online data is no tshowing from 05/03/2022@ 2.27 PM

Silo to Middle gate street light is not ON Condition. Found that TB connection is
loose condition. So tightness to done.
Abnormality jobs attended

Drain pot motor 2B Earthing cable found loose, so tight it

ACC -2 area RSB ELCB found dusty, so clean them

In CCR , Tv cabinet back door lock rod found inside the panel,in dismanteled
condition, So fixed the same door lock.
Boiler-2 LHS drum level gauage glass LED to working , so rectified the same.now
OK, cleaning of LED gauge glass both side also done.

Boiler-2 drum floor field equipments ,soot blover CV .MOV cleaning done.
Boiler-2 drum floor field equipments ,soot blover CV .MOV cleaning done.
Boiler-2 Startup vent MOV & metal temperature JB cleaning & blowering work
done.

BFP-2 Change over form DOL to VFD mode and clearance giver to CCR

BFP-3 , Stop and shut down given

Reclaimer having Left -right moment problem , found VFD get tripped due to
overload , so check and reset.
Compressor IFC having air leakage so leakage arrest and provide new tube

Turbine Floor EOT crane having upward direction problem , found its limit
switch acted so arranged done to de-attach the limit and then trial taken
working normally. Hand over to maintenance team at 22:30 Hrs. (2 Hrs
Stoppage)

Abnormality jobs attended


Unit no. # 2 vessel No.-22/22 Back Pr. Switch and Transmitter is not showing at
DCS. So Cleaned the Impluse line. Now Ok.
Unit no. # 2 vessel No.-22/22 Back Pr. Switch and Transmitter SS Tube impluse
line dressing to done.

Unit No. # 2 CO analyser showing at fault. So reset it. Now Ok.

In Fly ash silo No. # 2 Fork Level switch showing at site. So level Probe cleaned
at site. Now Ok.
New Spray Mist. Fan Power connection removed as per requirement.

Hand Lamp / Transformer Provided at BFP-3 for Mech. Work.

24 Volts LED to Provided at BAC-2B for Mech. Work.

In Cusher Building Light is not ON because Lighting Timer is not working


condition. So bypassed it.

Boiler-2 bag house vibrator motors checking done for 22-22 and 22-22 total 4
nos. motor and checked:-
a) Base bolt tightness
b) Double earthing
c) Motor power cable dressing
d) Motor TB intact and OK condition

Boiler-2 top side unwanted lights made off.

Tg-2 operator PC- mouse not working ,so arrange another maouse & made
operative.
P-fan-2 hoist cable dressing done.

Boiler-2, near baghouse air receiver tank auto drain valve cable dressing done

BAC-2A &2B field instruments & Local control panel cleaning & blowering work
done.
BAC-2A &2B field instruments & Local control panel cleaning & blowering work
done.
Furnace-2not running , so checked and and change its power socket of 20A now
OK

Fly ash silo oprating push button switch found hanging, so tight it and seal with
packing tape
Fly ash silo bag filter motor JB found unpack, so pack it with packing tape

Abnormality jobs attended


As Per Operation requirement Unit No. # 2 Soot Blower MOV ( 02MV0702 )
Close Limit to set. And Trial taken. Now it is working Normally.

All the auto drain valve checked in compressor checked and working Normally.

Fly Ash Silo No. # 2 Gate valve is closed when fork level switch acted. So Cleaned
the Fork level switch. Now it is running normally.
In CHP Line # 2 is tripped. So checked and found that Bucket elevator No. # 2
ZSS Proxy is not showing at DCS end. So checked and found that ZSS Controller
supply is OK. But there is large gap between Proxy and Mech. Wheel. Since Line
No. # 2 is started. So we can not set the Proxy.
ACC-2 , Mist Spray System cable laid on Floor so collect it and shifted to
Workshop.

Boiler-2 , Wind Box Floor , RSB-26, single phase ELCB not working, so open the
cover found its cable get heated and burnt out, so remove this cable and new
cable provided.

Abnormality jobs attended


Boiler-2 Coal bunker level showing voilet ,So cleaned & power reset ,now
working normal.
CHP bucket elevator -2 ZSS Proxy not checked ,because system did not start in
nigt, so need to check at run time.

08 no's Bag filter panel's cleaning & blowering work done.


BC-7A local start /stop switch box tightness done.

BC-7B local start /stop switch box tightness done.


Bc-7Apull chord switch rope fixewd properly.

Coal feeder-2 side RSB checked for ELCB operation and panel blowering done.

Water leakage found from P&V-4 plateform of Boiler, check and found that
its drain choke, so clean it
Bucket elevator-2 running feedback not coming, so adjust the proxy switch now
OK
Welding M/C plug top faound damaged at boiler-2, so replaced it

silo-2 fork level coming frequently, so clean the probe now OK

silo-2 level probs cleaning and reset, level is as previous, so told operation deptt
to verify level physically

Crusher building hydarulic system found push button were faulty so replaced
both element and push button 2 nos. of both unit system.

One 2-phase plug socket was replaced at vibrating screen floor of 24V
transformer.
Dusty MOV of Boiler- 0m drain were cleaned using brush.

Abnormality jobs attended


In Fly ash silo No. # 2 Fork switch showing at site. Also found that heavy
material deposit on the level Probe . So we have cleaned the Probe at site.Also
Vibrate the Probe. But Trial is not taken because Rope of the silo shute is not
working condition.
In Fly ash silo No. # 2 Fork switch showing at site. Also found that heavy
material deposit on the level Probe . So we have cleaned the Probe at site. Now
it is working normally.

Boiler 2 & 2 all Light made OFF during shift round

Boiler 2&2 Ground Floor RSB no -2 , 2 , 23 and 24, ELCB test and Double earthing
check.
silo-2 fork level coming frequently, so clean the level fork

4.5 mter switchgear room unit-2 side found durty, so clean it and rubber mat
cleaning with surf is under progress

Crusher building hydarulic system motor not starting found push button were
faulty so fixed & trial done ,working normal.
BC-4 run F/B not showing at DCS ,check both terminal connector at back
side .found normal, then check F/B signal at DCS end ,that was not coming from
feeder ,So loop provide at DCS on 93-4A TB4-2/2. Inform to SH E&I & Mr.
hemant sharma.

Crusher -hydraulic ststem control wiring terminal connector found broken, So


fixed properly with screw.
Crusher-2 & 2 hydraulic system control box panel was very dusty ,so cleaning
done.

Silo -2 plate valve not operating so found that it is mechanical jam now OK
BC-4 run F/B not showing at DCS ,BC-4 feedermaintenance done ,TB replaced &
trail done with general shift Engineer.

BC-4 03 no,s(Group-20,22&23) PCS acted, So reset done from field. & made
ready to operate.

BC-4 motor connection done at feeder side.

Bed ash silo wet unloading system panel check for trial, but in panel
equipment missing, So need to make ready as per operation requirement.

WTP HPP-2 got tripped on fault F0026,physically check motor & VFD panel , no
abnormality observed, So reset fault & start pump running normal.
Grinder 20 A top installed at Mech. Work shop.
24 Volts hand lamp Provided at BAC-7A/B for Mech. Work.
ACC-2 lighting timer reset.
P&V stopped at 6:00 PM

Abnormality jobs attended


In Unit No. # 2 Vessel No.-22 High Level Showing at DCS end. So checked and
found that material on the level Probe. So cleaned the level probe also calibrated
it. Now Ok.

In Unit No. # 2 Vessel No.-22 High Level Showing at DCS end. So checked and
found that material Inside the vessel. So informed to the shift Operator.

Boiler # 2 SOX analser showing zero flow at controller side. So checked and
found that moisture fault. So cleaned the moisture filter. Now Ok.
BC 7B Repair Supply Box 3 Phase ELCB get stuck and not tripping , clean its with
Rustoline and free it, now ok.
RO High Pressure pump trip in previous shit so , check the motor TB physically ,
found motor terminatio in ok and motor is balance 0.6, 0.6 0.6 Ohms, ( Motor
Rating 28.5 kw)
Fly ash silo RAV motor Trip sio check and reset.

Abnormality jobs attended


BAC-2B feeder locking arrangement found not proper so checked found one joint
was broken so welding done for that portion now OK.
Bed ash silo wet system to be made ready so items collected, refere logbook for
details.
Also motor megger done found main motor was OK.

Fly ash silo-2 RAV was tripped on ja so reset after operation information.

Sox analyser moisture fault on panel alarm so checked and reset.

Abnormality jobs attended


Boiler-2 PT2224 AH pressure showing less so impulse line flushing done now ok

Boiler-2 02 TI0952 temp showing high, so removed it & cleaning done, terminal
tightness also done & taken in line now ok
Boiler-2 soot blower-26 no fault and main mcb got tripped checked found
normal so rested again , working normal

Abnormality jobs attended

at 4.5 mtr switchgear room panel 22MCC-5325 door lock found damaged, so
replace it with new one

Bag house-2 LDB-28 earthing lug found damaged, so replaced it

Boiler-2 lift display at 0 mtr found hanging, so tight and pack it with packing tape

Abnormality jobs attended


BED Silo RAV get Trip due to material Jamming , so reset it after jam clear

Reclaimer having Left -right moment problem , found VFD get tripped due to
overload , so check and reset.
Boiler-2, SOX analyser Panel PM done-
2. Filer Cleaning
2. Roto Meter Check
3. Chiller Check
4. Pump Check
5. Auto drain Check

Boiler-2, SOX Analyser having moisture fault , and its not reset so clean the
filter , and having water accumulated inside funnel further checka nd found its
timer faulty , presently SOX-2 timer connected with SOX-2 panel by providing
new cable.

Bed Ash cooler Fiels Power JB packing done.


Boiler-2, Grinding machine check and green tag provided.
Side Strean Filter area , Blower Room LDB eartning missing so double earthing
done
Boiler-2, Welding machine connection done and eartning done

Abnormality jobs attended


TG building lift IR sensor box found in hanged condition so re-fix it

TG building o mtr area field equipments cleaning done

ACC 2 & switch yard area delug station switches & sov checking

Crusher house building , screen floor 24 v led lamp top changed

Coal feeder-2A feeder discharge mov open limit not showing checked the same
found still some margin in open limit so correct the operation now ok

Boiler-2 retractable soot blower-2 both limit switches physically check & liver
tightnesss done.
Boiler-2retractable soot blower-4 both limit switches physically check & liver
tightnesss done.
Boiler-2 retractable soot blower -6 both limit switches physically check & liver
tightnesss done.

APH back pressure line cleaning work done.


Chimney SPM running at high side ,need to cross check with enviroment
analyzer.

Abnormality jobs attended


Near Workshop Earth Pit No -68, Date of Test and due date sticker came out so
paste it with Transparent Tape.
CT Fan Lighting JB ELCB found without green tag , check the ELCB and Green tag
provided.

CT Fan one cable is in hanging condition near Stairs , Tied it and Cable dressing
done.

Mechanical workshop EOT power made ON as per Maintenance requirement.

ACW pump House MPDB 5303-G Power made OFF and ON as per requirement.

Bed Ash Silo Wet System following job done-


2.Phneumatic Plate Valve , New SOV arrange and install it
2. SOV air Line connection done by providing new tube

P & V No-4 made On at 8:00 AM,


Abnormality jobs attended
WTP furnace( chinese) not working properly so checked the same & found
controller not working so replaced with spare one now ok
WTP furnace( indian) not working properly so checked the same & found heater
coil problem so maintenance done now ok
MGF-2 inlet line sov4802 not working so replace with spare one , trial taken
working normal.

Inst Lab entrance door access lock installation & wiring job

Boiler-2 Coal feeder 2B techo meter wire found in hanging condition, So cable
dressing done.
Boiler-2 APH -2 dome valve not opening , check & found ,cylinder seal passing,
inform to operation, for maint.
Boiler-2 coal bunker O/L MOV found dusty ,So cleaning & blowering work done.

Boiler-2 coal bunker O/L MOV found dusty ,So cleaning & blowering work done.

Boiler-2 all coal feeder O/L MOV & SOV found dusty ,So cleaning & blowering
work done.

Boiler-2 all coal feeder O/L MOV & SOV found dusty ,So cleaning & blowering
work done.

Vib screen-2 found R-phase fuse base loose so tightened the same, now spring
OK.

Vib screen-2 found carbonize on the contact tips so cleaning done with cleaning
kit.
Abnormality jobs attended

Boiler-2, APH vessele-2, seal pressure gauge air leakage found from tube, so cut
the air tube and remount it, now leakage arrested.

in CCR Turbine-2 monitor display gone on movement of mouse , as informed by


turbine operator, so check and restart the PC after discuss with sati sir, now
display coming

Abnormality jobs attended


Behind Switch yard Watch tower Lights glow earlier so lightning timer adjusted
Bed Ash Cooler-2A Power JB , 425V Danger sticker pasted
Turbine 2 Baring Gear Motor earthing lug found loose tighten it

Boiler-2, APH vessele-2, Dome valve open-close Limit switch installed and
connection done

Boiler-2, Bed Thermocouple JB have hole , so glass putty provided.


HSD area lights found ON so OFF it.
Coal Bunker 2D, showing incorrect level, so sensor cleaning and power reset .
Now ok.
P&V no 4 stop manually at 7:30 PM.
Bed ash silo plate valve SOV air tube having leakage due to PU tube damage,
Replace damage tube & air leakage arrested.

Fly ash silo-2 & 2 cleaning & blowering work done.

Bed ash silo cleaning & blowering work done.


4.5 mtr AHU vfd panel cleaning done.
BFP room AHU vfd panel cleaning done.

Vib screen-2 found all fuse base tightness and spring loading checking done.

Vib screen-2 found carbonize on the contact tips and arch chute area so cleaning
done with cleaning kit.

Abnormality jobs attended

Co analyzer-2 showing fault so sample line fhushing, sov & filters cleaning done
now ok

EOP-2 discharge PG was not showing pressure during trial, checked the same
internal assembly not working so replaced the gauge now ok

Coal Bunker 2D, showing incorrect level, so sensor cleaning and power reset .
Now ok.

lighting timer adjust at ACC-2, ACC-2, Compressor house & silo area
Oil centrifuge-2 motor fan cover found loose so tightness work done.

APH of Boiler-2 vessel no. 2 seal pressure fault coming so seal pressure switch
cleaning done, still fault so one by one checked found seal-2 vessel was damaged
so informed operation.
Also shutdown given of air line for 560 key and air tube removed and gauge kept
inside panel.

Comp house instrument comp-2 water valve air tube side air leakage, so
arrested leakage from ferrule side.

Abnormality jobs attended

Boiler-2 , APH Vessel 2, Shut down clear, Seal Air Pressure gauge installed.

Boiler-2 , APH Vessel 2, Dome Valve not operating , found its SOV was faulty so
replace the SOV and trial taken now Ok

Boiler-2, APH Common out let conveying solenoid valve 8227 not operating ,
check and found SOV base Bolts are loose , tighten it and made OK

Boiler-2 , 5&6 Floor Lightens switch ON and OFF as per operation requirement.
Abnormality jobs attended
CEP-2B breaker rack out problem so checked found the shaft bolt was not
proper aligned so breaker removed and then the bolts are properly placed in
position and corrected the alignment, now OK.

Cable dressing done for one cable in CHP cable cellar room.

WWTP room 2 nos. panel indication supply was found ON so identified feeder
and power made OFF from feeder side.

BAS pneumatic plate valve was jamming so checked found mech jam so
informed operation.

Boiler-2 APH seal fult,So cjocked pressure switch line cleared & take in line
working ok.
Coal feeder 2A cleanrun got tripped during ,jam clearance, so reset the same

Bed ash Silo RAV motor got tripped on over load ,so reset the same.

WTP muffle furnace T/c wire got open so termination done.

Boiler-2 CO-Analyser preventive maintenance done with general shift


technician.

Plug top provide at crusher building.


Hand lamp provide at coal feeder-2.
boiler-2 200% main MOV feeder handle fixed.
LOTO tag's provided on FT4802 transmitter on 05 no's of valves in unit-2
turbine area

LOTO tag's provided on FT2902 transmitter on 05 no's of valves in unit-2


turbine area

Crusher Building Lights made OFF during shift round

Abnormality jobs attended


APH-2 seal pressure low, checked found actually low value so informed to CCR.

P&V no. 4 started on morning round. Later found the blower was stopped, found
the relay contacts were not coming so corrected the problem and started again.

DT-2 charged and PCC-2A taken in line as DT-2 trafo blower fans all were not
running and temp was rising. Now DT-2 and PCC-2B made off.

PCC-2A R-phase voltage was not coming found incoming of fuse cable was open
so relug and connected.
Boiler-2 bag house chamber 22 SOV air connection done & air charged.
Boiler-2 APH dome valve air tubing done,

Boiler-2 APH seal pressure air tubing & dome valve limit switch connection
done. Seal pressure trial done after maitenance ,working normal.

Co-analyzer -2 & 2 cabin AC temperature SP check .& found 27 & 24 respectively,


So both SP set at 27 deg.
DT-2 relay card replaced with general shift engineer.
232 KV main trx. Oil seapage from valve .so cleaned by cootton.
Dist . Txr. Temperature noted down in log book.
P&V stopped at 7:00 PM
Al l RnRP are UP.

Abnormality jobs attended

Jockey pump-2 VFD not ready showing A5002 alarm, so off the power from
feeder & tightness confirmed at card level , after becomes normal & run, but
after some time again trip on fault 9( motor over temp)and second jockey motor
started. so again check the drive, it was taking 33.2 amp and showing 220.6%
also checked from motor side found normal. after words feeder door & mcc door
kept open to reduce the room temp, now drive running normal.

Air receiver auto drain valve filter cleaning & trial through test button

Jockey Pump No-2, Motor Tripped on over temperature, check and found motor
is not rotating physically at site, then open the TB and Check the termination and
resistant taken ,, all are OK then further checking from VFD end.

ACC 2A , ACC 2B and ACC 2C motor Power JB cover with polythene for fins
cleaning work and remove after work completed.

Fins Cleaning trolley Power made OFF manually as per requirement.


Crusher-2 tripped 2 no. times on high vibration informed to operation .

Boiler-2 APH seal pr. Not operating ,c hecked & reset the sov supply, afterwards
system working healthy

Welding machine plug top found not working so replaced by new one.

Crusher-2 running normal after maintenance .

Boiler-2 APH seal pr. Not operating SOV got stucked ,so faulty SOV removed &
new SOV installed, afterwards system working healthy

CHP MCC AC power JB cable gland opening packed,& timer JB's earthling done.
CHP building to p to bottom field instrument & JB blowering done.

All the auto drain valve checked in compressor checked and working Normally.
Hand lamp picked up from caol feeder floor.
Conference hall AC switched On & made off after meeting.
P& V $ made OFF at 7:00 PM.
Abnormality jobs attended
Unit-2 DSH station control valves gland leakage arresting & tightness
Unit-2 DSH station control valves gland leakage arresting & tightness

Found dust deposition on the HP dosing room motors and panels so all motors
cleaning and oanel blowering done.

Boiler-2 top side unwanted lights were made off during plant round.

Unit-2 ACC trolley no. 4 up limit checked as per abnormality , found limit not
working . So need to be remove & checked
Boiler-2 soot blower-24 check as not started from DCS found limit position
distrub so need to be set after shutdown clearnace.

Blower plug top found faulty so replced by new one, working healty
Abnormality jobs attended
BC-7A&7B floor 24v hand lamp bulb replacement job as per operation team
requirement

Fly ash -2 bag clothes stucked on fork switch, So removed the same & cleaning
done.
Fly ash -2 fork switch & panel cleaning done.
Bed ash silo panel cleaning done.
Unit- 2 Soot blower-22check & found that gear box Jam ,not operated manually,
So inform to operation.

Unit- 2 Soot blower-24 limit adjust as per operation ,but trial not possible due
to motor connection are in open condition by maintenance ,as per operation.

Boilaer-2 Sretractable soot blower 2,3 & 5 ,forward & back ward limit checked.

Boiler -2 , Soot Blower No-22 get trip on G fault so check and reset.

As Mer MPSS AFR power trip , check the Breaker from our end , Breaker is close
and 420V is availabe , same inform to MPSS for further checking.
Boiler -2 , Fourth Floor Lights made ON as per requirement..
Abnormality jobs attended
Boiler-2 CO analyzer showing less reading so cheked the same found sample line
partially chocked so flushing done now ok

ACC-2C started after blade angle adjustment job but got tripped on overload at
420 rpm, taking hogh KW so informed to maintenance & ccr team about the
same, PTW taken again by maintenance team work is u/p

AFR breaker tripped as informed by MPSS , checked the same found overload.
Informed them and as per their request reseted.

Abnormality jobs attended

At Pantry , for Exhaust fan supply , 5 Amp domestic top provided and cable
dressing done with silver tape.

Boiler -2 Soot Blower trip on G fault so check and reset.

Boiler-2 APH seal pressure fault occurs , so line flushing and cleaning done.
Coal Bunker 2A showing wrong value so power resent and transmitter cleaning
done.

Boiler-2 retractable soot blower,7/8/9 & 20 forward & back ward both limit
switches maintenance work done.
Soot blower-9 fwd limit liver found loose ,so tightness done.
WTP all PH,Conductivity,& pressure transmitter &b switches cleaning done.
WTP all 07 no SOV panels cleaning & blowering done.
RO unit all Pressure gauge cleaned.

UF unit all Pressure gauge cleaned.

Dusty conditions of the Boiler om motors so cleaning and blowering work done
for :-
a) ID-2
b) PA-2
c) SA-2
d) J valve-2A
e) J valve-2B

Abnormality jobs attended


ACC Fan2F Lube oil pump Feeder not getting ON after shut down, check the
Feeder found its Timer Relay Malfunctioning then replace the Timer relay with
new ne and made it OK.
ACC Fan2F Lube oil pump , current not showing in CCR check and observe
current is also not showing on Ammeter further check and found CT Cable was
loose , tighten it now current showing normally.

Turbine Building EOT having up ward direction problem, found its rope limit
switch is acted, arrange one rod and try to de-latch it , but same problem also
check upward Push button it is also OK, to be check ..
Lightning JB Near Unit 2 MOT Tank found in open condition , cover it properly
with Brown Tape.

CT Fan -3 , LPB is in hanging condition so fit it properly by providing new bolts.

Fly ash Silo -2, Plate valve is operated continuously, check and found material
Jamming on Fork Switch Clean the fork Switch and made it Ok

Compressor house all auto drain valve check manually.


P & V No-4 made ON at 8:00 AM,
Abnormality jobs attended
TG-1 HP heatr O/l temp Fluctuating , tightness done at field side as well as DCS.

4.5 mar Inverter temperature check 7 found under 60 Deg, Accept ACW-1 (71.2
deg).
Reclaimer having Left -right moment problem , found VFD get tripped due to
overload , so check and reset.
Work shop MV drives temperature showing 40 deg at DCS ,so check at panel
temp. & found 37 deg.
DT temperature noted down.

Abnormality jobs attended


BC-7A and 7B floor following equipment cleaning done :-
Bag filter panels, local control switch, IR purging unit JB, ZSS JB, bag filter
pressure gauges.
Boiler-1 P fan RTD JB cleaning and packing done with packing tape.

Dusty conditions of the Boiler om motors so cleaning and blowering work done
for :-
a) ID-1
b) PA-1
c) SA-1
d) J valve-1A
e) J valve-1B

RSB no 49 all ELBC operation checking done and later panel blowering also
done.
Bed ash cooler water flow switch cleaning and packing done with packing tape
and covered.
Abnormality jobs attended
BAC-2B flow switch acted during water line charge so check & adjusted the same
now ok
Boiler-2 wind box 24 v hand lamp recoverd & kept at wtp workshop area
Turbine Building EOT maintenance job is U/P.

Abnormality jobs attended

Fly ash Silo -2, Plate valve is operated continuously, check and found material
Jamming on Fork Switch Clean the fork Switch and made it Ok

Boiler-1, Bag House Vessel 21 , level probe cable dressing done

Boiler-1 Co panel Maintenance done.

Green circle Audit done at 4.5 Mtrs Switch Gear Room and WTP MCC Room
Report prepared and mailed

Abnormality jobs attended


BC-6 floor following equipment cleaning done :-
a) Bag filter panels
b) BC-6 motor
c) Proxy and JBs

Unit-2 DCS AC found one earthing cable was broken so new lug connected and
mounted.

ACC-2 light was found off so corrected the timer and started again.

Coal feeder motors of Unit-1 cleaning and blowering work done.

BAC-2B flow switch cover found open, ,screw applied & packed.
BAC-2A flow switch cover found open, ,screw applied & packed.
Boiler-1 BAC & J valve fan area Insulation mat were not it's place , so keep all on
its place.

Boiler-2 BAC & J valve fan area Insulation mat were not it's place , so keep all on
its place.

All auto drain operation check and timer also adjusted for Receiver-2
BC-1 tripped on start so checked and found that the guard limit was acted so
reset the same then OK.

Boiler-2 lift at 5th floor remote panel box packing done with silver tape.

Abnormality jobs attended


At the starting of shift DCS server-1 got shutdown automatically so all operator
PC shifted on SP002, restarted the server-1 and again some of PC's operation
shifted on SP001, server cooling fan was working normal, afterword's resented
the alarms & normalize
During plant round found fire line one no of valve water leakage so informed to
ccr & with help of operator properly close

Green circle Audit point close at 4.5 Mtrs Switch Gear Room i.e Standardised
sticker prepared and pasted-
1. Boiler-1 MOV Incomer Power Supply
2. Boiler-1 MOV Incomer Power Supply
3. BC-6 Feeder
4. BC-7A Feeder
5. BC-7B Feeder
6. BC-6 Energy Meter
7. BC-7A Energy Meter
8. BC-7B Energy Meter
9. CT Fan -2 Energy Meter
10.. CT Fan -3 Energy Meter

Abnormality jobs attended

BAC-2A dome was asked not operating so checkedin field and manually purging
done once and then system was normalized.

CEP-1A and 1B area all MOVs, gauge and JBs cleaning and blowering work done
due to dusty condition.
Jizhu Hozen done at Coal feeder area and all motors and instrument cleaning
and blowering done.

Drain pot pump 1A showing RPM voilet & not starting from DCS as well
as local mode ,found feeder was not getting On , So check feeder & found
timer relay malfunctioning , so replace relay from spare feeder.& trial
done running normal.

Drain pot pump 2A showing RPM voilet & not starting from DCS so check
& found feeder was in remote position, & there is no provision on DCS to
feeder on. So made feeder on in local & keep on, then VFD trail done by
On/OFF , working well.
LT breaker maintenance done with general shift engineer.

00PDB5304-6 power made off as per Mr. Tarun gaur request, made on
after work.
Chimney analyzer SOX-2 flow not coming ,check & found ,pump not
working ,So faulty pump replaced with another pump,,Now runnong
normal.
Chimney analyzer PC not showing data ,SO restart PC ,Now ok.
Boiler-1 soot blower (1-4) limit switch checking work .done

Abnormality jobs attended


Boiler-2 firing floor field JB hole packing & sealing job
Green circle Audit point close at WTP MCC Gear Room i.e. Standardised
sticker prepared and pasted-
1. ARC FLASH suit
2. CPR Kit

Cable Dressing done for IT Server Box at WTP MCCC Room


RSB no 76 all ELBC operation checking done and then panel blowering also
done.

Abnormality jobs attended

BC-4 Belt tear protection trial taken


Crusher floor bagfilter motor fan cover found open , proper fixing done

Screen floor 24v transformer double earthing done

BC-4 magnetic serperator panel holes covering done


BC-6 magnetic serperator panel holes covering done

Abnormality jobs attended

BLR-1 FWS 100% bypass CV inlet air line leakage from fitting so attended

BC-4 magnetic seperator not started while starting as per operation


checked found healthy so again started , started normally.

Bc-5 head end cable tray cable dressing work .


BLR-1 hydrastep leakage abnormality informed by operation so marking
done , isolated by operation for cooling.

Abnormality jobs attended

RO pump-1 feeder was not starting and creating problem so checked and control
tightness done and maintenance done of feeder. Then local control trial taken
outisde and after normalization made healthy.

One earth lead was found loose in T-1 tower RSB so tightness work done.

Boiler-1 Bed material filling station air leakage from sov points arrested & un
wanted air line valve made close.

Boiler-2 Bed material filling un wanted air line valve made close.

Unit-1 HP heater drain line temp some hunting observed at dcs so terminal
tightness done now ok
IT server main panel at ccr having communication problem in two nodes so
informed to IT team about this, with help of remote instruction, reset the hub &
D-link power supply
Abnormality jobs attended
In Fly ash silo No. # 2 level is not correctly showing at DCS end. So Reset the
Power supply and Clean the level Probe. Now Ok.

Unit no. # 1 HPH Drain Temp. is showing flucations at DCS end. So RTD wire is
connected to OK Channel. Still it is showing Variation at DCS end. At field side
Spare RTD Pair is used also cable is directly connected. While RTD resistance is
showing normal. Still it is showing 3 to 5 degree variation at DCS end.
Abnormality jobs attended
Silo-2 bag filter controller off FB not showing at dcs after auto off
command, checked the same towards dcs side wiring found normal, so
checked at field panel found contactor's contact not changeover, replaced
with spare one but problem is still there , FB cable also need to trace from
panel to dcs, work in u/p

BC-6 magnetic seperator not started while starting as per operation


checked found healthy so again started , started normally.

BC-1 belt feeder not getting healthy as per operation team, checked &
found one more isolation is there by cement plant team for seperator
connection removal so informed to ccr & close the PTW. afterwords
become normal

Abnormality jobs attended


Unit-2, Coal Feeder RSB power missing found power Switch OFF from 4.5 Mtrs ,
Switch It ON.

Coal Feeder 2 Lights Made ON as Per operation Requirement.

Shift Almirah all Consumable Items Check and List Prepared , work under
progress.

Abnormality jobs attended


In Inst. Air Compressor No. # 1 Service required alarm at Local Display. As per
shift Incharge requirement Reset it. Now Ok.
BC # 1 Magnetic seperator Cable dressing to done.

Unit No. # 1 APH Vessel Power Supply cable dressing to done.

ACW Pump House Motor JB / Motor Cleaning and Blowerning to done.


ACW Pump Repair Supply Box no.-66 ELCB checked and working normally.
Compresoor House OFF Lighting Timer set to 6.15 AM ( Old setting is = 6.30 AM)
Abnormality jobs attended
VAM system chilled water pump-1 heavy gland leakage observed so
informed to ccr & stop the VAM system, chiller pump-1 change over with
pump-2 and again started, working normal

BC-1 new cable laying for belt tear protection, proxy installation & trial
DT-1 incomer KW meter replacement job

Coal bunker 1D showing wrong value so power reset and transmitter


cleaning done. Now ok

Instrument comp. -1,2 &3 field panels & motors found dusty so cleaning
& blowering job
AFR breaker tripped as informed by MPSS , checked the same found
overload. Informed them and as per their request reseted.

Abnormality jobs attended

Shift Almirah all Consumable Items Check and List Prepared , work under
progress.

Boiler-1 ,Soot Blower motor not covered with GI sheet cover , cover found near
by so coivered it properly.

HP dosing Line pressure gauge , needle get stuck up at 40Kg in stop condition so
release its pressue , now it is 0 kg in stop condition

Bed Ash Cooler Transmitter cover missing from equipment, serrch the it and
cover the transmitter.

Soot Blower -1 get trip so check and reset.


Abnormality jobs attended
Coal Bunker Level Transmiiter # 1D Not showing correctly at DCS end. So reset
the Power Supply. Now Ok.

Abnormality jobs attended

BC-5 area pull cord found cable dressing not proper and hanging
condition so proper cable dressing work done.

All control valves, Sovs and panels cleaning and blowering done at fire
station floor.
Compresoor House all auto drain valves manually operation checking
done.
CEP area cable tray cleaning work done.

Abnormality jobs attended

Unit-2 ACC Lightning not started , found lightning timer get stuck up, Corrected
it.

Compressor House Repair Supply Box -97, ELCB Checked physically found One 1
Phase ELCB is faulty so replace the ELCB with new one

Boiler-2 , 4th Floor to 7th Floor Lights made On as per operation requirement.

TG building lift IR sensor continoue is command condition, ( Lift Continue up-


down) without any manual command , checkj the IR sensor found wire loose ,
tighten it and trial taken..

Chimney Analyser Boiler-2 SOX valve not showing so Sample line checking and
flow adjusted from Roto meter, Now OK.

Abnormality jobs attended


Recalimer boom up/down limit problem reported by ccr team, checked & found
command hanged so reset the power .afterwards normal working

Coal bunker 2A showing wrong value so power reset and transmitter


cleaning done. Now ok

CHP Bucket elevator floor field panels of magnetic separator , zss, proxy,
coal sampling panel found dusty so cleaning & blowering job

CHP Screen floor field panels bag filter jb, DP tx, manometer, purging sov
JB's found dusty so cleaning & blowering job

Plough discharge-1B power cable found in hanged condition so proper


dressing done
Screen floor 24v led not glowing, plug top replaced now ok

Abnormality jobs attended

Coal Bunker-1D showing incorrect level , Transmitter clean and Reset its power,
now ok

Boiler -2 Soot Blower get trip due to overload so check and reset

BC-7A one hand lamp found damage so change the lamp with new one

Tower -2 behind switch yard , Tower Lights not ON, found timer get stuck up so
timer adjusted now OK.

Chimney Analyser Boiler-1 SOX panel is in moisture fault , so moisture drain and
filter cleaning done. Now Ok

Boiler-2 , APH back pressure fault , impulse line cleaning done

Abnormality jobs attended


In Unit No. # 2 Bag House Top Popette Valve SOV Cover is Not
Found. So SOV Cover to Provided. Now Ok.

In Unit No. # 2 Bed ash cooler -2A air leakage found from Dome
Valve SOV fitting. So tightness done at fitting side. Now Ok.
CCR AHU comes in Manual Mode. So Put into auto mode. Also SP=
32 degree.

Dusty conditions of motors in fire pump house so all cleaning done


with wet clothes.
Boiler-1 bucket elevator panel cleaning and blowering done, then
packed with brown tape.

Abnormality jobs attended

BC-1, stop is running due to Belt Tear fault so check and found Proxy acted, reset
the proxy and made it healthy and started BC-1 Normally

Coal Bunker-1D showing incorrect level , Transmitter clean and Reset its power,
now ok
Near BFP AHU one lightning Timer JB Earthing and lug damage so new
lug provided and earthing done.
Boiler-2, De superheating station , Control Valve "02TCV3203" having
gland leakage , tighten the nut but still gland leakge same inform to ,
Instrument General Shift Engineer.

AT TG building one hand blower top found damage , new top provided.

Abnormality jobs attended


In SWAS Room Dissolved O2 in Deareator water is not showing in
Local Display. So cleaned the sensor . Now Ok.
In SWAS Room Unit No. # 1 Drum water Conductivity is not
showing in Local display. So found that flow is not showing in
rotameter. Also incoming flow is less. So informed to WTP shift
incharge.

In Unit No. # 2 SOX analyzer flow is showing less. So checked and


found that Rotameter O/L tube is in Bend condition. So rectified it.
Now Ok.
Soot blower motors checking, blowering and earthing tightness
work done for :- 1,3,5,7,9,11,13 and 15.

Soot blower panel of Boiler-2 cleaning, blowering and power


termination tightness work done.

Abnormality jobs attended

Boiler-2 , Soot Blower get trip due to over load so check and reset.

Instrument comp. -1,2 &3 Current and voltage noted with Atlas Copco Service
Engineer.

Unit-2, IFC panel cover with polythene.

Boiler-2 , Super Heating station control Valve 3204 get stuck up, manually open
and close then made it Ok

1 No , 24 Volt Hand Lamp shifted from WTP to Shift Amirah

Abnormality jobs attended


Boiler-1 and 2 coal feeder VFD panel side all 8 panel calibration sticker
pasting work done.

DT-1 cooling fan made off, DT-1 and 2 panel front and backside brown
tape packing done.

Soot blower no. 10 motor earthing connection was found open so


reconnected.

Abnormality jobs attended


In Fly ash silo No. # 1 Air Leakage from Pneumatics Valve SOV
fitting. So Changed the SOV fitting. Now Ok.

In workshop MV Drive AC No. # 9 one earthing is broken condion.


So reconnected it. Now Ok.

In Unit No. # 2 Vessel No.-12 /22 seal Pr. Is not showing at DCS
end. So cleaned the Impluse Line. Now Ok.
Distribution transformer (DT-2) cooling fan sound coming, so stop
its power from its inside MCB.
PM Jobs carried

Crusher-2 motor both DE and NDE area greasing work done.

FAS area lights were made ON as it was found stopped condition, also
CT fan area lights found ON on round so made off.

All logbooks tag pasting work done.

Bunker level transmitter checking and cleaning work done.

PM Jobs carried
Unit No. # 2 and 2 Drain Pot Displacer transmitter Polythene Packing
to done.

Unit No. # 2 CO analyser Panel Cleaning and Blowering to done.

Unit No. # 2 CO analyser Panel Cleaning and Blowering to done.


Boiler-2 soot blower motors cleaning done as
soot blower motors-22,22,23,24,25,26

PM Jobs carried

Jhesu - Hozen done at CHP MCC and DCS Room.

PM Jobs carried
Unit No. # 2 APH field Inst. And JB Cleaning and Blowering to done.

Unit No. # 2 vessel No.- 22 /22 field Inst. And JB Cleaning and
Blowering to done.
Unit No. # 2 vessel No.- 22 /22 field Inst. And JB Cleaning and
Blowering to done.
ACC-2 lights cleaning work done and repaire supply box cleaning done

ACC-2 motors terminal covering done with polythene, as fins cleaning


work is going on.

Lime stone all 06 DCS panel's blowering done.


BFP-2 Cleaning & blowering done.
BFP-2 Cleaning & blowering done.
BFP-3 Cleaning & blowering done.
IAC-2 Panel & motor Cleaning & blowering done.
IAC-2 Panel & motor Cleaning & blowering done.
IAC-3Panel & motor Cleaning & blowering done.
Boiler-2 APH SOV panel and Bag house SOV of 22-22, 22-22, cleaning
done

coal feeder unit-2 all motors cleaning done

PM Jobs carried
In CHP T-2 Tower field Inst. And JB Cleaning and Blowering to done.
T-2 tower all panels were dusty so cleaning and blowering work done
of motors, JBs and panels.

ACC-2 area concerned motors covered with polythene during fins


cleaning by operation.

PM Jobs carried

crusher-2 and crusher-2 motor blowring and cleaning done

TG-2 put to bas eload and normalised after sometime as per Operation
requirement.
BC-4 feeder rackin problem, backside signal connector problem.
Puymp house all instrument and MOVs cleaning and blowering work
done.

PM Jobs carried

Boiler-2 coal feeder all 8 motors cleaning and blowering work done,
earthing checked for tightness:-
a) Coal feeder main motors - 4 nos.
b) Clean run motor - 4 nos.
Coal feeder side RSB cleaning and blowering work done and all ELCB
operation checked.
Comp house all auto drain valves checking and manually operation
done.

Desuperheater stations all MOVS gland tightness and cleaning done.

PM Jobs carried

Jhesu - Hozen done at China Yard


PM Jobs carried
Fly ash silo No. # 2 and 2 Field Inst. And Panel Blowerning and
cleaning to done.

Fly ash silo No. # 2 and 2 Motor Blowerning and cleaning to done.
PM Jobs carried

Unit-2 Drain pot both motors painting work done

Boiler-2 LHS drum level gauage glass LED to working , so rectified the
same.now OK, cleaning of LED gauge glass both side also done.
Boiler-2 drum floor field equipments ,soot blover CV .MOV cleaning
done.
Boiler-2 drum floor field equipments ,soot blover CV .MOV cleaning
done.
Boiler-2 Startup vent MOV & metal temperature JB cleaning &
blowering work done.

PM Jobs carried
BFP-3 MV Drive Panel cleaning done and all cells tighten done

BFP-3 main Motor RTD termination tighten done


PM Jobs carried
In CHP T-2 Tower field Inst. And JB Cleaning and Blowering to done.
Motor greasing work done for following motors both DE and NDE
side :-
a) ACC-2A
b) ACC-2B
c) ACC-2C
d) ACC-2D
e) ACC-2E
f) ACC-2F

BFP-3 motor bearing temperature taken both from DCS and


temperature gun found normal.
DE-70 and NDE-66 from DCS

BFP-3 oil changed today and added the motor in lubrication deatail list.

BAC-2A &2B field instruments & Local control panel cleaning &
blowering work done.
BAC-2A &2B field instruments & Local control panel cleaning &
blowering work done.
PM Jobs carried
crusher buiding equipments cleaning and blowring done as :-
2 Bucket elevator floor
ZSS switch, and JBs on that floor
crusher buiding Panel JB cleaning and blowring done as :-
magnetic saprator panel, coal sampler panel,

PM Jobs carried
Color sticker prepared and pasted-
2. Boiler-2 Bucket elevator
2. Boiler -2 Bed Material RAV
3. CHP MCC Room Bucket Elevator VFD panel
4. Boiler-2 coal Feeder Floor 24 V supply
ACC-2 Mist fan panel, cover with plastic polythene to avoided water
entrance inside.

Soot blower Panel - 2 power OFF and ON as per requirement.

PM Jobs carried
Boiler -2 Coal bunker 2A,2B,2C & 2D level transmitter cleaning work
done.
Boiler -2 Coal bunker 2A,2B,2C & 2D level transmitter cleaning work
done.
04 no's Bag filter panel's of coal bunker U#2 cleaning & blowering
work done.
04 no's Bag filter panel's of coal bunker U#2 cleaning & blowering
work done.

Motor greasing work done for following motors both DE and NDE
side :-
a) ACC-2A
b) ACC-2B
c) ACC-2C
d) ACC-2D
e) ACC-2E
f) ACC-2F
Coal feeder of Boiler-2 al 8 motors cleaning and blowering done and
double earthing tightness also ensured.
A) Main motor coal feeder
b) Clean run motor

PM Jobs carried
reclaimer lights fitting glass cleaning work done

Crusher-2 V-2 vibration sensor coming alarm continusoly in DCS so


checked in fiedl found mech work going on and scaffold was made over
the Crusher-2 hence vibration coming, also all sensor tightness
checked.

FAS-2 plate valve opening and closing so checked found level was
coming high, found material was stciking on probe. So cleaning done
with air on probe and in cover side. Also informed CCR to start blower
and heater prior to start.
Silo street lights were found On so timer setting delayed to 7:00pm.

One capacitor bank was made stopped and excitation was reduced as
voltage was found on higher side.

PM Jobs carried

at BC- 6 deluge tail end Station Field Inst. And JB Cleaning and Packing
Tape to done.

ACW Pump House all Motor , JB and Panel Cleaning and blowering
done

TPP Lightning scheme SLD prepared and mailed.


SOP for Lightning power resume after blackout prepared.
PM Jobs carried
a new 24 volt big transformer installed near BFP motors
2 shifting of transformer from CHP to location
2 cable fixing in transformer
3 Double Earthing of transformer
4 cable dressing of cable

crusher building screen floor cleaning done as


2 bag filter JB
2 purging SOV
3 monometer
4 transmitter
5 PA system
6 other equipments JB

Crusher -hydraulic ststem control wiring terminal connector found


broken, So fixed properly with screw.
Crusher-2 & 2 hydraulic system control box panel was very dusty ,so
cleaning done.

PM Jobs carried
Silo area chut motor protecting GI cover made and applied to motors of
Silo 2 and Silo 2
WTP DCS blowring and cleaning done
its protection penal blowring done
WTP MOV panel blowring done
Boiler-2 FWS 03 no's CV & 03 no's MOV cleaning done.

Boiler-2 DSH 04 no's CV & 02 no's MOV cleaning done.

4.5mtr AHF panel cleaning done.

PM Jobs carried

In Unit No. # 2 BAC-2A / 2B Local Inst. Panel Blowerning , Cleaning and


Packing to done.

In Unit No. # 2 BAC-2A / 2B Local Inst. Panel Blowerning , Cleaning and


Packing to done.
BC 7A Motor Cleaning and Blowering done

BC 7B Motor Cleaning and Blowering done

Coal Bunker Floor all Panel Cleaning and Blowering done


RSB 58 -59 , physically checkl found ok

PM Jobs carried
Boiler-2 bed thermocouple of Boiler-2 no. 27 was showing violet so
checked found termination loose, so tightened now OK.

FAS-2 contoller side fork No contact removed.

Water valve SOV of BAC-2B was exhausting so checked found mech


jam so informed operation.

TG-2 taken into base load and removed as per Operation requirement.

TG lift was in F2 fault so reset.

PM Jobs carried
ACW-2 vfd panel cleaning & blowering done

Bed ash silo contactor, o/l, two no's of selector swotch & element
mounted in panel & termination done, trial work is u/p
Boiler-2 PT2224 AH pressure showing less so impulse line flushing
done now ok

Boiler-2 02 TI0952 temp showing high, so removed it & cleaning done,


terminal tightness also done & taken in line now ok
Lighting booster transformer cleaning & blowering

PM Jobs carried
Unit 2&2 oil centrifuse panel maintenance done as:-
2 panel blowring done
2 Panel contactors and heater terminals tightness checking done

unit 2&2 HP and LP heater area equipments cleaning done as:-


2 MOV
2 control valves
3 transmitters
4 gauges

PM Jobs carried
Jeshu-Hozen done at side Stream Filter Room

Jeshu-Hozen done at ACW Pump House


Boiler-2, SOX analyser Panel PM done-

PM Jobs carried
BAC-2B&2B cleaning & blowering done

Unit-2 bowser system polythene covering rearrange & filed equipment


cleaning
Boiler-2 RHS side o2 controller polythene covering not found so
provided.

ACW 3 breaker control TB correction & trial job

WTP pump house area field equipment cleaning job

4.5 mar U#2TG building floor all MOV , CV & field instruments cleaning
work done.
4.5 mar U#2 TG building floor all MOV , CV & field instruments cleaning
work done.
silo roots blower panel maintenance done as:-
2 Panel blowring done
2 contactors and MCB terminal tightness done
3 wiring tightness done
4 both roots blower motors cleaning done
5 motors earthling tightness checked.

PM Jobs carried
Jeshu-Hozen done at Pump House

Fly Ash Silo-2 Panel Blowering and cleaning done

Fly Ash Silo-2 Panel Blowering and cleaning done


PM Jobs carried
Boiler-2 ID FAN Motor cleaning & blowering job

Boiler-2 SA FAN Motor cleaning & blowering job

Boiler-2 PA FAN Motor cleaning & blowering job

CHP dcs room all module & termination units panel cleaning &
blowering job

Boiler-2 coal bunker O/L MOV found dusty ,So cleaning & blowering
work done.
Boiler-2 coal bunker O/L MOV found dusty ,So cleaning & blowering
work done.
Boiler-2 all coal feeder O/L MOV &SOV found dusty ,So cleaning &
blowering work done.
Boiler-2 all coal feeder O/L MOV & SOV found dusty ,So cleaning &
blowering work done.

Motor greasing done for :-


a) CEP-2A
b) CEP-2B
Feeder maintenance done for :-
a) Vib screen-2
b) Bucket elevator-2
PM Jobs carried

Silo 2,2,3 wet system motor GI protection cover provided


2 Cut GI sheet as per measurement
2 Made GI cover
3 Installed GI cover over motor and tie with armoured wire.

Boiler-2 zero mtr, instruments cleaning as:-


2 Drain MOV
2 J valve MOV
3 APH JBs, Bag house JBs
4 transmitter cleaning and its GI cover refix

PM Jobs carried
4.5 Mtrs Distribution Transformer 2,2 3 and 4 cleaning done with
cotton cloth.

PRDS area following equipment cleaning and blowering done-


2. MOV
2. Control Valve
3. Pressure Gauge
4. Transmitter

Boiler-2, De-super heating area control valve and MOV Cleaning done
Fly ash silo-2 & 2 cleaning & blowering work done.

Bed ash silo cleaning & blowering work done.


4.5 mtr AHU vfd panel cleaning done.
BFP room AHU vfd panel cleaning done.

Soot blower panel checking, terminal tightness and panel blowering


work done.
Feeder maintenance done for :-
a) Vib screen-2
b) Bucket elevator-2
Boiler-2 2nd floor 24V socket and RSB panel cleaning, operation of
ELCB and checking, blowering work done.

PM Jobs carried

Coal Bunker 2D, sensor cleaning job

Boiler-2 "0" mtr area APH field equipments cleaning

Boiler-2 "0" mtr area 22-22 vessel field equipments cleaning

Boiler-2 "0" mtr area 22-22 vessel field equipments cleaning

Boiler-2 SA faN & PA fan Motor cleaning & blowering job


Lighting timer adjusted for
a) CT fan security tower
b) WTP street lights

Motor greasing done :-


a) CT fan-2
b) CT fan-3
c) ACW-2
d) J valve-2B

Bunker level transmitter checking and cleaning work done all 8 nos.

PM Jobs carried

Reclaimer Following Jobs Perform-


2Both Panel Cleaning and Blowering done2.
2. Travel Motor and Boom Motor Cleaning done
3. Panel Termination Tighten done
4. RSB all ELCB tested

Chimney Analyser Room Following equipment cleaning and blowering


done-
2. Boiler 2& 2 SOX panel
2. Chimney Panel
3. All PC ,
4.SPM controller Job
5. Cylinder
6. Window.
PM Jobs carried
Inst Comp house spare motor checked for megger found OK and
resistance was found 0.3 ohms balance, winding both end cable
identified and seperated. Motor covering done with polythene.
CHP MCC room on entry one mat kept for cleaning of foot before
entering inside.

Isolation given for inst air line of Bag house-2 chamber 22 amd SOV air
line also removed as per isolation.

TG acoustic room inside both camera cleaning done.

U#2 Coal feeder area field instrument cleaning done.


U#2 Coal feeder area field instrument cleaning done.

PRDS area following equipment cleaning and blowering done-


2. MOV
2. Control Valve
3. Pressure Gauge
4. Transmitter
Field equipments & JB cleaning & blowering at unit-2 APH conveying
system
Field equipments & JB cleaning & blowering at unit-2 bag house 22-22
vessel conveying system
Field equipments & JB cleaning & blowering at unit-2 bag house 22-22
vessel conveying system
WTP dcs all module & termnination unit panels cleaning & blowering
job
Unit-2 Bed ash system field JB cleaning & blowering

Turbine building Following Motor Cleaning and Blowering done-


2. BFP-2
2. BFP-2
3. BFP- 3
Boiler -2, Following Motor , Panel and JB clweaning and Blowering
done-
2.PA Fan-2
2. ID Fan-2
3. SA Fan-2
4. J Valve Fan 2A
5. J Valve Fan 2B

PM Jobs carried
APH-2 vessel-2 isolation given to MR. Tauqir and gauge and switched
removed.

Coal bunker-2B level not coming so power reset once of the controller
now OK.

Near DT-2 trafo P&V duct was charged and closed the duct near P-fan
VFD side.

BC-2 area 3-phase supply given for welding machine and top found
connection loose so tightened.
Boiler-2 WTP side protection panel cleaning done(Furnace pressure
Switch & PT Panel)
Boiler-2 Boiler-2 side protection panel cleaning done

PM Jobs carried

Field equipment's & JB cleaning & blowering at unit-2 APH conveying


system

Field equipment's & JB cleaning & blowering at unit-2 bag house 22-22
vessel conveying system
Field equipment's & JB cleaning & blowering at unit-2 bag house 22-22
vessel conveying system

CHP dcs all module & termination unit panels cleaning & blowering job
Unit-2 Bed ash system field JB cleaning & blowering
Boiler-2 ID fan RTD JB cleaning packing & poythene covering done

Boiler-2 ID fan RTD JB cleaning packing & poythene covering done

Jishu hozen done at WTP inst. Lab.

CEP -2 &2 motor cleaning done.

PCC 2B breaker cleaning & blowering done.


PM Jobs carried
Unit-2 feed water station control valves cleaning
Unit-2 DSH station control valves cleaning
Unit-2 feed water station control valves cleaning
Unit-2 DSH station control valves cleaning
Unit-2 soot blower panel cleaning & blowering job
Unit-2 soot blower panel cleaning & blowering job

Following feeders checking and maintenance work doen in CHP MCC;:-


a) Enmass conveyor-2
b) Enmass conveyor-2

Double earthing ensured and tightness done for all HP dosing motors.

Work outside Electrical JB covering work.

Workshop outside electrical JB shed proper fixing work

Jishu hozen done atLimestone MCC,DCS room.

Limestone MCC housekeeping work


J valve 2A, 2B power JB covered with polythene
PM Jobs carried
4.5 mtr switch gear room DT-5 incomer control supply connecter
replacement & maintenance
Compressure house Inst Comp-2 panel & motor cleaning & blowering
job

Compressure house Inst Comp-2 panel & motor cleaning & blowering
job

Compressure house Inst Comp-3 panel & motor cleaning & blowering
job

Fly ash -2 bag clothes stucked on fork switch, So removed the same &
cleaning done.
Fly ash -2 fork switch & panel cleaning done.
Bed ash silo panel cleaning done.

Both Shift Almirah found untidy so remove all items and again kept
properly.
PM Jobs carried

Jishu hoizen done at china office area

Boiler-2 CO analyzer sample line cleaning & fulshing done

At LS dcs panel hole packing done

BFP-2 motor blowering & cleaning job


BFP-2 motor blowering & cleaning job
BFP-3 motor blowering & cleaning job

PM Jobs carried

T2 Tower all field instrument ( Panel , VFD, Limit Switches Proxy and
ZSS )cleaning and blowering done

T2 Tower all field instrument ( Panel , VFD, Limit Switches Proxy and
ZSS )cleaning and blowering done
Fly Ash Silo 2 motor and Panel cleaning and blowering done.

Fly Ash Silo -2 motor and Panel cleaning and blowering done.

WTP all PH,Conductivity,& pressure transmitter &b switches cleaning


done.
WTP all 07 no SOV panels cleaning & blowering done.
RO unit all Pressure gauge cleaned.
UF unit all Pressure gauge cleaned.

P&V no. 4 local panel checking, control and power tightness and
maintenance work done.

Both generator voltages were not equal so excitation adjusted and


corrected the individual voltages.

CHP MCC feeder 2 nos. feeder were found without tagging, so


identified and tagging work done:-
a) CHP MCC room AC power
b) BC-6 coal sampler supply

PM Jobs carried

Unit-1 AHF Panel and Filter Cleaning done

Unit-2 AHF Panel and Filter Cleaning done

Boiler-1 , All Level Transmitter of bunker 1A,,1B , 1C and 1D Cleaning


done
Boiler-2 , All Level Transmitter of bunker 2A, 2B , 2C and 2D Cleaning
done

Pump House all field equipment cleaning and blowering done-


1. Pressure Gauge - 6 Nos
2. Transmitter -4 Nos
3. Pressure Switch - 12 no's

PM Jobs carried
CHP MCC all panels blowering done. Except Transformer.

CHP building crusher floor all field equipments cleaning done.

PM Jobs carried

Electrical inspector report translated to English and emailed.

Soot blower panel of Boiler-1 cleaning and blowering done.

P&V no. 1 local panel checking, control and power tightness and
maintenance work done.
PM Jobs carried
PRDS area all field equipment cleaning and blowering done-
1. Control valves - 6 Nos
2. Motor operated valve -5 Nos
3. Pressure gauges & Tx's
Compressor house all receiver's auto drain valve checked with test
button & water drain

Boiler-2 coal feeder all 8 motors cleaning and blowering work done,
earthing checked for tightness:-
a) Coal feeder main motors - 4 nos.
b) Clean run motor - 4 nos.

Boiler-2, RSB-56 , 24 v socket blower & cleaning job

PM Jobs carried

Boiler-2 zero mtr, instruments cleaning as:-


1) Drain MOV
2 J valve MOV
3 APH JBs, Bag house JBs

Raw Meal Feed System blowering done


Root Blower Room motor and panel cleaning and blowering done

PM Jobs carried
Green audit report prepared and audit conducted for:-
a) CHP MCC
b) Limestone MCC
c) Switchyard area
Firing station of Boiler-1 cleaning and blowering done.
A) Panels burner
b) Instrument and limit, SOVs
P&V no. 1 local panel checking, control and power tightness and
maintenance work done.

BAC-1 Filed instrument cleaning & blowering done.

BAC-2 Filed instrument cleaning & blowering done

4.5 mar MCC U#2 side floor & insulation mat cleaning done.

Boiler-2, RSB-56 , 24 v socket blower & cleaning job

Boiler-1 vibrator-11 and 21 checked found no. 11 was found cable


open, so motor megger done and resistance checked then later taken in
line.
BC-4, enmass and screen floor and local JBs and panel cleaning and
blowering work done.

Green zone data updated.


WTP MCC door sesnor lock taken in line and door closure spped
adjusted.

PM Jobs carried

Dosing room HP , LP & Morpholine dosing panelscleaning & blowering


done

WTP UF sov panel cleaning & blowering done


WTP MB sov panel cleaning & blowering done
WTP ACF sov panel cleaning & blowering done
WTP MGF sov panel cleaning & blowering done

Fire Pump House all Motor and JB Cleaning and Blowering done.

PM Jobs carried
Enmass conveyor-1 field LCS cable tracing done for start and stop.
Voltage checked and then new LCS box mounted in field. Connection
done, gland fitted and trial taken in local working OK.

Boiler-2 bag house vibrator no. 21 was asked bt CCR not operating so
checked and found normal and in field physically verified he same.
Chimney aviation lighting timer changed stop from 5:30am to 6:30am.

Chimney analyzer room& panels & PC cleaning done.

CHP MCC AHF panel cleaning done.

PM Jobs carried
Boiler-1 firing floor all field panels cleaning & blowering done
Boiler-2 firing floor all field panels cleaning & blowering done
Boiler-1 APH conveying field JB cleaning & blowering done
Boiler-1 11-21 conveying field JB cleaning & blowering done
Boiler-1 12-22 conveying field JB cleaning & blowering done

Boiler-2 APH field JB cleaning & blowering done

Boiler-2 11-21 conveying field JB cleaning & blowering done


Boiler-2 12-22 conveying field JB cleaning & blowering done
RO-1 and UF -2 Motor Cleaning done.
HPP Motor Cleaning done.

PM Jobs carried

Bc_4 magnetic seperator panel cleaning done


Chimney analyzer panel cleaning done

BC-5 to DCS spare core indentification U/P

PM Jobs carried
Coal feeder unit-2 area PM work. Ie bloering & cleaning of
MOV ,JB

BC-1,2& 5 motor cleaning blowering & earthing checking work

Coal feeder unit-1 area PM work. Ie bloering & cleaning of


MOV ,JB
PM Jobs carried
T-1 tower all equipment cleaning and blowering work done:-
a) BC-1 motor
b) 24V trafo
c) RSB
d) Local panel and Jbs

T-2 tower all equipment cleaning and blowering work done:-


a) BC-2 motor
b) 24V trafo
c) RSB
d) Local panel and Jbs
Motor greasing record updated and emailed to for the month of March-
2021.

Boiler-1 Bed material filling all field JB/panels cleaning & blowering
done
CHP dcs all 06 no's of module & termination unit panels cleaning &
blowering job
PM Jobs carried
In Fly ash silo No. # 2 level probe Polythene Coverning to done.
PM Jobs carried

Silo-2 bag filter controller & contactor cleaning & terminal


tightness job

Dcs-92 panel terminal tightness for


SV8164CD 92-2B-TB3-3,4(close fb) &
sv8164(open fb) wiring 92-2B-TB3-1,2

T1 tower, BC-1 magnetic seperator dual point earthing cables


removed

PM Jobs carried
Boiler-2, Zero Mtrs Drain M, J Valve e MOV , APH JB , Bag House 11-
21,12-22 JB , auto drain and bag house DP JB cleaning & blowering
done.
Boiler-2 Vesse1 NO 11 and Vessel 21 , Level probe found loose so
tighten it
Boiler-2 Vesse1 NO 12 Back pressure transmitter cover missing so
search the cover and covered it properly.

PM Jobs carried
PM Jobs carried

FAS-1 all field panels cleaning & blowering job

FAS-2 all field panels cleaning & blowering job


BAS all field panels cleaning & blowering job

Instrument comp. -1,2 &3 field panels & motors cleaning &
blowering job

BC-1 new cable dressing job for belt tear protection system

PM Jobs carried

BFP-1 Motor cleaning and blowring done

BFP-1 Motor cleaning and blowring done

BFP-3 Motor cleaning and blowring done

TG-1, Ground Floor all control valve and MOV cleaning and Blowering
done.

TG-2, Ground Floor all control valve and MOV cleaning and Blowering
done.

BAC Ash cooler 1A Level sensor, panel and JB cleaning and blowering
done.
BAC Ash cooler 1B Level sensor, panel and JB cleaning and blowering
done.

PM Jobs carried
In Pump House area all the Inst. related Field Instruments Cleaning
and Blowerning to done.
Unit No. # 1 and 2 all the Bunker Level Transmitter Level Probe
Cleaning to done.

PM Jobs carried
Street pole maintenance and faulty TB checking and
replacement done for 3 nos. poles and 5 nos TB replaced near
BC-1 area.

Following motors cleaning and blowering work done:-


a) CEP-1A
b) CEP-1B
c) Mist motor.
Updated greasing schedule as per technical cell requirement.

PM Jobs carried

Compressor Hpuse all Motors and Panel Cleaning and Bloiwering done

4.5 Mtrs and CCR AHU VFD Panel cleaning and Blkowering done, then
covr with Brown tape.

BFP AHU VFD Panel cleaning and Blowering done, then covr with
Brown tape.

PM Jobs carried
CHP Bucket elevator floor field panels of magnetic seperator ,
zss, proxy, coal sampling panel found dusty so cleaning &
blowering job

CHP Screen floor field panels bag filer jb, DP tx, manometer,
purging sov JB's found dusty so cleaning & blowering job

BC7A & 7B field panels , motors found dusty so cleaning &


blowering job

BC7A & 7B field LCS & RSB found dusty so cleaning & blowering
job

PM Jobs carried

Reclaimer Following Jobs Perform-


1. Both Panel Cleaning and Blowering done.
2. Travel Motor and Boom Motor Cleaning done
3. Panel Termination Tighten done
4. RSB all ELCB tested

Lime Stone DCS Panel Cleaning and Blowering done (5 Nos)

PM Jobs carried
Unit No. # 1 and 2 , 4.5 Mtrs Turbine side all the field Inst.
Cleaning to done.
Boiler-1 Bed material filling motor RAV cleaning and
blowering work done.
RSB-7 and 32 nos. all ELCB operation checked and later
panel cleaning and blowering work done.
Fire pump House emergency light operation checked and
ensured glowing in OFF condition.

PM Jobs carried

Jeshu-Hozen done at TG Building 0 Mtrs

General Consumable Item Shifted from WTP Workshop and


shifted to Shift Almirah, Item List prepared and mailed to all.
PM Jobs carried
All the Bag filter Panel ( total -08 Nos.) at BC-7A / 7B area
cleaning and Blowerning to done.
Boiler-2 Bed material filling motor RAV cleaning and
blowering work done.

Power report checked for month end and all figures


balancing done:-
a) Net export
b) DG aux
c) Stacker and AFR Power

Cable dressing done for soot blower no. 9 motor as found


disarranged.

PM Jobs carried

Jeshu-Hozen done at Compressor House

PM Jobs carried
Lighting pole TBs checking and faulty replacement work is
under progress:-
a) Pole no. 100 - 2TB
b) Pole no. 102 - 1TB
c) Pole no. 103 - 2TB

Boiler-2 soot blower motors cleaning and earthing checking


work done as
soot blower motors-2,4,6,8,10,12,14 and 16.
DT-2 again charged and PCC-1B taken in line and PCC-1A made
off and breaker rack out.
DT-1 kept in healthy condition.
CCR air duct 2 nos. opened polythene due to operation
requirement.
ACC-1 and 2 no. data given to operation team for 10 days.

PM Jobs carried
All the CHP DCS Panel cleaning and Blowerning to done.
BC-7AB motors and its JB cleaning and blowring done

dosing room at 9.5 mtr all panels blowring and cleaning


done. And panel outgoing terminals tightness done
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Chimney analyzer room round taken, CPCB &


ETP data noted found normal

P&V-2 made on at 7.00Am

Bucket Elevator-2 put in Local mode as per


request of CHP maint.(Mr.APS) & after
approval received from SH -E&I

Following shutdown given-


01.04.2021 A Jaswant Singh 1. Coal crusher-2
2. Vibrating Screen-2
3. BAC-1A
4. TG-2 oil centrifuge
5. BC-7A
6. BC-7B

RNRP all nodes found UP


Lights made off manually
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d) Swichyard logbook
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Chimney analyzer room round taken, CPCB &


ETP data noted found normal

RO booster pump-1 trip once in overload, so


reset it once, now runnning.

Bucket Elevator-2 put in Remote mode again

Following shutdown cleared-


01.04.2021 B Gajendra Pandya 1. Coal crusher-2
2. Vibrating Screen-2
3. BAC-1A
4. TG-2 oil centrifuge
5. BC-7A
6. BC-7B
RNRP all nodes found UP

side stream filter street light found ON at 6.15


p.m, so checked and found its timer got delay.
So adjust its time.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d) Swichyard logbook
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Please do not allow for santitizing spray to be


done near CCR electrical panels and inside
MCC room.

P&V no. 4 in stop condition and no. 2 is


running..

01.04.2021 C Anurag Chowdhury Unwanted lights made OFF during Plant


Round
Reports ( APC, Plant Performance , Power
Report and Env) not send due to CD not
detected.
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All AC AC MCB made ON

P&V No-4 & 2 Started at 7:00 AM

Chimney analyser room round taken.

02.04.2021 A Deepak Chand


4.5 Mtr all VFD drives inverter temp check

Following shutdown given


1 BC-6
2. End Mass -1
3. Vibrating Screen-1
4. Oil Centrifugue-1
5. Coal Crusher -1

RNRP all nodes found UP

Compressor House all Auto drain valve


manually Checked.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working Normally.

BC # 6 Belt TPH zero and Span calibration is


done. Also some parameter is changed
according to old set Value. Now reading are
under observation.
In CHP Line # 1 is tripped. So checked and
found that Bucket elevator No. # 1 ZSS Proxy
is not showing at DCS end. So checked and
found that ZSS Controller supply is OK. But
there is large gap between Proxy and Mech.
Wheel. Since Line No. # 2 is started. So we can
not set the Proxy.

Coal Bunker Level -1B is not showing


correctly at DCS . So reset the Power Supply
and Cleaned the The Level Probe. Now Ok.
In CHP T-1/ T-2 Tower field Inst. / JB / Panel
B Cleaning and Blowerning to done.
02.04.2021 Sanjay Garg
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary checked and Battery
Voltage-12.8 Volts.
all the manual light to ON Condition.

Following shutdown Cleared.


1 BC-6
2. End Mass -1
3. Vibrating Screen-1
4. Oil Centrifugue-1
5. Coal Crusher -1

24 Volts LED to Provided at Unit No. # 1 bag


house zero mtrs.

P & V. System No. -2 Stopped at 7.00 PM.


Bucket elevator No. # 2 Put into manual to
auto mode as per operation requirement.
WTP pump house area motor cleaning and
blowerning to done. Also checked double
earthing . It is Ok.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
P&V no. 4 in is running.

In CHP Line # 1 Bucket elevator No. # 1 ZSS


Proxy is not working at DCS end as per
previous shift, So checked and found that ZSS
Controller supply is OK. But there is gap
between Proxy and Mech. Wheel so set the
proxyimity switch gap & trial taken working
normal

C Gajendra Pandya Reports (APC, Plant Performance , Power


02.04.2021 Jaswant Singh Report and Env generate & mail to all
concerned

RNRP all nodes found UP.


Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All AC AC MCB made ON
P&V No-4 & 2 Started at 7:00 AM

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check

Following shutdown given


03.04.2021 A Deepak Chand 1 ACC Fan-1C
2.ACC Fan-1C Lube oil
3. BC-1
4. Reclaimer
03.04.2021 A Deepak Chand

Following Equipment AVI given and close ,


then shutdown clear
1 ACC Fan-1C
2.ACC Fan-1C Lube oil

RNRP all nodes found UP


Compressor House all Auto drain valve
manually Checked.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working Normally.

Boiler No.-1 SOX analyser Heat trace line MCB


is in OFF Condition. So ON the MCB. Now Ok.

Unit No. # 1 Metal Temp. Hole Sealing to done.

LP Dosing Tank Level is not showing at DCS.


So connection Tightness to done also Level
Probe pipe is Properly tight with cable tie.
Now Ok.
In CHP Reclaimer PLC Panel and VFD Panel
Cleaning and Blowerning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
B
03.04.2021 Sanjay Garg General Plant Round taken found all drive
running normal.
Fire Engine battary checked and Battery
Voltage-12.7 Volts.
all the manual light to ON Condition.
Following shutdown Cleared.
1 BC-1
2. reclaimer

As Per MPSS person requirement Trnsformer


HV Side Voltage is low. So Increased the
excition of Unit No. 3 1 and 2 by Common
excition system. Now Ok.
P & V. System No. -2 Stopped at 7.30 PM.
Bucket elevator No. # 2 Put into manual to
auto mode as per maintences requirement.
BC-7A and 7B motor cleaning and blowerning
to done.
BFP area Repair supply box Power supply is
OFF due to ELCB Change work. After
completion of work again supply is ON
condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V no. 4 in is running.

Reports (APC, Plant Performance , Power


Report and Env generate & mail to all
concerned
RNRP all nodes found UP.

C Anurag C Shift instrument log book filled


03.04.2021 Jaswant Singh

Shift abnormality  digital log book filled.


Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All AC AC MCB made ON

P&V No-4 & 2 Started at 7:00 AM

Chimney analyser room round taken.


04.04.2021 A Deepak Chand
4.5 Mtr all VFD drives inverter temp check

RNRP all nodes found UP

Compressor House all Auto drain valve


manually Checked.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the auto drain valve checked in


compressor checked and working Normally.

SPM Reading are showing high value at DCS


end. So checked at controller side . There is no
alarm in the controller. So checked at Chimney
Top side and found that Receiver Transmitter
SOV side air leakage from PU fitting. So
Replaced the PU Fitting. After this system is
taken in line. after 3 to 4 Hrs actual value of
SPM showing small variation in reading. ( Avg.
30 Sec. Reading ). Presently it is showing 43
mg/nm3. reading are under observation. also
informed to Tarun.
04.04.2021 B Sanjay Garg /
Gajendra Pandaya
Protection Cover is Provided at Unit No. # 1
Vessel No.-11/21 Back Pr. Transmitter.
In Fire Pump House area all the field Inst.
Cleaning and Blowerning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.

Fire Engine battary checked and Battery


Voltage-12.7 Volts.

Reclaimer CRD cable rolling normal in shift


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V no. 4 in is running.

Reports (APC, Plant Performance , Power


Report and Env generate & mail to all
concerned

RNRP all nodes found UP.

Shift instrument log book filled

Shift abnormality digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken for
04.04.2021 C Anurag C Power Report.
Jaswant Singh

Power report prepared and mail

FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.

EMS v/s manual Power Comparison Report


prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC AC MCB made ON

following shutdown given:-


1) BC-5
2) BC-6
3) En mass-2
4) IAC-2
5) DT-5
6) PCC-2B
7) P&V-2 boiler side

Load reduced due to shutdown of unit-2 Raw


05.04.2021 A Gajendra Pandya and cement mill from 6.30 a.m , cement mill -3
stopped at 12.30 p.m, so load reduced to 11.8
MW in both units
P&V-2 shutdown cleared after work, now
running normal
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp check
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V-4 made off at 7.00pm

Lights made on manually

05.04.2021 B Anurag Chowdhury


Shift abnormality  digital log book filled.

VAM log digital log book filled.


05.04.2021 B Anurag Chowdhury

a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 3:30 pm checked DT temp found as below-
DT-2 - 84deg C
DT-4 - 80degC
DT-6 - 80degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In Chimney analyzer room, Unit No. #


1 Boiler SOX analyzer Chiller Unit MCB
and Pump MCB is in OFF Condition. So
ON the MCB. Also Inlet and Outlet
Tube of the chiller Unit is Opened
condition. So connected it and taken in
line. Now reading are under
observation.

In Chimney analyzer room, All the


Panel / JB / window / PC Cleaning and
Blowerning to done.
Sanjay Garg
In Unit No. # 2 Firing Floor area ,
flame Scanner cable dressing to done.

Unit No. # 1 and 2 Coal feeder Load


cell purging to done.

Compressor House all the auto drain


valve checked and working normally.

CPCB Report on dated @05/04/2021


is sent to all.

05.04.2021 C
All the Report ( APC, Plant
Performance , Power Report ) is sent
to all.

05.04.2021 C
Service air driyer Moisture drained.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

Unwanted lights made OFF during


Plant Round

All Energy Meter manual Reading


taken for Power Report.

Power report prepared and mail


Deepak Chand
FH & HOD Report prepared and
mailed
DG report prepared and upload in
SAP.

EMS v/s manual Power Comparison


Report prepared and mailed

Transmission Losses Report Prepared


and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All AC AC MCB made ON

following shutdown given:-


1) BC-1
2) Reclaimer
3) Bed wet silo
4) PCC-1B
5) DT-2

06.04.2021 A Gajendra Pandya

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check

RNRP all nodes found UP


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Following shutdown closed:-


1) BC-1
2) Reclaimer
3) BC-1
4) IAC-2

P&V-4 made off at 7.00pm

Lights made on manually

Shift abnormality  digital log book filled.

Comp. house all auto drain valve operation


06.04.2021 B Jaswant Singh manual tested & drain the water
06.04.2021 B Jaswant Singh

VAM log digital log book filled.

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook

At 4:00 pm checked DT temp found as below-


DT-2 - 81deg C
DT-4 - 82degC
DT-6 - 79degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In WWTP DCS Panel No.- 88 M BRC


Comes in fault mode. LED No.- 2 and 4.
So reset the Card. Now Ok.

SH Room Both the AC is in running


condition. So OFF the AC and also OFF
the AC MCB.
In IAC No. # 1 Service required alarm
at Local Display panel. So reset it. Now
Ok.
Boiler No.-1 SOX analyser Heat trace
line MCB is in OFF Condition. So ON
the MCB. Now Ok.

Unit No. # 1 BAC VFD panel and Unit


Sanjay Garg No. # 2 BAC VFD Panel Blowerning
and Cleaning to done. Also Panel Filter
cleaning to done.

Compressor House all the auto drain


valve checked and working normally.

CPCB Report on dated @06/04/2021


is sent to all.
All the Report ( APC, Plant
Performance , Power Report ) is sent
to all.

C
06.04.2021
C Service air driyer Moisture drained.
06.04.2021
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Unwanted lights made OFF during
Plant Round

All Energy Meter manual Reading


taken for Power Report.

Power report prepared and mail

FH & HOD Report prepared and


Deepak Chand mailed

DG report prepared and upload in


SAP.

EMS v/s manual Power Comparison


Report prepared and mailed

Transmission Losses Report Prepared


and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC AC MCB made ON

07.04.2021 A Gajendra Pandya


following shutdown given:-
1) coal feeder-1D
2) Reclaimer
3) BC-1
4) BC-4
5) En Mass-1
6) MOV coal feeder-1D
07.04.2021 A Gajendra Pandya
Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check


RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Following shutdown closed:-


1) BC-1
2) Reclaimer
3) BC-4
4) Wet silo
5)Enmass-1
6) Coal feeder-1D
7) U-1 Mov912

P&V-4 made off at 7.00pm

Lights made on manually

Shift abnormality  digital log book filled.


07.04.2021 B Jaswant Singh

Comp. house all auto drain valve operation


manual tested & drain the water

VAM log digital log book filled.


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 4:00 pm checked DT temp found as below-
DT-1 - 69 deg C
DT-4 - 78 degC
DT-6 - 68 degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In Online CPCB website ETP TSS data


is not showing . So checked at Panel
side all the Isolator Connection
tightness to done. Now it is showing
online. Reading are under
observation.

in Boiler No.-1 SOX analyser Showing


zero flow in rotameter. So checked
and found that moisture fault in the
Controller. So cleaned the Moisture
filter. Now ok.

In Unit No. # 1 Firing Floor area ,JB


and Field Inst. Blowerning and
Cleaning to done.
In Unit No. # 2 Firing Floor area ,JB
Sanjay Garg and Field Inst. Blowerning and
Cleaning to done.

Unit No. # 2 Firing floor area Repair


Supply Box No.-26 Outside earthin is
in loose condition. So tightness to
done.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

CPCB Report on dated @07/04/2021


is sent to all.
All the Report ( APC, Plant
Performance , Power Report ) is sent
07.04.2021 C to all.
C
07.04.2021
Service air driyer Moisture drained.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Unwanted lights made OFF during
Plant Round

All Energy Meter manual Reading


taken for Power Report.

Power report prepared and mail

Deepak Chand FH & HOD Report prepared and


mailed

DG report prepared and upload in


SAP.

EMS v/s manual Power Comparison


Report prepared and mailed

Transmission Losses Report Prepared


and mailed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All AC MCB made ON

following shutdown given:-


1) BAC-1B
2) DT-5
3) PCC-2B
4) Belt feeder of BC5
08.04.2021 A Gajendra Pandya
Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check

RNRP all nodes found UP


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
following shutdown given:-
1) BAC-1B
2) DT-5
3) PCC-2B
4) Belt feeder of BC-5

P&V-4 made off at 7.00pm

Lights made on manually

Shift abnormality  digital log book filled.


08.04.2021 B Jaswant Singh
TG-2 put in base mode as per operation
requirement at 18:20 & again taken in line at
19:50
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook

At 7:00 pm checked DT temp found as below-


DT-2 - 73 deg C
DT-4 - 81 degC
DT-6 - 82degC
ALL office AC stopped as per not in use for
power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Please do not allow for santitizing spray to be


done near CCR electrical panels and inside
MCC room.

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


C Round
08.04.2021 Anurag Chowdhury
Reports ( APC, Plant Performance , Power
Report and Env) not send due to CD not
detected.
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC AC MCB made ON

P&V No-4 Started at 7:00 AM

Chimney analyser room round taken.

09.04.2021 A Deepak Chand


4.5 Mtr all VFD drives inverter temp check

Following shutdown given


09.04.2021 A Deepak Chand 1 BC-1
2. BC-4
3. BC-6
4. Reclaimer
5. IAC-1
6. BC-5 Ground Hopper

Reclaimer Shut down Clear

RNRP all nodes found UP

Compressor House all Auto drain valve


manually Checked.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working Normally.

In Silo No. # 2 Bag filter controller ( SV-8164)


ON feedback is not showing at DCS end. So
checked at DCS end. So found that DCS TB
Side. Connection is loosen condition. So
tightness done. Now Ok. Also OFF Feedback is
not showing at DCS end. Found that DI
Channel is not generating 33 Volts. Channel
faulty. So Informed to Mr. Tarun.

In CHP DCS Panel No.-91 M BRC Changed over


from Primary to Secondary.
In CHP DCS Panel No.-94 M BRC Changed over
from Secondary to Primary .

In Conference Room AC No. # 2 one earting is


broken condition. So reconnected it. Now Ok.

RNRP all nodes found Normal.


B Shift instrument digital log book filled
09.04.2021 Sanjay Garg
UPS log digital log book filled.
09.04.2021 B Sanjay Garg

Shift abnormality  digital log book filled.


VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary checked and Battery
Voltage-12.8 Volts.
all the manual light to ON Condition.
Following shutdown Cleared
1 BC-1
2. BC-4
3. BC-6
4. BC-5 Ground Hopper

Jocky Pump No.-1 Shutdown to given.


P & V. System No. -4 Stopped at 7.30 PM.

In Unit No. # 1 Soot Blower No.-11 Checked at


Local side. Its contractor is Pick up but Motor
Not stared. May be Gear Box Jammed
Condition. So Informed to shift Inchrage. Also
Motor wire removed from Soot blower Panel
side.

Unit No. # 2 Mist. Fan polythene Covering to


done.
Fire Pump House Motor Cleaning to done.
Fire Pump House Lighting ON as per Mech.
Person requirement.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all

CPCB & ETP data checked & report mail to all


C Jaswant Singh
09.04.2021 Gajendra pandya

RNRP all nodes found UP.


09.04.2021 C Jaswant Singh
Gajendra pandya

Shift instrument log book filled


Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC AC MCB made ON

TG-1 put in base Load at 09:00 AM due to Line-


1 Kiln Stop

P&V No-4 Started at 7:00 AM

Chimney analyser room round taken.

10.04.2021 A Deepak Chand


4.5 Mtr all VFD drives inverter temp check
found under limit.

Following shutdown given


1 BC-1
2. BC-4
3. BC-6
4. Reclaimer
5. BC-5 Ground Hopper

Compressor House all Auto drain valve


manually Checked.

RNRP all nodes found UP

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.


All the auto drain valve checked in
compressor checked and working Normally.

In CHP BC-4 Tripped due to Belt tare . So


checked and found that Belt Plate is unblance
due to wind. So informed to the shift incharge.

In Chimney analyzer PC is hanged condition.


So Restart the PC. Now Ok.

In WTP UF # 1 FT-4901 Outlet Flow is


showing negative Flow. So checked and found
that High side impluse line showing less Pr. As
compare to low side Impluse line. May be
chance of Orifics chocking condition.

In BC-4 Hooter is not Ok. So opened the hooter


and Cleaned the carbon brush and checked in
inst. Lab found that Ok. So installed at site.
Trial taken it is not working Condition. So
checked at DCS end connection tightness in
DO TB. One wire having 240 volts wrt ground.
while other wire having 150 Volts to ground.
wiring to check. Inform to Purshottam.
10.04.2021 B Sanjay Garg
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary checked and Battery
Voltage-12.9 Volts.
all the manual light to ON Condition.
Following shutdown Cleared
1 BC-1
2. BC-4
3. BC-6
4. BC-5 Ground Hopper
5. Reclaimer ,
6. Inst. Air compressor No.-1

P & V. System No. -4 Stopped at 6.30 PM.


TG # 1 removed from base Load as per
operation requirement.
CHP T-1 Tower Motor / JB/Panel Blowerning
and Cleaning to done.
ACC # 2 Mist. System Panel hole sealing done
by Silver tape.
Mechanical Workshop welding Machine 3-
Phase plug Top damaged to Changed it. Now
Ok.
Mechanical Workshop welding Machine Green
tag is Provided.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all

CPCB & ETP data checked & report mail to all

10.04.2021 C Jaswant Singh &


Anurag Chowdhury

RNRP all nodes found UP.

Shift instrument log book filled


Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC AC MCB made ON

P&V No-4 Started at 7:00 AM

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check


found under limit.

10.04.2021 A Deepak Chand Following shutdown given and close


1 Coal Feeder 2B

Coal Feeder 2B , AVI given and close

Compressor House all Auto drain valve


manually Checked.

RNRP all nodes found UP

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
In BC-4 Hooter is not Ok. So Checked and field
side in Contrctor Potential free contact NO is
not working condition. So we have used the
Spare NO Contact. Then we have shorted the
DCS wire TB at field side. Then hooter is
working condition. when BC-4 Belt is started
then hooter is not ok. Then check the DCS wire
continutity with field wire . it is not showing
the continutity. wiring to check.

In Chimney analyser Boiler No. # 1 SOX


analyzer Heat trace line MCB is in OFF
Condition. So ON the MCB . Now Ok.

11.04.2021 B Sanjay Garg /


Gajendra Pandaya
Unit No. # 1 Coal feeder -1B level is not
correctly showing at DCS end. So reset the
Power Supply. Now Ok.

Unit No. # 1 Firing Floor area JB cleaning and


Blowerning to done.
Unit No. # 2 Firing Floor area JB cleaning and
Blowerning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to ON Condition.
P & V. System No. -4 Stopped at 6.30 PM.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V no. 4 made off and no. 2 is running..

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all
CPCB & ETP data checked & report mail to all

RNRP all nodes found UP.

11.04.2021 C Jaswant Singh &


Anurag Chowdhury
Shift instrument log book filled

Shift abnormality  digital log book filled.

All Energy Meter manual Reading taken for


Power Report.

Power report prepared and mail


FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC MCB made ON

following shutdown given:-


1) BC-6
2) DT-3
3) PCC-3B
4) Reclaimer
5)coal crusher-2
6) BC -7A
7) BC-7B
12.04.2021 A Gajendra Pandya

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp check


RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

P&V-4 made off at 7.00pm

Lights made on manually

Shift abnormality  digital log book filled.

12.04.2021 B Anurag Chowdhury


VAM log digital log book filled.

a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 3:30 pm checked DT temp found as below-
DT-2 - 74deg C
DT-4 - 80degC
DT-6 - 81degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In IAC No. # 1 Service required alarm


at Local Display panel. So reset it. Now
Ok.

in Service Air Compressor No. # 2


Showing alarm in local display. So
checked and found that EPB is Pressed
condition. So informed to shift
Incharge.
In Unit No. # 2 BAC-2A / 2B Flow
switch Polythene Packing to done.

In CHP Bucket Elevator No.-1 and 2


ZSS Controller , BC-6 Magnetic
Seperator , Crusher No. # 1 and 2 RTD
Sanjay Garg and Vibration JB Blowerning and
Cleaning to done.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

CPCB Report on dated @12/04/2021


is sent to all.
All the Report ( APC, Plant
Performance , Power Report ) is sent
to all.
12.04.2021 C
Service air driyer Moisture drained.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

Unwanted lights made OFF during


Plant Round

All Energy Meter manual Reading


taken for Power Report.
Deepak Chand
Power report prepared and mail
FH & HOD Report prepared and
mailed
DG report prepared and upload in
SAP.

EMS v/s manual Power Comparison


Report prepared and mailed
Transmission Losses Report Prepared
and mailed.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC MCB made ON

following shutdown given:-


1) BC-6
2) BC-1
3) Jockey Pump-1
13.04.2021 A Gajendra Pandya 4) Reclaimer

AVI given for jockey pump-1 and again close


the AVI
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp check
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

following shutdown closed:-


1) BC-6
2) BC-1
3) Jockey Pump-1
4) Reclaimer

Jockey pump-1 AVI given & closed, trial taken


working normal

P&V-4 made off at 7.30pm

CPCB & ETP data checked at site & report


mail to all
13.04.2021 B Jaswant Singh
13.04.2021 B Jaswant Singh
Lights made on manually

Shift abnormality  digital log book filled.

VAM log digital log book filled.

a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook

At 3:30 pm checked DT temp found as below-


DT-2 - 79deg C
DT-4 - 77degC
DT-6 - 84degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

In Unit No. # 1 Fly ash system Vessel No.-11


High Level Probe Cleaned and Calibration to
done.
In Unit No. # 1 Fly ash system Vessel No.-12
High Level Probe Cleaned and Calibration to
done.
In WTP DM Water RO Discharge Pump Double
earthing is Provided.
In WTP UF SOV Box , ACF SOV Box , MGF SOV
Box , Mixed Bed Exchanger SOV Box
Sanjay Garg Blowerning and Cleaning to done.
In Both the DCS Server Panel Cooling Fan is in
running Condition.
CPCB Report on dated @13/04/2021 is sent
to all.
All the Report ( APC, Plant Performance ,
Power Report ) is sent to all.
Service air driyer Moisture drained.
RNRP all nodes found normal.
C
13.04.2021 Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

General Plant Round taken found all drive


running normal.

Deepak Chand
Unwanted lights made OFF during Plant
Round

Deepak Chand All Energy Meter manual Reading taken for


Power Report.

Following Report prepared and Mailed to


concern.
1. EMS Power Report.
2. Auxiliary Power Report
3. EMS v/s Manual Power Comparison Sheet
4. Transmission Loss sheet
5. DG Aux Report Prepared and mailed

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive
running normal.

Lights made off manually

All AC MCB made ON

P&V-4 made on at 7.00 AM

following shutdown given:-


1) Jockey Pump-1
14.04.2021 A Jaswant Singh 2) Reclaimer
CPCB & ETP data checked at site & report
mail to all
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp check
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All AC MCB made off

Chimney analyser room round taken.

Following shutdown Clear -


1) Jockey Pump-1
2) Reclaimer

14.04.2021 B Deepak Chand


Jockey pump-1 AVI given & closed, trial
taken working normal

P&V Nop-4 OFF at 7:00 PM.

ALL AC Power Made OFF in Evening

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In Compressor House water cooler


Body eathing to done.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

Service air driyer Moisture drained.

Unit No. # 2 APH Slave Vessel Dome


valve PU Tube fitting air leakage
found. So PU Tube fitting changed.
Now Ok.

In Unit No. # 1 MV925 MOV Cover is


not Present. So MOV Cover is
Sanjay Garg Provided.
Boiler Lift No. # 1 and 2 Lift Telephone
is working Normally.
Sanjay Garg

Unit No. # 1 and 2 Coal feeder Load


cell purging to done.
Turbine ETS Server trend is not
showing. So restart the Programme.
Now Ok.
CPCB Report on dated @14/04/2021
14.04.2021 C is sent to all.
All the Report ( APC, Plant
Performance , Power Report ) is sent
to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

Unwanted lights made OFF during


Plant Round

All Energy Meter manual Reading


taken for Power Report.

Gajendra Following Report prepared and


Pandya Mailed to concern.
1. EMS Power Report.
2. Auxiliary Power Report
3. EMS v/s Manual Power Comparison
Sheet
4. Transmission Loss sheet
5. DG Aux Report Prepared and mailed

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Lights made off manually


All AC MCB made on

TG-1 put in base Load at 013:00 hrs due


to low load (as per ccr request)

Bucket elevator-1 put in local mode as per


chp team request
P&V-4 made on at 7.00 AM

Following shutdown given:-


15.04.2021 A Jaswant Singh 1) 1D-01MOV0912
2) 01SV0905
3) COAL FEEDER-1D
4) BC-6
5)Root blower

CPCB & ETP data checked at site found


healthy
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp
checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All AC MCB made OFF

TG-1 Removed from base Load at 3.00


p.m due to load increased

Bucket elevator-1 put in Remote mode as


per chp team request

P&V-4 made OFF at 6.30 p.m

15.04.2021 B Gajendra Pandya


Following shutdown Cleared:-
1) 1D-01MOV0912
15.04.2021 B Gajendra Pandya 2) 01SV0905
3) COAL FEEDER-1D
4) BC-6
5)Root blower

ACC-1 consuption data made for three


months under progress
CPCB & ETP data checked at site found
healthy
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp
checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round
C
15.04.2021 Anurag Chowdhury Reports ( APC, Plant Performance , Power
Report and Env) not send due to reports
coming with same value, need to send in
morning.
RNRP all nodes found UP.

Shift instrument log book filled


Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

Lights made off manually

All AC MCB made on

TG-1 put in base Load at 11:055 hrs due


to TG-1 load increase to PG test.

Bucket elevator-1 put in local mode as per


chp team request
P&V-4 made on at 7.00 AM
16.04.2021 A Ajaya Kumar Following shutdown given:-
1) BC-1
2) BC-3
3) COAL FEEDER-1B
4) BC-6
5) MLDB
6 TPP Emergency power. 7.

CPCB & ETP data checked at site found


healthy
Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp
checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all
drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

VAM System taken in line. When all


the Temp. is normal the MV Drive
room BFP , 4.5 mtrs , Workshop AC ,
UPS 5.5 TR AC , and Unit No. # 1 and 2
DCS Room AC Stopped condition.

All the AHU System taken in line from


manual to Auto mode.

Unit No. # 1 Vessel No.-11/21 back Pr.


Transmitter , Back Pr. Switch and Seal
Pr. Switch impluse line is heavily
chocked condition. So cleaned the
impluse line. Now Ok.

BFP # 1 Oil Tank Level Showing Low


at DCS end. So checked and found that
moisture in Contact / TB. So cleaned
the TB and tightness done. Now Ok.

Unit No. # 1 Vessel No.-21 HH Level


Probe cleaned as per operation
requirement. Now Ok.
B RNRP all nodes found Normal.
16.04.2021 Sanjay Garg
B
16.04.2021 Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary checked and
Battery Voltage-12.8 Volts.

all the manual light to ON Condition.


Following shutdown Cleared
1) BC-1
2) BC-3
3) COAL FEEDER-1B and O/L MOV.
4) BC-6
5) MLDB
6 TPP Emergency power.
7. Reclaimer

Jocky Pump No.-1 Shutdown to given.


P & V. System No. -4 Stopped at 7.00
PM.

Reclaimer water Pump Connection to


done and trial taken Current= 5 Amps.

Jocky Pump No.-1 AVR Given and also


closed.
Fire Pump House Lighting ON as per
Mech. Person requirement.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Unwanted lights made OFF during Plant


Round
Reports(APC, Plant Performance , Power
Report and Env) prepared & mail to all

CPCB & ETP data checked & report mail


to all

RNRP all nodes found UP.

Shift instrument log book filled

Shift abnormality  digital log book filled.


16.04.2021 C Jaswant Singh
Gajendra Pandya
All Energy Meter manual Reading taken
for Power Report.

Power report prepared and mail

FH & HOD Report prepared and mailed


DG report prepared and upload in SAP.
EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Lights made off manually

All AC MCB made on

Jishu Hoizen done at Crusher house


building area.
Bucket elevator-1 put in local mode as per
chp team request
P&V-4 made on at 7.00 AM
Following shutdown given:-
1) BC-2 ( 02 time )
2) BC-3 ( 02 Time )
3) COAL FEEDER-2B
4) COAL FEEDER-2B O/L MOV.
5) COAL FEEDER-2B Pneumativs Valve.
6 . RAV
Crusher floor Bag Filter.
7. FAN Crusher floor Bag Filter.
8. Unit No. # 2 Bucket elevator.

17.04.2021 A Sanjay Garg CPCB & ETP data checked at site found
healthy
Chimney analyser room round taken.
Bucket Elevator No.-1 Put into remote to
Local mode as per APS requirement.
AVI given for jockey pump-1.
Crusher floor Field Inst. / JB / Motor
Cleaning to done.
Crusher floor RTD JB Cable Dressing to
done.
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Unit No. # 2 CO analyzer Preventive
maintences to done.
Unit No. # 2 APH / Vessel No.-11/21 and
Vessel No.-12/22 SOV JB and field Inst.
Blowerning and Cleaning to done.

Shift abnormality  digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Following shutdown given & closed:-


1) BC-2 ( 02 time )
2) BC-3 ( 01 Time )
3) ACW-1
4) COAL FEEDER-2B O/L MOV(AVI given)
5) ACWP-1 O/L mov

6) RAV Crusher floor Bag Filter.


7) FAN Crusher floor Bag Filter
Coal feeder-2B discharge MOV 02MV0910
AVI given

Bucket elevator-1 put in remote mode as


per chp team request
17.04.2021 B Jaswant Singh P&V-4 made off at 7.30pm
CPCB & ETP data checked at site & report
mail to all
Lights made on manually
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
At 4:00 pm checked DT temp found as
below-
DT-2 - 74deg C
DT-4 - 78degC
DT-6 - 82degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round

Reports ( APC, Plant Performance , Power


C Report and Env) not send due to CD not
17.04.2021 Anurag Chowdhury detected.
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

Lights made off manually

CD not working in PC for ENV & plant


report .

P&V-4 made on at 7.00 AM

CPCB & ETP data checked at site found


healthy ,

18.04.2021 A Ajaya Kumar Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp


checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V-4 made off at 7.00pm


Lights made on manually

18.04.2021 B Anurag Chowdhury Shift abnormality  digital log book filled.

VAM log digital log book filled.

a) Generator-2  checklist

b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
At 3:30 pm checked DT temp found as below-
DT-2 - 78deg C
DT-4 - 80degC
DT-6 - 82degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

In BC-6 Belt PCS Rope Clamp damaged


condition. So Replaced it. Now Ok.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

Service air driyer Moisture drained.

Unit No. # 1 vessel no.-12 Seal Pr. Is


not showing condition. Found that
Seal Pr. PU tube air leakage found. So
replaced it. Now Ok.

In Chimney analyzer Boiler No. # 1


SOX analyzer showing moisture fault.
Sanjay Garg So Reset it. Now Ok.
Sanjay Garg

Unit No.# 1 Vessel No.-12/22 Back Pr.


Transmiiter is not Showing at DCS
end. So cleaned the impluse line. Now
Ok.

In BC-6 area Bag filter Panel ( 02


Nos. ) Blowerning and Cleaning to
done.
CPCB Report on dated @19/04/2021
is sent to all.

C All the Report ( APC, Plant


18.04.2021 Performance , Power Report ) is sent
to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

Unwanted lights made OFF during


Plant Round

TG-1 put in base load at 12.30 am

All Energy Meter manual Reading


taken for Power Report.
Gajendra
Pandya

Following Report prepared and


Mailed to concern.
1. EMS Power Report.
2. Auxiliary Power Report
3. EMS v/s Manual Power Comparison
Sheet
4. Transmission Loss sheet
5. DG Aux Report Prepared and mailed
General Plant Round taken found all drive
running normal.

Lights made off manually

TG-1 132 side voltage increased upto 135


KV, so balanced the same .

P&V-4 made on at 7.00 AM

ALL AC made on in morning


round.8:30AM
CPCB & ETP data checked at site found
healthy ,
Chimney analyser room round taken.
19.04.2021 A Ajaya Kumar 4.5 Mtr all VFD drives inverter temp
checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

P&V-4 made off at 7.00pm

Lights made on manually

Shift abnormality  digital log book filled.


19.04.2021 B Anurag Chowdhury

VAM log digital log book filled.


a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
At 3:30 pm checked DT temp found as below-
DT-2 - 78deg C
DT-4 - 80degC
DT-6 - 82degC

ALL office AC stopped as per not in use for


power saving.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

Unit No. # 1 vessel no.-11/21


Conveying O/L Valve ( SV-8141 ) not
showing at DCS end. Found that Limit
Groove is loose condition. So tightness
to done. Now Ok.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

Service air driyer Moisture drained.

Unit No. # 1 vessel no.-11/21 Seal Pr.


Is not showing at DCS end. So cleaned
the Impluse Line. Now Ok.
Sanjay Garg In Chimney analyzer Boiler No. # 1
SOX analyzer showing moisture fault.
So Reset it. Now Ok.

Unit No.# 1 Vessel No.-11/21 Back Pr.


Switch / Transmiiter is not Showing at
DCS end. So cleaned the impluse line.
Now Ok.

Unit No. # 2 APH / Vessel No.-11/21


and Vessel No.-12/22 SOV JB and field
C Inst. Blowerning and Cleaning to done.
19.04.2021
C
19.04.2021
CPCB Report on dated @19/04/2021
is sent to all.
All the Report ( APC, Plant
Performance , Power Report ) is sent
to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

Unwanted lights made OFF during


Plant Round

All Energy Meter manual Reading


Gajendra taken for Power Report.
Pandya Following Report prepared and
Mailed to concern.
1. EMS Power Report.
2. Auxiliary Power Report
3. EMS v/s Manual Power Comparison
Sheet
4. Transmission Loss sheet
5. DG Aux Report Prepared and mailed

General Plant Round taken found all drive


running normal.

Lights made off manually

TG-2 removed from base load at 8:30 AM

P&V-4 made on at 7.00 AM

ALL AC made on in morning


round.8:30AM

20.04.2021 A Ajaya Kumar


CPCB & ETP data checked at site found
healthy ,
20.04.2021 A Ajaya Kumar Chimney analyser room round taken.
4.5 Mtr all VFD drives inverter temp
checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

In Both the DCS Server Panel Cooling


Fan is in running Condition.

Service air driyer Moisture drained.

Boiler Lift No. # 1 and 2 Lift Telephone


is Not working Normally. So checked
and found that No dial tone is present.
Sanjay Garg Also changed the hand set still it is not
working condition. Also supply is not
present in telephone wire.

Fly ash silo No. # 2 and Bed ash silo


level Transmitter Polythene coverning
to done.

B
BC # 1 Bag filter Panel / VFD Panel
Cleaning and blowerning to done.

20.04.2021 B BC #2 Bag filter VFD Panel and Chute


Level Supply JB Cleaning and
blowerning to done.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.

General Plant Round taken found all


drive running normal.

at boiler-2 bag house welding machine


conection done

Gajendra
Pandya at CHP MCC, cable celler exhaust fan
made OFF

P&V no. 4 stop at evening and no. 2 is


running..

Following shutdown Cleared:-


1) coal crusher-1
2) BC-6
3) vibrating screen-1
4) Vibrating screen-2
5)CHP MCC-B incomer

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all
CPCB & ETP data checked & report mail
to all

RNRP all nodes found UP.

20.04.2021 C Jaswant Singh/


Anurag Chowdhury

Shift instrument log book filled

Shift abnormality  digital log book filled.

All Energy Meter manual Reading taken


for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

Lights made off manually

ALL AC made on in morning


round.8:30AM

TG-1 take on base load at 1:30 PM. As per


operation request.

P&V-4 made on at 7.00 AM

Following shutdown Cleared:-


1) Reclaimer
2) BC-1
3) BC-4
4) BA dry unloading sys.

21.04.2021 A Ajaya Kumar CPCB & ETP data checked at site found
healthy ,
21.04.2021 A Ajaya Kumar

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp


checked

RNRP all nodes found UP

Shift instrument digital log book filled

UPS log digital log book filled.

Shift abnormality  digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.
In CHP DCS Room AC showing HP/LP
alarm. So reset it. Now Ok.
In Chimney analyzer Boiler No. # 2
SOX analyzer showing moisture fault.
So Reset it. Now Ok.

online CPCB website is not opened.

Unit No. # 2 Vessel No.-21 Seal Pr. PU


Tube Puncture condition. So Replaced
the PU Tube. Now Ok.
Fly ash silo No. # 1 , 2 and Bed ash
siloPanel / Field Inst. Blowerning and
Cleaning to done.
In IAC No. # 1 VFD Showing Cooling
alarm. Alarm code- 2052. IAC # 1 is in
stopped condition.
RNRP all nodes found Normal.
Shift instrument digital log book filled
B
21.04.2021 Sanjay Garg UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary checked and
Battery Voltage-12.8 Volts.

all the manual light to ON Condition.


Following shutdown Cleared
1) BC-1
2) BC-4
3) Reclaimer
4) Bed ash silo unloading System.

P & V. System No. -4 Stopped at 7.00


PM.
BFP No. # 1 , 2 and 3 Motor Cleaning
and Blowerning to done.
In Compressor House Repair Supply
Box No.-97 Hole selaing done by silver
Tape.

In CHP MCC Room Rubber mat laid.


Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
Unwanted lights made OFF during Plant
Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all

CPCB & ETP data checked & report mail


to all

21.04.2021 C Jaswant Singh/


Anurag Chowdhury

RNRP all nodes found UP.

Shift instrument log book filled

Shift abnormality  digital log book filled.

All Energy Meter manual Reading taken


for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

Lights made off manually

ALL AC made on in morning


round.8:30AM

TG-1 take on base load at 1:30 PM. As per


operation request.
P&V-4 made on at 7.00 AM
Following shutdown Cleared:-
1) BC-7A/B
2) BC-1
3) BC-4
4) Crusher-2
5. BC-6
Following shutdown Cleared:-BC-
7A/B
22.04.2021 A Ajaya Kumar

CPCB & ETP data checked at site found


healthy ,

Chimney analyser room round taken.

4.5 Mtr all VFD drives inverter temp


checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Lights made on manually

TG-1 take on base load at 1:30 PM. As per


operation request (from A-shift)

P&V-4 made off at 7.00 PM

CPCB & ETP data checked at site found


healthy.

Following shutdown Cleared:-


1) BC-1
B 2) BC-4
22.04.2021 Jaswant Singh
3) Crusher-2
4) BC-6 (two times)
Chimney analyser room round taken.
B
22.04.2021 Jaswant Singh

4.5 Mtr all VFD drives inverter temp


checked
RNRP all nodes found UP
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all

22.04.2021 C Gajendra Pandya

CPCB & ETP data checked & report mail


to all
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.

All Energy Meter manual Reading taken


for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

Morning round all light made off.

Following shutdown given-


1 BC-7A
2 BC-7B
3 Crusher-1
4 BC-1

23.04.2021 A Anurag Chowdhury


P&V started both in morning round.

RNRP checked found all nodes found UP.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.
All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

In Unit No. # 2 Desuperheater Control


Valve ( 02 TCV 3202 ) Showing 12.5
Feedback when command is 0%. So
calibrated the Control Valve. Now Ok.

In Unit No. # 2 Desuperheater Control


Valve ( 02 TCV 3204 ) Showing 12.5
Feedback when command is 0%. So
calibrated the Control Valve. Now Ok.
But when giving the open Command to
Valve Then Valve is Struck ( jerk ) .
Also 10 % Feedback is showing when
giving the 0% Command.

Pr. Guage of the Positioner of


Desuperheater Control Valve
( 02TCV3202) not working condition.
B So replaced it. Now Ok.
23.04.2021 Sanjay Garg
Boiler No. # 1 is stopped and
Shutdown condition.

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary checked and
Battery Voltage-12.9 Volts.

all the manual light to ON Condition.


Following shutdown Cleared
1) BC-1
2) BC-7A ( 02 Time )
3) BC-7B ( 02 Time )
4) Coal Crusher System No.-1 ,
5. Boiler Bucket Elevator No. # 2.

P & V. System No. -4 Stopped at 6.30


PM.
01 Nos . 24 Volts LED Light is Repaired
Condition.
01 Nos Electrical Hand Blower green
Tag to Provided.

In Fire Pump House area all the motor


Cleaning and Blowerning to done.

Following check list prepared


a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Unwanted lights made OFF during Plant


Round

Reports(APC, Plant Performance , Power


Report and Env) prepared & mail to all

CPCB & ETP data checked & report mail


to all
C
23.04.2021 Gajendra Pandya
C
23.04.2021 Gajendra Pandya

RNRP all nodes found UP.

Shift instrument log book filled


Shift abnormality  digital log book filled.

All Energy Meter manual Reading taken


for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Morning round all light made off.

Following shutdown given-


1 BC-4
2 BC-6
3 Coal feeder-1A
4 Coal feeder-1A discharge pneumatic
valve
5 Coal feeder-1A discharge MOV
6 BC-5

P&V started both in morning round.

24.04.2021 A Purushottam
RNRP checked found all nodes found UP.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

Unit No. # 2 PA fan DE Side external


cooling Fan shifted at site from Unit
No. # 1 PA Fan. Also ON the Cooling
Fan.

In Unit No. # 1 Coal Feeder -1A / 1B


/1C and 1D VFD panel Cleaning and
Blowerning to done.
In Unit No. # 1 Bed ash cooler -1A / 1B
VFD panel Cleaning and Blowerning
to done.
All the Filter of Unit No. # 1 Coal
Feeder and bed ash cooler VFD panel
Cleaning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
24.04.2021 B Sanjay Garg Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary checked and
Battery Voltage-12.8 Volts.

all the manual light to ON Condition.


Following shutdown Cleared
1) BC-4
2) BC-5
3) BC-6

P & V. System No. -4 Stopped at 7.00


PM.

Unit No. # 1 Coal Feeder area Lighting


ON as per operation requirement.

24 Volts hand lamp to provided at Unit


No. # 1 Coal feeder area.

10 Amps Plug Top to changed in


extension board in workshop area.

Following check list prepared


a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round

24.04.2021 C Anurag Chowdhury Reports ( APC, Plant Performance , Power


Report and Env) send and emailed.

RNRP all nodes found UP.


Shift instrument log book filled
24.04.2021 C Anurag Chowdhury

Shift abnormality  digital log book filled.


Unwanted lights made OFF during Plant
Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Morning round all light made off.

TG-1 stop manually at 11 a.m, rack out


breaker of generator-1, all load shedding
Put in TG-2 side from MPSS
Barring gear motor started normally
space heater of generator ON manually

Following shutdown given-


1 coal feeder-1B
2 01MV 909
3 01MV 910
4 01MV 911
5 01MV 912
6 ID-1
25.04.2021 A Gajendra Pandya 7 PA-1
8 SA-1 LT
9 P fan-1
10 soot blower-1
11 J valve 1A VFD
12 J valve 1B
13 boiler-1 ignitor-1
14 boiler-1 ignitor-2

P&V started both in morning round.


RNRP checked found all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

4.5 Mtrs MV Drive Room AHU System


OFF Condition at 19.00 PM due to
Boiler # 1 is in Shutdown condition.

In Unit No. # 2 vessel No.-12/22 Back


Pr. Switch and Transmitter Impluse
line cleaned as per operation
requirement.

Unit No. # 1 J-valve fan -1B VFD Panel


Cleaning , Blowerning and Connection
Tightness to done.
Unit No. # 1 SA Fan VFD Panel
Cleaning , Blowerning and Connection
Tightness to done.
RNRP all nodes found Normal.
B
25.04.2021 Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary checked and
Battery Voltage-12.6 Volts.

all the manual light to ON Condition.

P & V. System No. -4 Stopped at 7.30


PM.
03 Nos . 24 Volts Transformer and 01
Nos Extension Board Checked and
Found Ok.

02 Nos 24 Volts hand lamp checked


and Placed at Workshop area.

Switch Yard side Lighting Timer ON


Lighting Time changed from 6.30 PM
to 7.00 PM.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison


report prepared and emailed

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.
25.04.2021 C Anurag
Chowdhury
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Morning round all light made off.

P&V started one in morning round.


All required AC made ON

Following shutdown given-


1 coal feeder-1A
2 coal feeder-1B
3 coal feeder-1C
4 coal feeder-1D
5 01MV 909
6 01MV 910
7 01MV 911
8 01MV 912
26.04.2021 A Gajendra Pandya 9 coalfeeder-1D pnumetic valve
10 coalfeeder-1C pnumetic valve
11 Group LOTO Box-9
12 BC-2
13 BC-4
14 BC6
15 BC7A
16 BC7B

P&V started both in morning round.


RNRP checked found all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

Unit No. # 1 ID Fan Winding / Bearing


Temp. DE/NDE Side Motor and Fan
side JB ( Total-04 nos.) Connection
tightness , sealing and Packing to
done.

Unit No. # 1 PA Fan Winding / Bearing


Temp. DE/NDE Side Motor and Fan
side JB ( Total-02 nos.) Connection
tightness , sealing and Packing to
done.

In Chimney analyzer Boiler No. # 2


SOX analyzer showing moisture fault.
So Reset it and Filter cleaning to done.
Now Ok.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.

26.04.2021 B Sanjay Garg


VAM log digital log book filled.
B General Plant Round taken found all
26.04.2021 Sanjay Garg drive running normal.
Fire Engine battary charging
Condition.

all the manual light to ON Condition.

P & V. System No. -4 Stopped at 7.00


PM.

Following shutdown given-


1 ACC Fan-1A
2ACC Fan-1B
3ACC Fan-1C
4 ACC Fan-1D
5 ACC Fan-1E
6 ACC Fan-1F
7 ACC Fan-1A LOP
8 ACC Fan-1B LOP
9 ACC Fan-1C LOP
10 ACC Fan-1D LOP
11 ACC Fan-1E LOP
12ACC Fan-1F LOP
13 CEP-1A,
14 01MV2901

Following shutdown Cleared


1) BC-2
2) BC-4
3) BC-6
4. BC-7B ,
5. BC-7A

24 Volts hand lamp to provided at Unit


No. # 1 Boiler Furnace area.
24 Volts hand lampplug Top to
changed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison
report prepared and emailed

P&V no. 4 in stop condition and no. 2 is


running..
Unwanted lights made OFF during Plant
Round
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.

C Anurag RNRP all nodes found UP.


26.04.2021
Chowdhury Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working
Normally.
Unit No. # BAC-1A Conveying JB
Connection tightness , sealing and
Packing to done.
Unit No. # BAC-1B Conveying JB
Connection tightness , sealing and
Packing to done.

online CPCB website is not opened.

Unit No. # 2 APH Back Pr. Switch and


transmitter Impluse line cleaned as
per operation requirement.
A RNRP all nodes found Normal.
27.04.2021 Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.

all the manual light to OFF Condition.

P & V. System No. -4 Started at 8.30


PM.

Following shutdown given-


1 BC-1
2 BC-2

24 Volts hand lamp to provided at Unit


No. # 1 Coal feeder area.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Shutdown cleared for:-


a) BC-1
b) BC-2

P&V-4 made off at 7.00pm

27.04.2021 B Anurag Chowdhury


Lights made on manually in evening.
27.04.2021 B Anurag Chowdhury
Shift abnormality  digital log book filled.

RNRP all node status is UP.

a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
ALL office AC stopped as per not in use for
power saving.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

P&V no. 4 in stop condition and no. 2 is


running..

Unwanted lights made OFF during Plant


Round

C
27.04.2021 Gajendra Pandya TG-1 encloser exhaust fan made OFF
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.

RNRP all nodes found UP.


Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Following shutdown given-


1 BC-3
2 Reclaimer
3 BC-1
4 Chilled water pump-1 VAM
5 AVR-1
6 Generator-1 breaker
7 01Mv2305
8 01MV2306
9 Barring gear-1
10 BAC-1A
11 BAC-1B

28.04.2021 A Anurag Chowdhury


All lights made off during morning round.
P&V started in morning round.
RNRP checked found all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal
Following shutdown closed-
1 BC-3
2 Reclaimer
3 BC-1

Following shutdown given-


AOP-1A
AOP-1B
EOP-1
GSC-1A
GSC-1B

Lights made on during round.

28.04.2021 B Jaswant Singh P&V-4 made off at 7.30pm

ACC-1E lube oil motor connection


removed
DE Side(B,Y,R)

DT transformer temp reading


DT-2: 67 degc
DT-4: 90 degc
DT-6: 84 degc

RNRP checked found all nodes found UP.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

P&V no. 4 in stop condition and no. 2 is


running..
Unwanted lights made OFF during Plant
Round

TG-1 encloser exhaust fan made OFF


Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.
C
28.04.2021 Gajendra Pandya
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Following shutdown given-


1 BC-4
2 CEP-1A
3 BC-6
4 DRAIN POT-1A
5 DRAIN POT-1B

All lights made off during morning round.

29.04.2021 A jaswant Singh


29.04.2021 A jaswant Singh
P&V-4 started in morning round.

RNRP checked found all nodes found UP.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all


drive running normal.

All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working
Normally.

Unit No. # 1 ID Fan Bearing Temp.


DE/NDE Side removed as per
Mechanical maintences requirement.
Also fan side vibration probe removed
and handedover to Mr. tarun.
Unit No. # 1 BAC-2B Back Pr. Switch
and Transmitter impluse line cleaned
as per operation requirement. Also
popette valve SOV is not working
condition. Also Open at field side. So
removed the SOV from BAC-1A and
trial taken. It is working Normally.

In Chimney analyzer Boiler No. # 2


SOX analyzer showing moisture fault.
So Reset it and Filter cleaning to done.
Now Ok.

In Unit No. # 1 Turbine CCP panel


Cleaning , Blowerning and Connection
tightness to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
B
29.04.2021 Sanjay Garg UPS log digital log book filled.
Shift abnormality  digital log book
filled.
VAM log digital log book filled.
General Plant Round taken found all
drive running normal.
Fire Engine battary charging
Condition.

all the manual light to ON Condition.

P & V. System No. -4 Stopped at 7.00


PM.

Following shutdown Cleared.


1 ACC Fan-1A
2ACC Fan-1B
3ACC Fan-1C
4 ACC Fan-1D
5 ACC Fan-1E
6 ACC Fan-1F
7 CEP-1A.
8 U# 2 SA Fan Motor-2
9 BC-4
10 BC-6.
Following shutdown Given.
1) 01MV3208.
2) 01MV3207
3) U # 1 ID FAN MOTOR

01 Nos extension board provided at


Unit No. # 1 Boiler Furnace area.

Drain Pot Motor- 1A / 1B motor


connection removed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

P&V no. 4 in stop condition and no. 2 is


running..
Unwanted lights made OFF during Plant
Round

TG-1 encloser exhaust fan made OFF


C Reports ( APC, Plant Performance , Power
29.04.2021 Gajendra Pandya Report and Env) send and emailed.

RNRP all nodes found UP.


Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Lights made off manually

All AC MCB made on

Unit No. # 1 BAC-2B all the Connection


tightness to done and Power Supply
Reset . Also open the manual isolation
valve Then trial taken. It is working
Normally.

Unit No. # 1 FT-902 , PT-0904 , PT-


0901 , PT-1119, PT-0903 and PT-1115
Impluse line flushing to done.

Unit No. # 1 FT-914 , PT-1120 , FT-


0913 , FT-912, Impluse line flushing
to done.
Unit No. # 1 FT-906 , FT-907 , FT-0910
, FT-911, Impluse line flushing to
done.
P&V-4 made on at 7.00 AM
30.04.2021 A Sanjay Garg
30.04.2021 A Sanjay Garg
Following shutdown given:-
1) BC-4
2) BC-7A
3) BC-7B
4) Becket Elevator No.-1.
5) Becket Elevator No.-2. 6 . 6.
Crusher floor Bag Filter.
7. 01MV2301
8. 01MV2302.
9. 01MV2305.
10.01MV2311

CPCB & ETP data checked at site found


healthy
Following shutdown Cleared..
1) 01MV3208.
2) 01MV3207

P & V No. # 2 Stopped due to Water


Leakage and stopped condition. .So
informed to H.Sharma.

Shift abnormality  digital log book


filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Following shutdown cleared:-
1) BC-4
2) BC-7A
3) BC-7B

Following shutdown given:-


1) Bed ash cooler-1A
B
30.04.2021 Gajendra Pandya 2) Bed ash cooler-1B
3) CBD contrlvalve 01LCV501

Shift abnormality  digital log book


filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison


report prepared and emailed
P&V no. 4 in stop condition and no. 2 is
running..
Unwanted lights made OFF during Plant
Round
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.

C Anurag
30.04.2021 RNRP all nodes found UP.
Chowdhury
Shift instrument log book filled
Shift abnormality  digital log book filled.

Unwanted lights made OFF during Plant


Round
All Energy Meter manual Reading taken
for Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed

DG report prepared and upload in SAP.


EMS v/s manual Power Comparison
Report prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Abnormality jobs attended PM Jobs carried
P&V-1&2 side tank water overflow observed
from floor level so checked & found water Jishu Hoizen done at pump house area
inlet valve not closed while stopped the P&V
in evening
P&V-1&2 side common water drain line found BC-3 area cable dressing done for belt
chocked so cleaning & hammering done on tear proxy wiring
drain pipe, now ok
BC-3 new proxy installation & cable New Plug top arrangement for office
termination job cooler at TPP workshop area
VAM system-condensate motor single BC-3 area pullcord polythene covering
earthing observed so dual point earthing job
provided

T3 tower bagfilter vfd panel cleaning &


blowering done

BFP-1,2 & 3 motor's cleaning &


blowering job

Abnormality jobs attended PM Jobs carried

P&V-2 water leakage still found, so checked its


inlate water valve closed and drain is not
chocked, water is leaking from Tank bottom AOP motors of both unit cleaning anf
blowring done
near pipe rusted joints in floor. Now inlet
water is completely closed. Need observation.

TG-2 oil centrifuse not started, so checked and Boiler1&2 O2 probes and chimny
found that its controller not responding, so analyser Sox panel stickers pasting
reset it once after some time it started. done

RSB-61 JB door earthing found broken so new service compressor flow switch
earth provided polytene covered
service air dryer auto drain polytene
covered

DCS -1&2 side panels of EOP and AVR


panels rubber mate provided from
spare
material shifting work done in Inst. Lab

Abnormality jobs attended PM Jobs carried

T-1 tower all equipment cleaning and Green zone audit points closed in CHP
blowering work done:- MCC area:-
a) BC-1 motor a) Unwanted material in store removed
b) Tag pasting for missing name in
b) BC-1 power JB feeder
c) Repair supply box c) Rack area unwanted materials
d) LCS panel
removed

T-2 tower all equipment cleaning and


blowering work done:- Feed water station of Unit-1 and 2 all
a) BC-2 motor control valves and MOVs cleaning and
b) BC-2 power JB blowering work done due to dusty
c) Repair supply box condition.
d) LCS panel and VCS panel

Desuperheater station of Unit-1 and 2


Boiler-2 back pressure TX cover was found all control valves and MOVs cleaning
open so fixed it properly on position. and blowering work done due to dusty
condition.

RSB-4 one earthing of panel inside was


found open so reconnected.

Abnormality jobs attended PM Jobs carried


Boiler-1 BAC 1B Level not showing in CCR ,
check both level probe clean and calibrated
but still same problem , inform to check from
DCS. Jeshu-Hozen done at China Yard
Boiler-1, Vessel 11-21, conveying line limit
switch "SV 8141" is in loosen condition , new
bolt provided.
Boiler-1 APH Isolation Valve air Leakage WTP room root blower room motor
arrested cleaning done.
Switch Yard Both Transformer Winding Temp
gauge and oil Level indicator , green and red
marking done.
MT-1, Oil leakage observed so presently clean
the oil from rustolene . ( Sealing to be done
after finding exact position of leakage)

Crusher Building Screen floor , one 24 Volt


LED plug top changed with new one.

Behind CT Fan area MOV Cable tray painting


done (approx. . 30ft X 1ft)

Abnormality jobs attended PM Jobs carried


BC # 6 Belt TPH zero and Span calibration is
done. Also some parameter is changed In CHP T-1/ T-2 Tower field Inst. / JB /
according to old set Value. Now reading are Panel Cleaning and Blowerning to done.
under observation.

In CHP Line # 1 is tripped. So checked and


found that Bucket elevator No. # 1 ZSS Proxy
is not showing at DCS end. So checked and
found that ZSS Controller supply is OK. But
there is large gap between Proxy and Mech.
Wheel. Since Line No. # 2 is started. So we can
not set the Proxy.

Coal Bunker Level -1B is not showing


correctly at DCS . So reset the Power Supply
and Cleaned the The Level Probe. Now Ok.
WTP pump house area motor cleaning
and blowerning to done. Also checked
double earthing . It is Ok.

Abnormality jobs attended PM Jobs carried


CHP Bucket elevator floor field panels
In CHP Line # 1 Bucket elevator No. # 1 ZSS of magnetic seperator , zss, proxy, coal
Proxy is not working at DCS end as per sampling panel found dusty so cleaning
previous shift, So checked and found that ZSS & blowering job
Controller supply is OK. But there is gap
between Proxy and Mech. Wheel so set the
proxyimity switch gap & trial taken working
normal
CHP Screen floor field panels bag filer
Boiler-2 CO analyzer, moisture fault observed, jb, DP tx, manometer, purging sov JB's
checked & reset now ok found dusty so cleaning & blowering
job

Green zone audit points closed in CHP


MCC area:-
a) Nomenclatuure pasted for
equipments
b) Panel door locks replaced

Green zone audit points closed in Lime


stone MCC area and 4.5 mtr room:-
a) Nomenclatuure pasted for
equipments
b) Panel back side power identified and
pasted

Abnormality jobs attended PM Jobs carried

Compressor House Drain Valve for Receiver -


2, Its Drain time was 6 Hrs now changed from Jeshu-Hozen done at both CEP area.
6 to 4 Hrs.
Fly Ash Silo -1, operating panel having poor Drain Pot 2A and 2B Motor Cleaning
cable dressing, Cable Dressing done. done.

One spare Walky found faulty so repaired it.

ACC-1 , Mist System panel having Hole so


packing done with packing tape, and Panel
poelythene covering done.

DT-2 and DT-5, Panel Door Sealing done with


Brown tape.
P&V No-2 , Water Line Leakage and Its Drain
Valve also Choke, Water valve slightly close
and chocking attend.

Abnormality jobs attended PM Jobs carried

Boiler No.-1 SOX analyser Heat trace line MCB In CHP Reclaimer PLC Panel and VFD
Panel Cleaning and Blowerning to
is in OFF Condition. So ON the MCB. Now Ok. done.

Unit No. # 1 Metal Temp. Hole Sealing to done.

LP Dosing Tank Level is not showing at DCS.


So connection Tightness to done also Level
Probe pipe is Properly tight with cable tie.
Now Ok.

As Per MPSS person requirement Trnsformer


HV Side Voltage is low. So Increased the BC-7A and 7B motor cleaning and
excition of Unit No. 3 1 and 2 by Common blowerning to done.
excition system. Now Ok.
Abnormality jobs attended PM Jobs carried
15 mtr PRDS area following equipment
cleaning and blowering done-
1. MOVs
Polythene covering on unit-2 coal feeder's 2. Control Valves
pipe RTD head assembly & cable dressing job 3. Pressure Gauges
4. Transmitters

U#1 TG building 0 mtr floor all MOV,


WTP area AC supply power JB locking & Control valves & field instruments
polythene covering job
cleaning work done.
U#2 TG building 0 mtr floor all MOV,
Control valves & field instruments
cleaning work done.

Green circle abnormlaity point attended in


CHP MCC area :-
a) Spare AC cable dressing work done
b) MCC romm 5313 tag was missing so new ACW Pump house area equipment and
tag pasted cleaning and blowering work done:-
c) One panel earthing bolt was protruding so a) ACW all motors
packed properly with tape and closed the b) MOVS
sharp edge c) Spare motors cleaning done with
cloth
Panic door abnormality closed.
RSB all ELCB tested in ACW pump house and
cleaning done, found all working OK.

Abnormality jobs attended PM Jobs carried

P&V No-2 , Main Blower Motor direct start in Boiler-1, All bunker Level Transmitter
Delta, found Timer malfunctioning change the
timer and start normally. Cleaning done.
Compressor House 3 Nos JB was without Boiler-2, All bunker Level Transmitter
Nomenclature so identified the source then Cleaning done.
standardised sticker prepared and pasted. Shift Hand Blower , Cable was faulty so
1. EnMass-1 Power JB change the cable and made oK
2. EnMass-1 Power JB
3. Lightning JB

MT-1, Oil leakage was clean yesterday to find


exact point of leakage, Found Leakage is form
OLTC valve Spindle, so M seal provide at
leakage point. ( Under Observation)

Reclaimer Boom Left Right drive get trip due


to overload so check and reset
Boiler-2, Bag House 11-21 having minor air
leakage , fitting change and air leakage
arrested.
Abnormality jobs attended PM Jobs carried

SPM Reading are showing high value at DCS


end. So checked at controller side . There is no
alarm in the controller. So checked at Chimney
Top side and found that Receiver Transmitter
SOV side air leakage from PU fitting. So
Replaced the PU Fitting. After this system is
taken in line. after 3 to 4 Hrs actual value of
SPM showing small variation in reading. ( Avg.
30 Sec. Reading ). Presently it is showing 43
mg/nm3. reading are under observation. also
informed to Tarun.
at 4.5 mtr room DT-2 b phase winding temp
goes to 90.3 degree even both P&V was MPDB panel feeders blowring and
running, so start its stopped one cooling fan. cleaning done
Now temp lowered.

Green circle points of 4.5 mtr


completed as:-
4.5 mtr P&V-2 Fan one belt found dislocated 1) AHF-2 cooling duct painting done
and other two belts found loose, so stopped with aluminium paint.
the P&V.
2) Rubber mat provided at back side of
ACW-1 VFD panel

Abnormality jobs attended PM Jobs carried


Boiler-2 sox analyzer was in fault due to low Boiler-1 APH conveying field JB
sampling, purging done & after set the flow cleaning & blowering done
through rotameter now ok
Boiler-1 11-21 conveying field JB
cleaning & blowering done

Boiler-1 12-22 conveying field JB


cleaning & blowering done

Boiler-1 Bed ash conveying field jb


1A&1B cleaning & blowering done
Boiler-2 APH conveying field JB
cleaning & blowering done
Boiler-2 11-21 conveying field JB
cleaning & blowering done
Boiler-2 12-22 conveying field JB
cleaning & blowering done
Boiler-2 Bed ash conveying field jb
2A&2B cleaning & blowering done

Green zone audit point closed for CHP MCC


and Limestone MCC room :-
a) CPR kit tagging done DT-2 B-phase temp checked and noted
b) Arc flash suite hanger tagging
c) Cable JB hole packing done properly found 81 deg C at morning.
d) Limestone AC cable dressing
e) Panic door abnormality

Both Generator voltage found variation,


DT-1 front side air duct polythene covering so excitation was adjusted and
done as it is now in stopped condition.
equalised.
Security tower lights not glowing so found
timer stucked so corrected the same.
Abnormality jobs attended PM Jobs carried

coal feeder 1A outlet MOV(905) not operated switch grass removing work done in
from DCS and its limit not coming in DCS, so
check and rectify the problem and set the limit morning

coal bunker -1D level found disturbe, so clean Following substation cleaning done:-
1 4.5 mtr switchgear room
the level sensor and reset it now level shown 2 4.5 mtr MV drive room
correct. 3 BFP MV drive room

Green circle points of 4.5 mtr CHP MCC


in chimny analyser room sox chiller temp completed as:-
shows high, so check the chiller system but 1) Arc flash boundary sticker pasted
underprogress from AC technician side. where missing in middle portion (4 ,17)

Abnormality jobs attended PM Jobs carried


Boiler-1 soot blower no. 14 was not operating
so checked found motor was Ok but on WTP area following equipment cleaning
command main MCB trip. So checked local and blowering work done:-
panel and found start PB and selector NO a) DCS panels in WTP toom
command was faulty so replaced with new b) Protection cabinet panel
one and trial taken with operation now c) MOV feeders
running OK.

Recliamer travel limit at bottom was acted WTP hall all 3 VFDs of high pressure
near cable trench so checked the limit pump panel cleaning and blowering
operation found OK and proper positioning
also done. work done.

Reclaimer RSB no. 96 panel door earthing Comp auto drain manual operation
cable was opened so new nut mounted and
connected. checking work done.

Recliamer PCRD cable new motor trial taken,


taking 3.0A balance current and cable rolling
checked later also found OK.
Abnormality jobs attended PM Jobs carried

In Chimney analyzer room, Unit No. #


1 Boiler SOX analyzer Chiller Unit MCB
and Pump MCB is in OFF Condition. So In Chimney analyzer room, All
ON the MCB. Also Inlet and Outlet the Panel / JB / window / PC
Tube of the chiller Unit is Opened Cleaning and Blowerning to
condition. So connected it and taken in done.
line. Now reading are under
observation.

In Unit No. # 2 Firing Floor area ,


flame Scanner cable dressing to
done.
Green circle abnormality point
attended :-
a) Switch yard Lightning JB having
hole filling done.
b) Safety Hand Gloves missing behind
Boiler MCC , so Safety Hand Gloves
arrange at the location. ( 2 Locations)
c) "Rat Catcher Solution " Sticker
prepared and pasted at 4.5 Mtrs

Unit No. # 1, ACC Fins Cleaning trolley


sticker came out from JB, Properly
pasted again with transparent tape.

Boiler-2, Coal feeder area lights made


on as per requirement.
Boiler-2, zero to 5th Floor lights made
on as per requirement.

Abnormality jobs attended PM Jobs carried

BC-4 megnetic saperator tripping problem, so switch grass removing work done in
cheked it working normally morning
Following substation cleaning done:-
1 CHP MCC room

Green circle points


(13,18,29,56,64,65)of 4.5 mtr CHP MCC
completed as:-
1) Un wanted Description on Lightning
Power Change over switch, description
painted with blue
2) Mobile platform marking is just in
front of Lightning Change over switch,
This marking is painted with blue color
3) Structure painted as getting rusted
in CHP
4) Provide pushbuttons and indications
replaced in spare feeder
5) Broken SFU replaced in spare feeder
in CHP

silo top panel blowring and cleaning


done

Both CEP area instrument equipments


cleaning done as:-
1) all MOV
2) all pressure gauges

Abnormality jobs attended PM Jobs carried


ACC-2 LDB found gap so sealing done with Boiler-1 APH conveying field JB
packing tape cleaning & blowering done

Reclaimer light manual switch cable found Boiler-1 11-21 conveying field JB
hanging so dressing done cleaning & blowering done

DT-5 & DT-2 panel gaps sealed with packing Boiler-1 12-22 conveying field JB
tape cleaning & blowering done
Compressure house water cooler ELCB green Boiler-2 APH conveying field JB
tag not found so provided cleaning & blowering done
Unit-2 APH control supply MCB got tripped, Boiler-2 11-21 conveying field JB
no problem observed so reseted again cleaning & blowering done
Boiler-2 12-22 conveying field JB
cleaning & blowering done
Field JB polythene covering on AC
supply, back side of workshop mv drie

Abnormality jobs attended PM Jobs carried


Unit No. # 1 BAC VFD panel and
In WWTP DCS Panel No.- 88 M BRC Unit No. # 2 BAC VFD Panel
Comes in fault mode. LED No.- 2 and 4. Blowerning and Cleaning to
So reset the Card. Now Ok. done. Also Panel Filter cleaning
to done.

In IAC No. # 1 Service required alarm


at Local Display panel. So reset it. Now
Ok.

Boiler No.-1 SOX analyser Heat trace


line MCB is in OFF Condition. So ON
the MCB. Now Ok.
Green circle audit abnormality point
attended at WTP MCC Room :- CHP MCC "Cabinet No- 5314"
a) Jockey Pump VFD Panel having having hole inside panel, hole
unwanted naming , So Painting done covering done with glass putty.
(Nomenclature pending as panel is
wet)
b) Checker Plate inside MCC Room
Having side by gaps, Brown tape
provided and cover complete gaps.
c) Another Checker plate have sharp
edge that may injured any one ,
direction of checker plate change.

During Shift Round Fire pump house


lights found ON, switch OFF the lights.

Abnormality jobs attended PM Jobs carried

ACC-2 trolly-2&4 top limit switches not


working , so checked and found that its one Reclaimer VFD blowring done
limit switch got corroded and other got burnt,
so replaced both limit switches.
ACC-2 RSB door lock found damaged so Reclaimer motor panel blowring done
repaired it
CT fan area lighting JB covring done
with polythen

Boiler-2 lift checked working normal,


amd its door sensor cleaning done

Abnormality jobs attended PM Jobs carried


ACC misting system power not getting at field WTp dcs panels all termination &
JB checked found off at 4.5 mtr , switch on the module panel units cleaning &
feeder. blowering done

Following Green circle point


attended
Chimney analyzer calibration tag pasting job 65- Lime stone tile damage,
72-Earthpit gap
73-Cable dressing at switch yard JB

Gland leakage attaended of control valve


01TCV3203
unit-2 APH dome valve stucked so reset the
coil supply afterwords normal

BC-4 pullcord showing at dcs checked at field


side found supply not getting so checked at
dcs found wire broken, re-connected now ok

Coal feeder -1D open limit not showing at dcs


so checked at field side found plate valve not
fully opened so informed to ccr, hammering
done now ok
Abnormality jobs attended PM Jobs carried

In Online CPCB website ETP TSS data


is not showing . So checked at Panel In Unit No. # 1 Firing Floor
side all the Isolator Connection area ,JB and Field Inst.
tightness to done. Now it is showing Blowerning and Cleaning to
online. Reading are under done.
observation.

in Boiler No.-1 SOX analyser Showing In Unit No. # 2 Firing Floor


zero flow in rotameter. So checked area ,JB and Field Inst.
and found that moisture fault in the Blowerning and Cleaning to
Controller. So cleaned the Moisture
done.
filter. Now ok.
ACC-2 , Mist System Motor get trip due Unit-1 AHF Panel , Heat exhaust
to over current , so check and reset. duct get rusted , painting done
( Motor running current -29 Amp) with silver color
Motor Rating - 37 KW,
Max Current- 63 Amp,
Jockey Pump-1 VFD Panel
standardized stickering prepared and
pasted

Boiler-2, RSB No-33 found Panel door


broken , new panel door provided.

ACC-1, All lights trip suddenly found


during Fins Cleaning water hits the
lights , so reset the Lightning supply.

Abnormality jobs attended PM Jobs carried

Boiler-2 APH conveying system MCB found


trip and not reset, so megger the system found
wiring fault, so checked the wiring fault found BFP motors cleaning and blowring done
in APH level probe cable wiring fault, so
insulate the probe wiring properly , made
MCB On normal
ACC-2 misting panel door found open and CHP MCC room and rubber mate
water spray coming towards panel, so Lock its cleaning done with surf powder and
door and cover the panel with polythene rustoline

Boiler-2 APH conveying system level prob


gland found loose so tight it properly

boiler-1 ground floor welding JB gland hole


packing done
at coal feeder welding machine green tag
found expired, so change it

Abnormality jobs attended PM Jobs carried


Air leakage observed at Bed ash silo wet PM07 order closed-TPI
system water valve so arrested

Car parking lighting JB cover found hanging Bed ash silo wet system pneumatic vlv
due to one side bolt missing, so arrange & open & close limit switch installation
provided job

TPP wprkshop grinder not running found plug Bed ash silo wet system pneumatic vlv
top damaged so replaced with another one open & close limit termination & wiring
now ok at panel side
ACC-2 misting system trippied on overload
checked found taking 40Amp so informed to T1 tower bag filter vfd panel cleaning &
ccr to reduce the valve blowering job

Boiler-2 soot blower-13 no. not operate due to CHP AHF panel & filter cleaning &
power fault at panel checked & rested now ok blowering job

TG-2 oil centrifuse low oil temp alarm


appeared so reset it,now ok
Abnormality jobs attended PM Jobs carried
PTW master list updated for entire CPP
Moisture drain fault of SOX analyzer so clean function for Custodian, Issuer, Isolator
the filter and reset the same. and Initiator and emailed.

Green zone point updated for CHP MCC :- Crusher building all E&I equipment
a) Fire extinguisher old tagging omitted from cleaning and blowering done due to
inside MCC. dusty condition :-
B) Glass broken so fixed with packing tape. a) Screen floor
b) Bucket elevator floor
c) Crusher floor

Green zone point updated for Limestone


MCC :-
a) One dummy plate rusted so painted black.
B) Window Glass broken so fixed with packing
tape.
C) Door lock replaced.

Abnormality jobs attended PM Jobs carried

Coal Feeder 1B , Pneumatic valve open Jeshu-Hozen done at Coal Feeder 1 & 2
feedback problem , found Limit switch Lever
alignment disturbed , lever adjusted done . area.

Fins Cleaning pump discharge line , Pressure


Gauge having water leakage , leakage arrested CEP-1B , Mist water falls on Motor JB
done. Canopy, JB cover with Polythene.
Boiler-2, CCTV Camera covered with canopy as Boiler-2 , Firing floor Cable tray Cable
per Instruction dressing done
Boiler-1, Coal Feeder Sealing air pressure
malfunction , Pressure transmitter "01FIC
0205" Line flushing done.
Fly ash Silo-2, Plate valve is not operating due
to level high indication, Fork Switch Cleaning
done.

Unit-1 BAC interconnection valve (01SV1902)


not opening from DCS, check and found air line
valve closed , ON the air line and made it OK.

Boiler-2, RSB no-29 Inner door earthing found


damage , re earthing done.

DT- Temp @ 13:00 hrs


DT-2- 70 degree
DT-4 - 78 Degree
DT-6 89 Degree

ACC-2 misting system trippied on overload


checked found taking 54 Amp so informed to
ccr to check further.
Abnormality jobs attended PM Jobs carried

In Silo No. # 2 Bag filter controller ( SV-8164)


ON feedback is not showing at DCS end. So
checked at DCS end. So found that DCS TB
Side. Connection is loosen condition. So
tightness done. Now Ok. Also OFF Feedback is
not showing at DCS end. Found that DI
Channel is not generating 33 Volts. Channel
faulty. So Informed to Mr. Tarun.

In CHP DCS Panel No.-91 M BRC Changed over


from Primary to Secondary.

In CHP DCS Panel No.-94 M BRC Changed over


from Secondary to Primary .

In Conference Room AC No. # 2 one earting is


broken condition. So reconnected it. Now Ok.
In Unit No. # 1 Soot Blower No.-11 Checked at
Local side. Its contractor is Pick up but Motor
Not stared. May be Gear Box Jammed Unit No. # 2 Mist. Fan polythene
Condition. So Informed to shift Inchrage. Also Covering to done.
Motor wire removed from Soot blower Panel
side. Fire Pump House Motor Cleaning to
done.

Abnormality jobs attended PM Jobs carried


in fire pump house charging panel earthing CHP dcs all module & termination units
found loose, so tight it panel cleaning & blowering job
At air receiver auto drain valve less output
during manual testing filter found chocked so CHP I&C power distribution & console
cleaning done panel cleaning & blowering job
Unit-1 TG building 0 mtr field
equipments, mov's , control valves
cleaning
Unit-2 TG building 0 mtr field
equipments, mov's , control valves
cleaning

Pump house area equipments cleaning


and blowring done:-
1) all portable water and jockey pump
motors
2) battry charger panel and its charger
3) battary
4) Ehaust fan JB
Abnormality jobs attended PM Jobs carried
BC-4, Hooter not hooting while belt start up, at
site Remove the hooter and trial it with Jeshu-Hozen done at BC 7A and 7B area.
external single phase power, It is working OK,
further need to check from DCS.
DT- Temp @ 13:00 hrs
Fly ash Silo-2, Showing incorrect level, check DT-2- 74°C ,
the level transmitter and change it with Bed DT-4 - 78 °C ,
Ash Silo Transmitter but still showing incorrect DT-6 -85 °C ,
value, Safe inform to Inst. Team found problem
is form DCS. Rectified and solved

BC 7A, At Motor end , Pull Cord rope found


loose and rope holder also damage ,so tie the
pull cord and holder properly.
BC 7A , Plug discharge Local Push Button found
poor cable dressing, Proper cable dressing
done.

BC 7B , Plug discharge Local Push Button found


poor cable dressing, Proper cable dressing
done.

BC-5, Tunnel 24 Volt Hand Lamp Changed.

DT-6 , DT temp reached to 81°C , So exhaust


Fan made ON, CHP MCC AC not cooling to be
check.

Abnormality jobs attended PM Jobs carried

In CHP BC-4 Tripped due to Belt tare . So


checked and found that Belt Plate is unblance
due to wind. So informed to the shift incharge.

In Chimney analyzer PC is hanged condition.


So Restart the PC. Now Ok.
In WTP UF # 1 FT-4901 Outlet Flow is
showing negative Flow. So checked and found
that High side impluse line showing less Pr. As
compare to low side Impluse line. May be
chance of Orifics chocking condition.

In BC-4 Hooter is not Ok. So opened the hooter


and Cleaned the carbon brush and checked in
inst. Lab found that Ok. So installed at site.
Trial taken it is not working Condition. So
checked at DCS end connection tightness in
DO TB. One wire having 240 volts wrt ground.
while other wire having 150 Volts to ground.
wiring to check. Inform to Purshottam.
Abnormality jobs attended PM Jobs carried
Bed ash silo level TX LT-8202 showing zero Bed ash silo all field JB's, panel & field
value at dcs so physical checked , TX removed equipments cleaning & blowering job
from field , power reseted & cross check for
sensor working for high & low side , it was ok
so infromed to ccr.
Fly ash silo-1 top bag filter panel gland hole Fly ash silo-1 all field JB's, panel & field
sealing done with packing tape equipments cleaning & blowering job

Fly ash silo-2 all field JB's, panel & field


equipments cleaning & blowering job

Bed ash silo level TX LT 8202 removal


& sensor cleaning job

Coal feeder-2B clean run motor tripped on


overload so checked motor resistance found
balance 57ohms and megger value OK. Motor
TB opened and all tightness checked found
OK. So started again found current increasing
above 1.8A, need to check gear box and in Enmass conveyor-1 feeder checking
decouple run motor. and maintenance work done, all control
and power termination tightness done.

Soot blower-2 all motors in


2,4,6,8,10,12,14,16 checked found
following abnormalities:-
a) 12 no both earthing found loose so
tightness done.
B) Cover of 14 motor was hanging so
properly placed.
Abnormality jobs attended PM Jobs carried
Boiler-1, Soot Blower No-11 , tripping DT- Temp @ 13:00 hrs
continuously, so decouple the motor and trial DT-2- 74°C ,
taken in local , motor is running smoothly and DT-4 - 78 °C ,
takeing 0.5 Amp. Inform To Shift In charge ,t DT-6 -85 °C ,
hen disconnect the motor and kept nearby for
Maintence checking work.
Connection Details - R-Y-B ( From DE Side)
At 10:00 AM Reclaimer get trip due to
Reclaimer Power Fail Check and found Pump house area equipment's cleaning
Reclaimer ACB " Breaker trip on Zero Sequence and blowering done:-
fault" check and reset fault and Charge the 1) MOV-5 Noc
Breaker , But Reclaimer not healthy found 2) Transmitter-4 Nos
Reclaimer Control also fail found UPS trip 3) Pressure Switch - 15 no's
Restart the UPS and ON the Control Power. 4) Pressure Gauge - 5 Nos
Reclaimer Trial Taken working OK.

Coal Feeder 2B , Clean run Motor getting trip


due to Over load since previous shift , so de-
couple the motor with maintenance team and
trial taken found Motor is Ok and taking
normal current 0.6 Amp.

Coal Feeder 2B Clean Run Motor Connection


open and re connection done as per
requirement.

Coal Feeder 2B , Feeder outlet "MOV 02MV910",


not operating from DCS , so operate it manually
with manual wheel then operate from Remote
working OK.

TPP Biometric Machine not communicating as


per ER person, tighten it RS-485 Com-port .

Boiler-1, SOX analyser flow low showing in roto


meter, moisture cleaning and reset controller ,
now OK
Abnormality jobs attended PM Jobs carried

In BC-4 Hooter is not Ok. So Checked and field


side in Contrctor Potential free contact NO is
not working condition. So we have used the
Spare NO Contact. Then we have shorted the
DCS wire TB at field side. Then hooter is Unit No. # 1 Firing Floor area JB
working condition. when BC-4 Belt is started cleaning and Blowerning to done.
then hooter is not ok. Then check the DCS wire
continutity with field wire . it is not showing
the continutity. wiring to check.
In Chimney analyser Boiler No. # 1 SOX
analyzer Heat trace line MCB is in OFF Unit No. # 2 Firing Floor area JB
cleaning and Blowerning to done.
Condition. So ON the MCB . Now Ok.

Unit No. # 1 Coal feeder -1B level is not


correctly showing at DCS end. So reset the
Power Supply. Now Ok.

Boiler-1&2 motors blowring and


cleaning done, with blower and wire
silo RSB JB protection cover found damaged, brush:-
so remove it from RSB 1 ID-1&2
2 PA-1 &2
3 SA-1&2
4 J valve all motors

Boiler-1 soot blower motor 16 body found


with dusty oil so clean it with cloth

Abnormality jobs attended PM Jobs carried


Coal feeder -2C pneumatic valve open limit PRDS area all field equipments , mov's
protection cover was not in place so fix it with & control valves cleaning & blowering
bolt & covering done job

At Compressor house IFC panel both regulator Unit-2 coal feeder area 2A field
cum filter unit moisture observed so flushing equipment's, jb's & sov's cleaning &
done blowering job
Chimney analyzer boiler-1 SOX analyzer Unit-2 coal feeder area 2B field
sample line flow was less so flushing done & equipment's, jb's & sov's cleaning &
flow adjusted through rotameter now ok blowering job
At unit-1 dcs side panel console one cooling Unit-2 coal feeder area 2C field
fan making noise checked found jali was loose equipment's, jb's & sov's cleaning &
so tightness done now ok blowering job
Unit-2 coal feeder area 2D field
equipment's, jb's & sov's cleaning &
blowering job
Boiler-2 all of four Bunker outlet mov's
cleaning & blowering job
On soot blower checking found that soot TG building 0m area found punch
blower no.11 of Boiler-1 checked found the machine top LED light was off, someone
motor end shield long bolts(3nos.) threads
worn out so motor is vibrating when run. So has off the switch. So nomenclature
connection removed from panel end and rest done for all the 5 switches and display
board tagging also done.
power made healthy.

Boiler-1 Soot blower no. 15 and 16 checked as


per abnormality found working normal and no
any bolts loosened.
Coal feeder of both Boiler-1 and 2 all 4 8 clean
run motors and 8 main motors cleaning and
blowering work done.

Abnormality jobs attended PM Jobs carried

ACC-2 light switch removed and install the BC-5 belt feeder VFD blowring and
other switch now, lighting controlling with
switches normal cleaning done

soot blower-13 damaged motor removed, and Instrument lab cleaning work under
installed other motor inits place, trial taken progress
running without vibration

Reclaimer breaker trip in earth fault, so


checked its cable no damage found in cable, so
reset it , now running normal

AFR breaker trip in overcurrent Ir1 at 1.45


p.m, found that machine jamming at AFR site ,
so informe the MPSS and reset the breaker.
Abnormality jobs attended PM Jobs carried
Soot blower no. 13 motor repaired and Jockey pump-1 pressure gauge needle
installation done, connection done and trial was broken so replaced gauge with new
taken working normal. one.

Limit setting done of soot blower no. 13. Boiler-1 TX feed water station gland
hole open so packing done with putty.

Reclaimer trip on earth fault, so checked


found the sprinkler motor showing megger New sanitizer preparation work under
zero with ground so motor connection
removed from relay output. Need to check the progress with Mr. Purushottam.
cable in morning.
Soot blower-11 and 13 motor double earthing Unit-2 misting panel covering done
work done. with polythene.
RO booster motor stopped after sometime
when run, so checked found the timer delay
relay was faulty so replaced with new Omron
relay. Then trial taken found OK.

Abnormality jobs attended PM Jobs carried


In IAC No. # 1 Service required alarm In Unit No. # 2 BAC-2A / 2B Flow
at Local Display panel. So reset it. Now switch Polythene Packing to
Ok. done.

In CHP Bucket Elevator No.-1


in Service Air Compressor No. # 2 and 2 ZSS Controller , BC-6
Showing alarm in local display. So
checked and found that EPB is Pressed Magnetic Seperator , Crusher No.
# 1 and 2 RTD and Vibration JB
condition. So informed to shift Blowerning and Cleaning to
Incharge.
done.
RSB 81 & 82 all ELCB manually trip
check at crusher Building Zero Root Blower Panel all
Meters and cleaning done, found all Termination Tighten done
working OK.

RSB 81 , Inside Panel door having Root Blower Room all Motors
hole , hole packing done with brown and panel cleaning and
tape. Blowering done.

TG Building Exhaust fan Panel


inside and outside cleaning done
and all termination.
Abnormality jobs attended PM Jobs carried

Oil centrifuse-2 Low alarm temp coming in


Cleaning of WTP MCC room and Elct.
stop condition, so Set its Low temp. setting to Workshop done
15 degree, now under observation

Checking of faulty welding machine


done as:-
Bed ash cooler1B water valve actuator air 1) welding machine -7 cheked and
leakage found, so check and replace its made ready, also tight its output
damaged tube fittings terminal and put new plug top in the
machine. Clean the VRD contactor and
relay

Boiler-1 bed material RAV panel


Bed ash cooler1B temp switch cable found cleaning done as:-
1) MOV and SOV valve cleaning done
hangigng, so its cable dressing done in
channel 2) actuator cleaning and gland packing
done
3) Regulator cleaning done

Abnormality jobs attended PM Jobs carried


Boiler-2 DSH control valve TCV3203 gland Boiler-1 feed water station all of 03
no's control valves cleaning &
leakage observed so tightness done now ok
blowering job

WTP bomb calorimeter PC not booting so


checked with G-shift team, RAM, tablet cell & Boiler-1 DSH station all of 04 no's
power supply checked but still probem is control valves cleaning & blowering job
there-job is U/P

TG-2 enclosure light new two way switch Boiler-1 soot blower panel cleaning &
installed as previous one was damaged- blowering job
Completed
Boiler-2 feed water station all of 03
no's control valves cleaning &
blowering job
Boiler-2 DSH station all of 04
no'scontrol valves cleaning & blowering
job
Boiler-2 soot blower panel cleaning &
blowering job
Boiler-1 ID, PA, motor cleaning &
blowering job
Boiler-2 ID, PA, motor cleaning &
blowering job

Abnormality jobs attended PM Jobs carried


In WTP UF SOV Box , ACF SOV Box ,
In Unit No. # 1 Fly ash system Vessel No.-11 MGF SOV Box , Mixed Bed Exchanger
High Level Probe Cleaned and Calibration to SOV Box Blowerning and Cleaning to
done.
done.
In Unit No. # 1 Fly ash system Vessel No.-12
High Level Probe Cleaned and Calibration to
done.

In WTP DM Water RO Discharge Pump Double


earthing is Provided.

Main Transformer -2 , Oil Filtration Unit


having oil leakage for filter , so clean the filter
and oil clean done which was accumulated
inside panel.
Watch Tower-2 behind switch yard , light not
glowing found its lightning timer get stuck up
so reset the timer and made OK.

At Switch Yard Earth Pit No-8, Due date


sticker missing so sticker pasted done.

For Switch Yard Following color Sticker


prepared and Pasted-
1. Transformer-1 OLTC Silica Gel
2. Transformer-1 Main Tank Silica Gel
3. Transformer-2 OLTC Silica Gel
4. Transformer-2 Main Tank Silica Gel
5. Watch Tower-2 Silica Gel
6. Car Parking Lights

Abnormality jobs attended PM Jobs carried


Oil centrifuse-2 Low temp alarm point check Boiler-1&2 SA fan motors cleaning &
working normal- now ok blowering done

At 4.5 mtr area gland hole observed at exhaust TG building area at 4.5 mtr floor unit-
fan starter JB so sealing done with putty & 1&2 all mov's & control valves cleaning
packing tape with marking cloth & blowering job

Boiler-1 gauge glass WTP side bi-color port


power supply TB connector damaged so new Unit-1 Boiler-1 drum area field
terminal provided & fixing equipments cleanings

Boiler-1 gauge glass switch yard side bi-color


port power supply JB gland found loose so re- BFP-3 motor cleaning & blowering done
fix the gland & tightness done

GSC-1A motor fan cover & earthing wire found Boiler-1 soot blower control valve,
mov's & drum gauges & startup vent
loose so tightness done now ok two no's of mov cleaning job

Abnormality jobs attended PM Jobs carried


Reclaimer Shut down give from Breaker
T2 , Tower Motor JB and Repair
during time being UPS Backup power
Supply Box Cleaning and blowering
drain, so Reset the UPS power and ON done.
control power.
P&V No-4, Water pump JB have hole inside Boiler-1 Lift all floor readiness
so hole packing done with Silver tape. checking done found OK.
CHP Cable Cellar Room Exhaust Fan found
ON so OFF the Fan and remove its Control Boiler-2 Lift all floor readiness
checking done found OK.
Relay.

Comp. House and Rest Room Exhaust Fan Boiler-1 Lift Telephone not working
also found ON so OFF the Fan and Taken found telephone cable broken ,
out its Control Relay. rejoint the cable and trial taken.

Workshop Welding Machine BC-7A and 7B Bag Filter panel


VCW/TPP/WM-3 having lug damaged , cleaning blowering done and panel
Attended and trial taken. seal with packing tape.

Plant Street lights get ON during sun shine,


so lighting ON Timing adjusted from 6:30
PM to 7:00PM-
1. Compressor House
2. WTP China Yard Street Lights
3. ACC 1& 2 Side Street Lights.

Boiler-1 SOX analyser having sample


problem found its filter so by bass the filter
and made OK ( Done by G shift Inst Team)
Abnormality jobs attended PM Jobs carried

In Compressor House water cooler Unit No. # 1 and 2 Coal feeder


Body eathing to done. Load cell purging to done.

Unit No. # 2 APH Slave Vessel Dome


valve PU Tube fitting air leakage
found. So PU Tube fitting changed.
Now Ok.

In Unit No. # 1 MV925 MOV Cover is


not Present. So MOV Cover is
Provided.
Turbine ETS Server trend is not
showing. So restart the Programme.
Now Ok.
Boiler-1 RSB ELCB 3 nos not ON
properly so clean the ELCB with CTC Boiler-1 RSB cleaning done as:-
1) RSB-1,3,4,5,6,7,8
and made it working properly
Boiler-1 RSB ELCB checking and
cleaning done
Boiler-1 & 2 lift checking done
for operation for all floor
working normal.

Abnormality jobs attended PM Jobs carried

Boiler-2 bed material RAV power supply


found in off so made it ready : 12mcc
Jishu Hoizen done at ACW pump
5325-A, motor trial taken found RAV in
house,side stream filter & CT fan
jammed condition so informed to ccr
area
team for RAV cleaning or decouple the
motor their job is U/P

Boiler-2 sox analyzer low sample ACW-3 vfd panel cleaning &
observed maintenance work is U/P blowering job
Boiler-1 lift all floor cleaning done-
Kanha

ccr dcs, wtp dcs,chimney analyzer


room cleaning done by nepal

Abnormality jobs attended PM Jobs carried


Crusher floor Bag filter JB found without T3 area motor JB and RSB cleaning
proper earthing so relug it done

at 4.5 Mtr Danger sticker pasted for


415 volt and 11000KV total 27 nos,
Silo Roots blower feeder found jam during
replace the old white color sticker
racking, so clear its Jam
from distribution transformer and
VFD panels.

BAC-2B dome valve open and close limit


not showing, so checked dome valve boiler-1&2 lifts checking done for
found Jammed, so after clearing jam limit all floors found normal
came

coal feeder-1D plate valve limit not


coming , so found limit wire broken from BAC-2B level probe cleaning done
inside, so joint the limit wire and made it and calibrate it
healthy.
BC-5 all instruments panel cleaning
and blowring done
Abnormality jobs attended PM Jobs carried

Inst Comp-1 found in fault during shift,


checked incomer power OK. From VFD
checked found Fault-66 Cooling fault coming SWAS room all panels of Unit-1 and 2
as ambient temp was high(40 deg C). Found cleaning and blowering work done as
the AC in room was in blower mode, so panels are found dusty.
normalised the mode in AC and maintained
room temp then reset the fault, now OK.

SWAS room following abnormalities found :-


a) Inlet pH meter cable hanging so dressing
done.
B) Outlet condensate pump pH meter cable UPS and battery units of STG lift in
hanging so dressing done. SWAS room cleaning and blowering
work done.

Welding JB in Boiler-2 3rd floor door was CEP-2 area all both motors and misting
opened so closed it and sealed. motor and local panels cleaning and
blowering work done.
AFR breaker was trip from last shift so after Improvement project and Reliability
MPSS approval started at 10:30pm. points send and updated.

Wrong power source was found in Bucket


elevator RAV panel of Boiler-2 so corrected
the tag. RSB checking and cleaning and
blowering done for ACC area.
Dosing room panels cleaning done with
brush and clothes.
Both generator excitation adjusted as
per MPSS requirement of voltage at HV
side.
Chimney analyzer new O2 sensor
installed & check ,For Zero & span
Calibration , Also Check Sox, Nox,& CO in Jishu Hoizen done at BC-7A &B,
new spare anlyzer , After checking
previous chimney analyzer take in line.

VAM system got tripped on High temp.


vapour gen. due to load in crease on Tg-1
& dec. at TG-2 . SO All Mv drive AC made Coal feeder area one welding M/C
earthling provide.
On, VAM start again at 2:00 Pm . Please
resume Ac status when temp. normalized.

Bucket elevator -1 Put in Local mode as LS & Chp building cable celler floor
per operation request. cleaning done-Kanha

Both boiler lift checking done at each floor CCR dcs, wtp dcs,chimney analyzer
working normal room cleaning done by nepal
Abnormality jobs attended PM Jobs carried
All the AHU System taken in line from
manual to Auto mode.

Unit No. # 1 Vessel No.-11/21 back Pr.


Transmitter , Back Pr. Switch and Seal
Pr. Switch impluse line is heavily
chocked condition. So cleaned the
impluse line. Now Ok.

BFP # 1 Oil Tank Level Showing Low


at DCS end. So checked and found that
moisture in Contact / TB. So cleaned
the TB and tightness done. Now Ok.

Unit No. # 1 Vessel No.-21 HH Level


Probe cleaned as per operation
requirement. Now Ok.
Abnormality jobs attended PM Jobs carried
PM07 order-TPI list generate in SAP Boiler-1 APH conveying field JB
system & closed up to 17.04.2021 cleaning & blowering done
Boiler-1 CO vent got open without giving
command checked the same & tightness Boiler-1 11-21 conveying field JB
in sov connector, manually operation cleaning & blowering done
checked & taken in line.
SOX analyzer-1 moisture fault observed Boiler-1 12-22 conveying field JB
so clan the sensor & again taken in line
cleaning & blowering done
now ok
Boiler-1 drain valve all 06 no's of
Crusher-1 Energy meter display got
mov cleaning & j-valve 03 no's of
hanged, so OFF meter power and reset it.
mov
RSB-13 no one 3phase ELCB not tripping,
Boiler-2 APH conveying field JB
so clean it with CTC and now it is tripping cleaning & blowering done
manual
Boiler-2 11-21 conveying field JB
cleaning & blowering done
Boiler-2 12-22 conveying field JB
cleaning & blowering done
Boiler-2 drain valve all 06 no's of
mov cleaning j-valve 03 no's of mov
cleaning & blowering

Boiler-1 RSB maintenance done for


RSB-9,10,11,12,13,14,15,16,17
1) RSB JB cleaning done
2) ELCB Cleaning with CTC
3) ELCB tripping checking done
4) socket power and earthing
checking done

Abnormality jobs attended PM Jobs carried


Unit No. # 2 CO analyzer Preventive
maintences to done.
Unit No. # 2 APH / Vessel No.-11/21
and Vessel No.-12/22 SOV JB and
field Inst. Blowerning and Cleaning
to done.
Crusher floor Field Inst. / JB / Motor
Cleaning to done.
Crusher floor RTD JB Cable Dressing
to done.
Abnormality jobs attended PM Jobs carried
BC-4 belt pullcord showing at dcs (10 no) BC-7A &7B area 2A, 2B, 2C & 2D
checked at dcs side this group is not in use coal bunker bag filter panels &
so removed the wire from 93-3A-TB3-5,6 plough discharge field panels
now ok cleaning & blowering job

Crusher floor bag filter VFD rpm BC-7A &7B area 1A, 1B, 1C & 1D
increased as per operation team coal bunker bag filter panels &
requirement from 23 Hz to 35 Hz, running plough discharge field panels
normal cleaning & blowering job
Security tower lights not glowing so found Pump house area battery charger
panel , field equipments & motors
timer stucked so corrected the same.
cleaning & blowering

Abnormality jobs attended PM Jobs carried

Coal feeder-2B open limit not coming ,so Enmass conveyor-2 feeder checking
adjusted the limit position in proper place and and maintenance work done, all control
made it healthy. and power termination tightness done.

Boiler-2 soot blower-13 earthing found loose Soot blower-2 panel checking and
so tightened the same. terminal tightness work done for all
power and control contacts.

Coal feeder-2B close air hose pipe side air Soot blower of Boiler-2 checking and
leakage so leakage arrested. motor end cover bolt checking done for
1,3,5,7,9,11,13 and 15 done.
Boiler-2 coal feeder 2A,2B,2C and 2D all
pneumatic open and close limit switches, SOV
panel, RTD, outlet MOV cleaning and
blowering work done.

Boiler-2 all coal feeder discharge MOV


cleaning and blowering work done.
Instrumentation lab, Calibration Boiler-2 PA,SA ID,J valve 2A &2B,
information board updated. cleaning & blowering work done.

Boiler-1 furnace bed densty 01PIC1101 Boiler-2 Zero mtr. floor Panels & JB
impulse line cleaning done. cleaning work done.
Crusher building PA system 235 receiver BC-1 & BC-5 VFD panels cleaning &
& JB both cable gland was open , so
blowering done.
packed the same.
BC--1,BC-2,BC-3 , & BC-4 tail end guard
rope tightness done.
BC-1 & BC-5 VFD panels cleaning &
blowering doene.
RSB-24 single pole 230V ELCB not
working, Need to replace ELCB.

Security tower lights not glowing so found


timer stucked so corrected the same.

ACC-2 light timer found bypass, so take in


line.

Abnormality jobs attended PM Jobs carried


Street light pole TB checking and faulty
Coal feeder-1D air line of purging point found TB replacement work is under
some length of PU tube damaged and progress:-
puncture, so that portion cut and then tube a) Pole no. 43 - 2 TBS
reconnected, now OK. b) Pole no. 43 - 1 TBs
c) Pole no. 44 -- 2 TBs

Faulty ELCB of RSB-24 found one of single PRDS floor all 6 control valves, MOVs
phase so maintenance work done and cleaned and RTDs condition was found dusty so
the TB and then corrected. cleaning and blowering work done.
Coal feeder of Boiler-1 equpment cleaning
done for:-
a) Open and close limit switches All auto drain valve checking and
b) Bunker outlet MOVs manually operation work done.
c) Feeder outlet MOVs
d) RTDs

One ELCB replaced at RSB-24 which was


found faulty and not operating so replaced
with spare.
BFP-2 lube oil pump motor-2B fan cover bolt
was loose so tightness work done.

MPSS hotline telephone not working, checked


connector and interchanged phone also but
still dial tone not coming so informed Ranjit
Chouhan, he will attend tomorrow.

Abnormality jobs attended PM Jobs carried


Unit No. # 1 vessel no.-12 Seal Pr. Is In BC-6 area Bag filter Panel ( 02
not showing condition. Found that
Seal Pr. PU tube air leakage found. So Nos. ) Blowerning and Cleaning
to done.
replaced it. Now Ok.

In Chimney analyzer Boiler No. # 1


SOX analyzer showing moisture fault.
So Reset it. Now Ok.

Unit No.# 1 Vessel No.-12/22 Back Pr.


Transmiiter is not Showing at DCS
end. So cleaned the impluse line. Now
Ok.

In BC-6 Belt PCS Rope Clamp damaged


condition. So Replaced it. Now Ok.
soot blower-1 contactor-11 add on Boiler-2 RSB cleaning done as:-
block found loose, so tight it. 1) RSB-23,24,25,26,29

Boiler-2 RSB ELCB checking and


cleaning done
Boiler-2 RSB earthing and socket
power checking done

Boiler-1 soot blower panel


maintenance done as:-
1) panel blowring done
2) contactors cleaning done with
Klinit
3) terminal tight ness done
Boiler-1 SOX analyser flow showing low, Recalimer both PLC panel's cleaning
check moisture fault was there, so reset
& blowering work done.
fault & filter cleaning done.
Reclaimed AC out door unit cable dressing Reclaimed motor cleaning work
done. done.

Reclaimed hooter cable dressing done.

Recalimer both PLC panel's cleaning &


blowering work done.
Bomb calorimeter maintenance done with
gen shift enggr.

Compressor auto drain checked.


LOTO box 5S done.
Hand blower plug top replaced at inst lab.

Abnormality jobs attended PM Jobs carried

Lighting booster panel checking done , cable Street light pole TB checking and faulty
sleeve found damaged so replaced. Also power TB replacement work is under
back side incoming cable was touching panel progress:-
frame so new sheet acyrlic mounted. Then a) Pole no. 48 - 1 TBS
changeover done from MLDB-A to MLDB-B b) Pole no. 49 - Tightness done
again after work completion. c) 2 pole near Environment station

4.5 MCC room MLDB backside 2 TBs


tubelights not glowing so corrected the same TG-2 put into base load as per
and made healthy. Operation requirement.

BC-6 area instrument JB and panels cleaning Mositure fault for Sox-1 so cleaned filter
and blowering work done as they are dusty. and sensor the reset the alarm, now OK.

WTP telephone was not working found


connector was problem so rectified the same.

CCR-491 telephone not working, checked


connector and interchanged phone also but
still dial tone not coming so informed Ranjit
Chouhan, he will attend tomorrow.
Abnormality jobs attended PM Jobs carried

Unit No. # 1 vessel no.-11/21 Unit No. # 2 APH / Vessel No.-


Conveying O/L Valve ( SV-8141 ) not 11/21 and Vessel No.-12/22 SOV
showing at DCS end. Found that Limit
JB and field Inst. Blowerning and
Groove is loose condition. So tightness Cleaning to done.
to done. Now Ok.

Unit No. # 1 vessel no.-11/21 Seal Pr.


Is not showing at DCS end. So cleaned
the Impluse Line. Now Ok.

In Chimney analyzer Boiler No. # 1


SOX analyzer showing moisture fault.
So Reset it. Now Ok.

Unit No.# 1 Vessel No.-11/21 Back Pr.


Switch / Transmiiter is not Showing at
DCS end. So cleaned the impluse line.
Now Ok.
Repaire supply box-45 at boiler-2
Boiler-2 RSB cleaning done as:-
found its door damaged, need welding 1) RSB-39,40,41,42,43,44,45,46
of door

Repaire supply box-43 at boiler-2


found its one single phase ELCB not Boiler-2 RSB ELCB checking and
trip, so clean with CTC and made it cleaning done
healthy
Boiler-2 RSB earthing and socket
power checking done

Boiler-1 SOX analyser flow showing low,


check moisture fault was there, so reset
fault & filter cleaning done.

BAC-2A instrument air hose pipe found in


hanging condition,SO fixed properly.

Spare cable dressing done at BAC-2A .

Bomb calorimeter agitater not rotating so


make free .
Bomb calorimeter maintenance done with
gen shift enggr.
Compressor auto drain checked.

Abnormality jobs attended PM Jobs carried

Boiler Lift No. # 1 and 2 Lift Telephone


is Not working Normally. So checked
BC # 1 Bag filter Panel / VFD
and found that No dial tone is present. Panel Cleaning and blowerning
Also changed the hand set still it is not
working condition. Also supply is not to done.
present in telephone wire.

Fly ash silo No. # 2 and Bed ash silo BC #2 Bag filter VFD Panel and
level Transmitter Polythene coverning Chute Level Supply JB Cleaning
to done. and blowerning to done.
Reclaimer CRD cable found burried
under coal, so check and found that Crusher motor 1&2 blowring and
during unloding of coal , coal came
over cable trench, so clear the coal and cleaning done
pull cable from coal and made it free.

ID fan-1 area Light found hanging


condition , so straightning the light Crusher floor RSB and JBs
fitting and fit it properly in upright cleaning done
position
Bucket elevator -2 trip in overload, so MV drive room 4.5 mtr and BFP
reset it once cleaning done
bed ash silo RAV found trip, so
checked material jaming found ,so UPS room,Chimny room and
instrument lab cleaning done
inform to operation to clear Jam

Abnormality jobs attended PM Jobs carried


WTP dcs panel no: 84, during cleaning gap WTP dcs all module & termination
observed in cables so sealing done units panel cleaning & blowering
job
WTP I&C power distribution &
console panel cleaning & blowering
job
Unit-1 TG building 0 mtr field
equipments, mov's, control valves
cleaning
Unit-2 TG building 0 mtr field
equipments, mov's, control valves
cleaning

Motor checking and double


Boiler-1 side round taken for all RSB
checking for danger tag missing and found earthing, cleaning and blowering
work done:-
RSB-3'9 and 11 RSB , so pasted 415V
a) Cep-1A
danger tag.
b) Cep-1B

Green tag pasted in 230V socket in DM Power report checked for balance
plant for the new installation. and balanced till 20th April.

TG-2 Enclosure light blinking ,check & Compressor house Jisu hozen work
found light is ok but cable need to check. done.

Bed ash silo RAV got tripped on over


load ,foung jam, so inform to operation for Cleaning & blowering work done at
maintenance. IAC-1 ,2 & 3

Chimney analyzer empty & filled gas


Spare cable dressing done at BAC-2A . cylinder's hold with both chain
properly.

Chimney analyzer empty & filled gas Instrument lab telephone not
cylinder's hold with both chain properly. working, handset replaced .

SOX analyzer panel 03 no's cable duct


CCR telephone Shift incharge desk,
cover missing So fixed spare cover &
made servicable.
packing done.

One extention board provide at WTP.

Plug top provide at WTP .


Boiler-1 11-21 back pressure transmitter
display,not showing , so reconnect the
same . Now OK.

Compressor auto drain checked.

CHP MCC room AC PCB connector


soldering work done & trail done working
ok..
ACC area grass cutting M/C & extension
board plug top replaced.
Extension board provide at WTP and
plug top change.

Abnormality jobs attended PM Jobs carried


Fly ash silo No. # 1 , 2 and Bed
In CHP DCS Room AC showing HP/LP ash siloPanel / Field Inst.
alarm. So reset it. Now Ok. Blowerning and Cleaning to
done.

In Chimney analyzer Boiler No. # 2


SOX analyzer showing moisture fault.
So Reset it. Now Ok.
In IAC No. # 1 VFD Showing Cooling
alarm. Alarm code- 2052. IAC # 1 is in
stopped condition.
Abnormality jobs attended PM Jobs carried
Boiler-1 11-21 back pressure transmitter
& pressure switch reading not changing at BC-6 belt conveyor pull cord
dcs, so line flushing done for transmitter switches & zss jb polythene
now ok covering done
WTI: (WTI/VCW/21-22/79152) in BC-6 Field JB's, bag filter panel &
belt area point no-3 (pull cord switches equipment cleaning & blowering at
polythene covering to be done ) -attended BC-6 belt head area

Field panel, zss & equipments


cleaning & blowering at BC-6 tail
end area(crusher house)

WTP lab lighting material checking and


maintenance work done:-
a) Hand lamp-14 nos. ready(7 nos. Boiler-2 side round taken for all
repaired) RSB checking for danger tag missing
b) LED 24V - 4 nos. ready and found one RSB missing in 2nd
c) Extension board - 6 nos. made ready floor. Also the walkthough round
(2nos. Repaired) point emailed for closure.
d) Trafo 24V - 4 nos. made ready (1 nos.
repaired)

Motor cleaning and blowering work done


for Boiler-2 coal feeder motors and clean
run total 8 nos.

Boiler-2 lift 0m floor outside packing done


with brown tape and point attended.

Boiler-2 DSH control valve TCV3203 &


02TCV3201 gland leakage observed so CEP area Jishu hozen done .
tightness done ,now ok
Fly ash silo top floor bag filter SOV cable
2 LED & 2 hand lamp rapair &
found open ,connect the same & take in checked.
line.

Spare cable at cooling tower, open-end Removed polythene cover collected


packed & dressing done. from BC-6 & through in dust bin.

CEP pump discharge water pressure


gauge out of order, rectified the same &
packing done.
BFP-2 RTD cable dressing done.

Removed polythene cover collected from


BC-6 & through in dust bin.

2 LED & 2 hand lamp rapair & checked.

Grass cutting M/C cable cameout from


plug top,rectified.

Abnormality jobs attended PM Jobs carried

Bed ash silo -2 dry ash system not running Boiler-2 ID FAN Motor cleaning &
checked & found , rotory over load
operated, checked & rested now ok blowering job

Hand blower green tag not available so Boiler-2 SA FAN Motor cleaning &
provide the same blowering job
Boiler-2 PA FAN Motor cleaning &
blowering job
Boiler-2 Both j-valve motors
cleaning & blowering
24 V LED light repairing & also
hand lamp made ready
Abnormality jobs attended PM Jobs carried
Old AC panel fond hole in its base, so pack 24 volt hand lamp making done-
with packing tape 3nos and put in workshop
unit-2 12-22 back pressure presure
transmitter cover found misplace, so refix TG
hall exhaust fan panel cleaning
it again. and tightness done

Vam panel cleaning and blowing


doe as:-
1) 4.5 mtr and CCR AHU VFD
cleaning done
2) chiller pump panle blowring
done
3) booster pump panel blowring
done
4) AC compressor of Engg. Office
blowring done
5) old AC panel blowring done
6) VAM body and panel blowring
done
7) Lift UPS cleaning done
Barring gear-2 was not starting during TG-2 tripped at 8:05am due to TG
auto command, found limit not acted. So inlet temp. high. So all alarms reset
temp arranged and later after rolling after operation clearance and
started the limit adjusted and bolt set, rolling started again. GT-2
now no fault indication. synchronised at 8:57am.

Motion sensor of lighting in DCS-1 front


side is bypassed now. And rest one in After GT-2 synchronised the AVRt
DCS-1 light and other both in DCS-2 aken in remote.
timing incresed to 30 mins.

Boiler-1 coal feeder-1A motor shaft one


TG-1 put into base load as per
cap was found opened so fixed it properly
Operation requirment.
on slot.

DCS-1 printer PC not starting due to


video card error so video card
removed and then made healthy
and card handed over to
Purushottam.

Abnormality jobs attended PM Jobs carried

In Unit No. # 2 Desuperheater Control


Valve ( 02 TCV 3202 ) Showing 12.5
Feedback when command is 0%. So
calibrated the Control Valve. Now Ok.
In Unit No. # 2 Desuperheater Control
Valve ( 02 TCV 3204 ) Showing 12.5
Feedback when command is 0%. So
calibrated the Control Valve. Now Ok.
But when giving the open Command to
Valve Then Valve is Struck ( jerk ) .
Also 10 % Feedback is showing when
giving the 0% Command.

Pr. Guage of the Positioner of


Desuperheater Control Valve
( 02TCV3202) not working condition.
So replaced it. Now Ok.
Abnormality jobs attended PM Jobs carried
Bag house-1 11-21 back presure fault AC and vent panel blowring and
coming, so checked and flushing the back cleaning done from front and back
pressure line , now rectified side
Security tower-2 lights not glowing, so CT fan-2 , drain POT 1A and 2A VFD
checked and found the MCB got tripped,
so ON it panel blowring done

Cleaning & blowering work done


as:-
1) boiler-1 J valve MOV-3nos
Workshop MV drives temp found more
than daily observation upto 41.5 degree, 2)
boiler-1 drain valve MOV-6nos
3) bag house-1 -11-21 field JBs
so increase the AHU rpm from 899 rpm to
4) bag house-1- 12-22 field JBs
1000 rpm now temp normal as daily
5) APH field JBs
6) bag house DP transmitter and
auto drain valve JBs

bag house-1 dome valve limit cover found


loose, so tight it
PA fan-2 motor DE bearing temp goes
upto 70 degree from B shift, so observe it
now it becoms 68 degree in night shift.
Need further observation in day shift.

Abnormality jobs attended PM Jobs carried


Boiler -1 system 11-21 back presure not
coming , checked in field line got jam, DOL satrter at switch yard cooling
impulse line flushing done and system fan tested and starter removed and
taken in line kept at Electrixcal workshop

Coal feeder-1A Discharge Pneumatic


valve cable gland was not proper ,same CHP ground floor welding machine
was rectified checked and green tag provided

Instrument Hand blower found norking, Boiler-1 coal feeder- repar supply
checked in blower cable connection found box-7,56 checked and green tag
loose, same was rectified and taken in line provided

Coal feeder -1A Discharge MOV JB


cleaning and tightness checked

Coal feeder -1B Discharge MOV JB


cleaning and tightness checked

Coal feeder -1C Discharge MOV JB


cleaning and tightness checked

Coal feeder -1D Discharge MOV JB


cleaning and tightness checked
Abnormality jobs attended PM Jobs carried
Unit No. # 2 PA fan DE Side external In Unit No. # 1 Coal Feeder -1A /
cooling Fan shifted at site from Unit 1B /1C and 1D VFD panel
No. # 1 PA Fan. Also ON the Cooling Cleaning and Blowerning to
Fan. done.

In Unit No. # 1 Bed ash cooler -


1A / 1B VFD panel Cleaning and
Blowerning to done.

All the Filter of Unit No. # 1 Coal


Feeder and bed ash cooler VFD
panel Cleaning to done.
Abnormality jobs attended PM Jobs carried

Boiler-1 all open and close pneumatic valve Boile-1 all main motors checking and
limits checked for proper operation and maintenance work done:_
feedback in CCR. Found 1B close limit is not a) TB open and connections checking
coming so open limit and maintenance work done
done. b) Double eaqrthing checked
Also 1D limit close is faulty so opened and c) Connection tightness done
kept in instrument lab, found the link inside is d) Cleaning of motor
not present need to replace. e) Sealing of TBS

WTP lab bomb calorimeter elcb was not Capacitor bank stopped all for power
tripping so replaced with new one. factor increased above 0.98 in each and
voltage high HV side.
Boiler-1 both 1A and 1B bunker outlet MOV
connections checking, cleaning and TB Boiler-2 extra lights were made off and
packing done. ON for Boiler-1 for cleaning purpose.
24V lamb given at bunker floor to
Operation dept.
TG-1 removed from base load due to
load decreasing condition below 13MW
in total.
Abnormality jobs attended PM Jobs carried
Cooling tower side cable dressing done
near dosing pump
ACC -1 area lighting timer found bypass so
taken in line
Abnormality jobs attended PM Jobs carried

4.5 Mtrs MV Drive Room AHU System Unit No. # 1 J-valve fan -1B VFD
OFF Condition at 19.00 PM due to Panel Cleaning , Blowerning and
Boiler # 1 is in Shutdown condition. Connection Tightness to done.

In Unit No. # 2 vessel No.-12/22 Back Unit No. # 1 SA Fan VFD Panel
Pr. Switch and Transmitter Impluse
line cleaned as per operation Cleaning , Blowerning and
Connection Tightness to done.
requirement.
Abnormality jobs attended PM Jobs carried
New VAr meter was small in size so All gauges in TG area cleaning and
proper packing done from all the sides. blowering work done.

One pressure gauge in TG-1 of GSC main Clean run motors in Boiler-1
line 0m found it's base was loose so new cleaning and maintenance work
nut mounted and tightness done. done.

Coal feeder-1C pneumatic SOV control TG-1 0m LP-HP control valves


cable was hanging so dressing work done. cleaning and b lowering work done.
Abnormality jobs attended PM Jobs carried
ID-1 IGV air fittings leakage found, so
change the air tube and rectified the air
leakage.
Abnormality jobs attended PM Jobs carried

In Chimney analyzer Boiler No. # 2 Unit No. # 1 ID Fan Winding /


Bearing Temp. DE/NDE Side
SOX analyzer showing moisture fault.
So Reset it and Filter cleaning to done. Motor and Fan side JB ( Total-04
nos.) Connection tightness ,
Now Ok. sealing and Packing to done.

Unit No. # 1 PA Fan Winding /


Bearing Temp. DE/NDE Side
Motor and Fan side JB ( Total-02
nos.) Connection tightness ,
sealing and Packing to done.
Abnormality jobs attended PM Jobs carried
Dusty conditions of equipment in firing Power report checked for balance
floor so cleaning and blowering work and balanced till 26th April.
done.
CHP front side street lights found off so Flame detector panels cable
timer adjusted and corrected, now OK. dressing, hole sealing and panel
blowering work done.

Abnormality jobs attended PM Jobs carried

Unit No. # 2 APH Back Pr. Switch and Unit No. # BAC-1A Conveying JB
transmitter Impluse line cleaned as Connection tightness , sealing
per operation requirement. and Packing to done.

Unit No. # BAC-1B Conveying JB


Connection tightness , sealing
and Packing to done.
Abnormality jobs attended PM Jobs carried

SA-1 hoist was found operating towards right Both SA-1 and PA-1 hoist operation
side continuosly so opened local pendant and checking done and placed in proper
contacts cleaned and then placed in position. positio, abnormalities corrected.

Gen-1 current B-phase in mimic panel is faulty


need to replace.
Abnormality jobs attended PM Jobs carried
ACC-1E breaker auxiliary contacts holder
found loose, so tight it

desuperheating valve TCV 3201 found air


leakage from fitting, so tight the tube
fitting and leakage arrested.
Abnormality jobs attended PM Jobs carried
PA-2 motor side cooling fan cable was Green tag pasted for plasma
from bottom side so proper dressing done
machine in furnace floor Boiler-1.
from top side and started again.

Coal feeder-1D limit close of pneumatic Generator-1 field exciter, barring


was faulty so replaced with new one.Also gear and panels checking and
feedback ensured from CCR. maintenance work under progress.

Sanitizer shifted from engg office to inst


lab.

Abnormality jobs attended PM Jobs carried


TG-1 01PCV2401 Dump pressure control TG-1 field instruments near local
valve new positioner cable termination, gauge panel, pressure TX's, switches
link arrangement, new fittings & tubing isolation valves fittings & valves
job completed tightness job
2) Calibration job is U/P (shaft jamming)
TG-1 field instruments near local gauge TG-1 field instruments near control
panel, pressure TX's, switches isolation oil filter, pressure switches &
valves fittings & valves tightness job isolation valves fittings & valves
tightness job

TG-1 field instruments near TG enclosure TG-1 vibration sensors cable


control oil filter, pressure switches & dressing, proper fixing & additional
isolation valves fittings & valves tightness tape arrangement
job

TG-1 vibration sensors cable damage CCR sanitizer set line chock so
conduiet dressing, proper fixing & cleaning done now ok
additional tape arrangement

Abnormality jobs attended PM Jobs carried


CBD control valve(01CV0501) cleaning Drum side both field instrument
done, But during checking of its operation, cleaning done
its spindle is not operating, may be
mechanically jam. Its feedback is coming
in DCS. Need further Jam removing
pending

water filling in chilling tank of VAM


Abnormality jobs attended PM Jobs carried
03 no's of field JB terminal tightness &
cleaning blowering job towards TG-1 Green tag pasted for plasma
machine in furnace floor Boiler-1 &
top replaced & connection given

03 no's of field JB terminal tightness


& cleaning blowering job towards
03 no's of field JB (Local panel back side & TG-1
near panel) terminal tightness & cleaning
blowering job towards TG-1

Boiler-2 , BAC-2B conveying not cut with


back pressure also conveying sov
TG-1 area 03 no's of Field JB &
problem, so line cleaning done & equipments, cleaning & blowering
conveying sov connector removed &
job
manuanlly operated, afterwords again
taken in line now ok
BAC-2B conveying not cut with back
pressure, so line cleaning done &
TG-1 speed probes enclosure JB cleaning
& terminal tightness-completed conveying sov connector removed &
manuanlly operated, afterwords
again taken in line now ok

Abnormality jobs attended PM Jobs carried


In Chimney analyzer Boiler No. # 2 In Unit No. # 1 Turbine CCP
SOX analyzer showing moisture fault.
So Reset it and Filter cleaning to done. panel Cleaning , Blowerning and
Connection tightness to done.
Now Ok.

Unit No. # 1 BAC-2B Back Pr. Switch


and Transmitter impluse line cleaned
as per operation requirement. Also
popette valve SOV is not working
condition. Also Open at field side. So
removed the SOV from BAC-1A and
trial taken. It is working Normally.

In Chimney analyzer Boiler No. # 2


SOX analyzer showing moisture fault.
So Reset it and Filter cleaning to done.
Now Ok.
Abnormality jobs attended PM Jobs carried
VAM TR drops to 8 TR and workshop mv
drive temp gone to 44.5 degree, so
checked and found that VAM steam
control valve air pressure goes to zero,
then after exersice it is found that main
air valve of unit-1 side receiver is closed
by operation deptt. So bypass air valve
made ON from CCR outside location, then
VAM works normally and TR goes to 51
TR. During this problem AC made ON for
Workshop and BFP MV drive room
Abnormality jobs attended PM Jobs carried

Unit No. # 1 BAC-2B all the Connection


tightness to done and Power Supply Unit No. # 1 FT-902 , PT-0904 ,
PT-0901 , PT-1119, PT-0903 and
Reset . Also open the manual isolation PT-1115 Impluse line flushing to
valve Then trial taken. It is working
Normally. done.

Unit No. # 1 FT-914 , PT-1120 ,


FT-0913 , FT-912, Impluse line
flushing to done.
Unit No. # 1 FT-906 , FT-907 , FT-
0910 , FT-911, Impluse line
flushing to done.
Abnormality jobs attended PM Jobs carried
Abnormality jobs attended PM Jobs carried
Boiler-2 12-22 line was choking and so Month end report checking done
line flushing done and cleared the jam. and balanced fo rzero errors:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power
Shutdown jobs
Coal feeder 1A,1B,1C,1D feeder discharge temprature RTD
checking and tightness done
Coal feeder 1A,1B,1C,1D feeder RTD checking and
tightness done
1) 1A is 115 ohm
2) 1B is 115 ohm
3) 1C is 117 ohm
4) 1D is 116 ohm

Boiler-1 all pressure gauges checked physically found OK

coal feeder-1B motors terminal checking done


Shutdown jobs

Unit No. # 1 J-valve fan -1B VFD Panel Cleaning ,


Blowerning and Connection Tightness to done.

Unit No. # 1 SA Fan VFD Panel Cleaning , Blowerning


and Connection Tightness to done.
Shutdown jobs
All gauges in TG-1 area checking done for any
abnormalities and cleaning done for each gauge as found
dusty.
Boiler-1 all clean motors checking and maintenance work
done :-
a) TB open and connections checking done
b) Double eaqrthing checked
c) Connection tightness done
d) Cleaning of motor
e) Sealing of TBS

Faulty VAr meter for Generator-1 is replaced with spare


one, also all CT and PT paramteres are fed. Need to check
values on Generator start.
Shutdown jobs
ID fan-1 motor and bearing RTD tightness checking done

hand lamp and LED lights hand over to mech deptt:-


1) LED-3 nos
2) handlamp-6nos
3) 24volt transformer-2nos
4) Extention board-1 nos

One 24 volt transformer repaired


Two Extention board repaired and provide plug top in
them,
Two Charging LED put in chatge at 4.5mtr
Shutdown jobs

Unit No. # 1 ID Fan Winding / Bearing Temp. DE/NDE


Side Motor and Fan side JB ( Total-04 nos.) Connection
tightness , sealing and Packing to done.

Unit No. # 1 PA Fan Winding / Bearing Temp. DE/NDE


Side Motor and Fan side JB ( Total-02 nos.) Connection
tightness , sealing and Packing to done.
Shutdown jobs
ACC-1 side all lube oil motors power cable connections
removed and earthing cable removed. All connection
details are mentioned in the logbook.
Bag house panels following activities done :-
a) All connections checking and tightness
b) Checking for any holes and sealing
c) Cleaning and blowering of panels
d) Packing of panels with polyethene.

APH JB cleaning, terminal checking and tightness, cable


dressing and blowering work done.

Shutdown jobs

Unit No. # BAC-1A Conveying JB Connection


tightness , sealing and Packing to done.

Unit No. # BAC-1B Conveying JB Connection


tightness , sealing and Packing to done.
Shutdown jobs

J valve-1B DOL feeder checking and maintenance work done.


Found the lever inside and off incation was faulty so replaced
with spare one. Control trial taken found normal.

J valve-1A SFU feeder checking, terminal tightness and blowering


done

J valve-1A motor TB checking done and field JB cleaning, terminal


tightness work done.
J valve-1B JB side cable checking done found Y-phase cable
slightly cut so applied insulation tape and then corrected.
Both panels sealing done.
GT-1 breaker stopped from switchyard side.
SA-1 and PA-1 RTD opened from field of fan side and placed in
cable tray.
Vibration sensor opened and placed in lab, as per Maint.
Requirement from PTW.

Shutdown jobs
ACC-1A,1D,1E breaker maintenance done as:-
1) breaker cleaning with cloth
2) contacts cleaning with klinit
3) Greasing of racking mechanism
4) movement of racking mechnism checked.
5) arcing chut cleaning done
6) aux wiring tightness done

Boiler-1 desuperheating TCV valve wiring tightness and


operation checked at different comand(25%,50%,100%)
found normal and clean them as:-
1) TCV 3201
2) TCV 3202
3) TCV 2303
4) TCV 3204

Boiler-1 feed contrl valve cleaning and wiring tightness


checked:-
1) LCV 3201
2) LCV 3202
3) LCV 3203
Shutdown jobs
Coal feeder-1D pneumatic limit changed with new one and
feedback also ensured from CCR.

Generator-1 excitor end side cover opened and following


done :-
a) All connections tightness work done
b) carbon brush was depleted both so new brushes were
changed.
C) Cleaning and blowering of the carbon dust.
D) Packing of panel with silver tape.

Coal feeder-1B limit close of pneumatic feedback ensured


from CCR.
MOV maintenance work with service engg.

Shutdown jobs
TG-1 01PCV2401 Dump pressure control valve new
positioner cable termination, link arrangement, new
fittings & tubing job
2) Calibration job is U/P(shaft jamming)
TG-1 field instruments near local gauge panel, pressure
TX's, switches isolation valves fittings & valves tightness
job

TG-1 field instruments near TG enclosure control oil filter,


pressure switches & isolation valves fittings & valves
tightness job

TG-1 vibration sensors cable damage conduiet dressing,


proper fixing & additional tape arrangement

MOV maintenance work with service engg.


1) Coal feeder-1D (maintenance Completed , trial U/P)
2) Coal feeder-1A (Maintenance -U/P)

Shutdown jobs
ACC-1B,1C,1F breaker maintenance done as:-
1) breaker cleaning with cloth
2) contacts cleaning with klinit
3) Greasing of racking mechanism
4) movement of racking mechnism checked.
5) arcing chut cleaning done
6) aux wiring tightness done

GSC-1A and 1B motor connection removing done, its


earting conection is also removed
soot blower control valve cleaning done, also checking its
operation done on command from DCS(25,50,100%) also
checking of its wiring and air tube fittings, pack the gland
sealling

soot blower MOV cleaning done

Shutdown jobs
(01CV0501) CBD control valve locally & manually
operation checked but it's lower stem part is not moving,
need to open for further (may be bush damaged), to be
open with service engg-U/P

03 no's of field JB (Local panel back side & near panel)


terminal tightness & cleaning blowering job towards TG-1

TG-1 speed probes enclosure JB cleaning & terminal


tightness-completed
TG-1 Gear box RTD jb terminal tightness job-completed

TG-1 ETS PLC panel terminal tightness job is -U/P

TG-1, dump pressure control valve 01PCV2401 high temp


grease provided on shaft for smothness & direct air given
for cross checking of travel but still shaft is stucking during
movement & also jerk observed-job is U/P

Shutdown jobs

In Unit No. # 1 Turbine CCP panel Cleaning ,


Blowerning and Connection tightness to done.
Shutdown jobs
GSC-1A and 1B motor connection done, its earting
conection is also done

ACC-1B,1C,1D motor connection done, and its earthing


done
unit-1 firing floor flame detector pannel 1A and 1B cleaning
and ignitor JB cleaning done. Total 8 nos SOV cleaning
done, no air leakage found
Shutdown jobs

Unit No. # 1 FT-902 , PT-0904 , PT-0901 , PT-1119, PT-


0903 and PT-1115 Impluse line flushing to done.

Unit No. # 1 FT-914 , PT-1120 , FT-0913 , FT-912,


Impluse line flushing to done.

Unit No. # 1 FT-906 , FT-907 , FT-0910 , FT-911,


Impluse line flushing to done.
Shutdown jobs

ID fan-1 motor power connection removed

ID fan-1 motor RTD removed and vibration probe


connection removed
Shutdown jobs
PA motor power cable and all earthing cable connections
removed for mech maint. request. Also space heater
connections also removed and cable packing done and kept
side.

PA motor RTD connection removal work done and


connections noted.
PA fan motor vibration sensor removed after connection
opening and kept in Tarun sir table.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working Normally.

Unit No. # Vessel No.-22 Purging SOV


manual isolation valve Shotdown to given.
( Air Isolation valve Closed , Coil Removed
and Air tube open condition. )

Unit No. # Vessel No.-22 Popet valve SOV


manual isolation valve Shotdown to given.
( Air Isolation valve Closed , Coil Removed
and Air tube open condition. )

In Chimney analyzer PC data is not showing.


So Restart the PC. Now Ok.

Unit No. # 2 BAC-2B level Probe not


showing High signal. So calibrated it. Also
Changed the inside Controller card. Now Ok.

RNRP all nodes found Normal.

A Shift instrument digital log book filled


01.05.2021 Sanjay Garg
UPS log digital log book filled.
01.05.2021 A Sanjay Garg

Shift abnormality  digital log book filled.

VAM log digital log book filled.

General Plant Round taken found all drive


running normal.

all the manual light to OFF Condition.

Following shutdown given-


1 ACC Fan-1A
2ACC Fan-1B
3ACC Fan-1C
4 ACC Fan-1D
5 ACC Fan-1E
6 ACC Fan-1F
7 ACC Fan-1A LOP
8 Unit No. # 1 Ves-12 Purging SOV.
9. 01SV1274

Unit No. # 1 furnace Floor Grinding Floor


plug Top to changed. Also Green tag to
provided.

Unit No. # 1 PA fan Grinding Floor plug Top


to changed. Also Green tag to provided.

24 Volts hand lamp to changed in Unit No. #


1 oil Cooler area.
Following check list prepared

a) Generator-2  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All office AC MCB to off Condition.

All manual light made on Condition.

P & V No. 4 off at 8.00 PM

Following shutdown closed-


1 Coal crusher-2
2 GSC-1A
3. GSC-1B
4. 01MV0909(Coal feeder-1A o/l)
5. 01MV0910(Coal feeder-1B o/l)
6. Coal feeder-1A
7. Coal feeder-1B
01.05.2021 B jaswant Singh 8. ACC FAN-1A LUBE OIL PUMP
9. ACC FAN-1B LUBE OIL PUMP
10. ACC FAN-1C LUBE OIL PUMP
11. ACC FAN-1D LUBE OIL PUMP
12. ACC FAN-1E LUBE OIL PUMP
13. ACC FAN-1F LUBE OIL PUMP

All auto drain valve checked in compressor


house & receiver area found working
Normal.

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


Report and Env) send and emailed.

C Anurag
01.05.2021 RNRP all nodes found UP.
Chowdhury
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Lights made off manually

All AC MCB made on

02.05.2021 A Gajendra Pandya


02.05.2021 A Gajendra Pandya
Following shutdown given..
1) 01MV2303.
2) 01MV2304
3) mist fan-1A
4) mist fan-1B

Following shutdown cleared


1)132 KV isolator
2)GT-2 transformer

P&V-4 made on at 7.00 AM


CPCB & ETP data checked at site found
healthy
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Lights made off manually

All AC MCB made off

Following shutdown cleared


1)132 KV isolator
02.05.2021 B jaswant Singh 2)GT-2 transformer

P&V-4 made on at 8.00 AM


CPCB & ETP data checked at site found
healthy
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Unit No. # 1 FW 100 % MOV 01MV3208


Open Limit , Open Torque and Close Limit
and Close Torque to set. Trial is Pending.

Unit No. # 1 BAC-1A and 1B VFD Panel


Cleaning , Blowerning to done.
Service air driyer Moisture drained.
In Chimney analyzer Boiler No. # 2 SOX
Sanjay Garg analyzer showing moisture fault. So Reset it.
Now Ok.
Online CPCB data is not update in online
website.
CPCB Report on dated @02/05/2021 is sent
to all.
All the Report ( APC, Plant Performance ,
Power Report ) is sent to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
02.05.2021 C running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


Report and Env) send and emailed.
Anurag
Chowdhury RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Lights made off manually

All AC MCB made on

Following shutdown given..


1) BC-1
2) BC-5
3) Coal feeder-1D (MOV connector also
removed as per request of Mr. APS)
4) Chamber-21(sv1276)
03.05.2021 A jaswant Singh 5) 01 BH-1219_cmd
6) Coal crusher-1
7) Screen-1
8) Bucket elevator-1 (CHP)

Following shutdown closed-


1) 01 SV1277 (PTW-148079)
2) Purging air isolation valve(PTW-148079)
3) Drain pot-1A
4) Drain pot-1B

P&V-2 made on at 7.00 AM


CPCB & ETP data checked at site & mail
communicate to vendor for CPCB data
updating at server
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.

Shutdown cleared for:-


a) Crusher-1
b) Vib screen-1
c) Bucket elevator-1
d) BC-5
e) BC-1
f) Coal feeder-1D

03.05.2021 B Anurag Chowdhury Shutdown given for:-


a) Coal feeder-1B MOV
b) 01MV2307
c) 01MV3213
P&V-2 made off at 7.00pm
Lights made on manually in evening.
Shift abnormality  digital log book filled.
RNRP all node status is UP.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Unit No. # 1 MSSV Bypass MOV 01MV2302


Open Limit , and Close Limit to set. Trial is
Pending.

Service air driyer Moisture drained.


Unit No. # 1 Coal Feeder O/L MOV
( 01MV0910) MOV Power and Control cable
connector removed at site as per mech.
Person requirement.
Sanjay Garg
Sanjay Garg
In Chimney analyzer Boiler No. # 2 SOX
analyzer showing moisture fault. So Reset it.
Now Ok.
All the AC MCB to OFF Condition.
CPCB Report on dated @03/05/2021 is sent
to all.
All the Report ( APC, Plant Performance ,
Power Report ) is sent to all.
RNRP all nodes found normal.
C Shift instrument digital log book filled
03.05.2021
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison report
prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


Report and Env) send and emailed.
Gajendra Pandya Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Following shutdown given-


1 Coal feeder-1C discharge MOV
2 Reclaimer
Following shutdown cleared:-
a) 01MV2303
b) 01MV2304

04.05.2021 A Anurag Chowdhury


All lights made off during morning round.

04.05.2021 A Anurag Chowdhury


P&V started in morning round.
RNRP checked found all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

In CHP Bucket Elevator No.-1 and 2 VFD


Over load setting changed. Tial is taken.
Now working Normally.
Unit no. # 1 Coal Feeder-1C O/L MOV
Power/ Control cable Socket mounted at
site.
Unit no. # 1 Coal Feeder-1B O/L MOV
Power/ Control cable Socket mounted at
site.

In RO HPP No. # 1 VFD Tripped due to F022


fault. So Reset it. Also checked the Three
phase supply. It is showing Normally. Now
Pump is running normally.

04.05.2021 B Sanjay Garg


Unit No. # 2 Vessel No.-11/21 back Pr.
Transmitter , Back Pr. Switch and Seal Pr.
Switch impluse line is heavily chocked
condition. So cleaned the impluse line. Now
Ok.

B RNRP all nodes found Normal.


04.05.2021 Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary charging Condition.
all the manual light to ON Condition.

Following shutdown Cleared.


1 Coal Feeder- 1B O/L MOV.
2 Coal Feeder- 1C O/L MOV.
3 reclaimer
4 01LCV501
5 01MV2301
6 01MV2302
7 Mist. Fan-1A
8 Mist. Fan-1B

Following shutdown Given.


1) TG # 1 Enclosure Fan.
2) 01MV3301.
ID Fan Unit No. # 1 Hoist Travel limit set and
changed the fuse.
Drain Pot Motor- 1A / 1B motor connection
done also gland Packing and JB packing by
Silver Tape to done.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All the AC MCB to OFF Condition.

All the auto drain valve checked in


compressor checked and working Normally.

Unit No. # Vessel No.-12 Purging SOV


manual isolation valve Shotdown to given.
( Air Isolation valve Closed , Coil Removed
and Air tube open condition. )

Unit No. # Vessel No.-12 Popet valve SOV


manual isolation valve Shotdown to given.
( Air Isolation valve Closed , Coil Removed
and Air tube open condition. )

In Chimney analyzer Boiler No. # 2 SOX


analyzer showing moisture fault. So Reset it.
Now Ok.

New Fevurl is provided in manual isolation


valve of Unit No. # 1 100 % Control Valve.

Unit No. # 1 Coal Feeder VFD


A Panel-1A/1B/1C and 1D VFD Panel Cleaning
05.05.2021 Sanjay Garg and Blowerning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown given-
1 ACC Fan-1A
2ACC Fan-1B
3ACC Fan-1C
4 ACC Fan-1D
5 ACC Fan-1E
6 ACC Fan-1F
7 ACC Fan-1A LOP
8 Unit No. # 1 Ves-12 Purging SOV.
9. 01SV1274

Following shutdown Cleared.


1) VAM Chilled water Pump No.-1

Turbine Light is ON as Per shift Incharge


requirement.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All the AC MCB to OFF.

All the auto drain valve checked in


compressor checked and working Normally.

RNRP all nodes found Normal.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light made ON.
05.05.2021 B Purushottam
05.05.2021 B Purushottam
Following Shutdown Cleared-
1 01MV3207 Turbine-1 Inlet Steam Dump
Mov,
2. 01MV3213 Turbine-1 Feed Water Mov To
Ist-Stage Dumptemprature Ctrl valve,
3.01MV3301 Turbine-1 Hp Heater-1
Normal Drain Motorised Iso Valve Before
Ctrl Valve
4. AOP
5.EOP
6.AOP-1B

Following Shutdown Given-


1. AOP
2.EOP
3.AOP-1B

Following check list prepared


a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


C Anurag Report and Env) send and emailed.
05.05.2021
Chowdhury
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Following shutdown given-
1 Chiller pump-1

Following AVI given and cleared


1.AOP-1B
2.Turbine -1 EOP
All lights made off during morning round.
P&V started in morning round.
06.05.2021 A Purushottam
RNRP checked found all nodes found UP.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF.

RNRP all nodes found Normal.


all the manual light made ON.
Shift instrument digital log book filled
06.05.2021 B jaswant Singh UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
06.05.2021 B jaswant Singh

Following Shutdown Closed-


1. Chilled water pump-1
2. 01AM4401
3.TG-1 end fan
AVI given: AOP-1A
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


C Anurag Report and Env) send and emailed.
06.05.2021
Chowdhury
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working Normally.
Boiler-2 APH vessel-2 dome fault due to dome
not operating completely towards limit, Dome
Valve is in jammed condition. So Informed to
Shift Incharge.

Unit No. # 2 APH Vessel Back Pr. Switch and


Transmitter is not showing at DCS end. So
Cleaned the Impluse line. Now Ok.

Unit No. # 2 Vessel No.-11 /21 Back Pr.


Switch and Transmitter is not showing at
DCS end. So Cleaned the Impluse line. Now
Ok.

Unit No. # 2 Vessel No.-11 /21 Seal Pr.


Switch is not showing at DCS end. So
Cleaned the Impluse line. Also In Vessel No.-
11 Heavy material in seal Pr. Tube. So open
the both the Seal pr. Tube. Also inform to
shift Incharge.

VAM System is Tripped due to High STG


A Temp. So reset it. All the AHU Put into Auto
07.05.2021 Sanjay Garg mode. Also in Workshop Room Two AC is in
running condition.
VAM log digital log book filled.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown Cleared.-
1 ACC Fan-1A
2ACC Fan-1B
3ACC Fan-1C
4 ACC Fan-1D
5 ACC Fan-1E
6 ACC Fan-1F
7 01MV2305.
8 01MV2311.
9. AOP-1A
10 AOP-1B
11. EOP

at 4.5 Mtrs Breaker Maintences work Under


Progress.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

TG-1 put on base load for sync purpose as


per operation team request.

All the AC MCB to OFF, Unit-2 MV drive


room 11TR AC made off.

07.05.2021 B jaswant Singh


RNRP all nodes found Normal.

All the manual light made ON.

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Unwanted lights made OFF during Plant
Round

All Energy Meter manual Reading taken for


Power Report.
C
07.05.2021 Deepak Chand
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Transmission Losses Report Prepared and
mailed.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working Normally.

Unit No. # 2 Vessel No.-12 /22 Seal Pr.


Switch checked for Vessel No.-22. It is
working Normally condition. Presently for
vessel No.-22 Seal Pr. PU Tube is opened
condition.

In Chimney analyzer Boiler No. # 2 SOX


analyzer showing moisture fault. So Reset it.
Now Ok.
VAM log digital log book filled.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.

08.05.2021 A Sanjay Garg


VAM log digital log book filled.
A General Plant Round taken found all drive
08.05.2021 Sanjay Garg
running normal.
all the manual light to OFF Condition.

Following shutdown Given.-


1 BC-7A,
2 BC-7B,
3 Reclaimer

Following shutdown Cleared.-


1 BC-7A,
2 BC-7B,

at 4.5 Mtrs Breaker Maintences work Under


Progress.
At Unit No. # 1 ID Fan Heater Connection
( Two Phase ) is given.
At Silo area Light is ON Condition. So OFF
the Light.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC MCB made off

Chimney analyser room round taken.


08.05.2021 B Deepak Chand
Following shutdown Clear -
1) Reclaimer

P&V No-4 OFF at 7:00 PM.

ALL AC Power Made OFF in Evening


Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


C Anurag Report and Env) send and emailed.
08.05.2021 Chowdhury RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working Normally.

A
09.05.2021 jaswant Singh
In Chimney analyzer Boiler No. # 2 SOX
analyzer showing moisture fault so sample
A line & filter cleaning done & dry it after that
09.05.2021 jaswant Singh
reset from controller again taken in line.
Now Ok.
VAM log digital log book filled.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown Given.-
1) Boiler-2 APH inst air isolation valve
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All AC MCB made off in evening

Chimney analyser room round taken.

09.05.2021 B Deepak Chand


Following shutdown Clear -
1) Reclaimer

P&V No-4 OFF at 7:00 PM.

ALL AC Power Made OFF in Evening

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive
running normal.

Unit No. # 1 PA Fan Vibration Cable checked.


At DCS end TB no.-13-9B-TB3 - 1/2 and 13-
9B-TB3 - 3/4 .when we short the wire at
DCS end. Cable is not found at field
end.Conutity is not found at Spare cable at
field end. Need to check.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

Sanjay Garg
Workshop MV Drive Room Temp. is showing
41 Degree. So 02 Nos AC is Started.

Unit No. # 2 APH Field Inst. And JB Cleaning


and Blowerning to done.

Unit No. # 2 Vessel No.- 12/22 Field Inst.


And JB Cleaning and Blowerning to done.

Unit No. # 2 Vessel No.-11 / 21 Field Inst.


And JB Cleaning and Blowerning to done.

CPCB Report on dated @09/05/2021 is sent


to all.
09.05.2021 C
All the Report ( APC, Plant Performance ,
Power Report ) is sent to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Anurag Unwanted lights made OFF during Plant Round


Chowdhury
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.
Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to ON Condition.

P&V -2 started at 7:30 AM


VAM log digital log book filled.
RNRP all nodes found Normal.
Shift instrument digital log book filled
A
10.05.2021 jaswant Singh UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
A
10.05.2021 jaswant Singh

General Plant Round taken found all drive


running normal.
All the manual light to OFF Condition.
Following shutdown Given.-
1)Coal crucher-2
2)Bucket elevator-1 CHP(vfd selection also
made at off)
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive running
normal.
Shutdown cleared for:-
a) Crusher-2
b) Bucket elevator-1
c) Bag house-1 11 and 22 line instrument air

P&V-2 made off at 7.00pm


10.05.2021 B Anurag Chowdhury
Lights made on manually in evening.
Shift abnormality  digital log book filled.
RNRP all node status is UP.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

Unit No. # 2 Vessel No.-11 Level HH showing


at DCS end. So cleaned the Level Probe. Now
Ok.

Sanjay Garg
Unit No. # 2 Diverting Damper ( SV8146 )
Sanjay Garg not operating from DCS. Checked and found
that valve is in Jammed Condition. So
Informed to Shift Incharge.

In Chimney analyzer Boiler No. # 2 SOX


analyzer showing moisture fault. So Reset it.
Now Ok.
Unit No. # 1 Coal Feeder VFD Panel -1A / 1B
Cleaning , Blowerning and connection
Tightness to done.
Unit No. # 1 Coal Feeder VFD Panel -1C / 1D
C Cleaning , Blowerning and connection
10.05.2021 Tightness to done.
CPCB Report on dated @10/05/2021 is sent
to all.
All the Report ( APC, Plant Performance ,
Power Report ) is sent to all.
RNRP all nodes found normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison report
prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Following Feeder Isolation Given


1/ Coal Feeder 1A , 1B , 1C & 1D
Reports ( APC, Plant Performance , Power
Tarun Guar Report and Env) send and emailed.
Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Following shutdown given-


1 CHP Crusher-2
All lights made off during morning round.
P&V started in morning round.
RNRP checked found all nodes found UP.
11.05.2021 A Anurag Chowdhury Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

All the AC MCB to OFF Condition.

Unit no. # 1 Fly Ash APH JB connection


tightness , Cleaning and Blowerning to done.

In Fly ash silo No. # 1 Field Inst. And Panel


Cleaning and Blowerning to done.
In Fly ash silo No. # 2 Field Inst. And Panel
Cleaning and Blowerning to done.
In bed ash silo Field Inst. And Panel
Cleaning and Blowerning to done.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
B
11.05.2021 Sanjay Garg
B
11.05.2021 Sanjay Garg General Plant Round taken found all drive
running normal.
Fire Engine battary charging Condition.
P& V No.-2 Stopped at 19.00 PM.
all the manual light to ON Condition.

Following shutdown Given.


1 BC-1.
2. BC-2.

Following shutdown Given.


1 BC-1.
2. BC-2.

In Mech. Worshop 3 Phase Plug Top to


provided to Plasma Machine.
In CHP Building Screen Floor area 24 Volt
LED Plug top to changed.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 2 in stop condition and no. 4 is running.

Unwanted lights made OFF during Plant Round

Reports (APC, Plant Performance, Power Report


and Env) send and email.
RNRP all nodes found UP.
C Jaswant Singh Shift instrument log book filled
12.05.2021
Tarun Gaur
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
C Jaswant Singh
12.05.2021 Tarun Gaur

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried


General Plant Round taken found all drive
running normal.
All the AC MCB to ON Condition.

All the auto drain valve checked in


compressor checked and working Normally.

In WTP DCS Panel ( 05 Nos.) Cleaning and


Blowerning to done.
In Chimney analyzer Boiler No. # 2 SOX
analyzer showing moisture fault. So Reset it.
Now Ok.

BC-1 PCS Controller mounted at Panel side


and work is underprogess by Purshottam.

VAM log digital log book filled.


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
12.05.2021 A Sanjay Garg VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual
Following light toGiven.-
shutdown OFF Condition.
1 BC-1,

P& V System Near Boiler No.-1 area having


water leakage. So Informed to H.Sharma.
One Person Inside the Boiler No.# 1 Lift at
floor No.-2 .So informed to H.Sharma. Alsp
Person taken outside the lift .This is due to
bend of the front door. Presently Emergency
switch is Pressed Condition.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
General Plant Round taken found all drive
running normal.

All the AC MCB made off.

All the auto drain valve checked in


compressor checked and working Normally.

In Chimney analyzer Boiler No. # 2 SOX


analyzer showing moisture fault. So Reset it.
Now Ok.

BC-4 PCS showing active ,not getting


reset,So check physically,& reset 12 no PCS
coal shed side, then take system in line.

B VAM log digital log book filled.


13.05.2021 Ajaya Kumar
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Following shutdown Clear.-
1 BC-1,
2 BC-7A &B
3 Coal crusher-2

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

C Anurag Reports ( APC, Plant Performance , Power


12.05.2021 Report and Env) send and emailed.
Chowdhury
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
General Plant Round taken found all drive
running normal.
Following shutdown given-
1 CHP Crusher-2

All lights made off during morning round.

P&V started in morning round.

RNRP checked found all nodes found UP.


A
13.05.2021 Tarun Guar
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Swichyard logbook
Shift abnormality  digital log book filled.

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive running


normal.

All the AC MCB made off.

VAM log digital log book filled.

RNRP all nodes found Normal.

13.05.2021 B Jaswant Singh Shift instrument digital log book filled

UPS log digital log book filled.

Shift abnormality  digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
General Plant Round taken found all drive running
normal.

All the AC MCB made off.

VAM log digital log book filled.


Ajaya Kumar RNRP all nodes found Normal.
Shift instrument digital log book filled
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

C
General Plant Round taken found all drive
running normal.

C
13.05.2021

Power report, EMS and Comparison report


prepared and emailed

Anurag P&V no. 4 in stop condition and no. 2 is running.


Chowdhury
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB made off.

CPCB & ETP site date & time not updating at


page mail given to vendor for necessary
correction-U/P
P&V no. 2 started at 8AM
VAM log digital log book filled.
14.05.2021 A Jaswant Singh RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following S/D given-
1) ACW-3
2) 12MV4306
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

All the AC MCB to OFF Condition.


In IAC No. # 1 panel door is in opened
condition. So panel door to closed.
All the CHP DCS panel Blowerning and
Cleaning to done.
Coal Feeder -1A / 1B Load cell door to
closed.

Coal Feeder -1A / 1B Pneumatics air


isolation valve permit to closed condition.
Also air line is in charged condition.

In workshop MV drive Temp. is Increased to


44 degree. So 02 Nos AC is statred. After
Temp. is normalized then AC is in OFF
Condition.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
B running normal.
14.05.2021 Sanjay Garg
Fire Engine battary charging Condition.
P& V No.-2 Stopped at 18.00 PM.
all the manual light to ON Condition.
14.05.2021 Sanjay Garg

Following shutdown Given.


1 ACW Pump No.-3.
2.12MV4306.
3. Coal crusher No.-2.
4. Coal feeder- 1B.
5. 01MV0910.
6. Coal Feeder -1B pneumatics Valve.
7. Coal feeder- 1A.
8. 01MV0909.
9. Coal Feeder -1A pneumatics Valve.
10. BAC-1A .
11. BAC-1B.

ACW No. # 3 Motor connection removed.


Again motor connection as per mech.
Requirement.
Boiler No. # 1 Lift showing 2 F fault. So
Sensor cleaned also EPB is in Pressed
condition also is in stopped condition.
Unit No. # 1 ACC Side Light to OFF
Condition.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison report
prepared and emailed
P&V no. 2 in stop condition and no. 4 is running.

Unwanted lights made OFF during Plant Round

Reports (APC, Plant Performance, Power Report


and Env) send and email.
RNRP all nodes found UP.
Shift instrument log book filled
C Ajaya Kumar/Tarun Shift abnormality  digital log book filled.
14.05.2021
Gaur Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Gaur

Power report prepared and mail


FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB made off.

CPCB & ETP site data reading noted working


normal

P&V no. 2 started at 8AM

Unwanted lights made OFF during Plant Round

VAM log digital log book filled.


A RNRP all nodes found Normal.
15.05.2021 Jaswant Singh
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.

Following S/D given-


1) ACW-2
2) 12MV4305
3) BC-6
4) RECLAIMER(operation)
5) RECLAIMER(maint.)
6) Jockey Pump-1

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

All the AC MCB to OFF Condition.

In Unit No. # 1 Fly ash system Vessel no.-


12/22 JB Cable Dressing , Connection
tightness , Cleaning and Blowerning to done.

In Unit No. # 1 Fly ash system Vessel no.-


11/21 JB Cable Dressing , Connection
tightness , Cleaning and Blowerning to done.

In WTP ACF# 1 Backwash O/L ( SV-4818)


Limit is not working condition. So New Limit
switch mounted at site. And Trial taken. It is
working Normally.

In Chimney analyzer Boiler No. # 2 SOX


analyzer showing moisture fault. So Reset it.
Now Ok.
15.05.2021 B Sanjay Garg RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary charging Condition.
P& V No.-2 Stopped at 18.00 PM.
all the manual light to ON Condition.
Following S/D cleared.-
1)PA Fan-1
2. ID Fan-1 ( 02 Times .)
3) BC-6
4) RECLAIMER
6) Jockey Pump-1

In Boiler Lighting time ON Time Changed


from 18.45 PM to 19.15 PM. Also OFF time
changed from 6.25 AM to 6.05 AM.
Street Light Lighting timer Changed from to
7.20 PM.
Unit No. # 1 ID , FD and PA Fan Polythene
Cover removed as per Shift Incharge
requirement.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed

P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

C Anurag
15.05.2021 Chowdhury
Reports ( APC, Plant Performance , Power
Report and Env) send and emailed.
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

At compressor house air leakage from auto


drain valve. So rectified it. Now Ok.

At 4.5 Mtrs Unit No. # 1 MV Drive Room


AHU is started.
In Chimney analyzer Boiler No. # 2 SOX
analyzer showing moisture fault. So Reset it.
Now Ok.

Unit No. # 1 ID Fan Breaker started then U2


OVP fault showing at MV Drive display. So
informed to sati ji and hemant Sharma. They
come at site. Checked the cell U2 Voltage . It
is showing Normally. Then Start the Drive. It
A is running Normally. For ID and PA Fan
16.05.2021 Sanjay Garg
Interlock Button is in Pressed Condition.
also relesed.

Unit No. # 1 J-valve Fan -1A , ID Fan , PA


Fan , SA Fan is started. Also stopped.

VAM log digital log book filled.


RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown Given.-
1 BC-2,
P&V no. 2 started at 8AM
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
General Plant Round taken found all drive
running normal.
At compressor house auto drain valve.
Checked & found Ok.
At 4.5 Mtrs Unit No. # 1 MV Drive Room
AHU is stopped
In Chimney analyzer Boiler No. # 2 SOX
analyzer showing moisture fault. So Reset it.
Now Ok.
Unit No. # 1 ID Fan DE & NDE side RTD JB
cleaning & blowering work done.
Both JB packed with new polythene.
VAM log digital log book filled.
RNRP all nodes found Normal except
SPC007
B Shift instrument digital log book filled
16.05.2021 Ajaya Kumar
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown cleared-
1 BC-2,

P&V no. 2 started at 8AM


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison report
prepared and emailed

P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

Reports (APC, Plant Performance , Power and


Env. Report) send and email.
16.05.2021 C Jaswant Singh
Tarun gaur
RNRP all nodes found UP except SPC007 .
Shift instrument log book filled
Shift abnormality  digital log book filled.
All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.


Coal Feeder -2A Tripped due to Plough
Discharge. So Cleaned the Contact of the
Polugh Discharge. Also Packing to done.
Now Ok.

Unit No. # 1 PA Fan Vibration Cable and


Vibration probe and FAN DE and NDE RTD
Removed as per Jitesh Paliwal requirement.
Vibration Probe kept at Inst. Lab. Locker
No.-14.

Unit No. # 2 Boiler area Drum Floor ,


Cyclone Floor area , and Both side Oxygen
Probe polythene Covering to done.
VAM log digital log book filled.
RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
A all the manual light to OFF Condition.
17.05.2021 Sanjay Garg

Following shutdown Given.-


1 BC-1,
2. BC-6
3. En Mass Conv.-2,
4. PA Fan Unit No. # 1,
5. CEP-1A,
6. CEP-1B ,
7. 01MV2901,
8. 01MV2902,
9.ID FAN Unit-1,
10 FD Fan Unit-1,
11 PA Fan Unit-1,
12 P Fan Unit-1,
13 J valve 1A,
14 J valve 1B,
15 Coal Feeder 1A,
16 Coal Feeder 1B,
17 Coal Feeder 1C,
18 Coal Feeder 1D,
19 S0ot Blower Unit-1,

P&V no. 2 started at 8AM


24 Volts hand lamp to Provided at BC-7A / 7B
Floor area.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
General Plant Round taken found all drive
running normal.
All the AC MCB to OFF Condition.

BA silo RAV tripped on overload So ,reset


the same & running normal.
Workshop MV Drive Room check for rain
water entry inside, No water found in the
room.
Workshop EOT crane got fault during heavy
rain ,so powr made off from workshop
bacde SFU.
VAM log digital log book filled.
RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
B UPS log digital log book filled.
17.05.2021 Ajaya Kumar
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown Cleared-
1 BC-1,
2. BC-6
3. En Mass Conv.-2,

P&V no. 2 started at 8AM


24 Volts hand lamp to Provided at BC-7A / 7B
Floor area.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in running condition and no. 2 is
Stopped.
Unwanted lights made OFF during Plant Round

Jaswant Singh /
C
17.05.2021 Anurag
Chowdhury
CD not operate/detect, so following Reports not
able to send (APC, Plant Performance , Power
and Env. Report)

Jaswant Singh /
C
17.05.2021 Anurag
Chowdhury RNRP all nodes found UP except SPC007 .
Shift instrument log book filled

Shift abnormality  digital log book filled.


All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

Boiler-2 APH -2 level showing HH, Checked


& found materila available in side hooper.

Workshop EOT crane fuse checked,02 no,s


fuse found open.

VAM log digital log book filled.

RNRP all nodes found Normal except


SPC007
Shift instrument digital log book filled
A
18.05.2021 Ajaya Kumar UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
Following shutdown given-
1 Reclaimer
2. Coal crusher-2
3. En Mass Conv.-2,
P&V no. 2 started at 8AM
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

BA silo RAV tripped on overload So ,reset


the same & running normal.

Workshop MV Drive Room check for rain


water entry inside, No water found in the
room.
Workshop EOT crane got fault during heavy
rain ,so powr made off from workshop
bacde SFU.
VAM log digital log book filled.
RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
B Shift abnormality  digital log book filled.
18.05.2021 Tarun Guar
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.

Following shutdown Cleared-


1 Crusher-2
2. Reclamier
3. En Mass Conv.-2,
4. CEP 1&2 (Unit-1)
5. CEP Outlet MOV-1 &2
6. Drain Pot- 1&2

P&V no. 2 stop at 4.00 PM


24 Volts hand lamp to Provided at Boiler -1 J
Valve
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

Unit No. # 2 Bed ash cooler -2A and 2B VFD


panel Blowerning and Cleaning to done.

Unit No. # 2 Bed ash cooler -2A and 2B VFD


panel Filter Cleaning to done.
In workshop MV drive Temp. No rain water
found inside the room.
Sanjay Garg
In Online CPCB Data SPM Reading is hold
from 18/05/21 at 9.15 PM.
CPCB Report on dated @18/05/2021 is not
sent to all Because CD is not working
condition.
All the Report ( APC, Plant Performance ,
Power Report ) is not sent to all Because CD
is not working condition.

C RNRP all nodes found Normal except


18.05.2021 SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Anurag Shift abnormality  digital log book filled.


Chowdhury
Anurag
Chowdhury All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
General Plant Round taken found all drive
running normal.

All the AC MCB to OFF Condition.

4.5 Mar. MV drive AHU start as MV drives


start for fan trial.

VAM log digital log book filled.

RNRP all nodes found Normal except


SPC007

Shift instrument digital log book filled


UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
A General Plant Round taken found all drive
20.05.2021 Ajaya Kumar
running normal.
all the manual light to OFF Condition.

Following shutdown given-


1 Reclaimer
2. Coal crusher-1
3. En Mass Conv.-2,
AVI given for- ID fan
-1 PA fan-1
J valve 1B

P&V no. 2 started at 8AM


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

CHP mcc light not glowing so checked the


supply at 4.5 mtr area feeder found healthy
& so checked at chp mcc side found one mcb
got tripped due to this MCCB got tripped,
put it in off & charged others now ok.

Following shutdown Cleared-


1 Crusher-1
2. Reclamier
3. En Mass Conv-2

B
19.05.2021 Jaswant Singh

PA-1 motor RTD JB Covering by Polythene

VAM log digital log book filled.


RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to OFF Condition.

CHP mcc door access machine not working,


so checked the supply & found one mcb got
tripped due to this MCCB got tripped, put it
in off & charged others now ok.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

Fly ash Silo No. # 1 Field Inst. / panel


Blowerning and Cleaning to done.
Fly ash Silo No. # 2 Field Inst. / panel
Blowerning and Cleaning to done.
Bed ash silo Field Inst. / panel Blowerning
and Cleaning to done.
Sanjay Garg Unit No. # 2 all the Bunker Level
Transmitter Level Probe to cleaned.
CPCB Report on dated @19/05/2021 is not
sent to all Because CD is not working
condition.
All the Report ( APC, Plant Performance ,
Power Report ) is not sent to all Because CD
is not working condition.
RNRP all nodes found Normal except
SPC007
C
19.05.2021 Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Anurag Shift abnormality  digital log book filled.


Chowdhury All Energy Meter manual Reading taken for
Power Report.
Anurag
Chowdhury

Power report prepared and mail


FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

Following shutdown Cleared-


1) Bucket ele-2 (CHP)
2) Bucket elevator put in remote mode

B P&v-2 started at 2pm & again stopped at


20.05.2021 Jaswant Singh 7PM

VAM log digital log book filled.

RNRP all nodes found Normal


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to OFF Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All the AC MCB to on Condition.

At 7:13 AM PA fan-2 got tripped on motor


DE side 02TI903 bearing temp HH(103
degc), MFT occured & after some time ID fan
tripped(entire plant tripped) at 7:21 AM

DG started & aux supply normalised &


J-vlv fan started at 8:45AM
ACW pump-1 started at 8:55 AM

PA -2 motor bearing temp RTD duplex pair


taken in line as per HOD sir instruction
( presently both pair is healthy as showing
same resistance

A UPS-1B mains supply not detected due to


21.05.2021 Jaswant Singh
this operate on battery mode load shifted on
slave unit & again normalised, now ok

TG-2 sync at 11:32 AM


VAM system not able to start due to cooling
water I/L temp HH, so all other AC system
taken in line & after normalised the temp
again taken in line
Following shutdown Cleared-
1) Bucket elevator -1 put in Local mode
VAM log digital log book filled.
RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to OFF Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

All the AC MCB to OFF Condition.

VAM System is Tripped due to High STG


Vapour Temp. So reset it. All the AHU Put
into Auto mode. Also Steam Control Valve
opening reduced to 60 %.
All the AC of MV Drive Room and UPS to OFF
Condition.
In Chimney analyzer AC is Started . Then it is
Tripped to E3 Fault. Again OFF and
Restarted it. Then again fault is showing in
AC. So OFF the AC.

In Chimney analyzer Chimney data is not


showing in controller as well as DCS. So
Zero calibration done in the Controller. Now
B Reading are under observation.
21.05.2021 Sanjay Garg

BC-6 TPH is not showing at DCS end. So


checked and found that fault LED is ON in
Panel. Also display is not showing in the
Controller. So Supply Reset. Again fault is
showing in Panel. Need to check.

In reclaimer UPS is OFF Condition. So


charged the battery of the UPS. Then Started
it. Now Ok.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary charging Condition.
P& V No.-2 Stopped at 18.00 PM.
all the manual light to ON Condition.
Bucket Elevator no.-1 put into the auto mode.
Also taken in VFD Mode.
Boiler No. -1 Bed material RAV Feeder
charged condition as per Vishkarma
requirement.
WTP Pump House Motor Cleaning and
Blowerning to done.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

General Plant Round taken found all drive


running normal.

Service air driyer Moisture drained.

All the auto drain valve checked in


compressor checked and working Normally.

CPCB Report on dated @21/05/2021 is not


sent to all Because CD is not working
condition.
All the Report ( APC, Plant Performance ,
Power Report ) is not sent to all Because CD
is not working condition.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
C Shift abnormality  digital log book filled.
21.05.2021 Ajaya Kumar
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Power report, EMS and Comparison report
prepared and emailed
P&V no. 4 in stop condition and no. 2 is running..

Unwanted lights made OFF during Plant Round

Shift abnormality  digital log book filled.


All Energy Meter manual Reading taken for
Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to on Condition.

22.05.2021 A Jaswant Singh Following shutdown Given/Cleared-


1) Bucket elevator -2 put in Local mode as
per request of (Mr. APS)

VAM log digital log book filled.


RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
All the manual light to OFF Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Service air driyer Moisture drained.


All the auto drain valve checked in
compressor checked and working Normally.

All the AC MCB to OFF Condition.

CPCB Data is not showing in the Controller


as well as DCS. So Changed the Controller
also zero calibration to done. Now Ok.

Online CPCB data is not showing in CPCB


website. So discuss with adage Person. Then
rectified the Problem. Now Ok.

B RNRP all nodes found Normal.


22.05.2021 Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Fire Engine battary charging Condition.
all the manual light to ON Condition.
Bucket Elevator no.-2 put into the auto mode.
Also taken in VFD Mode.

Boiler No.# 2 Lift showing 2F fault. So Power


reset and sensor to cleaned. Now Ok.

Unit No. # 2 ACC Side Repair Supply Box


Polythene Coverning to done.
Following check list prepared
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

BC-3 Belt is Tripped when it is started at


DCS end. While in Local It is running
Normally. At site found that Guard limit
switch Rope is in loose condition. Due to this
belt slip is showing at DCS end. So tight the
guard limit rope. Now Ok.
Chimney analyser Room Panel Blowerning
and Cleaning to done.

In CHP , T-1 Tower bag filter VFD Panel


Blowerning and Cleaning to done.
VAM log digital log book filled.
RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
23.05.2021 A Sanjay Garg VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
Following shutdown
all the manual light toGiven.-
OFF Condition.
1 Coal Feeder-2B,

Following S/D are Cleared.


1. BC-2,
2. Unit No. # 1 PA Fan.

Oil Centrifuse Unit No. # 2 Tripped due to


Emgerency. So relased the Emergency. Now Ok.

24 Volts hand lamp Repaired at Coal Feeder -2B


area.
AVI of Coal feeder-2B given. Again Coal feeder
Clean Run motor Tripped on over load. Also S/D
to given.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.
All the AC MCB to OFF Condition.

B Following shutdown Cleared-


23.05.2021 Jaswant Singh 1) Coal feeder-2B -AVI given & close (two
times)

VAM log digital log book filled.


RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS and Comparison report


prepared and emailed
P&V no. 4 in stop condition and no. 2 is running.

Unwanted lights made OFF during Plant Round

Reports ( APC, Plant Performance , Power


Report and Env) send and emailed.
RNRP all nodes found UP.
C Anurag Shift instrument log book filled
23.05.2021
Chowdhury Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All the AC MCB to OFF Condition.


Following shutdown Cleared-
1) Coal feeder-2B -AVI given & close (two
times)

VAM log digital log book filled.


Ajaya
B
24.05.2021 Kumar/Gajendra
pandya RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Power report, EMS prepared and email

P&V no. 2 in stop condition and no. 4 is running.

Unwanted lights made OFF during Plant Round

Reports (APC, Plant Performance , Power Report


and Env) send and email.
RNRP all nodes found UP.
C Anurag
24.05.2021 Chowdhury / Shift instrument log book filled
Jaswant Singh Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round
24.05.2021 C Chowdhury /
Jaswant Singh

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
FH & HOD Report prepared and mailed
DG report prepared and upload in SAP.
EMS v/s manual Power Comparison Report
prepared and mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.


Following shutdown Cleared-
1 BC-1
2. Reclamier
3. BC-2
4. Tg-2 Enclosure fan

VAM log digital log book filled.


A
25.05.2021 Ajaya Kumar
RNRP all nodes found Normal

Shift instrument digital log book filled

UPS log digital log book filled.


Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Anurag
Shutdown cleared for:-
a) BC-1
b) BC-2
c) Reclaimer

Anurag All instrument and electrical logbooks filled.


25.05.2021 B Chowdhury
P&V-2 made off at 7.00pm
Lights made on manually in evening.
Shift abnormality  digital log book filled.
RNRP all node status is UP.
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Date Shift Engineer Name
General Plant Round taken found all drive running normal.
VAM area round taken all parameter found normal, MV drive room tem
Boiler-1 side lights 4th floor made off
All EMS and power report prepaired and mail to all
C All Instrument report mail to all concern
25.05.2021 Gajendra Pandya
DG power report prepaired and upload in SAP
All instrument and electrical logbooks filled.
RNRP all node status is UP.
a) Generator-1  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive
running normal.
All the AC MCB to OFF Condition.
Following shutdown given-
1 BC-1
2. AOP-2A
3. AOP-2B
4. EOP-2 5.
02MV2305 6.
02MV2311 7.
BC-4 8.
Enmass-2 9. Coal
crusher-2
A
26.05.2021 Ajaya Kumar
VAM log digital log book filled.
RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Shutdown cleared for:-


a) BC-1
b) BC-4
c) Coal Crusher-2
d) Enmass-2

Anurag
26.05.2021 B Chowdhury
All instrument and electrical logbooks filled.
P&V-2 made off at 7.00pm
Lights made on manually in evening.
Shift abnormality  digital log book filled.
RNRP all node status is UP except SPC007
a) Generator-2  checklist
b) Generator-2  checklist
c) Elect .Shift checklist
d) Switchyard logbook
Date Shift Engineer Name
General Plant Round taken found all drive
running
VAM area normal.
round taken all parameter found
normal, MV drive room temp found normal.
Silo area lights made ON as per requirment
All EMS and power report prepaired and
mail to all
C All Instrument report mail to all concern
26.05.2021 Gajendra Pandya DG power report prepaired and upload in
SAP
All instrument and electrical logbooks filled.
RNRP all node status is UP.
a) Generator-1  checklist
c) Elect .Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All the AC MCB to ON Condition.


Following shutdown given-
1 BC-1
2. BC-2
3. BC-4
4. ACW pump -2
5. ACW-2 discharge MOV-12MV4305
6. Generator-2
7. Barring gear-2
8. 02MV2305
9. 02MV2306

27.05.2021 A Purushottam Following shutdown Cleared-


1. ACW pump -2
2. ACW-2 discharge MOV-12MV4305

VAM log digital log book filled.

RNRP all nodes found Normal


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name
General Plant Round taken found all drive running normal.
VAM area round taken all parameter found normal, MV drive room tem

Following shutdown cleared:


1 BC-1
2 BC-2
3 BC-4

En mass-2 put in remote from local


compressor house lighting timer adjusted 7.00 pm to 7.30 pm
LED light provided in TG -2 Enclosure
27.05.2021 B Gajendra Pandya boiler-2 both side all RSB panel door closed
coal shed area Light made ON as per requirment
27.05.2021 B Gajendra Pandya

at 6.00 pm coal feeder-2C pnemetic plate valve closed suddenly, due to


opening of plate valve sudden coal fall in furnace and furnace draft gon
Imidiatly reset MFT and reset all coal feeders and SA Fan-2 and ON all
plate valve-2C in open condition and its control air Valve made OFF. fu

All instrument and electrical logbooks filled.


RNRP all node status is UP.
a) Generator-1  checklist
c) Elect .Shift checklist
General Plant Round taken found all drive
running normal.
All the AC MCB to OFF Condition.
All EMS and power report prepaired and
mail to all

All Instrument report mail to all concern

Ajaya RNRP all nodes found Normal


27.05.2021 C Kumar/Tarun Shift instrument digital log book filled
Gaur UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB made to on Condition.

All the manual light to off Condition.

A
28.05.2021 jaswant Singh
BC-2 & Enmass-2 put in local mode as per
request by(Mr.APS)

BC-2 mech job completed so again put in


remote.

A Following shutdown given-


28.05.2021 jaswant Singh 1 Coal feeder-2C
2 02MV0911 (2C-Discharge MOV)
3 Reclaimer
4 BC-1

Following shutdown closed-


1 Coal feeder-2C
2 02MV0911 (2C-Discharge MOV)
CPCB & ETP data site checked found data
working normal, report sent on mail

VAM log digital log book filled.


RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

In workshop MV drive Temp. is Increased to


44 degree. So 01 Nos AC is statred. After
Temp. is normalized then AC is in OFF
Condition.

Conference Room AC is ON as per


requirement. Also OFF the AC.
BC-7A / 7B Belt all the bag Filter panel
Blowerning and Cleaning to done.
VAM log digital log book filled.
Unit No. # 2 Load cell Air Purging to done.
28.05.2021 B Sanjay Garg /
gajendra Pandya
28.05.2021 B Sanjay Garg /
gajendra Pandya RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
En mass-2 put in remote from local
Following shut down cleared
1) BC-1
2) Reclaimer
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
All the AC MCB to OFF Condition.
All EMS and power report prepaired and
mail to all

All Instrument report mail to all concern


RNRP all nodes found Normal
Ajaya Shift instrument digital log book filled
C
28.05.2021 Kumar/Tarun UPS log digital log book filled.
Gaur Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

All the AC MCB made to on Condition.

All the manual light to off Condition.


Following shutdown given-
1) Coal Crusher-2
CPCB & ETP data site checked found data
working normal, report sent on mail
Following shutdown closed-
1) ID FAN-1
2) PA FAN-1
3) J-VALVE FAN 1A
4) J-VALVE FAN-1B (VVFD)
5) COAL FEEDER-1A
6) COAL FEEDER-1B
29.05.2021 A Jaswant Singh 7) COAL FEEDER-1C
8) COAL FEEDER-1D
9) UNIT-1 SOOT BLOWER
10) SA FAN-1 LT MOTOR/01AN0903
11) P FAN-1

VAM log digital log book filled.


RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to OFF Condition.

CPCB Data is not updating in the online


CPCB website. While updating in Chimney
analyzer PC. So inform to Mr. Tarun.

Unit No. # 1 APH O2 , Left and Right O2


Probe and Controller polythene Coverning
to done.

Unit No. # 1 ID Fan RTD JB Cable dressing to


done.
Coal feeder-1C Pneumatics Valve not
operated from DCS. So hose Pipe Tube
interchanged. Now Ok.
VAM log digital log book filled.
RNRP all nodes found Normal except
SPC007
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
29.05.2021 B Sanjay Garg General Plant Round taken found all drive
running normal.
All the manual light to on Condition.

Following shut down cleared


1) EOP Unit No. # 2,
2) AOP-2A
3. AOP-2B
4. 02MV2305
5. 02MV2311
6. CEP-2B
7. CEP-2B O/L MOV.
8. Coal Crusher- 2

BC-5 Motor feeder Problem. So BC-3 feeder


is inseted. Now Ok.

BC-5 Ground Hooper is not started at DCS


end. So 2 times A/M switch is operated. Also
Manual RPM is reduced. Also feeding is in
Very high. So informed to Shift Incharge.

In SWAS Room 24 Volts LED Light to


provided.
ACW-2 Motor Connection to done. Earthing
is Pending Condition.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
All the AC MCB to OFF Condition.
All EMS and power report prepaired and
mail to all

All Instrument report mail to all concern


RNRP all nodes found Normal
Shift instrument digital log book filled
C
29.05.2021 Tarun Gaur UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
29.05.2021 C Tarun Gaur

All the manual light to on Condition.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

Unit No. # 2 Oil O/H Tank High Level switch


is not showing at DCS end. So set the Limit
Switch and Connection tightness to done.
Now Ok.-

CPCB Data is not updating in the online


CPCB website. While updating in Chimney
analyzer PC. So inform to Mr. Tarun.

ACC Fan # 2B Flow switch is not showing at


DCS end. So cleaned the flow switch and set
it. Now Ok.

ACC Fan # 2F Flow switch is not showing at


DCS end. So cleaned the flow switch and set
it. Now Ok.

In Reclaimer Boom belt is not started . So


checked and found that Motor side Ok. Since
30.05.2021 A Sanjay Garg DO is not generated from PLC end. So
checked and found that some modifaction at
O/L Relay side. So removed it. Now Ok.

TG # 2 Rolling is started at 11.00 AM and


synchronised.
VAM log digital log book filled.
RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
P & V System No.-4 is started at 11.30 AM.
P & V System No.-2 water valve open condition.

In BC-5 Feeder Current Transducer to changed.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Tg-2 stopped at around 4:15 PM, So load
shifted to TG-1 ,

Again TG-2 synchronized at 4:40 Pm after


brush change & TG-1 stopped at 4:45 PM.

RNRP all nodes found Normal


Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
All the manual light to on Condition.
Ajaya Following check list prepared
30.05.2021 b Kumar/Gajendra
Pandya a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Following shut down given
1) BC-5
2) Reclaimed
Following shut down cleared
1) BC-5
2) Reclaimed
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.

Power report, EMS prepared and email

P&V no. 2 in stop condition and no. 4 is running.

Unwanted lights made OFF during Plant Round

Anurag
CD not working due to this Reports not
generated(APC, Plant Performance , Power
Report and Env)

Anurag
30.05.2021 C Chowdhury /
Jaswant Singh CPCB site data not updating at portal, ETP data
is normal at site, report send on mail
RNRP all nodes found UP.
Shift instrument log book filled
Shift abnormality  digital log book filled.
Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
DG report prepared and upload in SAP.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Shift Regular jobs carried

General Plant Round taken found all drive


running normal.

All the AC MCB to ON Condition.

Unit No. # 1 04 Nos. DSH Station , 03 Nos.


FWCV , SA Fan IGV , PA Fan IGV , and ID Fan
IGV Polythene Coverning to done.

Air leakage found in PU Tube of Unit No. # 2


11-21 SOV Box. So PU Tube Changed. Now
Ok.
CPCB online data is showing normally in
website.
VAM log digital log book filled.
RNRP all nodes found Normal
Shift instrument digital log book filled
UPS log digital log book filled.
Shift abnormality  digital log book filled.
VAM log digital log book filled.
A
31.05.2021 Sanjay Garg General Plant Round taken found all drive
running normal.
all the manual light to OFF Condition.
P & V System No.-2 is started at 9.00 AM.
31.05.2021 Sanjay Garg

Following shut down given


1) BC-5
2) Coal Crusher No.-2
3. BAC-1A

Following shut down cleared


1) J-Valve Fan-1A
2) J-Valve Fan-1B
Inst. Lab AC is not working Condition. Found
that Netural wire Cut condition. So
Reconnected it. Now Ok.
01 Nos. 24 Volts LED Light is in charging
Condition in 4.5 Mtrs.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Coal feeder 2B RPM fluctuating , so check


load cell one load cell varying resistance,So
this load cell wire removed & try on single
load cell working normal,then take I
remote ,working OK.

Coal bunker 2D level stucked at 5.8mter, so


cleaned the same & take in line But Mamps
not showing so need to check.

RNRP all nodes found Normal

Shift instrument digital log book filled


UPS log digital log book filled.
Ajaya VAM log digital log book filled.
31.05.2021 B Kumar/Gajendra
Pandya All the manual light to ON them
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
AVI given for ACW-2 Pump and again
cleared its AVI
Following shut down given
1) BC-1
2) BC-2
3) reclaimer

Following shut down cleared


1) BC-1
2) BC-2
3) reclaimer
4) BC-5
Date Shift Engineer Name Regular jobs

Coal feeder 2B RPM fluctuating , so check


load cell one load cell varying resistance,So
this load cell wire removed & try on single
load cell working normal,then take I
remote ,working OK.

Coal bunker 2D level stucked at 5.8mter, so


cleaned the same & take in line But Mamps
not showing so need to check.

RNRP all nodes found Normal

Shift instrument digital log book filled


UPS log digital log book filled.
Ajaya VAM log digital log book filled.
31.05.2021 B Kumar/Gajendra
Pandya All the manual light to ON them
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
AVI given for ACW-2 Pump and again
cleared its AVI
Following shut down given
1) BC-1
2) BC-2
3) reclaimer

Following shut down cleared


1) BC-1
2) BC-2
3) reclaimer
4) BC-5
Date Shift Engineer Name Shift Regular jobs carried
General Plant Round taken found all drive
running normal.
Power report, EMS prepared and email

P&V no. 2 in stop condition and no. 4 is running.

Unwanted lights made OFF during Plant Round

Reports generate of (APC, Plant Performance ,


Power Report and Env)
CPCB & ETP data is normal at site, report send
on mail
RNRP all nodes found UP.
C Anurag Shift instrument log book filled
31.05.2021 Chowdhury /
Jaswant Singh

Shift abnormality  digital log book filled.


Unwanted lights made OFF during Plant Round

All Energy Meter manual Reading taken for


Power Report.
Power report prepared and mail
DG report prepared and upload in SAP.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Abnormality jobs attended

Unit No. # 2 BAC-2B level Probe not showing High signal.


So calibrated it. Also Changed the inside Controller card.
Now Ok.

In Chimney analyzer PC data is not showing. So Restart


the PC. Now Ok.
Abnormality jobs attended

New green sticker pasted at boiler-1 on 03no's of


welding machine
Unit-2 bag house 11-21 conveying line back pressure tx
not showing due to line block so line flushing & Tx
cleaning done now ok.

01 no's of LED light arrangement at boiler-1 PA fan

01 no 's welding machine connnection given at PA fan-1

Boiler-1 APH area hand lamp not glowing so checked &


lamp replacemenet done now ok

ACC-1B, 1E, & 1A lube oil motors connection & earthing


cable connected

Bucket elevator -2 control wiring traced for dcs logic & cable
dressing job, trial taken working normal

Abnormality jobs attended


B-phase ammeter of Gen-1 mimic panel was faulty so
replaced.

ACC-1 and GSC-1A and 1B motors fixing done of gland seal


with m-seal.
Abnormality jobs attended
Unit-2 bag house fludising valve operating wrong, so
checked and found that its air tube fitting direction is not
correct, so interchaange the air tubes, now working
normal

unit-2 21 vessele dome valve air line lekage found , so


arrest the leakage
Abnormality jobs attended
unit-2 11-21 back pr tx line cleaning done

02 FIC2907 not operate as per command so air adjusted


now ok
chp both line tripped due to jamming , bucket elevator
mains supply tripped , taken in local & jamming clear
now ok

Abnormality jobs attended


In Chimney analyzer Boiler No. # 2 SOX analyzer
showing moisture fault. So Reset it. Now Ok.

Online CPCB data is not update in online website.

ACC lube oil pump-1E trippe don start found the y-phase fuse
was blown. So checked field side found the termination end
cable was not properly insulated and gap was close. So
opened all cable properly insulated and gland connected.
Then resistance was balance at 27ohm and megger OK. Trial
taken now normal.

ACC lube oil pump-1F current not coming in DCS end on run.
So replaced the tranducer and then trial taken found normal
now.
Abnormality jobs attended

TPP workshop unit-2 mv drive room high temp alarm so


checked the same found VAM was not supply cooling air
because of low water in makeup tank, so 11 TR AC
started & also AHU filter & coil cleaning done

CHP diverting for line -1&2 valve limit assembly checked


as per operation requirement found both is working
normal but mounting welding damaged so informed to
operation & chp maintenance team.

VAM 22 mtr DM water tank top up from dosing room


area, new hose pipe laid with help of mech team, now ok

TPP workshop AHU filter & condensor coil cleaning job-


completed

11TR AC outdoor condensor cleaning & also cooling


water outlet valve flow adjustment job as both AC were
tripping on HP/LP alarm
Abnormality jobs attended
U-2 workshop MV drive temp was high so checked with maint.
Found that line choke of AHU chiller line. So cleared and then line
charged. Later AC made off and ACW swtpoint normalised.

WTP bomb calorimeter sample stand was loose so fixed with m-seal.

TCV3201 air leakage from incoming so arrested.

Abnormality jobs attended

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault. So Reset it. Now Ok.
security tower-2 light is not glowing so check and found its
timer stuck, so reset it.

Abnormality jobs attended

Bucket elevator-2 tripped from VFD on start, jamming was


there. Also VFD not taking load on jam condition. The VFD trip
current setting need to be checked as it is tripping near 16A
and FLC is 26A.
Abnormality jobs attended

In RO HPP No. # 1 VFD Tripped due to F022 fault. So


Reset it. Also checked the Three phase supply. It is
showing Normally. Now Pump is running normally.

Unit No. # 2 Vessel No.-11/21 back Pr. Transmitter ,


Back Pr. Switch and Seal Pr. Switch impluse line is
heavily chocked condition. So cleaned the impluse line.
Now Ok.

In CHP Bucket Elevator No.-1 and 2 VFD Over load


setting changed. Tial is taken. Now working Normally.
Abnormality jobs attended

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault. So Reset it. Now Ok.
Abnormality jobs attended
Bed ash silo RAV got overload after jam clearing
overload reset and started.

Boiler-2 12-22 system seal line air leakage same was


rectified and taken in line.

Boiler-1 Lift came fault and zerometer door was not


closing , proper cleaning done at door ,power reset done
& trial taken
TG-1 Lift got stopped working, power made off.checking
U/P

TG-1 Centrifuge oil heaters not working checked


suspecting controller RTD card faulty. To be checked
Abnormality jobs attended
Inst Comp-1 found in fault, checked VFD alarm was there of
66, cooling fault. Found room temp was high at 39 deg C. So
reset AC alarm and brought temp at 30 deg C and then reset
the VFD alarm, now OK.

TG lift was off condition so started and checked all control


tighjtness, door sensors and alignment of door and door top
lock position. Later after few operation lift taken in line.

4.5m MCC room AHF-1 back side rubber mat proper laying
done.
Abnormality jobs attended
Bed ash silo RAV got overload after jam clearing
overload reset and started.

Boiler-2 APH dome getting struck up, same was checked and
taken into operation

Boiler-2 APH dome cylinder Base bolt found loose same was
tightness done

Abnormality jobs attended

Boiler-1 Soot blower drain line temp switch cum gauge


glass found broken so re-fix it & tape provided, now ok

Coal feeder-1B discharge pipe RTD cable found


undressed so dressing work done

Soot blower panel-1 terminal tightness & cleaning &


blowering job -completed
Abnormality jobs attended
Mist fan-1A permissive not coming in DCS so checked and
found SFT side NC contact was not making proper contact, so
replaced from spare and made healthy.

Boiler-1 11-21 and 12-22 back pressure switch and TX line


flushing done due to heavy dust.

Boiler-2 APH vessel-2 dome fault due to dome not operating


completely towards limit, so informed CCR.
Comp house auto drain manual operation done.

Abnormality jobs attended


Boiler-2 APH vessel-2 dome fault due to dome not operating
completely towards limit, Dome Valve is in jammed condition.
So Informed to Shift Incharge.
Unit No. # 2 APH Vessel Back Pr. Switch and Transmitter
is not showing at DCS end. So Cleaned the Impluse line.
Now Ok.
Unit No. # 2 Vessel No.-11 /21 Back Pr. Switch and
Transmitter is not showing at DCS end. So Cleaned the
Impluse line. Now Ok.

Unit No. # 2 Vessel No.-11 /21 Seal Pr. Switch is not


showing at DCS end. So Cleaned the Impluse line. Also In
Vessel No.-11 Heavy material in seal Pr. Tube. So open
the both the Seal pr. Tube. Also inform to shift Incharge.

VAM System is Tripped due to High STG Temp. So reset


it. All the AHU Put into Auto mode. Also in Workshop
Room Two AC is in running condition.
Abnormality jobs attended

02MV2313 mov not taking command from dcs , checked


the mcc feeder end & reset it afterwords working ok

Unit No. # 2 Vessel No.-11/21 Seal Pr. Switch tubing re-


connect & pressure cross checked, trial taken now ok
Abnormality jobs attended
Unit-1 01MV 0909, Feeder Maintenance done

Unit-1 01MV 0910, Feeder Maintenance done

Boiler-2, Vessel 22 seal pressure fault so clean the line


and change its pressure gauge but problem as it is, Need
to check its seal.
Unit -1 , Main Flow Control Valve Heater 01LCV 3304,
calibration done.

Abnormality jobs attended


Unit No. # 2 Vessel No.-12 /22 Seal Pr. Switch checked
for Vessel No.-22. It is working Normally condition.
Presently for vessel No.-22 Seal Pr. PU Tube is opened
condition.
In Chimney analyzer Boiler No. # 2 SOX analyzer
showing moisture fault. So Reset it. Now Ok.
Abnormality jobs attended

Unit -1 , 01FCV2904 overhauling done ,O ring replaced &


calibration done with Mr. Jaswant Ji

Boiler-1, Lift get stop at1st Floor so Door sensor cleaning done
and Reset its control power and made Healthy.

ACB maintenance work under progress.

Boiler-2, Vessel 22 seal pressure fault so impulse line cleaning


done.

Abnormality jobs attended


GSC-1A B-phase lug was loose and opened while doing
tightness so new lugging done and then connected. Trial taken
in control found OK.

BAC-2B back pressure TX checked for dust, found OK so


infomed CCR. The material in dome is sticky need maint. Work
to clear.

Boiler-2 APH vessel-2 dome fault due to dome not operating


completely towards limit, so informed CCR.

Abnormality jobs attended

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault so sample line & filter cleaning
done after that reset from controller again taken in line.
Now Ok.
Abnormality jobs attended

PA-1, Vibration sensor installed and cable laid, termination


pending.

Boiler-2 APH inst air isolation valve closed.

PA-1, Motor Megger done found OK

ID-1 , Motor Megger done found OK

SA-1, Motor Megger done found OK

4.5 Mtrs Switch Gear , HT breaker maintenance work under


progress.

Abnormality jobs attended


Workshop MV Drive Room Temp. is showing 41 Degree.
So 02 Nos AC is Started.
Security tower-2 light is not glowing so check and found its
timer stuck, so reset it.

Boiler-1 4th to 7th floor lights made OFF as for power saving.

Abnormality jobs attended

01 no's of SOV installed at boiler-1 BAC-1A for purging


sov line & termination done
Abnormality jobs attended
Boiler-1 lift at ground floor panel found open , so new silver tape
mounted and properly fixed.

Boiler-1 lift phone not wokring so found cable cut and handset not
working so replaced with spare, checked now OK.

Abnormality jobs attended

Unit No. # 2 Vessel No.-11 Level HH showing at DCS end.


So cleaned the Level Probe. Now Ok.

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault. So Reset it. Now Ok.

Unit No. # 2 Diverting Damper ( SV8146 ) not operating


from DCS. Checked and found that valve is in Jammed
Condition. So Informed to Shift Incharge.
T-1 , T-2 & CHP Area Unwanted Lights OFF

Boiler-1 4th to 7th floor lights made OFF as for power saving.
Abnormality jobs attended

DG report was not found correct for the last date so corrected
the same and uploaded in SAP.

Master file formaula found changed so updates the sheet.

Abnormality jobs attended

``
Abnormality jobs attended
Abnormality jobs attended
In Chimney analyzer Boiler No. # 2 SOX analyzer
showing moisture fault. So Reset it. Now Ok.
In Chimney analyzer Boiler No. # 2 SOX analyzer
showing moisture fault. So Reset it. Now Ok.
BC-4 PCS showing active ,not getting reset,So check
physically,& reset 12 no PCS coal shed side, then take
system in line.

P& V System -2 start at 2PM & stopped at 6PM.

Boiler-1 Lift cover stucked in door ,So Removed the


same & lift take in service.

BC-1 PCS rope found broken ,so fixed properly.

Security tower-2 light is not glowing so check and found


off, made on.
Boiler-2 4th to 7th floor light made off.
Abnormality jobs attended
Mositure fault coming in Sox for Unit-2 so cleaning of filter
done and then reset the fault error.

SWAs room lights were stopped so checked and attended


from the timer contact.

HOD report corrected for last 2 days and then emailed.

ACW Pump house E & I equipment found dusty so cleaning &


blowering work
4.5 switchgear room HT & LT Panel rubber mat found dusty so
washing work U/P

BAC-2A Dom valve not operating now operate manually now ok

Control room walkie talkie not working now repaired & OK


Abnormality jobs attended

Bed Ash silo level Tx-LI8202 not showing properly at dcs so cleaning
done & power rest now ok

Coal Crusher-1 not getting on cmd from dcs so checked the same
found breaker problem, removed the breaker & tried in
local/manual but not getting on so replaced with spare one now ok.

Bag house-1 Poppet valve -11 no vessel poppet valve not getting
command checked & found after sov line chocked cleaning done
now ok

IAC -1 showing cooling fault ,So reset the same .


Compressor house DCS room AC showin Hp/LP so reset the same
.
WTP UF SOV panel cleaning & blowering work done.
WTP MGF SOV panel cleaning & blowering work done.
WTP HPP VFD panel cleaning & blowering work done.
Raw coal bunker-1C MOV was faulty found one back
connector was broken so replaced the same with spare and
made healthy.

Abnormality jobs attended

CPCB & ETP site date & time not updating at page mail given
to vendor for necessary correction-Completed

12MV4306 ACW MOV feeder isolator not getting off during


isolation so control supply made off & feeder rackout, kept
aside towards Unit-2 dcs-Completed
Abnormality jobs attended

In workshop MV drive Temp. is Increased to 44 degree.


So 02 Nos AC is statred. After Temp. is normalized then
AC is in OFF Condition.

In IAC No. # 1 panel door is in opened condition. So


panel door to closed.

``
IAC -1 VFD showing cooling fault ,So reset the same .
Compressor house DCS room AC showin Hp/LP so reset the same
.
Abnormality jobs attended

At CHP dcs room, IAC -1 VFD showing temp high alarm, as


room AC was not effective & found tripped on HP/LP alarm
(room temp@40deg). So Cleaning done for indooor unit filter
assembly & out door condensor with water, afterwords
working normal.

Unit-2 APH vessel main air tube comeout fromvalve so re-


connect the same now ok
WTP area ACF O/Lline valve limit assembly removed as per
Mr. Gupta request

Abnormality jobs attended

In WTP ACF# 1 Backwash O/L ( SV-4818) Limit is not


working condition. So New Limit switch mounted at site.
And Trial taken. It is working Normally.
In Chimney analyzer Boiler No. # 2 SOX analyzer
showing moisture fault. So Reset it. Now Ok.

In Boiler Lighting time ON Time Changed from 18.45 PM


to 19.15 PM. Also OFF time changed from 6.25 AM to
6.05 AM.

Street Light Lighting timer Changed from to 7.20 PM.

Unit No. # 1 ID , FD and PA Fan Polythene Cover


removed as per Shift Incharge requirement.
Abnormality jobs attended
VAM tripped at 4:00Am due to high vapour temp, so after
temp normalisation taken in line and ensured all drive temp
to be in limit, now OK.
AFR energymeter Y-phase current is not showing, need to
replace meter as cosnumption from last 3 days in coming less.

Abnormality jobs attended


Unit No. # 1 ID Fan Breaker started then U2 OVP fault
showing at MV Drive display. So informed to sati ji and
hemant Sharma. They come at site. Checked the cell U2
Voltage . It is showing Normally. Then Start the Drive. It
is running Normally. For ID and PA Fan Interlock Button
is in Pressed Condition. also relesed.

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault. So Reset it. Now Ok.

At compressor house air leakage from auto drain valve.


So rectified it. Now Ok.
At compressor house auto drain valve. Checked & found
Ok.

At 4.5 Mtrs Unit No. # 1 MV Drive Room AHU is stopped

In Chimney analyzer Boiler No. # 2 SOX analyzer


showing moisture fault. So Reset it. Now Ok.

Unit No. # 1 ID Fan DE & NDE side RTD JB cleaning &


blowering work done.

Both JB packed with new polythene.

Abnormality jobs attended


CD found in stucked & drive not working of that PC (nearer to
EMS PC system) so open the PC & power & signal cord
removed & power reset after words open the CD drive of that
PC & removed the CD, Afterwords report prepared now ok.
Boiler-2 SOX analyzer ,moisture fault observed found drain
ckt bottom full so manually drain & line cleaning done again
taken in line now ok
T-2 Security Tower light not glowing so check & found timer
stuck up now reset done
Boiler-1 0 mtr near PA Fan RSB Panel door hanging condition
now fix it properly

Abnormality jobs attended

Coal Feeder -2A Tripped due to Plough Discharge. So


Cleaned the Contact of the Polugh Discharge. Also
Packing to done. Now Ok.
BA silo RAV tripped on overload So ,reset the same &
running normal.
Workshop MV Drive Room check for rain water entry
inside, No water found in the room.
Workshop EOT crane got fault during heavy rain ,so
powr made off from workshop bacde SFU.

Silo lights not getting on, made running.

Abnormality jobs attended


Following MOV's oil leakage observed at 0 mtr & 4.5 mtr TG
building area 01MV2906, 12MV3203 & 01MV3205 so
cleaning done, now ok.
Found all the lights are ON above 3rd floor in both floor so
stopped all lights.

P&V made stop for no. 2 at 10:30PM.


One relay found contacts loose for Enmass conveyor -2 feeder
so properly tighthed.

Boiler-2 APH -2 level showing HH, Checked & found


materila available in side hooper.

Workshop EOT crane fuse checked,02 no,s fuse found


open.
Workshop EOT crane fuse checked,02 no,s fuse found
open. Megger value check found ok , checking work U/P

Unit-1 Bag Level probe 11 , 21 ,12 ,22 remove checking &


calibration found material inside now remove
instrument side healthy

PA-1 RTD DE &NDE Side installation & cable dressing


done & Vibration probe installation & cable dressing.

SA-1 RTD & Vibration cable dressing done

SA-1 RTD JB Covering by Polythene

SA-1 IGV Positioner covering by Polythene


Abnormality jobs attended
In Online CPCB Data SPM Reading is hold from 18/05/21
at 9.15 PM.

Engg room 3rd row all soclet power found OFF so made ON
from 2nd PC socket of middle row. Also tagging done on the
switch for not making it off.
T1 tower lighting timer was stucked so made it ON during
shift round.
Unwanted light made Off in Boiler-1 area.
J -Valve fan 1B not stopping from DCS. So Stop manually
from feeder.
CHP crusher building En mass floor field instrument
cleaning & bloweringwork done.
Chimney analyzer SOX-2 flow not coming . So sample
line dust cleared. Now Ok.

BC-4 Bag filter panel cleaning & packing done.

Bag filter screen floor panel cleaning & packing done.

BC-6 magnetic seperator panel cleaning & blowering work done.


CEP 1A & 1B showing fault , so release fault & traildone working
normal.
Abnormality jobs attended

CHP mcc light not glowing so checked the supply at 4.5


mtr area feeder found healthy & so checked at chp mcc
side found one mcb got tripped due to this MCCB got
tripped, put it in off & charged others now ok.

CHP mcc door access machine not working, so checked


the supply & found one mcb got tripped due to this
MCCB got tripped, put it in off & charged others now ok.
Abnormality jobs attended

All RSB at Coal feeder floor found dusty so operation checked


and blowering work done.
Abnormality jobs attended

UF -I & II Inlet valve showing false indication on DCS, so


limit switch assembly replaced with spare one with
wiring done, trial taken working normal

MGF flow tx not showing at dcs checked the same found


one isolation valve not opened properly, so correct it
now showing ok.

Bed ash wet unloading system plate valve not getting


open, So check & found air leakage observed, arrest the
leakage & tube changed .Trial taken now ok.

BAC-2A level probe was showing HH at dcs so cleaning


done & calibrate the probe now ok

Abnormality jobs attended


At 7:13 AM PA fan-2 got tripped on motor DE side
02TI903 bearing temp HH(103 degc), MFT occured &
after some time ID fan tripped(entire plant tripped) at
7:21 AM
DG started & aux supply normalised &
J-vlv fan started at 8:45AM
ACW pump-1 started at 8:55 AM

PA -2 motor bearing temp RTD duplex pair taken in line


as per HOD sir instruction ( presently both pair is
healthy as showing same resistance

UPS-1B mains supply not detected due to this operate on


battery mode load shifted on slave unit & again
normalised, now ok

VAM system not able to start due to cooling water I/L


temp HH, so all other AC system taken in line & after
normalised the temp again taken in line

Abnormality jobs attended

VAM System is Tripped due to High STG Vapour Temp.


So reset it. All the AHU Put into Auto mode. Also Steam
Control Valve opening reduced to 60 %.
In Chimney analyzer AC is Started . Then it is Tripped to
E3 Fault. Again OFF and Restarted it. Then again fault is
showing in AC. So OFF the AC.

In Chimney analyzer Chimney data is not showing in


controller as well as DCS. So Zero calibration done in the
Controller. Now Reading are under observation.

BC-6 TPH is not showing at DCS end. So checked and


found that fault LED is ON in Panel. Also display is not
showing in the Controller. So Supply Reset. Again fault is
showing in Panel. Need to check.

In reclaimer UPS is OFF Condition. So charged the


battery of the UPS. Then Started it. Now Ok.
In Chimney analyzer Chimney data is not showing in
controller as well as DCS. So Zero & span calibration
done but System not working properly.

Chimney analyzer controller also getting On/Off itself So


power made off for some time for cooling.

Chimney analyzer room AC also not working ,Analyzer


controller was hot, so open panel all door for natural
cooling.

VAM got tripped at 5:15 AM On HTG reset the same now


Ok.
Abnormality jobs attended

Chimney analyzer room AC not working so checked the


same found , one wire(phase) got loose at field JB so re-
connect it after that E3 alarm observed so check the
indoor fan motor found one wire broken at motor
terminal, open the entire indoor unit & soldering done
on motor wdg terminal, trial taken working normal.

Boiler-1 '0' mtr RSB 02 no's of Panel earthing wire found


open so re-fix it again, now ok

Abnormality jobs attended


CPCB Data is not showing in the Controller as well as
DCS. So Changed the Controller also zero calibration to
done. Now Ok.
Online CPCB data is not showing in CPCB website. So
discuss with adage Person. Then rectified the Problem.
Now Ok.
Abnormality jobs attended
Oil Centrifuse Unit No. # 2 Tripped due to Emgerency. So
relased the Emergency. Now Ok.

AVI of Coal feeder-2B given. Again Coal feeder Clean Run


motor Tripped on over load. Also S/D to given.
BC-3 Belt is Tripped when it is started at DCS end. While
in Local It is running Normally. At site found that Guard
limit switch Rope is in loose condition. Due to this belt
slip is showing at DCS end. So tight the guard limit rope.
Now Ok.

Abnormality jobs attended

Coal feeder -2B clean run motor taking high current, so


decouple & motor trial taken for any abnormality. It was
taking 0.79 Amp again coupled & try to run but taking
high amp(4Amp) over load operate so stop the
system.after that trial taken working normal taking 0.51
Amp in coupled condition.
As per o&m team request Coal feder -2B clean run motor
change with spare taking noload current 0.49 Amp so
coupled again taking 4 Amps, overload operate again
stop, mech team changed the gear box , trial taken
working normal.

BC-1 not getting started checked the same found BC-3


belt was in fault , reset it afterwords normal running.

Abnormality jobs attended


Generator-1 space heater was found off so started the heater
from remote DCS command and checked the current found
balance at 11A.
DG report corrected for last 2 days and uploaded in SAP after
that.
Boiler-1 ID fan RTD JB polythene packing done and cable
dressing work done.
Boiler-2 BAC-2B water line flow switch cover was found open
so properly placed the cover.
Abnormality jobs attended
TG-1 LVC3301 CV having 10% difference in FB &
command, So air adjust & caliration done. Now Ok.
TG-1 LVC3302 CV having 10% difference in FB &
command, So air adjust & caliration done. Now Ok.

Color printer shiftd from engg. station to CCR EMS pC


side.

Window 10 based CPU search in lab & installed for boiler


reliability project
Chimney analyzer controller open & checked found a
capacitor damaged, Need to replace.

Abnormality jobs attended


Oil leakage observed at pressure gauges lubrication system in
TG-2 area cleaning done now ok
Oil observed at MOV's 02mv3205, 02mv3203) towards unit-2
at 0 mtr area so cleaning & tightness done

AVR panel put of Uni-2 Generator put into manual and in local
mode as TG is OFF now.
Boiler-1 Old O2 Probe removed & new probe installed for checking, & trail done, again new O2 Probe removed
& old probe installed & take in line.

MV drive cell shifted fro inst lab to 4.5 mar floor MV drive room & BFP drive room.

Coal bunker 2C level tx. Cleaned.

Window 10 based CPU shifted from CHP & installed for boiler reliability project in CCR .

Chimney analyzer controller open & checked found a capacitor damaged, Capacitor image taken & send to Mr.
Pramod sati.

Bucket elevator-2 change to local mode. As per maintenance depart.

Tg-2 enclosure 02 no exhaust fan connection remove.


Boiler-2 lift fault reset & take in line.
P&V no. 2 start at 7:30AM.

Abnormality jobs attended


BC-1 one belt sway was acted so checked in field found
the hinge bolt of handle was loose and hence sway was
acting on lying over belt, so tightened the bolt and then
normalised the sway.
Timer of lighting T-2 tower was faulty so replaced the
timer with spare one and made healthy, checked the
operation later now OK.

Shift jobs carried


ll drive running normal.
er found normal, MV drive room temp found normal.
off
d and mail to all
ncern
load in SAP
oks filled.

BC-1 got tripped ,check & found belt sway switch-4 malfunctioning, So take shit down of BC-4 for replacing
belt sway switch, remove old belt sway switch ,New belt sway switch connected wire cable found damaged so
replace the cable & installed new switch. trial done now ok.
Bag house -1 all vibrator motor checked for bolt tightness.

Panel 21 BRC300 came in fault & reset itself. First NIS modue loop B blinking, & second NIS module LED on
1,3& 5. after reset LED on 1,2,3 & 5.

AVI given for Enmass-2 & change in local mode.


P&V no. 2 start at 7:30AM.
Bag house -2 all vibrator motor checked for bolt tightness.
Abnormality jobs attended
Compressor IFC polythene was found lying on ground so
properly covered the IFC panel again with same
polythene.

Coal feeder-2C RTD covered with polytheene and


packing done.

Silo timer lighting was bypassed so corrected and taken


in line

Shift jobs carried

Abnormality jobs attended


Enmass-2 kept in Local as per per mail received from AP
srivastav

Shift jobs carried


ll drive running normal.
er found normal, MV drive room temp found normal.

l
djusted 7.00 pm to 7.30 pm
ure
or closed
er requirment
c plate valve closed suddenly, due to malfunctioning of SOV coil, so checked the Pnumetic valve by operation side during
fall in furnace and furnace draft gone to 1600. and MFT came, due to MFT remaining coal feeder and SA Fan-2 trip,
oal feeders and SA Fan-2 and ON all coal feeder and SA Fan-2, Now normalize boiler-2 in 10 miniuts. at present Pnumetic
nd its control air Valve made OFF. further SOV coil checking work will done in G shift.

oks filled.

CHP crusher building En mass floor field instrument cleaning & bloweringwork done.
CHP crusher building screen floor field instrument cleaning & bloweringwork done.
CHP crusher building Crusher floor field instrument cleaning & bloweringwork done.

Boiler-2 12-22 fludising valve malfunctioning ,rectified the same .


CPCB data is updating in Controller as well as DCS & PC.
Boiler-2 lift fault reset & take in line.
CHP MCC transformer temp. found 87 deg, so start exhaust fan but not started , checked & rectified
CHP MCC panels cleaning & blowering work done.
Coal shed area light made off.

Abnormality jobs attended

Boiler-1 makeup water pump getting start after giving


stop, check the supply & feeder made off . Local push
buttons cleaning done & contacts checked , feeder made
ready & after that trial taken working normal.

Unit-2 bag house 11-21 conveying 11 no vessel HH alarm


showing checked & found actual material was there,
informed to ccr.

BC-2 belt sway switch acted so checked & found belt was
out , after alignment, again set it right, trial taken now ok
BC-3 belt tear protection acted so checked & found
proxy switch bolt loose tightness done now ok

Abnormality jobs attended


In workshop MV drive Temp. is Increased to 44 degree.
So 01 Nos AC is statred. After Temp. is normalized then
AC is in OFF Condition.

BC-5 feeder trip so check and found that its control fuse
blown, then checked its current transducer found faulty,
so removed the current trancducer from circuit, and
made BC-5 feeder healthy
4.5 Mar all running VFD's inverter temperature checked & found all under 55 deg C.

Al AC setpoint check & found all set at 27 Deg C , except CO analyzer-1 .

BAC-2A local JB cleaning & blowering work done.


BAC-2B local JB cleaning & blowering work done.
Both BAC's cooling water valves SOV , Pressure gauges & Flow switches cleaning & blowering dobe.
Both BAC 's back pressure transmitter's cover missing, fixed that.
CPCB data is updating in Controller as well as DCS & PC.
CD not working ,so report unable to send.

Abnormality jobs attended


Abnormality jobs attended
CPCB Data is not updating in the online CPCB website.
While updating in Chimney analyzer PC. So inform to Mr.
Tarun.

Coal feeder-1C Pneumatics Valve not operated from DCS.


So hose Pipe Tube interchanged. Now Ok.

BC-5 Motor feeder Problem. So BC-3 feeder is inseted.


Now Ok.

BC-5 Ground Hooper is not started at DCS end. So 2


times A/M switch is operated. Also Manual RPM is
reduced. Also feeding is in Very high. So informed to
Shift Incharge.
4.5 Mar all running VFD's inverter temperature checked & found all under 55 deg C.

Al AC setpoint check & found all set at 27 Deg C , except CO analyzer-1 .

Unit -2 APH 2 DOM level probe glanding done


Chimney analyser Probe flushing done
ACW-2 New motor Double Earthing done
T-1 , T-2 & CHP Area Unwanted Lights OFF
CPCB data is updating in Controller as well as DCS & PC.
CD not working ,so report unable to send.
CEP- 1&2 motors & Power JB Cleanaing & Blowering work

Abnormality jobs attended


Unit No. # 2 Oil O/H Tank High Level switch is not
showing at DCS end. So set the Limit Switch and
Connection tightness to done. Now Ok.-

CPCB Data is not updating in the online CPCB website.


While updating in Chimney analyzer PC. So inform to Mr.
Tarun.

ACC Fan # 2B Flow switch is not showing at DCS end. So


cleaned the flow switch and set it. Now Ok.

ACC Fan # 2F Flow switch is not showing at DCS end. So


cleaned the flow switch and set it. Now Ok.

In Reclaimer Boom belt is not started . So checked and


found that Motor side Ok. Since DO is not generated from
PLC end. So checked and found that some modifaction at
O/L Relay side. So removed it. Now Ok.

In BC-5 Feeder Current Transducer to changed.


Shift jobs carried

Bed ash cooler-2A & 2B RTD SOV & Panel polythene packing done.

P fan -2 RTD JB packing done.


PA fan -2 RTD JB & IGV positioner packing done.
SA fan -2 RTD JB & IGV positioner packing done.
ID fan -2 RTD JB & IGV positioner packing done.
Boiler-2 11-21 & 12-22 Level probe & connector packing done.
Co-Analyzer -1 AC not working.

Coal feeder 2B RPM fluctuating , so check techo, found normal, Then try in local mode running normal, but not running
normal in remote, Clearance not given by operation for load cell checkingas bunkel level low. At present running in local. Need
to check load cell.
Polythen covering at JB outside TG building
1) J vajve 1A
2) Drain pot 1A and 1B
3) CEP-1A
LED light given at ACW pump house

LDB of bag House-2 cover found loose so tight it

P&V -2 water leakage found, so stopped it and its water valve closed, now P&V-4 is running
Abnormality jobs attended
Boiler-1 CO analyzer cain AC not working so chcked the same
& indoor filter & outdoor condensor cleaning done with air,
again taken in line now ok
Boiler-2 11-21 conveying line filling valve not getting closed
command in auto operation step-2 -U/P

TG-2 enclosure lighting near exciter side corrected the wiring


and then corrected the cable dressing.
Power report master file not updated for last 3 days so
updated same.

Abnormality jobs attended

Air leakage found in PU Tube of Unit No. # 2 11-21 SOV


Box. So PU Tube Changed. Now Ok.

CPCB online data is showing normally in website.

Inst. Lab AC is not working Condition. Found that


Netural wire Cut condition. So Reconnected it. Now Ok.
Shift jobs carried

Coal feeder 2A,2B,2C & 2D field local JB found coal dust inside, So blowering done in each JB,

FAS -2 showing full indication continuously ,so fork sensor cleaning done & take in line ,now Ok.
LOTO locks collected from all locations which is used in shutdown, arrange them in cartoon box and packed put in
workshop
ACW-2 trial taken so its direction found wrong, so changed its direction conection and then taken trial now direction is
correct. Running normal
CT Fan area lighting field JB covered with polythen done
BC-1 side welding JB door bolts found open so tight them
In swas room one LED and 24volt transformer provided
BC-5 not started so checked and found it is triped in overload, so reset it and running ok
Shift jobs carried

Coal feeder 2A,2B,2C & 2D field local JB found coal dust inside, So blowering done in each JB,

FAS -2 showing full indication continuously ,so fork sensor cleaning done & take in line ,now Ok.
LOTO locks collected from all locations which is used in shutdown, arrange them in cartoon box and packed put in
workshop
ACW-2 trial taken so its direction found wrong, so changed its direction conection and then taken trial now direction is
correct. Running normal
CT Fan area lighting field JB covered with polythen done
BC-1 side welding JB door bolts found open so tight them
In swas room one LED and 24volt transformer provided
BC-5 not started so checked and found it is triped in overload, so reset it and running ok

Abnormality jobs attended


Coal feeder-1A clean run motor was found both earthing
opened so both connected.
Boiler-1 top floor lights from 4th to 7th floor was found ON, so
made off for power saving.
Coal feeder of Boiler-1 all motors were found dusty so
cleaning and blowering work done and double earthing also
checked and tightness done.
PM Jobs carried Shutdown jobs

Unit No. # Vessel No.-22 Purging SOV


manual isolation valve Shotdown to
given. ( Air Isolation valve Closed , Coil
Removed and Air tube open
condition. )

Unit No. # Vessel No.-22 Popet valve


SOV manual isolation valve Shotdown
to given. ( Air Isolation valve Closed ,
Coil Removed and Air tube open
condition. )
PM Jobs carried Shutdown jobs
Unit-2 bag house 11-21 conveying line back Unit-1 feed water 100% control valve
pressure tx not showing due to line block so line overhaulling job with G-shift,
flushing & Tx cleaning done now ok. calibration & trial is U/P
01 no's of LED light arrangement at
All PM07 order closed for TPI up to 01.05.2021
boiler-1 PA fan

01 no 's welding machine connnection


given at PA fan-1
Boiler-1 APH area hand lamp not
glowing so checked & lamp
replacemenet done now ok

ACC-1B, 1E, & 1A lube oil motors


connection & earthing cable connected

Bucket elevator CHP- control wiring traced


for dcs logic & cable dressing job, trial
taken working normal

PM Jobs carried Shutdown jobs


Line flushing done of Boiler-1 lines for the following:- ACC-1 all lube oil pump motors gland
FT-904, PT-902, FT-909, PT-1114 and FT-908. sealing done with M-seal and checking
done for any holes.
New report sheets made for start of month. Mimic panel meter of Generator-1 B-phase
was faulty so removed old meter and
replaced with new meter.
TG-1all lube both GSC-1A and 1B motors
gland sealing done with M-seal and
checking done for any holes.
Settings applied for CT and PT for new
ammeter in mimic panel.
Load cell of Boiler-1 of all coald feeder-
1A,iB,1C and 1D cleaning done with
rustoline.

PM Jobs carried Shutdown jobs

CEP-1A motor cleaning and terminal


tightness done, and terminal covered
with polythen.

CEP-1B motor cleaning and terminal


tightness done, and terminal covered
with polythen.

CEP-1A breaker maintenance done as:-


1) breaker cleaning with cloth
2) contacts cleaning with klinit
3) Greasing of racking mechanism
4) movement of racking mechnism
checked.
5) arcing chut cleaning done
6) aux wiring tightness done
CEP-1B breaker maintenance done as:-
1) breaker cleaning with cloth
2) contacts cleaning with klinit
3) Greasing of racking mechanism
4) movement of racking mechnism
checked.
5) arcing chut cleaning done
6) aux wiring tightness done

Unit-1 APH vessele-1 level probe


replacement work done

PM Jobs carried Shutdown jobs


Unit-2 feed control valve overhauling
Unit-2 feed control valve overhauling job
job
01 mov3207 open limit & tourque set but for close is 01 mov3207 open limit & tourque set
U/p but for close is U/p

Mist fan-1&2 connection opened


DE-R,Y,G

PM Jobs carried Shutdown jobs


Unit No. # 1 FW 100 % MOV 01MV3208
Unit No. # 1 BAC-1A and 1B VFD Panel Cleaning , Open Limit , Open Torque and Close
Blowerning to done. Limit and Close Torque to set. Trial is
Pending.

Feeder maintenance of ACC lube oil of TG-1 feeders. Coal feeder motors 1B and 1C both main
motor and clean run motor termination
side gland sealing done with m-seal.

Sealing of coal feeder motors gland for proper packing ACC lube oil pump 1D and 1F feeder side
and avoid coal dust entry. checking and maintenance work done and
abnormalities rectified.
PM Jobs carried Shutdown jobs

01MV3207 MOV close & torque limit


P&V-2 common drain line found chocked & switch adjustment job
waterfall, so line hammering & drain clear done,
tank inlet water line valve also adjusted Close- Completed
Torque-U/P

VAM 22 mtr DM water tank top up from dosing room Unit-1 DSH control valve 01TCV3203
area, new hose pipe laid with help of mech team, overhaulling & calibration job-
now ok Completed

Unit-1 Feed water control valve air


TPP workshop AHU filter & condensor coil cleaning leakage arresting & ferrule
arrangement done in 01LCV3202
job-completed overhaulling & calibration job-
Completed

11TR AC outdoor condensor cleaning & also cooling


water outlet valve flow adjustment job as both AC Drain pot motor-1A &1B connection
done
were tripping on HP/LP alarm
PM Jobs carried Shutdown jobs
Boiler-1 coal feeder MOV connection done after maint. Work ACC lube oil-1B and IC feeder checking and
completion. maint. Done. Later trial taken ruuning normal.

ACC lube oil motors-1A trial taken after feeder


maint. Found overload trip on command. So
checked on motor found minor clearance in
adjacent cable. So proper insulation done and
then trial taken, found normal.

Boiler-1 MSSV 2302open limit setting done.

PM Jobs carried Shutdown jobs


Unit No. # 1 MSSV Bypass MOV
01MV2302 Open Limit , and Close
Limit to set. Trial is Pending.

Unit No. # 1 Coal Feeder O/L MOV


( 01MV0910) MOV Power and Control
cable connector removed at site as per
mech. Person requirement.
Coal feeder area motors gland hole sealing
done with m seal
Boiler-1 hydro test water pump connection
done
SA fan-1 motor covered with polythen due
to water falling from hydro test.
Boiler-1 lights made on as per requirement
of operation deptt.
boiler-1 side MOV feeder maintenance
done-2nos

PM Jobs carried Shutdown jobs


24V hand lamp given in Bag house-1 floor
Tagging done for pressure gauges in Boiler-1 area. for AP Shrivastava sir requirement.

MOV feeder01MV3207 was faulty as the


Bucket elevator-1 and 2 field start stop command were SFU was broken and not working. So
individual but the inciming feeder is common, so made replaced the feeder from spare one. The
the field command parellel from feeder for start /stop of relay and contator mounted on spare and
single incomer feeder for local operation. Trial taken, tagging done.
running normal.
Coal feeder-1C MOV discharge connections
opened as per Mech dept requirement.

Hydro pump connection done for Boiler-1


side for water filling.

PM Jobs carried Shutdown jobs

Unit no. # 1 Coal Feeder-1C O/L MOV


Power/ Control cable Socket mounted
at site.

Unit no. # 1 Coal Feeder-1B O/L MOV


Power/ Control cable Socket mounted
at site.
PM Jobs carried Shutdown jobs

Unit No. # Vessel No.-12 Purging SOV


manual isolation valve Shotdown to
Unit No. # 1 Coal Feeder VFD Panel-1A/1B/1C and
1D VFD Panel Cleaning and Blowerning to done. given. ( Air Isolation valve Closed , Coil
Removed and Air tube open
condition. )
Unit No. # Vessel No.-12 Popet valve
SOV manual isolation valve Shotdown
to given. ( Air Isolation valve Closed ,
Coil Removed and Air tube open
condition. )

New Fevurl is provided in manual


isolation valve of Unit No. # 1 100 %
Control Valve.

Unit No. # 1 Coal Feeder VFD Panel-


1A/1B/1C and 1D VFD Panel Cleaning
and Blowerning to done.
PM Jobs carried Shutdown jobs

Bed Thermocouple replacement

Blr-1PA fan Motor side DCS vibration


cable glanding and termination done

Blr-1 Soot blower control valve


calibration done and operation
checked from DCS
PM Jobs carried Shutdown jobs
4.5m area all control valve and MOVs cleaning and 4.5 MCC room mist fan-1A and 1B
blowering work done due to dusty condition checking, terminal tightness and cleaning
and blowering done.
Insulation done of cables for slightly faulty
portions and control trial taken found OK.

All AC power off done and P& Vno. 2 made off. 4.5m area all control valve and MOVs
cleaning and blowering work done due to
dusty condition
PM Jobs carried Shutdown jobs
Turbine-1 Actuator calibration done
BC-5 VFD panel cleaning done

Turbine-1 MOT tank heaters Feeder made


ON as per operation requirement

PM Jobs carried Shutdown jobs

Soot blower panel-1 terminal tightness & cleaning & Soot blower panel-1 terminal tightness
blowering job -completed & cleaning & blowering job -completed

Coal feeder-1B discharge pipe RTD cable found Boiler-1 Soot blower drain line temp
switch cum gauge glass found broken
undressed so dressing work done so re-fix it & tape provided, now ok

PM07 orders closed for TPI up to 06.05.2021


PM Jobs carried Shutdown jobs
ACC-1 all brekaers made healthy and charged upto VFD Following drives made healthy for turbine
end and PMT checked in DCS side, all OK. rolling and command given for trial run:-
a) Both Mist fan
b) Both GSC fan
c) Both Drain pot pumps
d) Both CEP drives

TG-0m all instrument, control valves,


MOVs and JBS cleaning and blowering
work done.

PM Jobs carried Shutdown jobs


PM Jobs carried Shutdown jobs

Unit No. # 2 Vessel No.-11/21 Seal Pr. Switch tubing TG-1 put on rolling at 14:15PM,
re-connect & pressure cross checked, trial taken TG-1 Sync at:16:15
now ok TG-1 Stopped at:18:10

Boiler-1 bed T/C


01TI1109
01TI1110
01TI1114
01TI1115
Thermowell replacement &
termination job-completed

Induction heater connection given at ID


fan-1as per maintenance request

TG-1 breaker re-insert & dc supply


made off & again restart
TR-2 breaker rackin & again
rackout@8pm
HT Breaker maintenance job followup
with service engg at 4.5 mtr (Crusher-1
&2)
PM Jobs carried
TG building ground floor all control valve cleaning
done.
Coal Feeder 2 all 8 Nos Motors cleaning and
blowering done.

PM Jobs carried Shutdown jobs


PM Jobs carried

PM Jobs carried Shutdown jobs


AOP-1B motor greasing done. GSC-1A and 1B feeder checking and maint.
Done and abnormlity of 1A made
correction. Then trial taken from DCS and
ruuning normal.

EOP-1 power made off as per Operation requirement. Coal feeder-1B 0906 MOV checked,
opening normally and limit OK. But close
command not going. Some feeder problem
rectified still not closing, need to check. For
now manually closed.

PM Jobs carried Shutdown jobs


1) ID fan-1 DE/NDE & motor winding
RTD connection at field JB-Completed
In Chimney analyzer Boiler No. # 2 SOX analyzer 2) DE/NDE RTD insert at position ,
showing moisture fault so sample line & filter tightness & cable dressing-Completed
cleaning done & dry it after that reset from 3)Vibration sensor installation at
controller again taken in line. Now Ok. position & cable dressing-Completed

ID fan-1 motor power cable


termination job -Completed
Boiler-2 APH field JB cleaning & blowering job
ID fan-1 motor power cable JB sealing
with M-seal job-Completed

Boiler-2 bag house conveying 11-21 field JB cleaning


& blowering job
Boiler-2 bag house conveying 12-22 field JB cleaning
& blowering job

Boiler-1 ID fan motor cleaning & blowering job

PM Jobs carried

ID fan, Motor JB packing done with silver tape.

PM Jobs carried Shutdown jobs


Unit No. # 1 PA Fan Vibration Cable
checked. At DCS end TB no.-13-9B-TB3
- 1/2 and 13-9B-TB3 - 3/4 .when we
Unit No. # 2 APH Field Inst. And JB Cleaning and short the wire at DCS end. Cable is not
Blowerning to done.
found at field end.Conutity is not found
at Spare cable at field end. Need to
check.

Unit No. # 2 Vessel No.- 12/22 Field Inst. And JB


Cleaning and Blowerning to done.

Unit No. # 2 Vessel No.-11 / 21 Field Inst. And JB


Cleaning and Blowerning to done.
PA-1 VFD end isolator checking and maint. Work done PA-1 VFD end isolator checking and maint.
Work done :-
a) All panels inside cleaning and blowering
work
b) All terminals tightness work done
c) Heater connection and heating checked
d) PT fuse checked and all earthing
tightness done

PM Jobs carried Shutdown jobs


1) SA fan-1 DE/NDE RTD insert at
position , tightness & cable dressing-
Completed
Boiler-2 ID fan motor cleaning & blowering job 2)01 no's Vibration sensor installation
at position & cable dressing-Completed

01 no's of SOV installed at boiler-1


Boiler-2 SA fan motor cleaning & blowering job BAC-1A for purging sov line &
termination done
Boiler-2, J valve fan both motors cleaning &
blowering job
PM Jobs carried Shutdown jobs
AOP-1B breaker made healthy after overhauling work and 4.5m MCC room LT breakers and HT breakers
charged. maintenance work under progress.

Bucket elevator-1 put into local mode as per operation PA-1 motor and fan side vibration sensor
connected and cable traced then cross checked
requirement and then put into remote as per need by them. with CCR for both probes.

Bag house-12 and 21 number isolation air and SOV connection


done after operation permit closure. BAC-1B SOV checking work done in panel.

PM Jobs carried Shutdown jobs

Unit No. # 1 Coal Feeder VFD Panel -1A / 1B Unit No. # 1 Coal Feeder VFD Panel -
Cleaning , Blowerning and connection Tightness to 1A / 1B Cleaning , Blowerning and
done. connection Tightness to done.

Unit No. # 1 Coal Feeder VFD Panel -1C / 1D Unit No. # 1 Coal Feeder VFD Panel -
Cleaning , Blowerning and connection Tightness to 1C / 1D Cleaning , Blowerning and
done. connection Tightness to done.
TG-1 LA &P T Panel cleaning & Blowering work
PM Jobs carried Shutdown jobs
Coal feeder-1A calibration done with Mr.
One spare MOV feeder was faulty and connections were Ajaya and other work is under progress.
open so made healthy.

4.5m MCC spare HT breakers maintenance


work under progress.

PM Jobs carried Shutdown jobs

In Fly ash silo No. # 1 Field Inst. And Panel Cleaning Unit no. # 1 Fly Ash APH JB connection
tightness , Cleaning and Blowerning to
and Blowerning to done. done.
In Fly ash silo No. # 2 Field Inst. And Panel Cleaning
and Blowerning to done.

In bed ash silo Field Inst. And Panel Cleaning and


Blowerning to done.
PM Jobs carried Shutdown jobs
WTP area following equipment cleaning and blowering
work done:-
a) All DCS termination &module unit panels at WTP

CHP area following equipment cleaning and blowering


work done:-
a) All DCS termination & module unit panels at CHP dcs
room

CHP I&C power distribution & console panel cleaning &


blowering job
PM07 orders closed for TPI up to 11.05.2021

CHP MCC PANELS Cleaning & Blowering work


PM Jobs carried Shutdown jobs
In WTP DCS Panel ( 05 Nos.) Cleaning and
Blowerning to done.
BC-1 PCS polythene covering & packing work done.

BC-7A SFU handle found loose so tightness done


now Ok.
PM Jobs carried Shutdown jobs
Feeder MOV of coal feeders checking and maintenance Following MOV panels maintenance work
wok done. done :-
a) MV0909
b) MV 0910
c) MV 0911
d) MV 0912
All connection terminal tightness and
feeder blowering work done.

Bed ash cooler-1A and 1B conveying JB


cleaning, blowering and all coonections
tightness and panel sealing work done.

ACW Pump house E & I equipment found dusty so cleaning


& blowering work
PM Jobs carried Shutdown jobs

Bed ash silo level tx-LI8202 cleaning & blowering job - Boiler-1 APH conveying field JB terminal
completed tightness , cleaning & blowering job-completed

Boiler-1 bag house 11-21 conveying field JB


Boiler-1 APH conveying field JB terminal tightness , cleaning & terminal tightness , cleaning & blowering job-
blowering job-completed completed

Boiler-1 bag house 11-21 conveying field JB terminal tightness , Boiler-1 bag house 12-22 conveying field JB
cleaning & blowering job-completed terminal tightness , cleaning & blowering job-
completed

Boiler-1 bag house 12-22 conveying field JB terminal Boiler-1 ID fan, PA fan , SA fan motor & J-valve
tightness , cleaning & blowering job-completed motor's cleaning & blowering job-Completed

Coal Crusher-1 breaker problem, not getting on in


local/manual also so spring charged in manual & again tried 4.5 mtr switch gear room-1&2 side electrical
two three times for manual on after becomes normal so put it protection matting cleaning with water
in LS crusher rack, now ok.

Boiler-1 ID fan, PA fan , SA fan motor & J-valve motor's cleaning Bag house-1 Poppet valve -11 no vessel poppet
valve not getting command checked & found
& blowering job-Completed after sov line chocked cleaning done now ok

4.5 mtr switch gear room-1&2 side electrical protection


matting cleaning with water

Bag house-1 Poppet valve -11 no vessel not getting command


checked & found after sov line chocked cleaning done now ok

WTP UF SOV panel cleaning & blowering work done.

WTP MGF SOV panel cleaning & blowering work done.

WTP HPP VFd panel cleaning & blowering work done.


Feeder MOV of coal feeders checking and maintenance Following MOV panels maintenance work
wok done. done :-
a) Raw coal bunker-1A MOV
b) Raw coal bunker-1B MOV
c) Raw coal bunker-1C MOV
d) Raw coal bunker-1D MOV
All connection terminal tightness and
feeder blowering work done.

STG Lift UPS panel checking and panel and battery bank Power report guide prepared for
cleaning and blowering work done. emergency report preparation by Inst team
and emailed.

PM Jobs carried Shutdown jobs


Unit-1 APH vessel Both seal pressure gauges removed as Coal feeder-1C calibration done with G-
per operation team request for material cleaning, kept at shift team -Completed
field Jb

Unit-2 side J-valve fan motor cleaning job-Completed


PM Jobs carried Shutdown jobs

Coal Feeder -1A / 1B Pneumatics air


All the CHP DCS panel Blowerning and Cleaning to isolation valve permit to closed
done. condition. Also air line is in charged
condition.
Compressor house IAC motors & Panels Cleaning &
Blowering work
CHP DCS room IAC-1 &2 VFD Panels cleaning & blowering
work
PM Jobs carried Shutdown jobs
CHP dcs room AC tripped on HP /LP alarm so Cleaning
done for indoor filter & out door condensor unit with ACW-2 Motor power connection open as
water, afterwords working normal per PTW :148426
Left to Right side: (Y, R, B)
Space heater: R & B wire connected

CHP dcs operator console panels cleaning & blowering One no three phase supply new top
job-Completed replaced in welding machine at boiler-1
IAC-1 ,2 & 3 panels at compressor house area cleaning &
blowering job-Completed
CHP dcs room floor found dusty so cleaning & blowering
job done -Completed
Unit-2 APH vessel main air tube comeout fromvalve so re-
connect the same now ok
WTP area ACF O/Lline valve limit assembly removed as
per Mr. Gupta request

PM Jobs carried Shutdown jobs

In Unit No. # 1 Fly ash system Vessel


In Unit No. # 1 Fly ash system Vessel no.-12/22 JB
Cable Dressing , Connection tightness , Cleaning and no.-12/22 JB Cable Dressing ,
Connection tightness , Cleaning and
Blowerning to done. Blowerning to done.
In Unit No. # 1 Fly ash system Vessel no.-11/21 JB In Unit No. # 1 Fly ash system Vessel
no.-11/21 JB Cable Dressing ,
Cable Dressing , Connection tightness , Cleaning and Connection tightness , Cleaning and
Blowerning to done.
Blowerning to done.
PM Jobs carried Shutdown jobs
Motor cleaning and blowering work for Boiler-1 drives at All drives shutdown cleared for the Group
0meter area. LOTO for all drives.

Motor sealing for JBs checked. Boiler-1 ID, PA, SA RTDs and vibration
sesnors feedback ensured form field side
and packing done for remaining.
Motor cleaning and blowering work done
for :-
a) ID-1
b) PA-1
c) SA-1
d) J valve both

Space heater made ON and esnured for


Isolator(at 10:00PM), MV drive(at G-shift
ensured 4:00PM) and motor ID-1 and PA-1
also started.

PM Jobs carried Shutdown jobs


Unit No. # 1 ID Fan Breaker started
then U2 OVP fault showing at MV Drive
display. So informed to sati ji and
hemant Sharma. They come at site.
Checked the cell U2 Voltage . It is
showing Normally. Then Start the
Drive. It is running Normally. For ID
and PA Fan Interlock Button is in
Pressed Condition. also relesed.

Unit No. # 1 J-valve Fan -1A , ID Fan ,


PA Fan , SA Fan is started. Also
stopped.
BFP-1 2 & 3 motor cleaning & blowering work done.

LED collected from ID fan & provide at boiler-1 J


valve.

PM Jobs carried Shutdown jobs


VAM PLC panel cleaning & blowering job
Chilled water-1&2 field JB cleaning & blowering job

CCR & 4.5 mtr AHU VFD panel cleaning & blowering job

VAM cooling water booster VFD panel cleaning &


blowering job
WTP area following equipment cleaning and blowering
work done:-
a) All DCS termination & module unit panels at WTP

CEP- 1&2 Motor Cleaning & Blowering work

PM Jobs carried Shutdown jobs

Unit No. # 1 PA Fan Vibration Cable and


Unit No. # 2 Boiler area Drum Floor , Cyclone Floor Vibration probe and FAN DE and NDE
area , and Both side Oxygen Probe polythene RTD Removed as per Jitesh Paliwal
Covering to done. requirement. Vibration Probe kept at
Inst. Lab. Locker No.-14.
Light provide at PA fan -1 as per maintenance FAS-1& 2 panel found dusty ,so
requirement. cleaning & blowering done .
BAS panel found dusty ,so cleaning &
blowering done .

PM Jobs carried Shutdown jobs


TG building 4.5 mtr area mov's & control valves cleaning
& blowering job

TG building 0.0 mtr area mov's & control valves cleaning


& blowering job
TG building 0.0 mtr area 02LCV3301 & 02LCV3301
positioner packing Tape covering
Following MOV's oil leakage observed at 0 mtr & 4.5 mtr
TG building area 01MV2906, 12MV3203 & 01MV3205 so
cleaning done, now ok.
Motor feeder checking and maintenance work done for:-
a) Enmass convetor-1
b) Enmass conveyor-2
All connections tightness work done.

Coal bunker O/L MOV operation check , Cable laying from SA fan-1 To Boiler-1
APH O/L Temperature point.

Coal Bunker-1A O/L MOV -Open close check-Found


Ok,
Coal Bunker-1B O/L MOV -Open close check-Found
gettion open from DCS- but not getting close due to
bunker full.
Coal Bunker-1C O/L MOV -Open close check-Found
JAM.
Coal Bunker-1D O/L MOV -Open close check-Found
Motor tripped on O/L Due to jam.
WTP Dosing pump connection removing & again
connection at CT fan Area

FAS & BAS Silo motors & Panels cleaning &


blowering work
PM Jobs carried Shutdown jobs
Unit No. # 2 Bed ash cooler -2A and 2B VFD panel
Blowerning and Cleaning to done.
Unit No. # 2 Bed ash cooler -2A and 2B VFD panel
Filter Cleaning to done.

HP Dosing room al motors checking, blowering and


maintenance work done.
Motor double earthing also ensured
All panels in HP dosing room were dusty so cleaning done
with cloth and brush.
CHP crusher building En mass floor field instrument ID fan -1,PA fan-1,& J valve 1B, AVI
cleaning & bloweringwork done. isolation cleared.
Chimney analyzer SOX-2 flow not coming . So sample ID fan -1,PA fan-1,& J valve 1B, trail
line dust cleared. Now Ok. done with operation .

BC-4 Bag filter panel cleaning & packing done.

Bag filter screen floor panel cleaning & packing done.


BC-6 magnetic seperator panel cleaning & blowering work
done.
PM Jobs carried Shutdown jobs

ID fan -1, PA fan-1, & J valve 1B, AVI


PM07 order closed for TPI up to 19.05.2021
isolation cleared.

CHP mcc light not glowing so checked the supply at


4.5 mtr area feeder found healthy & so cheched at ID fan -1, PA fan-1 MV drive put in
chp mcc side found one mcb got tripped due to this bypass mode as per operation
MCCB got tripped, put it in off & charged others now requirement for trial with IGV
ok.

CHP mcc door access machine not working, so


checked the supply & found one mcb got tripped due ID fan -1, PA fan-1 & J valve 1B, AVI
to this MCCB got tripped, put it in off & charged closed(again isolation given)
others now ok.

Boiler-1 J-valve draught point checked Boiler-1 J-valve draught point checked
01) DPT1101-H (OK) & air purging done, observation as per
02) PT1116 (OK) below-
03) DPT1103-H (CHOCK need to clear) 01) DPT1101-H (OK)
04) PT1101 (CHOCK need to clear) 02) PT1116 (OK)
03) DPT1103-H (CHOCK need to clear)
04) PT1101 (CHOCK need to clear)

VAM system AHU started for 4.5 mtr


area for Unit-1 fan trial purpose &
again made off as system run in DOL
with IGV
PM Jobs carried Shutdown jobs
Fly ash Silo No. # 1 Field Inst. / panel Blowerning
and Cleaning to done.
Fly ash Silo No. # 2 Field Inst. / panel Blowerning
and Cleaning to done.

Bed ash silo Field Inst. / panel Blowerning and


Cleaning to done.

Unit No. # 2 all the Bunker Level Transmitter Level


Probe to cleaned.

Boiler-2 coal feeder motors cleaning, blowering and


double earthing checking done for:-
a) All main motors
b) All clean run motors

RSB cleaning and ELCB operation checked at same floor.


PM Jobs carried Shutdown jobs

TG-1 accumulator Pressure Gauge


UF -I & II Inlet valve showing false indication on DCS, cross checked for zero pressure
so limit switch assembly replaced with spare one showing, PG was normal, actually
with wiring done, trial taken working normal pressure was lesser in accumlator so
informed to Mr. Tauqir about this.

MGF flow tx not showing at dcs checked the same TG-1 one no PG at lube oil ckt checked
found one isolation valve not opened properly, so
correct it now showing ok. at lab & zero adjusted now ok

Bed ash silo wet unloading system plate valve not


getting open, So check & found air leakage observed
from tube, arrest the leakage & tube changed .Trial
taken now ok.
Root blower room motor's & field equipment
cleaning, blowering & terminal tightness job
ACW-2 new motor cable lead prepare & lugging
done

CHP building 01 no's 24v led light arrangement done

PM Jobs carried Shutdown jobs


PM Jobs carried Shutdown jobs

WTP Pump House Motor Cleaning and Blowerning to


done.
BFP-1 not showing permit to start at DCS ,check & Boiler-2 coal feeder2A,2B ,2C & 2D
found breaker relay wastrip. Reset the same &
normalized. motor cleaning& blowering done.

BFP-2 not showing permit to start at DCS ,check &


found breaker relay wastrip. Reset the same &
normalized.
PM Jobs carried Shutdown jobs

Chimney analyzer room AC not working cleaning &


blowering done

Chimney analyzer controller display is not showing


found room temp was higher side made off the
controller & room windows open for cooling
purpose, AC maintenance done & taken in line but
display is still not showing.

BC-1 motor & JB cleaning & blowering

BC-2 motor & JB cleaning & blowering

PM Jobs carried Shutdown jobs

Unit No. # 2 ACC Side Repair Supply Box Polythene


Coverning to done.
PM Jobs carried Shutdown jobs
Chimney analyser Room Panel Blowerning and
Cleaning to done.

In CHP , T-1 Tower bag filter VFD Panel Blowerning


and Cleaning to done.
PM Jobs carried Shutdown jobs

Coal feeder -2B clean run motor taking high current,


so decouple & motor trial taken for any abnormality.
It was taking 0.79 Amp again coupled & try to run
but taking high amp(4Amp) over load operate so
stop the system.
As per o&m team request Coal feeder -2B clean run
motor change with spare taking noload current 0.49
Amp so coupled again taking: 4 Amps, overload
operate again stop, mech team changed the gear
box , after that trial taken working normal taking
0.51 Amp in coupled condition.

AOP-2A & 2B motor cleaning & blowering job done

TG building area 4.5 mtr field equipments cleaning &


blowering job done

PM Jobs carried
Fire pump house all motors were found dusty so cleaning
and blowering work done.

Pump house emergencg light LED checked for emergency


operation and found working OK.
Boiler-1 and 2 light made off from 4th to 7th floor as for
power saving.
WTP DCS panel and all MOV feeders cleaning and
blowering work done.
Jobs carried

TG-2 stop at 2.30 pm

TG-1 start at 3.00 pm

Line -2 made off at 3.30 pm

Bucket elevator2 put in remote

reclaimer shutdown cleared

PM Jobs carried
TG building 0 mtr & 4.5 mtr area TG-2 side field
equipments cleaning & blowering job
Oil observed at MOV's 02mv3205, 02mv3203) towards
unit-2 at 0 mtr area so cleaning & tightness done

WTP pump house all motors cleaning and blowering


work done. Also motor double earthing checked.
WTP Hall and WTP tank side RSB checking and blowering
done. Also all ELCB operation is checked found all OK.
stalled for checking, & trail done, again new O2 Probe removed

r MV drive room & BFP drive room.

alled for boiler reliability project in CCR .

und a capacitor damaged, Capacitor image taken & send to Mr.

maintenance depart.

move.

PM Jobs carried

Boiler-2 coal feeder all 4 nos. MOVs, JB limits and


local panel cleaning and blowering work done.
Gen-1 excitation and tap changer adjuested for
cement plant requirement for TR-1 and 4 charging
then normalised.

Timer adjusted of 132KV switchtard area.

Bucket elevator2 put in remote after maint work.

ch-4 malfunctioning, So take shit down of BC-4 for replacing


New belt sway switch connected wire cable found damaged so,
one now ok.
t tightness.

rst NIS modue loop B blinking, & second NIS module LED on

t tightness.
PM Jobs carried

Co Analyser of Boiler-2 maintenance work done with


G-shift, cleaning of purging tube, filter.

Following lighting timer is updated :-


a) WTP Street
b) ACC street
c) Switchyard street
d) Comp house
e) BC-1 street
f) Silo
g) Limestone

Capacitor 800VAr started as PF was found low on


TG-2.
Enmass-2 put into remote and AVI is closed.

PM Jobs carried
Compressor Auto drain valve functional check done

Chimney analyser Room Panel Blowerning and


Cleaning to done.

Boiler-2 Lift telphone line loose connection observed


,same was rectified and taken in line

Boiler-1 CO-Analyzer maintenance done

Boiler-1 4th floor ELCB operation checked and


Green tagging done
Boiler-1 5th floor ELCB operation checked and
Green tagging done
V coil, so checked the Pnumetic valve by operation side during
me, due to MFT remaining coal feeder and SA Fan-2 trip,
n-2, Now normalize boiler-2 in 10 miniuts. at present Pnumetic
g work will done in G shift.

ment cleaning & bloweringwork done.


ent cleaning & bloweringwork done.
ment cleaning & bloweringwork done.

ectified the same .


& PC.

tart exhaust fan but not started , checked & rectified


ne.

PM Jobs carried

Boiler-1 side, P&V-2 common drain line found


chocked & waterfall, so line hammering & drain
clear done, tank inlet water line valve also adjusted,
now ok

Boiler-1 makeup water pump getting start after


giving stop, check the supply & feeder made off .
Local push buttons cleaning done & contacts
checked , feeder made ready & after that trial taken
working normal.

Unit-2 bag house 11-21 conveying, 11 no vessel HH


alarm showing checked & found actual material was
there, informed to ccr.
BC-2 belt sway HH switch acted so checked & found
belt was out , after alignment, again set it right, trial
taken now ok

BAC-2B level probe showing HH so cleaning done &


calibration checked now ok

TG-2 enclosure light not glowing , checked the same


found Ph missing, corrected it , now ok

PM Jobs carried

BC-7A / 7B Belt all the bag Filter panel Blowerning


and Cleaning to done.

Unit No. # 2 Load cell Air Purging to done.

ACW-2 cable removed from JB and motor side

New cable provided from JB to Motor of ACW-2

Boiler-1 round taken and removed lighting material


from side
cked & found all under 55 deg C.

cept CO analyzer-1 .

ne.
e.
gauges & Flow switches cleaning & blowering dobe.
fixed that.
& PC.

PM Jobs carried
Boiler-2 APH conveying field JB cleaning & blowering
done
Boiler-2 11-21 conveying field JB cleaning & blowering
done
Boiler-2 12-22 conveying field JB cleaning & blowering
done
Boiler-2 drain valve all 06 no's of mov cleaning j-valve 03
no's of mov cleaning & blowering

BFP-1,2 & 3 motor's cleaning & blowering job


Unit-1 CEP-1&2 motor's cleaning & blowering job

PM Jobs carried

Unit No. # 1 APH O2 , Left and Right O2 Probe and


Controller polythene Coverning to done.

Unit No. # 1 ID Fan RTD JB Cable dressing to done.


cked & found all under 55 deg C.

cept CO analyzer-1 .

& PC.
PM Jobs carried
Shift jobs carried

e packing done.

ng done.

d normal, Then try in local mode running normal, but not running
or load cell checkingas bunkel level low. At present running in local. Need

ater valve closed, now P&V-4 is running


PM Jobs carried
Boiler-1 DSH station all of four control valve positioner
sealing done with packing tape

Boiler-1 feed water station all of control valve positioner


sealing done with packing tape

Boiler-1 01FCV0919, 01FCV0920 & FCV0921 actuator


sealing done with polythene
Generator-2 rotor voltage showing 90.2V at 17.5MW and
healthy status.
Month end report checking done and balanced fo rzero
errors:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power

AVR-1 put into manual mode from auto as Gen-1 is in


stop condition.

PM Jobs carried
Unit No. # 1 04 Nos. DSH Station , 03 Nos. FWCV , SA
Fan IGV , PA Fan IGV , and ID Fan IGV Polythene
Coverning to done.
Shift jobs carried

dust inside, So blowering done in each JB,

sensor cleaning done & take in line ,now Ok.


d in shutdown, arrange them in cartoon box and packed put in

hanged its direction conection and then taken trial now direction is

done
em
ided
verload, so reset it and running ok
Shift jobs carried

dust inside, So blowering done in each JB,

sensor cleaning done & take in line ,now Ok.


d in shutdown, arrange them in cartoon box and packed put in

hanged its direction conection and then taken trial now direction is

done
em
ided
verload, so reset it and running ok

PM Jobs carried
Boiler-1 all 06 no's of drain MOV's control ckt part
polythene covering done
Boiler-2 all 06 no's of drain MOV's control ckt part
polythene covering done
Unit-1 PA fan bearing RTD JB polythene covering done

Unit-1 PA fan IGV positioner polythene covering done

Unit-1 bag house area air receiver auto drain supply field
JB polythene covering done
Chimney analyzer area two no's of JB polythene covering
& packing tape provided
Boiler-1 BAC-1A &1B field JB cleaning & blowering
Month end report checking done and balanced for zero
errors:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal


Auto drain valve checked manually working OK

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

01.06.2021 A Gajendra Pandya Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given
1) BC-5
2) BC-6
3) reclaimer
4) BC-2

Following shut down cleared


1) BC-2
2) ACW-2
3) reclaimer
4) Bed ash cooler-1A
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal

RNRP all nodes found Normal

Auto drain valve checked manually working OK

Shift instrument digital log book filled

UPS log digital log book filled.


01.06.2021 B Anurag Chowdhury
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down clreared for :-
1) BC-5
2) BC-6
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Sanjay Garg / Ajay Shift instrument digital log book filled


01.06.2021 C Kumar UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal

DG power report prepaired and uploaded in SAP


also EMS report prepaired and mail to all

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

02.06.2021 A Gajendra Pandya


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given


1) BC-5
2) BC-6
3) reclaimer
4) BC-1
5) J valve-1A
6) J valve-1B
7) Roots blower-1 of side stream filter
8) Vibrating screen-1

Following shut down cleared


1) BC-6
Date Shift Engineer Name Regular jobs

Shift round taken drives running normal.

RNRP all nodes found Normal

Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.
02.06.2021 B Anurag Chowdhury
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down cleared for :-
1) BC-5
2) BC-1
3) Reclaimer
4) J valve-1A
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
02.06.2021 C Sanjay Garg / Ajay UPS log digital log book filled.
Kumar
Sanjay Garg / Ajay
02.06.2021 C Kumar
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

shift round taken drives running normal


RNRP all nodes found Normal

DG power report prepaired and uploaded in SAP


also EMS report prepaired and mail to all

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
03.06.2021 A Tarun Gaur
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given


1) BC-5
2) BC-1
3) reclaimer
4) BC-2
5) BC-3

Date Shift Engineer Name Regular jobs

Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
03.06.2021 B Anurag Chowdhury
Following check list prepared
03.06.2021 B Anurag Chowdhury

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down cleared for :-


1) BC-5
2) BC-2
3) Reclaimer
4) J valve-1B
5) BC-5
6) Vib screen-1

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
02.06.2021 C Gajendra Pandya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepaired and upload in SAP
Power report prepaired and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.
RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.
04.06.2021 A Anurag Chowdhury VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given for :-
1) MB feed pump-1
2) MB feed pump-2
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
Sanjay Garg / Ajay UPS log digital log book filled.
04.06.2021 B
Kumar VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
04.06.2021 C Gajendra Pandya/
Purushottam VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

DG Report prepaired and upload in SAP


Power report prepaired and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.
RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.

05.06.2021 A Ajaya Kumar


VAM log digital log book filled.

Following check list prepared


05.06.2021 A Ajaya Kumar a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
S/D given
1. BC-1
2. BC-5
3. Reaclaimer
4. Chiller water pump.
5. DM water pump-1
S/D cleared
WTP MCC 000MCC5320 door lock replacement
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
05.06.2021 B Sanjay Garg VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Anurag Shift instrument digital log book filled


05.06.2021 C Chowdhury/ UPS log digital log book filled.
Purushottam VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
05.06.2021 C Chowdhury/
Purushottam

b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepaired and upload in SAP
Power report prepaired and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
06.06.2021 A Gajendra Pandya VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown given:-
1) BC-1
2) BC-2
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Shift instrument digital log book filled


06.06.2021 B Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working ok

Shift instrument digital log book filled


Anurag UPS log digital log book filled.
06.06.2021 C Chowdhury/
Jaswant VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.
RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

Shift instrument digital log book filled

UPS log digital log book filled.


07.06.2021 A Gajendra Pandya VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown given:-
1) BC-5
2) Virating Screen-2
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

07.06.2021 B Sanjay Garg


Auto drain valve checked manually working OK
Shift instrument digital log book filled
07.06.2021 B Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working ok


Shift instrument digital log book filled
Tarun gaur/ UPS log digital log book filled.
07.06.2021 C
Jaswant VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

08.06.2021 A Gajendra Pandya a) Generator-1  checklist


b) Generator-2  checklist
c) Elect. Shift checklist
08.06.2021 A Gajendra Pandya

Following shutdown given:-


1) BC-5
2) BC-7A
3) BC-7B
4) soot blower-1
5) ACC-1D
6) Lub oil-1D

AVI given and cancelled for:


1) Soot blower-1
2) Lub oil-1D
Date Shift Engineer Name Regular jobs

Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
08.06.2021 B Anurag Chowdhury VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down cleared for :-
1) BC-5
2) Viv screen-2
3) BC-7B
4) BC-7A
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Shift instrument digital log book filled


08.06.2021 C Sanjay Garg /
Tarun Gaur UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
Tarun Gaur

b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


09.06.2021 A Gajendra Pandya
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shutdown given:-


1) BC-6
2) BC-4
3) Bed ash cooler-2B
4) DM pump-3
5) DM Pump-2

AVI given and cancelled for:


1) Lub oil-2B
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
09.06.2021 B Anurag Chowdhury Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
09.06.2021 B Anurag Chowdhury

c) Elect. Shift checklist


Following shut down cleared for :-
1) BC-6
2) BAC-2B
3) BC-4
4) DM transfer pump-2 and 3
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
Sanjay Garg / UPS log digital log book filled.
09.06.2021 C
Tarun Gaur
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
10.06.2021 A Anurag Chowdhury
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given for :-
1) BAC-2B
2) BC-7A
3) Bunker bag filter
4) BFP-3
5) BC-6

Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
10.06.2021 B Tarun Gaur a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down Cleared for :-


1) BC-7A
2) Bunker bag filter
3) BFP-3
4) BC-6
5) BFP-3 MOV

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

VAM parameter observed normal

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
10.06.2021 C Gajendra Pandya Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
10.06.2021 C Gajendra Pandya

DG Report prepared and upload in SAP


EMS Report Prepared work & Mailed
Power report prepared and mail
Plant performance report download and mail
Environment report download and mail
Date Shift Engineer Name Regular jobs

Shift round taken drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

Shift instrument digital log book filled


11.06.2021 A Anurag Chowdhury
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given for :-
1) Enmass-1
2) BC-7A
3) Bunker bag filter
4) BC-1
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Shift instrument digital log book filled


11.06.2021 B Sanjay Garg
11.06.2021 B Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.
VAM parameter observed normal
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
11.06.2021 C Gajendra Pandya a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
EMS Report Prepared work & Mailed
Power report prepared and mail
Plant performance report download and mail
Environment report download and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


12.06.2021 A Deepak Chand
Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
12.06.2021 B Sanjay Garg

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Shift instrument digital log book filled


Anurag UPS log digital log book filled.
12.06.2021 C Chowdhury/
Purushottam VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepaired and upload in SAP
Power report prepared and mail
Plant performance report download and mail
Environment report download and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
13.06.2021 A Deepak Chand
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
13.06.2021 B Sanjay Garg/
Gajendra Pandya UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.

Anurag
13.06.2021 C Chowdhury/
Jaswant
VAM log digital log book filled.
Following check list prepared
Anurag a) Generator-1  checklist
13.06.2021 C Chowdhury/
Jaswant b) Generator-2  checklist
c) Elect. Shift checklist

d) Night report readings with day consumption

DG Report prepared and upload in SAP

Power report prepared and mail

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

VAM parameter observed normal

All AC power made ON in morning.


14.06.2021 A Gajendra Pandya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given:
1) BC-2
2) P&V-4 boiler side
3) IBD Pump 1&2
4) Bucket elevator-2 boiler
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

14.06.2021 B Sanjay Garg


RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


Shift instrument digital log book filled
14.06.2021 B Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


Deepak Chand/
14.06.2021 C
Jaswant UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

15.06.2021 A Gajendra Pandya


Following check list prepared
15.06.2021 A Gajendra Pandya
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given:


1) BC-1
2) Coal crusher-1
3) Coal crusher-2
4) Vibrating screen-1
5) Vibrating screen-2
6) Crusher floor bag filter
7) Soot blower-1
8) Bed ash silo dray unloading
9) Reclaimer

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

15.06.2021 B Deepak Chand RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
15.06.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
16.06.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given:


1) BC-1
2) Reclaimer
3) BC-7A
4) BC-7B
5) BC-7A&7B bag filter
6) Unit-1 soot blower

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

16.06.2021 B Deepak Chand


All AC power made ON in morning.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
16.06.2021 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
17.06.2021 A Tarun Gaur
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down given:
1) Vibrating Screen-2
2)Coal Feeder-1B
3) Coal Feeder 1B Discharge MOV
4) IAC-1

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.


17.06.2021 B Deepak Chand
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
17.06.2021 C Gajendra Pandya VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS Report Prepared work & Mailed
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


18.06.2021 A Deepak Chand All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d) UPS Check List
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

UPS Check List filled.


18.06.2021 B Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

CPCB data cheked at chimny room found


updated
Shift instrument digital log book filled
UPS log digital log book filled.
18.06.2021 C Gajendra Pandya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS Report Prepared work & Mailed
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

All AC power made ON in morning & light mcb


made off manually
CPCB & ETP site data cheked at chimney room
found updated

RNRP all nodes found Normal except SPC007.

Following Shut down given-


a) Coal Crusher-2 (T067)
b) BC-7A (T066)
19.06.2021 A Jaswant Singh c) BC-7B (T045)
d) BC-1 (T079)
e) BC-2 (T065)
f) Reclaimer (T082)

Shift instrument digital log book filled


UPS log digital log book filled.
EMS Report Prepared work & Mailed
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
19.06.2021 B Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled

19.06.2021 C Deepak Chand/


Purushottam G
UPS log digital log book filled.
VAM log digital log book filled.
19.06.2021 C Deepak Chand/
Purushottam G Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Plant performance report download and mail
Environment report download and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal

chimny data found updated


20.06.2021 A Gajendra Pandya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
20.06.2021 B Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
Deepak VAM log digital log book filled.
20.06.2021 C
Chand/Jaswant Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Plant performance report download and mail
Environment report download and mail

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal
chimny data found updated
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
21.06.2021 A Gajendra Pandya b) Generator-2  checklist
c) Elect. Shift checklist
21.06.2021 A Gajendra Pandya

Following Shut down given-


a) Coal Crusher-1
b) BC-1
c) BC-2
d) BC-3
e) Vibrating screen-1
f) Instrument compressor-2
g) crusher floor bag filter
h) BAC-1B instrument air valve
i)

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

21.06.2021 B Sanjay Garg

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.

21.06.2021 C Ajay/Jaswant
21.06.2021 C Ajay/Jaswant
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


VAM parameter observed normal
chimny data found updated
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
22.06.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following Shut down given-


a) Fly ash silo dry unloading
b) BC-4
c) crusher floor bag filter
d) T2 tower bag filter
e) Vibrating screen-2

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


22.06.2021 B Deepak Chand
22.06.2021 B Deepak Chand
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
22.06.2021 C Sanjay Garg
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

DG Report prepared and upload in SAP


Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

VAM parameter observed normal


chimny data found updated
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
23.06.2021 A Gajendra Pandya Following check list prepared
a) Generator-1  checklist
23.06.2021 A Gajendra Pandya

b) Generator-2  checklist
c) Elect. Shift checklist

Following Shut down given-


a) BC-1
b) BC-4
c) Reclaimer
d) T2 tower bag filter
e) Crusher floor bag filter
f) oil centrifuse-2

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


23.06.2021 B Deepak Chand
Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
23.06.2021 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
23.06.2021 C Sanjay Garg

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


24.06.2021 A Deepak Chand
Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

25.06.2021 A Deepak Chand


25.06.2021 A Deepak Chand
Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

Sanjay Garg / Ajay


25.06.2021 B
Kumar

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

25.06.2021 C Gajendra Pandya


Comp house & receiver area auto drain valve
checked manually working ok
Shift instrument digital log book filled
25.06.2021 C Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Boiler-1 Co analyzer sample line cleared.as


sample not coming.
Shift instrument digital log book filled
UPS log digital log book filled.

26.06.2021 A Ajaya Kumar

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

shift round taken drives running normal

RNRP all nodes found Normal except SPC007.


Auto drain valve checked manually working OK
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

26.06.2021 B Sanjay Garg

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Deepak Chand/
26.06.2021 C
Purushottam G
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Plant performance report and Environment
report mailed

shift round taken drives running normal

RNRP all nodes found Normal except SPC007.


Auto drain valve checked manually working OK

Boiler-1 Co analyzer sample line cleared.as


sample not coming.
Shift instrument digital log book filled
UPS log digital log book filled.
27.06.2021 A Ajaya Kumar VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown given
BC-1
Reclaimed

shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
Shift instrument digital log book filled
27.06.2021 B Sanjay Garg
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.

27.06.2021 C Deepak Chand


27.06.2021 C Deepak Chand VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Plant performance report and Environment
report mailed

shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK


UPS Check List filled.
Shift instrument digital log book filled

28.06.2021 B Sanjay Garg


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

28.06.2021 C Ajaya Kumar


Shift instrument digital log book filled
UPS log digital log book filled.
28.06.2021 C Ajaya Kumar VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Plant performance report and Environment
report mailed
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007.

Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

29.06.2021 A Gajendra Pandya Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shutdown given


BC-1
BC-7A
BC-7B
BC-6
coal crusher-1
BC-4 T2 tower bag filter
silo roots blower-2

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


29.06.2021 B Deepak Chand
Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
Sanjay Garg / Ajay
29.06.2021 C Kumar UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007.
Auto drain valve checked manually working OK

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
30.06.2021 A Gajendra Pandya
c) Elect. Shift checklist

Following shutdown given


BC-1
BC-2
BC-4
BC-7A
T1 tower bag filter
coal-2D
MOV-912
Bucket elevator-1
Bucket elevator-2
Work shop EOT
coal bunker bag filters

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

30.06.2021 B Deepak Chand RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d) Switch Yard Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
30.06.2021 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DG Report prepared and upload in SAP
Power report prepared and mail
Shift jobs carried

Polythen covering provided at boiler-2 Insrument equipments as:-


1) Drum floor equipments
2) metel temprature JB
3) main steam line MOV-2 Nos
4) start up vent
5) SH O/L metel temp JB
Fly ash silo-2 bulker level showing high continiously, so clean the fork switch and reset high level now OK

WTP Oven-2 faulty fan removed from oven for repairing

CHP MCC panel back side found open so packed with glass putty

ALL loto locks put in WTP workshop top floor


All old Log books placed at WTP Top room, and put new log books

at 1.00 pm Chimny SPM of CPCB goes to 44 spm due to soot blowing, but after soot blowing its value is not going Low,
so need to checked further,

Shift jobs carried


One DOL starter made ready for switchyard cooling fan with indication lamp, trial taken and kept in WTO
workshop.
BC-1 pull cord rope was broken from 30m length so new rope connected and made healthy.
ACW-2 pressure gauge showing error of 0.5kg/cm2 so checked with one spare gauge of other ACW but still same
error, need to replace with new one.
Drain pot-2A not started from CCR, so checked feeder and found that it was in local and not charged, so made
healthy and trial taken.
BC-6 Tph controller replaced with spare one but still TH value not showing in controller so replaced again by old
and informed Tarun sir.

Compressor house side toilet tubelight checked and found faulty, so need to replace with new one.
Shift jobs carried

ACW-2 pressure gauge Not showing correctly. So we have replaced with new one. Now Reading are under
observation.

Unit No. # 1 Firing Floor area JB and Field Inst. Cleaning and Blowerning to done.

all the AC MCB to OFF Condition.


CPCB data is showing Normally.
All the Report sent to concered Person.
All the BFP motor Cleaning to done.

Shift jobs carried

Bed Ash cooler-1A and 1B water valve checked found mechanically jam infrom to shift incharge
Fly ash silo-2 bulker level showing high continiously, so clean the fork switch and reset high level now OK

5s done in LOTO box electrical of CCR

hand lamp collected from CCR and Swas room

VAM AHU of CCR, one belt found broken of Fan drive, so need to replaced in G shift.

Coal bunker 2D level switch found malfunctionning, so removed it from location for checking in Lab work under
progress
Shift jobs carried
Switchyard radiator cooling fan front side was not rotating, so checked and found 2 phases cable inside
got open from winding and also cable was damaged so replaced the cable and winding internal cable
reconnected, then trial taken found OK.
Comp house side toilet found light was faulty so replaced with spare light from 4.5m MCC room, the
fitted in toilet now working OK.

CCR AHU belt was found borkn all 3 nos. so new belt were mounted and then taken in line again the AHU.

Boiler-1 SA fan IGV abnormalties were checked with Jaswant sir, found air valve closed and positioner
error so calibration done and positionert maintenance also done, now OKJ.
Boiler-1 DSH control valve air leakage isolation valve abnormality was rectified.
Boiler-1 01TCV3203 control valve not operate so checked and calibration done with Jaswant sir so
rectified the problem.
Electrical shift mobile given for repair and sim kept in Hemant sir table.

Shift jobs carried


In SWAS Room Unit No. # 2 Drum Water PH and Conductivity Sample is not showing at DCS end. So adjust the flow
in rotameter. Now Ok.

WTP DCS and MOV panel Cleaning and Blowerning to done.

Unit No. # 1 All the Pneumatics Valve is not Operating Because Inst. Air line is in isolating Condition.
CPCB data is showing Normally.
All the Report sent to concered Person.
Boiler-1 all coal feeder & clean run motor's cleaning & blowering done.
Boiler-2 all coal feeder & clean run motor's cleaning & blowering done.
TG-1 EOP pump made ready for opeation.

PA-1Motor DE Side RTD Open & connect for drawing purpose


BC- 7A & 7B Area Bunker level transmittor 2D Base frame fixing work

5s done in LOTO box electrical of CCR


hand lamp collected from chp area
For maintenace purpose of maint. Deptt VAM Stopped & MV Drive , CCR & UPS Room AC taken in line now after
maintenance again VAM taken in line
WTP MCC Panel cleaning & Blowering work from outside
WTP Area 3 no'S RSB Panel Elcb testing work
ACC-1 B & Drain Pot-1A VFD supply healthy from panel
GT-1 Transformer changeover & charging work & COB-2 breaker Off & Rackout condition

Shift jobs carried


Motor greasing work done for:-
a) BC-1
b) BC-4
c) BC-6
d) Crusher-1

Gen-1 breaker made healthy and then synchronised at 03:52PM. Also Gen-1 put into base load mode.

SA-1,J-valve-1A&1B ID-1 and PA-1 made ready and trial taken. Also for first start, inerlock button was
pressed and kept for 5 mins then stopped and handover to operation.
VAM tripped one time at high generator vapour temp so AC were started for that time and then stopped,
also VAM reset after temp normalisation.
Bus PT-1 loop for PT switching removed and insulated.
Boiler-1 firing floor flame sensor detector 1A and 1B mounted, 1A is OK but 1B feedback not coming
continuos.
Mov feeder 01MV0105 made healthy and trial taken by CCR.
01FCV0922 checked for MCB tripping found that motor is faulty, one phase shorted. So removed motor
from site and kept in inst top lab. Also one spare motor from other FCV removed and kept in same floor,
need to replace.
ID-1 and PA-1 MV drive put into VFD mode from DOL mode. Also space heater is ON, need to stop after
start of fan.
TG building lift sensor not operating so corrected and also packing done for sensor box.

Shift jobs carried


J valve FCV922 motor fitted and conection done, but its feedback is not coming in DCS, need to check

HSD area light not glowing so check and found that its MCB was OFF, so ON it

Feed water station boiler-1 MOV cleaning done

Shift jobs carried


Boiler-1 both ignitor operation checked by removing outside the ignitor found working OK.
01FCV0922 feedbcak was not showing in DCS so checked found the potentiometer cable was opened, so
connectd from local TB then trial taken found OK.

P fan-2 motor cleaning and blowering work done and then covered motor with polythene.

All 4 coal feeder clean run motor power made ON and bed ash cooler 1A and 1B local stop was released
from field.
Boiler-1 CO analyser vent feedback checked from field side with Taruns ir.
Boiler-1 CO analyser room chiller pump started.
HSB area lights were found ON so made OFF.
Coal feeder-1B and 1D feeder outlet MOV feedback checked from field and DCS with Tarun sir.
Boiler-1 lightup process started at 6:40AM and in process now.
Shift jobs carried
Unit No. # 1 Bed Material Temp. 01TI1109 not showing at DCS end. So Connection Pair changed. Now Ok.
Coal Feeder-1A is not Started at DCS end. Found that Controller Parameter is out. So feed the New
parameter. Trial taken. Now Working Normally.
DSH Control Valve ( 01TCV3203 ) control valve showing 0% Feedback while Field side control
valve is fully 100 % opened. So Changed the Internal parameter and Calibration done. Now Ok.
ETP data is hang condition. So reset the Supply. Still data is hang condition.
Unit No. # 1 APH is showing seal Pr. Fault. So opened the Inst. Air valve. Now Ok.
BAC 1A & 1B make ready ,both trial done.
Coal feeder 1C cleanrun motor tripped on O/L , reset one time, & S/D given for checking.
05 LED light checked at work shop & one found faulty,
02 no's LED light top changed.
02 hand lamp bulb replaced.
Cover fixed on punching M/C at 4.5 mtr.
SA fan not start from DCS , found back side MCB found tripped ,again take in line .
Shift jobs carried
SA fan-2 terminal JB covered with silver packing tape

ACC-1 all Lub oil motors JB packing done with packing tape

ACC-1 Fan motors JB packing done with packing tape


Coal feeder area 24 volt hand lamp provided
coal feeder-1C AVI cancelled and shutdown given
HSD area pump found ON, so stop the feed pump-2
Boiler-1 Burner line 1307 valve close limit not coming same was setting done
Boiler-1 Burner main pipe line 1309 valve close limit not coming same was setting done
Compressor House & air reciever tank Auto drain valve functional check done
Boiler-1 Firing floor Instruments and Jb's cleaning done
Boiler-1 Bag house purging was not starting same was checked and observed air line close, opened and bag house
purging found normal
Boiler-1 Coal feeder-D GCV calculation checked
Shift jobs carried
BAC 1A cooling water valve not opening ,found JAM inform to operation.
Boiler-2 11-21 dome valve check, found normal operation,

Boiler-1 conveying valve 01SC8134 not operating from DCS found jam, operate 2-3 times manually ,&
take in service, now Ok.
Tample loudspeaker volume not increasing ,diaphragm changed but not successful, need to check
amplifier.
Chiller water pump connection removed & terminate after motor overhauling.
WTP pump house motor cleaning & blowering work done.

Boiler-1 HSD station 01SV2208 air tube came out of it's fitting ,connected the same ,& air leakage
arrested.

Shift jobs carried


all the AC MCB to OFF Condition.

Unit No. # 1 Coal Feeder Area all the field Inst. And JB Cleaning and Blowerning to done. Also Packing to done.
In SWAS Room Unit No. # 1 Drum Water PH Sample in Glass Tube is very dusty. So cleaned it. Also sensor to
cleaned.
Unit No. # 1 APH Main air Inst. PU Tube leakaged. So PU Tube is replaced. Now Ok.
All the manual light to ON Condition.
Unit No. # 1 TG put into Base Load as per shift incharge requirement. Also removed it.
AVI of Coal feeder -1C and feeder O/L MOV to given . Also closed the AVI.
TG # 2 Enclosure exhust fan ( 02 Nos. ) cable connection to done. Also Permit to closed.
Unit no. # 2 ACC Side mech. Welding machine Cable shorted. So Replaced it.
S/D Cleared- BC-1 , BC-5 , reclaimer , DM water Pump no.-1 , TG # 2 Enclosure exhust Fan , Coal Feeder-1C and
Feeder O/L MOV.

Shift jobs carried


Boiler-1 System-11-21 system bacpressure switch line got completely choked, PU tube arranged and system taken
in line

Boiler-1 System-11-21 system bacpressure Transmitter line got completely choked, flushing done and taken in line
CCR mimic LED light going when alarm comes and after acknowledge display is showing, power reset done and
kept under observation
Boiler-1 APH Back pressure line got jam, flushing done
Boiler-2 in system-11-21 rubber mat arranged at panel
Boiler-1 APH line SV8127 valve open/close functional check done as per operation request
Coal feeder motors all 8 nos. of Boiler-1 checking, blowering and double earthing checking done.
Gen-1 put into base load as load reduced and then removed again when load resumes.
TG-2 enclosure panel all 6 fans power made healthy and started.
Power report found some mistakes so corrected.

Shift jobs carried


Bed ash cooler-1B Puppet valve SOV found not operated, so remove it and maintenance of its air
mainfold done with rustoline, again fit it and check its operation now operating normally.
Boiler-1 APH conveying was not stopping in auto, so its back pressure switch line flushing done, But also
found that conveying was not in interlock, so put coveying in interlock and now conveying stopped in
auto
Boiler-1 APH outlet line valve feedback is not correct as informed by operation deptt. So checked the
feedback of valve open/close is found correct , so inform to shift incharge.
Pump house motor cleaning & blowering work done.
P&V-4 started as per requirement

Shift jobs carried


Unit No. # 2 ASH Vessel No.-12-22 Back Pr. Switch and Transmitter Impluse line chocked condition. So cleaned it.
Now Ok.

online CPCB and ETP data is showing normally.

Unit No. # 2 FWS and DSH Control Valve Station cleaning and Blowerning to done.
Bed ash cooler-1B Puppet valve SOV found not operated, So Changed the SOV. Now it is working
Normally.
All the manual light to ON Condition.
P & V No.-2 Stopped at 7 PM.
Unit No. # 1 Boiler Zero mtrs Rubber Mat Laid at J-valve Fan-1B Power JB, BAC-1A and 1B Local and
VCS Panel .
BC-7A and 7B Motor Cleaning to done.
Unit No. # 1 Oil Centrifuse Pump Panel Earthing loose condition. So connection tightness to done.
S/D Cleared- BC-1 , BC-2 .
Shift jobs carried
Boiler-1 BAC-1A Back pressure line got jam, flushing done
Boiler-1 BAC-1A conveying line Back pressure tx showing very less reading as per operation so replaced
from Boiler2, BAC-2B conveying system & removed tx installed at BAC-2B, under observation.

Boiler-2 firing floor area field equipments Gun-2A(Actuators- SV1301, SV1302, SV1303 & SV1304) field
panel flame sensor-2A &2B, Ignitor panel-2A &2B, Gun-2B(Actuators- SV1301, SV1302, SV1303 &
SV1304)
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance , Power Report and Env report) send on mail
Boiler-1 APH conveying line outlet valve SOV open/close command & feedback cross check as operation
team requirement
CHP MCC room AHF-3 panel all filters cleaning and panel b lowering work done.
4.5m MCC room found AHF-1 was OFF condition and breaker was OFF so made ON and then charged the
AHF panel.

Coal feeder area both RSB checking done and panel 5S done , cleaning and all ELCB checked found all OK.
One 1-phase ELCB was faulty in RSB-55 so replaced with new one, now OK.

Shift jobs carried


TG-2 enclosure one fan found wrong direction , so changed its direction
BC-4 hooter not operatiing , so changed its carbon brush and panel terminal tightness done, checked
from DCS with loop, it is operating normally

one welding machine plug Top found damaged, so changed it

BC-4 spare feeder modification work started, work is under progress as:-
1 remove MCB from BC-4 spare feeder
2 arranged a spare SFU from spare feeder of compressor MCC

Shift jobs carried


Inst. Air Compressor No. # 2 Display showing warning alarm. So checked and found that Element temp. is reached
to 100 degree. So Informed to shift incharge.
Spare cable at BC-7A and 7B Platform cable dressing to done. Also Display Unit Mounted at Coal Feeder-1A level
Transmitter.
IFC Panel polythene Coverning to done.
Unit No. # 1 APH Air Intake Valve Gland Packing and Covering to done.
all the AC MCB to OFF Condition.
All the manual light to ON Condition.
ACC Unit No. # 1 Side misting Fan Power Supply JB Polythene Coverning to done.
At 4.5 mtrs MLDB Panel door lock changed.
At 4.5 mtrs MPDB panel Blowerning to done.

main Road of TPP Road side light is OFF. Found that Timer is not working Condition. So Reset the Timer. Now Ok.
Shift jobs carried
Compressor area IAC-1,2 & 3 field panel & motor cleaning & blowering job
Compressor area field equipments, gauges & sov's cleaning & blowering job

CHP dcs all module (91M & 94M) & termination unit panels(90, 92, 93 & 95) cleaning & blowering job
CHP dcs operator console & PC cleaning & blowering job
Firing alarm JB at CHP dcs room cleaning & blowering job
Pull cord panel & both VFD's panel cleaning done with cloth
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance , Power Report and Env report) send on mail
Service air comp-2 water vlv sov tube air leakage abserved , isolate the vlv & correct it.
BFP-1 ,2 &3 Motor cleaning & blowering work done
Switchyard Behind security tower light found off check & found timer stuck up now reset & ok

Shift jobs carried


ACC-1D Lub oil motor power connection opened and earthing opend as requirement of Mecc deptt

Again ACC-1D Lub oil motor power connection closed and earthing closed after work complition

ACC-1D Lub oil Flow switch opened and again fit after work completion
LED lights provided at ACC area and recollected after work completion
Soot blower-2 power reset once
Oil centrifuse trip two times in Low temp.so reset it

Silo -1 diverting valve checking work under progress


Silo Top Polythen provided at instrument equipments workunder progress
Drain pot unit-2 JB polythen provided
ACC-2 RSB JB floor rubber mat provided properly
Shift jobs carried
BC-4 feeder SFU was found broken so removed it, new spare SFU taken fabricated the handle
arrangement for this feeder, grinding done. Then mounted on BC-4 feeder need to operate carefully
during shutdown.

BAC-2B one new relay mounted on local panel, wiring done and trial is pending.

BAC-2B foundation bolt of both motor was found loose so power made OFF from VFD end and informed
shift incharge.
One grinder was not operating so connection checked and rectified.
BAC-1A line flushing done for back pressure TX line.
APH 11-21 line flushing done for back pressure TX line.
BAC-2A and 2B back pressure TX line flusging work done.
One spare load management connector soldering work done and kept in lab.
CO analyser room of Boiler-2 AC power was OFF so started again.

Shift jobs carried


In SWAS Room Unit No. # 1 Drum Water PH and Conductivity Sample is not showing at rotameter,. So adjust the
flow in rotameter. Also cleaned the Bothe the sensor. Now Ok.

Fly Ash silo No. # 1 and 2 Field Inst. / Panel Cleaning and Blowerning to done.
Unit No. # 1 Vessel No.-21 Level Probe showing High Value. So checked and found that field side material in the
Vessel. So informed to shift operator.
Unit No. # 1 ASH Vessel No.-11-21 Back Pr. Switch and Transmitter Impluse line chocked condition. So cleaned it.
Now Ok.
CPCB data is showing Normally.
All the Report sent to concered Person.
Dosing Room all Motors cleaning work
Dosing room 1 no'sn tubelight fitting flickering now found loos connection so tight it now ok
Switchyard Behind security tower light found off check & found timer stuck up now reset & ok

Shift jobs carried


ACC-2B Lub oil motor conection removed after shut down as per requirement of Mech deptt.

After work completion by mech deptt, ACC fan-2B trial taken but its Lub oil flow low came, so adjust the
flow switch but Low flow again come after pump starting , so once replace the flow switch with spare but
condition is same. Inform to mech deptt for further checking of lub oil flow circuit.

again motor connection removed of ACC-2B main motor and Lub oil motor
Bed ash cooler-2B motor connection removed as per requirement of mech deptt

Shift jobs carried


ACC -2 area Cep misting system isolation valve pressure gauge polythene covering work done and
completed.
BAC-2A one new relay mounted on local panel, wiring done and trial taken working OK from relay test
button also tripping checked.
BAC-2B one new relay mounted yesterday on local panel, trial taken working OK from relay test button
also tripping checked.
BC-7A and 7B floor bag filter panels cleaning, blowering and JB packing work done.
All CCR both side doors and Inst lab door stciker tagging done for no door opening.
AVI given and removed for BAC-2B.
One LED lamp and 24V trafo given to ACC-2 area to MR. Taqueer.
All logbooks tagging done for both Electrical and Inst.
Reclaimer breaker found tripped on Inst. Current from previous shift so after checkinga all panels, brekaer is charged
and trial taken.
ACC-2B old flow switch checked and found working OK in lab.

Boiler-1 12-22 vessel SOV power source JB rubber mat layed.

Shift jobs carried


In VAM System Steam Control Valve opening Increased from 70 % to 80 %. Since chilled Water O/L temp. is high.
Now it is under observation.

WTP DCS Panel / MOV Panel / 220 Volts AC Supply Panel Cleaning and Blowerning to done.

In Compressor House all the auto drain valve checked. It is working Normally.
Unit No. # 2 Load cell Purging to done.
CPCB data is showing Normally.
All the Report sent to concered Person.
TG-2 Put in Base Load at 10.35 PM
BC- 7A &7B Motors , Power JB , RSB Panel & Bag Filter Panel Cleaning & Blowering work
UPS Room Battery Charger- 1 & 2 Cleaning Outside
Instrument Lab Hand Blower not working check & found neutral missing now rectified problem.
Daily Power Report Updated upto 09/06/2021
EMS Report Prepared work & Mailed
Shift jobs carried
BAC-2B asked to reverese rotation by operation so done. Then checked and found one motor at 6A and
other at 2.5A load. So checked each motor individually and found only one motor roller coming in contact
so informed shift incharge and SH maint.
ACC-2B lube oil motor connection done and limit assemly connected and adjusted, then trial taken
running normal and flow is coming OK.

ACC-2B main motor connection done and trial taken.


Switchyard area GT-1 side all 6 nos. cooling fan started.
ACWP-2 discharge pressure gauge replaced with spare old one and checked and reading corrected for
low value on gauge.
Reclaimer hooter was giving continuos alarm so power reset and made healthy, now OK.
BC-4 hooter not working, so checked first with loop from DCS, not started. Need to check from field side.
AVI given and removed for ACC-2B.
Y-phase cable of lube oil was found insulation damage so properly insulated.
BAC-2B STG Building side motor connection remove & Earthing connection removing done as per
requirement of Maint. Dept.

ACC-2B lube oil motor 1no's Earthing lug found damaged condition so replaced by new one

GT-1 Transformer OLTC Silica Gel Raplacement work done


Switchyard area GT-1 side all 6 nos. cooling fan started.
BFP-3 MV Drive all filter Remove & cleaning by Vaccum Cleaner
BLR-2 Bag House 11-21 seal pressure not showing CCR so checked in field 11 no's vessel Dom seal
leakage condition so leakage arrested & checked done
BLR-1 Bag House (11-21) seal back pressure , dom valve all Pu tube dressing done
All Office AC MCB Off
BFP-2 VFD Panel changeover VFD to DOL done

Shift jobs carried


Punching doors insctrctions pasted on doors of CCR ands Instrument Lab doors

Boiler-1 APH system outlet valve open feedback checked found correct and inform to CCR
J valve-1A flow drops momentorily, also operater inform some sound in J valve fan-1A momentorily, after few
miniuts J valve running normally
Boiler-1 J valve bypass valve FCV0906 checked its power is ON but it is not taken command from DCS need to
futher checked.
Dosing room 9.5 mtr all instruments blowring and cleaning done
Dosing room 9.5 mtr all Motors blowring and cleaning done
Dosing room 9.5 mtr all Motors earthing checked found OK
Shift jobs carried

Following summersible pumps checking and made healthy in field :-


a) Drain pot-1
b) Drain pot-2
c) ACW pump sump
d) BC-5 trench
e) N-pit pump
f) E-pit pump

Bed ash silo level showing constant value from night shift so remove the probe from site, power
connection supply reset and probe cleaning done, since then from level value showing according to
material level
01TCV 3201 Gland tightness done and then operated in manual for some command and taken in line this
control valve, now leakage not observed since then
P&V no. 4 checked for proper operation found working OK and water level OK and water proper
circulation.
P&V no. 2 checked for proper operation found working OK but water level low and not circulating water
so valve opening increased by 10%.
Bunker motor connection opened and details written in logbook.
BFP AHU side water accumulation observed so opened AHU once and line hammering done but still
clogging water so informed in G-shift.

Shift jobs carried


Inst. Air Compressor No. # 2 Display showing warning alarm. So checked and found that Element temp. is reached
to 110 degree. So Informed to shift incharge. Presently it is showing 106 Degree.

Unit No. # 1 CO anlayzer showing fault. So checked and found that Moisture fault. So Reset it. Now Ok.
Unit No. # 1 SWAS Room CBD sample is not coming. So checked and found that SOV Plunger is in Jammed
condition. So cleaned it. Now Ok.
BAC-2B Level Probe is not showing at High Value. So cleaned the Level probe. And checked with the
material. Found Ok.
all the AC MCB to OFF Condition.
All the manual light to ON Condition.
P & V No.-2 Water Valve closed condition due to overflow. Presently it is running condition.
BAC # 2 B Motor Connection done. Also AVI to given. One Motor takes 2.1 Amps current while the
other motor takes 3.1 Amps current. AVI and Permit to closed condition. Under observation condition.
S/ D Cleared- BC-1 , BC-7A , EN Mass -1 , Coal Bunker bag filter , BAC-2B,
S/D given to RO Booster Pump No.-1 and closed the Permit.
Shift jobs carried
Crusher-1&2 vibration prob tightness checking done found OK

screen floor all instrument equipments cleaning and packing done


screen floor PA system JB gland found loose so tightness done
screen floor motor cleaning and blowring done
screen floor motor earthing checking done
screen floor motor TB packing done with tape
Unwanted lights made OFF in the field

Shift jobs carried

Following Shut down given.


a) BC 7A
b) BC 7B
c) BAC 2B
d) VS-1
e) Reclaimer
f) BC-2
g) BC-6

Behind workshop , Scissors Lift direction found reverse, So direction corrected.

Engineer room , all PC power get trip so check and made healthy.
P&V -4, found water leakage attended it.
Switch yard Door lock was damage so replace lock with new one.
Fly Ash silo No. # 2, fork switch not working attended it.
Chimney Analyser Top, Co, SOX, NOx , temp all parameters checked with Testo and inform.
Chimney Analyser Top all 6 Nos, JB and panel packing and polythene covered.
Boiler # 1 , APH isolator valve leakage arrested.

Shift jobs carried


Boiler No. # 2 Secondary Pair of NIS/NPM Card comes in fault. LED No.-2 and 4. So Reset it. Now Ok.
BC-2 Not started at DCS end. So checked and found that guard limit switch is not properly cut by guard . Due to
some work done by operation person. So adjust the guard. Now Ok.
Unit No. # 2 Turbine O/H Tank Pressure switch is not showing high value at DCS end. So adjust the limit switch.
Now Ok.
all the CPCB data and ETP data is showing normally.
all the AC MCB to OFF Condition.
All the manual light to ON Condition.
P & V No.-2 Water Valve opened condition also closed the Valve.

Following Shut Cleared.


a) BC 7A
b) BC 7B
c) VS-1
d) Reclaimer
e) BC-2
f) BC-6

Mech. Workshop area welding machine wire open condition. So reconnected it. Now Ok.

main Road of TPP Road side light is OFF. Found that Timer is not working Condition. So Reset the Timer. Now Ok.
Shift jobs carried

TG building exhaust fan panel checking and maintenance work done :-


a) All terminal checking and tightness ensured.
B) All contacts and panel inside cleaning and blowering done.
C) Found one ON indication not glowing so corrected the wiring and made healthy.

2 old faulty ELCB checking done and made one ELCB healthy and kept in shift almirah.
P&V panel-4 exhaust fan panel checking and maintenance work done :-
a) All terminal checking and tightness ensured.
B) All contacts and panel inside cleaning and blowering done.
Master report found one day data missing so corrected.
Crusher building lighting made OFF.
Boiler-2 Bed ash cooler-2B level sensor checked found material was covereed, sensor cleaning and power reset
done
Boiler-2 Ash handling system panels cleaning and blowering done
Boiler-1 12-22vessel back pressure impulse line proper dressing done
TG-Building zero meter field instruments cleaning done
Shift jobs carried
BC-3, belt trip frequently due to "Belt Tear Fault" check at site its proxy get miss alignment , adjust it and
made it healthy
Switch Yard, Main Transformer No-2 , OLTC silica gel get moisturised so change the Silica gel , also kept
old Silica gel to dry.

Switch Yard, Main Transformer No-2 , Oil Filtration unit having oil accumulated inside , cleaning done.
Coal Bunker, all Transmitter check physically and cleaning done.
Boiler-1, APH having "Back Pressure fault" , transmitter cleaning done.
P&V -2 , water valve open 10%

Shift jobs carried


CCR AHU Comes in manual mode. So put into the auto mode with SP=31 Degree.

Boiler No. # 2 SOX analyzer Showing moisture fault. So cleaned the Moisture filter. Now Ok.

Boiler No. # 1 Module No.-11M Bottom BRC Changeover from Secondary to Primary.

Camera status sent to mail and TG # 1 and 2 Camera Glass to cleaned.


All the AC MCB to OFF Condition.
CHP Crusher Building ZSS JB , Coal sample Panel , BC-6 ZSS JB, magnetic seperator panel Cleaning and Blowerning
to done. `
online SPM Reading hold at 11.15 AM . So informed to Mr. tarun.
Instrument compressor motors blowring done
Bed ash cooler-1A VCS JB earthing lug found damaged, so relug it
P&V-2 water falling found, so OFF its make up water valve
Shift jobs carried
Boiler-1 &2 zero mtr area cameras lense cleaning done

Chimney analyzer round taken SPM & both boiler sox reading & analyzer healthiness checked found ok

PM07 order closed in SAP for TPI up to DT:13.06.2021


Boiler-2 area APH , 11-21 & 12-22 conveying JB cleaning & blowering done
Boiler-2 "0" mtr area all drain mov's (06 no's) & BAC-2A & 2B field JB's cleaning & blowering job
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Service air comp-2 water vlv sov tube air leakage abserved , isolate the vlv & correct it.
Silo-2 fork switch malfucntion so bypassed as per operation request.
P&V no. 2 water valve opened 5%, so kindly observe the leakage and then reduce the % opening
accordingly.
P&V panel-2 exhaust fan panel checking and maintenance work done :-
a) All terminal checking and tightness ensured.
B) All contacts and panel inside cleaning and blowering done.
C) Cable shrouding properly adjusted
ACW pump house all 3 motors cleaning and blowering done. Also all earthing terminals tightness
ensured.
4.5m MCC room one P&V vent polythene was found torn so new polythene mounted and abnormality
closed.
Shift jobs carried

Earthing pit maintenance done 4 nos of garden earthing pit as:


1 cleaning of earthing pits
2 Watering of earthing pits
3 tight ness of earthing strips

Jockey pump-2 pressure switch setting checked found OK Low at 3.5 kg/cm2 and high at 6kg/cm2
also Jocky pump-1 accelaration time1 decreased from5 to 4sec and Deaccelaration time increased from 4
to 10 sec.

bed ash cooler-1A coveying not stopped in auto , so clean the pressure switch line, now stopped in auto

Bag house-2 conveying , vessel-11-21 dome valve close in auto within 2 sec, so check and found that
dummy level switch got shorted, so insulate it properly, now working properly
Fire sensor switch checking work done for Pump house, CCR and DCS1&2
WTP hall ACF SV4923 assembly opend on request of mech deptt, also air isolated from panel
CCTV camera fo boiler1&2 glass cleaning done

Shift jobs carried


Boiler No. # 1 Module No.-11M Bottom BRC Changeover from Secondary to Primary.
Compressor house auto drain valve checked. It is working normally.

BAC No. # 1B water valve SOV is not operated so checked and found that Valve is in Jammed condition. So
informed to shift incharge.
online CPCB and ETP data is showing normally.
All the AC MCB to OFF Condition.
All the manual light to ON Condition.
P&V No.-2 and P&V No.-4 is in Running Condition.
BC-7A and 7B floor Light is not ON. Found that Lighting Timer structed. So Reset it. Now Ok.
ELCB of Repair supply BOX at BC-6 , BC-7A and 7B area checked. It is working Normally.
Bunker Floor at 22 mtrs Lighting OFF at 8 PM.
Shift jobs carried
Coal feeder-1A load showing in negative & also variation in speed, so as per operation request put in
local mode & started.

WTP dcs module- 81M, 83M & 80, 82 & 84 terminal panels cleaning & blowering

WTP CCR mov MCC panel cleaning & blowering

Chimney analyzer round taken SPM & both boiler sox reading & analyzer healthiness checked found ok

WTP hall area SOV's box panel Ultrafilteration, ACF panel, Multigrade filetr panel Acid & caustic
mesurement sov , Mixed bed sov, panel cleaning & blowering
Boiler-1 SA fan RTD field JB polythene covering done
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Silo Root Blower Room , Paneland Motor Blowering done
Silo Root Blower Room , Panel all terminations tighten done.
Boiler -2, All Unwanted lights made OFF during shift round.

Shift jobs carried

Oil centrifuse2 mator earthing lug found damaged so tight it.

Unwanted lighting mqaterial shifted from boiler-1 soot blower to scrape yard
welding machine three phase plug top changed inACC side
Bed ash cooler-1B water valve assembly removed on requirement of mech deptt. Connect it after work
completion and set its open close limit.
PC shifted in CCR
Temple loud speeker not nworking so checked its amplifier one out put is not coming , so speaker
conection shifted to other out put, now loud speaker is working
Load cell weight shifted from side to Lab
PA-1, PA-2, SA-1, SA-2 motor bearing temp is bypass due to greasing, kindly taken in line after
temprature is normal

Shift jobs carried

Following Shut down given.


1) BC-1
2) Coal crusher-1
3) Coal crusher-2
4) Vibrating screen-1
5) Vibrating screen-2
6) Crusher floor bag filter
7) Soot blower-1
8) Bed ash silo dray unloading
9) Reclaimer

IAC-1, get trip due to Drive Over temp , found its room temp high due to AC trip on HP/LP fault, but AC
not reset, so open the door and external cooling fan provided to Cool down the VFD.

BAC 1B , Water Valve SOV connection done.


BAC 1B , Water Valve SOV Close Limit not working so spare contact use, trial taken.
Boiler-2, APH Dome valve not operating , SOV cleaning done and reset it Power.
Boiler-1 , APH SV8127 "Common Outlet Conveying SOV" , Close Limit feedback not healthy , Found its
little jams so manually Operated twice then trial taken.
TG-1 Enclosure CCTV camera clean and angle adjusted.
TG-2 Enclosure CCTV camera clean and angle adjusted.
HSD area CCTV camera not working, rest it main power one OK.
ACC-2, RSB no-65 , ELCB and Socket check and Green tag pasted.
Boiler-2, 6 Floor water accumulated inside Lamp, drain the water and cleaning done.
Shift jobs carried
SH Room Both the AC is running Condition. So OFF the AC.

Engineer Room Both the AC is running Condition. So OFF the AC.

All the AC MCB to OFF Condition.


Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data is not updating at 15/06/21@11.00 PM.
CHP DCS Room AC is not working Condition. So CHP MCC side both the door is opened.
Unit No. # 2 APH , Vessel No.-12/22 , Vessel No.-11/21 Field Inst. And JB Cleaning and Blowerning to
done.
Electrical Report is generated.
CHP MCC Exhust Fan OFF Condition. So ON the Exhust Fan.
Fly Ash silo No. # 1 and 2,Motor Cleaning and Blowerning to done.

Shift jobs carried


CHP DCS AC feeder checked and found that its two phase fuse burnt, so changed the fuse also found that
AC controller got short circuited. So need to replace the controller. Also its feeder handle found damaged
so repaired it.

Transformer-2 Main silica breather changed with new one


Crusher house jisu houzen done at crusher building
Instrument compressore 1&2 VFD panel blowring done
Generator-2 rear bearing oil temp gauge found faulty, so change the temp gauge with spare from
instrument lab
Boiler-1 APH outlet line valve feedback limit swith found faulty so change it with new one

Shift jobs carried


Following Shut down given.
1) BC-1
2) Reclaimer
3) BC-7A
4) BC-7B
5) BC-7A&7B bag filter
6) Unit-1 soot blower

Unit-2 Soot Blower get Trip so check and reset it.

Crusher Building , 24 V hand lamp not working found , Top connection was loose tighten it and made Ok.

ACC 1B , Field Power JB Earthing missing so new Earthing done

ACC-1, Lightning Timer ON Time Adjusted to 7:00 PM.

Switch yard side Road lights not ON , found timer malfunctioning , attend it

Chimney Analyser Room Panel blowering and Cleaning done.

Boiler - 2 , APH auto analyser polythene covering done.


3 Nos Spare Camera trial taken , out of 3 , 2 are OK and 1 is faulty
Boiler-1 , Ground Floor CCTV camera cleaning done and cover base cover with polythene.
2 kg Moisturized Silica gel kept for drying in Oven at WTP.
Shift jobs carried
Boiler No.# 1 and 2 Bed Material T/C JB polythene Packing to done.

UPS and Inst. Lab. JB polythene Packing to done.

All the AC MCB to OFF Condition.


Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data and ETP data is showing Normally.
Unit No.# 2 APH , Vessel No.-11,21 and Vessel No.-12/22 level Probe to checked. It is working Normally.
Electrical Report is generated.
Unit No. # 1 PA Fan , SA Fan and ID Fan Motor Cleaning to done.
Dosing Room all the Motor Cleaning and Blowerning to done.
In Boiler No. # 2 Floor No.- 4 to 7 Lighting is ON. So OFF the Light.
Bed Ash silo RAV Motor not start so check & found Power Contactor wiring loose so tightness & Panel
cleaning work now ok

Bed Ash silo RAV Motor double earthing done


Comp. house IAC-2 Water I/L Pressure gauge showing false value so replaced by new one
Pump house jockey pump-1 Discharge pressure gauge pointer flucationing so replaced by new one
Lift-2 telephone not working found speaker issue , replaced done now ok
BAC-1B SOV not operating , remove SOV & cleaing done then sov air leakage arrest but SOV Limit
adjustment work U/P
Santak UPS Panel for large display at DCS-1 side smell observed inform to Mr. sati sir & kept in
observation condition.
FAS &BAS all E&I euipment cleaning & Blowering work

Shift jobs carried

Following Shut down Clear


1) Vibrating Screen-2
2)Coal Feeder-1B
3) Coal Feeder 1B Discharge MOV
4) IAC-1

Service Air compressor-3, while taken trial it trip on Return fault so check the circuit found Ok then at
HT Breaker end Replace the breaker with spare one, then trial taken its runs normally.

Boiler#1 , BAC 1B Water Flow Line SOV , Open Feed Back not showing , so Limit Adjusted done as per
requirement then trial taken working OK

IAC-1, get Trip due to High Element Temp Fault, so check and reset the same.

Boiler-1 , Cyclone floor Huffing device 1120-H , having air leakage , air leakage arrested done.

FLY Ash Silo , Instrument air receiver -03, Pressure gauge and its Unique ID tag found very Dirty so clean
it properly.
Service Air Compressor No-2, Water Line flow Switch Flow Low fault , Flow switch adjusted and made
Ok.
CHP Bucket Elevator-1 get trip check at VFD found it trip on Overload due to material Jamming, After Jam
Clear Reset the VFD and made Healthy.
Boiler-1 - 22 Mtrs Floor Hoist remote cable is in hanging condition , proper cable dressing done and tied
it
Boiler-2 - 22 Mtrs Floor Hoist remote cable is in hanging condition , proper cable dressing done and tied
it

Boiler -1 , Forth Floor Dome light water accumulated inside done , drain the water and cleaning done.
Shift jobs carried
Boiler 02 DPT1105 BOX cannot closed , so close its door and packed with packing tape

Boiler 02 DPT1104 BOX cannot closed , so close its door and packed with packing tape

Boiler 02 DPT1106, PT1103,PS-1101,PT-1118 BOX cannot closed , so close its door and packed with
packing tape
Boiler-2 soot blower area motor eartning lid found loose, so tightness done 5 nos
Boiler-2 sootblower 11 to 16 motor power JB packing with tape completed
coal shed area lights made OFF
Boiler-1 &2 Top floor lights made ON as per requirment of operation deptt, again OFF after work
completion

Shift jobs carried


Following Shut down given.
a) BC-6
b) Coal Crusher-1
c) Coal Crusher-2

Coal Crusher-1 , Shut down clear.

Coal Crusher-1 , Motor Direction change from HT breaker


Boiler -1 Lift all floor door sensor cleaning done
IAC-1, VFD panel Cooling Fan connection done and cover plate mounted
Pump House all Pressure gage Transmitter, Pressure gauge and all MOV cleaning done
Boiler-1, De- Superheat her Control Valve 01TCV 3203, gland leakage arrested
Boiler-2, De- super heather Control Valve 02TCV 3203, gland leakage arrested
Boiler-2, De- super heather Control Valve 02TCV 3201, gland leakage arrested
ACW Pump house Discharge header Transmitter is in hanging condition , tied it with armould wire.
Boiler-2, Near PA fan welding machine check and green tag pasted
Boiler-1 , Lift operated as per operation requirement, and OFF after work completed
Shift jobs carried
Inst. Air Compressor No. # 2 Display showing warning alarm. So checked and found that Element temp. is reached
to 110 degree. So Informed to shift incharge. Presently it is showing 111 Degree.

In Turbine ETS SCADA PLC Trend menu is not showing. So Open the software. Now Ok.

Unit No. # 2 FW Control Valve 02LCV3201 Steam Leakage is found. So gland tightness to done. Now under
Observation.
Boier No. # 2 Vessel No.-22 level Probe checked . Inst side is Ok. In Vessel Level is Present at site. So informed to
shift incharge.
online CPCB and ETP data is showing normally.
All the AC MCB to OFF Condition.
All the manual light to ON Condition.
P&V No.-2 and P&V No.-4 is in Running Condition.
S/D Cleared- Coal Crusher No.-1 and BC-6.
Coal feeder -1A plough Discharge is not operating. So O/L Reset it. Now Ok.
In Fire pump House Battery Supply JB Double earthing to done.
Shift jobs carried
GSC motor 1A,1B,2A,2B cleaning and blowring done

4.5 mtr TG building instrument equipments cleaning done, as MOV, control valve RTDs etc.

APH-1 back pressure transmitter line flushing done on request of operation deptt.
Instrument compressor-3 sensor internal fail alarm came once so reset it, now OK and ready
chimny analyser room Glens software found OFF, so ON it and readings updated and syncronized
normally
Unwanted Lights made OFF in WTP

Shift jobs carried


Unit-1 boiler APH line back pressure Tx & switch line flushing done & tested for low pressure side
switching, working ok

24 v Hand lamp not glowing so bulb arranged at BC-2


BFP-1,2 & 3 motor cleaning & blowering job

Coal shed Travelling trippler limit switch towards T2 tower proxy checked found damaged need to
replace-job is U/P

Polythen covering provided at reclaimer/CHP area Instruments as:-


1) PLC field JB
2) LCS/ES jb
3) Limit switches

Jishu Hoizen done at reclaimer area


Abnormality: TG-1 fins cleaning PG ferrule fitting leakage arresting job-completed
Abnormality: BAC-1A dome valve limit switch inst air tube leakage -completed
security lighting tower timer reduced
Jockey pump-1 earthing cable lug found broken, relugging done
ACW pump house area pit dewatering pump ELCB tested & green tag provided

Shift jobs carried

Unit No. # 1 Vessel No.-21 Dome valve small air leakage from PU Tube . So Changed the PU Tube. Now Ok.
Unit No. # 1 APH Sercice air Intake valve small air leakage from PU Tube and SS Fitting. So Changed the PU Tube.
Now Ok.
In CHP BC-3 Trippler , T-2 side Limit Switch is not working Condition. Proxy is not available in Inst. Lab. ( 12 Volts
DS Supply.)
Fly Ash silo No. # 1 and 2 Field Inst. / Panel Cleaning and Blowerning to done.
online CPCB and ETP data is showing normally.
All the AC MCB to OFF Condition.
All the manual light to ON Condition. P&V No.-2 and P&V No.-4 is in Running Condition.
BC-2 Current checked by tonge tester. It is showing same as DCS reading. Both the reading are ok.
S/D Cleared- BC-1, BC-2, Reclaimer, Coal Crusher No.-2, BC-7A , BC-7B.
BC-2 area hand Lamp to Provided to Mech. Person. In Unit No. # 2 Welding Machine connection
loosen. So tightness to done. Now ok.
in ACC Zero Mtrs portable Pump netural to Provided by laying the cable.
Shift jobs carried
All Energy Meter Manual reading taken for Power Report.

EMS Report Prepared.

DG Report prepared and upload in SAP


Both ACC Area . In front of RSB rubber mat placed.
ACW area all motors cleaning done.
Boileer-2 APH back pressure transmitter not showing value, checked in field air leakage observed, Fitting
replaced and air leak arrested

Boiler-1 APH main air isolation valve air leak observed, air leak arrested and system kept in line

Boiler-1 Field control station MOV 3207 open torque acted checked in field and closed ,torque released.
CCR AHU VFD,4.5mtr VFD and BFP VFD AHU panel cleaning and blowering done
Compressor side IFC filter cleaning done

Shift jobs carried

BC-4 spare Feeder modification work done under progress

Polythen covering provided at pending points of BC-2 ,BC-3 and BC-6 in field instruments

Lighting scrape collected from TG building and placed at Electrical workshop


Earthing pit maintenance done 2 nos below ACC
1 cleaning of earthing pits
2 tight ness of earthing strips
4.5mtr AHF panel blowring done from outside

Shift jobs carried


Unit No. # 1 Boiler Top Drum metal Temp. JB , Soot Blower CV Positioner , Transmitter/PS , Start up vent MOV
polythene Coverning to done.

Unit No. # 1 MSSV MOV 2301/2302 Packing tape to done.


Unit No. # 1 BAC-1B Dome Valve structed at 50% . Also manually is not operated. So Informed to Shift operator.
Also Poptte valve also not operated. So Informed to shift operator.
IFC Panel polythene Coverning to done.
online CPCB and ETP data is showing normally.
All the manual light to ON Condition. P&V No.-2 and P&V No.-4 is in Running Condition.
AFR Breaker Tripped . So checked and found that Breaker side no fault indication. So OFF the all the Supply and
Breaker IN / OUT Condition. Then START the Breaker. Now it is working Normally.
In Comptressor House IAC No. # 1 , 2 and 3 Motor , Lighting /Timer JB Cleaning to done.
ACC Fan -1A Lub oil Pump Earting loose condition. So tightness to done.
At 22 mtrs Light to OFF Condition.

Shift jobs carried


Chimney analyser round taken SPM & both boiler sox reading & analyzer healthiness checked found ok

Unit-1 &2 at 0 mtr area mov's oil leakage observed from body (01MV3303, 01MV3205 & 02 MV 3205)
so cleaning done now ok

TG building area "0" mtr all filed equipment's cleaning & blowering done
TG building area "4.5" mtr all filed equipment's cleaning & blowering done
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
All Energy Meter Manual reading taken for Power Report.
EMS Report Prepared.
DG Report prepared and upload in SAP
BC-7A and 7B area Motor cleaning and blowering done.
Compressor House lights get trip made it ON as per requirement.
one 24 Volt hand lamp kept for charging at 4.5 Mtrs Switch Gear Room.

Shift jobs carried


Unit-2 bag house vessele-12-22 seal fault coming ,so presure switch line flushing done. Finally found that
seal is damaged, inform to CCR.

Unit-2 bag house vessele-22 seal pressure gauge found faulty , so replace the gauge
Dilution damper work checking done, work under progress
switchyard earthing pit sticker pasting work done-20 nos
Transformer-1 cooling fan started in switchyard, kindly run the fans continiously.
TG-2 Put in Base Load at 9.30 a.m
TG-2 removed from Base Load at 12.30 p.m
Shift jobs carried
Unit No. # 2 Vessel No.-21/22 level probe polythene Coverning to done.

All the AC MCB to OFF Condition.

Unit No. # 1 Hydrastep LHS Side leakage found in electordes,. So New Electrodes mounted at site. Now Ok.

Unit No. # 1 Vessel No. # 12 air leakage from seal Pr. PU Tube. So arrested it. Now Ok.
online CPCB and ETP data is showing normally.
All the manual light to ON Condition. P&V No.-2 and P&V No.-4 is in Running Condition.

Following Shut down given-


a) Coal Crusher-1
b) BC-1
c) BC-2
d) BC-3
e) Vibrating screen-1
f) crusher floor bag filter
g) BAC-1B instrument air valve

GT # 1 Cooling FAN running condition.


ACC Unit No. # 1 Portable Pump Cable dressing to done.
TG Building Lift VFD / Control panel blowerning to done.
24 Volts LED Light to provided to mech. Person at Compressor house.
Shift jobs carried
Chimney analyser round taken SPM & both boiler sox reading & analyzer healthiness checked found ok

CCR unit-1 area BAC-1A & 1B VFD panel cleaning & blowering done

CCR unit-2 area BAC-2A & 2B VFD panel cleaning & blowering done
WTP dcs module- 81M, 83M & 80, 82 & 84 terminal panels cleaning & blowering
WTP CCR mov MCC panel cleaning & blowering
IAC-3 controller was showing sensor fault during start-up & unable to reset from controller. So reset the
power now ok.
Online site checked for CPCB and ETP data is showing normally, reports send on mail
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
P&V-2 stopped @11PM
CHP MCC AHF panel filter cleaning with & also blowering done
CHP 00MCC 5308 panel door lock provided
Compressor & ash handling system MCC feeder cleaning
All Energy Meter Manual reading taken for Power Report.
EMS Report Prepared.
DG Report prepared and upload in SAP
Shift jobs carried

Vibrating screen-2 control fuse base found damaged, so replace it

silica gel Drying in oven and packed in jar and put in work shop
RSB-26 new earthing loop provided
BC-7A and 7B hnd lamp repaired
CHP MCC one damaged door lock replaced
Consuption report prepaired for Bucket Elevator-1(CHP)
Unit-1 hot well area control valve and MOV tin shed bolt found damaged, so replaced it and fix properly
Unit-1 hot well area pressure switch and RTD polythen covering done
Bag house-2 dilution damper field wiring checking work under progress

Shift jobs carried

Following Shut down Clear.


a) Fly ash silo-2 dry unloading
b) BC-4
c) crusher floor bag filter
d) T2 tower bag filter
e) Vibrating screen-2

ACC 1 and ACC-2, month wise specific Power consumption sheet prepared for FY 2020-21 and mailed.

Boiler-2, Bag House Vessel-22, having continuous purging so check and found at transmitter end Pu tube
air leakage so leakage arrested and trial taken
Boiler-1, drum Floor Hydra step having electrode leakage , so remove the electrode and kept washer
inside then tighten again , and leakage arrested
TG- Building Lift , IR sensor sensitivity adjusted done
Boiler-2, Bag House Vessel-12, SOV pu tube laid on Floor so proper dressing done
WTP MCC room Cleaning and blowering done.
24 Volt hand lamp repaired at workshop
Hand Blower Check and Green Tag Pasted and Inst Lab.
DCS-2, 240 V Socket check and green tag pasted.

Shift jobs carried


IAC No. # 3 Not Started in auto mode. So checked the logic. It is Auto ON at 4.0 kg/cm2. Now Ok.

Air leakage arrested at BAC-1B Dome valve Limit switch hose pipe. So Tightness to done. Now Ok.

All the AC MCB to OFF Condition. U # 1 Firing floor area Blowerning and Cleaning to done.
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data and ETP data is showing Normally.
Unit No. # 2 SOX analyzer Flow showing low value. Due to main sampling line tube is in bend condition.
So rectified it. Now ok.
Electrical Report is generated.
IAC No. # 2 S/D Cleared. Due to leakage in heat exchanger EPB is pressed as per Shift Incharge
requirement.
WTP Pump House area all the Motor Cleaning and Blowerning to done.
RO Booster Pump No. # 1 and 2 Motor Cleaning and Blowerning to done.
As Per MPSS requirement There is diffrerence in 7200 In our reading and MPSS Reading. So we adjust
the Power Transformer -2 Export reading decreased .85 to .84 . Also MPSS Line -1 Import Increased from
5389.18 to 5389.19

Shift jobs carried

switchyard transformer-1 cooling fan current checked found 1.7A, so relay setting change to 2.5A

Instrument compressor-3 sensor internal fail alarm came once so reset it, after that it start normally and
alarm not come
soot blower-13 of boiler-1 not started in DCS. So checked in field remote switch contact problem, so
bypass its contact, and soot blower-13 running from DCS
Extention board provided at WWTP area and removed after work
Shift jobs carried

Following Shut down Clear.


a) BC-1
b) BC-4
c) Reclaimer
d) T2 tower bag filter
e) Crusher floor bag filter
f) oil centrifuse-2
g) IAC-2

Switchyard transformer-1 cooling fan current checked found 1.9Amp, so relay setting change from 2.5
Amp to 2.2 Amp

BC-7A/7B lights not ON as per timing found its timer stuck up, reset the timer.
BC-1 and BC-2, Motor Cleaning and blowering done.
IAC-2, trip on Element Temp Fault so check and reset the fault and made healthy.
BC-1 and BC-4 , CCTV Camera adjusted as per requirement.
Boiler-1, 4th Floor , CAC unit RHS O2 and LHS O2 panel sealing done with silver tape.
Boiler-1, Huffing device PT-1110, PT 1106, PT 1118, DPT 1105, .PT 1103, PT 1105 , PT 1104, PT 1106L ,
packing done with silver tape.
Boiler-2, De superheated control valve 02TCV 3203, having leakage so leakage arrested done.
CHP building , Screen Floor 24 Volt hand lamp changed.
P&V no-2, stop manually at 07:00 PM.
Shift jobs carried
In Compressor House all the auto drain valve checked. It is working Normally.

In Unit No. # 1 and 2 All the Coal Bunker Level Transmitter Level probe to cleaned.

Boiler No. # 2 Vessel No.-11 Level probe High side checked . It is working condition.
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data and ETP data is showing Normally.
Electrical Report is generated.
Electrical Report is generated.
Fly ash Silo No. # 1 all the Motor Cleaning and Blowerning to done.
bed ash Silo all the Motor Cleaning and Blowerning to done.

Shift jobs carried

Following Shut down given.


a) BUCKET ELEVATOR-2
b) BAG FILTER FAN CRUSHER FLOOR
c) BAG FILTER T2 TOWER
d) BC-4
e) COAL FEEDER-2B
f) COAL BUNKER -2B DISCHARGE MOV
g) COAL CRUSHER-2

SA-1, Hoist operation Check and maintenance done then due date mentioned.

SA-2, Hoist operation Check and maintenance done then due date mentioned.
Reclaimer Boom Belt get Trip due to O/L so check and reset.
At 11:00 AM VAM get trip so immediately ON the AC of BFP MV Drive, Bouiler-2 MV Drive and Boiler 1
MV Drive after VAM normalise OFF the AC.
Bunker level 2B not showing correct level, level probe cleaning done.
Boiler2, Annunicator Main steam Temp H/L and Oxygen H/L channel interchange.
Boiler-2 MV Drive AC Power Supply JB cover with Polythene.
WTP workshop extension board checked and green tag pasted.

Shift jobs carried

Following Shut down given.


a) BC-1
b) BC-2
c) RECLAIMER
d) BC-1
e) BAG FILTER T2 TOWER
f) BC-4
g) BAG FILTER FAN CRUSHER FLOOR
h) RSB 5303-I

Following Shut down Clear


a) BUCKET ELEVATOR-2
b) RSB 5303-I
TG-2 , taken is base Load at 11:30 AM and normalise at 13:00 Hrs.

BC-2 belt not stop during trial of pull cord, check all pull cord found 3 Nos of Pull Cord faulty, then check
and Replace 2 Pull cord and trial taken form operation at DCS. (1 Need to Check in next shift)

BAC-2A, Seal Pressure not showing at Desk, found Dome valve is jam so operate it manually and free it
then trial taken.
Bed ash silo showing level wrong valve so clean the probe and reset it, now ok
Coal Crusher -1, trip without any fault so check the HT breaker and trial taken in service mode it
working OK , then Rack in the breaker and give command from CCR, started normally.
Fly Ash Silo -2 , Bulker Earthing Clamp found damage new lugging done.
ACW pump house, single Phase extension board given.
Jeshu Hozen done at Switch Yard area.
P&V no-2, start manually at 07:00 AM.
Shift jobs carried
Unit No. # 2 Vessel No. 11 ,21 -12/22 level probe polythene Coverning to done.

All the AC MCB to OFF Condition.


In BC-2 Belt Middle side Gate Near CCTV Camera Stand one PCS is not working condition. So Replaced the PCS.
Now Trial taken. It is working Normally.
At CHP T-1 Tower field Inst. / JB Cleaning and Blowerning to done.
online CPCB website SPM Data is hold condition and ETP data is showing normally.
All the manual light to ON Condition. P&V No.-4 is in Running Condition.

Following Shut down clear-


a) Coal Crusher-2
b) BC-1
c) BC-2
d) BC-4
e) Bag filter t2 tower
f) crusher floor bag filter
g) Reclaimer

TG-1 , taken is base Load at 6:15 PM


BFP-1,2 & 3 cleaning & blowering work done
At TG-1 oil cooler charging light & 24 V transformer provide.
Security lighting tower timer take in line.
Shift jobs carried
Drain Pot unit-1 discharge pressure transmitter ( 01PI2902) showing voilet value, checked and found
that transmitter display is fluctuating , so connection tightness checked is correct, but some internal
circuit power fluctuation found, so need to replace it.
Deareator floor CBD level control valve (12LCV0501) not working, so checked and found its air lock
found ,so correct it , now LCV is working normal
Unit-1 feed water station contrl valves and desuperheating valves cleaning done
BFP area ACC-2A,2B,1A,1B,1E field power JB cleaning done
4.5 mtr MLDB panel blowring done
TG-2 encloser and ACC-2 lights found OFF, so adjust the lighting timer

Unit No. # 2 APH showing level continuously H, So check & found material inside.
Unit#2 APH back pressure not increasing so,check transmitter line , found clear ,material was not coming down.
Ask to operation for hammering ,now Ok.

BC-4 camera not showing footage,power reset ,now Ok.

TG-1 Enclosure CCTV camera clean and angle adjusted.

Online CPCB website and ETP data is showing normally.


All the manual light to Off Condition. P&V No.-2 & 4 is in Running Condition.

Following Shut down given-


a) Coal Crusher-2
b) Coal feeder 1D
c) BC-5
d) BC-4
e) Bag filter t2 tower
f) Reclaimer
g) 01SV0905 h)
Coal feeder 1C i) 01SV0904
Following Shut down
cleared - 1. BC-5
2.Coal feeder 1D
3.01SV0905

ACW-2 camera not showing footage rectified the same.


Boiler-1 all RSB cleaned ,checked &packed.
At 4.5 mar MCC panel brocken door lock replaced.
Singlr phase ELCB green tag expiredn So new tag applied.

IAC No. # 2 Not started Local as well as Remote. So checked and found that Emergency is not properly released in
panel side. So released the emergency switch. And trial taken. Now ok.

All the AC MCB to OFF Condition.


Moisture drain in IFC panel.

Coal feeder -1C Pneumatics valve S/D to cleared.


online CPCB and ETP data is showing normally.
All the manual light to ON Condition. P&V No.-2 OFF at 7.30 PM.

Following Shut down Cleared-


a) Coal Crusher-2
b) BC-4
c) BC-6
d) Coal Feeder -1C,
e) Bag Filter-T2 tower,

24 Volts LED Light to provided to mech. Person at Unit No. # 1 Oil Cooler area.
Crusher Floor area Monorail is not operating found that Supply is OFF Condition. So on the MCB. Now ok.

Shift jobs carried


All Energy Meter Manual reading taken for Power Report.

At CHP MCC Room , AFR Breaker get trip twice , then after checking by MPSS person they found tripping
is due to High Mask Tower problem, Isolate it and ON the Breaker.

Both DCS Room, in front of panel new rubber mat laid..


All Energy Meter Manual reading taken for Power Report.
Unit -1 Soot Blower , Panel Cleaning and Blowering done
Boiler-2 Bed ash cooler-2B conveying pressure switch checked found inlet valve close, opened and
checked the signal came healthy

Boiler-2 Bed ash cooler got trip on cooler level high same was checked and informed to Desk engineer
WTP DCS panels cleaning & blowering done
Bedash cooler-2A cooler level high switch checked and material is physically high ,same was informed to
Desk engineer
Boiler-1 11-21 cable dressing done properly in cable tray
TG-2 Taken in Based load at 5:38 hrs. as per operation requirement

Unit No. # 1 bag house vessel 11-21 & 12 -22 level probes signal cables & power cables dressing done on cable
tray.
Unit#2 APH back pressure not increasing so,check transmitter line , found clear ,material was not coming down.
Ask to operation for hammering ,now Ok.
CO analyzer -2 sample probe having leakage ,so arrest the same .

Coal feeder U#1 & 2 loadcell air purging done.

Online CPCB website and ETP data is showing normally.


01PI2902 drain pot pressure got violet . Tightness done at DCS side now OK.
Boiler-1 12-22 seal fault, so sample line cleared. Now ok.
ACW-2 camera not showing footage rectified the same.
Boiler-1 all RSB cleaned ,checked &packed.
At 4.5 mar MCC panel brocken door lock replaced.
Singlr phase ELCB green tag expiredn So new tag applied.

Reclaimer cabin panel blowring done


Earthling pit maintanance done of cooling tower area

AFR Breaker Tripped . AFR plant light cable earth fault found at their end, so AFR side Engineer checking it

In CHP DCS Panel-91 M Secondary BRC Comes in Fault Mode. LED Indication No.-2 and 4. So Reset it. Now Ok.
Unit No. # 2 APH Master Dome Valve ( SV-8103) Close Limit switch is not showing at DCS end. So Limit Switch
adjusted and trial taken. Now Ok.

CHP DCS Panel , Operator desk , and I & C Power Cabinet Cleaning and Blowerning to done.

online CPCB and ETP data is showing normally.


Following
All Shut
the manual down
light Cleared-
to ON Condition. P&V No.-2 OFF at 7.30 PM.
a) Reclaimer
b) BC-1

TG # 2 Put into Base Load as Per Operation requirement.


Turbine Lift one person inside it. So Reset the Power supply. Now Ok.
In Fire pump House all the Motor Cleaning and Blowerning to done.

Shift jobs carried


All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

Boiler 1. Bag House 12-22 Intake valve open- close limit not showing , Manually Operate the valve twice
and trial taken
BAC-2A, Showing Dome Fault , Operate Dome valve manually , and trial taken
Boiler-2, 12-22 , showing level high , check the probe found actual material inside the vessel , same
inform to CCR.
IAC-3 controller was showing sensor fault during start-up & unable to reset from controller. So reset the
power now ok.
Boiler-2, 12-22 , having back pressure fault, Impulse line cleaning done.

WTP DCS Room , Cable trench cover found open , close it properly and gap packed with silver tape.
Unit -2 Soot Blower , Panel Cleaning and Blowering done
Boiler-1 ,From 4th floor to 7th floor Lights made OFF.

In Inst. Lab 02 Nos PCS Contact cleaned by restoliene and checked it is working normally. Kept in Inst. Lab .

At Compressor House all the auto drain valve checked it is working Normally.

All the pump House area Inst. / JB Cleaning and Blowerning to done.

online CPCB and ETP data is showing normally.


All the manual light to ON Condition. P&V No.-2 OFF at 8.30 PM.

Following Shut down Cleared-


a) Reclaimer
b) BC-1
c) BC-2
d) BC-4
e) BC-6
f) reclaimer
g) T-2 Tower bag filter.

Shutdown to given.
1) Bed ash silo
Bed ash Silo one time RAV O/L reset as per Shift Incharge requirement. Again tripped due to Jammed condition. So
informed to shift incharge.
One LED Charging Light provided at Bed ash silo area.
IAC # 1 ,2 and 3 Motor cleaning and blowerning to done.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

Coal feeder unit-1 motor & clean run motor cleaning done.
BAC-2A, Showing Dome Fault , Operate Dome valve manually2-3 times now ok.
24 V lamp provide at BAC-2A
BAC 1A& 1B panel & probe JB cleaning done.
BAC 2A& 2B panel & probe JB cleaning done.
BC 7A& 7B bag filter panel cleaning done.
Boiler-2 all RSB checked & packed.

Shift jobs carried


Crusher floor hydraulic system checked and found that its solenoid coil not working, so need to replace it or need
PM to done.

soot blower-2 reset once.

CT fan side Lighting ELCB marking done

Base Load removed from TG-1


Power report balanced and error found zero
Generator-2 Exciter inlet temp gone to 41 degree
Bed ash cooler-2B frequent conveying observed, checked and found that its dome valve is not opened
more than 1%, so its feedback is coming but material is not coming out from dome. So conveying
pressure I not increasing more than 0.3. and frequent conveying observed. so operation side dome valve
working in progress.
cable found hanging in mix bed system so dressing it
Polythen covering done in WTP hall transmitter 25 nos and pressure switch 10 nos done
BED ash cooler instrument air shutdown given

Shift jobs carried


Following Shut down Clear.
1. BC-1
2. BC-7A
3. BC-7B
4. BC-6
5. Coal crusher-1
6. BC-4
7. T2 tower bag filter
8. Silo roots blower-2
9. BAC 2B dome valve air isolation

At 2:45 PM VAM get trip, so check and reset it and start normally.

Bed Ash Silo, Plate valve not operated found RAV get trip check and reset RAV and start loading normally
WTP workshop ceiling fan capacitor change and cleaned.
Above TG-2, Exhaust fan started at 3:00 PM and stop at 18:00 Hrs
From 4.5 Mtrs Switch gear Room , 24Volt Transformer and hand lamps shifted to Electrical workshop.
2 no's Extension board check and green tag pasted.
From Fly ash silo, unwanted electrical material collect and shift to scrap yard.
WTP all conductivity Sensor cleaning done.
Chimney Room Panel and PC cleaning and blowering done.
P&V no-2 , made OFF and 7:00 PM
Shift jobs carried
Unit No. # 1 Zero mtrs APH , Vessel No.-11/21 and 12/22 Field Inst. And JB Cleaning and Blowerning to
done.

In Compressor House all the auto drain valve checked. It is working Normally.

All the AC MCB to OFF Condition.


Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data and ETP data is showing Normally.
4.5 mtr all VFD drives inverter temperature checked ,found under 60 Deg.
Electrical Report is generated.
Coal feeder unit-1 motor & clean run motor cleaning done.
132 side voltage going down so balaance the same.
Jockey pump-2 got stoppeed so, reset .

Shift jobs carried


Green sticker pasted on portable equipments of CHP

Rubber mat placed at silo area RSB


scieser Lift connection given at workshop

Boiler-2 APH-2 vessel dome valve not working, so applied rustoline


UPS-1 slave battary current found 0 at 1.30 p.m, now under observation
Boiler-2 APH-2 back pressure not coming , so clean the tube of transmitter, and its inlet valve cleaning done, now
OK

Shift jobs carried

Following Shut down Clear.


BC-1
BC-2
BC-4
BC-7A
T1 tower bag filter
coal-2D
MOV-912
Bucket elevator-1
Bucket elevator-2
Work shop EOT
Coal bunker bag filters

Following Shutdown given-


1. ACC FAN-2F
2. ACC FAN-2F LUBE OIL PUMP
BC-2, Belt not started at the time of start up, check feeder it is ok, then check at site found Guard pull
cord switch acted, Switch and guard adjusted and made it ready for operated.
At CCR desk TG-2, PC keyboard not working change the key board with another one.
ETP Data not communicating so reset the power supply , now ok.
UPS-1 slave battery current found 0 at 1.30 p.m., now at 08:00 PM the current is 3Adc, under observation

BFP MV Drive Room Door , Cable Cellar Door and Switch yard Door lock and hing found rusted, clean it
with rustoline.
CHP Room, AHF panel cleaning done.
ACC-2, Lightning Timer get stuck-up so , reset it
CHP building , Screen Floor 24 Volt LED plug changed.
Boiler-2, Lift acrylic sheet was overlapping fix it properly and Silver tape provided.
Boiler-2, telephone cable is in hanging condition, proper cable dressing done.
Shift jobs carried
Unit No. # 2 Bed Material Temp.-1 ( 02TI1109) is not showing at DCS end. So checked and found that one
pair is out. So another pair is used. Now Ok.

BAC # 1 A and 1B VFD Panel and Filter Cleaning and Blowerning to done.

Unit no. # 2 APH O2 Probe one earthing is broken condition. So earthing is done. Now ok.
Reports generate of (APC, Plant Performance, Power Report and Env report) send on mail
Online CPCB data is Ok But ETP data is hand condition from 30/06/21@5.38 PM.
4.5 mtr all VFD drives inverter temperature checked ,found under 60 Deg.
Electrical Report is generated.
24 Volts LED Charging Light given at ACC Unit No.-2 zero mtrs. As per operation requirement.
BC-7A and 7B Motor Cleaning to done.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

01.07.2021 A Deepak Chand


Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


01.07.2021 C Gajendra Pandya Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


VAM parameters cheked found Normal
Chimny data updating normal

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

VAM parameters cheked found Normal

Chimny data updating normal


Shift instrument digital log book filled
UPS log digital log book filled.

02.07.2021 A Ajaya Kumar VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

VAM parameters cheked found Normal

Chimny data updating normal


Shift instrument digital log book filled
UPS log digital log book filled.

02.07.2021 A Ajaya Kumar


02.07.2021 A Ajaya Kumar VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 ans


SPC008 ( one Down )

Auto drain valve checked manually working OK

UPS Check List filled.

Shift instrument digital log book filled

02.07.2021 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters cheked found Normal

Chimny data updating normal

Shift instrument digital log book filled

02.07.2021 C Gajendra Pandya UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


VAM parameters checked found Normal
Chimney data updating normal
Shift instrument digital log book filled

UPS log digital log book filled.

03.07.2021 A Ajaya Kumar


03.07.2021 A Ajaya Kumar

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d)LOTO log book
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 ans


SPC008 ( one Down )

Auto drain valve checked manually working OK

UPS Check List filled.

Shift instrument digital log book filled

03.07.2021 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters cheked found Normal


Chimny data updating normal
Shift instrument digital log book filled
UPS log digital log book filled.
03.07.2021 C Tarun Gaur VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal


04.07.2021 A Gajendra Pandya Chimney data updating normal
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d)LOTO log book
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


Auto drain valve checked manually working OK

VAM parameters checked found Normal


04.07.2021 B Sanjay Garg
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
VAM parameters checked found Normal
Chimney data updating normal
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
05.07.2021 A Gajendra Pandya b) Generator-2  checklist
c) Elect. Shift checklist
d)LOTO log book

Following Shut down given.


a) BC-1
b) BC-2
c) BC-7B
d) RECLAIMER
e) BAG FILTER T1 TOWER
f) Drain pot-2B
g) BAC-2A
h) Bag filter Bunker-1A,1A,2A,2B
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


VAM parameters checked found Normal

UPS Check List filled.


Shift instrument digital log book filled

05.07.2021 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


VAM parameters cheked found Normal
Chimney analyzer data not updating at
site ,neither internet working.

Shift instrument digital log book filled

05.07.2021 C Ajaya Kumar UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d)CD not working in EMS PC, although report
saved in CD.
EMS report prepaired and mail to all
Power report prepaired
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


06.07.2021 B Deepak Chand
All AC power made ON in morning.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


Sanjay
06.07.2021 C Garg/Ajaya UPS log digital log book filled.
Kumar VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal

07.07.2021 A Gajendra Pandya Chimney data updating normal


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
d)LOTO log book

Following Shut down given.


a) BC-1
b) BC-2
C) RECLAIMER
d) Drain pot-2B
e) BAC-1B
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


07.07.2021 B Deepak Chand
07.07.2021 B Deepak Chand

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


UPS log digital log book filled.
06.07.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

08.07.2021 A Deepak Chand All AC power made ON in morning.

Shift instrument digital log book filled


08.07.2021 A Deepak Chand

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.


08.07.2021 B Ajaya Kumar
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
08.07.2021 C Gajendra Pandya Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
08.07.2021 C Gajendra Pandya

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


09.07.2021 A Deepak Chand
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

09.07.2021 B Sanjay Garg


VAM parameters checked found Normal
UPS Check List filled.
09.07.2021 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


09.07.2021 C Gajendra Pandya
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken
1)BFP MV drive all paramers are with in limit and
proper cooling in room
2)4.5 mtr drive all paramers are with in limit and
proper cooling in room
3)Workshop MV drive all paramers are with in
limit and proper cooling in room
4)Chimeny analyzer analy zer readings, pump
flow are normal
5) 4.5 Mtr MCC room VFD are ok without any
alarm

Following shutdown Given


1. Belt conveyor-6
2.Coal crusher-2
3.Vibrating screen-2
4.Instrument compressor-2
10.07.2021 A Purushottam

Following Shutdown Cleared


1.Instrument compressor-2

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

10.07.2021 B Sanjay Garg

VAM parameters checked found Normal


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Comp house & receiver area auto drain valve
checked manually working ok
Shift instrument digital log book filled

10.07.2021 C Deepak Chand


UPS log digital log book filled.

VAM log digital log book filled.

10.07.2021 C Deepak Chand Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

DG Report prepared and upload in SAP

Power report prepared and mail

Plant performance report and Environment


report mailed
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


11.07.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given


1)BC-6
2) Vibrating screen-2
3) Coal crusher-2
4) IAC-3
5) Instrument air BAC-2B

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

VAM parameters checked found Normal


UPS Check List filled.
11.07.2021 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

11.07.2021 C Deepak Chand


11.07.2021 C Deepak Chand Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

DG Report prepared and upload in SAP

Power report prepared and mail


Plant performance report and Environment
report mailed
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
12.07.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given


1)BC-1
2) BC-2
3)Reclaimer
4) BC7A
5) BC7B
6)ACW-1
7) 12MV4304 discharge MOV of ACW-1

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

VAM parameters checked found Normal


UPS Check List filled.

12.07.2021 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Sanjay Garg / Shift instrument digital log book filled


13.07.2021 C
Ajay Kumar
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


UPS log digital log book filled.
14.07.2021 A Gajendra Pandya VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down given


1)BC-4
2) BC-2
3)Bed ash cooler-2B
4) IAC-3
5) Drain pot-2B

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made OFF in Evening


14.07.2021 B Deepak Chand

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
BC-7A, 7B Lightning timer adjusted
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


14.07.2021 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


15.07.2021 A Deepak Chand
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


15.07.2021 C Gajendra Pandya checked manually working ok
chimny analyser data found updating
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

16.07.2021 A Deepak Chand Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

16.07.2021 B Ajaya Kumar Auto drain valve checked manually working OK

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

chimny analyser data found updating


16.07.2021 C Gajendra Pandya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


17.07.2021 A Ajaya Kumar Auto drain valve checked manually working OK
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Anurag
17.07.2021 B
Chowdhury
One P&V stopped at 7:00pm

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
18.07.2021 A Gajendra Pandya Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 7:00pm

Anurag
18.07.2021 B Chowdhury
All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
chimny analyser data found updating

18.07.2021 C Ajaya Kumar


Shift instrument digital log book filled
18.07.2021 C Ajaya Kumar
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Anurag Auto drain valve checked manually working OK


19.07.2021 A
Chowdhury
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


P&V no. 4 stopped at 7:00pm
All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
19.07.2021 B Gajendra Pandya a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
19.07.2021 B Gajendra Pandya

Following shutdown Given


1. Drain pot-2A

Following shutdown Cleared


1. Drain pot-2A
2. Drain pot-2B
3. Coal crusher-2
4. coal feeder-1A
5. BC-6

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Chimney analyser data found updating


19.07.2021 C Ajaya Kumar
Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
20.07.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
20.07.2021 A Gajendra Pandya

b) Generator-2  checklist
c) Elect. Shift checklist

Following shutdown given


1. Reclaimer
2. BC-1
3. BC-2
4. col crusher-2
5. Bucket elevator-1
6. vibrating screen-2
7. IAC-1

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

20.07.2021 B Deepak Chand Auto drain valve checked manually working OK


All AC power made OFF in Evening
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Ajaya Kumar / Chimney analyser data found updating
20.07.2021 C Anurag Shift instrument digital log book filled
Chowdhury UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
20.07.2021 C Anurag
Chowdhury

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
21.07.2021 A Gajendra Pandya
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shutdown given


1. Reclaimer
2. BC-1
3. BC-2
4. col crusher-2
5. Bucket elevator-1
6. vibrating screen-2
7. IAC-1

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


21.07.2021 B Deepak Chand
All AC power made OFF in Evening
Shift instrument digital log book filled
UPS log digital log book filled.
21.07.2021 B Deepak Chand

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Anurag Chimney analyser data found updating
21.07.2021 C Chowdhury Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


22.07.2021 A Deepak Chand
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


22.07.2021 B Ajaya Kumar All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Chimney analyser data found updating


22.07.2021 C Gajendra Pandya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


23.07.2021 A Ajaya Kumar
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 7:00pm

Anurag All AC power made OFF in evening.


23.07.2021 B Chowdhury
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


Sanjay Garg /
23.07.2021 C Gajendra
Pandaya

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
24.07.2021 A Ajaya Kumar Last two days plant & environment report send to
concern person.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Anurag P&V no. 4 stopped at 7:30pm


24.07.2021 B
Chowdhury
All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


24.07.2021 C Sanjay Garg /
Deepak Chand
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Anurag
25.07.2021 A Chowdhury
RNRP all nodes found Normal, except SPC007

Anurag Auto drain valve checked manually working OK


25.07.2021 A
Chowdhury
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

Sanjay Garg /
25.07.2021 B Gajendra VAM parameters checked found Normal
Pandaya
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled

Ajay Kumar/
26.07.2021 C Deepak Chand
26.07.2021 C Ajay Kumar/
Deepak Chand
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
26.07.2021 A Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

VAM parameters checked found Normal


UPS Check List filled.
26.07.2021 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled

Ajay Kumar/
26.07.2021 C Anurag
Chowdhury
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
27.07.2021 A Gajendra Pandya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown given:
1) BC-1
2) BC-3
3) Reclaimer

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

27.07.2021 B Deepak Chand


All AC power made OFF in Evening

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

28.07.2021 B Deepak Chand All AC power made OFF in Evening

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Sanjay Garg /
28.07.2021 C Anurag Shift instrument digital log book filled
Chowdhury

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


29.07.2021 A Deepak Chand
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
Shift instrument digital log book filled
29.07.2021 B Ajaya Kumar UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

Shift instrument digital log book filled


Sanjay Garg /
29.07.2021 C Gajendra UPS log digital log book filled.
Pandaya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.


Shift instrument digital log book filled
30.07.2021 B Ajaya Kumar UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok
Shift instrument digital log book filled
UPS log digital log book filled.
30.07.2021 C Gajendra Pandya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


All AC power made ON in morning.
31.07.2021 A Ajaya Kumar
Shift instrument digital log book filled
31.07.2021 A Ajaya Kumar
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

31.07.2021 B Sanjay Garg VAM parameters checked found Normal


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Comp house & receiver area auto drain valve


checked manually working ok

31.07.2021 C Deepakchand/
Purushottam
Shift instrument digital log book filled
Deepakchand/
31.07.2021 C
Purushottam UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared and mail
Shift jobs carried

Following Shut down given.


a) BC-1
b) BC-2
c) RECLAIMER
d) BC-2
e) BAG FILTER T1 TOWER
f) BC-4
g) Coal Bunker 1B,1C,2B,2C
h) En-Mass-1
i) En mass-2
Following Shut down Clear
1. ACC FAN-2F
2. ACC FAN-2F LUBE OIL PUMP
Following AVI Given and Close
1. ACC FAN-2F
2. ACC FAN-2F LUBE OIL PUMP
Fly Ash Silo -2, not starting found its control suppy get trip check and reset the control
power and srtart loading normally
Bed Ash Silo High Level not showing correct valve, sensor cleaning done now showing
correct value.
BAC-1B , water Valve SOV open close display showing incorrect , Displayt adjusted as per position
Chimney Analyser Calibration work done with General Shift Engineer.
BC 7A bag filter motor connection open as per requirement -
Connection Detail from DE to NDE ( RBY)

PM jobs carried
CHP MCC and Ash handling MCC Panel outside blowring done

DT6 and DT3 panel outside blowring done


CHP DCS Panel blowring and cleaning done
CHP DCS Protection cabinate Panel blowring and cleaning done

CHP DCS PC and its rack blowring and cleaning done


Shift jobs carried
CO-2 showing fault at DCS, Moisture fault reset & filter cleaned now OK.
Boiler-1 02 no's hydrastep electode connector replaced.

Cable dressing at BC -7A bagfilter SOV.

Boiler-1 CCTV camera unstalled & kept in lab for repair.


Boiler-1 100% Cv bonnet tightness done with general shift tech.
HSD camera not showing footage, Rectified & zoom out..

Following Shut down given.


a) BC-1
b) BC-2
c) BC-7B
d) BC-2
e) BAG FILTER T1 TOWER
f) BC-4
g) Coal Bunker 1B,1C,2B,2C
h) Vib. screen-1
i) Vib. screen-2
j) BC-6
k).Drain pot 2B
Coal bunker motor 7B connection removed.DE to NDE Side (RBY)
P&V 2 On at 7:00 AM

Shift jobs carried


CO-2 showing fault at DCS, Moisture fault reset & filter cleaned now OK.
Boiler-1 02 no's hydrastep electode connector replaced.

Cable dressing at BC -7A bagfilter SOV.

Boiler-1 CCTV camera unstalled & kept in lab for repair.


Boiler-1 100% Cv bonnet tightness done with general shift tech.
HSD camera not showing footage, Rectified & zoom out..
Following Shut down given.
a) BC-1
b) BC-2
c) BC-7B
d) BC-2
e) BAG FILTER T1 TOWER
f) BC-4
g) Coal Bunker 1B,1C,2B,2C
h) Vib. screen-1
i) Vib. screen-2
j) BC-6
k).Drain pot 2B
Coal bunker motor 7B connection removed.DE to NDE Side (RBY)
P&V 2 On at 7:00 AM

Shift jobs carried


In Unit No. # 1 Drum floor area Start Up Vent MOV -1No.-01MV2303 Double earthing to
done.
In Unit No. # 1 Drum floor area Start Up Vent MOV -2 No.-01MV2304 Double earthing to
done.
In Inst. Air Compressor No.-3 Cooling Water Inlet Pr. Guage not working condition. So
New pr. Guage mounted at site. Now ok.
All the AC MCB to OFF Condition.
online CPCB and ETP data is showing normally.
RNRP SPC008 showing one down. So connection tightness done at WTP. Now Ok.

All the manual light to ON Condition. P&V No.-2 OFF at 7.00 PM.

Following Shut down Cleared.


a) BC-1
b) BC-2
c) BC-7B
d) BC-2
e) BAG FILTER T1 TOWER
f) BC-4
g) Coal Bunker 1B,1C,2B,2C
h) Vib. screen-1
i) Vib. screen-2
j) BC-6
01 Nos LED Light Put into the Charging mode.
BC-7A bag Filter Motor connection to done.
PM jobs carried
CEP 1A,1B,2A,2B area equipments cleaning done like, MOV, pressure guage,
transmitter etc.

unit-1 vessel 11-21, 12-22 back pressure transmitter cover fixing done

unit-1vessele -2 dome valve leakage found , so repaire thyefitting and leakage is


arrrested.
CEP-2A field power JB, 2A,2B motors and 2A,2B LCS JB cleaning done

ACC-2 area RSB polythen packing done.


Drain pot-1A power JB and starter packed with packing tape

Shift jobs carried


Boiler-1 drum floor & cyclone floor air leakage checked & arrested .( huffing device
PI1106,PI1113 & sv1307)

CHP zero meter PA system check & found working.


Soot blower 12 earthling wire found broken , connected the same.
At 4.5 meter MCC check insulation mat availability ,old mat removed & new mat
applied.
At 4.5 meter MCC room breaker trolley adjust properly.

Boiler-1 RSB 11 indoor panel earthling done.


Following Shut down given.
a) BC-1
b) BC-2
c) BC-7B
d) RECLAIMER
e) BAG FILTER T1 TOWER
f) RECLAIMER
g) Coal Bunker Bag filter 7B
h)BAC-2B
I) FAS-2 dry UL system
j) BC-6

Reaclaimer back side AC out door unit cable dressing done.


P&V 2 On at 7:00 AM

Shift jobs carried


In Unit No. # 1 Drum floor area MSSV Main MOV -1No.-01MV2301 Double earthing to
done.
In Unit No. # 1 Drum floor area MSSV Bypass MOV -1No.-01MV2302 Double earthing to
done.
Chimney Analyser Room AC is not working condition. So Extra Fan mounted in the
Room.
All the AC MCB to OFF Condition.
online CPCB and ETP data is showing normally.
Fly Ash Silo -2, Fork level switch is contionuous showing High. So Cleaned the
Fork level switch. Now ok.
All the manual light to ON Condition. P&V No.-2 OFF at 7.00 PM.

Following Shut down Cleared..


a) BC-1
b) BC-2
c) BC-7B
d) RECLAIMER
e) BAG FILTER T1 TOWER
f) RECLAIMER
g) Coal Bunker Bag filter 7B
h)BAC-2B
I) FAS-2 dry UL system
j) BC-6
k) drain Pot Pump-2B
In Chimney analyzer room one nos. extension board to provided.
in Inst. Lab Single phase Board Plug Top to changed.
PM jobs carried
BFP-1 ,2 &3 Motor & Power JB & RSB Panel Cleaning & Blowering work

DCV 01CV3203 Control valve found Gland leakage now tighness & arrest it.

ACC-1D Motor Stop due to flow Low so check lube oil motor flow switch &
feedback check with ccr , cleaning & adjustment done now ok
BFP Area Intrument equipment Cleaning & Blowering work

Shift jobs carried


Housekeeping of CCR done, removing, Old rubber mats from CCR and shifted to
workshop

Abnormality attended-BC-1 not started due to act of belt sway group5 in DCS, so
checked at field side group5 all four belt sway switch found not operated and belt is
aligned at that position. So cross check the operation of all 4 belt sway but act not gone.
So due to urgency of CHP bunkering bypass the group5 belt sway from CHP DCS.
termination details: 93-9A, TB1-7,8 wire removed. Kindly check the all group 5 belt
sway switch contacts in the field. and remove the bypass.

bunker bag filter 2D purging check it operates on DP normally.


BC7A7B lighting timer adjusted and correct it

Shift jobs carried


CPCB SOX reading showing High value. So in Chimney analzer factor changed from 1.5 to
0.75. Also at DCS end factor changed form 1.5 to 0.75.
Coal bunker -2A level Transmitter not showing correctly. So reset the power supply.
Now ok.
Belt Sway Switch No. # 5 is showing High high at DCS end. So field side found that 28.5
Volts while we have checked at DCS end voltage is 33.3 Volts. There is 5 Volts voltage
droped. Due to urgency of CHP Presently Belt sway is in bypass condition. ( Location- 70
Mtrs near Welding JB )
Both CPCB and ETP data is hang Condition. So Informed to Mr. tarun.

Boiler No. # 1 Zero mtrs inst. JB and Field Inst. Cleaning and blowerning to done.

All the manual light to ON Condition. P&V No.-2 already OFF Condition.
BC-6 , BC-7A and 7B motor , LCS JB , Motor field power JB Cleaning and blowerning to
done.
03 Nos repair Supply Box at BC-7a/7b Floor area Cleaning to done.
BC-7A Motor LCS JB cable dressing to done.

Shift jobs carried


Damaged rubber mat replaced from boiler-1&2 0 mtr area
Spare rubber mat placed in chimny analyser room panels floor
cooling fan shifted in compressor house
FRP ladder shifted in WWTP room
bunker bag filter 2C motor connection removed as, DE-B,Black, y-NDE
AFR breaker trip in earth fault, so reset it once
new Rubber mat placing work in limeston MCC room
DCS-1 area housekeeping done, files arranged,drawer arranged, LOTO loacks arranged in
box
in Lime stone DCS module panel 86 fault reset in NIS NPN

Shift jobs carried

IFC Panel Polythene Packing to done.

Back side of Chimney analyzer Room Supply JB Polythene packing to done.

Air leakage from PU tube fitting at BAC-2A Water valve SOV. So fitting tightness to done.
Both CPCB and ETP data Showing Normally.
At CHP Bucket elevator Floor area all the Inst. JB / Field Inst. Cleaning and
Blowerning to done.
All the manual light to ON Condition. P&V No.-2and 4 are running condition.

Following Shut down Cleared.


a) BC-1
b) BC-2
c) BC-7B
d) RECLAIMER
e) BAG FILTER T1 TOWER
f) BAC-2A
g) Bag filter Bunker-1A,1A,2A,2B

Vibrating screen -1 and 2 Motor , 24 Volts Socket JB Cleaning and blowerning to done.
BC-7A/7B Floor area Bag Filter Motor Connection to done.
02 Nos hand Lamp to provided to T-1 Tower.
At BC-1 24 Volts Hand lamp Plug Top to changed.

PM jobs carried
Chimney analyzer CPCB data not updating at site ,neither internet working.

Compressor house exhaust fan panel cleaning & blowering done.


ACC-2 lighting timer got stucked ,reset the same .
Compressor motors cleaning & blowering done.

Boiler-2, APH vessele-2, seal pressure gauge air leakage found from tube, so cut
the air tube and remount it, now leakage arrested.
HP dosing pump pressure gauge got stucked at 50kg/cm2 , so checked & release
pressure, now ok.

Boler -1 firing floor ,igniter panel & all Sov 01Sv 1301 to 01SV 1308 cleaning done.
All auto drain checked manually.

Shift jobs carried


Following Shut down Clear.
a) BC-1
b) BC-4
c) Reclaimer
d) T1 tower bag filter
e) Crusher floor bag filter
f) Drain Pot 2B

IFC-1, having air leakage from pu tube , so cut the tube and reconnected and
leakage arrested

Boiler-2, Dome Valve Limit switch cover provided

Bed ash silo showing level wrong valve so clean the probe and reset it, now ok

Boiler-1, SOX showing incorrect valve, so filter cleaning and line flushing done,
now Ok
Bed Ash Silo Plate valve not operating , found RAV get O/L , check and reset and
started loading normally
Both IFC moisture drain
Reclaimer CRD motor cooling fan installation work done with G shift.
BC-4 , and En Mass 1&2 , motor and power JB cleaning done.
Boiler-2, Floor 5,6,7 all installed lights details prepared and handed.

Shift jobs carried


CPCB SOX reading showing High value. So in Chimney analzer factor changed from 0.5 to
0.4. Also at DCS end factor changed form 0.5 to 0.4.
In Chimney analyzer room Boiler No. # 1 SOX analyzer Chiller unit showing 16
Degree Temp. So Reset the Power Supply. Now Ok.

Unit No. # 2 BAC-2A and 2B VFD Panel cleaning and Blowerning to done.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send on mail
Online CPCB data and ETP data is Ok .
All the AC MCB to OFF Condition.
Chimney Analyzer room AC is not working condition. Room is in hot condition.
Electrical Report is generated.
WTP HP dosing pump vfd panel cleaning & blowering done.
WTP pump house motor cleaning & blowering done.
Both HP pump motor cleaning done.

Shift jobs carried


DG report prepared and uploded in SAP

EMS report prepaired and mail to all

Crusher floor hydraulic operation checked from E&I side found OK, only trial pending
from Mechanical side.

Bed ash silo level probe cleaning done and checked level found OK. Also verified by
operation OK.
Abnormality: Cable found undressed , so dressing done at silo top 2 nos
Bed ash silo RAV reset once, then trial done found Jam inform to operation
Green tag pasted on chipping Machine

Shift jobs carried

Following Shut down Clear.


a) BC-1
b) BC-2
C) RECLAIMER
d) Drain pot-2B
e) BAC-1B

Bed Ash Silo Dry Unloading shut down given and Clear

Following area Earthing Pit - Resistance value , Check date & due date sticker
pasted -
1. Unit -2 MV Drive (4 Nos)
2. TG Building ( 04 Nos)
3. TG Building Cable cellar ( 2 Nos)
4. Switch Yard outer pits ( 7 Nos)
China Yard Street Light Timer stuck up, Reset it
Compressor House , IAC-2 Element Temp RTD replace with G Shift team.
Vam get Stop at 4:00 PM, so ON all drive Room AC, and after VAM normalize OFF
the AC at 7:00 PM
IAC-2 , Body Earthing wire found broken , re connect it.
IAC-2 , Heat Exchanger water line flow gauge open as per operation requirement
, re fit again after work completed
P&V 2 OFF at 7:00 PM

Shift jobs carried

CCR AHU Mode is in Manual Mode.So Put into the Auto mode with SP= 31 Degree.

OPC server PC is OFF Condition. So ON the PC. Now Ok.

Fly ash Silo No. # 1 and 2 , Bed ash silo Inst Panel / Field JB cleaning and Blowerning to
done.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send on mail
Online CPCB data and ETP data is Ok .
Workshop back side MV Drive AC JB / Telephone JB and EOT Crane JB cleaning and
Blowerning to done.
Electrical Report is generated.
Boiler No. # 2 area First Floor to Fourth floor LED Light and Sodium Light
counting to done.
IAC No. # 1 ,2 and 3 Motor Cleaning to done.
Unit No. # 2 Boiler 7 th Floor to 4 th Floor Light to OFF.

Shift jobs carried

Following Shut down given.


a) Reclaimer
b) J valve fan 2B
c) J valve fan 2B MOV
d) IAC-2
e) Coal Crusher-2

Bed Ash Silo RAV get O/L so check and reset

Fly Ash Silo No -2, Plate Valve timer increase from 12 min to 20 Mins

Boiler-2 , SOX analyser moisture fault Reset.

Boiler-1, Feed water Station 2902 control valve steam leakage arrested
IAC-3 , Heat Exchanger water line flow gauge open as per operation requirement
, re fit again after work completed
Turbine floor EOT inspection date and due date sticker prepared and pasted
WTP , Extension broad check and green tag pasted
Compressor motor , Shifted from Compressor house to ACW pump house
Vacuum Cleaner Shifted from BFP MV drive Room to switch gear room
P&V 2 started at 7:00 AM

Shift jobs carried

Following Shut down cleared


b) J valve fan 2B
c) J valve fan 2B MOV
d) IAC-2
e) Coal Crusher-2

AVI given for Valve 2B, & trial done, Then removed isolation.

IAC-3 got tripped on element temp. So reset the same .

IAC-2 also got tripped on element temp. So reset the same but still element temp. is high.
Boiler-2 J valve MOV 02MV0921 not open, So checked & rectified.
BAC 2A dome fault . Manually operated 2-3 times now OK.
APH 8105, close F.B not showing ,rectified.
Dosing room unused instrument SOV & magnetic level gauge fixed.
P&V 2 started at 7:00 AM
CHP DCS,& MCC light not working , found main MCB got tripped.Reset the same
now Ok.
WTP high pressure pump-1 got tripped on O/C reset the fault & restart pump,
working normal.

Shift jobs carried

Instrument compressor-3 trip found in elemente temprature high, 2 times


Abnormality: ACC Fan-2E main motor one earthing found opened, so relug it and
fix it.

Crusher area lights made OFF.

Boiler-1&2 bag house area lights made ON as per operatiopn requirement.


Shift jobs carried
Following Shut down given.
a) Reclaimer ( Maint.)
b) Reclaimer ( Opert.)
c) BC-1
d) IAC-2
e) Coal Crusher-2

IAC-3 , Water Line inlet and outlet pressure gauge having heavy leakage , open both and by
Providing Teflon tape leakage arrested.
Coal Feeder 2D, pneumatic valve cover provided.
Coal Feeder 2B, RTD Cable dressing done
Unit-1, Coal Feeder area welding machine checked and green tag pasted
Unit-1, Coal Feeder RSB no-55 lock found damage so new lock provided
Coal Feeder -1C , 24V lamp cable cable dressing done.
P&V 2 started at 7:00 AM

Shift jobs carried


IAC No. # 3 inlet and outlet cooling water Pressure guage small water leakage . So Pr.
Guage thred tightness done. Now Ok.

IAC No. # 1 Oil cooler Line Pr. Guage is not working condition. So New Guage replaced.
Now Ok.
IAC No. # 2 Oil cooler Line Pr. Guage is not working condition. So New Guage replaced.
Now Ok.

Bomb Calorimeter showing igination failure alarm. So checked and found that in Bomb
anode rod loose. Also nut is in rustrated condition. So put into the restoliene.
Unit No. # 1 APH , Vessel No.-11/21 , and Vessel No.-12/22 JB Polythene covering to
done.
Unit No. # 1 APH , Vessel No.-11/21 , and Vessel No.-12/22Seal Pr. And Back Pr. Switch
Calibration sticker mounted at site.
Due to moisture BC-1 05 nos Belt sway is showing. Due to urgency Present is in Bypass
Condition. ( 93-9A-TB1-7/8 )
All the AC MCB to OFF Condition.
Both CPCB and ETP data is Showing Normally.
All the manual light to ON Condition. P&V No.-2 OFF at 7.30 PM.
Following Shut down Cleared.
a) Reclaimer ( Maint.)
b) Reclaimer ( Opert.)
c) BC-1
d) IAC-2
e) Coal Crusher-2

In Middle Gate , welding machine 20 amps Plug top changed.


In Boiler No.-2 Repair supply box Double earthing checked and all the door are closed
condition.
In Compressor House 24 Volts LED Light to OFF Condition.
In Boiler No. -1 and 2 Fourth to Seven floor LED Light to OFF.

Shift jobs carried


Boiler-1&2 Firing floor Panel and equipments cleaning and blowring done as:
Firing panel cleaning and pcking the door with packing tape, remove the old packing
tape from side, and housekeeping done

Boiler-1&2 flame detector panel hole packing done

Boiler-1&2 feed water station main pressure gauge glass cleaning done

All Instrument compressor water line pressure gauge glass cleaning done

TG building area Repaire supply box green tag checking done found updated

Boiler-2 repaire supply box checking done upto thired floor , green tag status, RSB-28
and-33 no green tag changed.

Shift jobs carried


ACW & Compressor are Hoist crane checking and Due date stickering done

Boiler-1,PA fan,Sa fan,ID fan & Pfan Hoist crane checking and Due date stickering
done

Boiler-2 Sa fan,ID fan & Pfan Hoist crane checking and Due date stickering done

WWTP single phase water pump found not running, observed cable short ,same
was rectified and trial taken .
Bomb Calorimeter showing igination failure alarm. So checked and found that in
Bomb anode rod loose same was rectified and trial taken along with WTP
operator Rajesh.
VAM got trip on HTG high temperature checked in field found normal, alarm
reset and VAM started

Shift jobs carried


As Per requirement CT Fan - 2 and 3 VFD Command Incresed from 70 % to 90 %. Table
as shown below.
I/P Temp. VFD Command in %( OLD ) Value. VFD Command in %( NEW ) Value.
30 35 45
30.2 45 55
30.4 50 60
31 60 70
31.6 65 80
32 70 90

In Boiler No. # 1 Zero mtrs to Drum Floor area all the huffing JB , Bucket elevator Panel ,
CO-1/2 FSHS Box, RAV panel , Calibration unit , Firing Floor JB , closed and Packing Tape
to Provided.
BAC-2B Level probe is not showing correctly at DCS end. So cleaned the level probe and
Calibrated it. Now Ok.
BC-1 Belt sway No.# 5 Found that wire is in loose condition and rusted. So cleaned it.
Also Tripping is taken in line. Now it is underobservation.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is not Showing in website.
All the manual light to ON Condition. P&V No.-2 OFF at 7.30 PM.
Following Shut down Cleared.
a) Coal Crusher-2 ( 02 times )
b) Vibrating Screen No.-2( 02 times)
c) BC-6

Boiler No.-1 22 mtrs EOT hoist checked and due dat sticker pasted at site.
Boiler No. # 1 bag house one spare JB open condition. So closed it and packing tape to
provided.
TG building area zero mtrs Near BFP Motor welding machine green tag sticker
pasted.

Shift jobs carried

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

Boiler-1 and Boiler-2, Equipment's Calibration date sticker pasted done.

Boiler-1, Vessel No-21 bag pressure switch , tube reconnected


Street Light main SFU Incoming power source sticker pasted

4.5 Mtrs , single phase socket check and green tag pasted
Boiler-2, All Lights made ON and OFF as per requirement

ACC -2, RSB Rubber mat laid properly

Shift jobs carried


Instrument Equipments calibration sticker pated at boiler-1&2 locations 12nos

Earthing pit stickers pasting work at CHP,Chimkny and WTP area, 15nos

Pressure gauge marking done near cable celler of TG building water cooling line
Abnormality: Tube light replacement work at BAG house-2
Electrical Authorization List pasted at the doors of 4.5mtr switchgear room and
BFP MV drive room
Bed ash cooler-2B Instrument air shutdown given and its pressure gauge
removed as per requirment.
WTP hall VFD panel packing with packing tape
Both boilers ID,PA,SA,P fan motors blowring done
Spare Motors of ID,PA and BFP blowring done near TG building shutter
damaged cooling fan removed from PA fan-2 motor platform

Shift jobs carried


Coal Feeder -2D pneumatics air valve open limit to set. Also found that seal of the
cylinder is damaged condition. So inform to shift incharge. Then changed the cylinder .
Also limit switch mounted at site. Now Ok.

calibration sticker Pasted at boiler No.-2 and TG No. # 2.

New hand santizer machine Installed at site. Also Power supply given. Now Ok.
BAC-2B Shutdown to cleared.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is Showing normally.
All the manual light to ON Condition. P&V No.-2 is in running condition.
Following Shut down Cleared.
a) Coal Crusher-2
b) Vibrating Screen No.-2
c) BC-6
d) IAC No.-3.

02 Nos Earth pit sticker pasted at site.


Electrical Authorization List pasted at the doors of 4.5mtr switchgear room and
BFP MV drive room , 4.5 mtrs MCC room , WTP MCC Room , WTP Cable celler
Room , CHP MCC and Cable celler Room , Zero mtrs Cable celler , LHS MCC and
Cable celler Room.
24 Volts LED Lamp provided at Screen floor at CHP. ( Mr. APS )
Crusher Top Floor EOT Hoist marking Sticker pasted at site.

Shift jobs carried

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

ACC Fan1C , get stops suddenly ,no tripping found at Breaker but VFD get OFF,
Charge the VFD and Start fan normally.

TG-1, Zero Mtrs all MOV cleaning and Blowering done

TG-2, Zero Mtrs all MOV cleaning and Blowering done

WTP area all Solenoid Box and panel cleaning done.


BFP Motor 1,2 and 3, Cleaning and Blowering done

TG Building , 0 Mtrs 2 Lightning JB cover with brown tape

Shift jobs carried


Boiler-1 camera polythen reduced by wrapping it

Boiler-1&2 panel doors checked once again

Service compressor-3 not starting so checked and found that, its breaker not
laching and stop imediately in manual mode also, so replace the breaker with
Service compressor-1 breaker. Now trial taken SAC-3 running normal

ACW-1 discharge MOV(12MV4304) shutdown given and its cable connection


removed on requirement of mech deptt.
Material shifting work from Instrument Lab
Safety board fixing work in field.

Shift jobs carried


In WTP RO Pump No. # 1 Tripped due to F0022 Fault. So Reset it. Again started. And
Checked the VFD Output Voltage is Ok but one Phase Current is showing Zero Amps.
Also Megger done at Motor Terminal JB. Found it 0.3 Kilo ohms. So inform to H. Sharma.
Presently VFD O/P Side wire is opened condition and Incoming MCCB is in OFF
Condition.

Some Inst. Materials Shifted to BFP MV Drive room to WTP Inst. Lab.

In Compressor House all the auto drain valve checked and working Normally.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is Showing normally.
All the manual light to ON Condition. P&V No.-2 and 4 is in running condition.

Following shut down Cleared.


1)BC-1
2) BC-2
3)Reclaimer
4) BC7A
5) BC7B
6)Vibrating Screen No.-2

BC-4 , and En Mass 1&2 , motor and power JB cleaning done.

Shift jobs carried


In Unit No. # 2 TG Hotwell level Control Valve ( 02LCV3002 ) Feedback is showing Violet
at DCS end. So calibratated the control valve and Connection tightness done at
Positioner TB. Now Ok.
Controller of the oil centrifuse Pump of TG No. # 1 is shifted to Unit No. # 2 oil
centrifuse and visa versa.
Unit No. # 1 High Level Probe of Vessel No.- 11/21/12/22 Checked with materials . It is
working Normally.
All the AC MCB to OFF Condition.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send on mail
Online CPCB data and ETP data is Ok .
Electrical Report is generated.
BC-7A /7B Bag filter Panel and Motor Cleaning and Blowerning to done.
Shift jobs carried
Level probe checking work for high and high high level in Biler-2 vessel 21 found
working correctly
ACW-1 discharge MOV(12MV4304) cable conection done and trial taken, then
fault came in DCS, so check its position limit and found that its limit component
broken, so need to replace this component
Abnormality: BAC-2B back pressure is not coming, so check and found that its
tube is cut and fitting found damaged, so replaced both of them, now back
pressure is coming.
BC-4 feeder modification work done, work under progress

Shift jobs carried

Following Shut down Clear.


1)BC-4
2) BC-2
3)Bed ash cooler-2B
4) IAC-3
5) Drain pot-2B

Coal Feeder 2D, pneumatic valve open limit not showing , found valve get jam so
clear the jam and limit switch adjusted

ACW-1, 12MV4904, Torque Limit adjusted and trial taken.

BAC-2A , seal pressure fault found Dome valve jammed, operate 2-3 times and
made it ok
BAC-2A, Having H:H fault, check the probe it works ok, after further check found
rain water enter inside the connector, remove the connector and connect cable
directly , now OK
Compressor -1, auto drain valve air leakage arrested
Both Oil Centrifuge controller interchange.
CRD Cable motor Cooling fan Replaced by new one trial work found ok
ACC-2, Lightning JB cover with polythene
Compressor house Lightning timer by-pass and again taken in line as per
requirement.
BAC 2B, one 24 Volt charging lamp given
BC-7A, 7B Lightning timer adjusted
Shift jobs carried
Unit No. # 2 Vessel No.-21 High level Probe is not showing at DCS end. So Level Probe
Calibrated at DCS end and Cleaned it. Now Ok.
WTP DCS Panel / MOV panel / 220 Volt AC Supply Panel Cleaning and
Blowerning to done.

Compressor House all the auto drain valve checked and working normally.
All the AC MCB to OFF Condition.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send on mail
Online CPCB data and ETP data is Ok .
Electrical Report is generated.
Coal Feeder - 1A/1B/1C/1D motor cleaning to done.
Dosing room all the motor cleaned by Cloths.

Shift jobs carried

Following Shut down given.


1. Soot Blower-2
2. Drain Pot 1A
3. BC-1
4. Unit-2 Battery
5. Root Blower-2
6. Washing pump

Following Shutdown Clear-


1. BC-1
2. Drain Pot 1A
3. SOOT BLOWER POWER UNIT-2

BAC-1A , showing H:H at CCR, check and calibration done.

Coal Feeder 2D, Pneumatic gate not operate found gate jam, open it manually

Bag House-1, All 4 Vessels with its all 8 Level probe calibration done
Main Transformer-1, All External Cooling fan switch OFF at 08:00 AM
Vibrating Screen Floor -1 Hand lamp given
CHP water cooler compressor check and inform about its healthiness.
Shift jobs carried

Abnormality: Swas room panel unit-1 condensate pump O/L PH spare and main
cable found undressed, so cable dressing done

Abnormality: Swas room panel dissolved O2 deareator sensor cable and specific
conductivity sensor cable found undressed, so cable dressing done

TG building 0 mtr unwated lights made OFF

Shift jobs carried

Following Shut down given.


1. Reclaimer
2. BC-2
3. BC-1
4. UPS Battery -2
5. Coal Feeder 2D Pneumatic Gate
6. En-Mass-1
Following Shutdown Clear-
1. ROOT BLOWER POWER UNIT-2
2. Coal Feeder 2D Pneumatic Gate
Coal Feeder 2D Pneumatic Gate, cylinder air connection remove and after work
completed re connect them.
Boiler-2, Feed Water Station All control valve clean and Positioner cover with packing
tape.

Boiler-1, APH Vessel 2 seal pressure gauge having air leakage , Leakage arrested.

UPS-2, Incomer Power made OFF and ON as per requirement.


Reclaimer Lightning switch packing done with brown tape
4.5 Mtrs , Lightning JB found loose tighten it .
Compressor House Exhaust fan found ON, switch them OFF
P&V 2 started at 7:00 AM

Shift jobs carried


Following Shut down Clear.
1. Reclaimer
2. BC-2
3. BC-1
4. UPS Battery -2
5. Coal Feeder 2D Pneumatic Gate
6. En-Mass-1
Coal Feeder 2D Pneumatic Gate, cylinder air connection found open, So fixed the same &
leakage arrested.
Chimney analyzer SOX U#1& 2 chiller temperature rising temperature, So restart the
same.
Mechanical workshop 15 A plug top replaced.
Boiler-2 lift fault reset done.
ACC U#2 lighting timer got stucked ,reset the same .
Coal crusher -1 getting trip on protection act from breaker, rectified with general shift
engg.
AVI given for vibrating screen -2 & clear AVI for enmass-1.
P&V 2 started at 7:00 AM

Shift jobs carried

Abnormality: Boiler-2 bag house vessele-22 seal pressure fault coming, so


checked and found that, air line tube fitting damaged, so change the fitting

Abnormality: Feed water 100% bypass valve (01LCV2302) came in manual at


5.15 am, so checked and found that feedback is ok below 89%, but above 89%
feedback is fix, air pressure is OK, need to further checked in next shift.
Shift jobs carried

Following Shut down given.

1. Coal crusher-1
2. Coal crusher-2
3. Coal crusher-2
4. Vib. Screen-1
5. Vib. Screen-2
6. BC-4
7. BC-6
8. DRAIN POT 1B
Crusher -1 getting trip, check & found Enmass-1 , proxy switch getting malfunction, so
rectified the same ,running normal.

IAC-2 manual drain valve found open, so close the same & auto drain valve take in line.
Boiler-2 Vessel -22 seal pressure switch fitting replaced.
Boiler-1 CO-flow low, sample line flushed.Now ok.
All auto draing vave checked & found normal.
Fire pump house emergency light, trial done,found ok.
At coal feeder-1 welding M/C earthling lug replaced.
P&V 2 started at 7:00 AM
Shift jobs carried

Following Shut down cleared:-


1. Coal crusher-1
2. Coal crusher-2
3. ACC-1 washing pump
4. Vib. Screen-1
5. Vib. Screen-2
6. BC-4
7. BC-6
8. DRAIN POT 1B

APH line back pressure not coming so found line choking, so line flushing done of TX.

Silo area found all FAS-1, FAS-2 and BAS all panels, JBs, motors and instrument were
dusty, so all equipment cleaning and blowering work done.
Shift jobs carried
BC-4 spare feeder modification job , adjust the SFU handle and its interlock strip
adjustment done

Boiler-2 lift F5 fault coming, so reset it now OK

Fly ash silo plate valve pneumatic air leakage found from SOV, so tight the air fitting of
SOV

Shift jobs carried


Following Shut down cleared:-
1. BAC-2A inst. Air line
BAC-2A water valve SOV found the air line leakage from fitting side, so tightness done,
now OK.

Pump house all instrument, gauges and MOVs found dusty so cleaning and blowering
work done.

WTP MCC room all running drives checked for KW consumption, report preparation
work is under progress.
Root blower room all motors cleaning and blowering work done.

Shift jobs carried


BAC-1A & 1B Panel , SOV,Flow swotch ,field JB & instruments cleaning done.

BAC-2A & 2B Panel , SOV,Flow swotch ,field JB & instruments cleaning done.

BAC-1B level showing H continuously.,Calibration done ,Now Ok.

WTP RO& field pressure gauge cleaning work done.


9.5 mar. dosing room panels & motor cleaning blowering work done.
Earthling checked for all motor;s & panels.
Boiler-4th & 7th floor loght made off.

Shift jobs carried


Following Shut down given:-
1. BC-6
2. Coal crusher-2
3. BC-7B
4. Drain pot pump-2B

3 nos. LED handover to Mr. Umesh sir.

EMS report prepaired and mail to all for last day in morning.

Coal feeder-1A and 1C both VFD cleaning and blowering work done and filters also
cleaning done.
One hand lamp24V given for BC-2 area.

Shift jobs carried


Abnormality: Boiler-1 APH pressure gauge showing low value, so found that it is faulty,
so replaced it with spare one.
Abnormality: bed ash cooler -2B back pressure transmitter cover found dislocated, so fix
it properly
Boiler-2 CO flow cheking Knob found in stop condition, so put the Knob in auto
Boiler-2 SOX pump taken in maintanance
Nut bolts arranged for feeder cable termination requirements.
OPL,GTF and kizen submitted in confluence
Shift jobs carried

BC-6 magnetic separator panel ,ZSS JB 1&2,Bag filter screen floor panel, Crusher
-1RTD JB & Vibration JB ,Crusher -2RTD JB & Vibration JB & bag filter JB cleaning
& blowering done.

En mass floor all field instrument panel's cleaning done.

Crusher building BC-4 head end floor all field JB cleaning & blowering done.

BC-4 head end side pill chord switch rope with shaft, So remove & fixed with angle.

Boiler-1 06 no's drain water wall MOV's blowering done.

Boiler-2 right hand side o2 analyser reading got violet, check in field showing
21% O@. So reset power & to become healthy.
Boiler-1 soot blower panel cleaning & blowering done.
Crusher building lights made OFF.

Shift jobs carried


Abnormality: Boiler-2 APH seal pressure tube found loose when checking it, so tight the
seal pressure tube.
Abnormality: bed ash silo level found high 10 , which is wrong, so clean the level sensor
and reset its power found OK.
Abnormality: VAM condenset tank overflow, so checked and found that deareator tank
valve is open and condensate pump is running, it is observed that deareator pressure
and pump pressure found same 5kg, so flow is reduced
BAC-2A dome valve found jam, checked and found that there is mechanically jam
problem, so informed to CCR
BAC-2B air Isolation given
Shift jobs carried

Following Shut down Clear.


1. Reclaimer
2. BC-1
3. BC-2
4. col crusher-2
5. Bucket elevator-1
6. vibrating screen-2

BFP-2, MV Drive change over from DOL to VFD mode as per requirement.

ACC Fan -2B, Lube oil current showing violet at CCR check and change the
Transducer still same to be check from DCS end.
5 Nos hand lamp check and repair at workshop
BAC-2B, 24 Volt Charging lamp given to operation.
Boiler-2, SOX valve not showing , open the probe and check and clean. Work
under progress.
SAC-3, Shutdown fault Check and Reset

Shift jobs carried


Shutdown cleared for BAC-2B feeder.

P and V no. 4 started at night at 11:40pm as 4.5m MCC room temp was found
high.

BFP-2 MV drive put into DOL mode as per operation requirement and all space
heater of isolators were stopped.
Boiler-1 DCS panel filter's cleaning work done.
Boiler-1 APH back pressure switch impulse line cleaning done.
All auto draing vave checked & found normal.
Load cell purging done for boiler-1 & 2.
Shift jobs carried
Abnormality: BAC-2A dome valve fault came, so checked and found that it is
mechanically jam, so inform to CCR

BC4 hooter checked physicallyfound OK

Abnormality: Boiler-2 P fan outlet flow ontrol valve (02FCV0905) MCB got trip, so
checked with multimeter found OK, then reset the MCB once, and trial taken flow valve
working normal
Abnormality: AFR breaker trip in Ir1 1500amp, 3.5 sec , found shedrer motor jam, so
reset it after MPSS confirmation

Shift jobs carried

Following Shut down Clear.


1. Reclaimer
2. BC-1
3. BC-2
4. BC-4
5. IAC-1

IAC-1, Motor power cable termination done.

Crusher Building Lighting Timer JB earthing done


BC-7A, 7B Lightning timer adjusted
BC-6 belt walkway lights made ON as per requirement.
BC-4 , Pull cord act alarm at desk, check and reset all pull cord.
CCR room engineers desk all PCs proper cable dressing done
Boiler-1 MV drive Air condition JB Cleaning and covering done with polythene.

PA fan out let main line RTD 02TIC0951 element cover missing arrange new
cover and polythene covering done.

Shift jobs carried

Boiler-2 control valve 02FCV0905 was showing violet feedback on DCS so


checked and found power MCB tripped so checked field side all OK and no any
ingress of liquid. So power MCB reset, now OK.

BC-7 floor one 24V hand lamp top 20A was faulty so replaced with new one and
corrected.
Boiler-1 coal bunker-1B level was showing wrong, so reset the MCB then level
came back to normal.

Shift jobs carried

Following Shut down given.


1. Reclaimer (Maintenance )
2. BC-4
3. BAC 1A
4. BAC-2B
5. Reclaimer. (Operation )
Boiler-1, Bag House Vessel 11 showing high level, probe cleaning and calibration done
now ok.
BAC-2B, water valve close limit not showing check and found valve is Ok but it cable get
break, re joint the cable and trial taken now OK

BAC 2B, SOV connector found loose tighten it

Bag House-11-21, line flushing done.

Boiler-2 Lift , from 4th to 7th Floor all door contacts cleaning done.
Shift jobs carried

Following Shut down Clear.


1. Reclaimer (Maintenance )
2. BC-4
3. BAC 1A
4. BAC-2B
5. Reclaimer. (Operation )

Boiler-2, APH back pressure not coming cleaning of sample line done now ok.

BAC-2B, flow switch not showing , calibrate the same & trial done, now ok.

BC-1 matel detector(Self check) JB removed & scrap.


BC-1 not getting start found 24 no pull switch found act , reset the same. & trial done.

TG-2 oil centrifuge alarm reset.


For bay level magnetic float transmitter maintenance done.
Welding machine near SA fan-2 plug top changed.
T1-Tower welding machine green tag pasted.
FAS root blower-1 power made off as per operation request , Pl donot made power on with
out operation ,information.

Shift jobs carried

CEP area lights found OFF , so checked and found MCB was OFF , so ON it

Abnormality: SA Fan-1 VFD cooling fan Warning alarm coming (A581), but
cooling fan is running both VFD and panel, and also inverter temprature is
normal 45 degree.
ACC-2B lub oil feeder transducer is changed with new piece, but again new piece
become faulty after some time.
silo roots blower-2 found trip in overload, so reset it once, again it became trip in
overload.
Material shifting work from Instrument Lab to car
Shift jobs carried

Following Shut down given.


1. Reclaimer (Maintenance )
2. BC-1

Boiler-1, APH diverting valve SV 8150 showing fault, found close limit mal functioning to
signal wire shorted, rectified the same & handover to operation after trial.

Boialer-2 Soot blower main CV01PCV0701minor gland leakage arrested.

TG-1 & Tg-2 gland sealing pressure gauge checked, & new pressure gauge installed in
TG-1 ,Syphon also removed.
Both P&V in running condition.
Root blower -2 found in O/L condition reset the same.
CHP MCC 02 LED installed & 05 LED repaired.

Shift jobs carried


Shutdown cleared for:-
a) Reclaimer
b) BC-01

All bunker level TX cleaning done due to dusty condition.

Boiler-2 APH vessel line flushing work done for backpressure TX.

Boiler-2 1101 O2 LHS was showing error in field controller. So as per Sati sir one
probeshifted to inst lab. Need to change if the RHS O2 value gets faulty.

Shift jobs carried

In Compressor House all the auto drain valve checked and working Normally.
IFC Panel Filter drain to done.

Unit No. # 2 Boiler FW Station , DSH Station and Soot Blower panel Blowerning ,
Cleaning and Packing to done.
In CHP and ASH DCS Panel No.-91M BRC Changed from secondary to Primary
also In 94 M Panel BRC changed from Secondary to Primary and NIS/NPM Card
Changed from Primary to secondary.

Unit No. # 1 APH Air Intake Valve ( SV-8127) Feedback is not showing at DCS
end. Found that Internal wire open condition. So connected it. Now Ok.

Reports generate of (APC, Plant Performance, Power Report and Env report)
not send because CD is full condition. No free Space is available.
Online CPCB and ETP Wesite is not open. After some time it will open the
website.
Electrical Report is generated.
ACC-2B lub oil feeder transducer is changed , Now working normal
CHP area lightings made OFF
HSD area lights made OFF

Shift jobs carried

Following Shut down given.


1. BC-2
2. BC-3 3.BC-7A
4.BC-7B

Pump house camera not showing footage,rectified the same & rain protection done.

BAC 1A back pressure switch transmitter line flushed.

BAC 1B back pressure switch transmitter line flushed.

VAM got tripped on HV temp, reset the same & restart.

TG-1 took on base load at around 11:45 AM as per operation requirement.

Both P&V in running condition.


BAC 2B dome abnormality check & ask to mention for maintenance .
Oil centrifuge -2 sensor alarm reset two time ,need to check.
Shift jobs carried
Shutdown cleared for:-
a) Bc-7A
b) BC-7B
c) BC-2
d) BC-3

Shutdown given for Silo root blowers.

Boiler-2 O2 LHS 1101 found thermocouple was faulty so replaced with spare one and
now under observation.

Mist fan-2B current was violet so replaced with spare tranducer, now OK.

Shift jobs carried


In Service Air Receiver Tank No. # 2 Auto drain valve is not working condition. So
cleaned the Filter. Now Ok.
As Per Operation requirement BAC-2B Back pr. Transmitter Front Position to
changed. Now Ok.

Unit No. # 2 Coal Feeder VFD Panel - 2A , 2B , 2C and 2D Blowerning , Cleaning to done.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send to all the Person.
Online CPCB and ETPdata is showing Normally.
All Energy Meter Manual reading taken for Power Report.
DG report prepared and upload in SAP
Electrical Report is generated.
All unwanted lights made OFF during shift round
Fire Pump House Motor Cleaning to done.

Shift jobs carried

Boiler-1 coal feeder-1A clean run motor tripped on overload. Checked from field found
the motor resistance Ok but megger was zero. Open TB found cable shorted 2 phases
due to minor cut and moisture ingress due to water pouring from top side on TB. So cut
the faulty cable and relugging done. Sealed the TB then trial taken found running OK.
Drain pot pum-1 side summersible pump was not operating found the ELCB was off, so
made ON and trial taken found OK pump.

P&V no. 2 is only running due to temp maintaned in 4.5m, kindly ON when required.

Shift jobs carried


CPCB SOX reading showing High value. So in Chimney analzer factor changed from 0.7 to
0.5. Also at DCS end factor changed form 0.7 to 0.5.
Unit No. # 2 WTP Side O2 Reading ( 01QIC1101 ) showing Flucations at DCS end. So
Connection tightness done at field TB Probe/ Controller Side. Now Reading are Under
Observations.
Boiler No.-2 SOX analyzer showing moisture fault. So Cleaned the Sensor and Moisture
Filter. Now Ok.
In CHP DCS Panel , Control Desk , I and C Panel Cleaning and blowerning to done.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is Showing normally.
All the manual light to ON Condition. P&V No.-2 is in running condition.
TG-1 Put in base load, and after some time removed from base load
Power report balance checking done, found OK.
BC7AB area unwanted lights made OFF.

Shift jobs carried


All Energy Meter Manual reading taken for Power Report.

DG report prepared and upload in SAP

Electrical Report is generated.

All unwanted lights made OFF during shift round

WTP all panel & SOV box cleaning done, MGF,UF ,ACF& acid & caustic tank LC
panel. Etc.
Chimney analyser room panel,deskwindow,PC table & all JB cleaning &
blowering work done.

Compressor House all the auto drain valve checked and working normally.

Shift jobs carried


Abnrmality: BAC-1B dome valve air hose found air leakage, so changed the air hose
Both coal feeder load cell purgigng done
Welding machine repairing done at boiler-1 BAC area, running normal
Green tag provided on: Hot blower, ACC side 230 volt sockets

Shift jobs carried

Unit No. # 2 Boiler -1 Side O2 Reading ( 02QIC1101 ) showing Flucations at DCS end. So
Connection tightness done at field TB Probe/ Controller Side. Now Reading are Under
Observations.
EMS PC is Hang Condition. Also data is not changed. So PC is restarted. Also all the
Application is started. Now Ok.

In Fire Pump House area all the Field Inst. And panel Cleaning and blowerning to done.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is Showing normally.
All the manual light to ON Condition. P&V No.-2 is OFF at 6.00 PM condition.
TG-2 Put in base load, as Per Operation requirement
S/D Cleared.
1. CT Fan No.-2,
2. CT Fan MOV,
3. BC-2,
4. BC-3,
5. BC-4 ( 02 Times )

02 Nos Charging LED Light Shifted to 4.5 Mtrs. Also Put into Charging mode.
TG # 2 Turbine Barring Gear Panel rubber Mat laid.
HP dosing Room Motor Cleaning to done.

Shift jobs carried

4.5m MCC room AHF panels filter cleaning done and the elctrical components
blowering work done for both AHF-1 and 2.

Power report prepared and emailed & DG report prepared and uploaded in SAP

TG-1 put into base load as load was reduced and then taken in line on load
resumption. Later again put into base load at 5:18AM.

TG-1 HP heater CV 01LCV3302 not getting close from DCS command, SO CV need
calibration along with air adjustment .Rectified & calibrated the same . Now OK/

Boiler-1 APH 11-21 & 12-22 all field instruments cleaning done.

Compressor House all the auto drain valve checked and working normally.

Dowsing Room all pressure calibration sticker check & Cleaning and Blowering
done.
All unwanted lights made OFF during shift round

Shift jobs carried


Abnormality: WTP bomb calorimeter pressure gauge fitting screw found loose, so new
screws fix in presure and fit it properly
Abnormality: SOX moisture falt came, so checked and clean the sensor and reset the
fault
Nox value showing double in CPCB, so find that factor is 2, so change the factor to 0.5 in
DCS and chimny room both.
Lighting timer list preapred which are used in field
hand lamp provided at BC7AB area
Shift jobs carried

Following Shut down Clear.


1. Reclaimer
2. BC-1
3. BC-3
4. DRAIN POT PUMP-2B
5. Coal Crusher-2
6. Coal Feeder -2A
7. Coal Feeder MOV
8. Coal Feeder SOV

Lime Stone , RSB-78, checked and green tag pasted.

Boiler-1, bag house Vessel 21 vessel pneumatic line dressing done properly.
P&V No-1, Motor Earthing done properly.
BAS SOV pneumatic line dressing done and tied with cable tie
One 24V charging lights given to maintenance team as per requirement.
WWTP area , all ladders collect and tied with chain and lock them.

Shift jobs carried

Following Shut down Clear.


1. Reclaimer
2. BC-1
3. BC-3
4. Reclaimer
5. BC-1
6. BC-3
7.Root Blower-2

Side Stream Filter Room , SOV 12SV 5002 not operated form DCS, found ready
from E&I side actual valve found jam same inform to WTP team

BAC-2A, Seal pressure fault occurs operate dome 2-3 time manually now OK
BC-4 tail end side guard pull cord clamp loose , tighten it
Boiler-1, Bag House vessel no-21, seal pressure gauge faulty , replace with new
gauge.
Silo Root Blower-2 trial taken , Motor current drawn - 24 Amp.
Boiler-1 , 6 the Floor , RSB no-17, check and green tag pasted.
BC-5, lightning get trip found loose connection from ELCB, rectified it.
EMS report not generated correctly, Marc viewer restarted.
Shift jobs carried
In SWAS Room Unit No. # 1 Drum Water PH water in Glass water is very dusty. So
cleaned the Water and Sensor . Now Ok.

In SWAS Room Unit No. # 1 Drum Water Sample is very hot. Temp. is showing 48.9
degree. So checked and found that Sample Cooler O/L line is also hot condition. So
informed to shift incharge. Also our side sample line Valve is in closed condition.

Unit No. # 1 APH , Vessel No.-11/21 and Vessel No.-12/22 Field Inst. And JB Blowerning
, Cleaning to done.

Reports generate of (APC, Plant Performance, Power Report and Env report) not send
because CD is full condition. No free Space is available.

Fly ash silo area ground floor RSB checked and cleaning done and then green tg pasted,
one 1-phase elcb to be replaced.
DG report prepared and upload in SAP and Electrical Report is prepsred.
All unwanted lights made OFF during shift round

Shift jobs carried


Following Shut down given.
1. CT Fan-1
2. CT Fan-2
3. Fly ash Silo-1 Wet Unloading
4. Fly ash Silo-1 Dry Unloading
5. CT Fan-2
6. CT Fan 2 MOV 4302
7. BC-5
8. BC-6
9. Vibrating Screen-1
10. Bucket Elevator - 1
11. CT fan-1
12. CT Fan-2
13. BC 7A
14. BC 7B
15 Vibrating Screen -2
16. BC-4
24 Volt Charging lamp given to Maintenance

Shift jobs carried


Following Shut down given.
1. CT Fan-1
2. CT Fan-2
3. CT Fan-1MOV
4. CT Fan 2 MOV 4302
5. BC-5
6. BC-6
7. Vibrating Screen-1
8. Bucket Elevator - 1
9. BC 7A
10. BC 7B
11. Vibrating Screen -2
12. BC-4

VAM chiller water pump-2 have seal leakage ,So stopped this pump & took pump-1 in
service.
Boiler-1 lift rope changed by AMC engineer.
Boiler-1 APH-1 seal pressure switch PVC tube dressing done.
CT fan-1 & 2 direction trial done.
CT fan-1 & 2 neominclature sticker pasted.
Shift jobs carried
Unit No. # 1 APH Master vessel air leakage from Pr. Guage . So Tightness the fitting. Now
Ok.

In Compressor House all the auto drain valve checked and working Normally.

WTP DCS Panel , MOV Panel and I & C Panel Blowerning , Cleaning to done.

WTP RO HPP Panel Blowerning , Cleaning and Packing to done.


Reports generate of (APC, Plant Performance, Power Report and Env report) not send
because CD is full condition. No free Space is available.

DG report prepared and upload in SAP and Electrical Report is prepsred.


Boiler-1 lift checked for operating, found normal working
coal shed area lights made OFF

Shift jobs carried


Following Shut down given.
1. Reclaimer

2. BC-1

3. BC-2

4. BC-3
5. BAC 2A
6. Reclaimer

VAM chiller water pump-1also have seal leakage ,So stopped this pump & took pump-2
in service.bur pump-2 have more leakage then pump-1so pump1 took in service.

BAC-2A, Dome assembly SOV & limit removed two times & installed .
BC-1 pull cord switch found open, So packed the same.
BC-4 pull cord rope stucked in pull swich rectified the same..
T1 tower bag filter panel cable dressing done.
Shift jobs carried

Boiler 1&2 7th floor lights made OFF


Reports generate of (APC, Plant Performance, Power Report and Env report) not send
because CD is full condition. No free Space is available.

DG report prepared and upload in SAP and Electrical Report is prepsred.

Shift jobs carried


Following Shut down given.

1. Chiller water pump-1(LCS MCB)

2. BC-4

3.Degasser water transfer pump-1


4.Degasser water transfer pump-2
BC-1 pull cord switchpolythene covering done.
BC-4 pull cord rope stucked in pull switch rectified the same..
BC-7A & B motor cleaning & blowering work.
24 V lamp provided at BC-7A & B
P&V 2 Stopped at 12:30PM.
ACC-2 zero meter welding machine connection done.
FAS -2 control MCB got tripped, reset the same.
VAM all AHU units SP increased 2 deg C except Work shop .
Shift jobs carried

In Fly ash Silo No. # 2 Fork Level switch is contionuos is showing at panel side. So
checked and found that 220 Volts Power Supply cable is internal damaged condition. So
we have used the Spare core of the cable. Also taken in line. Trial taken. It is working
normally.

In Unit No. # 1 APH Air intake Valve ( SV-8127) Limit is not showing at DCS end. So
checked and found that Limit switch bolt is loosen condition. So tightness done. Now Ok.
In Unit No. # 2 APH Back pr. Switch and Transmitter is not showing at DCS. So cleaned
the Impluse line. Now ok.
Unit No. # 1 Boiler SOX chiller is showing 34 degree. So OFF the chiller for 01 hrs. then
taken in line. Now Ok.
All the AC MCB to OFF Condition.
Both online CPCB and ETP data is Showing normally.
All the manual light to ON Condition. P&V No.-2 is already OFF condition.
Boiler No.-1 and 2 Lift checked it is working normally.
S/D Cleared.
1. Degressor Pump no.-1,
2. Degressor Pump no.-2,
3. BC-4,

earthing is provided at WTP Oven system.


single Phase Heater connection is done at WTP area.

Shift jobs carried

Boiler-1 PA fan hoist area cable dressing done

Chimney analyzer panel cleaning done

Boiler-1 Firing floor panel & SOV Blowering and Cleaning done
Reports generate of (APC, Plant Performance, Power Report and Env report) not sent on
mail due to CD problem

Online CPCB data and ETP data is Ok .


All the AC MCB to OFF Condition.
Compressor-1 IFC filter cleaning done and taken in line
Electrical Report is generated.
WTP HP dosing pump vfd panel cleaning & blowering done.
WTP pump house motor cleaning & blowering done.
Both HP pump motor cleaning done.
PM jobs carried

sted as per position

PM jobs carried
PM jobs carried
Cable dressing at BC -7A bagfilter SOV.
Boiler-1 02 no's hydrastep electode connector reeplaced.

EOT hoist boiler-1 Hook kept on the floor as per Mr. brajesh
verma suggestion.
Bag house -1 welding M/C green tagged

PM jobs carried
Cable dressing at BC -7A bagfilter SOV.
Boiler-1 02 no's hydrastep electode connector reeplaced.

EOT hoist boiler-1 Hook kept on the floor as per Mr. brajesh
verma suggestion.
Bag house -1 welding M/C green tagged
PM jobs carried
PM jobs carried
At 4.5 meter MCC check insulation mat availability ,old mat
removed & new mat applied.
Soot blower 12 earthling wire found broken , connected the
same.
At 4.5 meter MCC room breaker trolley adjust properly.
Boiler-1 drum floor & cyclone floor air leakage checked &
arrested .( huffing device PI1106,PI1113 & sv1307)
Boiler-1 RSB 11 indoor panel earthling done.
Reaclaimer back side AC out door unit cable dressing done.
Grass removing from Switch yard.

PM jobs carried
Fly ash Silo No. # 1 and 2 Inst. JB
and Field Inst. Cleaning and blowerning to done.
PM jobs carried
both P fan motors cleaning and blowring done, P fan-2 motors
polythene replaced

WTP DCS blowring and cl;eaning done

PM jobs carried
Boiler No. # 1 Zero mtrs inst. JB and Field Inst. Cleaning
and blowerning to done.
BC-6 , BC-7A and 7B motor , LCS JB , Motor field power JB
Cleaning and blowerning to done.
03 Nos repair Supply Box at BC-7a/7b Floor area Cleaning to
done.
BC-7A Motor LCS JB cable dressing to done.

PM jobs carried
BC7A7B motor cleaning work done

PM jobs carried
Vibrating screen -1 and 2 Motor , 24 Volts Socket JB Cleaning
and blowerning to done.
At CHP Bucket elevator Floor area all the Inst. JB / Field
Inst. Cleaning and Blowerning to done.
PM jobs carried
BC-4 , and En Mass 1&2 , motor and power JB cleaning
done.

PM jobs carried
Unit No. # 2 BAC-2A and 2B VFD Panel cleaning and
Blowerning to done.

WTP HP dosing pump vfd panel cleaning & blowering done.

WTP pump house motor cleaning & blowering done.

Both HP pump motor cleaning done.

PM jobs carried
Crusher building hydraulic system maintenance done.
1) clean the hydraulic motor
2) Clean the SOV coils of hydraulic system
3) tightness done of all wiring and push buttons and contacts
4) insulate the damaged wires

Deareator floor control valves and MOV cleaning done:


1) control valve-6nos
2) MOV-5nos
3) RTD-2nos
4 Presure gauge-1nos

CBD tank control valves and MOV cleaning done:


1) control valve-2nos
2) MOV-1nos

PM jobs carried
PM jobs carried
Fly ash Silo No. # 1 and 2 , Bed ash silo Inst Panel / Field JB
cleaning and Blowerning to done.
Workshop back side MV Drive AC JB / Telephone JB and EOT
Crane JB cleaning and Blowerning to done.

PM jobs carried

WTP MCC Panel Cleaning and blowering done.


PM jobs carried

BAC 2A dome fault . Manually operated 2-3 times now


OK.

APH 8105, close F.B not showing ,rectified.


Dosing room unused instrument SOV & magnetic level
gauge fixed.

PM jobs carried

VAM area equipments cleaning and blowring done as:


1) Repaire supply box
2) AC units 2 nos
3) AHU VFD panels
4) chilled water and cooling water pumps panels

ACC unit-2 Lub oil motors JB packing done with silver tape
PM jobs carried
Unit-1 & 2, Coal Feeder Cleaning and blowering done.

PM jobs carried
Unit No. # 1 APH , Vessel No.-11/21 , and Vessel No.-12/22 JB
Polythene covering to done.
Unit No. # 1 APH , Vessel No.-11/21 , and Vessel No.-
12/22Seal Pr. And Back Pr. Switch Calibration sticker
mounted at site.
In Boiler No.-2 Repair supply box Double earthing checked
and all the door are closed condition.
PM jobs carried

ACC unit-1 Lub oil motors JB packing done with silver tape

PM jobs carried
Boiler-2 Bedash cooler-2B removed and calibration
done as per operation requirement

Boiler-1 Bed ash cooler1A and 1B Junction Box and level


switch JB cleaning , Blowering and packing done

Boiler-2 Bed ash cooler2A and 2B Junction Box and level


switch JB cleaning , Blowering and packing done

PM jobs carried
In Boiler No. # 1 Zero mtrs to Drum Floor area all the huffing
JB , Bucket elevator Panel , CO-1/2 FSHS Box, RAV panel ,
Calibration unit , Firing Floor JB , closed and Packing Tape to
Provided.

PM jobs carried

WTP DCS blowering and cleaning done


PM jobs carried

PM jobs carried
calibration sticker Pasted at boiler No.-2 and TG No. # 2.

Electrical Authorization List pasted at the doors of


4.5mtr switchgear room and BFP MV drive room , 4.5
mtrs MCC room , WTP MCC Room , WTP Cable celler
Room , CHP MCC and Cable celler Room , Zero mtrs
Cable celler , LHS MCC and Cable celler Room.

PM jobs carried
PM jobs carried

PM jobs carried
BC-4 , and En Mass 1&2 , motor and power JB cleaning done.

PM jobs carried
PM jobs carried

Pending Shift Abnormality

BAC-2A, Level probe connector damage, new connector


to be provide
PM jobs carried

PM jobs carried

SAC -3 , Compressor Panel cleaning and blowering done

Reclaimer one JB found hang , JB tighten and cable dressing


done
PM jobs carried

Fire pump house area cleaning and blowring done


1) Motors
2) Battary charger and battary cleaning done
3) RSB and Exhaust panel checking done
4) Battary charging status is green OK, specific gravity is
found 12.5

Swas room area panel cleaning and blowring done for


both units

PM jobs carried
PM jobs carried

Coal Feeder 2D Pneumatic Gate, cylinder air connection found


open, So fixed the same & leakage arrested.

Mechanical workshop 15 A plug top replaced.

Boiler-2 lift fault reset done.

PM jobs carried

at 4.5 mt outside all control valve, pressure gauge, MOV


and JB , cleaning done

MLDB panel blowring and cleaning done from front and


back side

PCC-2 panel outer body blowring and cleaning done


from front and back side
DT-4&5 panel outer body blowring and cleaning done
from front and back side
AHF-2 panel outer body blowring and cleaning done
from front and back side
PM jobs carried
Crusher -1 getting trip, check & found Enmass-1 , proxy
switch getting malfunction, so rectified the same ,running
normal.
Boiler-2 Vessel -22 seal pressure switch fitting replaced.
Boiler-1 CO-flow low, sample line flushed.Now ok.
All auto draing vave checked & found normal.
Fire pump house emergency light, trial done,found ok.
At coal feeder-1 welding M/C earthling lug replaced.

PM jobs carried

Drain pot pump-1B motor feeder checking done, maintenance


done and all terminal tightness done. Local and remote trial
taken found OK.

PM07 R2 all notifications closed till 17.07.2021 from SAP.

WTP workshop area all LEDs checking done:-


a) 2 nos. hand lamp found faulty so replaced the hand lamps.
B) All 4 nos. LED lights checked and trial taken found OK, kept
in lab.
PM jobs carried

Ash and compressore MCC cleaning and blowring done

Crusher floor and screen floor instument equipments and JB


cleaning done

PM jobs carried
Roots blower room panel all terminal checking and tightness
done.

PM07 R2 all notifications closed till 17.07.2021 from SAP.

WTP workshop area all LEDs checking done:-


a) 2 nos. hand lamp found faulty so replaced the hand lamps.
B) All 4 nos. LED lights checked and trial taken found OK, kept
in lab.

All auto draing vave checked & found normal.

PM jobs carried
BAC-1A & 1B Panel , SOV,Flow swotch ,field JB &
instruments cleaning done.
BAC-2A & 2B Panel , SOV,Flow swotch ,field JB &
instruments cleaning done.
BAC-1B level showing H continuously.,Calibration
done ,Now Ok.
WTP RO& field pressure gauge cleaning work done.
9.5 mar. dosing room panels & motor cleaning
blowering work done.
Earthling checked for all motor;s & panels.

PM jobs carried

Drain pot pump-2B motor feeder checking done, maintenance


done and all terminal tightness done. Local and remote trial
taken found OK.

Boiler-2 lift was malfunctioniong from several days in F5


fault, so checked all reed switches and cleaning done with
clean-it and blowering done all contacts from lift top. Now
operated several times working OK.
Boiler-2 SOx maint work under progress, dobe with G-shift
filters, sample line and rotameter.

PM jobs carried

WTP High pressure pump VFD blowring done

Boiler-2 furnace floor and windbox floor RSB JB cleaning


done, and 24volt socket JB cleaning done
PM jobs carried
BC-6 magnetic separator panel ,ZSS JB 1&2,Bag filter
screen floor panel, Crusher -1RTD JB & Vibration
JB ,Crusher -2RTD JB & Vibration JB & bag filter JB
cleaning & blowering done.

En mass floor all field instrument panel's cleaning done.

Crusher building BC-4 head end floor all field JB cleaning


& blowering done.
BC-4 head end side pill chord switch rope with shaft, So
remove & fixed with angle.

Boiler-1 06 no's drain water wall MOV's blowering done.

Boiler-1 soot blower panel cleaning & blowering done.

PM jobs carried
all HT motor DE,NDE and body temp checked and verified,
found correct.
All HT motor double earthing conection status checked found
OK
Pending Shift Abnormality

ACC Fan -2B, Lube oil current to be check.

PM jobs carried
P and V no. 4 feeder local checking, cleaning and
maintenance work done.
ACC fan 2B lube oil tranducer replaced with spare, but
after sometime again the value goes violet. Need to
check the feeder circuit.

Boiler-1 DCS panel filter's cleaning work done.


PM jobs carried
Boil-1 bag house vessel 11-21 back pressure switch line
flushing done
cable dressing done at ACW outside transmitter and pressure
switch

green marking done on generator rear oil temp gauge

Blowring and cleaning done at bag house-1 equipments,


Jvalve MOV and APH fiel equipments

PM jobs carried

BC-3 and BC-5, Motor cleaning and blowering done

CCR room engineers desk all PCs proper cable dressing


done.
PM jobs carried
Motor cleaning, blowering and housekeeping work done
for :-
a) BC-7A
b) BC-7B
Boiler-1 APH,11-21 and 12-22 JBs cleaning and
blowering work done.
Boiler-2 APH,11-21 and 12-22 JBs cleaning and
blowering work done.
WTI done in TG-9.5m floor.
Boiler area extra lights made off.

PM jobs carried

Jeshu-Hozen done at Boiler 1&2 Ground floor.


PM jobs carried

BAC-2B, flow switch not showing , calibrate the same & trial
done, now ok.

For bay level magnetic float transmitter maintenance done.

Welding machine near SA fan-2 plug top changed.


T1-Tower welding machine green tag pasted.

PM jobs carried
4.5 mtr area motors cleaning done:
1)GSC1A and1B
2) AOP1Aand 1B
DCS-1 and 2 panel filter cleaning done:
1) turbine panel
2) load management panel
both unit bed ash cooler panel blowring done. And one
hole packing done
PM jobs carried

Boialer-2 Soot blower main CV01PCV0701minor gland


leakage arrested.

TG-1 & Tg-2 gland sealing pressure gauge checked, & new
pressure gauge installed in TG-1 ,Syphon also removed.
Boiler-1, APH diverting valve SV 8150 showing fault, found
close limit mal functioning to signal wire shorted, rectified the
same & handover to operation after trial.

CHP MCC 02 LED installed & 05 LED repaired.

PM jobs carried

DCS-2 side 4 nos. tube rod changed over the energymeter


panel as the area was found dark.

Boiler-2 lift card replaced with Boiler-1 card. Then Boiler-2


lift made healthy, now under observation.
CHP MCC room outside earth pit no. 70 and 71 sticker pasted
updated.

Rubber mat laid LDB ACW pump house room.

PM jobs carried

Unit No. # 2 Boiler FW Station , DSH Station and Soot Blower


panel Blowerning , Cleaning and Packing to done.
4.5 mtr area motors cleaning done:
1)GSC2A and2B
2) AOP2Aand 2B
3) Power JB and LCS

PM jobs carried

Pump house camera not showing footage,rectified the same &


rain protection done.

BAC 1A back pressure switch transmitter line flushed.

BAC 1B back pressure switch transmitter line flushed.

VAM got tripped on HV temp, reset the same & restart.


BAC 2B dome abnormality check & ask to mention for
maintenance .

Oil centrifuge -2 sensor alarm reset two time ,need to check.


PM jobs carried

Root blower no. 1 found overload relay was faulty and non-
functioning so replaced with spare relay from limestone area.
Also motor checked termination found OK.

Root blower no. 2 made healthy and motor checked and then
trial taken found OK with 35A balance.
Silo area FAS-1 and 2 found heavy duist deposition on all
intruments, panels and equipment so cleaning and blowering
work done.

PM jobs carried
Unit No. # 2 Coal Feeder VFD Panel - 2A , 2B , 2C and 2D
Blowerning , Cleaning to done.

Unit-1, MOV MCC panel cleaning and blowering done

Fire Pump House Motor Cleaning to done.

PM jobs carried

Chimney analyzer found all paramters readings were high,


checked found moisture fault. So cleaned filter and reset the
fault then OK.
BAC-1B level probe was high continuos, found oisture caused
the contacts to short. So opened and cleaned then sealing and
packing done. Now OK level.

ACC-2 lighting timer adjusted to 7:30pm.

PM jobs carried
In CHP DCS Panel , Control Desk , I and C Panel Cleaning and
blowerning to done.

coal feeder area motors TB packing done

coal feeder area motors Blowring done

PM jobs carried
Dowsing Room all motor and Panel Cleaning and
Blowering done

TG Building Exhaust fan Panel cleaning and blowering done.


WTP all panel & SOV box cleaning done, MGF,UF ,ACF&
acid & caustic tank LC panel. Etc.
Chimney analyser room panel,deskwindow,PC table &
all JB cleaning & blowering work done.
Compressor House all the auto drain valve checked and
working normally.
PM jobs carried

Bunker floor all bag filter panel cleaning and packing done
Bunker floor all Repaire supply box cleaning done

PM jobs carried

In Fire Pump House area all the Field Inst. And panel
Cleaning and blowerning to done.

HP dosing Room Motor Cleaning to done.


PM jobs carried

CHP MCC room Enmass conveyor-1 feeder checking, all


terminal tightness and panel blowering work done.

Boiler-1 APH 11-21 & 12-22 all field instruments


cleaning done.
Compressor House all the auto drain valve checked and
working normally.

Dowsing Room all pressure calibration sticker check &


Cleaning and Blowering done.

Compressor House all the auto drain valve checked and


working normally.

TG-1 HP heater CV 01LCV3302 not getting close from


DCS command, SO CV need calibration along with air
adjustment .Rectified & calibrated the same . Now OK/

PM jobs carried

All bunker level transmitter cleaning done

MLDB MCC blowring done


PM jobs carried

WTP , motor room all motors cleaning and blowering


done.

Fly ash Silo-1, Instrument panel , SOV cleaning and


blowering done.

PM jobs carried
PM jobs carried
Unit No. # 1 APH , Vessel No.-11/21 and Vessel No.-12/22
Field Inst. And JB Blowerning , Cleaning to done.

CHP MCC room AHF panel cleaning and blowering work


done and all filters cleaning done.

ACC-2 side one 2-way switch tagging done for not working
and ELCB manually reset and made power healthy.

Month end report checking done and balanced for zero errors
till 28.07.2021:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power

PM jobs carried

Boiler-1 , 6th Floor extension board checked and green tag


pasted

BC-6, Coal Sampler proxy not working , clean the fine dust
and trial taken

BC-3, Trolley end proxy touch with trolley guard, no margin


from proxy guar to be modify, Inform to Maintenance team

BAC - 2A, Dome found Jam , operate it manually 3-4 times and
free it, now ok

Coal Feeder-1 and 2 , Jeshu Hozen done


PM jobs carried
VAM chiller water pump-2 have seal leakage ,SO stopped this
pump & took pump-1 in service.
Boiler-1 lift rope changed by AMC engineer.

Boiler-1 APH-1 seal pressure switch PVC tube dressing done.

CT fan-1 & 2 neominclature sticker pasted.

PM jobs carried
WTP DCS Panel , MOV Panel and I & C Panel Blowerning ,
Cleaning to done.
WTP RO HPP Panel Blowerning , Cleaning and Packing to
done.

at 4.5 mtr MCC room DT-1 and 2 blowring done from outside
at 4.5 mtr MCC room PCC-1A and 1B blowring done from
outside

PM jobs carried
VAM chiller water pump-1also have seal leakage ,So stopped
this pump & took pump-2 in service.bur pump-2 have more
leakage then pump-1so pump1 took in service.
BAC-2A, Dome assembly SOV & limit removed two times &
installed .
BC-1 pull cord switch found open, So packed the same.

BC-4 pull cord rope stucked in pull swich rectified the same..

T1 tower bag filter panel cable dressing done.


CT fan-1 & 2 neominclature sticker pasted at VFD side.

PM jobs carried
at 4.5 mtr MCC room Lighting MCC AandB blowring done
from outside
at 4.5 mtr MCC room Lighting Transformer 1&2 blowring
done from outside
at 4.5 mtr MCC room Lighting booster Transformer blowring
done from outside
Unit-1 soot blower panel blowring and packing done
Unit-1 feed water station and desuperheating station MOV
and contrl valve cleaning done
de superheating control valve (3204) (3202) polythen over
positioner found uncover, so cover it properly

PM jobs carried
BC-1 pull cord switchpolythene covering done.

BC-4 pull cord rope stucked in pull switch rectified the same..

BC-7A & B motor cleaning & blowering work.

24 V lamp provided at BC-7A & B


P&V 2 Stopped at 12:30PM.
ACC-2 zero meter welding machine connection done.
FAS -2 control MCB got tripped, reset the same.
VAM all AHU units SP increased 2 deg C except Work shop .

PM jobs carried

PM jobs carried

WTP pump house motor cleaning & blowering done.

Both HP pump motor cleaning done.


Unit No. # 2 BAC-2A and 2B VFD Panel cleaning and
Blowerning to done.

WTP HP dosing pump vfd panel cleaning & blowering done.


Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


01.08.2021 A Anurag Chowdhury
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 ans


SPC008 ( one Down )
Auto drain valve checked manually working OK

Sanjay Garg / UPS Check List filled.


01.08.2021 B
Gajendra Pandaya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters cheeked found Normal

Ajaya
Chimney data updating normal
Shift instrument digital log book filled
Ajaya UPS log digital log book filled.
01.08.2021 C Kumar/Deepak
Chand VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepared and mail to all
Power report prepared
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
02.08.2021 A Sanjay Garg

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 ans
SPC008 ( one Down )

Auto drain valve checked manually working OK


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
02.08.2021 B Gajendra Pandya

b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown cleared
BC-4
BC-5
Vibrating screen-2
Flyash silo-1 dry unloding
ACC-2B fan
ACC-2B Lub oil
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
VAM parameters cheeked found Normal
Chimney data updating normal
Shift instrument digital log book filled
UPS log digital log book filled.

Ajaya VAM log digital log book filled.


02.08.2021 C Kumar/Deepak
Chand Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepared and mail to all
Power report prepared
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
03.08.2021 A Purushottam

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 ans


SPC008 ( one Down )
Auto drain valve checked manually working OK
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
03.08.2021 B Gajendra Pandya a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown cleared
BC-6
BC-7A
BC-7B
coal crusher-2
coal feeder-2C
coal feeder-2C MOV
Bed ash cooler-2B shut down given
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
VAM parameters cheeked found Normal
Chimney data updating normal
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

03.08.2021 C Tarun Gaur

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepared and mail to all
Power report prepared
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 ans


SPC008 ( one Down )
Auto drain valve checked manually working OK
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
04.08.2021 A Ajaya Kumar
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown cleared
BC-6
BAC-2B
Coal crusher-1
Bed ash cooler-2B shut down given & Clear
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Sanjay Garg / Shift instrument digital log book filled
04.08.2021 C Gajendra Pandaya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


05.08.2021 A Deepak Chand
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Ajaya
05.08.2021 B Kumar/Anurag
Chowdhary Auto drain valve checked manually working OK
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
05.08.2021 C Gajendra Pandya VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
DG report prepared and upload in SAP and Electrical
Report is prepsred.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

06.08.2021 A Sanjay Garg /


Deepak Chand

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Ajaya
06.08.2021 B Kumar/Anurag
Chowdhary Auto drain valve checked manually working OK

All AC power made ON in morning.


06.08.2021 B Kumar/Anurag
Chowdhary

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
06.08.2021 C Gajendra Pandya Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
DG report prepared and upload in SAP and Electrical
Report is prepsred.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


07.08.2021 A Anurag Chowdhury
All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

07.08.2021 B Sanjay Garg Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
VAM parameters cheeked found Normal
Chimney data updating normal
Shift instrument digital log book filled
Ajaya UPS log digital log book filled.
07.08.2021 C Kumar/Deepak VAM log digital log book filled.
Chand Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
DG report prepared and uploaded in SAP
EMS report prepared and mail to all
Power report prepared
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

08.08.2021 A Anurag Chowdhury


RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


08.08.2021 A Anurag Chowdhury All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

Sanjay Garg / UPS Check List filled.


08.08.2021 B
Gajendra Pandaya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
VAM parameters cheeked found Normal

Chimney data updating normal


Ajaya
08.08.2021 C Kumar/Deepak Shift instrument digital log book filled
Chand UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


09.08.2021 A Sanjay Garg

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


UPS Check List filled.
Shift instrument digital log book filled

Gajendra UPS log digital log book filled.


09.08.2021 B Pandaya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
09.08.2021 B Pandaya

b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown cleared
1 BC4
2 BC5
3 Limeston roots blower
4 chiller pump-1
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
VAM parameters cheeked found Normal
Chimney data updating normal
Shift instrument digital log book filled

Ajaya UPS log digital log book filled.


08.08.2021 C Kumar/Anurag
Chowdhury
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Environment report download and mail to all
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


Auto drain valve checked manually working OK
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
10.08.2021 A Gajendra Pandya Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shutdown given
1 BC1
2 BC2
3 BC3
4 Reclaimer
5 silo top bag filter

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

10.08.2021 B Deepak Chand All AC power made OFF in Evening


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Sanjay Garg /
10.08.2021 C Anurag Following check list prepared
Chowdhury
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

EMS report prepaired and mail to all


Power report prepared and mail
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
11.08.2021 C Sanjay Garg
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepaired and mail to all
Power report prepared and mail
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


12.08.2021 A Deepak Chand
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

12.08.2021 B Ajaya Kumar Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


12.08.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

EMS report prepaired and mail to all


Power report prepared and mail
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 7:00pm


13.08.2021 B Anurag Chowdhury
All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal

Shift instrument digital log book filled

13.08.2021 C Deepak Chand UPS log digital log book filled.


VAM log digital log book filled.

Generator-1  checklist
Generator-2  checklist
Elect. Shift checklist
Environment report download and mail to all
Plant APC Report , Plant Performance report
download and mailed to all
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

14.08.2021 A Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal


Shift instrument digital log book filled
14.08.2021 C Deepak Chand UPS log digital log book filled.
VAM log digital log book filled.

Generator-1  checklist
Generator-2  checklist
Elect. Shift checklist
Environment report download and mail to all
Plant APC Report , Plant Performance report
download and mailed to all
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.
Shift instrument digital log book filled
15.08.2021 A Ajaya Kumar UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

Sanjay Garg / UPS Check List filled.


15.08.2021 B Anurag
Chowdhury Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

16.08.2021 B Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag
16.08.2021 C
Chowdhury UPS log book filled.

VAM log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.


17.08.2021 A Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made OFF in Evening


17.08.2021 B Deepak Chand
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

17.08.2021 C Anurag UPS log book filled.


Chowdhury
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

18.08.2021 A Deepak Chand Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


18.08.2021 B Ajaya Kumar

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

18.08.2021 C Sanjay Garg VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

18.08.2021 A Deepak Chand


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

19.08.2021 B Anurag Chowdhury

P&V no. 4 stopped at 7:00pm


All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

19.08.2021 C Sanjay Garg VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


20.08.2021 A Ajaya Kumar

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 7:00pm

20.08.2021 B Anurag Chowdhury All AC power made OFF in evening.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal

Shift instrument digital log book filled


UPS log digital log book filled.
20.08.2021 C Deepak Chand
VAM log digital log book filled.

Generator-1  checklist
Generator-2  checklist
Elect. Shift checklist
Environment report download and mail to all
Plant APC Report , Plant Performance report
download and mailed to all
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

21.08.2021 A Ajaya Kumar All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

Sanjay Garg / UPS Check List filled.


21.08.2021 B Anurag
Chowdhury

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal


Shift instrument digital log book filled
UPS log digital log book filled.
21.08.2021 C Deepak Chand VAM log digital log book filled.
Generator-1  checklist

Generator-2  checklist
Elect. Shift checklist
Environment report download and mail to all
Plant APC Report , Plant Performance report
download and mailed to all
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.
21.08.2021 A Ajaya Kumar Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

22.08.2021 B Sanjay Garg


UPS Check List filled.

22.08.2021 B Sanjay Garg


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag UPS log book filled.


22.08.2021 C Chowdhury
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

23.08.2021 A Sanjay Garg


23.08.2021 A Sanjay Garg

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

Ajaya
23.08.2021 B Kumar/Deepak UPS Check List filled.
Chand

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

23.08.2021 C Anurag Shift instrument log book filled.


Chowdhury
UPS log book filled.

VAM log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made OFF in Evening


24.08.2021 B Deepak Chand
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag UPS log book filled.


24.08.2021 C Chowdhury
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Auto drain valve checked manually working OK

All AC power made OFF in Evening

25.08.2021 A Ajaya Kumar

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

All AC power made OFF in Evening

25.08.2021 B Deepak Chand Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
25.08.2021 C Sanjay Garg
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled

26.08.2021 A Deepak Chand UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled

26.08.2021 B Ajaya Kumar


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
26.08.2021 C Sanjay Garg VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

27.08.2021 A Deepak Chand

All AC power made ON in morning.

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found all drives running normal.

All AC power made OFF


27.08.2021 B Tarun Gaur

Auto drain valve checked manually working OK

All AC power made ON in morning.


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
27.08.2021 C Ajaya Kumar Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

28.08.2021 A Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

28.08.2021 B Anurag Chowdhury P&V no. 2 stopped at 7:00pm

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


Ajaya
28.08.2021 C Kumar/Deepak UPS log digital log book filled.
Chand
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007.

Auto drain valve checked manually working OK


29.08.2021 A Anurag Chowdhury

All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

29.08.2021 B Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


VAM parameters checked found Normal
Following Check List Filled
29.08.2021 C Deepak Chand 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007.


Auto drain valve checked manually working OK
All AC power made ON in morning.

30.08.2021 A Ajaya Kumar Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

30.08.2021 B Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.


Anurag
30.08.2021 C Chowdhury UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007.
Auto drain valve checked manually working OK

All AC power made ON in morning.

Shift instrument digital log book filled

31.08.2021 A Ajaya Kumar

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

UPS Check List filled.

Shift instrument digital log book filled


31.08.2021 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag
31.08.2021 C
Chowdhury
31.08.2021 C Anurag
Chowdhury
UPS log book filled.

VAM log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Shift jobs carried
Shutdown given for :-
a) BC-1
b) BC-2
c) BC-3

Boiler-2 ground floor area one 24V socket is replaced with 230V system.
New 1-phase ELCB installed, frame cut and 10A socket replaced. Power
up work to be done later.
P&V no.2 in stop condtion, kindly start by observing the temperatures at
4.5m MCC room.
Workshop mechanical one welding machine was not functioning so found
that the top side cable loose so corrected the same.

Shift jobs carried


In Unit No. # 1 Drum floor area Start Up Vent MOV -1No.-01MV2303
Double earthing to done.
In Unit No. # 1 Drum floor area Start Up Vent MOV -2 No.-01MV2304
Double earthing to done.
In Chimney analyzer Boiler No. # 2 Showing moisture fault. So reset it also
cleaned the Sensor and Filter. Now Ok.
Unit No. # 1 and 2 Coal Feeder Bunler level Transmitter probe cleaning to
done.
online CPCB and ETP data is showing normally.
coal shed lights ON as per requirement
VFD cooling fan spare shifted in vehical for store return

Shift jobs carried

Boiler-1 DCS room VFD panel cleaning & blowering done.

Boiler-2 DCS room VFD panel cleaning & blowering done.

Boiler-1 J valve MOV 01MV0906,01MV0921& 01MV0922 cleaning &


blowering done.
Boiler-2J valve MOV 02MV0906,02MV0921& 02MV0922 cleaning &
blowering done.
Boiler-1 ,2 & TG lift phone hand set checked.

All auto drain valve checked by manual operation , working normal.


All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Boiler -2, 4th -6th Floor all lights made OFF.

Shift jobs carried


Unit No. # 1 Vessel No.-11/21 , back Pr. Transmitter not showing at DCS
end. So Cleaned the impluse line. Now Ok.
In Compressor House all the auto drain valve checked. It is working
Normally.
DVD Writer ( dell make ) Put on the Report Computer for Downloading
the Night Shift Report.
ACC fan-2B Flow Switch removed as Per Mr. Taqueer requirement. Also
placed at Inst. Lab.
online CPCB and ETP data is showing normally.
All the Manual Light to OFF Condition.
All the AC MCB to ON Condition.
P & V No.-2 is in running condition.

Shutdown given for :-


a) BC-4
b) BC-5
c) Vibrating Screen No.-2,
d) ACC Fan-2B LOP,
e) ACC Fan-2B ,
f) Fly Ash Silo No.-1,

ACC fan-2B main Motor Connection removed as Per Mr. Taqueer


requirement.
24 Volts Charging LED Light to provided at ACC Fan-2B.
24 Volts LED Light and Transformer to provided at ACC Fan-2B.
Coal feeder -1A Screw Conveyor Tripped due to Jamming. So Reset it. Now
Ok.
Shift jobs carried
BC-4 spare feeder SFU cable connection done
ACC-2B motor power cable connection done, and its double earthing
connection done
ACC-2B Lub oil flow switch connection done, and trial taken working
normal
ACC-2B Fan trial taken done running normal
ACC-2B AVI given and cancelled
TG-2 put in base load at 3.00 pm
TG-2 base load removed at 9.00 pm
Generator-1 Equipment alarm coming frequently so checked and found
that, loss of Excitation alarm coming, and its rator voltage found +17, -18,
(30volt), carbon brush side found normal

Screw feeder of unit-1 found trip in overload , so reset it once

Shift jobs carried

CHP-DCS panel cleaning & blowering done.

All auto drain valve checked by manual operation , working normal.


All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Boiler -2, 4th -6th Floor all lights made OFF.
4.5 meter all VFD drives inverter temperature checked & found all
dives are under 57 deg C.
All auto drain valve checked by manual operation , working normal.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
ACC fan 2B motor terminal Box cover with brown tape.
ACC -2, RSB no-65 check and green tag pasted.
ACC-2, one lightning JB found open, cover it with brown tape.

Shift jobs carried

Turbine-2 HP heater Low level switch checking done


BC-7A&7B floor 10A plug top found damage same was replaced

Boiler-2 floor illumination lights filled with water 4-No's ,water


drained

TG-2 ACC two way switch replaced, and power JB checking done

BC-3 Coal shed area lights checking done ,replacement work under
progress
P & V No.-4 is in running condition.

Shutdown given for :-


a) BC-6
b) BC-7A
c) BC-7B
d) Crusher-2
e) Coal feeder-2C
f) Coal feeder-2C Discharge MOV

TG-1 taken into base load at 1:19 hrs as per operation requirement
online CPCB and ETP data is showing normally.
All the Manual Light to OFF Condition.
All the AC MCB to ON Condition.
Shift jobs carried
coal crusher-1 not started, so found that its breaker got ON and not
latching properly, so OFF immediately. So crusher-2 started.

Boiler MCC 5322 door lock replaced


Green tag applied on crimping tool
BC-3 coal shed trolly area 230v light fixing work

TG-1 Base load removed at 7.30 pm


Boliler-1 & 2 Coal feeder VFD Panel Cleaning & Blowering done

All auto drain valve checked by manual operation , working normal.


All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Boiler-1 SOX Analyser moisture fault cleaing filter & Sensor & reset done

4.5 meter all VFD drives inverter temperature checked & found all
dives are under 57 deg C.

TPP -1 &2 TG Power factor not maintain due to low Power demand
then Line 1 & Line -2 Capacitor Bank OFF From MPSS
Bilole-2 Lift found F5 Fault reset done now lift healthy but Lift
Emergency bus button release in lift due to rain .
Boiler-1 Lift not working & lift on 7th floor Emergency push button
release in lift now lift OFF Condition
WTP MCC Panel blowering & cleaning outside
Daily APC & Plant Performance & Env. Report prepared & mailed

Shift jobs carried


HP heater level switch showing wrong value , so rectified the same & take
in line.

BAC 2A conveying showing fault again & again, rectified the same.

TG-2 zero meter P&V 3 & 4 panel cleaning & blowering done.
ACC 2B & 2E power JB cleaning done.
ACC 2B power JB earthling wire tightness done.

ACC 2 lighting ckecked.


Pump house battery charging & water checked.
Boiler-2 11-21 back pressure line flushed.
Shift jobs carried

Unit No. # 1 Control Oil Main pipe Pr. ( PT-3901) Violet at DCS end. So
checked and found that transmiiter showing No display. So removed the -
Ve wire at DCS TB. Supply is showing zero voltage. Also checked at field
side No supply is showing at Transmitter end. So informed to satiji. they
comes at site. also tightness the Jumper setting. Also removed the second
wire. then checked at DCS end supply is showing at DCS end. So checked
the wire it is showing earth to the ground. also field side it is earth to the
ground. So both the wire is removed from DCS TB end. Spare Core is
required.
In Compressor House all the auto drain valve checked. It is working
Normally.

Reports generate of (APC, Plant Performance, Power Report and Env


report) send to all the concered person.
online CPCB and ETP data is showing normally.

DG report prepared and upload in SAP and Electrical Report is prepsred.


coal shed area lights made OFF

Shift jobs carried


Following Shut down given.
1. Coal Crusher-1
2. BAC-2B
3. Soot Blower -2
4. Fly ash Silo-1 Dry Unloading

Switch Yard, Main transfoormer-1, showing incorrect OLTC tap position,


check and found moisture inside connector, dry and clean the moisture
now OK.
TG-1 Lift Door closing problem , reset its control power and made
operative.

BAC-2A, showing pressure high fault , pressure switch limit adjusted.

Boiler-1, Vessel -11 level not showing , level probe calibration done

ACC-2, Lightning circuit checking work under progress


4.5 Mtrs Single phase socket ELCB check and Green tag pasted.
One cable drum shifted from WTP workshop to China Yard
Shift jobs carried
Following Shut down cleared.
1. Coal Crusher-1
2. BAC-2B
3. Soot Blower -2
4. Fly ash Silo-1 Dry Unloading
Shut down Given for bag house -2
1. 02SV1255
2. 02SV1277
3. ACWP-1

Boiler -2 baghouse poppet valve -22 SOV connection removed & isolation
done.
Boiler -2 baghouse poppet valve -22 header SOV air line removed &
Isolation done.
Boiler-2 AC drain plastic pipe removed & kept in Inst. Lab.
Boiler-1, soot blower-11 cover fixed properly.

BAC-1A,1B & 2A ,2B sov fixed with bolts.

Comp house motors cleaning and blowering work done.

Rubber mat laid in FAS-2 dry unloading.


PTW checklist send to concerned.

Shift jobs carried

Unit-2 HP heater level control valve(02LCV3302) came in manual, due to


level goes below set point 350, so also checked that physical level gauge
and transmitter level having diffrence is also of 250, so need to calibrate
the HP heater level transmitter. After few trials HP heater level control
valve came in auto.
Boiler lighting timing increased from 5.30 am to 5.50 am
Shift jobs carried

Coal Feeder -1C RPM is not showing at DCS end. So Connection Tightness
done at isolator side. After this trial taken. It is working normally.
LP Dosing Tank level is not showing correctly at DCS end. So Clamp
tightness done at Local Level guage also Cable Tie is provided in level
transmitter. Now Reading are under observation.
HSD tank area Camera is not showing Perfectly at DCS end. So Cleaned the
camera lens . Also 24 volts is not showing in UP/Down and Comm. Wire.
So Informed to Mr. Purshottam.

Unit No.# 1 APH , Vessel No.-11/21 and 12-22 Inst. JB and panel Cleaning
and Blowerning to done.
online CPCB and ETP data is showing normally.
All the AC MCB to ON Condition.

Shutdown given for :-


a) BC-7A
b) BC-7B
c) Vibrating Screen No.-2,
d) BC-4,
e) BC-3
f) BAS Ash Silo,

Mechnical workshop 3 phase extension board repaired


CHP building screen floor 24V hand lamp given
ACC-1, RSB and Lightning Timer insulation mat laid properly
Following shutdown clear-
1. BC-3
2. Silo Root Blower

Shift jobs carried


Following Shut down cleared.
1. BC-7A
2. BC-7B
3. Soot Blower -1
4. Bed Silo Dry Unloading
. 5. BC-4
6. Vib screen-2

FAS-1 top bag filter was not runnings so checked and found Y-phase fuse
was blown. Checked the motor found reistance was balace. Cable megger
done found OK. Then feeder checked and fuse replaced then started
running normal.

BC-3 feeder run in local mode and checked feeder was OK during trial.

BC-3 getting tripped after some time,Check & found belt tear switch
malfunctioning.Need plate welding .
CO- analyzer -1 having fault So both sample line cleared.Now ok.
BC-5 VFD panel polythene packing done.

Shift jobs carried


Abnormality: Marpholine dosing tank 1 nos gland found out of hole, so
tight it and pack it.

TG building unwanted lights made OFF


Workshop MV drive PA fan temp gone to 43.4 in DCS and at panel 42
degree in night shift

Shift jobs carried


Shutdown give for :-
a) Vib screen-1
b) Coal Crusher-2
c) Unit-2 battery bank MCCB

Boiler-1 lift was not stopping on any floor so checked the door car top
reed switches 3 nos. and found the contact TB was malfunctioning so
cleaned all contacts and the manual operation checked of switches found
OK. Then Lift was taken in line.

SA-1 fan bearing temp 01TI0923A was fluctuated 2 times in shift, so all
temp bypassed and terminal tightness done in field RTD box, found one
connection was loose. Now under observation.
IFC of compressor room outside was found accumulated with water
inside polythene so cleaning done of water trapped.
CCR shift incharge table walkie was not working so kept in Inst lab and
need to be checked.
Shift jobs carried

In Unit No. # 1 SA fan Bearing and Winding RTD Tripping taken in line.

In IFC Filter water drained.


In Compressor House all the auto drain valve checked. It is working
Normally.
In LHS and WWTP DCS Panel Cleaning and Blowerning to done.
online CPCB and ETP data is showing normally.
All the AC MCB to OFF Condition.
P & V No.-4 is in running condition.
S/D Given - LHS Manentic Seperator No.-1 and magnetic Seperator
ground floor area.
S/D cleared- Vibrating Screen No.-1 and Coal Crusher No.-2.

In Mech. Workshop Grinding machine 10 Amps Plug Top to changed.

Due to Over travel of Boiler No. # 1 Lift EPB is pressed at 7 th Floor area.
In Compressor House all the IAC Motor Blowerning to done.

Shift jobs carried


Boiler-1 soot blowr 16 cover found on the floor So cover fixed on
the same.
FAS-2 JB cable entry hole packing done.
Boiler-2 bag house 11 & 21poppet valve cable & PU tube dressing
done.
Boiler-1 all 04 no's DSH C cleaning done.
All auto drain valve checked by manual operation , working normal.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

Shift jobs carried

Battery charger of Unit-2 one new shrouding done for open ended TB side
at bottom as per electrical safety to provide isolation from live parts.
ACC-1B current showing violet so changed the tranducer but stills howing
violet so need to check the feeder and wiring on oppurtunity.

Boiler-2 12-22 back pressure TX cleaning work done and line flushing
done.
P&V no. 2 started as found temp on higher side on Unit-1 DT panels.

Shift jobs carried


In SWAS Room Unit No. # 2 Drum Water PH water in Glass water is very
dusty. So cleaned the Water and Sensor . Now Ok.
In VAM 22 Mtrs DM Tank is overflow condition. So Closed the filling
isolation valve. Also inform to Jaswant Singh.
In Turbine zero mtrs Field inst . Control Valve and MOV Cleaning to done.

online CPCB and ETP data is showing normally.


Boiler No. -2 HT Motor Cleaning to done.
All the Manual Light to ON Condition.
At 22 mtrs Floor area Light OFF at 7.00 P.M.
Boiler No.-2 Repair Supply Box no.-24 Earthing tightness to done.
CHP Coal Shed Light to ON at 6.30 PM as per requirement.

Shift jobs carried

Boiler-1 all 06 no's water wall MOV cleaning done.


Boiler-2 all 06 no's water wall MOV cleaning done.
Boiler-2 APH back pressure not showing at DCS , chocked pressure
tubes cleared & take in line.

Work shop AHU VFD panel door found open , close the same.

Chimney analyzer Sox very high so factor changed from 0.5 to 0.3.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Unit -1MOT near by cable tray cable dressing done.
TG building unwanted lights made OFF
Shift jobs carried
In Chimney analyzer Factor is changed but PC is not Started. So PC is
restarted. Now Ok.
In SWAS Room Unit No. # 1 Water leakage is found. So arrested it. Now
Ok.
As per Mech. Person requirement , In LHS Belt magnetic Seperator No. # 1
Hooter connection removed.
All the night shift Report sent to concered Person.
online CPCB and ETP data is showing normally.
All the Manual Light to OFF Condition.
All the AC MCB to ON Condition.
Shutdown Cleared :-
a) LHS Magnetic Seperator No.-1,
b) LHS Belt Feeder ( Ground Hooper ) ,

Shutdown given for :-


a) BC-4
b) BC-5
c) LHS Magnetic Seperator No.-1,
d) LHS Belt Feeder ( Ground Hooper ) ,

TG # 1 Put into the Base Load as per Operation requirement.


In LHS area belt -1 magnetic seperator motor and hoist motor connection
removed as per Mech. Person requirement.

Boiler No. # 1 Lift EPB is pressed due to Problem of Reed Limit switch.
At 9.5 Mtrs Extension Board is given to Civil dept.
Shift jobs carried
Abnormality: Bag house-2 vessele transmitter air tube found open , so
reconnect it
Abnormality: Coal feeder-2D plugh discharge limit came in empty hopper,
so removed the limit and reset it manually, now ok
Bag house-2 top air line shutdown cleared, and hadder SOV conection
done, trial taken running normal
Workshop area 4 nos welding machine cover fixing done
3 phase extention board repaired, its plug and socket changed.

chiller-1 pump shutdown cleared from mech side, they inform


pump can be run in emergency
Shift jobs carried

TG-1 9 .5 meter floor all PG & TX cleaning done.


TG-2 9 .5 meter floor all PG & TX cleaning done.
BAC-1A,1B LCS panel cleaning & blowering done.
BAC-2A,2B LCS panel cleaning & blowering done.

VAM system DM water tank level checked physicaly.


Report copied in CD but CD not responding , So report unable to send.

CHP MCC room new bucket elevator feeders-1 and 2 checking,


cleaning and maintenance work done.
Gen-1 having alarm of equipment in mimic due to low rotor voltage
ranging from 10 to 30V.

Shift jobs carried

VAM system DM water tank level found overflow so its valve closed

APH-2 vessele-2 dome valve checked and found jam , so informed to CCR
Green tag applied on workshop welding machine
Fire alarm system checking work in HOD, SH rooms
both boilers conveying system pressure switch setting checked
found OK
Shift jobs carried

Following Shut down Clear.


1. Reclaimer
2. BC-1
3. BC-3
4. BC-2
5. silo top bag filter

TPP area illumination checked and its checklist filled for July
Month.
Boiler-2, RSB No-29 Earthing missed new lugging done.
Boiler-1 RSB No- 001, check and green tag pasted
Boiler-1, 3 Nos Dome lights rain accumulated water drained.
BC-1 Pull cord polythene work under progress
Boiler-2, feed water station , control valve 3202 cable dressing
done
Behind Switch yard Lightning JB cover with polythene.

Shift jobs carried


In SWAS Room Unit No. # 1 Conductivity is not showing at DCS end. So
checked and found that flow is not showing in rotometer. So adjust flow in
rotometer. Now Ok.
In Compressor House all the auto drain valve checked. It is working
Normally.
All the AC MCB to OFF Condition.
In Unit No. # 2 Bed ash cooler -2A and 2B VFD Panel Cleaning and
Blowerning to done. Also Filter cleaned in Panel.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
online CPCB and ETP data is showing normally.

DG report prepared and upload in SAP and Electrical Report is prepsred.


coal shed area lights made OFF
Unit-2 battery charger panel B-phase indication was faulty so replaced it
with spare one.
TG building 9m area RSB checking operation and panel cleaning anmd
blowering work done.
BFP Motor -1,2 & 3 all motors clesning and blowering work done.
Unit-2 battery charger panel FCBC-2 controller was found in hang
condition so reset it.
Shift jobs carried
Unit No. # 2 Vessel No.-11/21 Back pr. Switch and transmitter is not
showing at DCS end. So cleaned the impluse line. Now Ok.
Fly ash Silo No. # 1 and 2 Field Inst. And Panel Cleaning and blowerning to
done.
All the AC MCB to OFF Condition.
Unit No. # 1 and 2 Coal Feeder Load Cell Purging to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
online CPCB and ETP website is not opened.
Electrical Report is generated.
Boiler No.-2 6th and 7 th Floor Light made OFF at 10.30 PM.
CHP MCC Panel Blowerning and Cleaning to done.

Shift jobs carried


Following Shut down given.
1. BC-7A
2. BC-7B
3. Chiller Pump-2
4. Chiller Pump-2
5. Vibrating Screen-2
6. TG EOT

Boiler-2, bag house vessel-22 not showing dp, found its air tube
disconnected.
WTP furnace ,oven temperature set point change form 45degree to 40
degree.
Bag House-2, vessel 22 purging valve SOV push fitting damage , replaced
it.
BAC -2B , back pressure not showing, line flushing done but still
transmitter checking work under progress.

Boiler-2 CO room light not working, cable get disconnected form holder
re-connect it.

Ladder Shifted from WWTP to TG building.

Shift jobs carried


Following Shut down Cleared.
1. BC-7A
2. BC-7B
3. Chiller Pump-2
4. Chiller Pump-2
5. Vibrating Screen-2
6. TG EOT
7. BC-2
S/D isolation given
1. BC-2

Boiler-2, bag house vessel-22 not showing dp, found its air tube damaged
replace with new tube. Now OK.
Boiler-2, bag house vessel-11 ferrule air leakage arrested.

SAR tank auto drain valve filter got chocked, Cleared chocking , now OK.

BAC -2B , back pressure not showing, line flushing done & transmitter
display fixed properly. Now ok.
ACC-2 lighting timer got stucked , reset the same.
Boiler-1 SA fan hoist maintenance done with G shift.

Shift jobs carried


In SWAS Room Unit No. # 1 Conductivity is not showing at DCS end. So
checked and found that flow is not showing in rotometer. So adjust flow in
rotometer. Also Cleaned the Sensor .Now Ok.
In SWAS Room Unit No. # 2 Conductivity is not showing at DCS end. So
checked and found that flow is not showing in rotometer. So adjust flow in
rotometer. Also Cleaned the Sensor .Now Ok.
In Compressor House all the auto drain valve checked. It is working
Normally.
Unit No. # 2 Feed water Station , DSH Station , Soot Blower Panel ,
Cleaning , Blowerning and packing to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
online CPCB and ETP website is not opened.
Electrical Report is generated.
HSD area Light is OFF at 10.30 PM.
At 4.5 Mtrs AOP-1A / 1B , GSC-1A / 1B Motor Cleaning to done.
At 4.5 Mtrs Boiler MCC panel One door is not working condition. So
replaced it. Now Ok.

Shift jobs carried


Shutdown cleared for:-
a) FAS-2 top bag filter
b) Vib scree-2
c) BC-4
d) BC-3

P&V no. 2 blower was not starting so checked motor was OK, found
contactor mounted timer termination was not tight so normalised the
contacts and made healthy, now no. 4 blower is tunning Ok with 12A
current balance.
Air leakage in BAC-2A seal pressure gauge so teflon mounted and
tightness done now OK.

Water valve opening reduced as found leakage from Vam top tank.
MOV shifting to lab from coal feeder floor with G-team.
Rock breaker machine top connection was loose so corrected the same.

Shift jobs carried

TG -2 taken in base load @ 5:45 am

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report download and mail to all
Plant APC Report , Plant Performance report download and mailed
to all
Unit-2, 11-21 all auto drain valve checked manually.
Boiler-2 Lights made ON as per requirement

Shift jobs carried

In Chimney analyzer Boiler No. # 1 SOX analyzer Flow is not showing at


DCS end. Found that Tube is in bend condition. So rectified it. Now Ok.
In CHP T-1 and T-2 Tower all the field Inst. And Inst. JB Cleaning and
Blowerning to done.

online CPCB and ETP website is not opened. Found that Modem is
in Fault condition. So Reset it. Now Internet acess is showing in PC.
Still data is not showing . So Informed to Mr. tarun.

All the AC MCB to ON Condition.


All the Manual Light to OFF Condition.

Shutdown given for :-


a) Boiler No. # 2 bucket elevator,
b) Coal Crusher No.-2,
c) Vibrating Screen No.-2,
d) BC-4,
e) BC-3
f) BAS Ash Silo,

In Boiler No. # 1 PA fan Hoist Checked and found that water inside
the Hoist remote. So cleaned by hot blower. Also changed the 02
nos fuse.
In UPS Room , 220 Volts AC Supply ELCB green Tag to Provided.
At Vibrating screen floor LED plug Top to changed.
Following shutdown clear-
1. Boiler No. # 2 Bucket elevator.

Shift jobs carried


BC-1, not started from DCS check at site found all is Ok then check
at feeder and replace the timer relay with spare one and made BC-1
Healthy.

Reclaimer Left Right VFD, get trip on o/l fault check and reset

Soot Blower No-2, get trip so check and reset


Boiler-2, RSB No-28, check and green tag pasted.
One 24 Volt, charging lamp given at BAC as per requirement.
All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.


DG report Prepared and upload in SAP.
All auto drain valve checked by manual operation , working normal.
Shift jobs carried
VAM tank getting over flow so manual isolation valve made off.

Boiler-2 APH back pressure not showing at DCS , chocked pressure tubes
cleared & take in line.
Bunker level transmitter U#1 cleaning done.
Bunker level transmitter U#2 cleaning done.
24 V Tranformer & LED light shifted to WTP work shop.

Charging LED found out side CCR , keep on charging at 4.5 Meter .

BFP Motor -1,2 & 3 all motors cleaning and blowering work done.

Shift jobs carried


Since EMS Report is not sent in C Shift on dated :- 12/08/2021 .
Today I Have Learned how to make the EMS Report by Electrical
Engineer Mr. Anurag Chowdhury.

Reclaimer Left Right VFD, get trip on o/l fault. So reset it. Now Ok.

online CPCB and ETP website is not opened.


All the AC MCB to OFF Condition.
VAM DM Tank isolation valve is in open condition.

In CHP Bucket elevator area all the field Inst. And Inst. JB Cleaning
and Blowerning to done.
Unit No. # 1 APH slave showing Low Seal Pr. So informed to shift
incharge.

Shift jobs carried

After Completion of Mech. Work Unit No. # 1 APH Limit switch / PU


Tube / Pr. Guage mounted at site. Trial taken.Dome valve is showing
reversed Feedback. So PU Tube Interchanged. Then trial taken. Now ok.
IAC No. # 1 Sensor Fail Alarm showing on the Local Controller. Found that
element Temp. RTD Reading is not showing in display. So RTD Connector
loose. So tightness done. Now Ok.
As Per operation requirement Coal Feeder -1A ABB Local Display
Changed.
online CPCB and ETP data is not showing normally. So In chimney
analyzer Room PC is restarted. Now it is showing.
All the AC MCB to OFF Condition.
All the Manual Light to ON Condition.
P & V. No. # 2 is in running condition.
S/D cleared- BC-6 , EN Mass No.-1 , CT Fan No.-2
Magnetic Seperator panel shifted from LHS Ground Hooper to BC-
1 , T-1 tower. Also cable to removed.
BC-1 Repair supply box door to repaired.

Shift jobs carried


4.5m MCC room one air duct polyethene was found in open
condition so properly tied it.

Service air compressor no. 2 found field side water valve Sov has
it's tube in open condition (air line), so mounted and fixed tube
again. Then manual operation done from CCR found working SOV.

VAM room found condensate water tank overflowing so stopped


momentarily the air line of main steam control valve and then the
level reduces in tank and then charged again the air line.

Generator voltages for both Unit found uneven so excitation is


adjusted and made equal.
One 24V LED from CCR shifted to 4.5m MCC room and put into
charging mode.

Shift jobs carried


Unit No. # 2 Turbine 31M Secondary BRC Comes in fault mode. LED
Indication No.- 1,3,5,6. So Reset it. Now Ok.
Unit No. # 1 Air intake valve ( SV-8127) Limit switch cover is not
available. So Limit switch cover is provided. Also Limit Switch Base
assembly Tightness to done.
Unit No. # 1 APH field Inst. And JB Blowerning and Cleaning to
done.
Service air compressor no. 2 Flow Switch is set. But trial is not
taken Because water valve is in closed condition.
As Per operation requirement Coal Feeder -2C Level Transmitter
Probe to cleaned.
All the AC MCB to ON Condition.
All the Manual Light to OFF Condition.
Shutdown given for :-
a) CT Fan No.-2,
b) BC-5,
c) Chiller Pump No.-2,
As Per operation requirement BFP-2 Changed over from VFD to
DOL Mode.
Fire Engine battery Voltage , Charging condition , and Specific gravity
checked and working normally.
Securitity Tower no.-2 light checked also field wire burnout.So new lug is
provided. Now Ok.

Shift jobs carried


BC-1 Shut down Given & Clear.

Coal feeder 1C , having feed problem work with instrument team


and replace techo proxy.
CHP MCC room spare feeder check , work under progress
Boiler-1, bag house vessel -12, Intel Valve 8134, Limit switch cable
dressing done
APH-2, O2 analyser panel polythene covering done
2 Nos hand lamp shifted from T2 tower to WTP workshop.
ACC-1, RSB no 68 check and green tag pasted.
Lime stone hopper lights switch OFF.

Shift jobs carried


New Light mounted for bulker unloading, it's switching
modification done for start/stop the light on requirement. One MCB
Jb above light floor is taken in line for this purpose.

Sox-1 in analyzer it's heat trace MCB was mount off/trip so started
the MCB and checked the line found working OK.

VAM top floor tank was overflowing water so throttle the valve.

Sticker pasting done for Boiler-1 unloading point for new JB with
MCB provided near RSB.
Shutdown cleared for BC-5.

Shift jobs carried

Following Shut down given.


1. BC-1
2. Bed ash Silo bag filter fan
3. En Mass-1
4. CT-2

T1 Tower , Cable laid for magnetic separator.

Soot Blower No-2, get trip so check and reset

Boiler-1, Bag house 11-21, line flushing done

Boiler-1, APH Vesseel-2, Dome valve air leakage arrested

BC-6, TPH feed rate checking work under progress.

BAC-2B , back pressure transmitter cleaning done.

BC-1, Motor Earthing cable found loose tighten it

BC-7A, one hand lamp given


20 Amp plug top change at coal bunker floor
Shift jobs carried
Following Shut Cleared.
1. BC-1
2. Bed ash Silo bag filter fan
3. En Mass-1
4. CT-2
5. BAC 2A
Following Shut given.
1.BC-3,
2.BAC 2A

BAC-2A TG building side motor having abnormal sound,So inform


to operation to check gearebox,so motor run without
gearbox,having no sound, Gearbox will be check by main. In
morning.

BAC-2A back pressure was very low ,check transmitter impulse line
found clear, then ask operation to hammeringvessel, then vessel
pressure increased upto 1Kg/cm2.

BAC-2A not showing level,so peobe calibrate now OK.


CCR shift incharge desk cable dressing done.
Charginfg light provide at BAC 2A.
RSB 50 earthling wire tightness done.
BAS top bagfilter motor maintenance done.

Shift jobs carried


Unit No. # 1 and 2 CEP area , Field Inst. , MOV , transmitter , Level and
Pressure Guage cleaning to done.

Rubber mat laid in Unit No. # 2 misting Fan Power JB.


In WTP 83 M panel door earthing is open condition. So reconnected it.
Now Ok.
Unit No. # 1 and 2 CEP area , Field Inst. , MOV , transmitter , Level and
Pressure Guage cleaning to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
online CPCB and ETP website is showing normally.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Boiler No.-2, 4 th to 7th floor Light OFF.
At 4.5 Mtrs , AHF Panel Blowerning and cleaning to done.

Shift jobs carried


Following Shut down given.
1. BC-1
2. Reclaimer
3. Reclaimer
4. CT fan -2

BFP-2 change over from DOL to VFD at 8:30 AM again change over
from VFD to DOL at 13:30 hrs , as per operation requirement.

BAC-2B, not operate from CCR check the circuit found problem in
Selector switch , rectify the same

CCR unit -2, mointor not working change the monitor with spare
one.

Ladder Shifted from LS hopper to WWTP

For civil work at 230 V Plug top given

Shift jobs carried


Shutdown cleared for:-
a) CT fan-2
b) BC-1
c) Reclaimer
d) BC-3

BFP room temp was found high 46 deg C on local BFP-3 display, so set
point raised of AHU to maximum and found 2 ducts were sealed over BFP-
3 so removed them, now temp is reduced to 42.5 deg C and under
observation.

T-2 tower light checked for proper operation and found working OK, so
informed the material gate security person to check.
Shift jobs carried
Unit No. # 2 Bed ash cooler Back Pr. Transmitter is not showing So
cleaned the Impluse line. Now Ok.
BFP AHU VAM is in Manual mode. So Put into the auto mode with SP=28
degree.

In Chimney analyzer O2 reading is showing 20 . So Informed to Mr. Tarun.


Presently it is showing normally also Chiller PU Tube is changed.
In CHP DCS Panel , 220 Volts AC Supply Panel , Control desk Cleaning and
blowerning to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.

BFP-2 change over from VFD to DOL as per operation requirement.

Electrical Report is generated.


EMS Report is prepared and Mail to all person.
CHP MCC room Blowerning and Cleaning to done.
in 4.5 Mtrs Exhust Fan starter earthing tightness to done.

Shift jobs carried


Following Shut given. .
1. BC-7A
2. BC-7B
3. En Mass-2
4. CT Fan-1
5. BAC 2A
6. CT Fan-2
7.Bucket
ELE-2

BAC-2A TG building side motor having abnormal sound,So trial


done by operation to check gearebox,so motor run with
gearbox,having no sound, Gearbox will be check by main. In nest
Shift.At present one motor's connection are open In field LCS JB.

Reclaimer not moving left & right side, found VFD trip On O/C ,
reset the same & run.
Grinder plug top 10 A ,changed at workshop.
At Reclaimer Jishuhozen work done,
BAC-2B new level probe showing level high, found moisture
inside,Packing done & take in service.
Chimney analyzer O2 getting high, So pump,filter,chiller &
rotameter checked,Sample line need to check.
Coal bunker 2C reset & become normal.

Shift jobs carried

Shutdown cleared for:-


a) CT fan-2
b) CT fan-1
c) BC-7A
d) BC-7B
e) Enmass-2
f) Bucket elevator-2

BFP room temp was found high 46 deg C on local BFP-3 display, so set
point raised of AHU to maximum and under observation.

Hackathon ideas submitted and emailed to Sati sir.

CT-1 and 2 equipment tag updated in PTW list.

Relcaimer left-right motor tripped on overload so reset from VFD reset


and normalized.
Boiler-2 APH 11-21 and 12-22 local JBs and panels cleaning and
blowering work done.
WTP Oven setpoint changed from 70 to 45 deg C as per Gupta ji
requirement.

Chimney Sox-2 maintenance done and line flushing with G-shift team.

Shift jobs carried

BFP-2, MV Drive change over from DOL to VFD mode.

Switch Yard Line -1 CT Terminal Box panel door lock found damage
, door lock change form new one

10 Nos Suggestion filled in HACKATHON.

BFP Room AHU switch to Manual mode to put it in Auto mode with
set point of 27 degree.
Boiler-2, APH Vessel pneumatic line flushing done.
All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.


DG report Prepared and upload in SAP.
All auto drain valve checked by manual operation , working normal.
WTI done at 4.5 Mtrs TG building.

Shift jobs carried


Following Shut given. .
1. BC-4
2. CT-1
3. En Mass-1

Bed ash silo RAV getting tripped on over load,Reset the same,Again
Plate valve not getting open rectified the same.

Reclaimer boom left & right switch not working selector switch
termination found loose,rectified the same .

Pump house battery charging & water checked.


Pump house DPS,MOV,& field instrument cleaning done.
All AC MCB made on as required.

Shift jobs carried


In Chimney analyzer PC connectivity is not showing. So In chimney
analyzer Room PC is restarted also MODEM power is OFF . Then
Started. Still it is not showing the connectivity.

Unit No. # 1 and 2 Load Cell Purging to done.


BC-7A / BC-7B Unit No. # 1 and 2 Bag filter Panel Cleaning and
Blowerning to done.

All the AC MCB to OFF Condition.

All the Manual Light to ON Condition.


online CPCB and ETP website is not opened.

Shutdown cleared for:-


a) BC-4
b) CT fan-1
c) Enmass-1
Shift jobs carried
BFP-2, MV Drive change over from DOL to VFD mode as per
requirement at 11:00 PM
BFP-2, MV Drive change over from VFD to DOL mode as per
requirement at 02:00 AM

Spare auto hand sanitizer machine repaired and made ready .


BC-7A, at Motor side pull cord cable dressing done
At Workshop one 24 hand lamp plug top changed.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


WTI done at zero Mtrs TG building.

Shift jobs carried


Following AVI given & cleared .
1. Coal feeder-2A

Coal feeder 2A clean run motor got tripped on O/l reset one time.
Again Avi cleared for maintenance.
Boiler-2 Sox getting moisture fault 2 times . Reset fault .
FAS-1& 2 panel cleaning & blowering work done.
BAS panel cleaning & blowering work done.
P&V 2 started at around 9:00 AM.
Pump house motor & MOV cleaning work done.

Shift jobs carried


In Unit No. # 1 APH System Seal Pr. Is not showing at DCS end. So
Cleaned the Impluse line. Now Ok.

In WTP HPP RO VFD Panel Cleaning and Blowerning to done.

IFC Panel fiter to drained.


All the Manual Light to ON Condition.
online CPCB and ETP website is not opened.
P & V. No. # 4 is in running condition.
BC # 1 S/D to given. After completion of work S/D also cleared.
In HP Dosing Room area all the motor cleaning and blowerning to
done.
In Turbine Floor area Exhust panel cleaning and blowerning to
done.

Shift jobs carried


New SLD architecture checked and corrections made and emailed
to concern for rectification.
UPS AC drain line found choked and water found on ground so line
hammering work done, need to attend line inside if further choking
happens.
4.5m Area ground floor, MOVs, TX, gauges and panels cleaning and
blowering work done.

AVI given for Coal feeder-2A motor and cleared.

Shift jobs carried

Unit No. # 2 Vessel No.-22 Level prbe showing High value .So
checked and found that cleaned the Level Probe also material inside
the vessel.
In Chimney analyzer room Boiler -1 and 2 SOX panel , and chimney
analyzer panel Cleaning and Blowerning to done. Also Cable
Dressing to done.
online CPCB and ETP website is not opened.
As Per operation requirement Coal Feeder -2A AVI is given. Also
closed the AVI.
All the AC MCB to ON Condition.
All the Manual Light to OFF Condition.
Shutdown given for :-
a) CT Fan No.-1,
b) BC-2,
c) EN Mass No.-1,
d) EN Mass No.-2,
e) Vibrating Screen No.-2,
f) Coal Crusher No.-2 ,
g) BC-4

P.& V. No.-2 is in running condition.

AVI given for EN Mass Conv. No. # 2 also put Into the Local mode.
BC-5 Tunnel side Deaterning Pump is not operating. Found that
MCB is in OFF Condition. So ON the MCB. Now Ok.
24 Volts Hand Lamp to Provided at EN Mass Floor.

Shift jobs carried


Coal feeder 2A clean run motor got tripped on O/l reset one time.
After cleaning feeder trial was successful.

Chimney analyzer data updating on PC.


Boiler-1 firing floor panels & all SOV cleaning blowering work done.

Boiler-2 firing floor panels & all SOV cleaning blowering work done.
All the AC MCB made Off in evening round.

Shutdown Cleared for :-


a) BC-2,
b) EN Mass No.-1,
c) EN Mass No.-2,
d) Vibrating Screen No.-2,
e) Coal Crusher No.-2 ,
f) BC-4
e) Coal Feeder 2A

Coal Feeder 2A, Clean run motor trip on O/L fault so reset.
Reclaimed Boom belt get trip so check and reset
T3 tower RSB check physically
En Mass-2 AVI close
on 24 volt hand lamp given at coal feeder 2A as per operation
requirement
Shift jobs carried

Motor greasing work done for :-


a) ACC-2A
b) ACC-2B
c) ACC-2C
d) ACC-2D
e) ACC-2E
f) ACC-2F
g) CEP-2B

Dosing room LP and HP oanel back side pressure gauiges, level


gauges and motors cleaning and blowering work done.

Boiler-2 lift telephone operation checked and found OK.


Coal bunker area lights made ON and OFF as per Operation
requirement.
Boiler-1 0m meter area 01TCV3201 cont rol valve gland minor
leakage so tightness done.

Shift jobs carried


Following Shut Down Clear-
1. Coal Feeder 2A
2. Reclaimer
3. BC-1
4. En Mass-1
5. Coal Bunker 2A - 02MV0905
6. Coal Bunker 2A - 02MV 0909
7. CT-1

BC-3, Shutdown given


Coal Feeder 2A AVI given and close.
WTP Hall conductivity sensor proper cable dressing done.
In workshop hand blower bearing jam so open and clean the
bearing and re fit it again.
Shift jobs carried
CHP bucket elevator not changing from 2 to1 on command from
DCS so checked found add-on of contactor was stuck so normalised
then f/b and command was ok.

Boiler-1 and 2 firing floor field panels, JBs, limits cleaning and
blowering work done.

CHP MCC room AC was put off from feeder, please observe DT temp
there in morning time.
Found Bucket elevator main feeder was trip on overload so
normalized

TG-2 put into base load at 5:15 am as load reduced below 22MW.

Shift jobs carried


Following Shut Down Given-
1. BFP-3
2. BFP-3
3. 12MV3205 4.
12MV3206
5. Coal feeder 2A
6. Chiller pump-2
7. Bucket elevator-2
8. BC-1
9. BC-2
Following Shut Down Clear-
1. Coal feeder 2A

BFP-2 started in VFD mode as per operation requirement.


LED light provide at BC -3 tail end for maintenance.
BFP-2 suction water RTD & pressure gauge removed as per
maintenance requirement.
BFP-2 suction water RTD & pressure gauge installed after
maintenance requirement.
Unwanted lights made off in morning shift round.
Pressure gauge removed from BFP-3 01 no's.
BAC-2B water valve SOV leakage arrested.
230V extension board provide at WTP cable caller.
Shift jobs carried
Following Shut Down Clear-
1. BFP-3
2. BFP-3
3. 12MV3205
4. 12MV3206
5. Bucket elevator-2
6. BC-1
7. BC-2
8. BC-3
9. BC-2

BFP-2, Change over from VFD to DOL mode.


Switch Yard MT-1, Main Oil tank Silica Gel get moisturised so silica
gel replace with new one.
Switchyard Lightning Timer ON time adjusted ( ON time From 7:00
PM to 6:00 AM)
ACC-1, Lightning timer get stuck up so reset it.
Coal Feeder 1D pneumatic gate get jam so manually open-close it
and made it Free.
Shift jobs carried

Unit No. # 2 CO Analyzer is showing group fault. So Reset it. Also found
that In probe No.-2 Showing less flow. So purging is done. Now Ok.
Unit No. # 1 all the Coal feeder VFD panel Cleaning and Blowerning to
done.

Unit No. # 1BAC-1A and 1B VFD panel Cleaning and Blowerning to done.
online CPCB and ETP website is not opened.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Unit No. # 1 Soot Blower panel Cleaning and Blowerning and Tightness to
done.
Boiler No.-2, lift Power is reset..
Securitity Tower no.-2 light is not glow. So Reset the lighting tower. Now
OK.
Shift jobs carried

Following Shut down given.


1. BC-2
2. Drain pot pump 2B

BC-2, shutdown clear.

Boiler-2, AHP 2 not operated from CCR, manually operated it and


trial taken now ok.

Boiler-1 , Bag house vessel 11 both Level probe checked and


sensitivity adjusted.
Boiler-1 , Bag house vessel 12 both Level probe checked and
sensitivity adjusted.
Boiler-1 , Bag house vessel 21 both Level probe checked and
sensitivity adjusted.

Boiler-1 , Bag house vessel 22 both Level probe checked and


sensitivity adjusted.

UPS ROOM main door hing get damage so replace the hing with new
one.

Boiler-1, ground floor welding machine earthing lead get open so re


connect it.

Shift jobs carried


Following Shut down given.
1. BC-4
2. Coal crusher-1

Drain Pot 2B, shutdown clear.

Boiler-2, Bag house vessel 11 both Level probe checked and


Calibration done.
Boiler-2 , Bag house vessel 22 both Level probe checked and
sensitivity adjusted.

Boiler-1 , Bag house vessel panel 11 & 21 rubber mat provide.

WTP muffle furnace checked & found T/C damaged need to replace
with new.

Furnace power socket fot fault& main MCB got tripped found short
circuit inside socket board, replace damage wire.
CHP bucket elevatoroverload reset & take in line.
RSB -78 wtp tank area green tag provided.
Compressor house lighting timer adjusted.
Reclaimed panel cleaning & blowering work done.
Shift jobs carried

In Unit No. # 1 APH System Back Pr. Transmitter and Pressure Switch PU
Tube dressing to done.
In Unit No. # 2 Vessel No.-11/21 Back Pr. Switch / Transmitter. Is not
showing at DCS end. So Cleaned the Impluse line. Now Ok.
Unit No. # 2 Feed water Station , DSH Station , Soot Blower Panel ,
Cleaning , Blowerning and packing to done.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
At 4.5 Mtrs , MPDB Panel Blowerning and cleaning to done.
At Fire Pump House and Crusher Building Light to OFF Condition.

Shift jobs carried

Following Shut down given.


1. BAC - 2A
2. BAC 2A Dome Valve
3. CT Fan-1
4. En Mass-2
5. Coal Crusher-2
6. BC-4

Bucket Elevator OLR get trip without physical jam ,check and found
at Feeder outgoing terminal "B " phase cable and Elmex ( Terminate
Block) get heated, changed the Elmex and termination done trial
taken working Ok.

Bucket Elecator-2, not showing current at CCR, check and found


problem in transducer , change the transducer with spare bucket
elevator feeder transducer , then current showing normal at CCR.

Boiler-1 , Bag house vessel 11 showing level High found actual level
high clean the probe and refit again
BC-4, CCTV camera not working found connector loose, tighten the
same.

Following Shut downClear.


1. CT Fan-1
2. En Mass-2
3. Coal Crusher-2
4. BC-4

Boiler-1 11-12 vibrator not working check & found DOL starter coil
supply issue now rectified & ok , working normally

BAC-2A Old motor trial work at mech workshop found running


normally take current R- 0.5 amp , Y- 0.5 amp , B-0.6 amp.

24 V Handlamp handover to BC-7A area


LED Light provided for mech. Team for BAC-2A Maint.
Boliler-1 11 vessel level malfunctioning calibration done now ok
Shift jobs carried
In Unit No. # 12-22 seal Pr. Transmitter and Pressure Switch Tube
cleaning done.
WTP ACF,MGF SOV panel's cleaning & blowering work done.
WTP HP pump motor cleaning & blowering work done.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) But CD not responding in other PC.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
WTP DCS Panel Blowering and cleaning to done.
VAM condensate tank observing minor lrakage ,pl check.

Shift jobs carried

During the plant round Inst. Air Compressor No.-3 EPB is in pressed
condition. So informed to Shift Incharge. Also Breaker is in charged
condition.
As Per operation requirement , unit No. # 1 Vessel No.- 11 /21 Draft
Transmitter Impluse Line is cleaned. But Transmitter range is not
checked because HART is not working condition.
online CPCB and ETP website is showing normally.
VAM condensate tank is overflow So Steam valve is closed for 5-6
minutes. After the opened. Now ok.
All the AC MCB to ON Condition.
All the Manual Light to OFF Condition.
Shutdown given for :-
a) BC-4
b) RSB-5307,
c) Vib. Screen No.-2,

P.& V. No.-2 and 4 is in running condition.

Shutdown Cleared for :-


a) BC-4
b) RSB-5307,

Repair Supply Box No.-23 ( Unit No. # 2 J-valve Fan ) Main MCB is
Tripped. Found that internal 24 Volt transformer is shorted. So
opened it. Now Ok.

Rubber mat laid in Repair Supply Box no.-78 ( WTP tank area )
TG building extension board green tag is provided.
Unit No. # 1 ID / PA / SA Motor Cleaning to done.

Shift jobs carried


Shutdown cleared for:-
a) BAC-2A
b) BAC-2A inst air
c) Vib Screen-2

WTP hall panels cleaning and blowering work done :-


a) Activated carbon SOV box
b) Multigrade filter SOV box
c) Mixed bed exchanger
d) Ultrafiltration SOV box

Boiler-1 11-21 line was choke and back pressure low so cleaning and line
flushing work done.
Shift jobs carried

Compressor house all Auto drain valve checked manually & working OK

U#2 firing floor all Inst checked & cleaned.

Zero meter TG -1 building all field instruments cleaning done.


Zero meter TG -2 building all field instruments cleaning done.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) But CD not responding in other PC.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.

Shift jobs carried

Shutdown given for :-


a) 02MV0909
b) Coal feeder-2A

Boiler-1 11-21 hopper level showing high so opened the level probe and
cleaning done and connected again.

Boiler-1 11-21 back pressure TX flushing done due to line choking.

Boiler-1 SV8141 manually operated on close side as per operation


requirement and then normalised.
APH vessel-1 TX line flushing done and intake valve manually operated as
per operation requirement.

Shift jobs carried


Unit No. # 1 Vessel No.-12/22, back Pr. Transmitter not showing at
DCS end. So Cleaned the impluse line. Now Ok.
Unit No. # 1 Vessel No.-11 High side Level Probe Checked. At field
side found that Material Inside the vessel. So Informed to Shift
Incharge.
Unit No. # 1 Vessel No.-11 High High side Level Probe Checked. At
field side found that Potential free contact are reversed. So
corrected it. Now Ok.
Unit No. # 1 HPH Drain Temp. showing flucations at DCS end. At
field side found that RTD wire is in loose conection. So connection
tightness done. Now ok.
IFC Panel fiter to drained.
All the Manual Light to ON Condition.
online CPCB and ETP website is showing Normally.
P & V. No. # 4 is in running condition.

Coal Feeder- 2A S/D to given. After completion of work S/D also cleared.
Coal Feeder -2A O/L MOV S/D also cleared.

Coal Feeder -2A Clean run motor connection removed as per


maintences person requirement. Also reconnected it. Now ok.

Boiler No. # 1 and 2 Lift checked it is working Normally.

Unit No. # 2 all the coal feeder motor cleaning and blowerning to done.

Shift jobs carried

Coal Feeder 2A, Clean run motor abnormal sound observed and
motor get heated, check and found its cooling fan get stuck with
motor body , remove and refit cooling fan properly and clean the
motor fins , then trial taken now OK.

AFR Breaker get trip due to o/c , check and reset.


All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
Power Report Monthly Report Balance
DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report download and mail to all

Plant APC Report , Plant Performance report download and mailed


to all
Shift jobs carried
ETS panel U#2 door fan having abnormal sound, on opening panel
found fan burning smell, So fan termination removed & PVS tape
provided.
Coal feeder-2A start in local mode for belt alignment,after that put
in remote position.
Coal feeder U#1 load cell purging done.
Coal feeder U#2 load cell purging done.

Boiler-1 11-21 back pressure line flushing done.

Boiler-1 firing floor panels & all SOV cleaning blowering work done.

Boiler-2 firing floor panels & all SOV cleaning blowering work done.

Shift jobs carried


Coal Feeder -1C is Tripped. Found that feeder O/L Temp. is
increased and Temp. switch is acted. After Normalized the temp. it
is running normally.
In Compressor House all the auto drain valve checked. It is working
Normally.
In Unit No. # 1 and 2 all the Coal Bunker Level Transmiiter Probe
cleaning to done.
In CHP Bucket elevator area all the field Inst. And Inst. JB Cleaning
and Blowerning to done.
All the Manual Light to ON Condition.
online CPCB and ETP website is showing Normally.
P & V. No. # 4 is in running condition.
In IAC No.-1 ,2 and 3 all the Motor Cleaning and Blowerning to done.
Switch yard round taken. It is working Normally.
Unit No. # 1 and 2 ACC Ground Floor area all the repair Supply Box
ELCB to checked. It is working Normally.
Street Timer lighting Timer to changed to 7.15 PM. ( old Setting is
7.30 PM)

Shift jobs carried


Boiler-1 coal feeder MOV0913 fault checing done for field side as
per operation need, so ensured closed feedback and informed
operation.

Boiler-1 and 2 all ground floor RSB checking and ELCB operation
tested found all Ok excpet one. And green tag also corrected for all.

Workshop area MV drive one polythene was not covered properly


back side so corrected.

Unwanted lights made off in morning shift round.


22m area lights made ON as per Operation need.

Shift jobs carried


Boiler-2APH seal pressure fault ,So sample line cleared & take in
line Now ok.
Tample loud speaker not working ,found CD player off.
Side steam filter VFD & field instruments cleaning work done.

ACW MOV & field instruments cleaning work done.

ETP Ph exceeding value so sample water change,Now ph is Ok but


under observation.

Following Shut down given.


1. BAC - 1A
2. BC-1
3. En Mass-1
4. En Mass-2
5.Bc-2

Boiler-1 lift stopped at & th floor, to avoid water ingress.


Pumphouse motor,LDB ACW & spare motor cleaning done.
Side steam filter lighing checked.

Shift jobs carried

In Unit No. # 2 Vessel No.-21 PU Tube Dressing to done.


In Compressor House all the auto drain valve checked. It is working
Normally.
Unit No. # 1 Carbon Black system Positioner and PT polythene
Coverning to done.
In Chimney analyser system all the Panel Cleaning and Blowerning
to done.
All the Manual Light to ON Condition.
online CPCB and ETP website is showing Normally.
P & V. No. # 4 is in running condition.

When BC-5 is statred from DCS end. Then it is not showing the
running Feedback also humming sound inside the feeder. Found
that feeder side Problem. So Changed the Feeder from BC-3 Side.

BC-5 feeder checked and found that 110 volts DC Relay inserted
into the 220 Volts AC Relay . So rectified it. Trial is not taken.

Following Shut down Cleared.


1. BAC - 1A
2. BC-1
3. En Mass-1
4. En Mass-2
5.BC-2
6. Vibrating Screen No.-2.

Boiler No.-1 Lift Power ON as per Jitesh paliwal requirement.


TG # 2 put into Base Load as per operation requirement.

Shift jobs carried


CT Fan area 2 nos. lights were from socket supply so modified the
circuit and taken from lighting JB and timer power, operation
checked working OK.
Boiler-1 all ground floor 11-21 and 12-22 JBs cleaning and
blowering work done due to dusty condition.

ACC-1D trippped on lube oil flow low alarm. So checked the switch
setting by removing outside foound OK but alram not going away.
Then again opened the switch and calibrated the position but still
alarm not going away, need to check from maint. Side also.
Unwanted lights made off in morning shift round.

22m area lights made ON as per Operation need.


PM jobs carried

Firing floor are found all panels, Sovs, actuators were dusty
condition so cleaning and blowering work done.

Air leakage found in dome Sov of 11-21 of Boiler-1 so leakage


arrested by teflon tape and tightness.

One issue pass prepared for MV drive cooling fan to be sent to


Aditya Cements.
Voltage difference obsereved in both Generators so
normalised.

PM jobs carried
Unit No. # 1 and 2 Coal Feeder Bunler level Transmitter probe
cleaning to done.
WTP hall motor blowring done and double earthing checking
done

PM jobs carried
Boiler-1 DCS room VFD panel cleaning & blowering
done.
Boiler-2 DCS room VFD panel cleaning & blowering
done.
Boiler-1 J valve MOV 01MV0906,01MV0921&
01MV0922 cleaning & blowering done.
Boiler-2J valve MOV 02MV0906,02MV0921& 02MV0922
cleaning & blowering done.
Boiler-1 ,2 & TG lift phone hand set checked.
All auto drain valve checked by manual operation ,
working normal.
ACW pump House Motors and JB cleaning done.
Environment Report not able to send as, CD not working,
kindly arrange new CD

PM jobs carried

PM jobs carried
Boiler-2 firing floor all SOV and panel cleaning done
fire sensor detecto4r panel cleaning done

AC filter cleaning done with kamlesh, AC of SH,FH,HOD room

PM jobs carried

Compressor house IFC panel polythene covering done.

PM jobs carried

BC-7A&7B motor &Power JB cleaning done


Boiler-2 coal bunker-2D level transmitter cleaning done

BC-7A&7B Bag filter panels blowering and cleaning done

Boiler 1&2 coal feeder load cells air purging done

PM jobs carried

Exhaust fan panel at TG hall blowring cleaning done

Boiler-1 APH panel and valve cleaning done

at BC7AB area unit-2 side bag filter panel blowring done


Bag house vessel -21 seal pressure and back pressure tube
dressing done
PM jobs carried
TG-2 zero meter P&V 3 & 4 panel cleaning & blowering
done.

ACC 2B & 2E power JB cleaning done.


ACC 2B power JB earthling wire tightness done.

ACC 2 lighting ckecked.


Pump house battery charging & water checked.
TG-1 & 2 zero meter field instrument cleaning done.
PM jobs carried

At 4.5 mtr switchgear room , boiler MCC cleaning and


blowring done from outside.

PM jobs carried

Chimney analyser room cleaning done.

BAC-2A, SOV fixed properly and dressing done.


PM jobs carried

Boiler -2 baghouse poppet valve -22 SOV connection removed


& isolation done.

Boiler -2 baghouse poppet valve -22 header SOV air line


removed & Isolation done.

Boiler-2 AC drain plastic pipe removed & kept in Inst. Lab.

Boiler-1, soot blower-11 cover fixed properly.


BAC-1A,1B & 2A ,2B sov fixed with bolts.
Switchyard area one 1-phase socket has green tag missing so
checked the operation and tag pasted.
Switchyard lighting timer JB has opening at bottom so silver
tape packing done.

PM jobs carried

Unit-1Coal feeder panel VFD panel cleaning and blowring


done.
Unit-1 Bed ash cooler panel blowring done
Unit-1 Turbine Panel filter cleaning done
4.5 mtr HT panel outer blowring done
PM jobs carried

Jishu Hozen done at TG building 9.5 mtrs floor.

Unit No.# 1 APH , Vessel No.-11/21 and 12-22 Inst. JB and


panel Cleaning and Blowerning to done.

PM jobs carried

CCR mimic panel found G-1 voltage meter was faulty so


replaced with new spare meter of Risabh make and
paramters updated. Also position for other meter also
corrected in mimic panel.

One spare relay was found in FAS-1 panel bag filter so


removed and kept in Shift almirah.

BC-5 VFD panel polythene packing done.


PM jobs carried
Swass room panel and UPS cleaning done

Dosing room 3 Nos panel cleaning and field equipment


cleaning done

4.5 mtr HT panel unit-1 outer blowring done

PM jobs carried

Battery bank of Unit-2 load testing done and all observations


taken for 1 hour kept in Hemant Sir's table. All voltages found
under limit(1.8V DC).

TG 4.5m and 0m all equipment cleaning and blowering work


done due to dusty condition.

CCR camera PC was not operating found mouse and keyboard


connectors were open so corrected.

Workshop AHU MV drive AHU line hammering done as temp


was found higher side on line.
PM jobs carried
In LHS and WWTP DCS Panel Cleaning and Blowerning to
done.

In Compressor House all the IAC Motor Blowerning to done.

PM jobs carried
Boiler-1 soot blowr 16 cover found on the floor So cover
fixed on the same.
FAS-2 JB cable entry hole packing done.
Boiler-2 bag house 11 & 21poppet valve cable & PU tube
dressing done.
Boiler-1 all 04 no's DSH C cleaning done.
WTP MCC Room Cleaning and Blowering done.

PM jobs carried

WTP room pump house all motors cleaning and blowering


work done as found dust accumulation.
CHP T1 and T2 tower all moors cleaning and blowering work
done for JBs, bag filter, panels and instrument.

PM jobs carried
In Turbine zero mtrs Field inst . Control Valve and MOV
Cleaning to done.

Boiler No. -2 HT Motor Cleaning to done.

PM jobs carried

Boiler-1 all 06 no's water wall MOV cleaning done.


Boiler-2 all 06 no's water wall MOV cleaning done.
Boiler-2 APH back pressure not showing at DCS ,
chocked pressure tubes cleared & take in line.
Work shop AHU VFD panel door found open , close the
same.
Both unit MOT Motors cleaning done
PM jobs carried

PM jobs carried

Pump house equipments cleaning done


PM jobs carried

TG-1 9 .5 meter floor all PG & TX cleaning done.


TG-2 9 .5 meter floor all PG & TX cleaning done.
BAC-1A,1B LCS panel cleaning & blowering done.
BAC-2A,2B LCS panel cleaning & blowering done.
22m coal bunker lights made ON as per requirement.

PM jobs carried

Coal bunker level transmitter cleaning done

silo motors cover provided

Hand lamp repaired


PM jobs carried

PM jobs carried

In Unit No. # 2 Bed ash cooler -2A and 2B VFD Panel Cleaning
and Blowerning to done. Also Filter cleaned in Panel.

TG building 9m area RSB checking operation and panel


cleaning anmd blowering work done.
PM jobs carried
Fly ash Silo No. # 1 and 2 Field Inst. And Panel Cleaning and
blowerning to done.

CHP MCC Panel Blowerning and Cleaning to done.

PM jobs carried

Fire pump house all motors cleaning and blowering done.

Both Silo Paenle cleaning and blowering done.

PM jobs carried
Boiler-2, bag house vessel-22 not showing dp, found its air
tube damaged replace with new tube. Now OK.

Boiler-2, bag house vessel-11 ferrule air leakage arrested.

SAR tank auto drain valve filter got chocked, Cleared chocking
, now OK.
BAC -2B , back pressure not showing, line flushing done &
transmitter display fixed properly. Now ok.
ACC-2 lighting timer got stucked , reset the same.

Boiler-1 SA fan hoist maintenance done with G shift.

PM jobs carried

Unit No. # 2 Feed water Station , DSH Station , Soot Blower


Panel , Cleaning , Blowerning and packing to done.

At 4.5 Mtrs AOP-1A / 1B , GSC-1A / 1B Motor Cleaning to


done.

PM jobs carried
ACC-1B current was found violet so checked and found the
trandcuer was Ok but the back side O/P wiring was loose for
tranducer so stopped feeder and made healthy, now current
showing OK.

One 24V LED given to operation for BAC-2B pit side.

ACC-2 lighting timer got stucked , reset the same.

Coal feeder-1A started in local mode as per Operation team


requiement in 2Hz.

PM jobs carried
GSC 2A and GSC 2B motor cleaning and earthling tighten
done
AOP 2A and AOP 2B motor cleaning and earthing tighten
done
Unit-1, feed water station MOV and control valve
cleaning done

Unit-1, De-superheating control valve cleaning done

Unit-1 Soot Blower panel cleaning done and seal it with


brown tape.

PM jobs carried

In CHP T-1 and T-2 Tower all the field Inst. And Inst. JB
Cleaning and Blowerning to done.
PM jobs carried

Boiler-1, Ground floor all instrument JB checking and


hole sealing done with putty

Boiler-2, Ground floor all instrument JB checking and


hole sealing done with putty
Punching machine JB hole sealing done with packing
tape.
PM jobs carried
Boiler-2 APH back pressure not showing at DCS , chocked
pressure tubes cleared & take in line.
Bunker level transmitter U#1 cleaning done.

Bunker level transmitter U#2 cleaning done.


24 V Tranformer & LED light shifted to WTP work shop.
Charging LED found out side CCR , keep on charging at 4.5
Meter .
BFP Motor -1,2 & 3 all motors cleaning and blowering work
done.

PM jobs carried

In CHP Bucket elevator area all the field Inst. And Inst.
JB Cleaning and Blowerning to done.

One new light fitting mounted on Boiler-1 side bulker


unloading oint as per Operation requirement.

BV-7 floor one hand lamp and bulb provided as per


requirement.
BC-7 floor plug top replaced as per requirement.
Old light fitting between both Boiler is removed and
connection also opened.

PM jobs carried
PM jobs carried
BAC-2A and 2B local panel cleaning, blowering and all
terminals tightness work done.

Compressor house all pressure gauge, flow switch, SOVs


and instrument cleaning and blowering work done due
to dusty condition.

Boiler 22m area lights found On so made OFF as no


requirement is there.

PM jobs carried
Unit No. # 1 APH field Inst. And JB Blowerning and
Cleaning to done.
PM jobs carried

Unit -1 CEP motor cleaning and blowering done.

Chimney analyser room cleaning done.

BAC 1A, MCC JB cleaning done

PM jobs carried
Coal Crusher bag filter feeder cleaning, all terminal
tightness work done.

Boiler-1 Polythene covering done for 2 nos. SOV and


plough discharge .
Coal feeder of Boiler-1 instrument equipment blowering
work done.

PM jobs carried

Rubber Mat laid at Fly Ash Silo Panel

Jeshu Hozen done at silo area.

PM jobs carried
BAC-2A back pressure was very low ,check transmitter
impulse line found clear, then ask operation to
hammeringvessel, then vessel pressure increased upto
1Kg/cm2.

BAC-2A not showing level,so peobe calibrate now OK.

CCR shift incharge desk cable dressing done.

Charginfg light provide at BAC 2A.


RSB 50 earthling wire tightness done.
BAS top bagfilter motor maintenance done.

PM jobs carried
Unit No. # 1 and 2 CEP area , Field Inst. , MOV , transmitter ,
Level and Pressure Guage cleaning to done.
Unit No. # 1 and 2 CEP area , Field Inst. , MOV , transmitter ,
Level and Pressure Guage cleaning to done.

At 4.5 Mtrs , AHF Panel Blowerning and cleaning to done.

PM jobs carried
BAC 2B, all TB and air connector tighten done.

Fly ash Silo No. # 1 and 2 Field Inst. And Panel Cleaning
and blowerning to done.

Jeshu Hozen done at WTP area.

PM jobs carried

CT fan-2 PMT not coming to DCS so checked feeder locally


outside working OK. Then checked the DCS end for R/L
permit found the local permit TB in DCS was shorted, so
removed short link and made healthy, now remote
permissive is OK and trial taken working OK.

Motor greasing work done for :-


a) ACC-1A
b) ACC-1B
c) ACC-1C
d) ACC-1D
e) ACC-1E
f) ACC-1F
g) CEP-1A

BFP-2 put into VFD from DOL as per operation requirment


and load increased above 40 MW.
Bucket elevator-1 proxy and JB cleaning work done.
BC-6 limit switch and magnetic seperator panel cleaning and
blowering work done.
CT Fan-2 local limit of door checking work done.
PM jobs carried
In CHP DCS Panel , 220 Volts AC Supply Panel , Control desk
Cleaning and blowerning to done.

CHP MCC room Blowerning and Cleaning to done.

In

PM jobs carried

Grinder plug top 10 A ,changed at workshop.

At Reclaimer Jishuhozen work done,

BAC-2B new level probe showing level high, found


moisture inside,Packing done & take in service.
PM jobs carried

BAC-2A TG side motor was remoed and replaced with spare


one(minor sound from motor NDE also) then trial taken of
new motor both in no load and load found motor OK but still
GB side sound coming so informed CCR and Maintenance.

Temporary light provided for lighting between both boiler


area.
BFP-2 put into VFD from DOL as per operation requirment
and load increased above 40 MW.
CT-1 and CT-2 motor cable normalized from field so from
feeder end tagging normalized and both feeder trial taken
found OK.
ETP pH value was not coming correct so cleaned the pH
sensor and DM water replaced, now value at 8.1 pH.

PM jobs carried
Fire pump house all motors cleaning and blowering
done.
Unit-2, feed water station MOV and Control valve
cleaning done
Unit-2, De Superheating MOV and Control valve
cleaning done

Unit-2 Soot Blower panel Cleaning done.


PM jobs carried

Bed ash silo RAV getting tripped on over load,Reset the


same,Again Plate valve not getting open rectified the
same.

Reclaimer boom left & right switch not working selector


switch termination found loose,rectified the same .

Pump house battery charging & water checked.

Pump house DPS,MOV,& field instrument cleaning done.


All AC MCB made on as required.

PM jobs carried
New light fitting done between both boiler area for Bulker
unloading and a separate MCB single pole given at Boiler-2
RSB 2nd floor.

Boiler-2 lift was not operating from ground floor so


outside connector was opened and cleaning done, now
OK.

One 24V hand lamp repaired at Electrical workshop area.

Boiler area lighting timer was modofoed from 7:15pm to


7:00pm.

Suggestion given to Sati sir for EMS template modifications.


PM jobs carried
Boiler # 1 Ground floor all field instrument cleaning
done
Boiler # 2 Ground floor all field instrument cleaning
done

Root Blower Room motor cleaning done.

PM jobs carried

Boiler-2 Sox getting moisture fault 2 times . Reset fault .

FAS-1& 2 panel cleaning & blowering work done.


BAS panel cleaning & blowering work done.
P&V 2 started at around 9:00 AM.
Pump house motor & MOV cleaning work done.

PM jobs carried
In HP Dosing Room area all the motor cleaning and
blowerning to done.
In Turbine Floor area Exhust panel cleaning and
blowerning to done.
In WTP HPP RO VFD Panel Cleaning and Blowerning to done.
PM jobs carried
ACW pump house all Motors and JBs blowering &
cleaning done.

TG-1 and 2 ground floor, MOVs, TX, gauges and panels


cleaning and blowering work done.

Sticker pasted and tagging done for new light between


both Boiler area in RSB.

Auto drain valves operation checking and drain done.


Unwanted light of bulker unloading switched off.

PM jobs carried

In Chimney analyzer room Boiler -1 and 2 SOX panel ,


and chimney analyzer panel Cleaning and Blowerning to
done. Also Cable Dressing to done.
PM jobs carried
Boiler-1 firing floor panels & all SOV cleaning blowering
work done.
Boiler-2 firing floor panels & all SOV cleaning blowering
work done.

BC-7A, BC7 B motor cleaning done

BC-5, one Lightbning JB cover found open so tied it with


new screw
BC-5. motor earthhing lug check and tighten done.
PM jobs carried

ACC 0m side RSB checking work and panel blowering &


cleaning done for RSB-63 and 64.

Boiler-1 Desuperheater and Feed water station area


floor MOVs, TX, gauges and panels cleaning and
blowering work done.

Auto drain valves operation checking and drain done.

Unwanted light of bulker unloading switched off.

PM jobs carried

WTP Hall all Xmitter Polythene covering done-10 Nos

Chimney Analyser Room panel Blowering and Cleaning


to done.

CEP 2A and 2B motor and cleaning and blowering done.


PM jobs carried

FAS-2 SOV side leakage of air was observed so new


fitting was provided and leakage was arrested.

Soot blower-2 panel cleaning and blowering work and


all power contactor checking and relay tightness work
done

Power report checked till 23.08.2021.

PM jobs carried

Coal bunker level transmitter cleaning done


CHP DCS panel cleaning & blowering done
Compressor VFD panel cleaning & blowering work done.

UPS room AC drain water coming inside room, Attended


by Kamlesh & under observation.
PM jobs carried

BAC 2B high level probe clean.

Chimney Analyser Room Sox-1 panel drain tube damage


so replace with new one

One 24V Light lamp kept in Charging at 4.5 Mtrs.

PM jobs carried

Unit No. # 1 all the Coal feeder VFD panel Cleaning and
Blowerning to done.
Unit No. # 1BAC-1A and 1B VFD panel Cleaning and
Blowerning to done.
Unit No. # 1 Soot Blower panel Cleaning and Blowerning and
Tightness to done.
PM jobs carried

Jeshu Hozen done at CEP area.

WTP MCC Room Cleaning and Blowering done.

ACC2, ground floor RSB cover with polythene.

MV Drive Room single phase socket check and Green tag


pasted.
Boiler 2, Bag House vessel 11,21,12,22 SOV JB cleaning
and blowering done.

PM jobs carried

Boiler-2, Bag house vessel 11 both Level probe checked


and Calibration done.

Boiler-2 , Bag house vessel 22 both Level probe checked


and sensitivity adjusted.
Boiler-1 , Bag house vessel panel 11 & 21 rubber mat
provide.
WTP muffle furnace checked & found T/C damaged need
to replace with new.
Furnace power socket fot fault& main MCB got tripped
found short circuit inside socket board, replace damage
wire.

CHP bucket elevatoroverload reset & take in line.

RSB -78 wtp tank area green tag provided.


Compressor house lighting timer adjusted.
Reclaimed panel cleaning & blowering work done.

PM jobs carried

Unit No. # 2 Feed water Station , DSH Station , Soot Blower


Panel , Cleaning , Blowerning and packing to done.

At 4.5 Mtrs , MPDB Panel Blowerning and cleaning to done.

PM jobs carried

Jeshu Hozen done at Switch yard area.

WTP near caustic room cable dressing done.

Bag House -1, LDB Earthing loose tighten it.


BC-7A & 7B Motor & Power JB & RSB Panel cleaning &
blowering work

T-1 & T-2 Tower E&I Equipment cleaning & blowering


work

PM jobs carried

WTP ACF,MGF SOV panel's cleaning & blowering work done.


WTP HP pump motor cleaning & blowering work done.
WTP DCS Panel Blowering and cleaning to done.

PM jobs carried

Unit No. # 1 ID / PA / SA Motor Cleaning to done.


PM jobs carried

RSB-61 found one ELCB was faulty so removed the ELCB and
same RSB 24V ELCB present so replaced with same, now RSB
is healthty and all ELCB operational.

Chimney analyzer SOX of Boiler-2 found moisture fault so


reset work done.

AVI given for BAC-2A and removed after work.


Extension board shifted to WTP lab.
PM jobs carried

U#2 firing floor all Inst checked & cleaaned.

Zero meter TG -1 building all field instruments cleaning done.

Zero meter TG -2 building all field instruments cleaning done.


Pump house motor cleaning work done.
Switch yard single phase socket green tag provided.

PM jobs carried

Motor greasing work done for :-


a) ACWP-2
b) J valve-2B
c) CT fan-1
d) CT fan-2

Bag house-1 11-21 vibrator was not operating so opened the


starter and found the coil was stuck due to spare cable so
corrected the same now OK.

Coal feeder-2A motor tripped clean run on overload 3 times,


so reset after operation cleaning, still problem. Motor already
checked 49ohms resistance and megger is OK.

PM jobs carried
Unit No. # 2 all the coal feeder motor cleaning and blowerning
to done.
PM jobs carried

Dosing room 3 Nos panel and motor cleaning and


blowering done also equipment double Earthing ensure.

Boiler-2, APH panel SOV connector air leakage arrested.


Coal Feeder 2A, 2B 2C & 2D panel cleaning done.

PM jobs carried
Coal feeder U#1 load cell purging done.

Coal feeder U#2 load cell purging done.


Boiler-1 11-21 back pressure line flushing done.
Boiler-1 firing floor panels & all SOV cleaning blowering
work done.
Boiler-2 firing floor panels & all SOV cleaning blowering
work done.
BC-7A & 7B Motor & Power JB & RSB Panel cleaning &
blowering work

BC-6 motor cleaning and blowering work done.


BC-6 motor earthling wire tightness done..
BC-7B plugtop change for24V transformer

PM jobs carried

In CHP Bucket elevator area all the field Inst. And Inst.
JB Cleaning and Blowerning to done.

In IAC No.-1 ,2 and 3 all the Motor Cleaning and Blowerning to


done.

PM jobs carried
Boiler-1 APH-1 SOV connector was found loose so
tightness and proper assembled.

Following motor cleaning, blowering and double


earthing checked done :-
a) CEP-2A
b) CEP-2B
Power report checked till 30.08.2021 and balanced till
date.
Chimney analser room all panels, PC and boards
cleaning done.

PM jobs carried
Boiler-1 lift stopped at & th floor, to avoid water ingress.
Pumphouse motor,LDB ACW & spare motor cleaning done.
Side steam filter lighing checked.

Side steam filter VFD & field instruments cleaning work


done.

ACW MOV & field instruments cleaning work done.

ETP Ph exceeding value so sample water change,Now


ph is Ok but under observation.

PM jobs carried
In Chimney analyser system all the Panel Cleaning and
Blowerning to done.
PM jobs carried

Coal feeder-1D pneumatic open limit was not coming so


corrected the limit position from field, now OK.

Cleaning and blowering done of Bucket elevator VFD


panel in CHP MCC.

Month end report checking done and balanced for zero


errors:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power
CHP MCC BC-5 feeder checking done and found it is not
starting instantly on command, problem in timer relay
so replaced with Omron relay.
Also both BC-3 and BC-5 feeders placed in correct
location in racks.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
01.09.2021 A Deepak Chand Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
01.09.2021 B Ajaya Kumar 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
01.09.2021 C Sanjay Garg Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

02.09.2021 A Deepak Chand Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK


02.09.2021 B Anurag Chowdhury
All AC power made OFF in evening.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
02.09.2021 C Sanjay Garg Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


03.09.2021 A Deepak Chand check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

03.09.2021 B Anurag Chowdhury All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


03.09.2021 C Ajaya Kumar
03.09.2021 C Ajaya Kumar
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Auto drain valve checked manually working OK

04.09.2021 A Anurag Chowdhury All AC power made ON in morning.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

04.09.2021 B Sanjay Garg


UPS Check List filled.
04.09.2021 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal


04.09.2021 N Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


Auto drain valve checked manually working OK

05.09.2021
( 8.30 AM to D Sanjay Garg
8.30 PM )

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

VAM parameters checked found Normal


05.09.2021 N Deepak Chand
05.09.2021 N Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

06.09.2021
( 8.30 AM to D Sanjay Garg
8.30 PM )
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


Anurag
06.09.2021 N Chowdhury Power report prepared and emailed to all for
EMS and manual report.

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

07.08.2021 D Deepak Chand Auto drain valve checked manually working OK


Sanjay Garg

All AC power made ON in morning.


Sanjay Garg

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Power report prepared and emailed to all for


07.09.2021 N Anurag EMS and manual report.
Chowdhury

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

08.08.2021 D Deepak Chand Auto drain valve checked manually working OK

All AC power made ON in morning.


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Date Shift Engineer Name 5. Electrical checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

08.09.2021
( 8.00 PM to C Sanjay Garg
8.00 AM )
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Anurag 4. Generator-2  checklist
09.08.2021 D Chowdhury 5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

All energy Meter manual reading taken for


power report

08.09.2021 Sanjay Garg /


( 8.30 PM to C
6.00 AM ) Deepak Chand UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
Auto drain valve checked manually working OK
Shift instrument digital log book filled
UPS log digital log book filled.

10.09.2021 A Tarun Gaur VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 7:00pm


10.09.2021 B Anurag Chowdhury
All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
VAM parameters checked found Normal
10.09.2021 C Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


UPS Check List filled.

11.09.2021 A Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

11.09.2021 B Anurag Chowdhury P&V no. 4 stopped at 7:00pm

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
11.09.2021 C Tarun Gaur VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

12.09.2021 A Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007


Compressor house Auto drain valve checked
manually working OK

All AC power made OFF in Evening


12.09.2021 B Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag UPS log book filled.


12.09.2021 C Chowdhury
VAM log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


13.09.2021 A Sanjay Garg
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked


manually working OK

All AC power made OFF in Evening

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
13.09.2021 B Deepak Chand 5. Electrical checklist
6. VAM Check list
3. Generator-1  checklist
4. Generator-2  checklist
13.09.2021 B Deepak Chand 5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

UPS log book filled.


13.09.2021 C Anurag
Chowdhury VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.
Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


14.09.2021 A Deepak Chand check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
14.09.2021 A Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

All AC power made OFF in Evening


Following Check List Filled
14.09.2021 B Tarun Mandawat 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

UPS log digital log book filled.


14.09.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
15.09.2021 A Deepak Chand Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

P&V no.4 made off at 7.00pm

15.09.2021 B Tarun Mandawat All AC power made OFF in Evening

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
15.09.2021 B Tarun Mandawat

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
7.CPCB parameters showing healthy after
resetting the supply screenshot attached
herewith

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

15.09.2021 C Sanjay Garg UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.
Auto drain valve checked manually working OK

All AC power made ON in morning.

16.09.2021 A Tarun Gaur


P&V-2 ON Condition & P&V OFF Condition

Compressor house all auto drain valve manually


16.09.2021 A Tarun Gaur check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
16.09.2021 A Deepak Chand 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

16.09.2021 C Anurag
Chowdhury
RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.


Anurag
16.09.2021 C Chowdhury UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

17.09.2021 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

P&V no. 2 stopped at 7:00pm

17.09.2021 B Anurag
Chowdhury

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

17.09.2021 C Tarun Mandawat

UPS log book filled.


VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DCS report mailed to all
Power report prepared.

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


18.09.2021 A Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

All AC power made OFF in evening.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


18.09.2021 B Tarun Mandawat a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following check list prepared
18.09.2021 B Tarun Mandawat a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Chimney round taken found system healthy


VAM round taken found system healthy
UPS round taken found system healthy

RNRP all nodes found Normal, except SPC007

CPCB data checked found healthy


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.


UPS log book filled.
18.09.2021 C Anurag
Chowdhury VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK


19.09.2021 A Sanjay Garg
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked


manually working OK

All AC power made OFF in Evening


19.09.2021 B Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

Anurag
19.09.2021 C
Chowdhury
UPS log book filled.

VAM log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Auto drain valve checked manually working OK

20.09.2021 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked


manually working OK

All AC power made OFF in Evening

20.09.2021 B Deepak Chand


IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.


UPS log book filled.
Anurag
20.09.2021 C Chowdhury VAM log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
21.09.2021 A Deepak Chand 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.
RNRP all nodes found Normal, except SPC007

Chimney round taken found system healthy


VAM round taken found system healthy

All AC power made OFF in Evening

UPS round taken found system healthy

21.09.2021 B Tarun mandawat

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

21.09.2021 C Sanjay Garg UPS log digital log book filled.


21.09.2021 C Sanjay Garg

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
22.09.2021 C Sanjay Garg
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

23.09.2021 A Tarun Gaur


All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
23.09.2021 A Tarun Gaur Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

23.09.2021 B Anurag Chowdhury


P&V no. 4 stopped at 8:00pm

All AC power made OFF in evening.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running
normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
VAM parameters checked found Normal
23.09.2021 C Deepak Chand Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007.


24.09.2021 A Anurag Chowdhury

Auto drain valve checked manually working OK

All AC power made ON in morning.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

24.09.2021 B Sanjay Garg


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
VAM parameters checked found Normal

24.09.2021 C Deepak Chand Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007.

Auto drain valve checked manually working OK


25.09.2021 A Anurag Chowdhury
All AC power made ON in morning.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

25.09.2021 B Sanjay Garg


25.09.2021 B Sanjay Garg

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

BLR-2 Top unwanted lights OFF

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
25.09.2021 C Tarun Gaur
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


26.09.2021 A Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

BLR-2 Top unwanted lights OFF

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
26.09.2021 C Tarun Gaur
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

27.09.2021 A Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
28.09.2021 A Deepak Chand

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Chimney round taken found system healthy.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


26.09.2021 B Tarun mandawat

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

28.09.2021 C Sanjay Garg


UPS log digital log book filled.
VAM log digital log book filled.
28.09.2021 C Sanjay Garg
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

29.09.2021 A Tarun Gaur IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007

29.09.2021 B Anurag
Chowdhury
P&V no. 2 stopped at 7:00pm

29.09.2021 B Anurag
Chowdhury All AC power made OFF in evening.
Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


29.09.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running
normal.

Dearator floor light made off.


All AC power made ON in morning.

30.09.2021 A Tarun Mandawat

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running


normal.

RNRP all nodes found Normal, except SPC007


Coal Shed light ON as per requirement of
Operation dept.
30.09.2021 B Tarun Gaur

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

UPS log book filled.

VAM log book filled.


Anurag
30.09.2021 C Chowdhury

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


01.10.2021 A Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
ACC Fan 1D motor connection removed.
ACC Fan 1D Lube oil motor connection removed.
ACC Fan 1D Lube oil flow switch connection removed.
Boiler-1 Furnace Floor cooling fan shifted and connection done with
extension board.
TG-2 taken is base load at 9:00 AM
Boiler-1 BAC 1A dome valve not operated and having jam , operate it
manually in local then trial taken from remote.
Boiler-2, Bunker 2C incorrect level showing, clean the level transmitter now
OK

Following Shut down given.


1. BC-1
2. ACC 1D
3. ACC 1D Lube oil
4. P fan -1
5. PA Fan-1
6. SA Fan -1
7. BC-6
8. Vibrating Screen-2

Chimney Sox-2, Moisture fault so clean the sensor and line cleaning done.
Shift jobs carried
ACC Fan 1D Lube oil motor Avi given & closed.
ACC Fan 1D Lube oil motor connection removed.
ACC Fan 1D Lube oil flow switch checked need to replace flow switch.

Boiler-1 Furnace firing system checked & both gun take in liat around 8:40
Pm & 9:45 Pm respectively.
Boiler-1 ID PA & SA fan VFD start normaly.
Boiler-1 DSH CV 01TCV3203 calibration done .
Boiler-1 MOV 01MV3208

Following Shut down Cleared.


1. BC-1
2. P fan -1
3. PA Fan-1
4. SA Fan -1
5. BC-6
6. Vibrating Screen-2
7. 01MV3208 S/d given & cleared

All MFT are on as previous shift, Pl take in written when MFT action
normalized.
Chimney Sox, factor cheanged from 0.5 to 0.25 In DCS as well as Chimney
analyzer PC.
Shift jobs carried
In Unit No. # 1 Coal Feeder -1C Techo generator is not showing at DCS end.
So cleaned the Techo and Adjust it. Now ok.
In WWTP one nos BRC Card showing fault mode. Found that this card is not
available at site.

In ACC Fan -1D New Flow switch is mounted at Site. Old one kept in Inst.
Lab. Trial taken with LOP motor . Then found that When LOP is started the
after 2 to 3 Sec. again it is showing Flow low. May be chance of Chocking of
the O/L lub. Oil Line.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Unit No. # 2 Bucket elevator S/D to cleared.
Unit No. # 2 Bucket elevator Local panel to make ready..

Unit No. # 2 Bucket elevator RAV Started with VFD mode. After some times
it is tripped Fault 12 ( Motor STALL). Again it is started again showing the
fault. So Motor Wire connected to contractor and O/L Relay and VFD is in
bypass condition. Trial taken it is working Normally.
All MFT are on as previous shift, Pl take in written when MFT action
normalized.

Shift jobs carried


ACC Fan 1D Lube oil motor connection removed.
ACC Fan 1D Lube oil motor connection done
ACC Fan 1D Lube oil flow switch connection removed.
ACC Fan 1D Lube oil flow switch connection done
ACC Fan 1D lube oil AVI given and close two times.
Boiler-1, 01LCV 3202 , not operating and valve stuck up , calibration done

One 24 volt Chanrging lamp given at Unit-2 Oil purifier.

Following Shut down given.


1. BC-3
2. BAC 2B
3. SA -2
4. Unit-2,Oil purifier.

Shift jobs carried


Shutdown given for following :-
a) All Boiler-2 coal feeder drives
b) 02MV0909
c) 02MV0910
d) 02MV0911
e) 02MV0912
f) 02MV0905

Cleared shutdown for :-


a) ACC-1D lube oil
b) ACC-1D main motor
c) Centiguge-2

VAM found steam temp control valve closed, found air inst is not coming so
aksed operation dept to check and normalize the air, later after
normalisation VAM ran normal.
SA-2 RTD opened in field for both DE and NDE of fan and kept in near pillar
as per Paliwal sir requirement.
Boiler-1 bed material RAV and bucket elevator power started and trial
taken by Operation dept.

Cooling fan shifted from Boiler-1 FWS to PA-1 motor area.

VAM tripped on 8:50PM due to HTG temp high so normalised the temp and
then taken in line again, valve of Control valve inst aur is opened approx
40%.

Shift jobs carried


In Unit No. # 1APH Line back Pr. Transmitter is not showing. So cleaned the
impluse line. Now Ok.

In Unit No. # 2 BAC-2A and 2B VFD Panel Blowerning and Cleaning to done.
All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked. It is working
Normally.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.

As Per Requirement , In Unit No. # 2 Coal Feeder -2A ( Main Motor + Clean
Run Motor ) , Coal Feeder -2B ( Main Motor ) , Coal Feeder -2C ( Main Motor
+ Clean Run Motor ) , Coal Feeder -2D ( Main Motor + Clean Run Motor ) ,
Motor Power Connection and Double earthing is removed. Motor details
kept at Tech. Shift log book.
In Coal feeder - 2C Clean Run Motor TB is in damaged Condition.
Shift jobs carried
Chimney Analyser SPM showing high value, check at Chimney top but not
found any abnormality , inform to Tarun M.
VAM get trip due to HTG vapour Temp high, Steam line air line close and
after temperature normalise reset the fault and start normally

Boiler-2, Bag house Vessel showing H:H , clean and calibrate Level probe.

BC-5, Hopper RSB-90, check and green tag provided


Boiler-2, Lift 1st Floor Door opening problem attend it now OK
BC-3 , Shutdown clear
Reclaimer Shutdown given-

Shift jobs carried


Shutdown given for following :-
a) PA-2
b) ID-2
c) J valve-2B
Cleared shutdown for :-
a) Reclaimer
AVI was given for ID-2, PA-2 and J valve-2B and now AVI in process for ID-2
and J valve-2B.
SA-2 VFD end cable opened as per Jaswant sir requirement.
SA-2 motor megger done and found value greater than 2.0 Gohms.
Power report found some reading mistake in entering so corrected for last
day.

Shift jobs carried


U#2 Coal feeder VFD panels cleaning & blowering done.Unwanted
material removed from panel.

LED light provide at boiler-2 furnace.


All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked. It is working
Normally.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.

Shift jobs carried


Shutdown given for :-
a) BAC-2A
b) BAC-2B
c) Vib screen-2

Shutdown cleared for SA-2 motor.

AVI given for ID-2 and J-valve 2B to Operation dept.

PA-2 fan side both DE and NDE RTD removed and kept in side with tagging.

SA-2 VFD removing from base done as per Jaswant sir requirement.
4.5m MCC room hand blower one plug top replaced with new one.
EMS report prepared and emailed to all.
DG report prepared and uploaded in SAP and start-stop booking also done.

Shift jobs carried


In Chimney analyser system In Chimney syatem it is showing
moisture fault. So cleaned the Sensor and Filter. Now ok.
In Compressor House all the auto drain valve checked. It is working
Normally.
As Per Requirement , In Unit No. # 2 Coal Feeder -2C pneumatics
Valve air tube connection , limit switch assembly is opened also
Permit to given.

BC-3 ZSS is in Bypass condition as per Previous shift. So checked and


found that Guard Limit switch is problem. Since Guard is not opened
condition. So we can not check it. Also informed to Mr. APS.

All the Manual Light to ON Condition.


online CPCB website is showing Normally.
online ETP website is hang condition at 04/09/21@ 3.58 PM.
P & V. No. # 4 is in running condition.
Unit no. # 2 PA fan Space Heater MCB is OFF also ON the MCB.
Unit no. # 2 Furnace floor area 24 Volt AC supply is not healthy. So
new ELCB is provided. Also one Nos hand lamp connection tightness
to done.
Following Shut down Cleared.
1. Vibrating Screen No.-2.
Compressor House lighting time changed to 7.10 PM. ( old Time =
7.30 PM.)

Shift jobs carried

Chimney Analyser SOX parameter not correct check and corrected.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

Power Report Monthly Report Balance

DG report Prepared and upload in SAP.


All auto drain valve checked by manual operation , working normal.
Shift jobs carried

In Chimney analyser system In Chimney syatem it is showing


moisture fault. So cleaned the Sensor and Filter. Now ok.

In Chimney analyser system In Chimney syatem O2 Reading is


showing 17-18. So check and found that Flow is zero in rotometer. So
adjust the Flow. Now Ok.
In Unit No. # 2 SA Fan IGV check from CCR. When giving the 50 %
Command. IGV is not operated. Mechanically Jammed condition.
When Mech. Team give to clearence then we check the IGV.

In Unit No. # 2 PA Fan IGV check from CCR. When giving the 50 %
Command. IGV is operated. But when giving the 0% command. Due
to Mechanically Jammed condition.The Link of the IGV is Broken. So
Informed to Jitesh Paliwal. Mech. team Work in Progress. When
Mech. Team give to clearence then we check the IGV.

All the other IGV of Unit No. # 2 Check When Mech. Team give to
clearence then we check the IGV.

BC-3 ZSS is in Bypass condition as per Previous shift. So checked and


found that Guard Limit switch is problem. So changed the Guard
Limit switch and Proxy After completion of work. Trial taken. It is
working Normally.
In Unit No. # 2 Huffing device No.- PT1119H , LT1107H , PT1109H,
PT1120, PT1102, PT1101 PU Tube is changed.
In Unit No. # 2 Huffing device No.- LT1107L , DPT1106H , DPT1109H,
DPT1103L, DPT1104H PU Tube fitting is in damaged condition. Then
we check at Inst. Lab. It is not found.
All the Manual Light to ON Condition.
online CPCB website is showing Normally.
online ETP website is hang condition at 04/09/21@ 3.58 PM.
P & V. No. # 4 is in running condition.
Following Shut down Cleared.

1. J-Valve Fan-2B,

Shift jobs carried


Chimney Analyser O2 showing high value 17.85%, roto meter
adjusted , now ok.

Boiler-2 , Hydro jet pump trial taken.

All Energy Meter Manual reading taken for Power Report.


Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Shift jobs carried
In Chimney analyser system In Chimney syatem O2 Reading is
showing 17-18. So check and found that Flow is zero in rotometer. So
adjust the Flow. Now Ok.

As Per Mech. Requirement Unit No. # 2 ID Fan Fan DE / NDE Side


RTD removed at site.

Unit No. # 2 CO Vent Valve open / Close Check from CCR. It is


working Normally. Also when air removed from SOV. Then CO Vent
Valve is automatically opened condition.
Unit No. # 2 O2 Analyser Left ( 02 QI 1101 ) probe cleaning done and
Connection Tightness done. Since Zero Gas Cylinder is not available.
So Zero calibration is not done.
Unit No. # 2 O2 Analyser Left ( 02 QI 1102 ) probe cleaning done and
Connection Tightness done. Since Zero Gas Cylinder is not available.
So Zero calibration is not done.

Unit no. # 2 APH / vessel No.-11/21 and vessel No.-12/22 Back Pr.
Transmitter and back pr. Switch impluse Line Cleaning to done.

Unit No. # 2 Coal Feeder O/L Hooper temp. Connection tightness


done and Packing to done.

All the Manual Light to ON Condition.


onlineETP website is showing Normally.
online CPCB website is hang condition Since internet connectivity is
not showing at Chimney analyser room.
P & V. No. # 4 is in running condition.

Following Shut down Cleared.


01. ID fan-2 ( 03 times ) ,
02. PA fan -2,
03. Vib. Screen No.-2,
04. 02 MV-2303/2304/2301/2302
05. Soot Blower no.-2,

02 Nos LED Light provided to mech. Team and one nos taken .
In Furnace floor area LED Light is not ON. Found that repair supply
box ELCB is tripped. So ON it. Now ok.

Shift jobs carried

SA fan-1 stopped on 01:57AM and found motor was taking any load
So checked the VFD end and found no trip indication. So checked on
local command from VFD, still no load. So started motor on DOL and
tripped on start current as dmaper was not closing completely. Later
motor all termianls opened and megger taken all balanced. Later VFD
end all terminal tightness and blowering done and started motor in
VFD, running normal.

Compressor IFC side found air leakage so PU tube changed and


leakage attended.

Need to check the cooling fan of SA-1 VFD for any alarms in shift.

Sox and Nox value found high so checked found in controller value
out of range, so reset the controller now OK, need to start the PC.

Shift jobs carried

Following Shut down given.


1. Vibrating screen-2
2. BC-4
3. 02FCV 915
4. 02FCV 916
5. 02FCV 917
6. 02FCV 918

Following Shutdown Clear-


1. 02MOV 2301
2. 02MOV 2302
3. 02MOV 2303
4. 02MOV 2304
5. Soot Blower - 2

SA Fan -1 , Motor TB packing done with Silver tape.


BC-3, belt is not started found site guard limit acted, rectified the
same.

Boiler-1 SOX analyser Showing moisture fault , so reset it Now OK

SA-1, VFD showing "Cooling Fan Stuck or Disconnected" Alarm


Shift jobs carried

Coal feeder-1B plough discharge was malunctioning several times, so


checked from field and adjusted minor for limit, now the problem is
rectified.

22m area lights of Boiler and bunker area made ON as per Operation
requirement.

DG report prepared and start stop booking done in SAP.

Shift jobs carried

Following Shut down given


1. BC-5
2. BC-4
3. BC-1
4. ACC Fan 2F
5. ACC Fan 2F Lube Oil Pump

Following Shut down Clear


1. BAC 2A
2. BAC 2B
3. Coal Feeder 2A
4. Coal Feeder 2B
5. Coal Feeder 2C
6. Coal Feeder 2D

Shift jobs carried


Unit No. # 2 feed water Inlet line pr. Guage Showing 100 kg/cm2. So
cleaned the pr. Guage. Now ok.
Unit No. # 2 DSH station C.V. 02 TCV3203 F/B is not showing correctly at
DCS. So Calibration done. Now ok.
Unit No. # 2 DSH station C.V. 02 TCV3201 , TCV3202 and TCV3204 Trial
taken from CCR. It is working Normally.
Unit No. # 2 FWS station LCV3201 Valve is showing jerked at site. To be
check.
Unit No. # 2 FWS station LCV3202 Trial taken from CCR. It is working
Normally.
Unit No. # 2 FWS station LCV3203 Trial taken from CCR. It isShowing 56 %
feedback when 100 % Command. To be check.
In Chimney analyser system In Chimney syatem it is showing
moisture fault. So cleaned the Sensor and Filter also adjust the
senstivity. Now ok.
online CPCB and ETP website is showing normally.
In Unit No. # 2 J-valve Fan -2B VFD Panel Cleaning and Blowerning to
done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Unit No. # 1 and 2 Harmonics panel Cleaning and Blowerning to done.
In Unit No. # 2 Furnace Floor area 24 Volts Hand lamp to provided.
In Unit No. # 2 J-Valve Top 24 Volts LED to provided.

Shift jobs carried


All permits cleared on Boiler-2 area except Group LOTO.

Shutdown given for:-


a) ACC-2C
b) ACC-2C lube oil pump
One 24V hand lamp found shorted in Boiler-2 area in J-valve so one
hand lamp and trafo 24V given.

Motor greasing work done for :-


a) ACC-1A
b) ACC-1B
c) ACC-1C
d) ACC-1D
e) ACC-1E
f) ACC-1F
g) ACC-2A
h) ACC-2B
i) ACC-2D
j) ACC-2E
DG aux booked in SAP 2000KWh and Start-stop booking also done.

Shift jobs carried


In Unit No. # 2 spare core trace in DCS panel No.-28 for Vibration Sensor of
PA fan.

Boiler No.-2 Light up under progress. Oil gun -1taken in line at 1.29 AM.
In Unit No. # 2 coal Feeder -2A Pneumatics valve showing opened F / B
while command is closed. So reversed the PU Tube. Now Ok.
In Unit No. # 2Bed material Temp.-12 ( 02TI 1120 ) is not showing at DCS.
So changed the Polarity . Now Ok.
In Unit No. # 2Bed material Temp. ( 02TI 1114 ) is not showing at DCS. So
we have given the Spare core of 02TI1110 . Now Ok.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concerned person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Power Report prepared and mailed to all
DG report prepared and upload in SAP

BFP-2 Changeover to VFD mode from DOL Mode & Isolater Panel space
heater stopped .
Boiler-2 lift stopped at 2nd floor due to heavy rain
FAS-2 Root blower -2 found overload reset done
24 V Handlamp Provide coal feeder -2A Area
ID-2 7 PA-2 Motor space heater terminal Packing tape Packing
Coal feeder -2A pnumatic valve limit not show in DCS check in field found
limit ok but valve mech. Jammed informed to CCR(Ketul)
Blr-2 DSH Control valve02PCV3201 correct postion not showing in CCR ,
calibration done.
Blr-2 DSH Control valve02PCV3201 gland leakage arrested
BFP-3 MV Drive temp 41 degree now AHU set point decrease from 31.5 to 30
degree now temprature normal.

Shift jobs carried


Recliamer tripped one time on zero sequence fault current so checked from
field and found that stair side lighting circuit having problem so made OFF
the light switch of stairs and made breaker healthy, bow OK but need to
check light circuit in morning.
Boiler-2 Bag house-11 was having continuos high high alarm so found
marterial but after cleaning still high high alarm so opened connector found
problem in DCS end TB, so shorted in DCS end termination direct, now OK
but beed to replace the connector TB.

BFP-2 put into DOL from VFD as per Operatio requirement.

Battery charger-2 RHS controller was hang condition so reset the supply
and now OK.
P&V no. 4 blower fan made stop at 7:00pm.

Shift jobs carried

Unit-2 , Bag house Vessel -11, showing H:H in empty vessel so , open
the level probe and cleaned it now OK.

Chimney analyser SOX having moisture fault, so reset the controller


and moisture cleaned now OK

T1 , T2 and Coal Shed area lights made OFF during shift round.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload in CD but not send as CD not Run in other

Plant APC Report , Plant Performance report upload in CD but not


send as CD not Run in other
Shift jobs carried

In Unit No. # 2 main MOV of Soot blower is not operating from DCS
end. So checked and found that 220 Volts AC Supply MCB is in OFF
Condition. So ON the MCB. Now Ok.
In Unit No. # 2 Soot Blower Panel Cleaning , Blowerning and Packing
to done.
online CPCB and ETP website is not opened.

Reports generate of (APC, Plant Performance, Power Report and Env


report) send to all the concerned person.
In Unit No. # 2 Vessel No.-11 HH Level Probe Supply Connector is
provided.
All the AC MCB to ON Condition.
All the Manual Light to OFF Condition.

Shutdown given for :-


a) Oil Purifier Unit No.-2,
b) Coal Crusher No.-2,
c) Vib. Screen No.-2,
d) BAC-2B,
e) HSD Oil Pump No.-1,
f) HSD Oil Pump No.-2,

As Per Mech. Requirement Unit No. # 2 BAC-2B Motor Connection


removed at site. ( DE to NDE Side R, Y , B )
Coal Crusher No.-1 is started from DCS. But not Started. So checked
and found that Trip LED is showing the indication. So RESET it. Also
IN and OUT the breaker. Now Ok.

Recliamer is not Started. So ckecked and found that UPS Is in Battery


Mode. Also Discharge the Battery. So ON the UPS. Now PLC Supply is
healthy. Now Ok.

Shift jobs carried


Shutdown given for :-
a) BC-2
b) BC-1

Shutdown cleared for :-


a) BC-2
b) BC-1
c) Crusher-2
d) Vib Screen-2
e) Centrifuge-2

AVI given for Centrifuge-2.

Reclaimer stair case lighting circuit problem rectified and all JBs and switch
boxed sealed properly with polythene and tapes.
T-1 and T-2 tower lights given 24V hand lamp and socket corrected.

Shift jobs carried


Reclamier Left Right Motor Megger Value check from Panel to motor
found R-Y-B - 1 Gohm & P-P = 0 Gohm
Reclmier Main Breaker found trip on Ground fault , Lighting circuit
off & then Reset & ON breaker now OK . Reclamier Lighting Circuit to
be checked in A Shift.
BLR-2 Bag house 21 vessel bag pressure transmittor fitting leakage
found now fitting replaced & leakage arrest done.
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concerned person.
All Office AC Power OFF
Shift jobs carried

In Unit No. # 1 BAC-1A Level Probe is showing High at DCS end. So


checked and found that O/P DCS Contact wire water inside it. So
Cleaned it and taken in line. Now Ok.
In Unit No. # 2 HPH Bypass Control Valve F/B is not showing
correctly at DCS end. So Calibrated the Control Valve. Also taken in
line. Now Ok.
Coal Bunker Level Transmitter - 2D is not showing correctly at DCS
end. So Cleaned the Level Probe also Reset it. Now Ok.
online CPCB and ETP website is not opened.
All the Manual Light to OFF Condition.
As Per Mech. Requirement Unit No. # 2 BAC-2B Motor ( CCR Side )
Connection done at site. ( DE to NDE Side R, Y , B )
As Per Mech. Requirement Unit No. # 2 BAC-2B Motor ( ID Fan Side )
Connection removed at site.
At BAC-2B area Hand lamp to provided.

Shift jobs carried


Boiler-Coal Bunker 1A showing incorrect level so , clean the
transmitter and Power Reset now OK
Boiler-Coal Bunker 1B showing incorrect level so , clean the
transmitter and Power Reset now OK
Reclaimer - 2 Nos 24 Volt focus lights installed at railing for reclaimer
feeding.
China yard , WTP and S/Y side Street Light timer ON time adjusted
from 7:00 PM to 6:30 PM
Coal Bunker 22 Mtrs Lights switch OFF due to no requirement.

Coal Shed, T1 and T2 tower lights switch OFF due to no requirement.

Shift jobs carried

Reclaimer top light from cabin started and no fault in that circuit and
bottom stair only need to be checked for cable short.

TG building zero meter arae RSB-46,47 and 48 checked and found all
ELCB are healthy and green tag status are checked and updated.

AHP panel of CHP found not running so checked and found MCB trip
single pole so reset and started but still going to off state(now MCB
not tripped) need to check AHF.
P&V no. 4 blower panel cleaning and blowering work done and
earthing checked.

Reclaimer one temporary light shifted to siren side location.

Isolation given for BC-5.

Shift jobs carried

In Unit No. # 1 Vessel No.-21 Air leakage from Dome valve PU tube
fitting. So Tightness of PU Tube. Now Ok.
In reclaimer 02 Nos Motor cable insulation damaged condition. So
PVC tape is Provided.
In CHP Building area ZSS of Bucket elevator , BC-6 ZSS , Coal
sampling Panel , magentic Seperator Panel Cleaning and Blowerning
to done.
online CPCB and ETP website is not opened.
All the Manual Light to OFF Condition.
P. & V. No. # 4 is in running condition.

Shutdown given for :-


a) BC-7A
b) BC-7B
c) BC-4 ,
d) Oil Centrifuse Pump No.-2

As Per Mech. Requirement Unit No. # 2 Oil Centrifuse Pump No.-2


Light to ON Condition.
BC-7A / 7B Hand Lamp Plug Top to changed.
BC-4 Motor Cleaning and Earthing Tightness to done.

Shift jobs carried


BAC-2B motor connection done after getting clearance from
Maintenance Team.

Reclaimer Boom left right motor trip due to O/C fault , check and
reset the same

Chimney Analyser SPM showing moisture fault, clean the sensor and
reset the controller

Boiler-2, Vessel 11-21 showing back pressure fault line flushing


done now ok.

Following Shut down Given-


1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.

Following Shut down Clear-


1. BC-4
2. BC-5
3. BC-7A
4. BC-7B
5. BAC-2B
6. Oil Purifier Unit-2
7. Coal Feeder 1B
8. Coal Feeder 1B MOV
9. Coal Feeder 1B pneumatic gate.
Following Shut down Clear-
1. BC-4
2. BC-5
3. BC-7A
4. BC-7B
5. BAC-2B
6. Oil Purifier Unit-2
7. Coal Feeder 1B
8. Coal Feeder 1B MOV
9. Coal Feeder 1B pneumatic gate.

Following AVI given and Close


1. BAC-2B
2. Oil Purifier Unit-2

Shift jobs carried


Both units MOT tank motors cleaning and blowering work done.

P&V no. 2 blower panel cleaning and blowering work done and
earthing checked.
DCS-1 side cola feeder all panels of VFD cleaning and blowering work
done.

Some errors found in the new EMS report, all details emailed.

Shift jobs carried


Boiler-2, Coal Bunker 2C showing incorrect level , level transmitter
cleaning done and power reset.
Bed Ash Silo , stop during loading found problem in on/off selector
switch attend the same

Fly Ash silo SOV having air leakage , air leakage arrested

Boiler-1, near PA Fan-1, welding machine connection done

Following Shut down Given-


1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.
4. Oil Purifier-1
Following Shut down Given-
1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.
4. Oil Purifier-1

Shift jobs carried


Coal feeder-1B feeder outlet MOV open limit setting done as per
operation requirement.

Compressor house service receiver drain found continuous draing so


rectified the same & trial done.
Baghouse -22 no. level H probe checked & claibrated as per operation
issue.
24 volt tx. Given at coal feeder floor to maintenance team.
1no. Handlamp given at boiler-2 soot blower .
Following Shut down Given-
1. Soot blower-unit 2

Following Shut down Clear-


1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.
4.Unit-1 Oil purifier

Following AVI given and Close


1. Coal feeder-1B

Shift jobs carried


At Chimney analyzer In Chimney Pump is not working condition. So Reset
the
ETPpower
data isSupply. Now Ok. at 11/09/2021 @8.30 PM. So Reset the Power
hang condition
supply. Still data is not showing in on line website.
All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked. It is working
Normally.
Unit No. # 2 Firing Floor area field Inst. And JB Cleaning and
Blowerning to done.
online CPCB website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.

Inst. Air compressor # 1 ,2 and 3 Motor Cleaning and Blowerning to done.


Boiler No.-2 4 th floor to 7 th floor Light to OFF Condition.
Unit No. # 2 Soot Blower Shut down to cleared.

Shift jobs carried

Boiler-2, APH Slave Dome vale have air leakage, arrest the same

Following Shut down Given-


1. BC-1
2. BC-2
3. Reclaimer
4. BAC-1A
5. BAC-1B
6. N-Pit-2
7. BC-1
8. BC-4

Following Shut down Clear-


1. BC-1
2. BC-2
3. BAC-1B

Shift jobs carried


MLDB-B CHP MCC breaker power reset & DC supply off done as per
EMS Meter power reset requirement .

Boiler-2 Baghouse -21 no. level HH probe checked & claibrated as per
operation issue.

Lighting
>SAWS Room panel lightning MCB frequently trip problem checked
& rectified
>HSD area street ligt timer set for ON at 6.45 pm & off at 6.00am.
>BC-7A / 7B 10A transformer Plug Top to changed as per
requirement.

Boiler-2, J valve 02DPIC1108 incorrect valve showing to be check


abnormality checked & rectified.
CCTV general checking done found 02no.s not showing at CCR ,so
rectified the issue now healthy.
Following Shut down Given-
1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.
Following Shut down Given-
1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.

Following Shut down Clear-


1. Coal Feeder 1B
2. Coal Feeder 1B MOV
3. Coal Feeder 1B pneumatic gate.
4.BC-1
5.BC-4
6.Reclaimer
7.BAC-1B

Following AVI given and Close


1. Coal feeder-1B
Shift jobs carried

At Chimney analyzer In Chimney Pump O2 reading is showing high value.


So checked and found that moisture fault at DCS end. So Reset it and
Cleaned the sensor. Now ok.
WTP DCS Panel , MOV Panel and 220 Volt I & C Panel Cleaning and
Blowerning to done.
All the AC MCB to OFF Condition.
online CPCB website is showing normally.

In Compressor House all the auto drain valve checked. It is working


Normally.
online CPCB website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Unit No. # 1 Soot Blower Panel Connection tightness , Cleaning and
Blowerning to done.
At Coal Feeder area 24 Volts hand lamp to provided.

Shift jobs carried


Battery charger-2 RHS controller was hang condition so reset the
supply and now OK.
APH#2 Dome not open fromDCS so check SOV Cleaning & Power
Reset now ok

BC-5 VFD Panel Clenaing , Blowering & Packing work done


CHP MCC AHF Panel found in Fault so open panel cleaning &
tightness all Card Pins now OK & working normally

DG report upload in SAP.


Boiler-2 Bed level (DP1104) not showing correct value check & found
air valve open now close valve & value ok

Following Shut down Given-


1. BC-6
2. Vibrating Screen-2
3. Soot Blower-2

Shift jobs carried

MLDB-B CHP MCC , Energy Meter Replace with new one and enter
parameter then communication confirm at EMS.

Reclaimer Incomer Breaker get Trip at 09:45 PM due to "Zero


sequence fault" , check and reset it.
4.5 Mtr switch gear Room self-audit done and checked for any hole
opening inside the panel and also closed them-
1. PCC 1A
2. PCC 1B
3. PCC 2A
4. PCC 2B
5. MLDB
6. MPDB
7. STG MCC
8 Boiler MCC
9. AC & Vent MCC

Following Shut down Clear-


1. Soot Blower -2
2. BC-6
3. Vibrating screen-2

Shift jobs carried


SWAS room all panels cleaning and blowering work done as found
dusty.
HP dosing room all instruments were found dusty so scheduled
cleaning and blowering work done.

UPS of lift STG was found dusty so cleaning done from outside.

Coal shed and 22m area lights were found ON, so made OFF all
manually.

Shift jobs carried

When ketul giving the command in Boiler No. # 1 lift. Then he was
inside the Lift. On Display C is showing the fault. Then OFF the power
supply from feeder as well as Field local Panel. Then Display Showing
O fault. Then Informed to Tarun Guar and H. sharma. Also tarun Guar
comes at site. After 1/2 hrs Ketul comes outside from Lift. when
manually opened the door at 7 th floor. Also Power OFF the Lift.
In Unit No. # 1 Soot Blower Showing fault. So Reset the Overload.
Now Ok.
Ash Silo root Blower No. # 2 is not started from DCS end. So reset the
overload. Now ok.
online CPCB and ETP website is healthy condition.
All the Manual Light to OFF Condition.
P. & V. No. # 2 is in running condition.
In VAM CCR AHU is tripped on Over current. So Reset it. Then it is
started it is working normally.
In reclaimerLeft / right VFD showing fault. So reset the VFD fault.
Now Ok.
In crusher Building 24 Volts Lamp to provided. Also changed the plug
Top. Now Ok.
In Boiler No.-1 Vessel No.-21 level is not showing High mode. So
Cleaned and calibrated the level Probe.Now Ok.
All the AC MCB to ON Condition.
In CHP DCS Panel no.-93 TU Hole sealing done by glass putty. Now
Ok.
In CHP DCS 220 Volts I& C panel Hole sealing done by glass putty.
Now Ok.

Shift jobs carried


One tube rod holder was found damaged in CO analyzer-2 so changed
with correct holder and now light glowing OK.

Hole checking done for Battery charger panels of both Unit-1 and 2.

Following meter power made ON as for EMS configuration:-


a) P fan-2
b) SA-1
c) Lime crusher-1
d) Lime Crusher-2
e) P fan-2 LT
f) PCC-1A
g) ACW-1
Bunker level TX were found dusty so cleaning and bloweirng work
done.
All AC supply power made OFF from MCB in evening.
P7V no. 4 stopped in the evening.

Shift jobs carried


Chimney analyser system found- flow low ,so adjusted
rotameter ,now healthy.

Coal shed and T1,T-2 tower were found ON, so made OFF all
manually.

EMS report checked & prepared , some issues are noted &mailed
a) Some meters showing abrupt values,need to be checked
B) Report not triggered in auto at 00.30hrs

TG-1 taken in base load at 4.45am as per operation requirement.


Shift jobs carried

In BC-5 two nos PCS ( Toward Coal Shed side ) is not operating from
DCS end. At site found that loop cable between the PCS is Present But
DCS supply cable is not Present at site. So DCS supply cable is laid
from other PCS switch. This cable connected and trial taken . Now it
is working Normally.
In BC-5 two nos PCS ( TowardWTP side ) is not operating from DCS
end. So rectified the Problem Also trial taken . Now it is working
Normally.

All the AC MCB to ON Condition.


online CPCB and ETP website is healthy condition.
All the Manual Light to OFF Condition.
P. & V. No. # 2 is in running condition.
BC-5 S/D to given and cleared.
WTP N-Pit pump -2 S/D to cleared.
wall fan Installed at Rest Room.
At WTP outside Repair supply box green tag to updated.

Shift jobs carried


Following WTI points closed
1.Insulated Rubber Mat not available in front of ACW LDB -attended
2.Instrument dryer was single earther and 2nd earth was open, need
to be double earthed -attended
3.24VOLT TRANSFORMER HAVING NO PLUG-TOP, IT WAS FOUND
OPEN- NEED TO BE PROVIDE TOP FOR CONNECTION-checked found
ok
4.Loose cable found on the floor need to be removed-dressing done.
5.Rubber mat not its place at Repair supply box to be kept proper
below to RSB near unit-1 ACC -attended
6.Bed material filling system of boiler#2 RAL motor & hopper
discharge Plat valve MOV earthing wire hanging not connect to earth
point-attended
7.A type FRP ladder was kept there to remove and kept it location-
shifted from MV drive to proper location
7.A type FRP ladder was kept there to remove and kept it location-
shifted from MV drive to proper location

Shutdown given
1.Enmass-1
2.bucket elevator-1
3.Screen-2

Boiler-2 Soot blower MOV close limit setting done as per operation
requirement.
Reclaimer boom belt not operating ,checked found belt misalignment
fault & physically same condition so inform operation for
rectification.
All AC supply power made OFF from MCB in evening.
Shift jobs carried
CHP MCC room both PCC and MCC checked for any hole in back side
cable entry and observed areas sealing done.

WTP MCC room both WTP and Fire water MCC checked for any hole
in back side cable entry and observed areas sealing done.

DG report for both today and yesterday prepared and uploaded in


SAP.
IFC filter cleaning work done
TG-1 taken in base load at 3.15am as per operation requirement.
All Boiler-2 unnecessary lights were made off.

Shift jobs carried

In Unit No. # 2 DCS Panel No.- 27 Hole sealing done by Glass putty.
Unit No. # 1 Vessel No.- 12 /22 Seal Pr. Is not showing at DCS end. So
Cleaned the Impluse line. Now Ok.
In Unit No. # 2 coal Feeder area PA System is not working condition.
At site found that in hand set no dial tone. Also hand set is not
working condition.
Unit No. # 1 and 2 all the Bunker Level transmitter probe Cleaning to
done.
online CPCB and ETP website is healthy condition.
All the Manual Light to OFF Condition.
P. & V. No. # 4 is in running condition.
In CHP vibrating screen floor area one nos hand lamp to provided.
Also one nos hand lamp blub to changed.

Fire Pump House Battery voltage is checked. ( Voltage- 12.3 Volt. )

WTP pump House area all the motor cleaning and blowerning to
done.

Shift jobs carried


BC-3 , Trolley Motor cleaning done and panel cleaning done

BC-3, RSB and BC-2 Motor and power JB cleaning done.

BC-3, RSB and BC-2 Motor and power JB cleaning done.

Coal Shed Area Lights not On, found Lightning MCB trip so reset

Following Shut down Clear-


1. Vibrating Screen-2

Shift jobs carried

Reclaimer room panels checked for any hole in back side cable entry
and observed areas sealing done.
Limestone MCC checked for any hole in back side cable entry and
observed areas sealing done.

Following oil leakage abnormalities attended:-


a) 01MV2906
b) 01MV3205
c) 01MV3205

TG building 4.5meter both units MOVs and instrument cleaning done.

Rest room light and fan unnecessary power found ON so made off.

Shift jobs carried


Unit No. # 1 APH Back Pr. Switch / Back Pr. Transmitter is not
showing at DCS end. So Cleaned the Impluse line. Now Ok.

All the AC MCB to ON Condition.


in Unit No. # 1 01MV0913 earthing is broken condition. So
reconnected it. Now Ok.
Switch yard side Degaule Startion pr. Guage checked and zeroing
done. Now it is working condition.
online CPCB and ETP website is healthy condition.
All the Manual Light to OFF Condition.
P. & V. No. # 4 is in running condition.

Shutdown given
1.BC-5,
2.bucket elevator-1
3. BAC-2B,
4. Coal Feeder -1A ,
5. 01MV0909,
6. Coal Feeder- 1A pneumatics Valve ,
7. Vibrating Screen no.-2
Shift jobs carried
Coal Feeder -1A Clean run motor direction change from Panel side.

Bucket Elevator-1, change over in Local as per operation


requirement

BC-5, get tripped due to O/C so reset but it again trip then inform the
same to clean the jam.

Coal Feeder -1A Clean run motor chain get damage so by-pass the
Clean run motor ( MCB OFF from Panel)

Following AVI given and Close-


1. Coal Feeder 1A
2. Bucket elevator - 1

Following Shut down Clear-


1.BC-5,
2.Bucket elevator-1
3. BAC-2B,
4. Coal Feeder -1A ,
5. 01MV0909,
6. Coal Feeder- 1A pneumatics Valve ,
7. Vibrating Screen no.-2

Shift jobs carried

Unit-1 and Unit -2 AVR, Metering, EOP and Relay panels checked for
any hole in back side cable entry and observed areas sealing done.

AVR-2 one gland hole found so putty applied.

Unit-1 Metering of empty meter space is sealed with brown tape.


Shutdown given for BC-5.
AVI given and closed for BC-5.
Shift jobs carried

Reclaimer Left Right motor get trip so check and reset

BC-5, Guard Limit Switch rope open as per operation requirement for
belt jam cleaning
Boiler-2, Vessel 11-21 seal pressure fault so line flushing done but
same fault again found at pressure gauge pu tube came out . Attend it
now OK

Boiler1, bag House DP transmitter purging problem found MCB trip ,


so reset but after some time it again trip , check at site found no
abnormality , all transmitter made zeroing, under observation.

Unit-1 APH pressure transmitter line flushing done

At T1 Tower submersible pump connection done.


ACC-2, zero mtrs sing phase Top changed as per Environment person
requirement
BC-5 tunnel lights made ON manually .

One 24Volt hand lamp given at BC-5 belt

Following Shut down Given-


1. BC-1
2. Vibrating Screen-2
3. Reclaimer

Following AVI given and Close-


1. HSD pump-2
2. BC-5
BC-5 shutdown clear
Shift jobs carried
Chiller pump changeover from No.1 to no.2 as per operation
requirement.
2 no. handlamp repaired at CHP crusher house area.

Reclaimer breaker trip on zero sequence ,so lighting from


RSB ,manual switch at stair for lighting made off ,reset the fault &
started the reclaimer ;need to check lighting ckt./ fault analysis.

ACC & BC-6 lights On manually at 5pm as per operation requirement.

Following AVI given and Close-


1. VAM chiller pump-2

Following Shut down Clear-


1.BC-1
2.Reclaimer
3. Chiller pump-2
4. HSD feed pump-2
5. Vibrating screen-2

Coal feeder 1D pneumatic valve limit disturb so set again ,tightness


done.
Unit-1 baghouse 22 no. air sov not opearting from DCs so checked
found sov not working , forcely given open -need to be reapir.

Unit-1 LP heater New drip temp. RTD connection done at field & DCS.

DCS MEA report prepared as per auditor requirement.


Shift jobs carried

In BC-5 belt slip is not showing at DCS end. So checked and found
that guard limit switch is Ok Condition. Also Controoler side DCS
wire is Ok condition. Also checked at CHP DCS Panel no.-93 found
that one wire is in opened condition. So connected the wire . Now it is
showing at DCS end. trial is pending condition.
Chimney analyser AC is in OFF Condition. So ON the AC. Now ok.

All the AC MCB to OFF Condition.


online CPCB and ETP website is showing normally.
In Unit No. # 2 Vessel No.-12 /22 Field JB Hole sealing to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
P & V. no. # 4 Panel Connection tightness , Cleaning and Blowerning
to done.
At Reclaimer area 24 Volts Light to OFF Condition.
BC-6 and BC-4 Belt Light to OFF Condition.

Shift jobs carried


In Bed ash silo air leakage from plate valve SOV. So changed the PU
tube fitting. Now ok.
In Fly ash silo No. # 1 and 2 Panel and field Inst. Cleaning and
Blowerning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is showing normally.
Report DVD is showing full. So DVD Format to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Bucket Elevator-2, change over in Local as per operation
requirement
S / D Given- Coal Crusher No.-2 and Vibrating screen No.-2
S / D Cleared- Coal Crusher No.-2 and Vibrating screen No.-2
Vibrating Screen No.-2 O/L Reset as per operation requirement.
TG-1 Put into Base Load as per operation requirement.
Bucket Elevator-2, change over in VFD to DOL Mode as per operation
requirement
Shift jobs carried

BC-5 Motor not start from DCS & Lcoal ,Feeder check found ok , check
field side found guard limit switch interlock with Emergency Switch
now bypass Emergency switch now belt running normally

Shoot blower-2 trip on Cabinet overload check & found 9 no's shoot
blower in overload condtion due to overtravel & 1 bolt damaged
condtion inform to mech & ccr .
Boiler-2 Bed Material RAV Power healthy done as per requirement of
Operation dept.
Chimney Analyser SOX value high so change factor now value normal

Coal Bunker 1D level not showing so checked in field side clean level
probe & confirm from CCR level OK
Blr-2 0 mtr. Welding M/C Earthing Provided
DG report upload in SAP for 21& 22 sept.

Following Shut down Given-


1. Bed Ash Cooler-2B
2. Soot Blower-2
3. CT-2
4.Coal Feeder-2D

Following Shut down clear


1.CT-2

Shift jobs carried

Shutdown given for :-


a) BC-2
b) Reclaimer
c) Vib screen-2
d) Bucket elevator-2

Shutdown cleared for :-


a) BC-2
b) Recliamer
c) Soot blower-2
d) Coal feeder-2D
e) BAC-2B

TG building stair case side one 2ft light was hanging so corercted the
abnormality.

All AC powe made OFF.

EMS given in remote for some data backup to Mr. Gaurav.

Shift jobs carried


Vibrating Screen No.-2 shutdown clear.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern

Burner 2A actuator SV1304 main air fitting found loose tighten it.

Shift jobs carried

Shutdown given for :-


a) BAC-2B
b) Soot blower-2
c) Vib screen-1
d) Bucket elevator-1
e) Enmass-2
f) 01MV0909
g) Coal feeder-1A
h) BC-5

Shutdown cleared for :-


a) 01MV0909
b) Coal feeder-1A
Coal feeder-1A clean run motor power also started as per Operation after
permit clerance.

HIRA prepared for Crusher-1 motor work with Hemant sir.


P&V no. 4 started in morning.

Shift jobs carried

In BC-5 all the Pull Chord Switch polythene Coverning to done.


In Unit no. # 2 APH , Vessel No.-11/21 and 12/22 field Inst. And JB
Cleaning and blowerning to done.
All the Manual Light to ON Condition.
online CPCB and ETP website is showing Normally.
All the AC MCB to OFF Condition.
P & V. No. # 4 is in running condition.
Boiler No.-2 Lift showing fault condition. So Reset the Power Supply.
Now Ok.

Following Shut down Cleared.


1. EN Mass No.-2.
2. BC-5,
3. BAC-2B ,
4. Soot Blower No.-2,
5. BC-1
6. Fly ash Silo No.-2,

Following Shut down Given.


1. BC-1.
1. Fly ash silo No.-2,

Light ON at T-1 Tower , Crusher Floor , BC-6 belt , BC-4 Belt as per
Operation requirement.
CHP Street Light ON Lighting Timer Set to 7.00 PM. ( old Timer = 7.15
PM ).
In Boiler No.-2 Repair Supply Box JB No.-45 Packing to done.
Shift jobs carried

Following Shutdown Given and Close-


1. BC-3
2. Reclaimer

En Mass-2 change over in Local as per requirement and then


normalize at 5:40 AM

Coal Shed area lights ON as per requirement.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to


concern
Shift jobs carried
Shutdown given for :-
a) Enmass conveyor-2
b) Coal feeder-1B
c) 01MV0910
d)BC-5

Coal feeder-1B clean run connection removed as per maint. Requirement


gland side R,B and Y..
Chimney analyzer room all panels cleaning and blowering work done from
front and back side.

Coal shed lights made off in morning.


P & V no. 4 started in morning.

Shift jobs carried


In Unit no. # 2 vessel No.-22 level Probe is showing at DCS end. So
cleaned the level probe. Now ok.
In Unit No. # 1 and 2 all the bunker level transmitter Probe cleaning
to done.
coal feeder -1B pneumatics valve S/D to cleared.
All the Manual Light to ON Condition.
online CPCB and ETP website is showing Normally.
All the AC MCB to OFF Condition.
P & V. No. # 2 is in running condition.
Coal Feeder - 1B Clean run Motor connection done and trial taken.
But direction is reversed. So Rectified it. Now ok.
Crusher Building screen floor 24 Volt. LED Light plug top to changed.
Following Shut down Cleared.
1. EN Mass No.-2.
2. BC-5,
3. Coal Feeder -1B ,
4.01MV0910,
5. vibrating screen no.-2,

Following Shut down Given.


1. Vibrating screen -2

In Inst. Lab Blower green tag to provided.


CHP AHF Panel blowerning and cleaning to done.
Coal shed lights made ON as per operation requirement.
Shift jobs carried
Following shutdown Given-
1/ BC-1
2/ Crusher-2
3/Vibration Screen-2

AFR Breaker trip on overload IR-1 Reset done now Breaker healthy

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.


DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
Following shutdown Clear-
1/BC-1
2/ Crusher-2
3/Vibration Screen-2
Shift jobs carried

PA System of Unit No. # 2 Coal Feeder area is not working condition.


So checked and found that handset is not working condition. So
replaced the hand set from Unit no. # 1 FWS. Now Ok.
PA System of Unit No. # 2 FWS area is not working condition. So
checked and found that handset is not working condition. So
Connection tightness done . Now Ok.
In CHP Coal crusher No. # 1 DCS wire of A/M station , Start CMD and
Stop CMD Checked from New feeder to DCS termination TB. It is
working normally.
All the Manual Light to OFF Condition.
online CPCB and ETP website is showing Normally.
P & V. No. # 2 is in running condition.

BC-4 Belt , BC-6 Belt , coal Shed area , crusher Floor area Light to OFF
Condition. All the lighting timer is in bypass condition.

Fire Pump House all the motor cleaning and blowerning to done.
At 4.5 mtrs new Breaker feeder of coal crusher No.-1 Connection
tightness , busbar tightness to done.

Shift jobs carried


Following shutdown Given-
1/ BC-1
2/ Reclamier
BC-1 Belt not start from DCS so check & found Guard limit issue now
rectify problem Belt running normally

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Crusher-1 DE Side Bearing temprature found vilot now RTD


Replaced in CHP DCS Panel now DE Side value healthy
Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
Following shutdown Clear-
1/BC-1
2/ Reclmaier
Shift jobs carried

In ACW Pump House area PH transmitter sensor cleaning to done.


Unit No. # 1 CO analyzer showing the fault. So checked and found
that moisture fault at field side. So Reset it and cleaned the sensor.
Now ok.
In Fly ash silo No. # 2 gate valve is automatically closed and found
that fork level switch is showing full indication. So cleaned the
sensor. Now Ok.

Unit No. # 2 Soot Blower MOV closed limit switch checked at site and
field side closed limit is set ok position. There is no margin at site.

All the Manual Light to OFF Condition.


online CPCB and ETP website is showing Normally.
P & V. No. # 2 is in running condition.
S/D Cleared- Coal crusher No.-2 and BC-4.
S/D Given- U# 2 oil purifier , HSD Oil supply pump no.-1, Vibrating
Screen no.-1.
Boiler No.-2 First Floor Repair Supply Box no.-28 green tag to
updated.

TPP Middle gate Street light checked and it is working normally.

Shift jobs carried

BFP-2 Change over from DOL to VFD mode to start BFP-2

Coal Crusher 1, Motor On load trial taken


Hanuman Temple Music system not working attend it

Following shutdown clear


1. Coal Crusher-2
2. BC-3
3. Reclaimer
4. En Mass-2

Following shut down given-


1. Coal Crusher-2
2. BC-3
3. Reclaimer
4. En Mass-2
5. Booster Pump-1
6. BAC-1B
3. Reclaimer
4. En Mass-2
5. Booster Pump-1
6. BAC-1B

Shift jobs carried

Bunker level cross checked with physical found almost healthy

In Unit No. # 1 and 2 all the bunker level transmitter Probe cleaning
to done.
coal feeder -2A pneumatics valve close limit not going while open
command ,so limit cleaning done.
All the Manual Light to ON Condition.
Blr-1 lift telephone found not working so problem rectified & tested.
All the AC MCB to OFF Condition except Engg. Room
Chimney Nox value gong high so checked .

CHP bucket elevator-1 not taking selection so checked & found its
outgoing feeder contactor not changing aux. contact ,so rectified.
BC-3 24 Volt. LED Light started for operation requirement.

Following Shut down Cleared.


1. BE No.-1.
2. VS-1
3. BAC-2B
4.Ro pump-2
5. VS-2

Following Shut down Given.


1. Vibrating screen -2

Reclaimer area new light installation with G shift team.

CHP DCS system graphics edited for Crusher-1 Amp. Requirement.

CPCB data checked PH found going high value need to be checked.


Shift jobs carried

In Chimnay analyzer O2 reading is showing 18 %. So checked and


found that moisture fault at DCS end. So Reset it and Cleaned the
sensor. Now ok.
In unit no. # 2 BAC -2A and 2B VFD Panel Cleaning and Blowerning
to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
BFP-2, change over in VFD to DOL Mode as per operation
requirement
In Boiler no.-2 4th to 7th Floor Light to OFF Condition.
In Unit No. # 2 Soot Blower Panel Cleaning , Blowerning and
Tightness to done.

Shift jobs carried


In Chimnay analyzer O2 reading is showing 17 %. So checked and
found that moisture fault at DCS end. So Reset it and Cleaned the
sensor. Now ok.
ETP pH data showing higher value change, Water with solution then
taken in line now data within limit.
Bunker level 2D showing incorrect value check panel side found MCB
OFF condition ON it now Data OK

Unit-2 APH vessel-2 Dome Valve not close from DCS so check field
side & open & inform to CCR open & close limit check from CCR. To
be check Mech. Jam inform to Vikas Bhoir Sir

Following shutdown Given


1. RO High Pressure
2. Vibrating Screen-1

Shift jobs carried

Shutdown cleared for:-


a) BC-1
b) BC-5
c) Vib screen-2
Shutdown given for BC-1 and BC-5
BC-3 belt motor end one new light mounted from Boiler-1 bouzer
unloading point.

BC-1 area 2 nos. light provided.


RSB-90 indoor hole cover sealing done.

P7V no. 4 stopped in the evening.


RSB-90 green tag updated.

Compressor house lighting timer adjusted from 6;15 to 6;00PM.

Shift jobs carried

In Unit No. # 2 Vessel No.-11/21 Back pr. Switch and Transmitter is


not showing at DCS end. So Cleaned the impluse line. Now Ok.
In unit no. # 1 and 2 Firing Floor area Panel and field Inst. Cleaning
and Blowerning to done.
In unit no. # 1 and 2 Load cell Purging to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
In Boiler no.-2 4th to 7th Floor Light to OFF Condition.
In Unit No. # 1 Soot Blower No.-11 Over load .So reset it as per
operation requirement.

Shift jobs carried


Bucket elevator -1 tripped on belt motion ,so checked & target
tightness done with operation.

Soot blowe-2 MOV close limit set as per operation requirement , trial
done.
BFP-2 Change over from DOL to VFD mode to start BFP-2 as per
operation requirement.

following shutdown cleared


1.BC-4
2.DM water-2
3.DM water-3

Following shutdown Given


1.BC-4
2.VS-2
3.Coal crusher-2
4.DM pump-2
5.DM pump-3
6.12MV2306
7.12MV3210

Shift jobs carried

Shutdown cleared for:-


a)Crusher-2
b) ACW-1
c) Vib screen-2
d) Crusher-1
Shutdown Given
a)Crusher-1

6 no's WTI Points closed at Electrical Side


Coal bunker-2D level was high so filed side level probe cleaned then
value came to normal.
BAC-2A & P-FAN-2 Power JB Front Rubber Mat Provided
Boiler-1 0 mtr. Area Welding M/C Green Tag Provided
DG report Prepared and upload in SAP. For 29/09/2021

Compressor house lighting timer adjusted from 6;15 to 6;00PM.

Shift jobs carried


Shiutdown given for ACWP-1.
TG floor exhaust panels claening and blowering work done.

Root blower room all motors cleaning and bowering work done and
all panels cleaned.

Soot blower panel-2 cleaning and blowering work done.

Hoffing device 2 nos. was found open so made closed and cleaning
and blowering done.

Shift jobs carried


In Unit No. # 2 Soot Blower MOV open / Close Limit checked. It is
working Normally. But when giving the stop command it is not stop.
Also work is underprogress.
In Unit No. # 2 Boiler bed material bucket elevator RAV panel Double
earthing is broken condition. So earhing is reconnected. Also in panel
packing Tape to provided.
All the AC MCB to ON Condition.
In Auto drain valve of Service air compressor No.-2 drain filter is
chocked condition. So cleaned the filter. Now ok.
All the Manual Light to OFF Condition.
online CPCB and ETP website is showing Normally.
P & V. No. #4 is started at 7.00 AM.
S/D Given- BC-2 , Reclaimer , Vibrating Screen no.-2.
S/D Cleared- BC-2 , Reclaimer , Vibrating Screen no.-2.

coal Shed area , BC-1 , BC-2 , BC-3, Coal Bunker ( 22 mtrs. ) , Silo area ,
Lighting is ON Condition at morning time. So OFF the all the light.

At T-1 Tower , T-2 Tower , BC-3 and BC-5, 24 Volts AC hand lamp
repaired.
PM jobs carried
Jeshu Hozen done at WTP MCC Room
Jeshu Hozen done at WTP Hall

PM jobs carried
Boiler-1 lift stopped at 2nd floor by emergency switch, to avoid malfunction
due to rain.
Boiler-2 lift stopped at ground floor bdue to door malfunction .
PM jobs carried

PM jobs carried

PM jobs carried
GT-1 found wrong tap position in controller so opened field panel and found
water ingress in the connector main, so removed water and died with blower
and then sealed the panel from all side additional gasket. Then trial taken and
tap brought at normal position.

ACC-1D lube oil flow switch old one mounted and connection done, calibrated.
Then trial taken found OK.

ACC-1D motor main power connection and earthing done after mech work.

One 24V LED shifted from ACC-1D to shift almirah.

DG aux booked 1700KWh for last day and start stop booking also done.

70 additional red LOTO locks brought from WTP and kept in DCS-1 area for
isolation.

PM jobs carried

In Unit No. # 2 BAC-2A and 2B VFD Panel Blowerning and Cleaning to done.
Boiler-2 Shut Down Job.
Following Shut down given for Boiler 2 Shutdown
1. SA-2
2. Reclaimer
3. PA-2
4. P fan -2
5. PA Fan-2
6. SA Fan -2
7. J Valve 2A
9. 02MV2301
10. 02 MV 2302
11. 02MV0909
12. 02MV0910
13. 02MV0911
14. 02MV0912
15. Boiler -2 Igniter -1
16. Boiler-2 Igniter-2

PM jobs carried

SA-2 breaker maintenance work done, racking mechanism greasing, TB


tightness, panel and feeder cleaning work done.

Moisture fault in SPM analyser so moisture removed and reset the alarm.

GT-1 OLTC tap changer panel earthing was open inside so proper earthing
done.
Boiler-1 APH line choked so flushing done for impulse line.

PM jobs carried
U#2 Coal feeder VFD panels cleaning & blowering done.Unwanted material
removed from panel.

LED light provide at boiler-2 furnace.


All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked. It is working
Normally.
PM jobs carried

BC-3 tripped on belt slip, checked found NDE side proxy no changeover. So for
now NC contact remmoved from controller side(TB-5). Proxy in lab, need to
check it and normalise.

GT-2 main oil tank breather silica gel replaced and oil top up done for bottom
cap.
PA-2 breaker checking and maint done:-
a) All moving contacts
b) Contact and TB tightness checking
c) Cleaning and blowering of all brekaer parts

Boiler-2 coal feeder 2B and 2D pneumatic limits open and close removed and
covered with polythene and air tube of cylinder also removed as per Mech
requirement(2C to be done).

Bag house boiler-2 chamber-22 shutdown given for puppet valve and SOV.

PM jobs carried
Boiler-2 Shut Down Job.

Coal Feeders 2A, 2B, 2C and 2D VFD panel cleaning, Filter cleaning and
all TB's Tightness also proper cable dressing inside panel done

Bed ash cooler 2A & 2B , VFD panel cleaning, Filter cleaning and all TB's
Tightness also proper cable dressing inside panel done

Unit-2 All stopped MOV Feeder maintenance done (Feeder Cleaning ,


blowering all termination tighten and Racking rail lubrication done)

Unit -2 Total 35 Nos spare Feeder Check and made Ready, most of them
have Control Fuse Missing issue , new control fuse provided.

S/D jobs carried

In Unit No. # 2 SA Fan IGV check from CCR. When giving the 50 %
Command. IGV is not operated. Mechanically Jammed condition. When
Mech. Team give to clearence then we check the IGV.

In Unit No. # 2 PA Fan IGV check from CCR. When giving the 50 %
Command. IGV is operated. But when giving the 0% command. Due to
Mechanically Jammed condition.The Link of the IGV is Broken. So
Informed to Jitesh Paliwal. Mech. team Work in Progress. When Mech.
Team give to clearence then we check the IGV.
All the other IGV of Unit No. # 2 Check When Mech. Team give to
clearence then we check the IGV.

In Unit No. # 2 Huffing device No.- PT1119H , LT1107H , PT1109H,


PT1120, PT1102, PT1101 PU Tube is changed.

In Unit No. # 2 Huffing device No.- LT1107L , DPT1106H , DPT1109H,


DPT1103L, DPT1104H PU Tube fitting is in damaged condition. Then we
check at Inst. Lab. It is not found.

Boiler-2 Shut Down Job.


BAC-2A & 2B Feeder Maintenance done all termination tighten and
cleaning done.
SA Fan -2, RTD TB wire check and tighten done also confirm healthiness
at DCS and JB sealing done with glass putty
ID Fan -2, RTD TB wire check and tighten done also confirm healthiness
at DCS and JB sealing done with glass putty
PA Fan -2, RTD TB wire check and tighten done also confirm healthiness
at DCS and JB sealing done with glass putty
Bag House , 11-21 both panel all wire checked , cable tighten and cable
dressing done
Bag House , 12-22 both panels all wire checked , cable tighten and cable
dressing done
S/D jobs carried

As Per Mech. Requirement Unit No. # 2 ID Fan Fan DE / NDE Side RTD
removed at site.

Unit No. # 2 CO Vent Valve open / Close Check from CCR. It is working
Normally. Also when air removed from SOV. Then CO Vent Valve is
automatically opened condition.
Unit No. # 2 O2 Analyser Left ( 02 QI 1101 ) probe cleaning done and
Connection Tightness done. Since Zero Gas Cylinder is not available. So
Zero calibration is not done.
Unit No. # 2 O2 Analyser Left ( 02 QI 1102 ) probe cleaning done and
Connection Tightness done. Since Zero Gas Cylinder is not available. So
Zero calibration is not done.

Unit no. # 2 APH / vessel No.-11/21 and vessel No.-12/22 Back Pr.
Transmitter and back pr. Switch impluse Line Cleaning to done.

Unit No. # 2 Coal Feeder O/L Hooper temp. Connection tightness done
and Packing to done.
Boiler-2 Shut Down Job.

4.5m MCC room all Unit-2 end panels cleaning and blowering work done.

FAS silo level TX cleaning, then material sensing checked found OK and
polythene covering done.
SA-1 motor all termiantions opened and megger and resistance value
taken found OK.

BAS silo level TX cleaning, then material sensing checked found OK and
polythene covering done.

Bunker level all TX level cleaning and blowering work done all 8 nos.

APH of Boiler-2 vessel-1 high levelprobe cleaning and then material


sensing checked found OK.
APH of Boiler-2 vessel-2 high levelprobe cleaning and then material
sensing checked found OK.
Boiler-2 Shut Down Job.

Coal Feeder 2C clean run motor connection done

Boiler-2, Furnace test Point No-4 (TI 11128 ) is not showing at DCS end,
At field side T/C wire is not correct, Corrected it and made it Ok.

3 Nos Hand Lamp given at Boiler-2 Furnace area.


ID fan and PA fan motor space Heater switch made ON.

c)
Boiler-2 soot blower motors checking done from 5 to 19 nos:-
a) Motor earthing and tightness done
b) Motor end shield bolts checking and tightness
c) Cleaning and blowering work

IGV of Boiler-2 SA and PA checked with operation team, air charged from
field, but on command from DCS not operating both, need to check by
Instrument person.

4.5m MCC room all Boiler MCC of 2nd Unit side back cable dressing and
hole sealing work done, blowering of back side also done.

Boiler-2 soot blower limit checking done and local JB cleaning and
blowering work done.

Motor cover placed for all soot blowers and not found for no. 6 and 10.

APH of Boiler-2 vessel-2 high level probe checked, need to check high
high probe.
APH of Boiler-2 vessel-1 high level probe checked, need to check high
high probe.
Boiler-2 Shut Down Job.

SA Fan -2 , IGV check and maintenance done with General Shift Team

Involve in ACC Fan 2F Breaker Maintenance with G shift Team

ACC Fan 2F motor Connection open and done after motor overhauling

ACC Fan 2F Lube oil pump motor connection open and done after motor
overhauling
2 Nos hand lamp given at Furnaces floor.
3 Nos hand lamp given at Coal Feeder Floor.
Boiler-2 Shut Down Job.
Unit No. # 2 feed water Inlet line pr. Guage Showing 100 kg/cm2. So cleaned
the pr. Guage. Now ok.
Unit No. # 2 DSH station C.V. 02 TCV3203 F/B is not showing correctly at DCS.
So Calibration done. Now ok.
Unit No. # 2 DSH station C.V. 02 TCV3201 , TCV3202 and TCV3204 Trial taken
from CCR. It is working Normally.
Unit No. # 2 FWS station LCV3201 Valve is showing jerked at site. To be
check.
Unit No. # 2 FWS station LCV3202 Trial taken from CCR. It is working
Normally.
Unit No. # 2 FWS station LCV3203 Trial taken from CCR. It isShowing 56 %
feedback when 100 % Command. To be check.

In Unit No. # 2 J-valve Fan -2B VFD Panel Cleaning and Blowerning to
done.

Boiler-2 Shut Down Job.


Breaker maint. Work with G-shift team for ACC-2C, found the racking rod
bolts were loose so tightened the same.

ACC-2C motor and lube oil motor connection done after work and trial
taken found OK.

ACC-2C lube oil found low low not coming so cleaning done of the sensor
and then trial taken found OK.

Boiler-2 coal feeder all pneumatic limit switched connection done and
trial taken with operation in DCS limit OK. All air line connection done.
Thermocouple connection and replaced for no. 15

All RTD connection done for ID, PA and SA fan side DE and NDE both.

Following Shut down given for Boiler 2 Clear


1. SA-2
2. Reclaimer
3. PA-2
4. P fan -2
5. PA Fan-2
6. SA Fan -2
7. J Valve 2A
9. 02MV2301
10. 02 MV 2302
11. 02MV0909
12. 02MV0910
13. 02MV0911
14. 02MV0912
15. Boiler -2 Igniter -1
16. Boiler-2 Igniter-2

WTP Pump house motor cleaning & Blowering done


CCR LOTO LOCK Station LOTO LOCK 5S Done

PM jobs carried

BFP area all 3 motors cleaning and blowering work done as per dusty condition.
BC-3 tripped on belt slip, checked found NDE side guard machine limit acted. So
removed the rope and tightened again and then normalise the belt.

Boiler-2 side after light up work both flame sesnor shifted from Boiler to Inst
lab.

PM jobs carried

Boiler -1, Furnace DPT 1101 not showing furnace dp, check and found its
valve close , open the valve and now showing correct value.

BAC-1A dome valve not operating , so operate it manually 2-3 times now
OK

Dosing Room all panel and motor cleaning done.

Abnormality + Pending Job.

Reclaimer Lightning get trip continuously to be check in Day

Environment Report CD not working in any PC.

PM jobs carried

In Unit No. # 2 Soot Blower Panel Cleaning , Blowerning and Packing to


done.
PM jobs carried

BC-2 motor end and NDE side machine guard swicthes of limit were tied with
armoured and ropes so properly fixed with bolting arrangement, now OK both
limits.

WTP DCS panels cleaning and blowering work done due to dusty condition.

EMS upgradation work engaged with Service engg and all tags entered and SLD
data updated and corrected.
Reclaimer tripped one time on left-right VFD Fault-16, reset once, now running
OK. Need to check motor cable and TB once.

PM jobs carried
Boiler-2 Firing floor 2A & 2B SOV 1301 & 1304 , Ignitor & flame sensor
Panel Cleaning & Blowering work

BLR-2 DCV 02 TCV 3201 , 3202 , 3203 & 3204 Cleaning & Blowering
work

WTP Pump house motor cleaning & Blowering done

Abnormality + Pending Job.

Reclaimer Lightning get trip continuously to be check in Day

PM jobs carried

PM jobs carried

Pump House all Field instrument cleaning and blowering done

AOP 2A and 2B Motor cleaning done.


Abnormality + Pending Job.

Reclaimer Lightning get trip continuously to be check in Day

PM jobs carried

Boiler-2 FWS side PT-1117,1104,1102, DPT-1102H,1102L, PT-1104L JB


found open so all closed in shift round.

EMS PC ethernet swicthed to new system at 10:30PM and report for


12.09.2021 00:00hrs reading KWh taken from this report and report
prepared.

Boiler-2 Lift started as per Operation department need.

Boiler-2 FWS 100% main, 40% line control valve, 23 nos. MOV cleaning
and blowering work done.

Boiler-1 BAC-1A and 1B panels cleaning and blowering work done.

Many errors found in the new EMS SLD and reports, all details emailed.

PM jobs carried

In CHP Building area ZSS of Bucket elevator , BC-6 ZSS , Coal sampling
Panel , magentic Seperator Panel Cleaning and Blowerning to done.

BC-4 Motor Cleaning and Earthing Tightness to done.


PM jobs carried
Reclaimer Lightning circuit get trip , so check the circuit and identified
the faulty light and remove it, now Ok

Boiler 1, Bed Material RAV not working found its selector switch and
Start Push button not working, clean both switch and made OK.

ALL Hoist and EOT operated for NDT test for maintenance team.

Pending Job.
ID-2, SA-1 and PA-1 hoist hook to be kept in cage. ( Hook taken out for
NDT Test)
PM jobs carried

BFP MC drive AHU cleaning and blowering work done.

VAM 4.5m, workshop and CCR AHU VFD panel found with heavy dust
deposition so cleaning and blowering work done.
EMS report day sheet values linking done with consumption page for
Today column.
EMS report prepared with new data sheet generated after linking the
data of today.

DCS-1 BAC-1A and 1B VFD paenl cleaning and blowering work done.

PM jobs carried

Jeshu Hozen done at Fly ash silo and Bed Ash silo.
BC-3, Coal Shed trolley cable tray found hanging ,proper cable dressing
done
TG-1 and TG-2 Barring gear panel cleaning done.
PM jobs carried
WTP MCC room blowering done.

Switchyard Single phase socket checked & tested ok tagging done

Fire pump house All pressure gauge cleaning ,MOV cleaning ,JB cleaning
done.
Compressor house Auto drain valve checked /tested manually working
OK
Pending Job.
Coal feeder 24 volt transformer (Fix type) having incoming supply
issue,need to be checked.

PM jobs carried
Unit No. # 2 Firing Floor area field Inst. And JB Cleaning and Blowerning
to done.
PM jobs carried

Jeshu Hozen done at Fly ash silo and Bed Ash silo.

EMS Report modification work with Sati Sir

BAC-1B, VCS Earthing cable found loose tighten the same

Crusher Building Screen floor all field instrument panel cleaning done.

Fire pump house Engine battery is in healthy condition.

Pending Job / Abnormalities


SAWS Room panel lightning MCB frequently trip

Boiler-2, J valve 02DPIC1108 incorrect valve showing to be check

PM jobs carried
Reclaimer panels cleaning& blowering done.

Boiler-2 housekeeping work while field round


>Soot blower-16 motor GI sheet covering done.
> 02 no. Drain MOV GI covering done
BC-1 area Power JB polythene covering done.

CCR AC remote were hanging in walkway ,so cable dressing done.

Pending Job.
PM jobs carried

WTP DCS Panel , MOV Panel and 220 Volt I & C Panel Cleaning and
Blowerning to done.

PM jobs carried

Jeshu Hozen done at T-1 & T-2 Tower .


T-1 & T-2 Tower E&I Equipment cleaning & Blowering work done

TG-1 and TG-2 Barring gear panel cleaning done.


Car Parking area lighting checked & found 3 NO's Lighing is ON condition

Pending Job / Abnormalities

APH#2 Dome#2 seal pressure gauge found faulty to be check

PM jobs carried

Compressor house Drinking water area one tube light not working check
and attend.
ACC 2, Lightning Timer get stuck up so check and reset.

01TCV 3203 air leakage arrested

Pending Job / Abnormalities

Reclaimer Main Breaker Trip while running to be check in Day

PM jobs carried
Motor cleaning and blowering work done and double earthing ensured
for AOP-1A and 1B, GSCV-1A and 1B.
EMS report prepared and some mistakes are noted and need to be
modified:-
a) SA-1 and 2 LT missing from graphics and SLDs.
B) AFR power not updating
c) T-loss sheet need to prepared.

Auto drain of Comp house checked and operation was ensured.

Reclaimer power of PLC was found off as breaker tripped on previous


shift so made healthy.

PM jobs carried

In CHP DCS Panel no.-93 TU Hole sealing done by glass putty. Now Ok.
In CHP DCS 220 Volts I& C panel Hole sealing done by glass putty. Now
Ok.
PM jobs carried

EMS report modified for auxiliary consumption and formula is modified.

Transformer loss sheet made and regenerated for last day found normal.

Template modified for EMS day report and checked.

SWAS room both Unit-1 drum water sample not coming so checked and
flow adjusted now pH showing OK.

PM jobs carried

4.5mtr PDB blowering done

FWS,Desupheating station Control valve cleaning blowering done.

Soot blower-2 panel cleaning , blowering &packing work.

Boiler-2 field inst. Near FWS cleaning ,blowering work as found dusty.
Compressor house auto drain valve tested manually.
PM jobs carried

PM jobs carried
PM jobs carried
Boiler-1 bag house JB of 11-21 and 12-22 checked for any gland holes
and then panel SOV connector tightness checked.

Boiler-2 bag house JB of 11-21 and 12-22 checked for any gland holes
and then panel SOV connector tightness checked.

EMS report modifications checked for done yesterday and all values are
OK.
12-22 panel of Boiler-2 rubber mat provided.
PTW emailed for exclusion list to all SHs.

PM jobs carried
WTP pump House area all the motor cleaning and blowerning to done.
PM jobs carried

FWS Unit-1 ,Desupheating station Control valve cleaning blowering


done.

Soot blower-1 panel cleaning , blowering &packing work.

Boiler-1 field inst. Near FWS cleaning ,blowering work as found dusty.

PM jobs carried

Coal feedrr-1B clean run motor having abnormal sound near motor so
checked in field found GB hot and motor OK, current also checked found
balanced. Motor is OK, need to confirm once when decoupled condition
Inst comp-3 PMT not coming so checked breaker is OK, found field
Emergency stop acted so released as per operation requirement.

TG building floor 0meter for both units all instrument MOVs and control
valve cleaning and blowering work done.

PM jobs carried
PM jobs carried

Boiler-1, RSB no-18 check and Inspection date updateed in green tag.

Fire pump house All pressure gauge cleaning ,MOV cleaning ,JB cleaning
done.

Temple watch Tower lights not glowing , found timer mismatched timer
reset and adjusted.

Abnormalities
Boiler-1 and Boiler 2 Lift control power switch OFF due to fault

PM jobs carried
Boiler-2 APH seal pressure not showing in gauge so checked and found
gauge was faulty, so replaced the gauge and connections of SOV
tightened also, now OK.
CEP-1A and 1B pressure gauges, tank gauges, NRV line MOV and TX
cleaning work done.
CEP-2A and 2B pressure gauges, tank gauges, NRV line MOV and TX
cleaning work done.
Dosing room all pressure gauges and tank level gauges cleaned.
Sox of chimney analyser changed for CPCB as per Operation requirement
from 0.8 to 0.4 factor.
Panel hole sealing and packing status PPT prepared with photos and
emailed.
PM jobs carried

PM jobs carried
Pending abnormalities

Unit-1 baghouse 22 no. air sov not opearting

BC-5 belt slip / guard limit proxy need to be checked

Boiler-2 Startup vent MOV operation from DCS to be checked

Reclaimer Zero sequence fault

PM jobs carried

In Unit No. # 2 Vessel No.-12 /22 Field JB Hole sealing to done.


PM jobs carried
In Fly ash silo No. # 1 and 2 Panel and field Inst. Cleaning and
Blowerning to done.

PM jobs carried

WTP pump House area all the motor cleaning and blowerning to done.
Pending abnormalities
1/ BC-5 Guard Limit Switch need to be checked

PM jobs carried

BC-5 DE side both guard limits checked and found one WTP end limit was slight
bend and not operated so corrected and check continuity from Em stop end
found OK, then feeder end TB-2A taken in line. Then trail taken now belt doen't
trip on start command.

Soot blower-9 after mechanical work completion, limit to be checked so for


now motor connection from output side is opened and power made healthy,
need to check the limit operation in morning.

Some materila shifting done to Inst lab.

Coal feeder-2D not getting any command from DCS found the power of
controller was OFF so started and changed controller config from local button
mode, now OK.
All PM07 notifications closed till 23.09.2021

PM jobs carried
Unit-2, Firing floor all Field instrument & JB cleaning done.

Unit-2, Firing floor 2B sensor cable dressing done.

Coal Feeder 1B, Clean run motor fan cover found loose , tighten it.

Silo Root Blower panel cleaning and blowering done.

PM jobs carried

Soot blower-9 of Boiler-2 checked and connection done from feeder, then both
limits opened and operation checked, found OK. Also the continuity found OK.
Then trial taken in local and remote, working both side OK.

HSD area transfer pump-2 not started from field so checked and found that
feeder was in remote so given in local, now trial taken found OK.

BC-5 NDE side both guard limits checking work is under progress with G-shift
team.
4.5m area Coal crusher-1 breaker bottom area thermocol packing done for
broken region

PM jobs carried
In Unit no. # 2 APH , Vessel No.-11/21 and 12/22 field Inst. And JB
Cleaning and blowerning to done.
PM jobs carried

WTP pump room all motors cleaning and blowering done.

Unit-1, Firing floor all Field instrument & JB cleaning done.

Unit-1, Flame Detector panel having hole so hole sealing done.

Unit-1, Firing floor Burner sensor cable dressing done.

Lime Stone area Lights Switch OFF during shift round


PM jobs carried

Coal feeder-1B old clean run motor was damaged in key slot so removed and
new motor provided to maint for mounting. Also paramters checked all
balance.

Boiler-1 lift was not closing door at 3rd floor so checked and opened the door
from lift top cabin and tightened the rope then taken in line.

Boiler-2 lift stopped from 2nd floor emergency switch.

CCR shift incharge walkie handset was not operating so found problem in
internal cable of handset so proper soldering done, now OK.

PM jobs carried
PM jobs carried

BC-6 , BC-7A & BC-7B Motor & Power JB Cleaning & Blowering work

Workshop MV Drive , BFP & CCR AHU Panel Cleaning & Blowring work

BLR-1 & TG Building Lift Telephone checked working & Cable dressing
work

PM jobs carried
PM jobs carried

CHP MCC Panel outside cleaning & Blowering work

BLR#1 6 no's drain MOV cleaning & blowering work

BLR#1 APH isolation valve handle side air leakage so handle nut
tightness & leakage arrest

PM jobs carried
PM jobs carried

Jeshu Hozen done at Deaerator Floor.

Boiler-2, APH vessel No-2 pu tube and cable dressing done


Unit-2 Coal Feeder Panel cleaning done
PM jobs carried

PM jobs carried

In unit no. # 2 BAC -2A and 2B VFD Panel Cleaning and Blowerning to
done.
PM jobs carried

Jeshu Hozen done at Reclamier Area

UPS-1 Panel Sealing done outside by Packing Tape

PM jobs carried

Boiler-1 APH SV-8127 common outlet conveying solenoid valve limit was
loose condition so tightened the same.
Coal bunker-2D level was high so filed side level probe cleaned then
value came to normal.
Boiler-1 6 nos. draon mov cleaning work done.

Boiler-1 11 vessel dome valve air tube dressing work done and cleaned.
EMS report some pending points sent.
EMS report hourly sheet format modified for correct auxiliary
percentage.

PM jobs carried

In unit no. # 1 and 2 Firing Floor area Panel and field Inst. Cleaning and
Blowerning to done.

PM jobs carried
PM jobs carried

Boiler-1 D superheating 4 nos Control Valve cleaning done

PM jobs carried
FWS all motors MOV, cleaning and blowering work done also all
instrument was cleaned.
Desuper heater station control valve and MOVs cleaning and blowering
done.
BFP-2 put into DOL and then VFD again as per Operation and interlock
used during starting breaker.
CoaL feeder Deaerator lights made ON and HSD area unwanted lights
made ON.

Reclaimer left-right motor was tripped so reset made ON.

Month end report checking done and balanced for zero errors:-
a) Net export
b) Power generation and auxiliary
c) DG Auxiliary
d) AFR and coal stacker power

PM jobs carried
Date Shift Engineer Name

01.10.2021 B Anurag Chowdhury

Date Shift Engineer Name

01.10.2021 A Tarun Gaur

Date Shift Engineer Name

02.10.2021 A Sanjay Garg


02.10.2021 A Sanjay Garg

Date Shift Engineer Name

01.10.2021 B Tarun Mandawat

Date Shift Engineer Name

02.10.2021 C Tarun Gaur

Date Shift Engineer Name


03.10.2021 A Jaswant Singh

Date Shift Engineer Name

03.10.2021 B Tarun Mandawat

Date Shift Engineer Name

03.10.2021 C Deepak Chand


03.10.2021 C Deepak Chand

Date Shift Engineer Name

04.10.2021 A Sanjay Garg

Date Shift Engineer Name


04.10.2021 B Tarun Gaur

Date Shift Engineer Name

04.10.2021 C Deepak Chand


Date Shift Engineer Name

05.10.2021 A Tarun Gaur

Date Shift Engineer Name

05.10.2021 B Deepak Chand

Date Shift Engineer Name


05.10.2021 C Sanjay Garg

Date Shift Engineer Name

06.10.2021 A Tarun Gaur

Date Shift Engineer Name


06.10.2021 B Deepak Chand

Date Shift Engineer Name

07.10.2021 A Tarun Gaur


Date Shift Engineer Name

Anurag
07.10.2021 B Chowdhury/
Tarun Mandawat

Date Shift Engineer Name

07.10.2021 C Deepak Chand

Date Shift Engineer Name


08.10.2021 B Sanjay Garg

Date Shift Engineer Name

08.10.2021 C Deepak Chand


Date Shift Engineer Name

09.10.2021 B Sanjay Garg

Date Shift Engineer Name


09.10.2021 C Tarun Gaur

Date Shift Engineer Name

10.10.2021 B Sanjay Garg

Date Shift Engineer Name

10.10.2021 C Tarun Gaur


10.10.2021 C Tarun Gaur

Date Shift Engineer Name

11.10.2021 A Sanjay Garg

Date Shift Engineer Name


12.10.2021 A Deepak Chand

Date Shift Engineer Name

12.10.2021 B Tarun Gaur

Date Shift Engineer Name


12.10.2021 C Sanjay Garg

Date Shift Engineer Name

13.10.2021 B Tarun Gaur


13.10.2021 B Tarun Gaur

Date Shift Engineer Name

13.10.2021 C Sanjay Garg

Date Shift Engineer Name

14.10.2021 C Deepak Chand


14.10.2021 C Deepak Chand

Date Shift Engineer Name

15.10.2021 A Tarun Gaur

Date Shift Engineer Name

15.10.2021 B Sanjay Garg


15.10.2021 B Sanjay Garg

Date Shift Engineer Name

15.10.2021 C Deepak Chand

Date Shift Engineer Name

16.10.2021 B Sanjay Garg


16.10.2021 B Sanjay Garg

Date Shift Engineer Name

16.10.2021 C Tarun Gaur

Date Shift Engineer Name

17.10.2021 A Sanjay Garg


17.10.2021 A Sanjay Garg

Date Shift Engineer Name

17.10.2021 B Tarun Gaur

Date Shift Engineer Name

17.10.2021 C Deepak Chand


17.10.2021 C Deepak Chand

Date Shift Engineer Name

18.10.2021 A Sanjay Garg


Date Shift Engineer Name

18.10.2021 B Deepak Chand

Date Shift Engineer Name

18.10.2021 C Gajendra Pandya


Date Shift Engineer Name

19.10.2021 A Deepak Chand

Date Shift Engineer Name


19.10.2021 B Deepak Chand

Date Shift Engineer Name

19.10.2021 C Sanjay Garg

Date Shift Engineer Name


20.10.2021 A Tarun gaur

Date Shift Engineer Name

20.10.2021 B Deepak Chand


20.10.2021 B Deepak Chand

Date Shift Engineer Name

20.10.2021 C Sanjay Garg

Date Shift Engineer Name

21.10.2021 A Tarun gaur


21.10.2021 A Tarun gaur

Date Shift Engineer Name

21.10.2021 B Tarun Mandawat

Date Shift Engineer Name

21.10.2021 C Deepak Chand


21.10.2021 C Deepak Chand

Date Shift Engineer Name

22.10.2021 B Sanjay Garg

Date Shift Engineer Name

22.10.2021 C Deepak Chand


22.10.2021 C Deepak Chand

Date Shift Engineer Name

23.10.2021 A Tarun gaur

Date Shift Engineer Name


23.10.2021 B Sanjay Garg

Date Shift Engineer Name

24.10.2021 A Sanjay Garg

Date Shift Engineer Name


24.10.2021 B Deepak Chand

Date Shift Engineer Name

24.10.2021 C Tarun Gaur


Date Shift Engineer Name

25.10.2021 A Sanjay Garg

Date Shift Engineer Name

25.10.2021 B Deepak Chand


25.10.2021 B Deepak Chand

Date Shift Engineer Name

25.10.2021 C Tarun Gaur

Date Shift Engineer Name

26.10.2021 A Deepak Chand


26.10.2021 A Deepak Chand

Date Shift Engineer Name

26.10.2021 B Tarun Mandawat

Date Shift Engineer Name


26.10.2021 C Sanjay Garg

Date Shift Engineer Name

27.10.2021 B Tarun Gaur


Date Shift Engineer Name

27.10.2021 C Gajendra Pandya

Date Shift Engineer Name

28.10.2021 A Tarun Gaur


Date Shift Engineer Name

28.10.2021 B Tarun Mandawat

Date Shift Engineer Name

28.10.2021 C Deepak Chand


28.10.2021 C Deepak Chand

Date Shift Engineer Name

29.10.2021 A Tarun Gaur

Date Shift Engineer Name


29.10.2021 B Deepak Chand

Date Shift Engineer Name

29.10.2021 C Sanjay Garg


Date Shift Engineer Name

30.10.2021 A Tarun Gaur

Date Shift Engineer Name

30.10.2021 B Sanjay Garg


30.10.2021 B Sanjay Garg

Date Shift Engineer Name

30.10.2021 C Gajendra Pandya

Date Shift Engineer Name

31.10.2021 A Sanjay Garg


31.10.2021 A Sanjay Garg

Date Shift Engineer Name

31.10.2021 B Tarun Mandawat

Date Shift Engineer Name

31.10.2021 C Tarun Gaur


31.10.2021 C Tarun Gaur
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped at 8:00pm


All AC power made OFF in evening.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument log book filled.
UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


P&V no. 4 stopped .
All AC power made OFF in evening.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
Boiler 1&2 unwanted lights OFF
Shift instrument log book filled.
UPS log book filled.

VAM log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all
Power report prepared.
DG report upload in SAP.
Regular jobs
Shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

All the Manual Light made to OFF Condition.

Following shutdown given & close-


1) Crusher-1
2) BC-1
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


P&V no. 4 stopped at 7.30pm
22 mtr light made ON
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

P&V no. 4 stopped .

All AC power made OFF in evening.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument log book filled.
UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house Auto drain valve checked manually
working OK

All AC power made OFF in Evening

IFC filter moisture drain


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument log book filled.

UPS log book filled.

VAM log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Shutdown given
1/ BFP-3
2/ BFP-3 Outlet main MOV
3/BFP-3 Outlet Bypass MOV

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house Auto drain valve checked manually
working OK

All AC power made OFF in Evening

IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

P&V-2& 4 ON Condtion

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

P&V no. 2 and 4 in running conditon.

All AC power made OFF in evening.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
Boiler 1&2 unwanted lights OFF
Shift instrument log book filled.
UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

EMS report prepared and mail to all


Power report prepared.
DG report upload in SAP.
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
Boiler 1&2 unwanted lights OFF
Shift instrument log book filled.
UPS log book filled.
VAM log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
EMS report prepared and mail to all

Power report prepared.


DG report upload in SAP.
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


P&V no. 4 OFF at 6 .00 AM
All AC power made OFF in evening.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


P&V no. 4 OFF at 7 .00 AM
All AC power made OFF in evening.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

P&V-4 ON at 7.00 am

CHP & Fire pump house & fly ash silo area light OFF
during morning round

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

P&V-4 OFF at 6.30 Pm

TG Building light ON

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually
check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked manually


working OK

All AC power made OFF in Evening

IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Chimny sox factor changed on request of operation


deptt, from 2 to 1

Bunker floor 22mtr lights made ON and OFF after


work completion

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house Auto drain valve checked manually
working OK

All AC power made OFF in Evening

IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.

1 no's extension Board provided at Crusher Building


( Mr. Umesh Vishwakarma)

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked manually


working OK

All AC power made OFF in Evening


IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

1 no's extension Board provided at Crusher Building


( Mr. Umesh Vishwakarma)

All AC power made ON in morning.


Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house Main IFC filter cleaning as


moisture found.

All AC power made OFF in Evening

P&V no.4 made off at 6.30pm

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

STG Building & CHP Area light OFF

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked manually


working OK

All AC power made OFF in Evening

IFC filter moisture drain


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house Auto drain valve checked manually


working OK

All AC power made OFF in Evening


IFC filter moisture drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

IFC filter moisture drain

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Boiler IFC moisture drained from filter

All AC power made OFF in Evening

P&V no.4 made off at 7pm.

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  Checklist
4. Generator-2  Checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

LIGHT MADE ON MANUALLY

All AC power made OFF in Evening

P&V no. 4 made OFF.

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

P&V-4 ON at 12.00PM

All AC power made ON in morning.

STG Building & CHP Area light OFF

Compressor house all auto drain valve manually


check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

LIGHT MADE ON MANUALLY

All AC power made OFF in Evening

P&V no. 4 made OFF.

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

P&V-4 ON

All AC power made ON in morning.

STG Building & CHP Area light OFF

DG Reading balance for Oct. Month in SAP

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

Chimney Analyser having moisture fault , moisture


sensor cleaning done

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

P&V-4 ON

All AC power made ON in morning.

STG Building & CHP Area light OFF

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

unwanted lights made OFF

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

P & V. No. # 4 is OFF at 7.30 PM.


All the Manual Light to ON Condition.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

unwanted lights made OFF


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift jobs carried
Shutdown given for :-
a) Coal Crusher-1
b) Vib screen-2
Shutdown cleared for :-
a) Coal Crusher-1
b) Vib screen-2
Coal Crusher-1 tag updated in PTW.
All AC powe made OFF.
2 nos. dome Led light shifted to Workshop.
Coal shed lights made ON by bypassing timer.

Shift jobs carried


BFP-2 VFD mode to DOL mode Changeover done as per requirement
of Operation dept.
WWTP MCC Back side Feeder Nomiclature Pasting done
Crusher-1 New Breaker & Old Breaker Nomiclature done
Compressor auto drain check found ok
Reclamier left right motor trip due to overcurrent reset done
1 no's LED Provided T-2 Tower area
Soot Blower-2 trip on G fault reset done now healthy

Shift jobs carried


At BC-7A / 7B Floor area all the Bag Filter JB cleaning and
Blowerning to done.
Unit No. # 2 Soot Blower MOV open and Close checked from CCR.At
Close side there is no margin at site . Presently Closed limit is set at
last position.
In Unit No. # 1 Firing floor area In JB hole sealing to done.
CCR AHU is in manual mode. So put into auto mode with SP=28.5
Degree.
All the Manual Light to OFF Condition.
online CPCB and ETP website is showing Normally.
P & V. No. #4 is started at 8.30 AM.
S/D Given- Coal Crusher No.-1,
S/D Cleared- Coal Crusher No.-1,
Coal Shed BC-3 area one nos 24 Volt Hand lamp to repaired also lamp
to changed.
Coal feeder area Unit No. # 1 and 2 lighting timer set also taken in
line.

Shift jobs carried


Shutdown given for :-
a)BC-1
Shutdown cleared for :-
a) BC-1
Boiler lighting timer changed as per Sunrise/sunset timings.
Boiler-2 secodary Damper 02FCV915 close limit setting done as per
operation requirement,trial done.
Boiler-2 secodary Damper 02FCV913 close limit setting checked as per
operation requirement,but found mech. Jamming while manual operation
for closing so informed to operation.
Bed ash silo system comes to fault ,so checked & reset as per operation
requirement.
CPCB reading check found healthy.
Lighting timer adjusted -coal shed , china yard road street light , aACC street
light.
Green tagging done for Silo RSB-68
WTI sheet updated as points closed.
UPS room 5.5 ton Ac started as room temperature observed 34deg.
Shift jobs carried
24 v Handlamp Provided T-2 Tower Area
2 No's Hand lamp Repir work at Electrical Workshop
1 no's LED & 1 no's handlamp collect from T-1 & T-2 Tower
Compressor auto drain check found ok

UPS room 5.5 ton Ac started as room temperature observed 34deg , 5.5 T AC
trip on HP/LP FAULT then off & started 1.5 T AC now temprature within limit

Coal Shed area Light Light ON as Per Requirement of Operation dept.

Shift jobs carried


All Coal bunker level tx cleaning and Blowerning to done.
BC-1 not getting started after cleaning of belt area by operation
team .checked the same found guard limit not acted properly , set it
right now ok

Reclamier left right motor trip due to overcurrent reset done

Temple music system was not running checked & found amplifier
supply was off, switched on ,now ok

Shift jobs carried


Compressor house IFC air leakage arresting work done as found from inlet
cylinder moisture drain PU tube. Work done with operation team by
bypassing the IFC.
CPCB reading check found healthy for ETP , Chimney reading not updating
after 5pm due to network issue.
UPS room 5.5 ton Ac started as room temperature observed 31deg.
ALL DCS report arranged  in proper folder from April-21 to Sept-21.

Shift jobs carried

Coal shed lights made ON as per operation requirement.

Boiler-1 from 4 to 7 Floor all lights switch off during shift round

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.


All auto drain valve checked by manual operation , working normal.
Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern

Burner 2A actuator SV1304 main air fitting found loose tighten it.
Shift jobs carried

At Morning 7.30 AM VAM System is tripped. So checked and found


that Chilled water Pump no.-2 is tripped. So checked and found that
O/L switch is acted. At site found that heavy water leakage at gland
side. So Chilled water Pump no. # 1 taken in line. also field side
manual I/L and O/L valve is in closed condition . So opened it. All the
AC is stared. But tripped due to HP/LP alarm. Since Cooling water
valve is in closed condition.After normalized the VAM all the AC is
OFF Condition. Now VAM syatem is in running condition.

In BC-4 Tail end Guard limit switch is in Loose condition. Also nut
and bolt is missing condition. So Proper fixing to done.

In Chimney analzer all the panel Cleaning and Blowerning to done.

Since BC-5 is in running condition. So we can not set the Min RPM in
VFD parameter. Pl set the Min RPM.
All the Manual Light to OFF Condition.
online CPCB and ETP website is showing Normally.
Coal Shed light to OFF Condition at morning time.
P & V. No. #4 is started at 8.30 AM.

Chiller Pump No. # 2 is tripped due to overload. So Reset it. Again it is


started. Again it is tripped. Now it is Under S/D condition.

S/D is given.
1. Vib. Screen No.-2,
2. BC-1,
3. reclaimer ,
4. Chilled water Pump no.-2,
5. BAC-1A,

at BC-1 24 Volts Hand Lamp to changed.

Shift jobs carried


WTI sheet updated Electrical side as points closed.
Shutdown cleared for :-
a) BC-1
b) RECLAMIER
c) BAC-1A
d)Chiller Pump-2

VAM System trip 2 times due to STG High Temprature now after
normalised STG temprature VAM Taken in line now VAM running normally

LS MCC Panels back side Feeder nomiclauture sticker pasting work done

Boiler-2 secodary Damper 02FCV913 close limit setting checked as per


operation requirement,but found mech. Jamming while manual operation
for closing so informed to operation.
BC-5 Belt feeder VFD low rpm set as per requirement on operation dept.
Rpm reduced from 100% to 60%( 8.0 to 4.8)
Silo-2 plate valve not operate check physically found mech. Jamming inform
to CCR Person
BLR-1 11-21 back Pressure line flushing work
CHP Coal Shed light ON as Per Requirement of Operation dept.

UPS room 5.5 ton Ac started as room temperature observed 34deg. When
temprature normal upto 27 deg. Started 1.5 T AC & Stopped 5.5 T AC

Chimney analyser found moisture fault now cleaning tube & again taken in line
now ok & Reading healthy
Shift jobs carried

Following shutdown given and clear-


1. BC-4
2. Coal Crusher -1

BC-4 motor not started after jam cleaning work, check from feeder it
is OK then at site found Guard Limit switch acted while opening the
guard. Attend the same

Coal Feeder 2B Motor get trip due to F0012 fault i.e." Motor Stall ",
After clearing jam Reset the Fault

ACC-1 , Lights not ON and get trip immediately , found problem in TG


Building side Door Switch so OFF the switch and ON from another
end
All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
Shift jobs carried
BFP-2 DOL mode to VFD mode Changeover done as per requirement
of Operation dept.
BLR-2 Furnace Bed temprature JB sealing & Packing work
Office AC ON Condition
Compressor auto drain check found ok & IFC Filter Drain check
Compressor House RSB-97 Green Tag Updated work
1 no's LED Provided T-2 Tower area
P&V -4 ON at 12 pm due to DT-4 winding temp . 85 deg.
P&V 2 &4 ON Codition
DG&MPSS Meter Communication Problem checking with G shift
Team
Hourly Report Auxiliary Formula updated in template

Shift jobs carried


Compressor IFC having heavy air leakage , air leakage arrested

BFP-2, change over from VFD top DOL at 19:50 Hrs


BFP AHU belt get tear , so BFP Room AC Switched ON and OFF after
AHU healthy
At Workshop 10Amp hand Grinder top changed

Boiler 1&2 SOX line flushing done.

In Hourly Power Report LS aux formula changed in Template

P&V No-4 , made OFF in evening


Coal Shed Lights Switch ON as per operation requirement

Shift jobs carried


In BFP AHU is in Manual mode. So put into the auto mode with set
point of 30 degree.
In CCR AHU is in Manual mode. So put into the auto mode with set
point of 30 degree.
In Boiler No.-2 APH , Vessel No.-11/21 and vessel No.-12/22 Inst JB
Cleaning and Blowerning to done.
online CPCB and ETP website is showing normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Coal Shed Light ON as per Operation requirement.
BFP-3 Lub oil Motor No.-1 Earthing is in loose condition. So Tightness
to done.
P & V. No. # 2 panel Cleaning and Blowerning to done.

Shift jobs carried


BFP-2 DOL mode to VFD mode Changeover done as per requirement
of Operation dept.
DT-5 HT Breaker Meggering done found found P-E = 400Mohm & P-
P=0 , Breaker Cleaning work

Office AC ON Condition

DT-4 to DT-5 HT & LT side changeover work due to DT -4 Protection


relay Power card failure & relay supply unhealthy
DT-4 HT Breaker Protection relay Power Card Change with spare
one now ok & Healthy
DT-4 & PCC-2A HT & LT breaker rackout condtion
P&V -4 ON at 12 pm due to DT-4 winding temp . 85 deg.
P&V 2 &4 ON Codition
Dereatror floor cable tray cable found hanging condtion dressing
work

Comp. auto drain manual check done

CHP area light manually OFF at Morning round


STG Building Hoist supply Healthy done
Shift jobs carried ( Electrical )
BFP-2, change over from VFD top DOL at 19:50 Hrs

Unit-2 soot blower get overload so check and reset.


Switch Yard TR-2, OLTC filtration unit having oil leakage, oil cleaning
done.

ACC-1, Lightning Timer get stuck up so reset and adjust the timer.

En-Mass -2 put in Local mode as per maintenance requirement.

Instrument Hand blower not working so check and repair

TG Building EOT power switch OFF

Coal Shed and coal bunker lights made ON

Following shutdown given and clear-


1. BFP-3
2. BFP-3 Outlet main MOV
3.BFP-3 Outlet Bypass MOV

Shift jobs carried

Following S/D Given


1/ Crusher-1
2/BC-4
3/Bucket Elevator boiler-1
4/ SooltBlower -1
BC-4 motor not started after jam cleaning work, check from feeder it
is OK then at site found Guard Limit switch acted while opening the
guard. Attend the same
BC-4 motor Gurad limit checked & found hang by armour wire so
new bolt fixing work
Bag house -1 inlet & outlet temprature differcence found ,so check in
field inlet rtd resistance checked found constat 152 ohm & terminal
cleaning done& DCS side Terminal tightness work. Now value under
observation.
CHP area light manually OFF at Morning round
Office AC ON Condition
DG report Prepared and upload in SAP.

Following S/D Clear


1/ Crusher-1
2/BC-4
Shift jobs carried

Shutdown cleared for :-


a) Boiler-1 bucket elevator
b) Soot blower-1

WTP DCS panels were found dusty so cleaning and blowering work
done in shift.

One hand lamp given in Coal feeder-2B area.

All auto drain valve checked by manual operation , working normal.


One 24V lamp given in T-2 tower area.

Shift jobs carried


BFP-2, change over from DOL to VFD at 19:50 Hrs

Bed Material RAV not healthy found its Feeder is not charge from
Local.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to


concern
Shift jobs carried
In Unit No. # 1 APH Seal Pr. Is not showing at DCS end. So Cleaned the
impluse line. Now Ok.
After Normalized the PRDS System , VAM System is taken in line. Also
all the AC ( all the MV Drive System , DCS-1 and 2 , UPS Room ) OFF
Condition. Also all the AHU Put into the auto mode. Now it is running
normally.
In Compressor House all the auto drain valve checked.It is working
Normally.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
All the AC MCB to OFF Condition.
P & V. No. # 4 is OFF at 7.00 PM.
En-Mass -2 is not started . So checked and found that it is in Local
mode. So put in Autol mode . Now Ok.
BC-1 tail end welding machine connection done as per mech.
Maintences requirement.

Following Shut down Cleared.


1. BAC-1B.
2. BC-1,
3. DM Transfer Pump No.-1,
4.01MV2312,
5. 02MV2312.

Unit No. # 2 Soot Blower Showing G Fault. So ON the MCB. Now Ok.

Shift jobs carried

T1, T2 and T3 Lights switch ON as per requirement.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

All auto drain valve checked by manual operation , working normal.


Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to


concern
Shift jobs carried
Fly ash silo No.-1 Silo Top Diverting Gate SOV JB air leakage found. So
PU tube fitting tightness to done. Now Ok.
In Fly ash silo No. # 2 Purging SOV No.-2 air leakage found. So
checked and found that Plunger assembly is in damaged condition.
Need to replace.
In Fly ash silo No. # 1 pneumatics gate Valve air leakage found from
PU Tube fitting. So replaced the fitting. Now Ok.
In Unit No. # 1 APH Seal Pr. Guage air leakages found. So Replaced
the Pr. Guage. Now Ok.
All the AC MCB to OFF Condition.
In Unit No. # 2 FCV 911 and 912 Cleaning and blowerning to done.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
All the AC MCB to OFF Condition.
P & V. No. # 4 is OFF at 7.00 PM.
Switch yard side lighting timer adjusted. ( New Time- 6.30 PM , Old
time- 7.15 PM.)
Boiler No.-2 , RSB No.-29 Green tag to provided.

Following Shut down Cleared.


1.BC-2.
2. BC-1,
3. Vibrating screen No.-2,
4. Coal Crusher No.-1,

BC-3 Belt area hand lamp to repaired.

Fire Pump House area , Fire engine battery is in charged condition.

Shift jobs carried


Fire Pump House area , Fire engine battery is in charged condition.
Battery voltage checked found 12.7 Vdc
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
All auto drain valve checked by manual operation , working normal.
Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
Root Blower -2 not start so check & found relay trip in O/L reset
done now healthy

Bucket Elevator-1 not start due ZSS act so check in field side found
Proxy switch loose so adujstment flapper now ZSS healthy

Shift jobs carried

In Chimney analzer SOX factor changed from 0.38 to 0.7 in chimney


analyzer PC as well as DCS. In Chimney analyzer PC after changing
the facor PC is restarted. Also services is restarted. But the value is
not changed. So informed to Mr. tarun.

In BFP AHU is in Manual mode. So put into the auto mode with set
point of 28.5 degree.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.15 PM.
BFP-2 Changed over from DOL to VFD mode as per operation
requirement.
ACC No.-2 , RSB No.-64 Green tag to provided.

TG-2 Floor area lift gate is not closed. Found that external sensor
near lift button at floor no.-3 is hang condition. So reset it. Now Ok.

Shift jobs carried


Boiler-1 Bag House 22 No vessel level high so filed side cleaning &
calibration done now ok
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
All auto drain valve checked by manual operation , working normal.
Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
BC-1 Handlamp repaired work
BLR#1 APH Isolation valve air leakage arresting work

Chimney analyser room window found open condition so closed it

ACC-1 , 6 no's motors & Power JB Cleaning by Cotton waste cloths

Shift jobs carried

In Unit No. # 1 Burner -1B air leakage found at packing sheet. So


Proper packing sheet to provided and tightness to done. Now ok.

LP Dosing Room , LP dosing magnetic level guage is not showing


correct reading . So rectified by magnet. Now ok.
In Coal feeder -2A Level transmitter is not showing correctly. So
Power Reset and Cleaned the probe. Now ok.
In WTP area fire sensor checked . All are working normally.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
LED light to Provided at BC-1 belt.
P & V. No. # 4 is started at 7.30 AM.
BFP-2 Changed over from VFD to DOL mode as per operation
requirement.
S/D is given.
1. Vib. Screen No.-2,
2. BAC-2B,

at BC-2 area 24 Volts Hand Lamp to changed.


at BC-7A / 7B area 24 Volts Hand Lamp to changed.

Shift jobs carried

TG building Lift Light not working , so change the light with new one.

EQMS ph valve showing incorrect value , so change the water


solution in pot , now it showing correct value 7.4pH
EQMS ph valve showing incorrect value , so change the water
solution in pot , now it showing correct value 7.4pH

Unit-2 Dome valve SV8105 not operated properly check physical and
found it get jam , same inform to CCR person.

Following shutdown given


1. BC-2
2. BAC-2A

BC-2, shutdown clear.

One 24V lamp given in BC-2.

Shift jobs carried

Shutdown cleared for :-


a) BAC-2A
b) Jockey Pump-2
c) HSD Pump-1
d) BC-1

BFP MV Drive room Cable tray GI Sheet hole found sealing by putty
ACC-1 both RSB Green Tag Updated
All auto drain valve checked by manual operation , working normal.
One 24V lamp given in bc-7A&7B
Shutdown Given for :-
a) BC-1
b) HSD Pump-1

Root Blower-1 Pressure gauge tube found remove condtion , fixing


work done
Start up vent MOV motor shifting in lab
Reclamier left right motor trip due to overcurrent reset done
Coal Shed area Light Light ON as Per Requirement of Operation dept.

Root Blower-2 trip on O/L reset done now healthy


Shift jobs carried
In Chimney analyzer O2 reading is showing High . ( Near about 18
%. ). So checked and found that flow is showing zero in rotometer.
Also back side of rotameter is damaged condition. So we can directly
connected the Tube inlet and outlet line. Now reading are showing
normally. also informed to Mr. tarun.
In CHP water cooler is overflow. So checked and found that inlet
valve is in opened condition. So closed the valve. Now ok.
In WTP DCS Panel cleaning and blowerning to done.

In reclaimer Left and right VFD showing fault. So reset it. Now Ok.
online CPCB and ETP website is not opened .
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.

In Coal crusher no.-1 power consumption reading is showing zero in


EMS. Also meter is showing error display. So supply off. Also meter is
showing error. So we can put the power consumption reading as per
the running hrs. ( 744 KWH ).
Root Blower -1 main MCB is ON as per operation requirement. Also
trial taken. It is working Normally.
At 22 mtrs light ON as per operation requirement.

Shift jobs carried

Shutdown cleared for :-

a) BC-4

CCR Shift incharge desk walkie talkie not working repairing done
now ok
Reclamier outside PLC Panel covering by Polythene
Bag house-1 air receiver tank auto drain check found ok but mech
air pipe leakage

BLR-1 Shoot blower no. 14 not start from DCS so check in filed side
found puppet valve open condition & limit issue now adjust valve &
limit now after start from DCS found ok & take 0.5 amp.
Shutdown Given for :-
a) BC-4
b) Crusher-1

RSB-6 BLR-1 Green tag updated done


Bolier-2 Soot Blower-9 motor connection open from Panel side as
per requirement of Operation dept.
Reclamier left right motor trip due to overcurrent reset done
Root Blower-2 trip on O/L reset done now healthy

Shift jobs carried


In Boiler No.-1 SOX analyzer Heat Trace line Controller MCB is in OFF
Condition. So ON the MCB. Now Ok.
In Boiler No.-1 Vessel No.-11/21 and vessel No.-12/22 Inst JB
Cleaning and Blowerning to done.
online CPCB and ETP website is not opened .
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.

In Coal crusher no.-1 is in Shutdown condition . So we can put the


power consumption reading as per the running hrs. ( 780 KWH ).
Unit No. # 2 Soot Blower Power Reset as per operation requirement.
WTP Pump House area Motor cleaning to done.
Shutdown Cleared. :-
a) BC-4
b) Crusher-1

Shift jobs carried


ACC Fan 2D lube oil pump current get violet , change the transducer
from spare feeder but still violet, to be change whith new when Load
gets down.
CPCB SOX value reaches to 900ppm then change the co efficient from
3 to 1 also change in DCS now it is 270ppm.

T1, T2 and Coal Shed Lights switch ON as per requirement.


CCR Desk phone not working , observe looseness form Joint tighten it
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern
Shift jobs carried

Compressor house all auto drain manually checked

T-1 & T-2 tower area handlamp repired work

3 no's handlamp repaired at Electrical Workshop

1 no's Extension board provided mech.team at Coal Bunker

RSB-76 WTP Hall Door Lock damaged replaced by new one

CPCB SOX Value reaches 570 PPM change factor from 1 to 0.5 both
DCS & CPCB Monitor now ok

Workshop MV Drive room temp. 41 deg. Then checnge set point 40 to


38

Shift jobs carried


In Unit No. # 2 APH slave Dome valve is not operating from DCS end.
So SOV Connector tightness to done. Now ok.
In Boiler No.-1 APH , Vessel No.-11/21 and vessel No.-12/22 Inst JB
Cleaning and Blowerning to done.
All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked.It is working
Normally.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.30 PM.
S/D Given.
1. BC-1,
2. BC-2,
3. Reclaimer ,

S/D Cleared.
1. BC-1,
2. BC-2,
3. Reclaimer ,
In ASH root Blower Panel Cleaning and Blowerning to done.
At BC-7A and 7B area 24 Volts Hand Lamp to changed.

Shift jobs carried


All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.


Environment report upload and mailed to concern
Plant APC Report , Plant Performance report upload and mailed to
concern

Shift jobs carried

In Unit No. # 2 APH Conveying Cut at high Pr. So Cleaned the impluse
line of Back Pr. Switch and transmitter. Trial taken. Now ok.

In Chimney analyzer Boiler no. -1 SOX chiller unit temp. is showing


at 18 degree. So Reset the power. Then started. Now Ok.
All the AC MCB to OFF Condition.
In Compressor House all the auto drain valve checked.It is working
Normally.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.30 PM.
Boiler No.-2 soot Blower Panel S/D to cleared.
In Unit No. # 2 Soot blower No.-15 power cable connection to done.
Also JB mounted at site. Trial taken but steam leakage found. So
informed to shift incharge.
At BC-7A and 7B area 02 Nos. 24 Volts Hand Lamp to changed.

one nos extension board is provided to durga electrical person. Also


collected it.

Shift jobs carried


All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to


concern

S/D Given.
1. BC-2,

S/D Clear
1. BC-2,

CPCB SOX Value reaches 80 PPM change factor from 0.5 to 3 both
DCS & CPCB Monitor now ok

Shift jobs carried

In the Chimney analyzer Room , Chimney Controller is showing ''


RAM FEHLER ' error on the display. So reset the Power . Now all the
reading are showing normally in the controller.

At BC-6 , Coal Flow TPH Panel door lock damaged condition. So New
door lock to Provided. Now Ok.
In WTP Hall all the SOV Panel , Field Inst. , transmitter , Sensor
Blowerning and Cleaning to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
at BC-1 area 24 Volts Hand Lamp to Provided.
In CHP MCC Room , HF Panel cleaning and blowerning to done.
In Unit no. # 2 Soot Blower No.-10 Motor resistance checked. It is
showing normally.
In Bed ash silo RAV tripped on O/L. So O/L reset as per Operation
requirement.

Shift jobs carried

DM Transfer Pump-3 not start from DCS & Local check feeder side
found OFF delay timer relay faulty replaced by new one now ok

SWAS-1 pH condesor cable found hanging condition dressing done

CEP-2A Discharge Line Pressure Gauge found faulty so new Pressure


gauge mounting work & taken in line

In Compressor House all the auto drain valve checked.It is working


Normally.
Compressure house RSB Panel Green Tag Updated done

1 no's 24 V Transformer collect & shift to Electrical workshop from


BLR#1 Ground floor
BC-2 not start so check & found chute level act checked in field side &
inform to operation dept.

Shift jobs carried

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.


DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to


concern

Coal Shed Lights Switch ON as per operation requirement

Shift jobs carried

In Unit No. # 2 APH slave Dome valve is not operating from DCS end.
So SOV Connector tightness to done. Now Under observation.

In Unit No. -2 , Vessel No.-11-21, Back Pr. Transmitter / Switch


Impluse line cleaned as per operation requirement.

In Unit No. # 2 APH Line Inst. Side isolation valve is closed due to
S/D. also removed the PU Tube , Limit Switch and Pr. Guage as per
maintences requirement. ( Loto key available at Electrical Loto Box. )

All the AC MCB to ON Condition.


All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is ON at 8.30 AM.
In Morning time Coal shed area , Crusher Building and BC-4 light is in
ON Condition. So OFF the light.
Boiler OFF Lighting time Changed from 6.15 AM to 6.05 AM.

S/D to Given.
1. FAS No.-2 Dry unloading system.
2. Coal Crusher No.-1,
3. BC-4,
4. Vibrating screen No.-1,
5. U# 2 Soot Blower system.

At WTP Motor cleaning to done.


At screen Floor area , LED light plug Top to changed.
At crusher floor area , 24 Volts LED light to provided to maintences
Person.

`
Shift jobs carried ( Electrical )
Boiler-2 APH Vessel -2 , Dome valve changed by Maintenance so all
instruments assembly remove and after dome change all assembly re
fitted and trial taken. ( gauge , level probe pneumatic fitting) and

Boiler-2 , APH level probe damage so kept the dome at Instrument


lab and dummy provided.

Chimney Aviation Lights Timer adjusted from 6PM to 6 AM.

Coal Shed , Crusher Building , T1 and T2 Tower Lights switch ON


manually

P&V No-4 , made OFF in evening

Following Shutdown clear-


1. FAS No.-2 Dry unloading system.
2. Coal Crusher No.-1,
3. BC-4,
4. Vibrating screen No.-1,
5. U# 2 Soot Blower system.

Shift jobs carried

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.

BC-1 chut level prob mechanical attachment found broken so tie the
prob with cable tie and mechanical attachment need to weld in Gshift

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern


Plant APC Report , Plant Performance report upload and mailed to
concern

Coal Shed Lights Switch ON as per operation requirement

Shift jobs carried

Soot Blower-2 trip on G fault check and reset it.

Following shutdown given


1. BC-1
2. BC-2
3. Soot Blower-2

SWAS unit -1 steam sampling annoucuter power get trip found


moisture enter inside controller, so remove controller and kept for
drying

Compressor House IFC air leakage arresting work under progress.

BC-3 Motor Earthing found loose so tighten it properly

BC-3, RSB and All JB checking & Cleaning done cleaning

4.5 Mtrs, LDB board Cover came out , new bolting done

SWAS Room AC power switch ON as per maintenece requirement

Shift jobs carried ( Electrical )


Following shutdown clear
1. BC-1
2. BC-2
3. Soot Blower-2

SWAS unit -1 steam sampling controller power get trip found


moisture enter inside controller, so remove controller and kept for
drying clean by CRC & Blower .
BLR-2 Soot blower -15 motor TB Spark observed check TB Side
found power cable insulation damaged condtion then re insulation
Power cable & connection done

Grinding M/C Faulty cable replacement & Green tag Provided

SWAS room W/M Green tag upadated

2 No's Hand lamp Repir work at Electrical Workshop

Shift jobs carried

In Unit No. -1 BAC-1A face plate is showing C.V. So as per discussion


with Mr. Rakesh sharma modification is done in the graphics editor.
Also changed the face plate name. Also replicate in all the PC. Now ok.
In Chimney analyzer chimney SOX reading is showing high. So as per
shift incharge requirement , SOX factor changed from 1 to 0.5 as well
as chimney analyzer PC and DCS system.
In Unit No. # 2 APH System Bypass main air valve air leakage from
fitting. So teflon and tightness to done. Now Ok.
online CPCB and ETP website is not opened .
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
Unit No. # 1 Boiler 4 th to 7 th Floor Light to OFF Condition.
Unit No. # 2 Boiler 4 th to 7 th Floor Light to OFF Condition.
At 22 mtrs light ON as per operation requirement.

Shift jobs carried


Following shutdown given
1. BC-4
2. Screen-1
3. Crusher-1

Following shutdown clear


1. BC-4
2. Screen-1
3. Crusher-1

SWAS unit -1 steam sampling annoucuter & Temprature controller


cleaning by hot blower & CRC after that installed at Panel now
Power healthy

Turbine-1 LP Heater O1LCV3304 Drain control valve leakage


observed now leakage arrest done

BLR-2 12-22 Seal pressure switch air tube laeakage arrested done

Chimney Anyalyser SOX-2 Moisture fault found now cleaning sensor


& again taken in line

Green tag upadated for 1 phase supply socket at CHP Crusher house ,
UPS Room & 4.5 mtr. Switchgear room

Grinding M/C Faulty at mech. Workshop problem attaend & rectified.

Shift jobs carried ( Electrical )

BFP-2 change over from DOL to Drive mode as per operation


requirement

Coal Feeder 2B Clean run motor get trip due to overload found it trip
due to material jamming, shutdown given for jam cleaning.

Coal Feeder 2A Clean run motor get trip due to overload so reset it
after jam clearing

Scissor Lift direction change as per requirement.


UPS Room 230 Volt ELCB check and green tag provided

* Following Shutdown Given-


1. BC-6
2. Coal Feeder 2B
3. Boiler-2 APH , Vessel -2
1. BC-6 Shutdown Clear

Shift jobs carried

In the Chimney analyzer Room , Chimney analyzer Panel , PC ,


Calibration Culinder Cleaning and Blowerning to done.

In Unit No.# 2 Vessel No.-11 Dome Valve PU Tube dressing to done.


All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
S/D Given- Coal Crusher No.-1, and BC-4,
S/D Cleared- Coal Crusher No.-1, and BC-4,
At 22 mtrs light ON as per operation requirement.
At Unit No.-2 Coal Feeder -2B ,02 Nos Hand lamp to Provided.
At Unit No.-2 Coal Feeder -2C ,01 Nos Hand lamp to Changed.

Shift jobs carried

Following shutdown given


1. BC-4
2. Screen-1
3. Crusher-1
4. BC-1
5. IAC-3

Following shutdown clear


1. Coal feeder-2B

Bed ash silo pneumative valve not close so check & found field close
limit engage spindle damaged condtion inform to operation dept.
Coal Feeder 2B MOV outlet open limit not fully engage then limit
adjustment done & cleaning done now ok
Bag House -2 11-21 & 22 level switch showing H-H , Checking &
calibration done now ok
3 NO'S Hand Blower Grenn tag Updated done

Shift jobs carried

IAC-3 field emergency released after PTw clearance for trial , found
healthy.

BC-1 belt welding JB abnormality point -Cover found in hanging


condition -So rectified by properly fixing.

BC-1 Magnetic seperator power On as per operation requirement,


again made off after work.

ACC unit-1 lighting timer checked, reset.

Switchyard & ACC both unit road street light timer On time
adjusted.from 6.15pm to 6pm.

* Following Shutdown clear-


1. BC-1
2. BC-4
3. crusher-1
4.IAC-3
5.VS-1

Shift jobs carried

BFP-2 change over from VFD to DOL mode as per operation


requirement

Watch Tower Lights Behind Switch Yard not glowing , its timer stuck
up so reset it adjust the time.

HSD area Lights found ON so OFF it, Coal Shed Lights switch On as
per operation requirement.
Following Report Preapared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried

In Unit No.-2 Soot Blower control MCB is tripped. So checked the


circuit and found that Control Supply -Phase wire is loop to all the
soot blower local jb. So one by check when removing the soot blower
No.-15 control wire then control wire is removed then MCB is not
tripped. Presently this wire is removed from the TB. Now Ok.

In Unit No.-2 Soot Blower No.-13 not started from DCS end. So
checked and found that DCS command is Ok. But field side switch is
in manual mode. So put into auto mode. Now Ok.
All the AC MCB to OFF Condition.

In BAS gate valve is not opened. So checked and found that ON delay
timer contact is structed. So external loop is provided. Now ok.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.30 PM.
AVI is given to Bucket elevator no.-1
S/D Cleared- BC-2 and Bucket elevator No.-1
Bucket Elevator-1 Put into DOL to VFD mode.

Shift jobs carried


Coal Bunker 1A, Showing incorrect Level , level Transmitter cleaning
done. Now OK

Boiler-2, RSB No-29, ELCB not functioning properly , clean it with


limit , now ok.
Crusher building Lights Switch ON manually.

Following Report Prepared


1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried

Following shutdown given


1. BC-1
2. Reclamier
3. Soot Blower-2
4.Jockey Pump-1

Following shutdown clear


1.Jockey Pump-1

BLR-2 Soot blower -15 motor field Panel check & found limit
assemble cable ground with jb now reinsulation & cleaning work &
motor trial take manually found running normally without tripping
control supply

BLR-2 feed water station 100% line control valve 02LCV3202 gland
leakage observed , leakage arresting done

ACC-1 6no's ACC motors both DE & NDE side Lubrication done

Bed ash Cooler- 2A not start from DCS check & found motor field
Panel relay O/L reset done now supply healthy
1 no's extension board Handover to Mr. Vishwakarma
Fly ash silo area RSB-82 Green Tag Updated done
Shift jobs carried

In Unit No.-2 Boiler DCS panel No.-25 TU Cable dressing to done.

In Bed ash silo Dry Panel Connection Tightness and panel sealing to
done.
In BFP AHU System SP changed from 31 to 30 degree because Cubicle
Temp. is incresed to 43 degree.
All the AC MCB to OFF Condition.
In BAS gate valve Air leakage from SOV PU tube fitting. So Tightness
to done. Now Ok.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.30 PM.
BFP-2 put into DOL to VFD as per operation requirement.
S/D Cleared- BC-1 , reclaimer and Boiler -2 Soot Blower.
BC-7A / 7B hand lamp to changed.

Shift jobs carried


In Unit No.-2 Soot Blower no. -12 Limit switch to set as per operation
requirement. Trial taken it is working Normally.
As per operation requirement Unit No.-2 Soot Blower No.-
11,13,14,15,and 16 with Boiler shift operator. All are working
Normally.
Fly ash silo No.-1 and 2 panel and Field Inst. Cleaning and blowerning
to done.
BFP AHU System is in Manual Mode. So put into auto mode with
SP=30 degree.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is ON at 7.30 AM.
In WTP RO Booster Pump-1 ON F/B is not showing at DCS end. So
checked and found that internal relay is faulty. So changed the relay.
Now Ok.
In WTP Pump house area all the motor Cleaning and blowerning to
done.
In CHP Vibrating screen No.-2 AVI is given and Puto into Local Mode
as per APS requirement.

`
Shift jobs carried
BAC-2A, Flow switch not open completely , found its limit get stuck
due to dusting , clean and free it , now trial taken working OK.

Vibrating Screen-2, Motor check found balance 0.9-0.9-0.9 ohms ,


during trial its direction is reverse so correct the direction , then trial
take . Load Current 17-17-17 Amp
Following Shut Given
1. BC-1
2. BC-4
3. Reclaimer

Following Shut Clear-


1. BC-1
2. BC-4
3. Reclaimer
4. Coal Crusher-2
5. Vibrating Screen-2

Both -1, Bag house zero meters JB and Field instrument cleaning
done.

Both -1, APH JB and Field instrument cleaning done.

Shift jobs carried

Bucket Elevator -1 feeder selection not ready in DCS So check in


feeder side found aux. contactor ADD ON block stuck up now
cleaning add on& tightness terminals then DCS Selection healthy

Boiler-2 APH Conveying check & found back pressure line leakage so
change back fitting & transmittior cleaning work
Following Report Prepared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report
Shift jobs carried

In the Chimney analyzer system, O2 reading is showing High. So


Checked and found that rotameter O/L line is in chocked condition.
So open the fitting and Put into acid. After removing the chocking
again connected. And taken in line. Now ok.

In BAC-2A S/D to provided. Pr. Guage / tube/limit switch removed at


site. Also air valve is in closed condition.
BAC-2A Dome valve Limit switch Bolt to provided.
AC MCB to ON Condition.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is ON at 8.00 AM.
HSD area oil Pump Motor No.-1 motor connection removed as per
Mech. Requirement.

S/D Given.
1. Vib. Screen No.-2,
2. BC-4,
3. Oil centrifuse Pump No.-2,
Hand Lamp to Provided at Unit no. # 2 Oil centrifuse area.

`
Shift jobs carried

BAC 2A Pressure gauge, Dome limit switch and air connection done.

CCR Desk -client PC get hang, open its CPU and blowering done.

Following Shut Given-


1. Bed Ash Silo Dry Unloading

Mist Fan 2A and 2B current showing violet , so both feeder


transducer change but still showing violet. Work under progress.
Unit-1, Bag house vessel 11-21 back pressure not healthy , line
flushing done.

Following Shut Clear-


1. Oil centrifuge Pump No.-2
2. BC-4
3. Reclaimer
4. Bed Ash Silo Dry Unloading
5. Vibrating Screen-2

Shift jobs carried

Chimney SOX data fluctuation at DCS check in field side found Panel
display RAM fechler showing so reset panel power supply & restart
PC now ok & SOX Value showing healthy at DCS & Panel.

BAC-1A Field Panel new rubber mat laying work

BLR-1 APH Conveying line common outlet conveying solenoid valve


SV8127 limit found loose bolt tightness done now ok
Following Report Prepared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried

BC-6, TPH controller check and change . Work under progress.

Unit-2, MOT level showing incorrect , so main valve isolate the valve
and drain , now OK
Unit-2, APH SV-8105 not operating , operate it manually now ok.

Compressor-2, Motor cleaning and blowering done.

Near BC-6, Power cable dressing done

Following Shut Down Given-


1. Vibrating Screen-2
2. Fly Ash Silo-1

Shift jobs carried

boiler-1 01DPIC1102 tx.line found heavily choked so tried to clean


but still choking is there work is U/P

24 volt led light shifted from boiler-2 to elec. Workshop.


24volt transformer & LED given to maint. Team near BAC-2A .

Following Shut cleared-


1. VS-2
2.FAS dry unloading system

Mist Fan 2A current showing violet , so feeder transducer checked


found not shwoing 4 MA while applying aux. supply..

Chimney analyser O2 % value going high so checked & rectified the


issue by increasing roatmeter flow. afterwards under
observation ,running healthy

Shift jobs carried


As per operation requirement Unit No.-1 BAC Interconnecting valve (
01SV1902 ) is manually closed from the SOV.

In Unit no.-1 Vessel No.-12 Dome valve Open and Close PU tube air
leakage found. So Cut the PU Tube and reconnected it. Now Ok.
In Unit no.-1 and 2 all the Bunker Level Transmitter probe cleaning
to done.
In Unit no.# 1 Boiler area Zero mtrs field Inst. Cleaning and
Blowerning to done.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.

EMS Report is prepared and Mail to all person.


BC-7A / 7B area motor and Electrical JB cleaning and Blowerning to
done.
In Boiler No.-2 4 th to 7 th Floor Light to OFF.
At T-1 Tower , T-2 Tower and BC-3 area light ON as per operation
requirement.

Shift jobs carried

ACC-2 4no's motor DE & NDE Side Lubracation done

Bolier-1 RSB -1 Green tag updated done

Switchyard & ACC Garden area Earth Pit Sticker Updated done

SAC-2 SOV Fitting found damaged relaced by new one & air charge
done

BC-5 Belt Group 1&2 pullcard act so check in field side manually
found ok for requirement bypass pullcard & after work again pull
card takren in line, checking work U/P

Following Shut Down Clear-


1. Vibrating Screen-2
2. BC-1(2times)
Following Shut Down Clear-
1. Vibrating Screen-2
2. BC-1(2times)

Shift jobs carried


BC-5 Belt Group 1&2 pullcard voltage is coming, on removing cable
pull card is reset in DCS, also pullcord no/nc making properly, so
need check the pull cord cable

BAC-2B water flow low came in DCS, so remove the cable of flow
switch once and reset the flow low, again its cable is connected.

boiler-2 RSB-32 one single phase ELCB not working so clean it with
CTC, now working
Following Report Prepared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried

BC-5 Pull cord checking work U/P

Chimney Analyser moisture fault , reset done now value healthy

W/M-8 near BAC-2A Rectifier JB found loose condition now JB


Proper dressing & tighness with screw

BC-2 Not start in Local so check & found guard in open condition now
as per requirement in Local running. Bypass guard limit (MR.
Srivastav)

STG Building lift telephone not working attend problem & rectified

BC-2 AVI Given & Put on Local Mode as per requirement of Mr.
Srivastav.
Following Shut Down Given-
1. BC-1
2. BC-2
3. BC-5

Shift jobs carried

BAC interconnection valve logic modified as per process requirement


.

Workshop grinder Green tag updated done

Compressor house lighting time modified from 6.15 to 6 pm.

Shutdown given
1.portable pump-1
2.portable pump-2

BC-5 Belt Group 2 PCS removed from field & maintenance done,now
healthy.to be installed .

Following Shut Down Clear-


1. BC-1
2. BC-5
3.portable pump-1
4.portable pump-2

Shift jobs carried

3 Nos of Faulty Pull cord Repairing done at Instrument Lab

Chimney Analyse controller moisture fault attended.

Boiler-1&2 all unwanted light Switch OFF manually

Following Report Prepared


1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report
Following Report Prepared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried

Chimney Analyser moisture fault , reset done now value healthy

Scree-2 not start in DCS check feeder side found control feedback
wire loose in TB Tightness done , motor output cable remove &
feeder trial taken both DCS & Local mode now ok. & again motor
connection done . Motor megger done found ok

BC-5 Pull cord 3 no's checking work at Inst. Lab found healthy
condition

Cement plant speaker check & found daiphram damaged , checking


completed , diaphram repalcing work U/P

BC-5 motor not start due to O/L , Relay reset done now ok

Following Shutdown clear


1. BC-5

Following Shut Down Given-


1. BC-5
2. Screen-2

Shift jobs carried


BC-2 , motor taking high current 38 Amp, so decouple motor and no
load trial taken.
No load Current -13 amp, FLC -28 Amp

BC-5, 2 no's faulty pull cored replace with repaired one. And trial
taken.
BC-2, all limit switches ( Guard Limit/ emergency switch) made
healthy after belt replacement work.

BAC 2A, 24 volt land lamp given as per operation requirement and
collect after work completed.

Instrument lab Single phase socket power missing , found Loose


connection.

Following shutdown given


1. BC-2
2. BC-5

Following shutdown given


1. BC-1
2. BC-2
3. BC-5
4. Vibrating screen

BC-2 AVI given and close as per maintenance requirement.

Shift jobs carried

In Chimney analyzer , in Chimney Moisture fault is showing.So Reset


it and Cleaned the moisture filter. Now ok.
At VAM area 4.5 mtrs AHU Panel , CCR AHU Panel , Lift UPS panel , AC
Compressor oudoor unit , Local and field inst. Cleaning and
blowerning to done.
IFC Panel Filter drained to done.
In Compressor House all the auto drain valve checked.It is working
Normally.
Reports generate of (APC, Plant Performance, Power Report and Env
report) send to all the concered person.
Electrical Report is generated.
EMS Report is prepared and Mail to all person.
BC-2 AVI to Closed and S/D to provided as per Mech. Person
requirement.
In Boiler No.-2 4 th to 7 th Floor Light to OFF.
Unit no.-2 Lift showing fault on display. So Reset the power. Now ok.
Shift jobs carried

CCR Desk Walkie talkie hand speaker checking work found healthy

ACC-1C Fan stopped frequenty so check & found ACB Breaker High
Speed contactor ON OFF freqently due to control supply
malfunctioning now off breaker & tightness terminals now control
supply healthy & ACC-1C Fan running normally

HSD & BC-5 Area RSB Panel Green Tag Updated done

HSD-1 Pump motor Connection work done


DE- R-Y-G-NDE

HSD-1 Pump Feeder SFU Handle found broken condition & not ON ,
so check feeder reckout condtion found SFU Mechanism Jammed &
ON forcely. Need to replace SFU Hnadle Mechanism

Following AVI Given & clear


1. BC-2

DG report Prepared and upload in SAP.

Shift jobs carried


In BC-2 Belt Guard PCS is in open condition. So proper fixing to done.
Also taken in line. Now ok.
In BC-2 Belt all the PCS rope is in loose condition. So tightness done.
Now Ok.
In Unit no.-2 Vessel no.-12/22 seal Pr. Fault is showing at DCS end. So
cleaned the impluse line. Now Ok.

In Chimney analyzer all the panel Cleaning and Blowerning to done.


All the AC MCB to OFF Condition.
All the Manual Light to ON Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is OFF at 7.00 PM.
BFP-2 put into DOL to VFD as per operation requirement.
S/D Cleared- BC-2 , and HSD oil Pump No.-1,
In HSD Oil Pump No.-1 feeder is not ON Condition. So checked and
found that SFU ON/OFF lever interlock spring is not working
condition. So rectified the problem and adjust the Level rod. Then ON
the feeder. Now Ok.
In WTP MCC Cleaning and blowerning to done.

Shift jobs carried

WTP transmitter(FT-4804) polythene found dirty so replaced it

BFP -2 MV drive Changed from VFD to DOL

BFP-3 MV Drive temp incresed to 40 degree so set point of AHU


incresed to 29 degree

Following Report Prepared


1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report

Shift jobs carried


In BFP AHU System temp. is Normal So SP changed from 28 to 30
degree.

In reclaimer Left and right VFD showing fault. So reset it. Now Ok.

In EMS PC hourly Report is not generated. So closed all the old report
and also google. Then generate the report. Now ok.
Unit No. # 2 Firing Floor area all the Inst. Panel and field inst.
Blowerning and Cleaning to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is ON at 11.00 AM.
Coal bunker area , BAS , Fire Pump House , T-1 Tower , T-2 Tower
and Coal Shed area Light to OFF at morning time.
ACW Pump House area all the motor and JB's Cleaning and
Blowerning to done.
BC-7A / 7B floor area 01 Nos hand lamp repaired and RSB green tag
to provided.

`
Shift jobs carried
ACW pump house lighting timer not working so reset and taken in
line.
WTP RSB supply box ELCB checked & green tagging done.

CHP recliamer boom left movement issue was there so checked &
selector switch connection tightness done.working healthy & is
under observation.
Boiler-2 BAC2B dome stucked so manually operated once as per
operation requirement.

Chimeny analyser moisture fault found so filter cleaning & reset fault
once, system working healthy & is under observation.

Compressor house all auto drain valve operation checkedc found


working healthy.

Shift jobs carried

ACW pump house lighting timer not working so reset and taken in
line.

Coal Feeder Area RSB-55 ELCB Checking work found 1 no's ELCB not
working cleaning by cleaner now ok

Chimney Analyser data flucations so panels all tubes leakage checked


& all fitting tighness checked now ok
Following Report Prepared
1. EMS Power Report
2. DG Report
2. Environment report
3. Plant APC Report, Plant Performance report
PM jobs carried
Deaerator floor back side illumination problem found light circuit
tripping ELCB. So checked and rectified the earthing issue from light
circuit and made healthty one light in back side.

BAC-1B seal pressure side air leakage so arrested the same.

Bed thermocouple JB of Boiler-1 made sealing for gland holes.


WTP DCS area cleaning and blowering work done.
One motor is meggered for Boiler-2 soot blower MOV and found
ground from TB end, need to open the motor side.

PM jobs carried
LS MCC & WWTP MCC Panel outside cleaning & Blowering work
done
VAM System 5 no's Panel Cleaning 7 Blowering work done
SWASS Room 1&2 Control Panel cleaning done

PM jobs carried

In Unit No. # 1 Firing floor area In JB hole sealing to done.

At BC-7A / 7B Floor area all the Bag Filter JB cleaning and


Blowerning to done.
PM jobs carried

PM jobs carried
CHP MCC Outside cleaning & Blowering work done
Chimney Analyser Panel Cleaning & Blowering work
Unit-2 Bag House 11-21 12-12 vessel Panel Cleaning work

PM jobs carried
Unit-1 all Coal bunker level tx cleaning done

Unit-2 all Coal bunker level tx cleaning done

P&V-2 side common drain line found chocked so hammering


done now ok

BFP-1,2 &3 motors cleaning & blowering job

LED supply given at CHP screen floor area


24 V hand lamp bulb replaced at BC-1 head area

PM jobs carried

Pump house instruments blowering cleaning work done.

Pump house Electrical Motors blowering cleaning work done.


IFC filter cleaning & auto drain testing found ok.
BLR-1,2 load cell Purging done.

PM jobs carried
TG Building Zero Mtrs 01 MV 3303, 01MV 3205, 02MV 3203,
02MV 325 oil leakage cleaned.

TG -1 Zero Mtrs all control valve and MOV cleaned

TG -2 Zero Mtrs all control valve and MOV cleaned

Reclaimer Panel Cleaning done


PM jobs carried

In Chimney analzer all the panel Cleaning and Blowerning to


done.

PM jobs carried
WTP & Fire MCC Panel outside cleaning & Blowering work
PM jobs carried

WTP , MGF air blower motor 1&2 cleaning and blowering done

WTP , MGF air blower motor 1 , body Earthing found loose


tighten it.

WTP all DCS panel , MOV panel & Filed Instrument JB cleaning
done.

WTP reverse Osmosis all pressure gauge cleaning done

Pending Job / Abnormalities

ACC-1, Lightning switch faulty to be replace. (TG building side)

WTP DCS room Floor cleaning required


PM jobs carried
CHP DCS Room & Compressor Panel Cleaing & Blowering
workring work done
Blr-1,2Bunker transmittor cleaning work

Pending Job / Abnormalities

STOP P&V -4 when DT-4 Temp. normal

PM jobs carried
WTP pump House motor cleaning done.
Compressor IFC internal cleaning done.

PM jobs carried
In Boiler No.-2 APH , Vessel No.-11/21 and vessel No.-12/22 Inst
JB Cleaning and Blowerning to done.
PM jobs carried

WTP DCS Room Panel cealing & Blowering work

WTP DCS Panel open hole sealing by sodium silicate & siragul

WTP DCS Desk inside & outside sealing by Sodium silicate &
siragul

Rubber Mat Laying work WTP DCS Room Panel

Pending Job / Abnormalities

STOP P&V -4 when DT-4 Temp. normal

Shift jobs carried ( Instrument )

BFP-3, dp transmitter drain valve open after shut down clear.

Service Air Compressor 2 Nos water valve SOV fitting damage so


replace the fitting with new one.
T2 Tower De ludge station having water leakage from drain
point, found SOV and pressure transmitter working OK, so close
the balancing line valve

BFP Room AHU change over from manual to Auto

PM jobs carried

ACW Pump house Motor & Power JB Cleaning & Blowering work
PM jobs carried

PTW standard Exlusion list final list prepared for plant and same
emailed to standard team after compilations.

Chimney analyser panels were found dusty so cleaning and


blowering work done in shift.
BFP-2 put in VFD mode from Dol after requirememnt from
Operation dept and interlock used.

CHP belts lights made ON.

PM jobs carried

Boiler-2 Soot Blower panel Cleaning done.

Unit-2 De super heating station MOV & control valve cleaning


done.

Unit -2 Feed Water station cleaning done.

PM jobs carried
PM jobs carried

ACW Pump house Motor, LCS & Power JB Cleaning & Blowering
work

Unit -1 Feed Water station MOV and Control Valve cleaning


done.

Unit-1 De super heating station MOV & control valve cleaning


done.

Unit-1 Firing Floor JB and Equipment cleaning done

Ubnit -1 Soot Blower Panel cleaning done


PM jobs carried
In Unit No. # 2 FCV 911 and 912 Cleaning and blowerning to
done.

Screen floor E&I Equipment cleaning & blowering work


Unit-2 Boiler-2 drain MOV Cleaning work

PM jobs carried

BLR#1 6 No's Drain MOV Cleaning work


Unit-2 Boiler-2 drain MOV Cleaning work
PM jobs carried

PM jobs carried

Jeshu Hozen done at Switch yard

Unit -1 , All Coal Bunker level transmitter cleaning done


Unit -1 , All Coal Bunker level transmitter cleaning done

Unit -2 , All Coal Bunker level transmitter cleaning done

EQMS Filter Cable dressing done.

PM jobs carried

ROOT Blower=1&2 Motor & Pannel blowering & Cleaning work

Chimney analyser panels were found dusty so cleaning and


blowering work done in shift.

PM jobs carried
In WTP DCS Panel cleaning and blowerning to done.

PM jobs carried

Boiler-1 feed water station desuper heater control valve cleaning


& Blowering work
PM jobs carried
In Boiler No.-1 Vessel No.-11/21 and vessel No.-12/22 Inst JB
Cleaning and Blowerning to done.

PM jobs carried

Unit -1 Feed Water station MOV and Control Valve cleaning


done.

Unit-1 De super heating station MOV & control valve cleaning


done.

Unit-1 Firing Floor JB and Equipment cleaning done


Unit -1 Soot Blower Panel cleaning done

PM jobs carried

WTP pump House motor cleaning done.

BLR-2 Bucket Elevator Panel sealing by Packing Tape

Pending abnormalities

Unit-2 MIMIC Panel Reactive ( KVAR) meter disply not shown


need to be change

PM jobs carried
In Boiler No.-1 APH , Vessel No.-11/21 and vessel No.-12/22 Inst
JB Cleaning and Blowerning to done.
PM jobs carried
Unit -2 Feed Water station MOV and Control Valve cleaning
done.
Unit-2 De super heating station MOV & control valve cleaning
done.

Unit-2 Firing Floor JB and Equipment cleaning done

PM jobs carried
PM jobs carried
BLR-1 BAC 1A & 1B Panel & level probe JB Cleaning & Blwerong
work

BAC-1 A& 1B Motor & Field Panel cleaning & Blowering work

BLR_1 Ground floor 6 no's MOV Cleaning work

Compressor house Instrument compressor SOV & Pressure


gauge Cleaing work

PM jobs carried
PM jobs carried

SWAS Room -1&2 Panel cleaning & Blwering work

CEP-1A & 1B Motor & Power JB Cleaing & Blwering work

Pending abnormalities

PM jobs carried

ACC-2 , all motors double Earthing check physically and clean the
motor with cloth.

Unit -2 MV drive room , AHU VFD panel packed with packing


tape.
TG-1 Ground Floor all MOV and control Valve cleaning done

TG-2 Ground Floor all MOV and control Valve cleaning done

PM jobs carried
Shift jobs carried ( Instrument )

ACW pump house all Motors cleaning and blowering done.

Coal Shed RSB No - 91, Earthing missing , new Earthing done.

BC-7A hand lamp plug top changed

Boiler-2 , APH isolation valve having air leakage so new ferrule


provided and leakage arrested.

PM jobs carried

BFP-1,2 &3 motors cleaning & blowering job

TG-2 Ground Floor all MOV and control Valve cleaning done
Pending Job / Abnormalities

SWAS room Unit-1, steam sampling Temperature Scanner get


moisturised, need to attend.

Compressor House IFC air leakage arresting work under


progress.

PM jobs carried

Compressor House IFC air leakage arresting work fitting & tube
replacement by new one
PM jobs carried

PM jobs carried
ACW Pump house E&I Equipment Cleaning & Blowering work

Zishu Hozen at ACC Garden Area

Shift jobs carried ( Instrument )

Coal Feeder unit-2 hand lamp repair also one extension board
provided.

Boiler-2, APH dome not operate check and found seal pressure
not healthy so inform to maintenance , seal change by
Maintenance trial taken now OK

Boiler-2 , Bag House Vessel-11, showing H:H fault, open and


found actual material inside vessel, check and clean the level
probe and inform to operation.

Boiler-2 APH , Vessel -2 , Shutdown given and clear.


BFP MV Drive Room cable tray Duct remove as per operation
requirement for cleaning, after cleaning work fix the duct again.

PM jobs carried

In the Chimney analyzer Room , Chimney analyzer Panel , PC ,


Calibration Culinder Cleaning and Blowerning to done.

PM jobs carried

LT ACB Breaker PM Work

P&V 2&4 Field Panel Cleaning & Blowering work

Zishu Hozen at ACC Garden Area


BFP MV Drive Air Filter cleaning & washing work U/P

Shift jobs carried

TPP garden area 2no. LED provided & 1 no. 24volt Tx. Provided&
grass cutting machine plug top changed.

Boiler-1 APH dome level switch cable glanding done properly as


found loose.

Boiler-1 11-21 main air I/L Pu tube leakage arrested.

Boiler-2 dome valve level probe dressing done.

WTI open point sheet updated & send status .

1 no. LED provided at unit-2 coal feeder discharge chute.

PM jobs carried

Unit-2 , Oil Station Main incioming Line 02SV 1309 air leakage
arrested.

Unit-2 , Huffing Device PIC 1101 air leajage arrested.

Unit -2 , Bed Material RAV Panel clean and pack with brown tape
also double earthing checked.
PM jobs carried

PM jobs carried

WTP Hall all Field Equipment Cleaning done with Cloth.

HP Pump VFD cleaned with blower.


Boiler-2, Zero Meter All Drain MOV Cleaned with Cloth.

BC-7A/ 7B all motor cleaning done.

BC-7B motor Earthing done properly.

PM jobs carried

4.5 mtr. MV Drive filter removing work

Zishu Hozen at Reclamier Area

PM jobs carried
PM jobs carried
PM jobs carried

CHP MCC Outside cleaning & Blowering work done

BLR#1 &2 cctv camera glass cleaning work


PM jobs carried

PM jobs carried

Unit -2 Soot Blower panel cleaning done

Boiler-1, Floor 2 RSB -5 check and green tag update.


PM jobs carried

Boiler-1 &2 Jvalve fan motors & Power JB Cleaning & Blowering
work

BAC-1A & 1B Field Panel , level probe JB Cleaing work

Boiler-1 &2 ground floor RSB Panel ELCB Testing work


PM jobs carried

BC-6 motor ,LCS panel blowering & cleaning work

BC-6 bagfilter panel blowering & cleaning work

Tg-2 cooling water flow trend checked found value is healthy .

PM jobs carried
PM work

Dosing Pump room motor & JB Cleaning & Blowering work


PM jobs carried

Boiler-2 Soot blower motor cleaning done 5 nos

PM jobs carried

BLR- 1&2 0 mtr. HT & LT Motors cleaning & Blowering work


PM work

WTP area motor & JB Cleaning & Blowering work

T-2 tower 10 amp grinder connection done.

Chimney analyser moisture fault observed so reset 7 under


observation.

PM jobs carried

P&V No-4, Panel maintenance done

Soot Blower-1 , Panel cleaning done.


PM jobs carried

Vibrating Screen-2 Feeder Maintenance work

Bunker-1&2 bunker level transmittor cleaning work

Pending Job / Abnormalities

Lime stone building ground Floor Repair supply Box check and
green tag pasted.
PM jobs carried
PM jobs carried

CO Analyser Filter cleaning , line flushing & SOV JB Cleaning


work

ECO Floor Instrument Panel Transmitter cleaning & Blowering


work

STG & Boler-1 &2 Lift Maintenance work U/P

Office area tube light replacement work U/P

PM jobs carried
PM jobs carried

WTP all solenoid box panel, SOV , transmitter,pressure switches


cleaning done

Boiler-2 De-superheatinh valve(02TCV-3201-04) cleaning done

MLDB MCC blowring done from outside

PM jobs carried
PM jobs carried

In WTP Pump house motor Cleaning and blowerning done.

In WTP Pump house field Instruments & panel Cleaning and


blowerning done.

DCS engg. Desk 5s done.

PM jobs carried

ACW Pump house E&I Equipment Cleaning & Blowering work

BLR#2 SOX Panel Pump gland hole sealing by Putty

BLR#1 feed water control station de superheating control valve 4


no's cleaning work
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

01.12.2021 B Deepak Chand Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.

01.12.2021 C Sanjay Garg


VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.

02.12.2021 A Gajendra Pandya Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
02.12.2021 B Deepak Chand 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

02.12.2021 C Sanjay Garg


UPS log digital log book filled.
02.12.2021 C Sanjay Garg

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
Following Check List Filled
03.12.2021 C Gajendra Pandya 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

04.12.2021 A Deepak Chand Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


05.12.2021 B Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
05.12.2021 C Gajendra Pandya Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually
check and drain
All unwanted lights switch OFF manually during
shift round
06.12.2021 C Deepak Chand All Energy Meter Manual reading taken for Power
Report.

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Date Shift Engineer Name 5. Electrical checklistRegular jobs
6. VAM Check list
Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
07.12.2021 A Gajendra Pandya

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .
UPS Check List filled.

Chimney round taken found system healthy.

07.12.2021 B Tarun Mandawat VAM system round taken found healthy.

Shift instrument digital log book filled

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.

07.12.2021 C Sanjay Garg


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

07.12.2021 A Gajendra Pandya LED and 24volt transformer given at ACC1D

VAM condensat found spread on floor, so clean the


floor
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Daily shift activities

Shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Chimney round taken found system healthy.

VAM system round taken found healthy.


08.12.2021 B Tarun Mandawat

Shift instrument digital log book filled

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
08.12.2021 C Sanjay Garg
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
09.12.2021 A Gajendra Pandya
VAM condensat found spread on floor, so clean the
floor
09.12.2021 A Gajendra Pandya

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Daily shift activities


Shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Chimney round taken found system healthy.

09.12.2021 B Tarun Mandawat VAM system round taken found healthy.

Shift instrument digital log book filled

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
09.12.2021 C Tarun Gaur
09.12.2021 C Tarun Gaur All unwanted lights switch OFF manually during
shift round
All Energy Meter Manual reading taken for Power
Report.

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
10.12.2021 A Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1 Checklist
4. Generator-2 Checklist
5. Electrical checklist
6. VAM Check list
Following AVI Given and Close-
1. ACC fan 1D Lube oil pump
2. ACC fan 2D main motor.

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

10.12.2021 B Sanjay Garg


Shift instrument digital log book filled
10.12.2021 B Sanjay Garg UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

10.12.2021 C Tarun Gaur All unwanted lights switch OFF manually during
shift round
All Energy Meter Manual reading taken for Power
Report.
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

11.12.2021 A Deepak Chand Compressor house all auto drain valve manually
check and drain
11.12.2021 A Deepak Chand

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1 Checklist
4. Generator-2 Checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


11.12.2021 B Sanjay Garg
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

11.12.2021 C Tarun Gaur All unwanted lights switch OFF manually during
shift round at fire pump house & reclamier
11.12.2021 C Tarun Gaur

All Energy Meter Manual reading taken for Power


Report.
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


12.12.2021 A Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made OFF in Evening.
Compressor house all auto drain valve manually
12.12.2021 B Tarun Gaur check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually
check and drain
All unwanted lights switch OFF manually during
shift round
All Energy Meter Manual reading taken for Power
Report.
12.12.2021 C Deepak Chand
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

13.12.2021 A Gajendra Pandya

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


13.12.2021 B Tarun Gaur
Unwanted light switch off at HSD & Boiler area
Shift instrument digital log book filled
UPS log digital log book filled.
All AC power made OFF in Evening.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
13.12.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .
UPS Check List filled.
Unwanted light switch off at HSD & Boiler area
Shift instrument digital log book filled

14.12.2021 B Tarun Mandawat


UPS log digital log book filled.
All AC power made OFF in Evening.
14.12.2021 B Tarun Mandawat
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
14.12.2021 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.
Compressor house all auto drain valve manually
check and drain
DG report Prepared and upload in SAP for 13 &14
dec.
15.12.2021 A Tarun Gaur
15.12.2021 A Tarun Gaur
Following Equipment S/D Given-
1/BC-1
2/BC-2
3/BC-4
4/Reclmier
5/TG-1 OIL Purifier
6/RO High Pressure Pump

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


Sh.Eng - Deepak
Chand
15.12.2021 B Elect- Vinod Compressor house all auto drain valve manually
Tech- Puran check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
15.12.2021 C Sanjay Garg VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found all drives running normal.
STG Building light OFF
All AC power made ON in morning.

TG-2 Put ON base load at 10.00 AM

Following S/D Clear


1/ RO High Pressure Pump
16.12.2021 A Tarun Gaur
DG report Prepared and upload in SAP for
15/12/2021
Following Equipment S/D Given-
1/BC-1
2/Reclmaier
3/BC-4

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Date Shift Engineer Name Regular jobs
Shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
All AC power made OFF in Evening.
16.12.2021 B Tarun Mandawat
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually
check and drain
All unwanted lights switch OFF manually during
shift round ( fire pump house
16.12.2021 C Deepak Chand
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
STG Building light OFF
All AC power made ON in morning.
TG-2 Put ON base load at 10.30 AM

17.12.2021 A Tarun Gaur


Following Equipment S/D Given-
1/BC-1
2/Reclmaier
3/BC-4
4/BC-3
5/BC-2

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

17.12.2021 B Sanjay Garg

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
17.12.2021 C Deepak Chand All unwanted lights switch OFF manually during
shift round ( fire pump house
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
STG Building light OFF

All AC power made ON in morning.

TG-2 Put ON base load at 08.30 AM & Remove at


11:40 am

Following euipment AVI Given & Clear


17.12.2021 A Tarun Gaur 1/ TG-1 Oil Centrifuge
Following Equipment S/D Given-
1/BC-1
2/RO High Pressure
3/BC-4
4/BC-3
5/BC-2
6/ BC-6

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


18.12.2021 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
BFP-2 changeover from VFD to DOL as per
requirement of operation deptt
18.12.2021 C Gajendra Pandya green tag provided in CHP RSB

All unwanted lights switch OFF manually during


shift round ( fire pump house
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


19.12.2021 A Sanjay Garg
19.12.2021 A Sanjay Garg

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


Deepak Chand
19.12.2021 B Compressor house all auto drain valve manually
check and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
BFP-2 changeover from VFD to DOL as per
requirement of operation deptt
green tag provided in ACC RSB
19.12.2021 C Tarun Gaur
19.12.2021 C Tarun Gaur

All unwanted lights switch OFF manually during


shift round
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


20.12.2021 A Sanjay Garg

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain
Following Check List Filled
20.12.2021 B Deepak Chand 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
All unwanted lights switch OFF manually during
shift round
20.12.2021 C Tarun Gaur All Energy Meter Manual reading taken for Power
Report.

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.


Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

Following shutdown given:


21.12.2021 A Gajendra Pandya 1)BC-1
2) BC-4
3) BC-3
4) BC-6
5) soot blower-1
6) AHF-1

AHF-1 shutdown cleared


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


check and drain

21.12.2021 B Deepak Chand P&V No-4 stop at 5:00 PM

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually
check and drain
All unwanted lights switch OFF manually during
shift round
All Energy Meter Manual reading taken for Power
Tarun Gaur/Amit Report.
21.12.2021 C Singh
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Shift j


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

22.12.2021 A Tarun Mandawat

WTP DM flow transmitter checked & problem


attended.

BC-7a,b light JB covering done.

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.
VAM system round taken found healthy.
All AC power made OFF in Evening
Following Check List Filled
1. Shift instrument check list
22.12.2021 B Gajendra Pandya 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
All unwanted lights switch OFF manually during
shift round .
22.12.2021 C Deepak Chand
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Shift j


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made ON in morning.
WTP DM flow transmitter checked & problem
attended.

23.12.2021 A Tarun Mandawat BC-7a,b light handlamp repairing done.


23.12.2021 A Tarun Mandawat

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Shift j


Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


All AC power made OFF in Evening

WTP DM flow transmitter checked & problem


attended.

Reclaimer Boom belt trip due to overcurrent reset


23.12.2021 B Tarun Gaur done now ok
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Deepak Chand
23.12.2021 C
Amit Kumar Singh
23.12.2021 C Deepak Chand All unwanted lights switch OFF manually during
Amit Kumar Singh shift round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

STG Building light OFF

Auto drain valve checked manually working OK


All AC power made ON in morning.
WTP Side stream filter flow transmittor taping
24.12.2021 A valve leakage observed so arrest done
Tarun Gaur
BC-7a,b light handlamp repairing done.

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

UPS room fan started for optimizing AC power

All AC power made OFF in Evening

Following Check List Filled


24.12.2021 B Tarun Mandawat 1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
Following Check List Filled
24.12.2021 B Tarun Mandawat 1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
Gajendra Pandya All unwanted lights switch OFF manually during
24.12.2021 C Amit Kumar Singh shift round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

STG Building light OFF

Old 3 KW BAC-2A Motor checked in mech. W/S


found megger & resistance value Healthy

All AC power made ON in morning.

Following Equipment AVI Given & Clear


25.12.2021 A 1/ Boiler Draingae Pump
Tarun Gaur
25.12.2021 A
Tarun Gaur

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

All AC power made OFF in Evening

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
25.12.2021 B Tarun Mandawat 3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

25.12.2021 C Gajendra Pandya


Gajendra Pandya All unwanted lights switch OFF manually during
25.12.2021 C shift round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

STG Building light OFF

EMS page link given on boiler-1,2 page in botoom


for quick access

All AC power made ON in morning.

26.12.2021 A Tarun Mandawat


Inst. Compressor-2 controller power reset as per
requirement.

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

All AC power made OFF in Evening

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
26.12.2021 B Tarun Gaur 3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
1. UPS Check List
2. Generator-1  checklist
26.12.2021 B Tarun Gaur 3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain
26.12.2021 C Deepak Chand All unwanted lights switch OFF manually during
shift round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

Telephone NO. 490 replace due to voice not clear.

DG Emergency supply spare cable tagging done

All AC power made ON in morning.


27.12.2021 A Amit kumar singh H.T. megger kept in charge as battery low.
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
27.12.2021 A Amit kumar singh

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually


27.12.2021 B Deepak Chand check and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

Tarun Gaur All unwanted lights switch OFF manually during


27.12.2021 C shift round .
Tarun Gaur
27.12.2021 C

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

Compressor house all auto drain valve manually


check and drain

VAM parameters checked found Normal

All AC power made ON in morning.

28.12.2021 A Amit kumar singh STG building light ON/OFF as per require due to
rainy weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

28.12.2021 B Deepak Chand


Compressor house all auto drain valve manually
check and drain
28.12.2021 B Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

Tarun Gaur All unwanted lights switch OFF manually during


28.12.2021 C shift round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Shift j
Shift round taken found all drives running normal.

Compressor house all auto drain valve manually


check and drain
VAM parameters checked found Normal
All AC power made ON in morning.
STG building light ON/OFF as per require due to
rainy weather
Following Check List Filled
29.12.2021 A Amit kumar singh 1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
Following Check List Filled
29.12.2021 A Amit kumar singh 1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually
check and drain

All unwanted lights switch OFF manually during


shift round .

VAM parameters checked found Normal


29.12.2021 C Deepak Chand
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

All AC power made OFF in Evening

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
30.12.2021 B Tarun Gaur 5. VAM Check list
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
30.12.2021 B Tarun Gaur 5. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually
check and drain
All unwanted lights switch OFF manually during
shift round .
30.12.2021 C Deepak Chand
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

Compressor house all auto drain valve manually


check and drain

VAM parameters checked found Normal

All AC power made ON in morning.

STG building light ON/OFF as per require due to


31.12.2021 A Gajendra Pandya rainy weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
31.12.2021 A Gajendra Pandya
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Date Shift Engineer Name Shift j

Shift round taken found all drives running normal.

All AC power made OFF in Evening

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
31.12.2021 B Tarun Gaur

Date Shift Engineer Name Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain

31.12.2021 C Deepak Chand


31.12.2021 C Deepak Chand All unwanted lights switch OFF manually during
shift round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
09.01.2022 A Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
WTP RO first Rejecter low pressure , transmitter drain valve found close,
attended.

Unit-1 TG HP Heater showing level mismatch physically & DCS , set the level
bar from magnet now matched.

SA fan Discharge MOV 01MV0917 not showing open limit work with sati Sir .
Presently Open the valve manually work under progress.

Reclaimer battery get drain so ON the UPS manually after shutdown clear.

Following shut down Cleared.-


1) Coal Cruhser-1
2) Oil Purifier
3) Reclaimer
4) BC-1,

Shift jobs carried

In BFP zero mtrs- AHU SP Increased from 28 to 29 degree. , 4.5 Mtrs SP


increased from 28.5 to 29.5 degree , and CCR SP Increased from-23 to 25
Degree. For optimization.
Bag House Vessel No.-12 Dome Valve PU Tube air leakage. So cut it and
connected it. Now ok.
Bag House Vessel No.-11/21 and Vessel No.-12/22 , SOV Panel Cleaning and
Blowerning to done.
online CPCB website is not open.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send to all the concered person.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
Unwanted lights , ( WTP Hall area , Boiler No.-1 4 th to 7 th Floor , and TG
Building one light to OFF .
ACW Pump area motor Cleaning to done.
TG-1 Put into Base Load.

Shift jobs carried

shift Almirah 5S done, and scrap shifted to scrap point

Cable shifting work from china office to T1 tower


TPP fire hydrant Line water leakages searching, no leakage found except a
minor water leakage found at BC-5 fire station

BC-1 belt tear coming, so bypass it to start the belt, kindly check the belt tear
switch malfunctioning in next shift, when BC-1 stopped.
Following shut down Cleared.-
1) Coal Cruhser-2
2) BAC-2B
3) BC7A
4) BC7B

Shift jobs carried


Reclaimer CRD Cable get loose , Re-roll it manually.

Boiler -2 ,De superheated control valve 02TCV 3201 gland leakage arrested

Boiler -2 ,De superheated control valve 02TCV 3203 gland leakage arrested

BAC-1B , showing level high so celan and calibrate level probe , working Ok.

CHP AHP Panel Cleaning and blowering done

BC-1, Magnetic Seperator motor earthing found loose tighten it.

BC-1, Magnetic Seperator Power ON and after scrap remove OFF the power
again.
Following shut down Cleared.-
1) Coal Cruhser-2
2) BC-7A
3) BC - 7B

Shift jobs carried

In SWAS Room Unit No. # 1 Conductivity is showing zero at DCS end. So


Checked and found that Sample is not coming in rotameter. Also in main line
sample is not coome. So Informed to WTP Shift Incharge.

In SWAS Room Unit No. # 2 Conductivity is showing zero at Local Display. So


Checked and found that Sample is not coming in rotameter. Also adjust the
Flow in main line sample . Now it is showing Normally. Now ok.
In SWAS Room all the Panel and UPS Cleaning and Blowerning to done.
online CPCB website is not open.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send to all the concered person.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.

Unwanted lights , ( Boiler No.-1 and 2 , 6 th to 7 th Floor) light to OFF .


Silo Root Blower Panel and Motor Cleaning to done.
At 22 Mtrs Bunker Floor area Light to OFF Condition.

Shift jobs carried

Boiler-1, soot blower-2 motor got trip, so reset it once and check its current
found high 6 amps, so stop it and inform to shift incharge for gesrbox checking.
TG building 0 mtr ACC fan JB cleaning done
oil centrifuse panel-2 cleaning done
Unit-2 , Feed water station and desuperheating station contrl valves and MOV
cleaning done
Unit-2, PA system , RSB, transmitter panel 3&4 , hoffing device cleaning done
IFC filter cleaning done outside compressor house.
All Energy Meter Manual reading taken for Power Report.
EMS Power Report prepared and mail to all
DG report Prepared and upload in SAP.
Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

Shift jobs carried


Reclaimer Operator Panel all Switch wiring done and trial taken in presence of
operator, working OK

Feed control valve inlet MOV (014MV3207) showing fault in open condition,
Limit adjusted.

Boiler-1 B/H Lightning Jb Earthing found broken , new lugging done.

Boiler-1, soot blower-2 motor connection remove from Panel Relay.

Following Shut down Given -


1. BC-4
2. Vibrating screen -2
3. Oil Purifier -1
Following Shut down Given -
1. BC-4
2. Vibrating screen -2
3. Oil Purifier -1

Oil centrifuge -1 AVI given and close

Shift jobs carried

Coal Feeder -2B Runs in high RPM . So checked in controller side material on
belt showing negative value. So informed to shift incharge. So checked at field
side no matrial on the Belt. After clearnece of operation again it is started. It is
running normally.
Coal Feeder -2B O/L MOV ( 02MV910) open limit is not showing at DCS end. So
limit switch set at site. Now ok.
Coal Feeder -2B level transmitter power supply reset as per operation
requirement.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to OFF Condition.
At 22 Mtrs Bunker Floor area Light to OFF Condition.

Vibrating Screen No.-2 PTW Closed and Started in Local mode. Current is
showing at 18 Amps. Also put into auto mode.
EN-mass Conveyor No.-1 and 2 Power JB , LCS JB Cleaning to done.

Shift jobs carried


Unit-1 , Feed water station and desuperheating station contrl valves and MOV
cleaning done
Unit-1 , desuperheating contrl valve (01TCV3204) gland leakage bolt
tightness done
soot blower-1 panel cleaning and terminal tightness done.
Dosing room panels terminal tightness checking done
All Energy Meter Manual reading taken for Power Report.
EMS Power Report prepared and mail to all
DG report Prepared and upload in SAP.
Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

Shift jobs carried


Boiler-2 Soot Blower panel cleaning done.
WTP hall 5 Nos Solenoid Box , JB and RSB cleaning done
Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

Shift jobs carried

OLTC-2 main MCB trip, so remove its outgoing wire, now under observation

compressor house hoist power made OFF

ELCB checked at compressore house RSB

Bag house-2 ,11-21 vessel H/H alarm coming, so clean the probe

BC7AB bunker level transmitter cleaning done

Following Shut down Given -


1. BC-1
2. BC-2
3. BC-4
4. Mist fan 2B
5. T1 tower bag filter
6. Jockey pump-1

Oil centrifuge -1 AVI given and close

Shift jobs carried


TG-2 stopped , Gen breaker made-off as per plant requirement.
Jockey pump-1 VFD commisioning work with G shift team & trial taken , now in
line.
WTP- pressure switch line flushing & air leakage arresting work from actuator.
VAM system trippped checked found inlet steam pr. Increased from 4.5 to 8.5
kg/cm2 , so flow increased &hence valve throttling done with operation team,
now owrking healthy.

ACC fan-1D tripped on lube oil flow low so checked& cleaning done of flow
switch found working healthy from inst. Side , but for final cross checking
installed new switch which is also showing same result so informed to
operation team.
All the Manual Light made on as per requirement.
DCS Boiler-2 & TG-2 report provided to operation team as per requirement.

Shift jobs carried


In BFP zero mtrs- AHU SP Increased from 30 to 31 degree. , Work shop MV
Drive Room SP increased from 39 to 40 degree ,
In Unit No. # 1 TG zero mtrs , 01MV3303 , 01MV3205 MOV oil leakage So Nut
boly tightness and Cleaning to done.
At TG-2 Zero mtrs all the C.V. MOV and Transmitter Cleaning to done.
online CPCB website is not open.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send to all the concered person.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
Unwanted lights , ( Office area , Dosing Room , TG-2 Side LED Light , Unit no. #
2 ACC zero mtrs area ) light to OFF .
BFP- 1 , 2 and 3 Motor Cleaning to done.
Boiler No. -1 Lift Power to Reset as per requirement.
TG-2 Enclosure Fan Power to OFF.

Shift jobs carried


ACC-1D lub oil pump motor connection removed, and its lub oil probe removed
on request of mech deptt

Condenset contrl station valve (FCV2907) tube found bent so it was not
operating , so straight the air tube and trial taken now OK
Unit-2 , LP heater Flow control valve(3304) air adjust and trial taken from CCR
working normally

Unit-1 , LP heater Flow control valve(3304) not working properly checked and
found malfunctioning, so need to change positioner in next shift

Boiler-2 bag house 12-22 level checked found empty, and clean the level probe
and inform to CCR

Transformer-2 OLTC MPCB changed under observation for tripping

Following Shut down Given -


1. BC-1
2. BC-4
3. Reclaimer
4. ACC-1D
5. ACC-1D Lub oil

Shift jobs

ACC-1D main motor & lub oil pump motor connection removed, and its lub oil
flow switch probe removed on request of mech deptt & placed in inst. Lab

Unit-2 , LP heater Flow control valve(3304)Positioner replaced & calibration


done, working healthy.

Boiler-2 bag house 11-21 level checked & calibration done.

Boiler-1 bag house 11-21,12-22 level checked .

Following Shut down given -


1. ACC-1D
2. ACC-1D Lub oil
Note: cable connection also removed & noted
(lube oil motor from DE side - RYB ; main motor from DE side GRB)

Following Shut down cleared -


1. BC-1
2. BC-4
3. Reclaimer
AVI given
4. ACC-1D
5. ACC-1D Lub oil

Shift jobs carried


Unit No.# 1 , Vessel No.-12 Level Probe is Showing at high at DCS end. So
Calibrated and Clean the level Probe. Now Ok.

Unit No.# 1 , Vessel No.-22 Level Probe is Showing at high at DCS end. So
checked and found that Matrial inside the vessel . So inform to shift operator.
Unit No.# 2 , Vessel No.-21 and 22 Level Probe is Showing at high at DCS end.
So checked and found that Matrial inside the vessel . So inform to shift
operator.
At TG-1 Zero mtrs all the C.V. MOV and Transmitter Cleaning to done.
online CPCB website is not open.
Reports generate of (APC, Plant Performance, Power Report and Env report)
send to all the concered person.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
Unwanted lights , ( Office area , Dosing Room , TG-2 Side LED Light , ) light to
OFF .
Following shut down Cleared.-
1) ACC Fan -2A ,
2)ACC Fan -2B ,
3) ACC Fan -2C ,
4) ACC Fan -2D ,
5) ACC Fan -2F ,
6) Mist. Fan -2A ,

At 4.5 mtrs all the ELCB of repair Supply box checked. It is found normally.

Shift jobs carried

TG-2 synchronize at 8.30 am

ACC-2F Lub oil flow low coming so set it now OK

Turbine-2 hood temp control TCV (02TCV2902) command is 5% and feedback


is 15%, so its air line flush and set air pressure. Now OK

Bag house-2 ,11-21 vessel H/H alarm coming, so clean the probe

Bed ash cooler vessele level showing high, so clean its probe now OK
Following Shut down Given -
1. BC-1
2. BC-5

Shift jobs
ACC-1D lub oil pump motor connection done, and its lub oil flow switch probe
installed back as per mech deptt requirement.

UHF PC harddisk installed in spare PC & started now is under observation.

ACC fan-2F tripped on lube oil flow low so checked& cleaning done of flow
switch found working healthy from inst. Side , but for final cross checking
installed new switch which is also showing same result so informed to
operation team.

Air leakage arrested at boiler-1 APH inst. Air line of extra air valve from fitting.

Following Shut down given -


1. ACC-2F
2. ACC-2F Lub oil
Note: cable connection also removed & noted down ; 1 no. nut of main motor
connection found slipping so tried but not open so work is u/p

Following Shut down cleared -


1. BC-1

Compressor house bypass manual valve of auto drain found minor throttle &
air continously passing so closed the valve.

1 no. control wire removed from 11no. TB at OLTC tap changer unit-2 as found
MCB tripping from same.now is under observation.

Shift jobs carried


ACC-2F Lub oil flow Switch removed & kept in instrument lab.
VAM Panel cleaning & Blowering work
12-22 Bag house 12 no's Vibrator motor base plate damaged & motor fall on
floor then kept motor & connection removed & motor resistance checked
found balanced condition ( 165 ohm)
TG-2 enclousre exhaust fan start as per requirement of operation dept.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

OLTC-2 MIMIC Panel controller indication off check in OLTC Field panel found
MCB ON & selection local condition.

Shift jobs carried


ACC Fan 2F Motor Connection remove, R phase nut found damage so cut the
nut , Need to replace the lug and nut. ( new lug and new nut arranged and kept
in LOTO box)

ACC Fan 1D Motor connection done and trial taken observe jerk, under
checking.

Bag House 11-21, extra service air inlet valve SV8137, Valve get loose and
disturbed so new bolting done.

Unit-2, Bag House vessel 21 showing high level so open the probe , clean and
calibrate it , now ok

Unit-1, Bag House vessel 12 showing high level so open the probe found level
probe is OK actual material inside the Vessel , same informed to CCR.

Unit-1, Bag House vessel 22 showing high level so open the probe found level
probe is OK actual material inside the Vessel , same informed to CCR.

Following Shut down Given -


1. BC-4
2. Reclaimer
3. BC-1

Shift jobs carried


In Reclaimer PLC Supply is not showing due to main breaker shutdown. Also
UPS battery Voltage is Low. Then first OFF the UPS then ON the UPS. Now
supply is showing in PLC .

Air leakage arrested at boiler-1 CO analyzer FSHS Box No.-2 from PU Tube side.

In ACC Fan -1D and ACC Fan-2F Vibration high is showing at DCS end. So Reset
it. Now Ok.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to OFF Condition.
Following Shut down Cleared -
1. BC-4
2. Reclaimer ( 02 Times )
3. BC-1

ACC Fan -1D AVI and Permit to closed condition.


ACC-fan -2F Lub. Oil Motor connection to done. But direction is not checked
since oil leakage . Again S/D to provided.
Reclaimer CRD Cable near CHP Building insulation cover by armored.
ACC fan -2F Lub. Oil Pump AVI to given. Also closed the AVI.

Shift jobs carried


22 NO'S Vessel showing level high so check in field & cleaning level probe ,
taken in line
Unit-1 6 no's drain MOV Cleaning work
Unit-1 11-21 Back pressure transmittor cleaning & Blowering work
TG-2 enclousre exhaust fan start as per requirement of operation dept.
Power Report prepared and mailed.

DG report Prepared and upload in SAP.

APC , Plant Performance & EMS report not sent due to CD Driver not working in
any PC

OLTC-2 MIMIC Panel controller Power fluctation then OFF field panel MCB &
Put on local mode need to reset controller power

Shift jobs carried

TG-2 taken in base load at 13:25 hrs.

BAC 1B , showing level high so clean the probe and calibrate now Ok.

BAC 2B level probe cable dressing done.

ACC fan ID lube oil motor Earthing done also spare Low speed cable dressing
done and cove with polythene.
Following Shut down Given -
1. BC-4
2. Coal Crusher-1

Following AVI Given and Close-


1. ACC fan 2F Lube oil pump

Shift jobs carried

In ACC Fan -2F Flow switch is showing Low at DCS end when starting the lub.
Oil Pump. So checked the field side Found that setting of flow switch is not
correct. So set the flow switch setting then trial taken it is working normally.

In Side Stream Filter -2 Flow Transmitter ( FT5002 ) is not showing correctly.


So checked and found that Low Pr. Line of the Trasmitter is chocked condition.
So cleaned the Impluse line. Now Ok.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to OFF Condition.
Following Shut down Cleared. -
1. BC-4
2. Coal Crusher-1

ACC fan -2F Lub. Oil Pump AVI to given. Also closed the AVI.

ACC-fan -2F main motor , Earthing , canopy connection to done. When given to
AVI then Breaker is not inserted fully. So Informed to Hemant Sharma. He
comes at site. Then inserted properly. Now Ok. Also Permit to closed.

Shift jobs carried


Unit-2 feede water station MOV & Control valve cleaning & Blowering work
Unit-2 shoot blower Panel Cleaning & Blwoering work
Unit-2 desuperheating station MOV & Control valve cleaning & Blowering work
Unit-1 CEP & Drain Pot motor & Power JB Cleaning & Blowering work
Power Report prepared manually and mailed.

DG report Prepared and upload in SAP.


APC , Plant Performance & EMS report not sent due to CD Driver not working in
any PC

FH& HOD Daily power report update upto 11/12/2021

Shift jobs carried


In marpholiene Dosing Pump No.-2 Discharge pr. guage showing zero reading.
So open the pr. guage and checked in inst. Lab. It is working normally. Then
open the flange and set the diaphgram. Then installed the pr. guage. Then start
the pump. It is showing 7 kg/cm2. Now ok.

BC-1 Belt is tripped so checked and found that heavy material is stored at BC-1
head end and guard limit switch is acted. So Permit is given to cleaning
purpose. After completion of work. Permit is closed.

Compressor House all the auto drain valve checked and working normally.
All the Manual Light to OFF Condition.
P & V. No. # 2 and 4 is already OFF Condition.
online CPCB and ETP website is not opened .
BC-1 S/D to given . After completion of work. S/D is closed.
Bed ash silo RAV is not started due to O/L. So Reset it. Now Ok.
BC-1 Magnetic seperator is not started from DCS end. So O/L reset. Now Ok.

ACC Unit No. # 2 Lighting timer is in Bypassed condition. So Timer is taken in


line.

Shift jobs carried


CHP MCC Road street light not ON check & found lighting timer stuckup now
reset done ok

Unit-2 CEP & Drain Pot motors & Power JB Cleaning & Blowering work
BC-6 Bag Filter Panel & SOV Cleaning & Blowering work
BAC & FAC Silo level transmittor cleaning work
CHP DCS Panel Cleaning & Blowering work
Unit-2 Drain pot-1 motor 1 no's earthing found damaged condtion then
relugging done

Shift jobs carried


Boiler-2 , APH-2 dome valve air leakage arrested.

Compressor IFC moisture fault, moisture drained.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

Chimney Room Panel cleaning and blowering done.


TG Building Exhaust fan Panel cleaning and blowering done.

Shift jobs carried


WTP UF-2 system inlet valve (4907)feedback is not coming, so removed its
limit and set the magnetic limit, but limit switch frame got rusted so it is not
fitted properly, further need to dril the hole for limit fitting, work under
progress
WTP UF-2 system back wash valve (4908)feedback is not coming, its limit
found damaged, further need sparelimit ,work under progress

boiler-1,12-22 level probe checking, as per requirement of operation, found


working normal

RO booster-2 motor connection removed as per requirement

Hole Packing done in Lighting JB of BC-1, BC-5, BC-3 and RSB-94

Jockey pump-1 VFD found OFF, so checked and found that its feeder found in
OFF condition , so ON the feeder and VFD started current taking normal 10
amp
Shift jobs carried
Following Equipment S/D Clear -
1/BC-5
2/ Oil Centrifuge Pump-1
3/ Vibrating screen-1 , RO Booster Pump-1
Boiler-1 Lift not working due to F2 Fault check & found door open at 0 mtr.
Then clean all door sensor then lift healthy .

OLTC-2 Controller supply reset done but after some times again flucutaions
then controller backside neutral wire remove for controller supply off

BC-1 Tail & Head End RSB & Power JB insulated rubber mat provided
RO booster-2 motor connection Done
Boiler-1 Bag house light not ON check & found timer stuckup reset done now
ok
Compressor house all auto drain valve manually check and drain
WTP UF-2 backwash valve limit 4908 fixed & limit setting work
STG Building 0 mtr & 4.5 mtr. Instrument euipment cleaning work
TG-2 Put ON Base load at 16:30PM.

Shift jobs carried


In marpholiene Dosing Pump No.-1 Discharge pr. guage showing zero reading.
So open the pr. guage and checked in inst. Lab. It is working normally. Then
open the flange and set the diaphgram. Then installed the pr. guage. Then start
the pump. It is showing 7 kg/cm2. Now ok.

In BFP zero mtrs- AHU SP Increased from 31 to 32 degree. , Work shop MV


Drive Room SP increased from 37 to 38 degree ,
In Chimney analyzer all the Panel cleaning and Blowerning to done.
online CPCB website is not open.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
At shift almirah control fuse checked and removed the blown fuse.
At BC-7A / 7B area rubber mat to laid at repair supply box.
At BC-7A / 7B area rubber mat to laid at Lighting DB Box.

Shift jobs carried

Following Equipment S/D Clear -


1BC-5
2.BC-1
3.BC-2
4.BC-3
5.Reclaimer
Abnormality attended
1.Boiler-2 2nd stage DE super heater bypass control valve gland leakage.
( 02TCV3203)
2.boiler 1 De-super heater bypass control valve gland minior leakage.
(01TCV3204)
3.Bulker unloading earthing system to be checked
4.Control valve FCV-1402 near spare cable and air tapping to be checked and
rectification.
5.PVC Mat required at Supply JB no.VCW/TPE/RSP-74

Shift jobs carried


In Unit No. # 1 APH Conveying O/L Valve ( SV-8127) Limit assembly is in loose
condition. So Tightness to done. Now Ok.
In Work shop MV Drive Room SP increased from 38 to 40 degree ,

In Unit No. # 2 CEP recirculation MOV ( 02MV2905) Try to set the open limit.
But Internal limit assembly is in jammed condition. To need to check.
In Chimney analyzer all the Panel cleaning and Blowerning to done.
online CPCB website is not open.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
Megger shifted to shift almirah.
Boiler no.-2 Floor no.-4th to 7th Floor Light to OFF Condition.
Inst. Air compressor No.-# 1 ,2 and 3 Motor cleaning to done.

Shift jobs carried


Inslated Rubber Mat Laying Work at RSB-59 (BC-7A)

BC-7A &7B area handlamp repaired & handover to operator


Boiler-1 BH-11 Vibrator motor connection & tril work
RO Booster Pump motor connection open
Gland- Y-B-R

Boiler-2 FRS 100% bypass control valve gland leakage. Arrest now ok
1/ Boiler 2 coal feeder sealing air flow showing wrong (02IC0905) then Flushing
line now value ok

2/Boiler 1 coal feeder sealing air flow showing wrong then Flushing line now
value ok

Boiler-1 11-21 Both vibrator motor terminal cover not found , both motor
terminal cover Provided.

Shift jobs carried

RO Booster panel -3 motor connection done.

Fire pump house Deasil Engine start JB Earthing done and JB door also found
damage attend the same

T1 Tower BC-1 bag filter new Earthing done by laying new cable and cable
dressing done.

Mechanical workshop 3-phase welding machine checked and green tag pasted.

Following shut down Cleared.-


1.BC-1
2. BC-2
3. BC-4
4. Reclmier

Shift jobs carried


In Unit No. # 1 PH and Conductivity sample is not coming in rotameter. So
adjust the flow in the inlet sampling line. Now ok. Also cleaned the PH and
Conductivity sensor.

In Work shop MV Drive Room SP increased from 38 to 40 degree , also Put into
the Auto mode.
In WTP DCS Panel all the Panel cleaning and Blowerning to done.
online CPCB website is not open.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.

At BC-6 Head end area rubber mat to laid at repair supply box.
At BC-6 head end area rubber mat to laid at Lighting DB Box.
At BC-6 head end area rubber mat to laid at Lighting DB Box.

Shift jobs carried


Insulated rubber Mat Laying at Fly ash silo RSB Panel & Mech. Workshop RSB
Panel
Green Tag updated at FAS , WTP MCC & Fire Pump house RSB Panel
BAS Rav motor not start check & found trip due to O/L reset done now ok

WTP Furnace room sieve shaker m/c motor earthing remove as per
requirment of WTP Dept.

Auto drain valve checked manually working OK

BLR-2 BH-22 Level probe not showing low level then adjust level probe now level
healthy
WTP Tank Outside area instrument cable dressing work

Comp. house IFC Filter supply off as per discussion with Sati sir

Shift jobs carried


Following Equipment S/D Clear -
1/BC-1
2/Reclmaier
3/BC-4
Abnormality attended
1.Reclaimer left right on/off button not functioning properly.
2.BFP 3 Discharge pressure gauge glass broken
3.J valve-1A pressure gauge not available checked & remark given

Reclaimer left right VFD comes to overcurrent fault so reset once.


TG cooler flow tx. Checked found low line in choke condition so need to further
clean the same.

Service IFC taken in line at 45 PSI target pressue.


Main IFC taken in line after operation clearnace at 49PSI target pressure

Shift jobs carried

Street Lights not ON ,found timer stuck up reset the timer .


Boiler-1, Bed material RAV panel cable dressing done.
Rubber mat laid at Vibrating screen floor RSB

Unit-2 Bed Material RAV panel and actuator cleaning done and air tube found
loose air tube dressing done.
Unit-2 Drain MOV, J-Valve MOV and APH JB cleaning done.

Power Report prepared and mailed.

DG report Prepared and upload in SAP.


UPS room both AC found ON , OFF the same after confirming.

Shift jobs carried


PA-2 & ID-2 Motor both side Lubrication work
Reclaimer left right VFD comes to overcurrent fault so reset once.
BFP-2 DOL to VFD mode changeover work
Auto drain valve checked manually working OK
Coal bunker level 1C flucutation in DCS so reset power supply now healthy

CO-1 FSHS box -2 SOV heavy air elakage observed check & found bolt loose , bolt
tighness done but problem same then remove assembly & maintenance now work
underprogress

Note- PA-2 & ID-2 Tmeprature bearing increase upto 90 to 100 degree for PA-2
& ID-2 motors lubrication work

Shift jobs carried

After greasing work , Tripping of ID / PA Fan of unit No. # 2 taken in line.

BC-1 not started due to Pull Chord switch. So checked at found that in
controller PCS no.-55 is showing at DCS. So 03 nos PCS reset at field end. Still it
is showing PCS. As per SH ( E.& I.) PCS is bypass condition due to urgency. Also
Loop provided at 93-7A-TB2-3/4. Need to check.
Boiler No.-1 Lift telephone cable is damaged condition. So reconnected it. And
cable dressing done. Now ok.
online CPCB and ETP website is not opened .
All the AC MCB to OFF Condition.
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment S/D Given-
1/BC-1
2/Reclmaier
3/BC-4
4/BC-3
5/BC-2
5. 01MV0917

As per operation requirement , BFP-2 Put into VFD to DOL mode again DOL to
VFD mode. Again VFD to DOL mode.
BC-5 Dewaterning Pump Not started then checked one fuse is blown. Then
replaced the fuse. Again started. Still it is not started. So megger done. It is
showing zero value.

Shift jobs carried

BC-1, Pull cord-55 showing acted from previous shift, checked Pull cord No 55
& 56 found voltage is OK and contacts also changing properly NO-NC-NO, need
to check in day time.

BFP-2MV drive change over from DOL to Drive mode.

Boiler-2 firing floor all JB and Panel cleaning done.

All Energy Meter Manual reading taken for Power Report.


Power Report prepared and mailed.
DG report Prepared and upload in SAP.

Shift jobs carried


PA-1 & ID-1 Motor both side Lubrication work
STG Building lift comes on F2 (Door Fault) power supply reset done now lift
healthy
Boiler-1 lift comes on F2 (Door Fault) power supply reset done now lift healthy

Auto drain valve checked manually working OK


RO High Pressure Pump-3 connection remove(Gland-R-G-Y)
BC-1 Pull Cord Checking work found 55 no's pull cord rusted condition then
remove pull cord , rusted pull maintenance work underprogress
Boiler-1 & 2 Bunker level transmittor cleaning work

Note- PA-1 & ID-1 Tmeprature bearing increase upto 90 to 100 degree for PA-2
& ID-2 motors lubrication work

Shift jobs carried

After greasing work , Tripping of ID / PA Fan of unit No. # 1 taken in line.

In Inst. Air Compressor no.-2 Plan Maintences alarm is showing at Local


display. So Reset it. Now Ok.
In Unit No. # 2 Vessel No.-11/21 Seal Pr. Is not showing at DCS end. So cleaned
the Impluse line. Now ok.

In Unit No. # 2 Veseel No.-11 Level High is showing at DCS end. So checked and
found that material inside the vessel. So informed to shift incharge.

online CPCB and ETP website is not opened .


All the AC MCB to OFF Condition.
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared-
1/BC-1
2/RO High Pressure
3/BC-4
4/BC-3
5/BC-2
6/ BC-6

As per operation requirement , BFP-2 Put into VFD to DOL mode again DOL to
VFD mode.
RO Booster Pump No.-3 motor connection done and trial taken. It is working
Normally.

Shift jobs carried

TG-1 4.5 mtr all control valve, MOV, transmitter, presssur gauge and JB claning
done

TG-1 4.5 mtr (01MV2313) (01MV2308) (01MV2906) (01MV2908) all oil


cleaning done

01CV 2303 QCNRV JB cleaning and packing tap covered

TG-2 4.5 mtr all control valve, MOV, transmitter, presssur gauge and JB claning
done
02MV3201 HP heater Inlet feed water MOV oil cleaning done
02CV2303 QCNRV JB , AOP-2A JB, AOP-2B JB cleaning done
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

Shift jobs carried


In TPP Middle gate street Light timer structed So changed from Unit No. # 1
ACC area. Also ON Time- 6.00 PM.
BFP-2 DOL to VFD mode ALSO VFD to DOL Mode changeover work
Unwanted Light silo area , Dosing room to OFF Condition.
In Unit No. # 2 Vessel No.-11/21 Seal Pr. Is not showing at DCS end. So cleaned
the Impluse line. Now ok.
BFP AHU Put into auto mode with SP= 33 Degree.
In Unit No. # 2 Vessel No.-11/21 Seal Pr. Is not showing at DCS end. So cleaned
the Impluse line. Now ok.

In Unit No. # 1 Veseel No.-22 Level High is showing at DCS end. So checked and
found that material inside the vessel. So informed to shift incharge.
Compressor House all the auto drain valve checked and working normally.
All the Manual Light to OFF Condition.
P & V. No. # 2 and 4 is already OFF Condition.
online CPCB and ETP website is not opened .

Shift jobs carried

Middle gate Lights not started till 6:00 PM check and found timer is Ok but time
mismatch, corrected it now OK

DG House Oil Feed pump 1& 2 get trip due to high viscosity so reset it two
times.

BFP-2 , MV drive change over from bypass to Drive mode.

Reclaimed left right VFD get trip due to overcurrent fault so reset once.
Boiler-2, bag house 11-21 showing level High so clean the probe and med it ok.

Boiler-1, APH intene valve 8127 showing close so cheek and attend, also back
pressure line cleaning done.

Shift jobs carried

TG-1 0 mtr. All MOV , Control Valve , transmittor JB's Cleaning & Blowering
work

TG-2 0 mtr. All MOV , Control Valve , transmittor JB's Cleaning & Blowering
work

TG-1 0 mtr. 01mv 3205 MOV oil leakage cleaning work

TG-2 0mtr. (02MV3202 , 02MV 3204 & 02MV3205) MOV Oil leakage Cleaning
work
CHP MCC Panel cleaning & Blwoering work outside
ACC-1 light not start check & found lighting timer stuckup reset done ok
All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.

Shift jobs carried


BC-1 is not started found that Shoute level Proxy is showing at DCS. So checked
and found that material inside the shoute. So informed to shift incharge.
Removed it. Now Started. Then Ok.
WTP field Inst, , Local Panel , guages and field JB , DCS Panel cleaning and
blowerning to done.
IFC SP= 50 PSI checked as per operation requirement.
All the Repoerts sent to the all the Person.
BFP AHU Put into auto mode with SP= 30 Degree.
Following Equipment S/D Given.-
1/BC-1
2/ BC-3,
3/BC-6
4/BC-7A,
5/BC-7B
6/ Coal shed trolley,
7. BAC-2A,

All the Manual Light to OFF Condition.


P & V. No. # 2 and 4 is already OFF Condition.
online CPCB and ETP website is not opened .
China Yard lighting timer checked it is working normally. Automatically light to
OFF Condition.
Unit No. # 2 Boiler zero mtrs welding machine green tag to provided.
In WTP , coal grinding machine Power TB to changed and Double earthing is
Provided.

Shift jobs carried


Reclaiemr Boom Up-down problem found wire from up-down switch came out
re connect the wire and trial taken working Ok

TG-2, Generator Rear Oil gauge leakage , new washer provided and leakage
arrested.
ACC-2, ground floor RSB -64, Earthing missing , new Earthing done.

Street Lights not ON ,found timer stuck up reset the timer .

Boiler-1, Bed material temp JB cable dressing done

Following Equipment S/D Given.-


1BC-1
2 BC-3,
3 BC-6
4 BC-7A,
5 BC-7B
6 Coal shed trolley,
7. BAC-2A,

Shift jobs carried


Turbine-2 Generator RB inlet line pressure gauge oil leakage arrested & set in
proper direction.

HP Dosing tank-4 no pump pressure gauge faulty so removed & checked & set

Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern
BLR-1 4 no's De superhaeting control valve cleaning work
BLR-1 De superheating control valve (01TCV3204) gland leakage so gland bolt
tightness & leakage arrest.
WTP Pump House Motor Cleaning & Blowering work

Shift jobs carried

Reclaimer up down not operating , so checked and found that lose connection
from selector switch, tight it and ON the reclaimer
Level probe 12-22 clean and checked on requirment of Operation

Bag house-2 vessele-21 air leakage arrest

Abnormality: Cable dreassing of Diverted JB at BC7AB completed


Abnormality: Boiler-2 near furnace floor WTP side earthing strip repaired.

Abnormality:Lighting JB covered at BC-6 head pully floor total-4nos completed

submersible pump connection done at BC-5


HP dosing pump level checked physicaly ok

two extention board given at BC-5

Shift jobs carried


Bag House 11-21 showing level high check and corrected.

Bag House 12-22 showing level high check and corrected.

Abnormality- Coal Feeder 1D pneumatic gate cable dressing done.

BC-6, open Lightning JB clover with packing tape.

Soot blower-1AVI given and close

Following Equipment S/D Given.-


1)BC-1
2) BC-4
3) BC-3
4) BC-6
5) soot blower-1

Shift jobs carried


IAC-1 ,2 &3 Motors Cleaning & Blowering work
BFP-2 Drives VFD to DOL Changeover work
Power Report prepared and mailed.

DG report Prepared and upload in SAP.

Environment report upload and mailed to concern

Plant APC Report , Plant Performance report upload and mailed to concern

APH-1 main air valve leakage arrset done ( PU tube found damaged then cut
damaged part & fit)
WTP Hall field instrument cleaning work
BFP-3 Drives Temprature incresae 43 degress then set point decreases 32 to
28 degree.

Shift jobs carried


Bag House 22level checked found healthy from our side, informed to operation
as suction was there.
Bag House 22 temeprature RTD checked found healthy from our side, informed
to operation resistance was same as DCS reading.

Abnormality-
1.TG-2 load display in CCR showing negative value.
2.LP Dosing tank level gauge not showing currect.
3.Both units HP heater outlet water temp.(01TE3235, 02TE3235) and
Economiser inlet temp.(01TI0145, 02TI0145) transmitter checking required.
4.Blr-2 annunciation (main steam temp) not showing though alarm hooter goes
on.

Following Equipment S/D Given.-


1)BC-1
2) BC-4
3)Reclaimer
4) BC-6
5) boiler drain pump
6)AHF panel-2
7)Jockey pump-1

Shift jobs carried


Fly ash silo-1 and bed ash silo all SOV, fork switch JB and Panel cleaning and
blowring done
Fly ash silo-1 and bed ash silo all Motors cleaning and blowring done
Fly ash silo motor protection cover found misplaced so fix it properly
Following Equipment S/D Cleared.-
1)BC-1
2) BC-4
3)Reclaimer
4) BC-6
5)AHF panel-2
6)Jockey pump-1

Shift jobs carried


Boiler-2, bag house 12-22 seal pressure line flushing done @ 21:00 PM

Boiler-2, bag house 12-22 seal pressure not showing , check manually then
balancing valve seal by pass as per operation recommendation @ 00:30 hrs

Boiler-2, bag house 12-22 back pressure line flushing done @ 04:00 hrs

Boiler-2 Soot Blower panel cleaning done.

24Volt Charging light shift from WTP to 4.5 Mtrs.

All Energy Meter Manual reading taken for Power Report.

Power Report prepared and mailed.


DG report Prepared and upload in SAP.

Shift jobs carried


BFP-2 MV drive change to VFD & again to DOL as per operation requirement.

Boiler-2 11-21 isolation of Inst. Air & pr. Gauge removal.


Boiler-2 12-22 back pr. Line flushing & pr. Setting in pr. Switch done.
Following Equipment S/D Given.-
1)BC-2
2) BC-3
3)Coal crusher-1
4) EOT TG
5) Soot boiler-1
6)Jockey pump-1
1)BC-2
2) BC-3
3)Coal crusher-1
4) EOT TG
5) Soot boiler-1
6)Jockey pump-1

Shift jobs carried


Boiler-1 Lift comes on F2 (Door Fault) power supply reset & Door sensor
Cleaning done now lift healthy

China Yard lighting timer checked & found stuckup condition now reset timer
Boiler-2 11-21 isolation of Inst. Air & pr. Gauge fitting work

Boiler-2 12-22 conveying issue check & found balacing valve seal damaged
inform to mech. Dept. Then start system found system not start due to seal
fault s check & found 22 no's vessel pressure low (3.4 kg) due to leakage near
plate valve iform to operation dept. after attend probelm system start found
cycle running normally in both auto & manual mode

Shoot Blower-1 comes in G fault due to 14 no's motor O/L Reset done now ok

CHP DCS Road side lighting timer found stuckup condition , timer reset done
now ok
Following Equipment S/D Clear.-
1)BC-2
2) BC-3
3)Coal crusher-1

4) Soot boiler-1
5)AHF-3
6) 11-21 & 12-22 bh vessel

Shift jobs carried

Boiler-2, bag house Vessel 22 showing HH & H , open the probe found actual
material inside, same inform to CCR.

Boiler -2 , Zero mtrs drain MOV and J valve MOV cleaning done.

Unit-2 APH JB all Equipment checking done.


ACC-2, 1 Lightning JB found open so cover it with packing tape.

All Energy Meter Manual reading taken for Power Report.


Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


4.5 swithcgear room MV Drive filter Cleaning & washing work

Boiler-1 Lift comes on F2 (Door Fault) power supply reset & Door sensor
Cleaning & outside door not close properly so adjust door now lift healthy

Boiler-2 21-22 vessel level showing H-H then calibrated & adjust level probe
now ok
SA-2 Motor both side Lubrication work
Following Equipment S/D Given.-
1)BC-2
2) BC-3
3)BC-4
4) BC-7A &7B
5) Bucket Elevator Boiler
6)Jockey pump-2
7)Boiler Make up pump

Shift jobs carried

BAC-2A VFD comes to OCF fault so checked found 1no. Motor megger showing
low Kohm Pto E, so replaced the motor & trial taken now working healthy.OLD
motor placed in mech. Workshop for further checking .

WTP Sieve shacking machine tripped & timer controller card became faulty so
direct connection dobne as per WTP team requirement. Machine working
healthy.

WCM TPP Team report compileed & mailed

S/D given
BAC-2A
Following Equipment S/D Cleared.-
1)BC-2
2) BC-3
3)BC-4
4) BC-7A &7B
5)Jockey pump-2
Following Equipment S/D Cleared.-
1)BC-2
2) BC-3
3)BC-4
4) BC-7A &7B
5)Jockey pump-2
6)BAC-2A

Shift jobs carried

boiler-2 hopping device and JB cleaning done

soot blower-2 panel cleaning and wiring tightness done

unit-2 feed water station equipments cleaning done

WTP Pump House Motor Cleaning & Blowering work

All Energy Meter Manual reading taken for Power Report.


Unwanted Lights made OFF in field
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


BC-3 not start due to Belt Tear act so check & found DCS supply wire remove
condion at DCS End so coonect wire now BC-3 Healthy

Boiler-1 Lift comes on F2 (Door Fault) power supply reset & Door sensor
Cleaning & outside door not close properly so adjust door now lift healthy

Boiler-1 11-21 seal pressure fault act so check & found line choke flushing done
now system healthy

BAC-2A VFD comes to OCF fault so checked found field side silo side motor &
power cable megger , Motor megger value ok but power cable value 0 ohm at
Y& B Phase then cable found single phase , Damaged cable connection remove
both motor & Filed Panel side & new cbale laying work Underprogress

Bolier-1 Bucket Elevator area Welding M/C Double Earthing done


Boiler-2 22 vessel temp. show low at DCS so check & found RTD Resistance
value is 119 ohm so inform to desk operator
Following Equipment S/D Given.-
1)BAC-2A
2) BC-1
3)BC-4
4) BC-6
5) Side Stream Filter Root Blower 1&2

Shift jobs carried


BAC-2A motor connection done & trial taken working healthy

Reclaimer cable rolling up issue come while in forward direction so checked by


found sometimes its not rolling.

DCS unit-2 NIS NPM pair comes to fault on 26M panel , so reset & taken in line.

S/D given
BC-7A
Following Equipment S/D Cleared.-
1)BC-1
2) BC-4
3)BC-6
4) BC-7A
5)Soot blower-1,2
6)BAC-2A

Shift jobs carried

WTP flow transmitter (FT-4905) ferrule side water leakage, so ferrule


tightness done

WTP solenoide JB cleaning done 5 nos total

WTP MOV panel cleaning done


BFP-3 breaker rack out as per requirement of operation deptt for pump
checking , again taken in Line.
BFP-2 put in DOL from VFD
All Energy Meter Manual reading taken for Power Report.
Unwanted Lights made OFF in field
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


VAM AHU set point optimised , battery room AC set point optimised , temp. is
under observation.
Reclaimer CRD cable gearbox greasing done , trial done for forward reverse
movement.

Reclaimer pull cord rope loosen done as per requirement.

BC-4 camera cleaning & polythene covering, BC-3 camera adjusted as per
requirement.

PM work :Greasing of motor as per schedule hourly maintenance done


1.CEP-1A
2.CEP-2B
3.CT fan-2
4.CT fan-3
5.ACW-2

Following Equipment S/D Given.-


1)Reclaimer
Following Equipment S/D clear.-
1)Reclaimer
2)Boiler- 1 bucket elevator
Shift jobs carried
ACC-1A all 6 no' motor Lubrication work
Boiler-1 &2 Bunker transmittor cleaning work

Bunker Area 2 no's side instrument cable dressing work

WTP Hall high pressure Panel cleaning & Packing work


IFC Filter moisture drain manually

Compressor house all auto drain valve manually check and drain
Boiler-2 area RSB-30 Green Tag Updated done

ACC-1 6 nos Motros & Lube oil motors cleaning work

Shift jobs carried

Unit -2 ACC following motors Greasing done as per schedule.


1. ACC fan2A
2. ACC fan 2B
3. ACC fan 2C
4. ACC fan 2D
5. ACC fan 2E
6. ACC fan 2F

All Energy Meter Manual reading taken for Power Report.


Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


BAC 2A Both motor connection open, (PA FAN SIDE DE-R/Y/B-ND & CCR SIDE
DE-G/R/Y)
UNIT-2 DCS Room Motion sensor time increse 03 minute to 10 minute due to
delay in checking supply.

Shoot blower no. 14, show trip at CCR, at panel, winding resistance: 76.1 ohm
and megger value at 89k ohm ,motor very hot, motor megger at terminal
(without cable) 2.6 G ohm. So its power JB open found its power cable (4*1.0
sqmm) melt and short .Its cable not change due to electrician at BC5 light and
pump reparing job. motor connection (DE-R/Y/B-ND)

BC5 belt 24 volt light repairing done as coal removing job contine.

One no. Pump repairing and connection done at BC5 tunnel for sluge removing
job.
Following Equipment S/D Given.-
BAC-2A
BC5
BC6
BC7B
UNIT-1 SHOOT BLOWER

Following Equipment S/D clear.-NIL

Shift jobs carried

Boiler -1 Soot Blower no-14 Cable from JB to motor changed and termination
done at both end with proper lugging.

HP dosing pump no-1 not started in auto found level low alarm , check the low
level switch it is malfunctioning so presently by pass it . Under observation.

BFP-2 Change Over from bypass mode to Drive mode as per requirement.

Following Valve Air Leakage arrested


1. IAC-3, Water valve SOV air leakage arrested.
2. WTP Hall , MGF -2 SV4810 backwash generate valve

Unit-1 Bag house 11-21 back pressure line flushing done.

Following Equipment S/D Given.-


BC5
BC6
BC7B
UNIT-1 SHOOT BLOWER

Shift jobs carried

BFP-3 Change Over from vfd mode to bypass mode as per requirement.

BAC-1 A & 1B Field Panel , Level probe JB & Trnasmittor cleaning work

BAC-2 A & 2B Field Panel , Level probe JB & Trnasmittor cleaning work

STG Building Dosing room motors & Panels cleaning & Blowering work
All Energy Meter Manual reading taken for Power Report.
Unwanted Lights made OFF in field
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


BFP-3 ,Power isolation done , after bypass interlock from mvvfd & it MOV both
main and bypass too isolate
BFP-3, straienr guage remove and kept at shift office, and RTD remove and
dressing done at cable tray ,and its fitting too remove as require fore strainer
maintanance

UNIT-2 AOP pump not show healthy at ccr, feeder power and control
connection check of both drive found ok then inform to Pramod sir and check
with Mr. tarun found its main tank oil lavel at 794 mm while at DCS
minimumdefind vale at 800. Then its corrcted.

UNIT-2 Bag House chamber solenoid valve cleaning done and polythene cover
as rain continue and its shed cover (its found away from it)

Unit-2 APH JB I/C air valve found leakage so its tight .

Following Equipment S/D Given.-


BFP-3
BFP-3 MOV (main & bypass)
BC2
BC6
WTP LDB & B-2 LDB

Following Equipment S/D clear.-NIL

Shift jobs carried

BFP-3 Change Over from DOL to Drive DOL mode.

BFP-2 Change Over from Drive to DOL mode as per requirement.

BFP-3, RTD and Pressure gauge re fitted after mechanical work completed and
RTD cable dressing done
Main Road street light timer automation done from boiler lightning circuit ,
work with General shift Team

BC-6, bag filter panel cleaning done.

Following Equipment S/D Given.-


1. BFP-3
2. BFP-3 MOV (main & bypass)
3.BC 2
4. BC 6
5. WTP LDB

Shift jobs carried

CHP MCC & PCC 3A & 3B Panels cleaning & Blowering work outside

Boiler-2 RSB-31 Green Tag Updated done

Chinmey Analyser Panel cleaning & Blowering work

Unit-1 Bag house 11-21 comes in seal fault then as per requirement of
operation dept Balancing valve bypass done

All Energy Meter Manual reading taken for Power Report.


Unwanted Lights made OFF in field
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


BAC-1A,1B check with Mr. ketul found its back pressure transmitter working
ok .
Boilor 1&2 CO value check , in manual operation, purging found ok then put
again in auto mode.
Chimni room SOX sensor moisture cleaning and alighnment done.
UNIT-1 Shoot blower power reset one time.

BFP3 Room AHU find at 34 rpm , then its increse to 650 rpm, as room
temprature increse till 37 C.
Following Equipment S/D Given.-
BC1
BH-1,VESSEL-11-21,INTRUMENTMENT AIR VALVE
BC2
WTP LDB & B-2 LDB

Following Equipment S/D clear.-NIL

Shift jobs carried

Following shutdown Given-


1. BFP-3
2. BFP-3 Outlet MOV
3. BFP-3 By pass MOV

ACC Fan 1A suddenly stopped while running, check from feeder, VFD and at
site but not found any abnormality, tripping/alarm, then started command
given from CCR , it start normally.

Boiker-2, Bag House 12-22 showing H:H , remove probe found actual material
inside the vessel , same inform to CCR and probe calibrated.

Boiker-2, Bag House 11-21 showing H:H , remove probe found actual material
inside the vessel , same inform to CCR and probe calibrated.

Boiler-2, Bag House 11-21 back pressure line flushing done.


All Energy Meter Manual reading taken for Power Report.
Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.
Shift jobs carried
J Valve-1 A & 2B & SA-1 Motors Lubrication done
BFP-3 Bypass to VFD Changeover work

BC-1 Magnetic seperator is not started from DCS end. So O/L reset. Now Ok.

BC-3 takup pully new guard limit switch installation work & trial work
IFC Filter moisture drain manually
Boler-1 Bag house Vessel 11 DP not showing so check & found in nanometer
water level low so fill water & check DP Healthy but after sometimes violet
checking work underprogress
Bolier-1 Bag House Vessel 21 DP not showing so check & found Set vlave on
condtion so off valve no DP Helathy

Following S/D Clear-


1/ BC-2
2/BC-3
3/ BFP3 , outlet & inlet MOV
4/ CHP LDB

Shift jobs carried


BFP-2 Change over form Drive to By pass mode.
4.5 Mtrs Switch gear Room PDB cleaning done
Unit 2 Firing Floor JB cleaning done

All Energy Meter Manual reading taken for Power Report.


Power Report prepared and mailed.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

Shift jobs carried


Air leakage finding and arresting work, air leakage found from boiler-2 100%
flow control valve daifrom, so tight the daigfram bolt and leakage arrested.
(02LCV3203)
boiler-1 vessele 11-21 continious level high , so checked and found that
conveying line is heavely jam and conveying is not proper

boiler-2 bag house 11-21 seal pressure fault came, so flushing the line ,now ok

Boiler-2 Lift fault came, so found that lift gone below ground level so operate it
manually, and reset it now working normally

ACW pump house motor cleaning done


Following Equipment S/D Given.-
BC1
BC2
BC5
IAC-2
Reclaimer

Following Equipment S/D clear.-IAC-2

Shift jobs carried


Boiler-2 area 9 mtr. 2 no's Lighting fitting found pouring with water now water
drain & clean glass
Bag house -1 light not start so check & found lighting timer stuckup so reset
timer & taken in line

AHF-3 CHP MCC found trip due to C01 Fault then clean filter section &
tightenss all cards pin then start now filter healthy & working normally

Boiler-1 11-21 Back Pressure Transmittor flushing done


IFC Filter moisture drain manually

Bunker level 2B & 2C value show violet so power reset & Transmittor cleaning
in field now value healthy

APH-2 Not conveying due to system fault so check in field found dom in
jammed condition & inform to Operation dept.

Following S/D Clear-


1/ BC-2
2/BC-1
3/ Reclamier
4/ CHP LDB
5/BC-5
6/Boiler-2 APH

Shift jobs carried

Boiler -1 Bag House Vessel 11 not showing H:H so open the probe and checked
physically , material is not inside vessel at probe end.

Boiler -1 Bag House Vessel 21 not showing H:H so open the probe and checked
physically , material is not inside vessel at probe end.

Boiler-1 , Bag House 11-21 back pressure transmitter tube leakage arrested.
As per operation Boiler-1 , Bag House 11-21 back pressure not showing so
open the back pressure line and confirmed with them.

One 24 Volt charging lamp provided at boiler 1 bag house.

Power Report prepared and Month end report balanced.

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.


Shift jobs carried
In IFC Showing higher Pr. As Compare to Set Pr. . So checked and found that
Bypass Valve is in Passing condition. So Removed the actuator and manually
closed the Valve then taken in line. Now ok.

In IFC Drain PU Tube puncture. So Cut the PU Tube and reconnected it. Now Ok.
Reclaimer left right VFD comes to overcurrent fault so reset once.
In Service air Compressor No.-2 Auto drain valve is not working condition. So
opened the auto drain valve and found that filter is heavily chocked condition.
So cleaned it and taken in line. Now Ok.
CCR AHU Put into auto mode with SP= 26 Degree.
All the Manual Light to OFF Condition.
P & V. No. # 2 and 4 is already OFF Condition.
online CPCB and ETP website is not opened .
Unit No. # 2 Coal Feeder area welding machine green tag to provided. Also Plug
Top Repaired.
WTP Pump House Motor Cleaning & Blowering work
0
0
0
Date Shift Engineer Name

01.01.2022 A Ashvin Jadav

Date Shift Engineer Name

01.01.2022 B Tarun Gaur

Date Shift Engineer Name

01.01.2022 C Gajendra Pandya


01.01.2022 C Gajendra Pandya

Date Shift Engineer Name

02.01.2022 A Tarun Gaur

Date Shift Engineer Name

02.01.2022 B Gajendra Pandya

Date Shift Engineer Name

31.12.2021 C Deepak Chand

Date Shift Engineer Name


03.01.2022 A Tarun Gaur

Date Shift Engineer Name

03.01.2022 B Deepak Chand

Date Shift Engineer Name

03.01.2022 C Sanjay Garg


03.01.2022 C Sanjay Garg

Date Shift Engineer Name

04.01.2022 A Gajendra Pandya

Date Shift Engineer Name

Deepak Chand
04.01.2022 B Ashwin Jadav
Deepak Chand
04.01.2022 B
Ashwin Jadav

Date Shift Engineer Name

05.01.2022 B Tarun Gaur/Ashwin


Jadhav

Date Shift Engineer Name

04.01.2022 C Sanjay Garg

Date Shift Engineer Name


06.01.2022 A Ashvin Jadav

Date Shift Engineer Name

06.01.2022 B
Tarun Gaur

Date Shift Engineer Name

06.01.2022 C Deepak Chand


Date Shift Engineer Name

07.01.2022 A Tarun Gaur

Date Shift Engineer Name

07.01.2022 B Sanjay Garg


Date Shift Engineer Name

Deepak Chand
07.01.2022 C
Ashwin Jadav

Date Shift Engineer Name

08.01.2022 A Tarun Gaur


Date Shift Engineer Name

08.01.2022 B Sanjay Garg

Date Shift Engineer Name

08.01.2022 C Gajendra Pandya


Ashwin Jadav
Gajendra Pandya
08.01.2022 C Ashwin Jadav

Date Shift Engineer Name

09.01.2022 A Sanjay Garg

Date Shift Engineer Name

09.01.2022 B Deepak Chand


09.01.2022 B Deepak Chand

Date Shift Engineer Name

09.01.2022 C Tarun Gaur

Date  Shift  Engineer Name

10.01.2022 A Sanjay Garg 


10.01.2022 A Sanjay Garg 

Date Shift Engineer Name

10.01.2022 B Deepak Chand

Date Shift Engineer Name

10.01.2022 C Tarun Gaur


10.01.2022 C Tarun Gaur

Date Shift Engineer Name

11.01.2022 A Ashvin Jadav

Date Shift Engineer Name

11.01.2022 B Deepak Chand


Date Shift Engineer Name

11.01.2022 C Sanjay Garg

Date Shift Engineer Name

Deepak Chand /
12.01.2022 A Ashvin Jadav

Date Shift Engineer Name

12.01.2022 B Tarun Gaur


12.01.2022 B Tarun Gaur

Date Shift Engineer Name

Sanjay Garg / Amit


12.01.2022 C Kumar

Date Shift Engineer Name

13.01.2022 A Ashvin Jadav


Date Shift Engineer Name

13.01.2022 B Tarun Gaur

Date Shift Engineer Name

Deepak Chand
13.01.2022 C
Date Shift Engineer Name

14.01.2022 A Tarun Gaur

Date Shift Engineer Name

14.01.2022 B Sanjay Garg / Amit


Kumar
Date Shift Engineer Name

14.01.2022 C Deepak Chand


Ashwin Jadav

Date Shift Engineer Name

15.01.2022 A Tarun Gaur

Date Shift Engineer Name


15.01.2022 B Amit Kumar Singh

Date Shift Engineer Name

15.01.2022 C
Ashwin Jadav

Date Shift Engineer Name

16.01.2022 A Amit Kumar Singh


Date Shift Engineer Name

Tarun Gaur
16.01.2022 C

Date Shift Engineer Name

Amit Kumar Singh/


17.01.2022 A Sanjay garg

Date Shift Engineer Name


17.01.2022 B Deepak Chand

Date Shift Engineer Name

Tarun Gaur
17.01.2022 C

Date Shift Engineer Name


18.01.2022 A Deepak Chand

Date Shift Engineer Name

18.01.2022 B Ashvin Jadav

Date Shift Engineer Name

18.01.2022 C Sanjay Garg / Amit


Kumar

Date Shift Engineer Name


19.01.2022 A Ashvin Jadav

Date Shift Engineer Name

18.01.2022 B Tarun Gaur

Date Shift Engineer Name

Sanjay Garg / Amit


19.01.2022 C Kumar
Date Shift Engineer Name

20.01.2022 A Ashvin Jadav

Date Shift Engineer Name

20.01.2022 B Amit kumar singh

Date Shift Engineer Name

20.01.2022 C Deepak Chand


20.01.2022 C Deepak Chand

Date Shift Engineer Name

21.01.2022 A Tarun Gaur

Date Shift Engineer Name

21.01.2022 B Sanjay Garg


21.01.2022 B Sanjay Garg

Date Shift Engineer Name

Deepak Chand
21.01.2022 C
Ashwin Jadav

Date Shift Engineer Name

22.01.2022 A Tarun Gaur


Date Shift Engineer Name

Sanjay Garg / Amit


22.01.2022 B Kumar

Date Shift Engineer Name

22.01.2022 C Ashwin Jadav

Date Shift Engineer Name


Amit Kumar Singh/
23.01.2022 A Sanjay garg

Date Shift Engineer Name

23.01.2022 B Deepak Chand

Date Shift Engineer Name

23.01.2022 C Tarun Gaur


23.01.2022 C Tarun Gaur

Date Shift Engineer Name

24.01.2022 A Sanjay garg

Date Shift Engineer Name

24.01.2022 B Deepak Chand


Date Shift Engineer Name

24.01.2022 C Tarun Gaur

Date Shift Engineer Name

25.01.2021 A Deepak Chand

Date Shift Engineer Name

25.01.2021 B Ashwin Jadav


25.01.2021 B Ashwin Jadav

Date Shift Engineer Name

25.01.2022 C Sanjay Garg / Amit


Kumar

Date Shift Engineer Name

26.01.2021 A Deepak Chand

Date Shift Engineer Name


26.01.2021 B Tarun Gaur

Date Shift Engineer Name

26.01.2022 C Sanjay Garg

Date Shift Engineer Name

27.01.2022 A Ashwin Jadav

Date Shift Engineer Name


27.01.2021 B Tarun Gaur

Date Shift Engineer Name

27.01.2022 C Deepak Chand

Date Shift Engineer Name

28.01.2022 A Amit Kumar Singh


28.01.2022 A Amit Kumar Singh

Date Shift Engineer Name

28.01.2022 B Sanjay Garg

Date Shift Engineer Name


Deepak Chand
28.01.2022 C
Ashvin Jadav

Date Shift Engineer Name

289.01.2022 A Amit Kumar Singh

Date Shift Engineer Name


29.01.2022 B Sanjay Garg

Date Shift Engineer Name

29.01.2022 C Deepak Chand

Date Shift Engineer Name


30.01.2022 A Sanjay garg

Date Shift Engineer Name

30.01.2022 B Ashwin Jadav

Date Shift Engineer Name

30.01.2022 C Amit kumar singh


Date Shift Engineer Name

31.01.2022 A Ashvin Jadav

Date Shift Engineer Name

31.01.2022 B Deepak Chand

Date Shift Engineer Name

31.01.2022 C Amit kumar singh


31.01.2022 C Amit kumar singh
Shift jobs carried
Shift round taken found all drives running normal.

Compressor house all auto drain valve manually check


and drain
VAM parameters checked found Normal
All AC power made ON in morning.
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Shift jobs carried

Shift round taken found all drives running normal.

All AC power made OFF in Evening

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift jobs carried
Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Shift jobs carried


Shift round taken found all drives running normal.
VAM parameters checked found Normal
chimny area round taken parameters normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Shift jobs carried
Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain
VAM parameters checked found Normal
All AC power made ON in morning.

Bolier-1 &2 & STG Building lift check & found working
normally
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.

Compressor house all auto drain valve manually check


and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Shift jobs carried

Shift round taken found all drives running normal.

Compressor house all auto drain valve manually check


and drain

VAM parameters checked found Normal

All AC power made ON in morning.

Bolier-1 &2 & STG Building lift check & found working
normally
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


Compressor house all auto drain valve manually check
and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
Auto drain valve checked manually working OK
All AC power made OFF in Evening
Compressor house all auto drain valve manually check
and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Shift jobs carried


Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain
VAM parameters checked found Normal
All AC power made ON in morning.
Bolier-1 &2 & STG Building lift check & found working
normally
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

CHP Coal shed area Light ON

Compressor house all auto drain valve manually check


and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift jobs carried


Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain

VAM parameters checked found Normal


All AC power made ON in morning.
Bolier-1 &2 & STG Building lift check & found Boiler-1 &
STG Building lift working normally & Boiler-2 lift
shutdown condition due to down side reed switch
malfunctioning by moisture or water
STG building & Coal Shed Area Light OFF
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift jobs carried


Shift round taken found all drives running normal.

Compressor house all auto drain valve manually check


and drain
VAM parameters checked found Normal
Green tag Upadated at Reclmier RSB & DCS -2 Supply
socket
Environment and Plant performance report upload and
mail to all.

Bolier-1 &2 & STG Building lift check & found Boiler-1 &
STG Building lift working normally & Boiler-2 lift
shutdown condition due to down side reed switch
malfunctioning by moisture or water
STG building & Coal Shed Area Light OFF
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

All AC power made ON in morning.


Compressor house all auto drain valve manually check
and drain

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Boiler-1 lift door not closed at 0 mtr. Then clean all


sensor now lift door closed & lift healthy

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal  except SPC007 .
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

HSD area lights switch OFF

Compressor house all auto drain valve manually check


and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Boiler-1 lift door not closed at 0 mtr then Lift Power


supply off from lift cabin
Boiler-2 RSB-30 Panel Green tag Updated
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK

HSD area lights switch OFF

Compressor house all auto drain valve manually check


and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


ALL Office AC OFF Evening
Temple loud spaker Found OFF during round then ON
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

Auto drain valve checked manually working OK


ALL Office AC OFFICE Evening
Temple loud spaker Found OFF during round then ON
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found all drives running normal.
OFFICE AC ON Morning

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
OFFICE AC ON Morning
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .
UPS Check List filled.
All ac mcb off done

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs
Shift round taken found all drives ,HT panel room,
transformer yard, WTP mcc room ,CHP panel running
normal.

OFFICE AC ON Morning
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs
Shift round taken found all drives ,HT panel room,
transformer yard, WTP mcc room ,CHP panel running
normal.

OFFICE AC ON Morning
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.


Auto drain valve checked manually working OK

All required lights switch ON in evening

Compressor house all auto drain valve manually check


and drain
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs
4. Generator-2  checklist
5. Electrical checklist
Shift
6. VAMround
Checktaken
list found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist

6. VAM Check list

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist

6. VAM Check list

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives ,HT panel room,
transformer yard, WTP mcc room ,CHP panel running
normal.

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs

Shift round taken found all drives ,HT panel room,


transformer yard, WTP mcc room ,CHP panel running
normal.

\
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Following Equipment S/D Given-
1/ Boiler 21 no's popet Valve air isolation & SOV Air
Isolation
Following shut down Clear-
1. Coal feeder 2B

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found all drives ,HT panel room,
transformer yard, WTP mcc room ,CHP panel running
normal.
\
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
1. Shift instrument check list
2. UPS Check List
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
Shift jobs carried
Air leakage finding and arresting work, air leakage found from boiler-2 so tight the daigfram bolt
and leakage arrested.(02LCV3203, and 02LCV3202)

WTP back side repair supply box 78 new rubber mat laying done.
WTP re-generation room cable tray cable dressing done.
Mechnical workshop grinder green tag provide.

Jocky pump 1 not run, so chedked found starter off, so on and running normal.

Following Equipment S/D Given.-


BC1
BC2
Bag House-1 Vessel 11-21.

Following Equipment S/D clear.-


Bag House-1 Vessel 11-21.

Shift jobs carried


BC-5 Tunnnel spare dewatering pump ELCB Tripped then Motor meggering value check ed &
found motor winding ground inform & handover to mech. Dept.
Boiler-2 RSB 25 & 26 Green tag updated done

Bolier-2 CO Chiller found OFF taken in line

CHP DCS AC trip due to HLHP Fault reset done now ok


Boiler-1 vessel 11 shows levelm H-H then calibration done now ok
Mid Gate light OFF due to timer stuckup timer reset & taken in line now ok
BC-5 Motor & Power JB Cleaning & Blowering work
Following S/D Clear-
1/ BC-2
2/BC-1
3/ BC-5

Shift jobs carried

P&V panel cleaning and wiring tightness done in boiler side P&V-4

Green tag provided on Repaire supply box of boiler-1

TG 0 mtr equipments cleaning done

soot blower-2 panel found open , so closed it


New month power report created

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.


Shift jobs carried
CCR AHU change from manual to auto mode & set point increse 18 to 20
WTP Hall field instrument cleaning work
Fire Pump House Motors & Power JB Cleaning & Blwoering work
Bed Ash silo RAV trip due to O/L Reset done now ok
STG Building lights OFF

Shift jobs carried


Jockey pump-1 found OFF, so restart it
Boiler-2 unwanted lighting pole removed from 6th floor
Earthing Pit logsheet updated for TPP
Boiler-2 co panel found in manual mode, so put it in auto mode
coal bunker both unit level transmitter cleaning done
Boiler-2 drain MOV found dusty, so clean them with brush 6 nos

Shift jobs carried


coal bunker both unit level transmitter cleaning done
Boiler-2 , Drain MOV found dusty so clean it with brush . 6 Nos
CO panel found in auto mode so cjhange it in auto mode.

Dosing Room , LP , HP dosing motors and panel cleaning done.

Power Report prepared and Month end report balanced.


DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.
Shift jobs carried
China Yard faulty Lighting Timer Replaced by new one
Fly Ash Silo faulty Lighting Timer Replaced by new one
Boiler-2 lift comes in F6 Fault (Terminal switch malfunctioning ) reset done now ok
Boiler-2 02T1125 temprature show low so check in field side Thercouple exsiting pair found
faulty then spare pair taken in line
Boiler-1 11-21 Extra air service line gauge found faulty relaced by new one now pressure shows
healthy

Boiler-1 11-21 Back Pressure gauge found faulty replaced by new one now pressure shows
healthy

Following Equipment S/D Given.-


BC1
CHP Crusher House LDB
BC-5
Reclamier
BC-7A & 7B
BC-4

Shift jobs carried


All 3 BFP correct showing violet at CCR , check with Mr.tarun found BRC card is in fault , Reset the
card now OK.

Coal Feeder 1D sealing air pressure gauge replace with new one.

TPP middle gate lightning not started till 6:00 PM so found timer time mismatched. Timer
correction done

Reclaimer get stopped due to UPS power trip, reset the UPS .

Following Equipment S/D Clear.


BC1
CHP Crusher House LDB
BC-5
Reclaimer
BC-7A & 7B
BC-4

Shift jobs carried


In Unit No.# 1 DSH Station C.V. ( 01TCV3204) gland leakage found. So tightness done. Now ok.

All the AC MCB to OFF Condition.


In Chimney analyzer Rooml all the Panel cleaning and Blowerning to done.
online CPCB website is not open.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
In Workshop MV Drive Room Back side all the JB Cleaning to done.

Unwanted Lights at TPP SH Room , TG Building area , CHP-T-1 and T-2 Tower to OFF Condition.
Authorised sticker name list pasted at 4.5 mtrs main and exit door , BFP / 4.5 mtrs / workshop MV
drive door.

Shift jobs carried


Jockey-1 Feeder found OFF but not ON in auto and jockey-2 running,so checked and found that its
Low pressure switch setting found lower that Jockey-2, now Jockey-1 low setting increse more
than Jockey-2, now only Jockey-1 operating in auto

boiler-1 vessele 12-22 level checked on request of operation deptt, found OK

WTP deggessor tank level stuck, so set its zero and span setting, now level showing correct

Abnormality: TG-1 4.5mtr (MOV(01MV2907) LP heater MOV oil leakage arrested and packing it

Abnormality: TG-2 0mtr HP heater MOV oil leakage arrested and packing it

AVI given for Fly ash silo dry unloading


BC-5 dewatering pump checked its level ON/OFF switch not working properly
Following Equipment S/D Given.-
BC1
BC-2
BC-5
BC-7A & 7B
BC-4
fly ash dry unloding
P fan-1
P fan-2
crusher LDB

Shift jobs carried

BC-5, Tunnel submersible pump not started , check physically Motor is Ok and its level switch is
also working properly found continuity of cable from motor terminal is missing. To be repaired.

Coal Crusher building Lights not On till 6:30 PM , found its timer NO contact not changing. Planned
to replace timer tomorrow.

Rubber mat laid in front of Drain pot-2 starter


BAC 1A, showing Level High found material accumulated on probe, cleaned it now Ok.

BC-7A feeder control switch mechanism problem, attend the same.

Following Equipment S/D Clear.


BC1
BC-2
BC-5
BC-7A & 7B
BC-4
fly ash dry unloading
crusher LDB
Shift jobs carried
Boiler-2 Lift fault came, so found that lift gone below ground level so operate it manually, and
reset it now working normally
MPED Energy Commissioning work for unit 1&2
BC-5 Tunnnel spare dewatering pump connection & trial taken found ok
CO-2 Analyser Maintenance work
Following Equipment S/D Clear.
BC1
T1-&T2 Tower LDB
BC-5
Reclaimer
Screen-1&2

Shift jobs carried


In Unit No. # 1 Vessel No.-11 /21 back pr. Transmitter air leakage from fevrul side. So teflon and
tightness done. Now Ok.
Engineer Room AC is in ON Condition . So OFF the AC also MCB to OFF.
In Compressor House all the auto drain valve checked and working Normally.
online CPCB website is not open.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
CCR Lift Power OFF due to door / Sensor Problem.
In Unit No. # 2 DCS Room 24 Volts Light shifted to 4.5 Mtrs Charging station.
Compressor Room IAC No.-1 ,2 and 3 Motor cleaning to done.

Unit No. # 1 and 2 MPSS Meter Panel Housekeeping to done.

Shift jobs carried


CCR Lift Door alignment issue resolved, and running normal.
Bag House -1 DP transmitter 22 nos, not showing, so Line flush and manometer liquied filled in
11-21 and 12-22.
Cable roll shift to china yard from CHP MCC.
Boiler-2 IFC controller packing by tape.

Side stream filter blower-1 not running, checked and found Local /Remote switch on remote
postion, so put it in Local and trial running normal.

Following Equipment S/D Given.-


Oil Supply Pump-1
Oil Un-loading Pump-1
Oil Transfer Pump-1

Shift jobs carried

Boiler-2 Lift fault came, so found that lift gone below ground level so check & found down side
read switch malfunctioning so off power suplly in lift cabin & lift placed on 0 mtr.

Boiler-1 Lift comes on F2 (Door Fault) power supply reset & Door sensor Cleaning done now lift
healthy
BC-5 Belt feeder not start due to Serious deviation fault so check in field side found BSS Switch
malfunctioning so remove BSS Supply wire & VFD Healthy take current found all phase normal
(5.8 amp)

FAS 1, 2&3 All Panel Instrument equipment Cleaning & Blowering work
BRC Controller Elect-2 Comes in fault so reset done now ok

Shift jobs carried

Unit-2, Feed water station and De superheating station all MOV and Control valve cleaning done.

GSC-2B motor cleaning done and earthling checked.

ACW pump house area motors and JB cleaning done.

All Energy meter manual reading taken for Power Report.

Power Report prepared and Month end report balanced.

DG report Prepared and upload in SAP.


Environment and Plant performance report upload and mail to all.

Shift jobs carried


BAC-1B transmittor line fitting air leakage observed attend & rectified
Bag House -1 21 vessel purging sov pu tube heavy leakaged observed so tube damaged portion cut
& reconnect now ok

CCR Telphonne incoming voice issue so check & found Telephone wire loose sorecoonect now ok
Crusher floor Bag Filter JB Single Earthing found Double Earthing Done

Following area Field instrument calibration sticker checked & lift handover to Jaswant Sir,
1/ Compressor House , Chinmney Analyser , fire pump house &WTP ,APH , Bag House

Following Equipment S/D Given.-


1/BC-1
2/BC-2
3/Reclamier
5/ Belt feeder ground hopper

Shift jobs carried


In BAC-1A level probe Showing high at DCS end. So cleaned the Level probe. Now Ok.
CCR VAM AHU running in full RPM. So set Point increased from 21 degree to 24 degree.
BC-2 Tripped 02 times due to PCS acted. So due to urgency PCS DCS wire No.- 93-6A-TB1-3/4
removed. Need to be check.
In BC-5 take of Pulley Limit switch operated. Then it is not showing at DCS end. So field side
changed the wiring. Then Trial taken. It is working Normally.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared-
1/BC-1
2/ BC-2
3/ Reclaimer ,
4/ BC-5 Ground Hooper

BC-2 Motor Tripped 02 Times due to Overload . At field side checked scrubber rubber structed at
tail end. So Informed to Shift Incharge. Then removed this piece. Then trial taken. It is working
Normally.
Boiler No.# 2 RSB No.- 30 , 32 and 52 green Tag to provided.
Earthing Lead provided to mr. Taqueer.
Shift jobs carried

Bed Ash cooler 2A and 2B motor cleaning and blowering done.

VAM Floor VFD panel cleaning done and panel sealed with packing tape

VAM Floor all 4 Nos control panel and Old AC panel cleaning done

All Energy meter manual reading taken for Power Report.

Power Report prepared and Month end report balanced.

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.

Shift jobs carried


SA-2 Fan area spare vibration proble cable found hanging condtion proper dressing in cable tray

Bucket Elevator -1 ZSS Sensor malfountioning then celaning & adjustement done now healthy
Boiler-1 DPIC 1101 Line flushing work underprogress
Unit-2 OIL centrifuge pump not start check & found selector switch loose condition then tightness
done now supply healthy & handover to operation dept.

BC-1 Magnetic Sepertaor not start from DCS so check & O/L Reset now ok

5 no's Erathing Lead Ready & handover to Electrical General shift technician

Following Equipment S/D Given.-


1/BC-1
2/BC-2
3/Reclamier
4/ BFP-1
5/ VAM SYSTEM AC-1
6/ BC-5
7/ Bucket Elevator-1
Following Equipment S/D Given.-
1/BC-1
2/BC-2
3/Reclamier
4/ BFP-1
5/ VAM SYSTEM AC-1
6/ BC-5
7/ Bucket Elevator-1

Shift jobs carried


In BC-2 PCS checked one by one all are working normally. When BC-2 is started then PCS is
showing Normally. Now Ok.
Fly Ash Silo -2 Level is not showing correct. So cleaned the level probe and Reset the power
Supply. Now Ok.
In DCS Sever No.-1 hang condition. Due to ICT card fail. Then all the PC shifted to server No.-2.
Also Reset the ICT Card. Then server No.-1 Healthy. Also BFP page also violet. In 71-M panel
NIS/NPM one Pair not working condition. So Replaced the card from LHS area. Now System is in
under observations.
In Unit No. # 1 APH Seal pr. Is not showing at DCS end. So checked and found that Slave vessel seal
is damaged condition. So Informed to shift incharge.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.-
1/BC-1
2/BC-2
3/Reclamier
4/ BFP-1
5/ VAM SYSTEM AC-1
6/ BC-5
7/ Bucket Elevator-1

In Shift almirah Megger , Voltage detector , Earthing Tester , Hot Blower Green tag to provided.
24 Volts LED Light shifted from CCR to 4.5 Mtrs charging station.

LHS Securitity Tower light is not glow. Found that lighting timer is structed. So reset it. Now Ok.
07 Nos Earthing Lead Prepared and kept in workshop area.

Shift jobs carried

Boiler-1 firing floor all sov and flame sensor, detecttor cleaning work done

APH-1 valve shutdown cleared

desuperheating control valve (02TCV3203) gland leakage arrested


All Energy meter manual reading taken for Power Report.

Power Report prepared and Month end report balanced.

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.

Shift jobs carried


In IFC Showing higher Pr. As Compare to Set Pr. . So checked and found that Bypass Valve is in
Passing condition. So Removed the actuator and manually closed the Valve then taken in line. Now
ok.
In IFC Drain PU Tube puncture. So Cut the PU Tube and reconnected it. Now Ok.
Reclaimer left right VFD comes to overcurrent fault so reset once.
In Service air Compressor No.-2 Auto drain valve is not working condition. So opened the auto
drain valve and found that filter is heavily chocked condition. So cleaned it and taken in line. Now
Ok.
CCR AHU Put into auto mode with SP= 26 Degree.
All the Manual Light to OFF Condition.
P & V. No. # 2 and 4 is already OFF Condition.
online CPCB and ETP website is not opened .

Unit No. # 2 Coal Feeder area welding machine green tag to provided. Also Plug Top Repaired.
WTP Pump House Motor Cleaning & Blowering work

Shift jobs carried

J valve fan outlet Main pressure get drops due to this J valve fan 1B started in auto , After Stop J
valve fan 1B permit not healthy so checked and rack out- rack in the Feeder. Now OK.

Boiler 2, 11-21 vessel level probe checked physically and confirm to CCR.

Boiler 2, 22 vessel level probe checked physically and confirm to CCR.


Boiler-1, APH back pressure not showing found loose connection so tighten it properly.

Boiler-1 , Bag house 11-21 back pressure flushing done.

ACC-2 one lightning cable found loose so proper cable dressing done

BC-7A and BC-7B motor and JB cleaning done.

Shift jobs carried


HP Heater ByPass Control Valve (02LCV3302) not working so control valve positioner auto
calibration & checked 0 to 100 % & 100% to 0 now ok
FAS-2 Level showing high at DCS so check & found field side field level transmittor cleaning now
level ok

05 Nos Earthing Lead Prepared


WTP Pump House Motor Cleaning & Blowering work
desuperheating control valve (02TCV3203) gland leakage arrested

All Energy meter manual reading taken for Power Report.


Power Report prepared and Month end report balanced.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.

 Shift jobs carried


Unit No. -2 vessel No.-11 /21, seal pr. Is not showing at DCS end. So cleaned the impluse line. Now
ok.
In Compressor House all the auto drain valve checked and working Normally.
In Chimney analyzer  SPM is showing high value. So checked our side air is in charged condition.
Due to soot blowerning in Boiler side. After this is in Normal condition.
Inst. S/D Given- 1. BAC-1B , 2. Unit no. # 1, APH System.
CHP DCS AC trip due to HL / HP Fault reset done Informed to kamlesh.
All the Manual Light to OFF Condition.
P & V. No. # 2 and 4 is already OFF Condition.
online CPCB  and ETP website is  not opened .
Following Equipment S/D Cleared.-
1/BC-1
2/BC-3
3/Reclamier
4/ T-1, T-2 PDB
5/ BC-5

                                                          
Inst. Air Comprerssor No.-3 not started from DCS end. So Power reset from breaker side. Then it is
started. It is working normally.
Boiler No.-1 Lift door not closed. So door sensor cleaned. Now ok.
Shift jobs carried

Boiler-2, Lift not working and car get misaligned , so taken in local and rectified it , now OK

SWAS Room one single phase motor connection done as per requirement of maintenance team.

Reclaimer get stopped due to UPS power trip, reset the UPS .

APH-1, back pressure line flushing done.

BAC-1B , all filed equipment connection done and AVI clear.


Following Shut Down Clear -
1. BC-1
2. BC-5
3. BC-3
4. Reclaimer
5. T1, T2, T3 LDB
6. P fan-1
7. P Fan -2
8. HSD Pump-1
9. HSD Pump-1
10. HSD Pump-1
11. APH-1

Shift jobs carried


Boiler- 1&2 Bag house 11-21 & 12-22 Seal Pressure & Back Pressure Switch cleaning & packing
done
Boiler-2 Firing floor flam sensor detector panel , Ignitor burner 2a &2b Panel , 8 no's SOV cleaning
work

Boiler-2 Bed thrmocouple JB Cleaning work


CHP DCS AC trip due to HL / HP Fault reset done & Set Temp. 24 to 26
For TPSA Audit Electrical Saftey ( Lighting arrestor & Dewatering Pump) record updated done
All Energy meter manual reading taken for Power Report.
Power Report prepared and Month end report balanced.
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.
Shift jobs carried
Boiler-1 Bag house 21 nos. Probe Level HH, Level probe cleaning and taken in Line.
Chimney room SOX no 1 moisture fault, filter cleaning done & taken in Line
Boiler-2 Bag house 12-22 nos. Probe Level HH, Level probe cleaning and taken in Line.

LP dosing pump level wrong showing, so physically matched, by Mr. Tarun Sir.

BC-1 Magnetic seperator not run checked and found Control fuse blown, replace and trial run
normal.

BC-1 Lighting cable hanging, so dressing done.


Watch tower -2 lighting timer disturb so manually off light.
Following Equipment S/D Given.-
1/CT Fan-3
2/VS-1
3/BC-6
4/ BC-5
5/ LDB 5301-D

Shift jobs carried

Fly ash silo-2, not showing correct level clean the level transmitter properly, now OK.

BC-7B, Bag filter gauge not working and its glass also loose so change the gauge.

Boiler-2, De superheating control valve 3203 and 3202, have gland leakage so tighten the gland
and leakage arrested.

Boiler-2, soot blower get trip due to O/L so reset it, observed abnormal sound from Soot Blower
No-14 , to be check further.

ACC-1, ground floor single phase socket check and green tag provided.

Following Shut Down Clear -


1. CT Fan-3
2. VS-1
3. BC-6
4. BC-5
5. LDB 5301-D
Shift jobs carried
In Chimney analyzer SOX reading is showing low. So factor is changed from 0.35 to 0.5 at chimney
as well as DCS. Now Ok.
Engineer Room AC MCB to OFF.
In Unit No. # 2 Vessel No.- 12 and 22 Level Probe checked . Cleaned and calibrated the level probe.
Now Ok.
CCR VAM AHU is in manual mode. So Put into auto mode with SP= 22 degree.
Electrical Report is generated.
EMS Report is generated in auto mode also mail to all the concern.
In Unit No. # 2 Soot Blower No.-14 Motor connection removed from contractor side.
Unit No. -2 Soot Blower panel Cleaning and connection tightness to done.
Reclaimer , Crusher Floor Light to OFF Condition.

Boiler No.-2 Lift overtravelled at Zero mtrs. So Pressed the emergency switch in Panel.

Shift jobs carried


Boiler-1 & 2 Bag House High level prob checked found normal as operation requirement.
WTP Hole SOV Panel double earthing work done.
Chimney-1 O2 checked and found Chiller inlet tube cut, so re-connection done by Mr. Tarun

Bed Ash Silo soot not running, found tripped reset and trial running normal.
Green tag provided in Lime Building RSB-76
Following Shut Down Given -
1. BC-1
2. Reclaimer
3. Soot Blower-Boiler-1
4. Coal Crusher-1
5.BC-7A -

DM Transfer Pump 1,2 and 3 Motor Cleaning and Blowering done.


Fly Ash Silo Light Manually ON and OFF as per operation requirement
Shift jobs carried
Bolier-2 lift overtravelled at 0 mtr. So check & found FSD Relay chattering during lift travel from
2nd to 1st floor now replace FSD Relay by new one now no chattering observed at FSD Relay & lift
healthy condition
CHP MCC infront street light timer double earthing work
5 no's Earthing lead prepared
BLR-1 Bag house 12-22 vessel level high & high-high checked & clean & calibration done now
material inside inform to CCR
Cement Plant fly ash system SOV Checked & found cylinder leakage & Pneumatic valve Jammed
condition so inform to concren person
BLR-2 Bag house 11-21 vessel level high & high-high checked & clean & calibration done now
material inside inform to CCR
Following Shut Down Clear-
1. BC-1
2. Reclaimer
3. Soot Blower-Boiler-1
4. Coal Crusher-1
5.BC-7A -
Shift jobs carried
In Unit No. # 2 Vessel No.-11, 21 and 12 and 22 Level Probe checked . Cleaned and calibrated the
level probe. Now Ok.
In Unit No. # 1 Vessel No.-11, Level Probe checked . Cleaned and calibrated the level probe. Now
Ok.
In Compressor House all the auto drain valve Filter cleaned.

In Chimney analyzer SOX /NOX/CO reading are showing zero value. While O2 reading is showing
in Controller. So checked and found that rotameter O/L line flow is zero. So Rotameter I/L and
O/L line is directly connected. Still it is not showing in controller. So zero calibration is done in
controller. Now reading is showing in controller. Reading are under observations.

Electrical Report is generated.


EMS Report is generated in auto mode also Not send to all person Because CD is not opened in
PC .
Unit No. -2 Boiler 4 th to 7 th floor area Light to OFF Condition.
In WTP RO Booster Pump No.-1 Motor cleaning to done.
CHP tower T-1 , T-2 , T-3 , Coal Shed area , Reclaimer , Crusher Floor Light to OFF Condition.

Shift jobs carried


Boiler- 2 Bag House 21-22 HH and High level prob checked two times and 11 HH checked found
normal as operation requirement.
Raw Mill Pneumatic valve work done.
Chimney-2 SOX NOX pump exchange and trial running normal By Mr. Tarun.

ACC Unit-1 (0.0 Mtr) EP-22 Sticker pasting done, WTP Back side EP-46 Sticker pasting done
ACC Unit-1 (0.0 Mtr) RSB-61 Damaged Door lock replaced.
Following Shut Down Given -
1. BC-1
2. BC-4
3. BC-5
4. Soot Blower-Boiler-1
5.Reclaimer
6. Bed Ash Cooler 2A. Following Shut Down Clear-
Bed Ash Cooler 2A.
Following AVI Done- Bed Ash Cooler 2A.
1. BC-1
2. BC-4
3. BC-5
4. Soot Blower-Boiler-1
5.Reclaimer
6. Bed Ash Cooler 2A. Following Shut Down Clear-
Bed Ash Cooler 2A.
Following AVI Done- Bed Ash Cooler 2A.

Shift jobs carried


Cooling water I/L water SOV (SV8203) of Service air compressor-2 is not closing. So check SOV
Plunger cleaning work then operate Normally

Bolier-2 Bag House 11-21 seal fault comes check & found 11 no's vessel seal pressure shown 3.2
kg Then inform to CCR , Mech. Side checking work U/P
Boiler-1 near ID Fan W/M plug top repalcement work
Recalmier cabin LOTO LOCK Arrangement work
LS Silo RSB-71 Green tag Updated & Insulated Rubber mat providing work
24 V LED Ready work & Handover to Operation dept. for Bunker 1A Work
Following Shut Down Clear -
1. BC-1
2. BC-4
3. BC-5
4. Soot Blower-Boiler-1
5.Reclaimer

Shift jobs carried

Coal Feeder 1A, 1B ,1 C and 1D feeder motor and clean run motor cleaning done .

Unit -1 Coal feeder two no's lightning cable found hanging so cable dressing done.

Unit-2 Bag House vessel showing High level so remove and clean the level probe.

SWAS Room All JB, Panel and UPS cleaning done.

All Energy meter manual reading taken for Power Report.

Power Report prepared and Month end report balanced.

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.


Shift jobs carried
Chinmey SOX Value goes high then factor changed from 2.5 to 1.5 now ok
SAR-02 auto drain not working so check & found auto drain filter heavy corrosion then clean filter
& checked by test button now ok

Middle gate display broken glass covered by polythene

BAC-2B CCR Side motor connection open ( DE-R-Y-B-NDE) as per requirement of maint. Dept.
Boiler-2 0 to 7th flooor all RSB Green tag Updated done
Electrical Ladder 8 ft. Hnadover to Mr. Gupta(WTP)
Following Shut Down Given -
1. BC-1
2. BC-4
3. BC-5
4. Soot Blower-Boiler-1
5.bc-2
6. Bed Ash Cooler 2B.

Shift jobs carried


In Unit No. # 2 Vessel No..-11 level HH is showing at DCS end. So checked and found that material
inside the level Pipe. Informed to Shift operator.
Reclaimer Boom UP / Down Limit Cable dressing and Inslualation tape to provided.
CCR VAM AHU is in manual mode. So Put into auto mode with SP= 21 degree.
Reclaimer Coal shed side spare JB cable dressing to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut Down Cleared. -
1. BC-1
2. BC-4
3. BC-5
4. BC-2
5. Bed Ash Cooler 2B.

Unit No. # 2 BAC-2B motor connection to done. Also AVI given to Mech. Person also closed the AVI.
In CHP Bucket elevator No.-2 Power OFF. So ON the Power. Now Ok.
In Compressor House Lighting Timer is structed. So Reset it. Now ok.
In BAC-2B LED Light provided to mech. Person. Also take the LED light.
Shift jobs carried

Unit-2 Bag House vessel-21 showing High level so remove and clean the level probe.

Unit-2 Bag House vessel-11 showing High level so remove and clean the level probe.

Unit-2 , Drain MOV, J valve MOV and Bed Ash Cooler Local JB cleaning done.

Compressor House lights not ON found timer stuck up so reset the timer.

All Energy meter manual reading taken for Power Report.

Power Report prepared

DG report Prepared and upload in SAP.

Environment and Plant performance report upload and mail to all.

Shift jobs carried


Turbine Area , 9.5 mtr. , 4.5 mtr. , 0 mtr. Intrument equipment checked & calibration sticker
Pasted
Boiler-2 21 no's vessel level H-H so clean level probe & Calibration now ok
BLR#2 De Superheater Control valve (02TCV3203) heavy Gland Leakage so Gland bolt Tightness
& leakage arrested
Switchyard Area Power & Contol JB Nomilclature done & 1 phase supply ELCB Green Tag Updated
.
Cresher-2 Motor Both DE & NDE Side Lubrication work done
WTP Hall RSB-76 Damaged door lock Replaced by new one
Following Shut Down Given -
1. BC-1
2. BC-4
3. Reclamier
4. BC-6
5. Bed Ash Cooler 2B.
6. Enmass -1
7. Vibrating Screen-2
8. SA-2 Hoist

Shift jobs carried


Unit-1 bag house 11 , HH level probe remove and fix at Unit-2 ,11 no HH Lavel probe .
Unit-1, no. 12 HH lavel probe calibration done.
SOX parameter of Chimany show high then check at analyser room and correction done as per
requirement of process deptt.
Boilor #1 floor 1 to floor 7 all RSB green tag sticker change.
Bed ash silo RAB not running, found tripped reset and trial running normal.
Commpressor House light not on ,so check found its timer stack so clean it .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.

Following Shut Down clear -


1. BC-1
2. BC-4
3. Reclamier
4. BC-6
5. Bed Ash Cooler 2B.
6. Enmass -1
7. Vibrating Screen-2
8. SA-2 Hoist
Shift jobs carried
Boiler-1 MV Drive room Sinle power socket green tag provided.
MPHB Exhaust fan panel cleaning done.
Boiler -1 and 2 Bag house JB and Inst Cleaning and blowering done,.

Compressor House lights not ON found timer stuck up so reset the timer.
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP.
Environment and Plant performance report upload and mail to all.
Shift jobs carried

SA Fan-2 ,Hoist hook found in hanging position so keed it down at plateform .

Few old cloth and paper, found inserted at cable tray and duct near BAC of UNIT 1 then its remove
and through to dust bin.
Boiler-2 near PA Fan JB-24 Volt tagging done ,as iot was not in use.
WTP roots blower room , motor cleaning and blowering

WTP roots blower no 1, motor fan cover found loose ,so tight it.

Crusher building , screen floor LED light plug top replace.


Bag house no #1, vessale no# 11, HH lavel probe change.
Following Shut Down Given and cancelled -
1. BC-4
Following Shut Down Given and cancelled -
1. BC-4

CCR AHU ,convert manual to auto & set point change 18 to 21


Shift jobs carried
Chinmey analyser room all Panel , PC , Window & Cylinder cleaning work
DCS 1&2 All Panels cleaning outside
Unit-2 , Drain MOV, J valve MOV and Bed Ash Cooler Local JB cleaning done.

Env. & Plant Report Not send to all person Because CD is not opened in PC .
All MCC , PCC & Cable celler round taken & open Emergency door chitkani
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP.

Shift jobs carried

Boiler #1, 11/21 seal pressure is not showing at DCS end. So Impluse line flushing done.

Boiler #2, 12/22 seal pressure is not showing at DCS end. So Impluse line flushing done.
Boiler #1 ,Vessel No.-12 H level probe switch calibration done.
Boiler#2 , 11/21 &12/22 physically checked.found all are ok.

WTP authorisation list update & paste.


ACC 1&2 lighting timer cabinet door found open so , close it,and rubber mate provide.
Boiler #2 lift get stop at between 1st and 2nd floor then, its door open in manual mode and then
auto mode.
Following Shut Down Given -
1. BC-6
2. BC-4
3. BC -7A
4. BC-7B
5. BE-1

Shift jobs carried

Boiler-2 Lift one person stuck between 5-6 floor , so operated lift manually and taken him out.
CHP MCC room , tower bolt remove from emergency exit door.

BC-1, Magnetic separator not working found it get trip due to O/L , check and reset it.

Boiler-2 , Hoist 22 mtrs and at 7th Floor "Not in Use" sticker pasted.

TG-2, Gland sealing pressure gauge fitted properly

BAS plate valve not operating so attend it.


Following Shut Down Clear -
1. BC-6
2. BC-4
3. BC -7A
4. BC-7B
5. BE-1

Shift jobs carried

BLR#2 12-22 Level not showing in DCS So check & found 12 no's vessel DCS wire removed
condition so recoonect it & 22 no's vessel clean & calibration now level healthy & shows in DCS

Boiler-1 &2 BAC Field Panel Cleaning & Blowering work


Equipment Status Related Sticker Pasted at Boiler- 1&2 lift & Boiler-1 22 mtr. Hoist

Env. & Plant Report Not send to all person Because CD is not opened in PC .
WTP Pump House Motor Cleaning & Blowering work
All Energy meter manual reading taken for Power Report.
Power Report prepared

DG report Prepared and upload in SAP.

Shift jobs carried


Chimney O2 level reached to 23% , check and found sample point tube break, cut and Re-fit now
O2 is 9.4%

PRDS on cable found hanging so cable dressing done.


Coal Feeder1&2 RSB no-55 & 56 Insulation Rubber mat laid.

Both Boiler Lift " Lift Under Maintenance " Sticker prepared and pasted.

One ladder shifted from pump house to Workshop

Shift jobs carried


Boiler -1 and 2 area 12 nos. rubber mat laying in Soot blower panel and RSB.
Compressor house light timer set.
Fire Water pump house light manually ON and OFF as per requirement.

Boiler-1 and 2 Bunker level transmitter Cleaning and checking done.


Boiler-1 Bag house Purging sometimes not start in AUTO , So manually ON done and under
observation

Shift jobs carried


In Unit No. # 1 bag filter Purging is not done. So Mr. Tarun modifed the logic and trial taken.
System is in under observation.
In Chimney analzer Boiler No.-2 SOX analzer moisture fault. So reset it. Now Ok.
In Service air compressor No.-2 auto drain valve Filter cleaned.
WTP hall area field Inst. And Panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also Not send to all person Because CD is not opened in
PC .
Unit No. -2 Boiler 4 th to 7 th floor area Light to OFF Condition.
Unit No. - 1 and 2 Soot Blower panel Cleaning and connection tightness to done.

Shift jobs carried


Reclaimer Left-Right movement issues, VFD tripped in overload reset and trial running normal.
Boiler-2 bag house 22 nos. Probe Level HH, Level probe cleaning and taken in Line.
Bunker level transmitter Cleaning and checking done.
Compressor AUTO drain valve IFC manually checked and found normal.
Boiler-2 Rubber mat laying done.
Switchyard area temporary connection done.
ELCB replaced at Boiler-2 coal feeder area.
Bed ash Cooler-2A Rack-OUT on PTW, rack in on AVI, Rack out on AVI and Rack in on PTW closer,

Shift jobs carried


Compressor House , Fire Pump House & WTP Side street Lighting Timer Evening Light ON time
Updated done
Chrging light handover & Tackover at BAC-1B
Fire Water pump house light manually ON and OFF as per requirement.

WTP Tank Area W/M Damaged Plug top Replaced by new one
ETP Panel Nomiclature Pasted
Boiler-1 4 th floor InstrumentJB Cleaning & Packing work
Following Shut Down Clear -
1. BAC-1B

Shift jobs carried


In SWAS Room Unit No. # 1 Drum water Conductivity is not showing at DCS. So adjust the flow of
the rotameter also cleaned the sensor. Now Ok.
In SWAS Room Unit No. # 2 Drum water Conductivity is not showing at DCS. So adjust the flow of
the rotameter also cleaned the sensor. Now Ok.
In SH / Engineer Room AC is ON Condition. So OFF the AC.
In Chimney analyzer all the Panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.

Unit No. -2 Boiler 4 th to 7 th floor area Light to ON Condition as per operation requirement.
In WTP Fire Pump house all the motorCleaning to done.
Shift jobs carried
CCR door access not working, checked and found hang, so reset and trial run OK.
Bed Ash Cooler-1A water valve SOV trial done found OK as per operation requirement.
Boiler-2 Soot blower no 14 Limit not cut checked and cleaning done, limit to be set during trial.

LP dosing level transmitter level not showing, so checked and reset and now working normal.
Service air receiver tank -2 auto drain valve manually operate and running normal.
Boiler-2 TCV3203 gland leakage attend done.

Boiler- 2 FCV 3202 Gland leakage attend done.


Earthing lead prepare 05 no’s for bed ash cooler line.
Cable Loop prepared for Relay testing connection work.
Bed ash cooler-1B shut down given
Shift jobs carried
BC-1 magnetic seprator overload relay found in operate condition so on it.
Boilor #1 , soot blower power found in off position so on it.

Boilor #2 , soot blower no. 14, motor found in hot condition with CCR person , while itys
connection already open from panel. Itys due to leakage, so its inform to mechanical by CCR.

Coal reclaimer PCRD not work properly near cable joint position so it push slightly to rotate it.
Mechanical workshop 24v led light top changed
BAC#1A lavel high probe check clean and calibrate ,now ok
B/H#2 , 22no lavel high check clean and calibration done.

B/H#2 , 22no lavel high check clean and calibration done.But material observed in side so inform
to CCR.
APH 1&2, back pressure and seal pressure switch covered with packing tape.

Shift jobs carried

Boiler-2, MOV(02MV0701) close Limit cross checked by Shift Incharge.

Silo-2 Level transmitter cleaning done.

Boiler 1 - Air boost panel tapping joint Air Leakages arrested.

VAM AHU rpm reached to 1300 rpm, found its main steam control valve air missing , valve
physically check and clean it , now OK.
Root Blower Room Panel and motor cleaning done

All Energy meter manual reading taken for Power Report.

Power Report prepared & DG report Prepared

Environment and Plant performance report upload and mail to all.

Shift jobs carried


Reclamier Boom Belt Lfet Right VFD Trip due to overcurrent reset done now healthy
Coal Bunker2D LEVEL Showing Faulty so check in field & level probe clean & sully reset now level
healthy
Boiler-1 Bag House 12-22 & 21 Vessel 's level showing high so clean & calibration done now level
healthy

Compressor House all SOV JB Packing by Packing Tape


Boiler -2 soot blower trip due due 14 no's motor overload trip reset done now healthy
ENMASS-1 PMT not healthy at DCS So check in Panel found feeder trip due to overload so reset &
inofrm to CCR For Further Checking

ENMASS-1 AVI Given & Close


Following Shut Down Given -
1.ENMASS-1
2. Vibrating Screen-2
3.Soot Blower-2

Shift jobs carried

In Unit no.-1 Boiler -1 Booster Panel air leakage found at joint side. So m-seal is Provided. Now Ok.
In bed ash Silo No.-2 Level Transmitter cleaned and power supply Reset. Now Ok.
In bed ash Silo gate valve is not closed. So checked and found that mech. Jammed condition. So
inform to shift operator.
In WTP RO-2 O/L Conductivity is showing 100 microS/cm. So cleaned the sensor and Open the
sample Valve. Now ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut Down Cleared. -
1. Unit No.-2 Soot Blower Panel
Unit No. # 2 Soot Blower No.-14 motor connection to done. Also trial taken by operation . During
Trial heavy sound and steam leakage in sootblower side. To be check.
In Compressor House Lighting Timer is structed. So Reset it. Now ok.
In CCR Lift showing O and C fault also gate is not fully open. So OFF the control MCB.

Shift jobs carried


Boiler-2, Soot Blower get trip on G fault so check and reset.

Unit-2 Drain MOV and J valve MOV cleaning done.

Unit-2, Bed Ash Cooler 2A & 2B field JB and VCS cleaning and bowering done.

TG-1 and TG-2 barring gear motor cleaning and bowering done.

HP dosing room motor cleaning and bowering done.

All Energy meter manual reading taken for Power Report.

Power Report prepared & DG report Prepared

Environment and Plant performance report upload and mail to all.

Shift jobs carried


BC-7A , 7B All pull cord Rope checked found loose so tightness & clamp it done
BC-4 & BC-6 All Pull Cord Rope Checked & Tightness & clamp it
Battery Bank-2 individual Batteries cell voltage checking work ( 54 no's) found total voltage- 121
Vdc

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13Vdc
2/ Cell Water Specific Gravity Checked Found - 1220
3/ Battery & Charger Cleaning done

Boiler -2 soot blower trip due due 14 no's motor overload trip reset done now healthy check in
field side found motor heat inform to shift incharge for decouple motor for trial

Crusher House Screen floor 24 V LED cable found damaged condtion so reinsulation done

STG Building Lift Inside Door not open to be check further control supply OFF
Following Shut Down Given -
1.BC-1
1.BC-1
2. bc-2
3.Soot Blower-2
4. Reclamier

Shift jobs carried


In WTP RO-2 O/L Conductivity is showing 100 microS/cm when RO-2 Pump is started. Then
sensor cleaned and power Supply Reset it. Now ok.
CCR-AHU is running in full RPM. So SP is increaed. ( SP= 29 Degree.)
In Chimney analyzer sample Tube leakage. So corrected it. Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut DownCleared. -
1.BC-1
2. bc-2
3.Soot Blower-2
4. Reclamier

Unit No. # 2 Soot Blower No.-14 motor connection open and removed and Trial taken at
workshop. It takes 0.5 Amps current and No Sound. Then Installated at site and connection done.
trial taken But Tripped to O/L So reset it also Inform to shift incharge.

Shift jobs carried


WTP DCS Panel Blowering done.
WTP area instrumnet cleaning done.
WTP Motor blowering done.

Earthing lead prepare 05 no’s for WTP area.


All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.

Shift jobs carried


Boiler # 2, 12/22 High Level probe checked. It is working Normally.

Boiler # 2, 22 Nos Vessel HH level probe checked. Found that material structed at level probe. So
cleaned the level probe. Now ok.
Boiler # 2, 22 Nos Vessel Temp. checked as per operation requirement. As per RTD Resistance
temp. is showing normally.

Boiler # 2, 22 Nos Vessel Air Intake Valve opened manually as per operation requirement.

In Crusher Building 02 Nos LED Light not On. Cable replaced and wire connection done. Now ok.
In Crusher Building 01 Nos LED Light Plug Top to changed.
BC-7A , 7B Motor Cleaning and Blowerning to done.
Following Shut DownCleared. -
Nil

Shift jobs carried


Crusher Building , screen floor bearing heater not working found its element get burnt, so provide
new hot plate to APS from Electrical workshop.

Reclaimer Left-Right movement issues, VFD tripped in overload reset and trial running normal.

Boiler-1 Soot Blower no-11 get trip due to over load so check and reset.

End mass 1 & 2 , motor and field JB cleaning done.


WTP area back side lights ON as per requirement.

Both Bunker all 8 Nos. level transmitter cleaning done.

Boiler-2, APH vessel -1 dome air leakage arrested and its Pu tube dressing done.

Shift jobs carried


ACW Pump House E&I Equipment Cleaning & Blowering work
TG-1 HP Heater Control Valve 01LCV3202 feedback hunting so calibration done & checked found
working normally.

TG-1 0 mtr. All Control Valve & Mov's cleaning & Blowering work
TG-2 0 mtr. All Control Valve & Mov's cleaning & Blowering work
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.

Shift jobs carried


In Reclaimer Left / Right not happen. So Checked at VFD side there is no fault. Our Motor is
working But gear box is not moving. So open the cover then found that Motor rotor shaft is
damaged condition. So Informed to Mr. Rakesh Sharma ,SH (E.& I.) / hement sharma. Motor
replacement work is U/P.

BC-5 belt is not started in Remote mode. Then Started in Local. It is running normally. So checked
and found that Take off pulley is showing at DCS end. So Reset at field end. Then started in
Remote. It is running in Normally.
In BC-3 Belt is also showing at DCS end. So Reset from field side. Now Ok.
Electrical hunter gun given to Mr. APS.

All the AC MCB to ON Condition.


Reclaimer Left / Right Motor Connection removed. ( DE Side- R,Y,G)

Following Shut Down Given-


1.BC-1
2.BC-2
3.Mist. Fan -1A
4. Reclamier ( 02 times )
5. VAM Chilled Pump No.-2

Shift jobs carried


BAC 2B Shutdown given.
BC-7A and BC-7B motor cleaning done.

Crusher Building , bucket elevator floor all field instrument cleaning done.

Instrument Technician work with Tarun Mandawat at BC-5 and BC-6.

WTP area back side lights ON as per requirement.


Following locations lightning timer ON time adjusted from 5:30 PM to 6:00 PM
1. Compressor House.
2. Fire Pump House.
3. Switch Yard Lights.
4. Lime Stone street lights.
1. Compressor House.
2. Fire Pump House.
3. Switch Yard Lights.
4. Lime Stone street lights.

Shift jobs carried


CHP MCC panel outdoor cleaning work.
Baghouse-12 no. level high not showing in CCR, checked field DCS wire removed condition so
connect it and checked level OK.

Bag House-12 no HH clean and calibration work done.

Unit-1 and 2 06 nos drain MOV cleaning done.


All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.
CCR AHU manual mode so change in Auto mode set point 24 to 25
Shift jobs carried

HP heater drain control valave 3302, not operating as per command check and air adjusted.

BAC 2B taken in local from VFD panel as per operation requirement.

Boiler-2 bag house 11-21 back pressure line flushing done.

Crusher Building 3 phase bearing heater new top provided.

Screen floor one 24Volt hand lamp cabe found in damage condition cut the damage cable and re
connected.

Instrument Technician involve with Tarun Mandawat at Chimeny analyser.


Following shut doen give-
1. BAG FILTER FAN CRUSHER FLOOR
2. BAG FILTER RAV CRUSHER FLOOR

BAC 2B AVI given.

Shift jobs carried


Reclaimer Left / Right Motor Connection done. ( DE Side- R,Y,G)
Temporary light supply given at Reclaimer motor work.
Induction hot plate TOP connection given and Grinder TOP connection given.

Compressor house lighting TIMER set.


CHP Maint team Extension board given.
Instrument Technician involve with Tarun Mandawat at Chimney analyzer
Unit-1 bag house 12 Level probe HIGH checked as per operation requirement.
Unit-2 bag house 22 Level probe HIGH calibration done.

BAC 2B AVI Close. Reclaimer PTW close. Chilled Water Pump-2 PTW Close.
Shift jobs carried
In Unit No. # 2 air leakage from Vessel No.-22 Dome Valve PU Tube. So Tightness to done. Now
Ok.
In Unit No. # 1 Bed material Temp.-4 ( TI1112 ) T/C Checked. According to mV it is showing
correctly.
In CCR AHU is in manual mode so put into local mode with SP= 25 degree.
In WTP hall area all the field inst. And Panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
Unit No. -2 Boiler 4 th to 7 th floor area Light to OFF .
In CHP , T-1 /T-2 Tower , Coal Shed , BC-5 Belt Light to OFF Condition.
In Unit no.-1 Soot Blower Panel connection tightness and Blowerning to done.

Shift jobs carried

Compressor House Lightning timer change with new one and trial taken.

IAC 1,2 &3 all motors and Panel cleaning done.

Boiler-1, APH showing seal pressure fault so line flushing done.

Boiler-1, APH back pressure transmitter cleaning and line flushing done.

Instrument Compressor-3 water valve SOV having air leakage in incoming so air leakage arrested.

Crusher Floor Screen bag filter JB and purging SOV JB cleaning done.

Following shut down give and close-


1. BC-4
2. Vibrating Screen-1

Shift jobs carried


TG Building 9.5 mtr. DC LDB Front Cover found hanging condtion so Proper fixed by Bolt.
ACW Pump House Light not Glowing so check & found MCB OFF Condition so ON MCB
ACC-2 light not glowing so check & found Lighting Timer Stuckup so reset done now ok

TG Building Exhaust Fan Panel Cleaning work

STG Building 0 mtr. Control Valve 01LCV3303, 3301 , 3304 , 3305 & 3302 & Control Valve
02LCV3302 , 3301 , 3304 , 3305 Posinitioner open & Oil Cleaning & Closing work
Service air receiver tank -2 high Moisture Found Drain Manually.
OFFICE AC MCB OFF

Shift jobs carried

In Chimney analyzer Boiler No.-1 SOX , sample tube Joint leakage. So reconnected it. Now Ok.
All the Compressor house all the auto drain valve checked. It is working Normally.
In CCR AHU is in manual mode so put into Autol mode with SP= 23 degree.
In Chimney analyzer all the Panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
Unit No. -1 and 2 Boiler 4 th to 7 th floor area Light to OFF .

In Fire Pump house , WTP Hall area , ACC-1 and 2 Inside, Dosing Room Light to OFF Condition.
P.& V. No.-2 and 4 Panel connection tightness and Blowerning to done.

Shift jobs carried


Reclaimer Left/Right movement issue checked found VFD tripped in O/L reset it.
Coal feeder 2B Pneumatic valve Jammed, Closing issue, SO close through MOV.
Compressor House Lightning timer SET

WTP Back side welding machine green tag provided.


Boiler-2 ignitor floor cable tray cable dressing work done.
Reclaimer Panel room panel cleaning and blowing done.
WTP Back side welding machine Earthing LUG provided.
Following shut down give-
1. Coal feeder 2B

Shift jobs carried


Reclamier Boom Belt Lfet Right VFD Power Cable Terminal found loose tightness done
1 no's Extension Board collect from Reclamer Area
Boiler-2 0 mtr. Extension board given & collect for Scaffolding work,Drill M/C Top Replacemnent
work

Bed Ash Silo RAV Trip due to O/L Reset done

Bag House-2 NO'S 21 no's SOV & 21 no's Poppet Valve air isolation chamber tube assembly & SOV
air isolation tube removed

12-22 Puppet valve Purging SOV 8 NO's air leakage so bolt tightness & air leakage arrest
OFFICE AC MCB OFF
Feed water station BLR+2 No's Main 100% , 40 % control valve & all MOV Cleaning work

Shift jobs carried

Unit-2 Feed water station all MOV and control valve cleaning done.

Unit-2 Superheated station MOV and Control Valve Cleaning done.

Soot Blower Panel cleaning done.

WTP MCC panel cleaning and blowering done.

ACC-2, one lightning cable found hanging so cable dressing done.

All Energy meter manual reading taken for Power Report.

Power Report prepared & DG report Prepared

Environment and Plant performance report upload and mail to all.

Shift jobs carried


24 v LED light with transformer provide at BAC-2B area job
Silo root blower motor's cleaning done.
Coal feeder 2B, Discharge MOV not work then check found its supply ok from feeder, its torque
limit operated during manual closing by attender so its release and after decouple found its shaft
bend slight. Its maintanance continue by maintance team. so MOV connection open from
connector.
Service pressure show high, then check it found at IFC ,found working ok . Then contact to tarun ,
he inform that its due to logic limit of instrument air pressure low.
BAC-1A , lavel high show due to material , so its probe cleaning done.
Reclaimer Panel room panel cleaning and blowing done.
AVI Power on: Vibrating screen -2 & BAC-2B Then Power off : Vibrating screen-2 only
Following locations lightning timer ON time adjusted from 5:30 PM to 6:00 PM
1. Coal feeder 2B.
2. DM Water pump-1.
3. Coal feeder discharge MOV.
4. Coal feeder pnumatic valve.
5. Coal crusher-1.
6. Coal crusher -2.
7. BC-4

Bed ash silo chout found over load , then its reset it.
De superheater & feed water station Unit 1&@ control valve check found ok.
Shift jobs carried
In Coal feeder- 2B Discharge MOV when it is manually operated after 90 % it is mechanically
jammed condition. So Informed to the Shift Incharge. Also Set the Open limit. Also MOV operating
Rod is in bend condition. So inform to shift incharge. Also Closed the Permit. Now it is in running
condition.
AVI is given to BAC-2A. Also closed the AVI.
Unit No. # 2 bag house -21 nos vessel Permit to closed.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following S/D is closed.
1. Coal feeder 2B.
2. DM Water pump-1.
3. Coal feeder discharge MOV.
4. Coal feeder pnumatic valve.
5. Coal crusher-1.
6. Coal crusher -2.
7. BC-4

Boiler ON Lighting Time changed from 17.55 PM to 18.15 PM.


Lighting time of WTP street light and Compressor house light adjusted from 5.50 PM to 6.15 PM.

BC-1 and BC-2 Motor and Field power JB Cleaning to done.

Shift jobs carried


Chimney room AC OFF condition, So ON done.
Unit-02 Bed Material RAV panel cleaning done.
Unit-02 Bed material RAV MOV and actuator cleaning work done.

Compressor house IFC filter drain and Auto drain manually done.
Environment and Plant performance report upload and mail to all.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared

Boiler -2 Soot Blower POWER RESET.All unwanted light OFF. Boiler 2


Soot Blower 14,to 16 power off as per operation requirement. Bed Ash cooler
2B AVI Done. Bed Ash Coooler 2B
AVI Close.

Shift jobs carried

Reclaimer left-right swing drive found overload from vfd, then its check motor and drive , after
reset it take upto 9.5 amp during operation ,no any abnormal sound from motor.

VAM System water over flow ,then steam valve close for 30 minute then open. Now vam running
normal.

Unit#1, CO analyzer room's AC check found its PCB of indoor faulty .

BAC#2B , AVI power oon & after work power off.


Unit#1 soot blower found overload then it check and reset.
Reclaimer faulty cable tracking job contine.

Following shutdown provide :


1. Coal crusher-1.
2. Reclaimer(breaker).
3. Unit#2, soot blower no#14, connection open (DE- B/G/R).
4. BC -1.
5. BC -2.
6. BC-4

Unit#2 soot blower no 14, connection open (DE- B/G/R)


Two hand lanp 24v and one transformer shift from coal feeder area to work shop.
Shift jobs carried
In Unit No.-2 Soot Blower No.-14 motor Connection to done. Also closed the Permit. When Trial
taken then Motor is Ok. But gear box is not rotating. As per shift incharge requirement Soot
Blower No.-14 Motor connection is removed at Contractor side.
AVI is given to BAC-2A. Also closed the AVI and Permit,
In Unit No.-2 APH seal Pr. Is not showing at DCS end. So cleaned the impluse line. Now ok.
In Compressor House all the auto drain valve is checked and working normally.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following shutdown Closed :
1. Coal crusher-1.
2. Reclaimer(breaker).
3. Unit#2, soot blower no#14, connection open (DE- B/G/R).
4. BC -1.( 03 Time )
5. BC -2.
6. BC-4
7. Crusher Bag Filter.
8. RAV of Crusher Bag filter.
9. BAC-2A ,

Coal Crusher No.-1 direction reversed and megger done. Now Ok.
24 Volts LED light taken from BAC-2A and shifted to wirkshop area.

Shift jobs carried


WTP area all field instrument ( Sov, Pressure transmitter, pressure gauge, PH box etc) cleaning
done.

Compressour housel field instrument ( Sov, Pressure transmitter, pressure gauge, flow switch etc)
cleaning done.

P&V NO 2 and 4 panel cleaning done.

Power Report Month end balancing done.

Environment and Plant performance report upload and mail to all.

All Energy meter manual reading taken for Power Report.

Power Report & DG report Prepared

Shift jobs carried

In CCR TG Operator PA System is not working condition. So RJ-45 connector and Jointer of Cable
connector tightness to done. Now working normally.
CCR AHU manual mode so change in Auto mode set point 23 Degree.
In CCR lift door is not closed. So IR Sensor adjusted. Now Ok.

All the Manual Light to OFF Condition.


online CPCB and ETP website is not opened .

P & V. No. # 2 and 4 is in OFF condition.


In Vibrating Screen No. # 1 and 2 Motor and Power JB Cleaning to done.
In Crusher Building floor Lighting cable dressing to done.
Silo area Light to ON as per Shift Incharge requirement. After completion of work light to OFF
Condition.

Shift jobs carried


Chimney room AC OFF condition, So ON done.
Crusher Bucket Elevator floor Equipment cleaning done.
Boiler-2 bag house 11-21 back pressure transmitter line flushing done.

Compressor house IFC filter drain and Auto drain manually done.
Compresor house lighting timer set.
WTP MCC panel cleaning and blowering done.

Shift jobs carried


IFC service and instrument air pressure check with CCR person and its contol power reset one
time.
Pump house , 5 no MOV pressure guage ,DPs and transmitter JB cleaning done.
APH 1&2, SOV connector tightness and cleaning done.

At 04.00 am , network error alarm at control room, check and found Unit#2, cabinet no. 26M,
INNIS21 & INNPM12 faulty ,then talk to Mr. tarun and reset it, now ok.(room tempreture normal
at that time)
Unit 1&2 ,7Th floor light off done as it found on.
Unit# 2, soot blower power connection tightness done at panel side.
Environment and Plant performance report upload and mail to all.
All Energy meter manual reading taken for Power Report.
Power Report & DG report Prepared
Shift jobs carried
Crusher Building Screen floor Equipment cleaning done.
Boiler-2 bag house 12 nos. DOM Air Leakage attend done.
Boiler-2 Soot blower no 14 Control JB removed from Motor as per MMD requirement.

ACC fan 1A Tripped in flow Low reset it.


Coal Feeder 1A, 1C, 1D and1B Motor fan Cover hole seal with M-Seal
Reclaimer PCRD Cable manually role.

Following shutdown provide :


1. BC -1.
2. Reclaimer.
3. Unit#2, soot blower no#14, connection open (DE- B/G/R).
4. BC -6.

1C Bunker Level not showing, So power reset and found normal.


Shift jobs carried
Unit -2, Soot Blower -14 , motor o/h done at work shop and after assendly motor connection done
and shut down clear.

Unit-1, Soot Blower No 1 & 2 taken higher current so connection remove from relay.

BC-4, magnetic seperator not moving so clean the rail trial taken.

Fly Ash Silo-2, dry unloading system air isolation given and clear.

Fly Ash Silo-2, dry unloading system flap fate close limit setting done.
Following shut down Clear-
1. BC-1
2. Reclaimer
3. Soot Blower-Boiler-2
4. BC-6

Shift jobs carried


CEP#1, all instrument MOV, JB, pressure guage, transmitter cleaning done.
CEP#2, all instrument MOV, JB, pressure guage, transmitter cleaning done.
Dozing room, all motor"s cleaning done.
RO Booster pump 1&2, panel blowering , and motor cleaning done.
Unit #2, soot blower no 14 get overload then its motor check tempreture normal and winding
resistance at 61.4 Ohm balance in all phase then its reset, now running.
ACC-1, area lightning cable dressing done.
Environment and Plant performance report upload and mail to all.
Unit#2, Drain MOV and j-valve MOV cleaning done.
Power Report & DG report Prepared
Date Shift Engineer Name

01.02.2022 A Ashvin Jadav

Date Shift Engineer Name

01.02.2022 B Deepak Chand


Date Shift Engineer Name

01.02.2022 C Sanjay Garg

Date Shift Engineer Name

02.02.2022 A Ashvin Jadav

Date Shift Engineer Name


02.02.2022 B Amit kumar singh

Date Shift Engineer Name

02.02.2022 C Sanjay Garg

Date Shift Engineer Name

03.02.2022 A Deepak Chand


03.02.2022 A Deepak Chand

Date Shift Engineer Name

03.02.2022 B Amit kumar singh

Date Shift Engineer Name

03.02.2022 C Ashvin Jadav


03.02.2022 C Ashvin Jadav

Date Shift Engineer Name

04.02.2022 A Amit kumar singh

Date Shift Engineer Name

04.02.2022 B Sanjay Garg


04.02.2022 B Sanjay Garg

Date Shift Engineer Name

04.02.2022 C Ashvin Jadav

Date Shift Engineer Name

05.02.2022 A Amit kumar singh


05.02.2022 A Amit kumar singh

Date Shift Engineer Name

05.02.2022 B Sanjay Garg

Date Shift Engineer Name

05.02.2022 C Deepak Chand


05.02.2022 C Deepak Chand

Date Shift Engineer Name

06.02.2022 A Sanjay garg

Date Shift Engineer Name

06.02.2022 B Ashvin Jadav

Date Shift Engineer Name

06.02.2022 C Amit kumar singh


06.02.2022 C Amit kumar singh

Date Shift Engineer Name

07.02.2022 A Sanjay garg

Date Shift Engineer Name


07.02.2022 B Ashvin Jadav

Date Shift Engineer Name

08.02.2022 A Ashvin Jadav

Date Shift Engineer Name

08.02.2022 B Deepak Chand


08.02.2022 B Deepak Chand

Date Shift Engineer Name

08.02.2022 C Sanjay Garg

Date Shift Engineer Name


09.02.2022 A Ashvin Jadav

Date Shift Engineer Name

09.02.2022 B Amit kumar singh

Date Shift Engineer Name


09.02.2022 C Sanjay Garg

Date Shift Engineer Name

10.02.2022 A Deepak Chand

Date Shift Engineer Name


10.02.2022 B Amit kumar singh

Date Shift Engineer Name

10.02.2022 C Ashvin Jadav

Date Shift Engineer Name

11.02.2022 A Amit kumar singh


11.02.2022 A Amit kumar singh

Date Shift Engineer Name

11.02.2022 B Sanjay Garg

Date Shift Engineer Name

11.02.2022 C Ashvin Jadav


11.02.2022 C Ashvin Jadav

Date Shift Engineer Name

12.02.2022 A Amit kumar singh

Date Shift Engineer Name

12.02.2022 B Sanjay Garg


12.02.2022 B Sanjay Garg

Date Shift Engineer Name

12.02.2021 C Deepak Chand

Date Shift Engineer Name

13.02.2022 B Ashvin Jadav

Date Shift Engineer Name

Tarun Gaur/ Amit


13.02.2021 C Singh
Tarun Gaur/ Amit
13.02.2021 C Singh

Date Shift Engineer Name

14.02.2022 A Sanjay garg

Date Shift Engineer Name


14.02.2022 B Ashvin Jadav

Date Shift Engineer Name

Tarun Gaur/ Amit


14.02.2021 C
Singh

Date Shift Engineer Name

15.02.2022 A Deepak Chand


15.02.2022 A Deepak Chand

Date Shift Engineer Name

15.02.2022 B Ashvin Jadav

Date Shift Engineer Name

15.02.2022 C Sanjay Garg

Date Shift Engineer Name

16.02.2022 A Ashvin Jadav


16.02.2022 A Ashvin Jadav

Date Shift Engineer Name

16.02.2022 B Tarun Gaur

Date Shift Engineer Name

16.02.2022 C Sanjay Garg


Date Shift Engineer Name

17.02.2022 A Tarun Gaur

Date Shift Engineer Name

17.02.2022 B Amit kumar singh

Date Shift Engineer Name


18.02.2022 A Tarun Gaur

Date Shift Engineer Name

18.02.2022 B Amit kumar singh

Date Shift Engineer Name

18.02.2022 C Ashvin Jadav


18.02.2022 C Ashvin Jadav

Date Shift Engineer Name

19.02.2022 A Tarun Gaur

Date Shift Engineer Name

19.02.2022 B Deepak Chand

Date Shift Engineer Name


19.02.2022 C Amit kumar singh

Date Shift Engineer Name

20.02.2022 A Ashvin Jadav

Date Shift Engineer Name

20.02.2022 B Amit kumar singh

Date Shift Engineer Name

20.02.2022 C Tarun Gaur


20.02.2022 C Tarun Gaur

Date Shift Engineer Name

21.02.2022 A Ashvin Jadav

Date Shift Engineer Name

Sanjay Garg / Deepak


21.02.2022 B
chand
Date Shift Engineer Name

21.02.2022 C Tarun Gaur

Date Shift Engineer Name

22.02.2022 A Ashvin Jadav

Date Shift Engineer Name


22.02.2022 B Deepak Chand

Date Shift Engineer Name

22.02.2022 C Sanjay Garg / Amit


Kumar

Date Shift Engineer Name


23.02.2022 A Ashvin Jadav

Date Shift Engineer Name

23.02.2022 B Deepak Chand


Date Shift Engineer Name

Sanjay Garg / Amit


23.02.2022 C
Kumar

Date Shift Engineer Name

24.02.2022 A Deepak Chand


Date Shift Engineer Name

24.02.2022 B Tarun Gaur

Date Shift Engineer Name

24.02.2022 C Sanjay Garg / Amit


Kumar

Date Shift Engineer Name


25.02.2022 A Tarun Gaur

Date Shift Engineer Name

25.02.2022 B Sanjay Garg


25.02.2022 B Sanjay Garg

Date Shift Engineer Name

25.02.2022 C Ashvin Jadav

Date Shift Engineer Name


26.02.2022 A Tarun Gaur

Date Shift Engineer Name

Sanjay Garg / Amit


26.02.2022 B
Kumar
Date Shift Engineer Name

26.0.2022 C Deepak Chand

Date Shift Engineer Name

27.02.2022 A Sanjay garg


Date Shift Engineer Name

27.02.2022 B Amit Kumar

Date Shift Engineer Name

27.0.2022 C Tarun gaur

Date Shift Engineer Name

28.02.2022 A Sanjay garg / Amit


Sanjay garg / Amit
28.02.2022 A
Kumar

Date Shift Engineer Name

28.02.2022 B Ashvin Jadav

Date Shift Engineer Name

28.0.2022 C Tarun gaur


28.0.2022 C Tarun gaur
Shift jobs carried
Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain
VAM parameters checked found Normal
All AC power made ON in morning.
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Shift jobs carried


Shift round taken found all drives running normal.
Compressor house all auto drain valve manually check
and drain
VAM parameters checked found Normal
All AC power made ON in morning.
STG building light ON/OFF as per require due to rainy
weather
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
4. Electrical checklist
5. VAM Check list

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  Checklist
3. Generator-2  Checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  Checklist
3. Generator-2  Checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal

Following Check List Filled


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .
VAM parameters checked found Normal
Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  Checklist
3. Generator-2  Checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  Checklist
3. Generator-2  Checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain
All unwanted lights switch OFF manually during shift
round .
VAM parameters checked found Normal
Following Check List Filled
1. UPS Check List
2. Generator-1  Checklist
3. Generator-2  Checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal


Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Silo-2 RAV tripped in overload reset it.
Silo-1 RAV motor canopy open condition, so fitted done.

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Silo-2 RAV tripped in overload reset it.

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Silo-2 RAV tripped in overload reset it.

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal


Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Silo-2 RAV tripped in overload reset it.

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Silo-2 RAV tripped in overload reset it.

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually check
and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
Regular jobs
Shift round taken found all drives running normal.
RNRP all nodes found Normal, except SPC007
Compressor house all auto drain valve manually check
and drain.
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


Following Check List Filled
1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Following shut down Clear-


1/ACC FAN-2D
2/ Fins cleaning-2

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Following shut down Clear-
1/ACC FAN-2E
2/ Fins cleaning-2

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift instrument digital log book filled
UPS log digital log book filled.
Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift instrument digital log book filled
UPS log digital log book filled.

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually check


and drain
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal


VAM parameters checked found Normal

Following Check List Filled


1. UPS Check List
2. Generator-1  checklist
3. Generator-2  checklist
Shift jobs carried
Reclaimer PCRD Cable manually role.
Coal Bunker 2B Level not showing, Cleaning done now showing healthy.
Bunker Floor 7B Side tray inside cable dressing.
Chimney AC off condition, so ON done.
02MV 2905 Hotwell MOV Close Limit set, Work Under Progress.
Following shutdown provide :
1. BC -1.
2. Reclaimer.
3. BC -4.
4. BC -2.
5. Soot Blower Boiler-2
6. Soot Blower Boiler-1
7. Bed Ash Cooler-2A.
8. Street light Boiler & ACC Side.
Following shutdown Clear :
1. BC -1.
2. Reclaimer.
3. BC -4.
5. BC -2.

Shift jobs carried

Unit-1 Soot Blower main Reverse fuse A2 get blown frequently, so check circuit found soot blower
15 control cable get short , so remove its connection. Planned to check tomorrow.

Unit-1 soot Blower no -1 not operating in manually found its limit switch setting disturbed attend
the same.

Unit-1 Soot blower no-11 get trip due to overload , so remove its connection.

BC-4, magnetic separator not operating found limit travel switch acted, manually operate it and
release limit switch now ok.

HSD CCTV camera showing burr image so clean the camera and reset it power but still not clear to
be check further.
ACC Street lights taken In auto from DCS command.

BAC 2A and Unit soot blower -1 AVI given and close.


Following shut down Clear-
1. BAC 2A
2. Soot Blower-Boiler-2
3. Soot Blower-Boiler-1
4. ACC street lights.

Shift jobs carried


In Boiler Lift No.-2 Telephone is not working condition. So connector tightness to done. Now ok.
All other lift telephone is checked it is working normally.
In unit No.-2 Slave Dome valve air leakage from PU Tube. So rectify it. Now Ok.
In CCR AHU is iRunning in High RPM So SP Increased from 26 to 28 degree.
In Silo No.-1 and 2 all the Panel and Field Inst. cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In HSD Area , CHP T-1 and T-2 Tower Light to OFF Condition.
Fly ash Silo No.-2 Motor Cleaning to done.

Shift jobs carried


Boiler-2 soot Blower 14 tripped in O/L reset it and trial running normal.
BC-5 Area temp connection work of Civil manpower, Also Extension board repair. Also 24V
transformer Plug top replace.
BC-4 Tail End Area Earthing Connection done abnormality Close.
C7 AB area Level transmitter Cleaning work.
02MV 2905 Hotwell MOV Work Under Progress.
Following shutdown provide :
1. BC -1.
2. Reclaimer.
3. BC -4.
4. BC -2.
5. BC -5.
6. Soot Blower Boiler-1
7. Morphine Dosing Pump 3
8. 02MV2905

Shift jobs carried


CHP D.C.S. Panel cleaning and blowering done.
APH#2, cleaning and blowering done.
One no. Industrial plug top change of blower below coal-crusher building.

BC-4, magnetic separator not operating so check control and power supply found its power
contactor's aux block create problem so cleaning done. It require to replace.
Electrical lock ,hasp and MCB lock (Running & spare ). list prapare and provide to Mr. jaswant ji.
Magnetic seprator of BC4 not start during start of coal transport group,as limit not found ,so check
at field and found its out from limit so it shift to limit and start it
WTP Pump house motor cleaning blowering done.
Following shutdown clear :
1. BC -1.
2. Reclaimer.
3. BC -4.
4. BC -2.
5. BC -5.
6. Soot Blower Boiler-1

Shift jobs carried


In unit No.-1, vessel No.-12/22 Seal Pr. SS Tube dressing to done.
In Compreesor Room all the auto drain valve checked it is working Normally.
Engineer Room AC to OFF Condition.
Unit No.-1 FWS all the control valve cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Boiler No.-2 Soot Blower No.-14 Double earthing to done.
AC and Vent MCC Panel cleaning and Blowerning to done.

Shift jobs carried

Reclaimer PCRD Cable get unrolled so cable rolled manually.

Unit-2, RHS hydra step having electrode leakage , so change the electrode.

CCR Motorola PA mic not working found inner wire opened , soldering done and handed back to
CCR

IFC pressure not maintaining so its power reset done.

Unit-2. Vessel 21 showing High and H:H level , both level probe checking done.

LS building ground floor welding machine check and green tag pasted.
Following Shut down Given-
1. BC-1
2. BC-2
3. BC-5
4. BC-4
5. COAL CRUSHER-1
6. BAC 2B

Shift jobs carried


Unit# 1, soot blower no 13&14 limit not show , so check with ccr person and adjust it.and crocc
check at CCR found ok.
UNIT #1, bed Thermacouple tag no. 01TI1117, show temprature rise 840C to 1088 C gradually ,
then check at field found its 37.8mV and spare core 33mV then spare core use now at DCS 831C.
Both core show No cuntinuty.

H.P. dosing pump 1&2 guage check ,both found ok , its due to line choke.

Powwer on done of BAC#2B on AVI and then off as AVI close.


Unit#1, shoot blower no. 14 body earthing found not connected so connect it.
Service air Presuusre and instrument air pressure show at equal pressure then its IFC check and
its reset one time. Now ok
SOX, reading show very low 40.3 , so check with Mr. tarun and provide data as per requirement of
ccr.
BC4, Magnetic seprator not work at starting of group then ,check at field find its on local mode so
put it on remote mode and group start.
Following Shut down Clear-
1. BC-1
2. BC-2
3. BC-5
4. BC-4
5. COAL CRUSHER-1
6. BAC 2B

Shift jobs carried


Unit-2 Feed water suction MOV and Control valve cleaning done.
Unit-2 De-Superheating suction MOV and Control valve cleaning done.
Unit-2 Feed water station equipment cleaning done.
IFC Filter drain and Compressor Auto drain checking done.
ACC-1 Repair Supply box Green Tag Provided.
ACC-1 LDB and Repair Supply box Rubber mat laying done.
BC-4 and Coal Shed Area lighting manually OFF.
Environment and Plant performance report upload and mail to all.
All Energy meter manual reading taken for Power Report.
CEP-2A and 2B Motor Cleaning done.
MPSS requirement Line Voltage are >135 KV at MPSS end, So Gen Side Excitation 02 Pulse Lower
taken and Voltage reduce from 11.09 kV to 11.03 kV.
Shift jobs carried
service air pressure and instrument air pressure check , at IFC Panel found normal.
U#2, Bag house chamber no 21, HH lavel check probe working ok . It have material in it.
Bankar 2A lavel sensor cleaning done one time.

One no. 24v light with transformer provide at BC5 belt.

U#1 shoot blower no. 2 checked with process and maintanance deptt. Found it have jerk at few
point ,so its maintanance job continue.
BC#3&5 , guard limiit reset , as it found actuated.
Coal feeder, #1D, sealing air pressure guage damage, so change in next shift.
Unit #2 shoot blower pressure guage , green tagging done.
BC1 ,belt sway swith lever tight done & insulation provide.
Reclaimer travaling limit switch lever found damage , so replace it.
U#1 shoot blower no. 2 checked as ccr informed it not run found it 10 amp control mcb,single pole
get trip. So check aftyer PTW.
Following Shut down Given-
1. BC-1
2. BC-7A
3. RECLAIMER
4. MORPHOLINE PUMP-2
5. BC-5

Shift jobs carried

In Unit No.-1 Soot blower No.-15 Motor connection done at contractor side and Trial taken. It is
working Normally. Also Soot Blower No.-2 not started from DCS. So checked at field side
Backward limit switch Position is not correct. So rectify it. Now Ok. Also Soot Blower No.-11
Motor connection already removed from Panel side. Informed to shift Incharge.

In Service air compressor No.-1 , 2 and 3 EPB is released. Also Reset from Controller side. Now ok.

In HP Dosing Pump No.-2 Pr. Guage is not working condition. So Check the Pr. Guage in lab. It is
working Normally. Then Installed at site. Pr. Guage is not showing Because Pr. Is not developed by
pump. So inform to WTP Shift operator.
Unit No.-1 HP Heater level control Valve 01LCV3302 is not working Properly. So calibrated the
Control Valve. Now ok.
In Chimney analyzer all the Reading are showing zero value. So checked and found that moisture
filter jammed condition also SOV taken air. So Bypassed it. Now readings are under observation.
Also inform to Mr. Tarun.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut down Cleared-
1. BC-1 ( 02 Times )
2. BC-7A
3. RECLAIMER ( 02 Times )
4. MORPHOLINE PUMP-2
5. BC-5

Root Blower -1 in Ash Silo MCB Power ON as per Operation requirement.

Shift jobs carried


Boiler-2 Firing Floor Panel Cleaning done.
Boiler-2 Firing Floor Actuator limit switch and JB cleaning done.
Boiler-2 Burner 2B side cable dressing done.
IFC Filter drain and Compressor Auto drain checking done.
TG 1&2 Barring gear motor and field panel cleaning & Blowering done.
ACC-2 Cleaning trolley 1 earthing and power cable dressing done.
Boiler-2 3rd floor light off, so manually on done.

Shift jobs carried


U#1 , soot blower no 11, connection open on( PTW 165277) , Cable heated and black colour so not
identified please check direction at time of trail.
Unit #1 RAV not work as PTW of elevator ,after on powwer it work.
Unit #2 RAV not work as PTW of elevator clear previously,but its feeder not chared condition so
charge it.
U#1 , soot blower no 11, connection open on( PTW 165277) , Cable heated and black colour so not
identified please check direction at time of trail.

MOV, limit assembly cleaning done at lab.


All coal bunkar, lavel sensor cleaning done.
Following Shut down Given-
1. BC-1
2. BC-7B
3. RECLAIMER
4. U#1, Soot Blower
5. BC-6
6.EN-MASS CONVEYOR-1
Following Shut down Given-
1. BC-1
2. BC-7B
3. RECLAIMER
4. U#1, Soot Blower
5. BC-6
6.EN-MASS CONVEYOR-1

Shift jobs carried

In Unit No.-1 Soot blower No.-11 new Motor connection done at contractor side and Motor side
and Trial taken. Its limit Switch is not cut properly. So Limit set. Now it is working Normally.

Unit No. # 1 Vessel No.-12/22 Seal Pr. Is not showing at DCS end. So found that heavy chocking at
impluse line. So cleaned it. Now Ok.
In Chimney analyzer chiller auto drain system is not working condition. So Replaced with Boiler
No.-1 SOX analyzer . Now ok.
BC-4 is not started from DCS end. So Checked at feeder side started in Local mode. It is not started.
Found that Head side Guard limit switch is acted. So rectify it. Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut down Cleared-
1. BC-1
2. BC-7B
3. RECLAIMER
4. U#1, Soot Blower
5. BC-6
6.EN-MASS CONVEYOR-1
7. ACC -1 Light

Root Blower -1 in Ash Silo MCB Power ON also Put into Remote mode as per maintences
requirement.
WTP Pump house MCC Panel cleaning blowering done.

Shift jobs carried


IFC near boiler Power reset done.

WTP motor Room all motors cleaning done.

TG -1 , 4.5 mtrs all field instrument cleaning done.

All Energy meter manual reading taken for Power Report.


Power Report prepared & DG report Prepared

Environment and Plant performance report upload and mail to all.

Shift jobs carried


Unit No. # 1 Vessel No.-12/22 Seal Pr. Is not showing at DCS end. So found that heavy chocking at
impluse line. So cleaned it. After some time again it is showing fault. So the seal Pr. Checked.
Found that Vessel No.-22 seal Pr. is showing Low. So Informed to shift incharge. After Completion
of work again taken in line. Now Ok.
Unit No. # 2 Vessel No.-12/22 Seal Pr. Is not showing at DCS end. So found that heavy chocking at
impluse line. So cleaned it. Now Ok.
In CCR lift door is opened condition at ground floor. So IR Sensor adjusted and Power Supply
Reset. Now Ok.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
BC-4 S/D to given.
Fire Pump House Battery is in charging condition and Voltage= 12.9 Volts.
In WTP Pump house area Motor cleaning to done.

Shift jobs carried


Chimney NOX value goes to above 300 mg/Nm3, so parameter changed and taken value at 220
mg/Nm3
Silo-2 Bulker level switch cleaning done and trial taken running normal.
Boiler-1 Bag House-22 high level switch check as per operation requirement.
DCS CHP page violate and again normalized in AUTO.
BC-7 A and B Motor power JB and Motor cleaning done.
BC-1 Magnetic Separator not ON, Checked and found Fuse base are removal condition so Close
and trial running normal.
BC7 AB area 24V transformer Plug top replace.
BC-7 Area lighting JB open condition, so packing done.
BC-4 S/D Clear.
Shift jobs carried
Boiler floor no#4 to 7 unwanted light,s off done
CHP MCC outdoor panel cleaning and blowering done.
Boiler-1 Bag House-22 high level switch check as it show continue lavel high alarm, due to already
material on it.so inform to control room.
Unit#1, shoot blower panel reset one time.

All Energy meter manual reading taken for Power Report.


Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.
On auto drain valve, check manualy found ok.
WTP area field instrument, cleaning dione.
Shift jobs carried
In Unit No. # 1 HPH Level Control valve ( 01LCV3302 ) not mainting the level in auto mode. So in
PID gain is adjusted. Now Working Normally.
In Unit No.-1 Soot Blower No.-14 reversed direction. So Phase change from Contractor side. Also
Limit set at site. Now Ok.
In Unit No.-1 Soot Blower No.-15 Limit set at site. Now Working Nomally.
In Service air receiver Tank No.-2 air leakage from auto drain valve. So attended it. Now Ok.
Unit No.-1 both the Hydrastep electrodes connection tightness to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
Following S/D to given.
1. BC-1,
2. T-1 , T-2 lighting LDB,
3. BC-7A ,
4. BC-7B,
5. BC-6,
6. BC-1,
7. BC-4,
8. Unit No.-1 Soot Blower Panel all OFF all the MCB in Panel.

In Unit No.-1 Soot Blower No.-1 Motor connection removed as per Maintences requirement.

Shift jobs carried


Boiler-1 Bag House-22 high level switch check as it show continue level high alarm, Cleaning and
trial taken running normal.
Bucket Elevator floor equipment cleaning done.
IFC Filter drain and Compressor Auto drain checking done.
Unit No.-1 Soot Blower -1 Panel and Motor end connection removed PTW 165401
Bc-1and 2 Motor cleaning done.

Following S/D Clear


1. BC-1,
2. T-1 , T-2 lighting LDB,
3. BC-7A ,
4. BC-7B,
5. BC-6,
6. BC-1,
7. BC-4,
8. Unit No.-1 Soot Blower
ACW and CT fan area lighting Timer Set.

Shift jobs carried


EOP-2 Field Power JB Double earthing provided.
Mechanical Workshop Grinder Plug top provided.
Boiler-1 Bag house 12-22 seal pressure fault, Line cleaning and now running normal.
Boiler-2 Bag house 21 Level high showing , checked cleaning and running normal.
Boiler-1 CO panel maintenance work under progress.
Unit-2 soot blower AVI rack in.

Following S/D Given


1. BC-1,
2. T-1 , T-2 lighting LDB,
3. BC-7A ,
4. BC-7B,
5. BC-6,
6. BC-1,
7. BC-4, (02 times)
8. Unit No.-2 Soot Blower 1. BC-1,
9. BC-3
Shift jobs carried

Soot Blower-1, Left Drain Valve 01MV0702 open limit setting done.

Boiler-1, bag house 12-22 Level not showing, found actual level so both probe calibration done,
now OK.
Soot Blower-2, Blower -13 get trip on O/L so check and reset.
BC-6 operated on Local from feeder as per maintenance requirement.
Soot Blower-1, Left / Right Drain Valve 01MV0702 & 01MV703 MOV Cleaning done.

Soot Blower-2 AVI given and close

BC-6 AVI given and close twice

Following S/D Clear


1. BC-1,
2. T-1 , T-2 lighting LDB,
3. BC-7A ,
4. BC-7B,
5. BC-6,
6. BC-1,
7. BC-4, (02 times)
8. Unit No.-2 Soot Blower 1. BC-1,
9. BC-3

Shift jobs carried


In unit No.-1, Soot Blower No.-13 Limit Switch to set. Now it is working Normally.

In Unit No.-1 Soot Blower No.-2 is not started in auto mode. Then started at Local mode. It is
working Normally. After completion of the soot blower. Then check command is Ok. But at TB end
Contact is not changeover. So checked fuse is blown. So replaced the fuse. Now trial is not taken
from CCR.
In Fly ash silo No.-2 Fork level switch is showing . So cleaned the sensor. Now ok.
In Unit No.-1 and 2 Fly ash Conveying system is not started even if level high is showing at DCS
end. So Informed to Mr. Tarun. Then in PCU-24 and ON/OFF Block Number- 8657 to set zero. Now
working Normally.
Engineer Room AC to OFF Condition.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Boiler No.-2 4 th to 7 th Floor Light OFF.
In Boiler No.-1 4 th to 7 th Floor Light ON as per operation requirement.

In Fly ash silo No.-2 is in running condition. Then Control supply is automatically OFF. Then
Checked at feeder side. 02 Nos. 40 Amps fuse blown. Then fuse blown. Then replaced it.

Shift jobs carried


TG-2 Drain pot area cable dressing work done.
Silo-2 Soot Up/down issue, reset and trial taken running normal.
Boiler-1 01TIC0952 RTD checked as per operation requirement, found healthy.
Boiler-1 Soot blower-1 motor side connection done. On AVI.
Silo-2 RAV not operate found L/R selector switch put on manual, put in remote and trial taken
found running normal.
Silo-2 RAV motor cover not on motor, so put on motor and abnormality close.

Following S/D Given


1. BC-1,
2. T-1 , T-2 lighting LDB,
3. BC-7A ,
4. BC-7B,
5. BC-6,
6. BC-1,
7. BC-4, (02 times)
8. Unit No.-2 Soot Blower 1,
9. Mist Fan 2B7. BC-4, (02 times)
10. 02MV 2905,
11. HP Dosing Pump-2
Shift jobs carried
U#1 ,Soot Blower, Left Drain Valve 01MV0702 check found its niot operate from ccr, due to heavy
jam, so by rustoline use to clean jan and slight grese and operation check with ccr person and
operate in ccr mode it work ok.

Boiler-2, bag house 12-22 H Level not showing, found actual level so probe cleaning and
calibration do.
U#1, shoot blower NO#15 not work , so check with maintanance team and ccr person found its
very hot position in off position ,so maintanance team tell that they work as it cool down . Winding
resistance 99.8 ohm balance .
U#1, Shoot blower no#1, connection done at contactor then as its permit clear done .

WTP back side, tank area 3 phase ,extension board ELCB check and green tag change.
SOX, reading show very low 26.2 , so check at panel found its 29.2 at Analyser panel and
24.9mg/Nm3 to CPCB . Inform to ccr and Pramod sati sir.
CCR inform that U#1, shoot blower NO#15 limit not work then its trail taken in local mode , But at
time to start in ccr mode heavy steam leakege at thare so it stop by CCR.
Following S/D Given
1. BC-2,
2. T-1 , T-2, T-3 lighting LDB,
3. BC-3 ,
4. BC-4, (02 Permit)
5. Unit No.-2 Soot Blower 1
6. Mist Fan 2B

Shift jobs carried


For NOX Factor changed in DCS from 0.71 to 0.57 . In Chimney analzer it is already changed by B
Shift Engineer.
In Unit no.-2 Vessel No.-21 Showing HH level . So Cleaned the level Probe. Now ok.
In Fly ash silo No.-2 Fork level switch is showing . So cleaned the sensor. Now ok.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Boiler No.-2 4 th to 7 th Floor Light ON as per operation requirement.
In Boiler No.-1 4 th to 7 th Floor Light ON as per operation requirement.
Dosing Room all the Motor Cleaning to done.

Shift jobs carried

BFP-2 changeover from by pass to DOL at 7:30 AM then normalize at 12:30 Hrs.

De super heater control valve 01MV3203 and 02 MV 3203 , gland leakage arrested.

Soot Blower No-15, Limit switch adjusted and trial taken

Fly Ash Silo-2, chute level continue full indication attended.

BC-1 Magnetic separator not running found motor overload due to jamming, work under progress
by Mech Team.

Following Shut down Given


1. BC-4
2. Soot Blower 1
3. BAC 1B pneumatic isolation

Following Shut down Given and close-


1. ACC fan 2A
2. ACC fan 2A Lube oil
3. 1. ACC fan 2C
4. ACC fan 2C Lube oil
5. ACC fan 2D
6. ACC fan 2D Lube oil

Shift jobs carried


BC-1 , Magnetic seprator one time overload ,due to material then its cleaning job done and
material remove then its power on and it start normal.

Boiler #1 , Both side lighting timer bypass, for light maintanance ,and after that its taken in circuit.
Boiler #1 , Both side lighting timer bypass, for light maintanance ,and after that its taken in circuit.
HP Dosing pump #2, AVI Given and close.

Reclaimer boom belt swing motor get overload due to over current, so its reset then it start and
running with 7.6 amp max.
Coal bunker 1B & 1C, lavel sensor cleaning done.
Fly ash silo No.-1 & 2 Lavel sensor probe and contact terminal Cleaning done as reading not
receive at ccr.
Following Shut down clear.
1. BC-4
2. Soot Blower 1
3. BAC 1B pneumatic isolation

Shift jobs carried


Boiler-2 Bag House-12 Level probe cleaning done.
Boiler- 2 Drain MOV, J Valve MOV, and bed ash cooler Local JB cleaning done.
DCS-1 Common System 73 Module panel Card Fault Internal Error reset it
DCS CHP 94 Module panel card fault internal error reset it

Boiler-1 Conveying system not run in probe and timmer mode not running, so logic to be checked

Coal feeder 2A Motor fan covet touch with motor, additional nut provided and correcttion done.
Coal feeder area cable dressing done.
ACW Motor cleaning done.
Bunker Floor 22 mtr area light OFF.
Shift jobs carried
ACC-2C , Motor connection open, and record on requirerment of maintanance team.
U1 , Bag house , conveying pr. Switch setting change 0.3 Mpat to 0.23Mpa, with pramod sati sir.

ACC-2C , Motor connection done, and its earthing provide.

ACC-2C , not show healty then check and found its control mcb ,Q21 in off position so, on it.

ACC-2C, lube oil pr, switch not show healty after maintanance , check and found its connection cat
near motoe ,so its connect properly.
Following Shut down Given-
1. ACC fan 2C
2. ACC fan 2C Lube oil
3. U#2, Soot blower
4. BC7
5. BC4
6. BC1

Following Shut down clear.


1. ACC fan 2C
2. ACC fan 2C Lube oil.
U#1, Bag house vaccum pr. Guage line flushing done.
One PCB of AC soldering done.
AVI- provide of Unit#2, soot blower on maintanance requirement and isolate after AVI close.

Shift jobs carried


In Chimney analyzer All the PU Tubes Joint tightness and anbond to applied.
Unit No. # 2 Vessel No.-21 Level high is showing at DCS end. So checked and found that material
inside the Vessel. So informed to shift incharge.
Unit No. # 2 Vessel No.-21 /22 hooper Temp. is crossed checked. According to resistance it is
showing normally. So Informed to Shift Incharge.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut down Cleared-
1. Vibrating Screen No.-1
2. Coal Crusher No.-1
3. U#2, Soot blower
4. BC- 7A
5. BC-4
6. BC-1

At Vibrating scrren floor 24 Volt LED Light to repaired.


TPP Street light Switchyard main road Lighting Timer is Bypassed from JB end.

Shift jobs carried


Unit-2 Bag House-21 Level probe cleaning done.
Unit-2 Bed Material RAV JB, MOV cleaning done.
IFC Filter drain and Compressor Auto drain checking done.
Fly Ash Silo-1 area Motor and panel cleaning done.
Engineer Room AC to OFF Condition.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
Soot Blower-1 mainn MCB tripped in trial of 14 nos Soot Blower reset it.
4.5 Mtr. AC and vent MCC panel hole sealing work.
Shift jobs carried
U#1 -12/22 Seal air pr. Line flushing done.
Chimni SOX sample checking done, Lavel check and its increse from 28 to 76mG/Nm3.
U#2, vessale no-22, temprature RTD, check found ok, and its H lavel probe check found its
connector loose ,so tight it.
Raw coal bunkar 2A, MOV not check found its contactor chattring , so its feeder replace then it
work ok. Inform to ccr.
One hand lamp provide at BC-7A & One charging LED at mechanical workshop.
Following Shut down Given-
1. Bucket elevator-1
2. BC4 & BC7A
3. Vibrating screen -1
4. Soot blower-1
5. Soot blower-2
6. Coal feeder 2A, 2A Discharge MOV, and its Panumatic plate valve.

At 12.40 P.M. Unit #1 , taken in base load at 12000 kW, Due to low load from plant

U#1 , U#2 Transformer,s OLTC tap change from 6 to 7 (after off Capacitor from plant). Then
voltage reduce from 135.4 kv to 132.7 kv
AVI- provide For coal feeder -2A , 2A Discharge MOV & panumatic plate valve

Shift jobs carried


In Unit No.-2 Coal Feeder -2A Pneumatics Valve Open limit switch wire is shorted and Closed
Limit one wire is open condition. So Both the Limit switch cleaned and normalized the connection.
Now Ok.
In Unit no.-2 Vessel No.-22 hopper Temp. is showing is showing 55 degree. So level probe is
checked it is working Normally. Vibrator is ON then Temp. is increased. Now it is showing 113
Degree.
In CHP-94M Secondary Pair of NIS/NPM comes in fault. LED Indication-2,3,and 5. So Reset it. Now
Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Shut down Cleared-
1. Bucket elevator-1
2. BC-4 & BC-7A
3. Vibrating screen -1
4. Soot blower-1
5. Soot blower-2
6. Coal feeder 2A, 2A Discharge MOV, and its Panumatic plate valve.

At Lime Stone Street Light ON time increased from 6.00 PM to 6.20 PM.
Boiler -1 and 2 4th to 7 th Floor light to OFF.
ACW Area welding machine Plug Top wire connection tightness to done.
Unit No.-1 TG Base Load to removed.

Shift jobs carried


BFP 1,2, & 3 motor cleaning done with blower.
TG -2 , 4.5 mtrs all field instrument cleaning done.
Boiler 1 and 2, all Lights switch ON at 1:30 AM and OFF at 04:30 AM as per operation requirement.

All Energy meter manual reading taken for Power Report.


Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.

Shift jobs carried


In CHP-94M comes in fault. LED Indication-2,3,5 and 6. Internal error. So Reset it.
Unit-2 Bag house 12-22 Back pressure transmitter and switch cleaning done.
Unit-1 Bag House 11-21 transmitter cleaning done.
Crusher building screen floor equipment cleaning done.
ACW area de-watering pump earthing provided.
Vibrating screen 1 and 2 motor cleaning done.
Screen floor repair supply box power socket cap provided.

Coal Feeder 2B Flow hunting from 1.5 to 3.0 at set point of 2.0, so checked VFD end in Local mode
with 4.5 Hz. and found Below 4.5 Hz motor are stopped, then taken trial in remote mode, found
running healthy at 2.5 set point at DCS. Inform to operation run coal feeder above 2.5 set point.

Shift jobs carried


ACW Pump House E&I Equipment Cleaning & Blowering work
BLR-2 Vessel-22 Level showing H-H so calibration done now ok
BAC-1A Level malfuntioning so level probe cleaning now ok

All Energy meter manual reading taken for Power Report.


Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.
Chimney Analyser Room Panel Cleaning work

Shift jobs carried


In Unit No. # 2 Coal Feeder -2B O/L Temp. is showing 11 Degree at DCS end. So Checked at field
side Joint in the Cable. So removed the joint and RTD cable is directly connected to the DCS cable.
Now it is showing Normally.
In Unit No.-2 , Vessel No.-22 High level probe is not showing at DCS. So checked and found that
Soldering in Supply wire is loose condition. So Solderning to done. Now ok.
In ASH System Root Blower No.-1 is not started at DCS as well as Local. So Checked and Found
that in Local Stop Button is not showing NC Contact. One cable is in series with Limit switch
Contact also is in hanging condition. So removed this cable and directly connected to LPB wire.
Trial taken it is working normally.

In ASH System Root Blower No.-2 is not started at DCS as well as Local. So Checked and Found
that in Local Stop Button is not showing NC Contact. One cable is in series with Limit switch
Contact also Removed this contact cable.and directly connected to LPB wire. Trial taken it is
working normally.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
Following S/D to given.
1. BC-1,( 02 Times )
2. Unit No. # 2 Soot Blower.
3. BC-7A ,
4. Coal Crusher No.-1,
5. Coal Crusher No.-2,
6. BC-6,
7. BC-4,( 03 times )

In SWAS Room 10 Amps plug Top of extension Board to changed

Shift jobs carried


Compressor House LDB 63 Amp ELCB replace.
BC-4 belt area extension board connection given.
HSD area lighting manually ON and OFF as per operation requirement.
Silo 1&2 diverting valve trial taken from dcs as per operation requirement.
Boiler-2 Bag house 21 High Level checked as per operation requirement.

Following S/D Clear.


1. BC-1,( 02 Times )
2. Unit No. # 2 Soot Blower.
3. BC-7A ,
4. Coal Crusher No.-1,
5. Coal Crusher No.-2,
6. BC-6,
7. BC-4,( 03 times )

Shift jobs carried


WTP Pump House E&I Equipment Cleaning & Blowering work
BLR-1 Vessel-22 Dom valve leakage found arrested done
BAC-1A & 1B Instrument Panel Cleaning work

All Energy meter manual reading taken for Power Report.


Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.
TG-1 & TG-2 Generator Voltage Adjsutment done

Shift jobs carried

In CHP-94M Secondary Pair of NIS/NPM comes in fault. LED Indication-2,3,and 5. So Reset it.

Boiler -1, Bed Temperature 0TI1112 showing incorrect valve so , Thermocouple pair change with
spare one.

Boiler-1, bag house 12-22 seal pressure fault , line flushing done.

Boiler-2, soot blower trip on cabinet fault so reset it.

Following shut down given-


1. BC-1
2. BC-2
3. BC-4
4. BC-6
5. SOOT BLOWER-1
7. ROOTS BLOWER
8. Coal Feeder 1A
9. Coal Feeder 1A discharge gate.
Following shut down given-
1. BC-1
2. BC-2
3. BC-4
4. BC-6
5. SOOT BLOWER-1
7. ROOTS BLOWER
8. Coal Feeder 1A
9. Coal Feeder 1A discharge gate.

Shift jobs carried


Silo-2 Fork Switch & panel cleaning done and trial taken found running normal
Boiler-2 Bag House-21 High level switch, so cleaning done and trial running normal.
Unit-1 Soot Blower -13 & 14 Limit set as per operation requirement.
Following shut down Clear-
1. BC-1
2. BC-2
3. BC-4
4. BC-6
5. SOOT BLOWER-1
7. ROOTS BLOWER
8. Coal Feeder 1A
9. Coal Feeder 1A discharge gate.
Shift jobs carried
In Unit No.-2 Soot Blower No.-15 not roating at field end. So checked at field side found that Motor
is Ok. But gear Box is in jammed condition. So Informed to Shift incharge.
In Unit No.-1 soot Blower left side Drain MOV ( 01MV702) is jammed condition. So restoline is
provided at Valve side and manually operated 2 to 3 times. Now Ok.
Unit No.-1 Soot Blower -1 AVI is closed and S/D to provided.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Boiler No.-1 4 th to 7 th Floor Light OFF.
In Boiler No.-2 4 th to 7 th Floor Light OFF.
In Unit No. # 1 Soot Blower Panel Cleaning and Connection Tightness to done.
Root Blower -2 of ASH System tripped due to O/L .So Reset it. Again it is started tripped to O/L. So
Informed to Shift Incharge.

Shift jobs carried


Following shut down Given-
1. BC-5
2. BC-2
3. BC-4 (03 PTW)
4. 02MV0910
5. SOOT BLOWER-2
7. Fly ash Silo Dry Unloading system.
8. Coal Feeder 2B
9. Coal Feeder 2B air Isolation valve.
10. AVI rack in Coal feeder 2B and MOV.

11 Fly Ash Silo Pneumatic plate Valve


BC-4 tripped in PULL SWITCH 12 group acted, so checked and bypassed from DCS 93-3A address
TB1-1 and 2 ( loop)
Boiler-2 Bag house-21 vessel High and H-H probe removed & calibration done.and checked with
CCR found healthy
Sht Down Clear: Coal Feeder 2B, 02MV0910, Coal Feeder 2B air Isolation valve.
Shift jobs carried
Coal feeder 2B Pnumatic valve limit adjustment & trial taken not operate so check in DCS Panel
side found fuse blown so replace by new one now ok
Coal feeder 2B Outlet MOV limit adjustment & trial taken not operate so check in DCS Panel side
found TB Faulty so connection replace to another TB Now OK & AT Present Faulty TB( 25-3B-
TB3-5&6) Healthy TB( 25-3B-TB2-5&6) ( TB3 to TB2 Replacement)
Silo-2 Damaged air fitting tube replace by new one.
BC-4 12 Group Pull chrod found unhealthy so clean by cleanit & restolene now healthy.

Coal Feeder-2b Bunker Outlet MOV motor not operate megger value check found 0 (P-E)
FAS-1 Bulker Earthing Clamp found Damaged Condition & Repaired done
Following Equipment Shutdown Clear-
1/BC-2
2/BC-4
3/BC-5
4/ Soot Blower-2
5/FAS-2

Shift jobs carried


In Unit No.-1 Veseel -12/22 Back Pr. Switch and Transmitter Impluse line cleaned as per
operation requirement.
In Chimney analyzer Boiler No.-2 SOX Panel Cable dressing to done.
In Compressor House all the auto drain valve checked it is working Normally.
In Unit no.# 1 Firing Floor area all the JB/ Field Inst. Cleaning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
BFP 1,2, & 3 motor cleaning done with blower.
Fire Pump House Light ON as per fire person requirement.
In RNRP SPC004 Showing Both the nodes is in down condition.
Shift jobs carried
BC-5 not start from DCS so check in Feeder side found ON timer relay malfunctioning so clean &
reinsert now feeder healthy
BC-5 Belt not healthy due to Take Off Pully Guard limit act so check in field side found Guard limit
contact not change due to dust so clean & connect now BC-5 Belt healthy
AHF-3 Panel Fliter found trip condition (C01) Fault So check all fliter circuit pins & cleaning &
tightness done now AHF Panel healthy
Boiler-1 12-22 vessel seal pressure Line flushing done & taken in line
Boiler-1 1D bunker outlet MOV faulty Motor removing work
Coal feeder 1B Bunker outlet MOV Remove work
STG Building RSB -51 (9mtr. ) Green Tag Updated done
Power Report prepared & DG report Prepared upto 16/02/2022
Following Equipment Shutdown Given-
1/BC-2
2/BC-1
3/Screen-2
4/ BC-7A
5/Soot Blower-2

Shift jobs carried


Street Lighting timer & time from DCS adjust to 6.40 pm , as due to to early start of lights
Boile #2 ignitor floor cable dressing done of cable tray.
Boiler#2, RSV 32, Door lock found damage so its replace with spare .
Bed ash silo , plate valve air leakage arresting , and panel cleaning done.

Coal feeder bunker outlet MOV 1B, feeder replace to check MOV and again place previous feeder.

Boiler-2, bag house 12-22 H Level not showing, found actual level so probe cleaning done.
Following Equipment Shutdown Clear-
1/BC-2
2/BC-1
3/Screen-2
4/ BC-7A
5/Soot Blower-2

Shift jobs carried


Unit -2 LCV2301 & 3202 Feed Water control station Gland Leakage Arrest done
Unit-2 TCV 3203 Desuper heater Gland Leakage Arrest done
BC-7A & 7B Instrument Equipment Cleaning & Blwoering work U/P
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1220 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Battery Bank-2 (Unit-2) individual Cell voltage checking , Report Prepared & Mailed to Concern
Person
ACC-2 Spare Earthing Strips Found Hanging Condition so Proper Dressing done
WTP MCC Panel Outside Cleaing & Blowering work
Power Report Month End Report Balance upto 16/02/2022
Following Equipment Shutdown Given-
1/Reclamier
2/BC-1
3/BC-6
4/ BC-7A & bc-7B
5/Oil Purifier Unit-2

Shift jobs carried


Boiler #2, furnace RTD (02TI1125) connection tightness done due to its temprature varies .
Fly ash silo #2 , fork lavel switch cleaning and connection tightness done , now ok.
ACC-2 area light not on , found its mcb off position ,so its ON.
RO booster pump no. 1 ,2 &3 motor and panel cleaning done.
Reclaimer UPS supply ON done.
Boiler-1 Bag House-22 high level switch check , found its connector loose so reconnect it.
Fire engine ,Battery voltage, check 12.9 v & charger at ON condition.
Following Equipment Shutdown clear-
1/Reclamier
2/BC-1
3/BC-6
4/ BC-7A & bc-7B
5/Oil Purifier Unit-2

Shift jobs carried


CHP MCC outdoor panel cleaning and blowering done.

In CHP-94M Secondary Pair of NIS/NPM comes in fault. LED Indication-2,3,and 5. So Reset it.
dosing room 03 nos. panel cleaning and field level gauge cleaning done.
Silo-1 RAV tripped in overload, reset and trial run found 2.4 A balanced amp taken.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared
Environment and Plant performance report upload and mail to all.
U-1 Soot blower control tripped 02 times reset it, trial run found healthy.

Shift jobs carried


Battery Bank-1 (Unit-1) individual Cell voltage checking , Report Prepared & Mailed to Concern
Person

BAS Rav motor trip due to Overlaod reset done running normally take balance current 2.8 Amp.
Mech. Workshop RSB-98 Door Lock found Damaged Condition Replaced by new one
boiler- 1&2 Draft Point Purging done
Boiler-1 01DPIC1101 Line found chocked so cleaning done & taken in line
Unit-1 Boiler Bed Thermocouple TI1112 temprature found flucuation so another spare core taken
in line now temprature healthy.
Battery Charger Room Battery Bank 1&2 Cleaning & Blowering work
DG report Prepared on 17/02/2022 & 18/02/2022
Following Equipment Shutdown Given-
1/Reclamier
2/Crusher-1
3/ BC-7A
4/Soot Blower-2

Shift jobs carried


BC-4, get stopped due to Pull switch acted, all switches are healthy found PC controller connector
is loose tighten the same.

Fly ash silo fork level switch acted , found dust accumulated on switch clean the same.

ACC-2 , single phase pump connection done.

Boiler -2 RSB no 30, check and green tag provided.

WTP DCS room panel cleaning done.

Following Shut down clear.


1. BC-4
2. Soot Blower 1
3. BAC 1B pneumatic isolation

Shift jobs carried


U#2, soot blower no 13 show not healthy at ccr , then check and found its contactor hold and out
going voltage at 415 volt, motor winding resistance at 72.6 ohm balance in all phase, then
contactor cleaning done.At motor side check found its motor running ok but its gear box found not
move. so inform to ccr and panel healthy done.
U#1, 12/22 seal air pressure check, found its pressure at 3.0 kg pr. In 12 no.
U#1, 12/22 seal air pressure check, and flushing done.
U#2, boiler 3rd floor to 7th floor light ON on requirement of ccr.
All Energy meter manual reading taken for Power Report.
Power Report prepared & send.
Environment and Plant performance report upload and mail to all.
CEP 2A & 2B motor cleaning and blowering done.
U#1, 12-22 vessel seal pressure Line flushing done & taken in line.
Shift jobs carried
Fly ash silo-2 Fork level switch act , so cleaning and connection tightness done, trial taken found
healthy.
WTP hole area field instrument cleaning done.
Compressor House all auto drain valve checked, found healthy.
Fire Pump House Battery is in charging condition and Voltage= 12.9 Volts.
Fire pump house area lighting JB earthing re-connection done.
ACW pump house motor cleaning done.

Shift jobs carried


Rubber mat laying done at PA Fan Unit 1 & 2 motor terminal.
Rubber mat laying done at CHP ground floor air blower, as frequently manual intervention of that.

Motor cleaning and blowering done of BC 7A & 7B and its power JB also.

CHP Module no. 94 INIS/NPM get faulty at 4.50 pm ,room temprature found at 28C and AC in fan
mode then its put in AC mode and setting at 26C, module reset and do healthy ( error 2 3 5).

Crusher building bucket elevator floor all instrumemnt equipment cleaning done.
Compressure house all auto drain valve manual check done.

IFC filter draining done.


Shift jobs carried
SA-2 Motor & Power JB Cleaning & Blowering done
Air Blower not working so check & problem rectified now ok
WTP MCC Panel Outside Cleaing & Blowering work
Boiler-1 &2 Bag House Instrument JB cleaning
All Energy meter manual reading taken for Power Report.
Power Report prepared & send.
Environment and Plant performance report upload and mail to all.
Bolier-1 &2 APH Instrument JB Cleaning
Power Report prepared & DG report Prepared
Shift jobs carried
Car parking area extension board connection given.
China yard temporary connection given.
Bed ash silo , RAV tripped in overload reset and amp checked found 3.0 amp taken.
Boiler-2 J valve 2A,2B, ID fan-2, PA fan-2, SA fan-2 Motor cleaning and blowering done.
Boiler-1 bag house 12-22 seal pressure fault, Line cleaning and now running normal.
Boiler-2 bag house 12-22 level H and H-H checked and confirm to CCR.
Feed water control valve gland leakage, so gland tight and leakage arrest done.
Boiler-1 thermocouple 1121 mv checked and found healthy.
Following Equipment Shutdown Given-
1/BC-1
2/Coal Crusher-1
3/ BC-7A
4/Soot Blower-21
5/BC-2
AVI rack in and rack out BC-7A.

Shift jobs carried


In Unit No.-# 2 Vessel No.-12 Level High checked as per operation requirement. Material inside
the vessel. So Informed to Shift operator.
BC- 7A / 7B area all the Coal Bunker Level Transmitter Cleaned.
In Service air receiver Tank No.-2 Alarm is showing in auto drain valve. So Cleaned the Filter.
Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment Shutdown Cleared-
1/BC-1
2/Coal Crusher-1
3/ BC-7A
4/Soot Blower-2
5/BC-2

In Soot Blower No.-1 and 2 G fault is showing at Panel Side. So Reset it. Now Ok.
In ACC Unit No.-2 Trolley Number -4 Motor Double earthing to done.
In ACC Unit No.-2 Trolley Number -4 cable Dressing to done.
Fly ash silo Light ON as per operation requirement.

Shift jobs carried


SA-1 Motor & Power JB Cleaning & Blowering done
PA-1 & J Valve 1A &1B Motor Cleaning & Blowering work
RSB-1 Boiler-1 0 mtr. All ELCB Testing work found working
Boiler-1 Bag House Instrument JB cleaning
All Energy meter manual reading taken for Power Report.
Power Report prepared & send.
Environment and Plant performance report upload and mail to all.
BLR# 1 22 NO Vessel Air Tube Dressing work
DG report Prepared & upload in SAP
Shift jobs carried
Fly ash silo-2 RAV tripped in overload reset and trial taken found healthy.
4.5 mtr. AC and vent MCC panel Door lock replaced.
Reclaimer temporary connection TOP provided.
Bh-2 (12-22) Gauge removed, Air tube removed (both end) as per PTW.
U-1 bag house 12-22 seal pressure fault act, Line flushing done.
U-2 thermocouple 02TI1116 field JB connection tightness done.
CHP-94 NIS/NPM card checked and found healthy.
CHP DCS panel 91 and 94 Blowering & cleaning done
For NOX Factor changed in DCS from 0.53 to 0.38 . In Chimney analyzer changed from 1.2 to 0.8
Following Equipment Shutdown Given-
1. BC-1 (03 times)
2. Coal Crusher-1
3. Soot Blower-1
4. Soot Blower-2
5. BC-6
6. Reclaimer
7. Coal feeder 2A
8. 02MV0909
9. COAL FEEDER-2A DISCHARGE PANUMATIC PLATE VALVE. (key-TP-512)
10. BH-2 -12-22 INSTRUMENT AIR VALVE (key-63)
11. Unit-1 Oil Purifier

Shift jobs carried


Compressor house WTI abnormality attended and closed-
1. Protection cover provided for single phase supply board.
2. Domestic Lightning switch by pass as paste "Not in Use" sticker.

ACC-2 Fins cleaning trolley supply switch OFF from common supply MCB.
Bed ash silo RAV get trip due to material jam so reset it.

Soot Blower-1, get trip due to G fault so check and reset it power.

Coal Feeder 2A, pneumatic valve not operated from CCR, open it manually and start the circuit, to
be check in further.

Fly ash silo 1 & 2 and bed ash silo panel cleaning done.

Following Equipment Shutdown Given-


1. BC-1 (03 times)
2. Coal Crusher-1
3. Soot Blower-1
4. Soot Blower-2
5. BC-6
6. Reclaimer
7. Coal feeder 2A
8. 02MV0909
9. COAL FEEDER-2A DISCHARGE PANUMATIC PLATE VALVE. (key-TP-512)
10. BH-2 -12-22 INSTRUMENT AIR VALVE (key-63)
11. Unit-1 Oil Purifier

Shift jobs carried


In CHP Module No.-94M Secondary Pair of NIS/NPM showing Fault. LED No.-2 , 3 and 5. So Reset
it. Now Ok.
In Unit No. -1 Soot Blower No.-13 Limit switch set. Trial taken it is working normally.
In Unit No.-2 Coal Feeder -2A Pneumatics Valve Coil is picked up condition. Also open Command
from DCS end. We can not open and Close the pneumatics valve Because feeder is in running
condition.
In WTP all the DCS panel Cleaning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Chimney avaitation RED light is not On. So checked and found that Lighting timer is structed
condition. So Reset it. Now Ok.
In RNRP SPC004 Showing Both the nodes is in down condition.
Boiler No.- 1 and 2, 4 th to 7th floor Light to OFF Condition.
BFP 1,2, & 3 motor cleaning done with blower.

Shift jobs carried


Bed ash silo RAV tripped in overload reset and trial taken found healthy.
Soot Blower-1, get trip due to G fault so check and reset it power.
AOP 2A,2B motor cleaning and blowering done.
Bag House-2 LDB earthing cable dressing done.
Parking area temp connection done.
U-2 De-super heater TCV3201 & TCV3203 gland leakage attend.
U-2 soot blower 13, and 15 limit set.
Following Equipment Shutdown Given-
1. Reclaimer (02 times)
2. Coal Crusher-1 (02 times)
3. CT fan 2
4. BC-1
5. BC-4
6. CT fan -1
Following Equipment AVI Given-
1. CT Fan-2
Following Equipment AVI Close-
1. CT Fan-2
Following Equipment Shutdown Clear-
1. CT Fan-2

U-1 soot blower-13 & 14 limit set


U-2 bed thermocouple 1116 temp fluctuation correction done.
Shift jobs carried

Fly Ash Silo-2, chute level continue full indication, so fork switch cleaned.

Coal Bunker-1C , not showing incorrect level so level probe cleaning done and power reset.

Soot Blower -1, get trip on cabinet fault so power reset.

2 Nos 24Volt LED and 24 Volt Extension board given at ACC-2 area for fins cleaning work.

Feed water control valve cleaning done.

Following shut down given-


ACC FAN-2F
ACC-2 FINS CLEANING
Following Equipment Shutdown Clear-
1. Reclaimer (02 times)
2. Coal Crusher-1 (02 times)
3. CT fan 2
4. BC-1
5. BC-4
6. CT fan -1
Following Equipment Shutdown Clear-
1. Reclaimer (02 times)
2. Coal Crusher-1 (02 times)
3. CT fan 2
4. BC-1
5. BC-4
6. CT fan -1

Shift jobs carried


In Unit No.-2 APH Seal pr. Line PU tube dressing to done.
In Compressor House all the auto drain valve checked it is working Normally.
At VAM Floor area all the JB cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
In Chimney avaitation RED light is not On. So checked and found that dial actual time is not
correct. It is showing 6.00 PM. So corrected it. Now it is working normally. ( ON Time- 6.30 PM and
OFF time- 6.00 AM setting in Timer )
In RNRP SPC004 Showing Both the nodes is in down condition.
Due to Fins Cleaning by third Party person , Unit No. # 2 ACC Fan Motor - 2F , Lub Oil motor ,
Power JB Polythene Coverning to done.

Shift jobs carried

ACC Fan 2F breaker not ON from Local, so open breaker and check physically found mechanism is
ok but its cover stuck with mechanism, then re fit and ON the breaker.

Boiler - 1, Soot Blower -1, 2 & 3 not returning , found reverse control fuse "A2" gets blown so
check and replace the fuse, now all are reversing .

Boiler - 1, Soot Blower -15 , motor no stop check and found its limit switch get heated, work under
progress.

Boiler-2, CO not showing correct value ,sample line flushing done.

Boiler-1, BH 12-22, seal pressure fault, line flushing done

Following Shut down clear-


1. ACC Fan -2F
2. ACC-2 Fins cleaning Trolley
Following shut down given-
1. BC-1
2. BC-4
3. CT-3
4. Coal Crusher-1
5. LDB
7. SOOT BLOWER-1
8. BH-1 12-22
Following shut down given-
1. BC-1
2. BC-4
3. CT-3
4. Coal Crusher-1
5. LDB
7. SOOT BLOWER-1
8. BH-1 12-22

Shift jobs carried


ACC-2 1 Phase Cehmical dosing pump Double Earthing done
Aviation light & ACC-2 Lighting timer found stuckup condition reset done & taken in line
Soot blower-1 15 nos Damaged limit replaced by new one connection done trial work u/p with
Operation team

1 Nos 24Volt Transformenr given to Coal Feeder 2B

Coal feeder-2B trip due to F0012 ( Motor stall ) fault so check & inform to Operation team

Bag House -1 12-22 Dome valve limit assemble & Pressure gauge mounted shutdown clear trial
taken found ok
Following shut down given-
Coal Feeder 2B
Following shut downClear-
1. BC-1
2. BC-4
3. CT-3
4. Coal Crusher-1
5. LDB
7. SOOT BLOWER-1
8. BH-1 12-22
9. Coal Feeder-2B

Shift jobs carried

U#1, soot blower system show faulty , so check panel and reset .
Electrical Report is generated.
EMS Report is generated in auto mode also sent to the all the person.
U#1, soot blower no 15 limit setting done and trail taken.
In CHP Module No.-94M Secondary Pair of NIS/NPM showing Fault. LED No.-2 , 3 and 5. So Reset
it. Now Ok.
Due to Fins Cleaning by third Party person , Unit No. # 2 ACC Fan Motor - 2D , Lub Oil motor ,
Power JB Polythene Coverning to done.

Shift jobs carried


BFP-2 VFD Drives Cahngeover DOL to VFD as per requirement of Operation dept.
ACC-2D Motor & Power JB Ploythene Remove after Fins cleaning work
Coal Feeder 2B area W/M not working so check & found Plug Top connection single phasing now
tightness all connection W/M Healthy
Unit-1 12-22 Seal Pressure line flushing done
Reclamier Left Right Boom VFD Trip due to overcueent reset done now ok
Coal feeder 2B Outlet MOV Connector Removal for Mech. Maint. Requirement
Boiler-1 CO Reading checking work reading show 0 checked & found drain tube damaged
condition so tube repair & pump taken in line now reading under observation
Following Equipment Shutdown Given-
1. Reclaimer (02 times)
2. Coal Crusher-1
3.BC-3
4. BC-2
5. BC-4
6. BC-5
7. BFP-3( 2times)
8. BFP -3 Main & Bypass MOV
9. Soot Blower-1
10.Coal Feeder -2 Outlet MOV

DG report Prepared & upload in SAP


Power Report Balanced upto 24/02/2022
Shift jobs carried
In CHP Module No.-94M Secondary Pair of NIS/NPM showing Fault. LED No.-2 , 3 and 5. So Reset
it. Now Ok.
In Unit No.-1 Soot Blower No.-14 Limit Switch to Set. Trial taken it is working Normally.
In Unit No.-1 Soot Blower No.-15 Limit Switch to Set. Trial taken it is working Normally.
Coal Feeder -2B O/L MOV Open and Close limit to set. During the Trial time When giving the Close
Command. Then Torque is operated. So Reset it locally. Due to urgency Open it by manually. Open
limit is showing at DCS and Feeder is started. Then Increased the open and Torque Limit setting in
MOV. trial is pending condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.

P & V. No. # 2 and 4 is in OFF condition.


All the Manual Light to ON Condition.
Following Equipment Shutdown Given-
1. Reclaimer (02 times)
2. Coal Crusher-1
3.BC-3
4. BC-2
5. BC-4 ( 02 Times )
6. BC-5
7. BFP-3
8. Soot Blower-1
9.Coal Feeder -2 Outlet MOV
Following Equipment Shutdown Given-
1. Reclaimer (02 times)
2. Coal Crusher-1
3.BC-3
4. BC-2
5. BC-4 ( 02 Times )
6. BC-5
7. BFP-3
8. Soot Blower-1
9.Coal Feeder -2 Outlet MOV

In Soot Blower No.-1 cabinet Power MCB is tripped. So Reset it. Now Ok.
In reclaimer UPS Supply is ON.
In Fire Pump House battery is in charged condition. Battery Voltage = 12.8 Volts.
BFP-3 is in VFD mode and Permit closed also Breaker is not charged condition.

Shift jobs carried


In CHP Module No.-94M Secondary Pair of NIS/NPM showing Fault. LED No.-2 , 3 and 5. So Reset
it. Now Ok.

U# 2 Feed water station & De-super heating station MOV and control valve cleaning done.
TG Floor Exhaust fan panel cleaning and blowering done.
Dosing room motor cleaning done.
ACC-2E motor & JB covering done for ACC Cleaning work.
Power Report prepared & send.
Environment and Plant performance report upload and mail to all.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared
Following Equipment Shutdown Given-
1. ACC 2E
Instrument air Comp-1 load not taken report from CCR, Checked but not found any fault on HMI,
trial found healthy
U#2 bag house-21 vessel level H-H showing, probe cleaning and trial found healthy.
Shift jobs carried
BC-4 take up Pully new Guard limit switch Installation work
12MV3206 BFP-3 Bypass Line MOV Open Limit is not showing in CCR so limit adjustment done
now ok
Coal Feeder 2B area W/M not working so check & found Plug Top connection single phasing now
tightness all connection W/M Healthy
Unit-1 12-22 Seal Pressure line flushing done
Reclamier Left Right Boom VFD Trip due to overcueent reset done now ok
FAS-2 given to shutdown air valve closed
WTP MCC Panel Outside Cleaing & Blowering work
Following Equipment Shutdown Given-
1. Reclaimer
2. Coal Crusher-2
3.BC-6
4. Boiler-1 & 2 IBD Drainage pump
5. BC-4
6. BC-1
7. ACC-2 Fins cleaning
8. FAS-2 Pneumatic Air isolation
9. Soot Blower-2

DG report Prepared & upload in SAP


Power Report Balanced upto 24/02/2022
Shift jobs carried

In CHP Module No.-94M Secondary Pair of NIS/NPM showing Fault. LED No.-2 , 3 and 5. So
Changed the NIS/NPM Card from LHS-86M. This card taken in line in CHP also This Pair is in
running condition in Both the location CHP as well as LHS area. This card is under observation.
In BC-5 Belt Take OFF Pulley is showing at DCS end. So Reset at field side. Now Ok.
In Compressor House all the auto drain valve checked it is working Normally.
In Unit No.-2 Vessel No.-11/21 and 12/22 Fly ash system JB Cleaning and Blowerning to done.

Coal Bunker-2D , not showing correct level so level probe cleaning done and reset. Now Ok.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is in OFF condition.
All the Manual Light to ON Condition.
Following Equipment Shutdown Cleared.-
1. Reclaimer
2. Coal Crusher-2
3.BC-6
4. Boiler-1 & 2 IBD Drainage pump
5. BC-4
6. BC-1
7.FAS-2 Pneumatic Air isolation
8. Soot Blower No.-2
In CHP MCC Temp. is high So Exhust fan is started and off at 7.00pm
BFP-2 Drives Cahngeover VFD to DOL as per requirement of Operation dept.
U#1, soot blower no 15 & 16 check in remote mode its work ok.

Shift jobs carried

Following shutdown given-


1. ACC Fan 2C
2. ACC Fins cleaning trolley

ACC Fan 2C Motor cover with polythene for fins cleaning work

One Lightning connection done at ACC -2 area

WTP all Instruments cleaning and bowering done.

All Energy meter manual reading taken for Power Report.

Power Report & DG report Prepared,


Month End Report balanced.

Environment and Plant performance report upload and mail to all.

Shift jobs carried


Unit No.-2 Lift Telephone Cable dressing to done.
CCR Lift IR senor adjusted it is showing continuously.
Fly as silo No.-1 and 2 Inst. Panel and field Inst. Cleaning and blowerning to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
Following S/D to Cleared.
1. ACC Fan-2C,
2. Unit No. # 2 Fins Cleaning Motor ,

In Unit No. # 2 ACC Fan -2C Polythene Coverning removed as per Operation person requirement.

In Bed ash silo RAV reset as per operation person requirement.


Mech. Welding machine at Unit No. # 1 near ID fan Repair supply box not working condition.
Found that 3 phase supply is not Ok. Checked and found that incomer feeder MPBD-5304 -D Fuse
break. So Replaced the fuse. Now Ok.
In Unit No.-2 ACC area Light ON as per Shift Incharge requirement.
Shift jobs carried

Bed ash silo RAV not work so check and found O/L relay operated so winding resistance at 7.8
ohm and no continuty with earth, relay reset. It start with 4.0 amp balance(Relay setting at 4.5
amp.) in all phase. Its motor observed some abnormal sound from bearing so reqiure overhouling.
ACC2 , area lighting timer found in bypass mode ,so its taken in by service.
Unit#2, coal feeder area ,toatl 08 no of motor cleaning done.
Bunkar floor ,22 mtr, lights off done as , unnecessary glow.
Unit#1, soot blower panel reset done.
Crusher house building ,screen floor, instrument equipment cleaning and blowering done.
Unit#2, 11/21 seal pr. Line flushing done.
Compressure auto drain valve manual check, and IFC filter drain done.

Shift jobs carried

Following shutdown given-


1. ACC Fan 2A
2. Lube Oil 2A

ACC Fan 2A Motor cover with polythene for fins cleaning work

One Lightning connection done at ACC -A area


TG-1 Ground floor all MOV & Control valve cleaning work
DG report Prepared & upload in SAP
SAC-2 Showing alarm so check & found filter corroded so clean & alar reset now ok
All Energy meter manual reading taken for Power Report.
Power Report & DG report Prepared,
Month End Report balanced.
Environment and Plant performance report upload and mail to all.
Shift jobs carried
In Unit No.-2 ACC Fan - 2A motor having abnormal sound. So checked and found that Motor NDE
side Bearing sound. Also Greasing done. Also checked and found that Sound still Present. So
Informed to H.sharma.

In BC-5 repair supply Box is not On. So ON the supply at T-2 Tower near BC-5 Motor.Then Ok.

In WTP magnetic stireer is not working condition. Found that it is in jammed condition. So cleared
the jammed. Now Ok.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 2 and 4 is in OFF condition.
In Unit No. # 1 Vessel No.-12/22 Seal Pr. Is not showing at DCS end. So cleaned the impluse line.
Now Ok.
In Unit No. # 2 ACC Fan -2A Polythene Coverning removed as per Operation person requirement.

In Unit No.-2 ACC Fan - 2A and Lub. Oil motor S/D to cleared.
Following Equipment Shutdown Given.-
1. BC-1,
2. BC-4,
3.AHP panel -3
4. Bed ash silo

Coal Feeder -2B permit to cancled after completion of work.

Shift jobs carried

Following Equipment Shutdown Clear.-


1. BC-1,
2. BC-4,
3.AHP panel -3
4. Bed ash silo

U-2 Bag house 11 level High showing checked and found its healthy condition.
Bunker floor C7 A and B level transmitter cleaning done.
U-2 Bag House 12-22 pressure switch connection tightness done.
CHP AHF Panel Y and B phase Card interchange, and trial taken found healthy.
Bed Ash Silo RAV Motor Canopy fixing done and control power ON.
U-1 Soot Blower G fault reset.
ACW area motor cleaning done.
Watch tower lighting tower timer stuck up cleaning and trial run found healthy.
Shift jobs carried
Following shutdown given-
1. ACC Fan 2B

ACC Fan 2B Motor cover with polythene for fins cleaning work

One Lightning connection done at ACC -2B area


HP Dosing room motors & Panels cleaning & Blowering work
TG-2 Ground floor all mov Cleaning work & 02MV3203 , O2MV3205 & 02MV 3303 )oil leakage
cleaning work
WTP Lab Bomb Calorimeter air cylinder pu tube leakage observed so tube cut & connect now ok
All Energy meter manual reading taken for Power Report.
Power Report & DG report Prepared,
Month End Report balanced.
Environment and Plant performance report upload and mail to all.
1738.5
Date Shift Engineer Name

01.04.2022 A Tarun Gaur

Date Shift Engineer Name

Sanjay Garg / Amit


01.04.2022 B
Kumar
Sanjay Garg / Amit
01.04.2022 B
Kumar

Date Shift Engineer Name

01.04.2022 C Ashvin Jadav

Date Shift Engineer Name

02.04.2022 A Sanjay garg


02.04.2022 A Sanjay garg

Date Shift Engineer Name

02.04.2022 B Amit Kumar

Date Shift Engineer Name

02.04.2022 C Ashvin Jadav

Date Shift Engineer Name


03.04.2022 A Sanjay garg

Date Shift Engineer Name

03.04.2022 C Tarun Gaur

Date Shift Engineer Name

Ashvin Jadav/Deepak
04.04.2022 C
Chand
Chand

Date Shift Engineer Name

04.04.2022 C Tarun Gaur

Date Shift Engineer Name

05.04.2022 A Ashvin Jadav

Date Shift Engineer Name


05.04.2022 B Amit Kumar Singh

Date Shift Engineer Name

05.04.2022 C Sanjay Garg

Date Shift Engineer Name

06.04.2022 A Ashvin Jadav


06.04.2022 A Ashvin Jadav

Date Shift Engineer Name

06.04.2022 B Tarun Gaur

Date Shift Engineer Name

06.04.2022 C Sanjay Garg


Date Shift Engineer Name

07.04.2022 A Amit kumar singh

Date Shift Engineer Name

07.04.2022 B Tarun Gaur


07.04.2022 B Tarun Gaur

Date Shift Engineer Name

07.04.2022 C Ashvin Jadav

Date Shift Engineer Name

08.04.2022 A Sanjay garg


Date Shift Engineer Name

08.04.2022 B Amit kumar singh

Date Shift Engineer Name

08.04.2022 C Ashvin Jadav

Date Shift Engineer Name


09.04.2022 A Sanjay garg / Tarun Guar

Date Shift Engineer Name


08.04.2022 B Amit kumar singh

Date Shift Engineer Name

09.04.2022 C Deepak Chand

Date Shift Engineer Name

10.04.2022 A Tarun Gaur


Date Shift Engineer Name

10.04.2022 B Amit kumar singh

Date Shift Engineer Name

10.04.2022 C Deepak Chand

Date Shift Engineer Name


11.04.2022 A Amit kumar singh

Date Shift Engineer Name

11.04.2022 B Sanjay Garg / Ashwin


Jadhav
Date Shift Engineer Name

11.04.2022 C Tarun Gaur

Date Shift Engineer Name

12.04.2022 A Ashvin Jadav

Date Shift Engineer Name

12.04.2022 B Amit kumar singh


12.04.2022 B Amit kumar singh

Date Shift Engineer Name

13.04.2022 A Ashvin Jadav

Date Shift Engineer Name


13.04.2022 B Tarun Gaur

Date Shift Engineer Name

13.04.2022 C Sanjay Garg

Date Shift Engineer Name


14.04.2022 A Tarun Gaur

Date Shift Engineer Name

14.04.2022 B Deepak Chand

Date Shift Engineer Name


15.04.2022 A Tarun Gaur

Date Shift Engineer Name

15.04.2022 B Sanjay Garg


15.04.2022 B Sanjay Garg

Date Shift Engineer Name

15.04.2022 C Ashvin Jadav

Date Shift Engineer Name

16.04.2022 A Tarun Gaur


16.04.2022 A Tarun Gaur

Date Shift Engineer Name

16.04.2022 B Sanjay Garg

Date Shift Engineer Name

17.04.2022 C Deepak Chand


17.04.2022 C Deepak Chand

Date Shift Engineer Name

17.04.2022 A Sanjay garg

Date Shift Engineer Name

17.04.2022 C Tarun Gaur


17.04.2022 C Tarun Gaur

Date Shift Engineer Name

18.04.2022 A Sanjay garg

Date Shift Engineer Name

18.04.2022 B Gajendra Pandya

Date Shift Engineer Name


18.04.2022 C Tarun Gaur

Date Shift Engineer Name

19.04.2022 A Gajendra Pandya

Date Shift Engineer Name


19.04.2022 B Deepak Chand

Date Shift Engineer Name

19.04.2022 C Sanjay Garg

Date Shift Engineer Name

20.03.2022 A Deepak Chand


20.03.2022 A Deepak Chand

Date Shift Engineer Name

20.04.2022 B Tarun Gaur

Date Shift Engineer Name

20.04.2022 C Sanjay Garg


Date Shift Engineer Name

20.04.2022 B Deepak Chand

Date Shift Engineer Name

22.04.2022 B Tarun Gaur


22.04.2022 B Tarun Gaur

Date Shift Engineer Name

22.04.2022 C Deepak Chand

Date Shift Engineer Name

23.03.2022 A Tarun Gaur

Date Shift Engineer Name


23.04.2022 B Sanjay Garg

Date Shift Engineer Name

23.04.2022 C Deepak Chand

Date Shift Engineer Name

24.04.2022 A Ashvin Jadav


24.04.2022 A Ashvin Jadav

Date Shift Engineer Name

24.04.2022 C Tarun Gaur

Date Shift Engineer Name

25.04.2022 A Sanjay garg


25.04.2022 A Sanjay garg

Date Shift Engineer Name

25.04.2022 B Ashvin Jadav

Date Shift Engineer Name


26.04.2022 A Ashvin Jadav

Date Shift Engineer Name

26.04.2022 B Deepak Chand


Date Shift Engineer Name

26.04.2022 C Sanjay Garg

Date Shift Engineer Name

27.04.2022 A Ashvin Jadav

Date Shift Engineer Name


27.04.2022 B Tarun Gaur

Date Shift Engineer Name

27.04.2022 C Sanjay Garg

Date Shift Engineer Name


28.04.2022 A Tarun Gaur

Date Shift Engineer Name

28.04.2022 C Amit kumar singh

Date Shift Engineer Name


29.04.2022 A Tarun Gaur

Date Shift Engineer Name

29.04.2022 B Sanjay Garg / Amit


kumar
29.04.2022 B Sanjay Garg / Amit
kumar

Date Shift Engineer Name

29.04.2022 C Ashvin Jadav

Date Shift Engineer Name

30.04.2022 A Tarun Gaur


30.04.2022 A Tarun Gaur

Date Shift Engineer Name

Sanjay Garg / Amit


30.04.2022 B
kumar
Sanjay Garg / Amit
30.04.2022 B
kumar

Date Shift Engineer Name

30.04.2022 C Deepak Chand


Regular jobs

Shift round taken found drives running normal

P&V-4 Water Pump start at 11.00 am

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004

UPS log digital log book filled.

Shift instrument digital log book filled

VAM log digital log book filled.

Following check list prepared


b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

UPS log digital log book filled.


Shift instrument digital log book filled

VAM log digital log book filled.


Following check list prepared

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

UPS log digital log book filled.

Shift instrument digital log book filled

VAM log digital log book filled.


Following check list prepared
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

UPS log digital log book filled.


Shift instrument digital log book filled

VAM log digital log book filled.

Following check list prepared

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004

UPS log digital log book filled.


Shift instrument digital log book filled
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004

UPS log digital log book filled.


Shift instrument digital log book filled
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal


Following Check List Filled
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Office AC ON
Line-1 SF6 Breaker SF6 Gas Pressure Alarm Display at
Announciator to be Under Observation
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC007 .
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually
check and drain.
All unwanted lights switch OFF manually during shift
round .
P&V 2 OFF at 08:00 PM.

VAM parameters checked found Normal


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain.

Office AC OFF
P&V 2 OFF at 08:00 PM.

VAM parameters checked found Normal


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007


Compressor house all auto drain valve manually
check and drain.
All unwanted lights switch OFF manually during shift
round .

P&V 2 OFF at 08:00 PM.

VAM parameters checked found Normal

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain.

Office AC OFF

P&V 2 OFF at 08:00 PM.


STG Building lights ON
RNRP all nodes found Normal, except SPC007
VAM parameters checked found Normal
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
Office AC ON
STG Building lights OFF
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain.

All unwanted lights switch OFF manually during shift


round .

VAM parameters checked found Normal

Engineer Room and SH Room AC switch OFF


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found all drives running normal.

RNRP all nodes found Normal, except SPC007

Compressor house all auto drain valve manually


check and drain.
All unwanted lights switch OFF manually during shift
round .

VAM parameters checked found Normal

Engineer Room and SH Room AC switch OFF


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

P&V 2 ON Condition water valve closed due to water


overflow please Open valve if reqd in B &C Shift

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal except SPC007 .

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist

P&V 2 ON Condition water valve closed due to water


overflow please Open valve if reqd in B &C Shift

TPP Area unwanted Lights OFF


Following Shutdown clear
1/ AHF-3

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal


Engg office and SH Room AC power switch ON.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist

P&V 2 ON Condition

TPP Area unwanted Lights OFF

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift jobs carried

Following Equipment S/D given-


1/ BC-1
2/BC-2
3/ Reclamier
4/ BAC-2B

Following Equipment AVI given-


1/ Bed Ash Cooler 2B

Fire Pump House Battery Charger Double Earthing done

WTP Water tank Pressure Gauge ferrul water leakage observed so M Seal Pasting for
arrest

Coal Buker -2D level showing violet so clean level probe in field now level healthy in
DCS

Fire Pump House Battery charger put on charging maode by timer bypass now timer
taken in to be line around 4.30 pm ( B Shift) & check Battery Green status

p&v-4 Water pump OFF at 6.30 pm & Agin ON at 11.30 am

Bucket elevator-1 put in local and DOL mode as per Maint requirement.

Zishu Hozen at Fire Pump House Area

Shift jobs carried

In BAC-2B Water Vlave open By Mech. Person. Then in Open Condition. Actuator is
mounted at site. Mech. Valve is in jammed Condition. So informed to shift incharge.
In VAM , DM water Tank is checked. It is full condition.
In Crusher No.-2 Tripped due to High Vibration ( 02 Times ). So Line -1 is Started.
BAC-2B Inst. Side Permit is closed and Inst. Air line is in Charged condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.

P & V. No. # 2 and 4 is in running condition. Also P .& V. No.-2 is OFF at 6.30 PM.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared-
1/ BC-1
2/BC-2
3/ Reclamier
4/ BAC-2B Inst. Side.
5. Jocky Pump No.-1

Fire Pump House Battery charger timer taken in line also Battery showing Green
status

Bucket elevator-1 put in Remote and VFD mode as per Operation requirement.
Vibrating Screen Floor area LED Light to Provided.
Switchyard ON lighting timer Increrased from 6.30 to 7 PM.
ID Fan -1 I/L Pr. Transmitter showing Violet . May be Line chocked condition.
TPP Middle gate Cement Plant welding machine connection removed.
Shift jobs carried
Boiler-2 Vessel -21 level High showing, cleaning and checked found healthy.

Boiler-1 vessel-12-22 level high showing, so cleaning and checked found healthy.
Dosing room equipment cleaning done.
Coal feeder-Unit-1 area 24V socket double earthing done.
Coal feeder unit 1 all 08 motors cleaning done.
DT-2 temp 76 deg C, DT -5 temp 86 Deg C. DT-6 temp 82 Deg C.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
MPHB 22 Mtr Bunker light OFF.
Shift jobs carried

Unit No. # 1 ID Fan Inlet Pr. ( 01TI0907 ) is showing Violet at DCS end. So Checked and
field side Impluse line is in chocked condition So cleaned it also Isolation valve is
removed and direct connection to done. Now Transmitter is showing correct Reading.

In SAC No. # 2 Cooling Water I/L Valve air isolation valve is opened as per Operation
requirement.
Unit No. # 1 and 2 Coal feeder area field Inst. / JB /Motor /MOV / Control Valve
Cleaning to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is already is in running condition.
Following Equipment S/D Given-
1/ BC-1
2/ BC-2,
3/ Reclamier
4/ Fly ash dry Unloading System ,
5. Coal Crusher No.-2,

In CHP Building Crusher Floor 10 Amps Plug Top to Provided.


Reclaimer CRD Cable is Ok Condition.
Fire Engine Battery is charging Condition. ( Voltage - 14.8 Volts DC )
Shift jobs carried
Following Equipment S/D Cleared-
1/ BC-1
2/BC-2
ACC U#1 & 2 , motor DE/NDE bearing tempreture taken found between 36 to 46 C.
DT transformer winding tempreture check.
Bucket elevator-1 selection not change over ,check at panel found its contactor aux
block not hold properly so its refix properly.
Vibrating floor light not on due to top damage so change it.
One camera change of TPP mid gate.

At 5.05 pm DCS show module of boiler-1 module no. 11M (NIS) and common sys. 73M
(NPM)get faulty then its done healthy in presence of Tarun, Pramod sir and Rakes sir.
VAM light timer reset due to stuck.
Turbine #2, one pr. Guage change due to faulty.
One auto drain supply remove of dryer at workshop MVVFD.

Shift jobs carried


Switchyard single phase power socket green tag provided.
Boiler area unwanted light OFF.
ACC work one temporary light provided, and received after work completed.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
Bed Ash cooler 2A tripped in overload reset it.
Unit-2 APH air leakage from PU tube, Connection tightness done.
Unit-2 vessel 12-22 air leakage from SS fittings, connection tightness done.
4.5 mtr AHU change over manual to AUTO.
Shift jobs carried
In Unit No. # 2 Vessel No.-11 /21 small air leakage found at PU fitting at Seal Pr.
Pressure switch. So fitting tightness to done. Now ok.

In CHP Building Bucket elevator Floor area field Inst. / JB / panel Cleaning to done.

In Compressor House all the auto drain valve is checked and working Normally.

All the Manual Light to OFF Condition.


online CPCB and ETP website is not opened .
P & V. No. # 4 is already is in running condition.

Fly ash Root Blower No. # 1 is not started . So checked and found that O/L . So Reset it.
Then again started. Again Tripped to O/L So Informed to Shift Operator.

Bed Ash Silo RAV is not started . So checked and found that O/L . So Reset it. Now Ok.
Reclaimer CRD Cable is Ok Condition.
DT-2 temp 79 deg C, DT -5 temp 83 Deg C. DT-6 temp 82 Deg C.
Shift jobs carried
Boiler-1 Vessel -12 level not showing so checked in field & found DCS wire removed
condition so reconnect & level ok
Boiler-1 vessel-22 level not showing, so calibration done now level ok
Boiler-1 firing floor instruments Panels cleaning work
Boiler-2 RSB-30 Grenn Tag updted done
CEP -1 &2 Motor & Power JB Cleaning work
DT-2 temp 76 deg C, DT -5 temp 86 Deg C. DT-6 temp 82 Deg C.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
Boiler-1 &2 unwanted Lights OFF

Shift jobs carried

Following Equipment S/D Cleared-


1/ BC-1
2/BC-2
3/ Reclamier
4/ Coal crusher-2
5/ Fly Ash Silo 1 Dry Unloading System.
BC-4 Not started Checked and found DCS crusher-2 tripped reset pending, so reset and
trial found running healthy.

Boiler-1 Vessel -22 level showing HIGH, checked and cleaning probe, found healthy.
WTP HPP VFD cleaning done.
MPHB 4.5 mtr extension board given and received after work completed.
Reclaimer UPS power ON.
ACC-1 and 2 CEP 1A and 2B DE/NDE motor temp taken found healthy.
BC-1 tripped in overload reset it, due to material jamming work under progress.

Shift jobs carried


Boiler-1 &2 Bed Material JB Cleaning Work
Boiler-1 vessel-22 level not showing, so calibration done now level ok
Boiler-2 firing floor instruments Panels cleaning work
BLR#2 VESSEL 22 Level showing H-H so level probe cleaning & Calibration now level
ok
WTP Pump House Motors Cleaning & Blwoerin work
BC-1 Magnetic separator not running found motor overload due to jamming, work
under progress by Opeartion Team after jamming clear Magnetic Seperator work
normally.
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
At 4.08 am DCS MODULE PANEL-21 (ELEC1) comes in fault & healthy after sometimes
check Panels side no any Physical observation observed inform to Rakesh Sir & Sati Sir
to be continue observation
CHP & Boiler & STG Building Cable Celler Unwanted Lights OFF
Shift jobs carried

Following Equipment S/D given-


1/ BC-1 (02 times)
2/BC-2
3/ Unit-1 Soot blower
BC-1 Not started Checked and found Take off Pulley fault, so reset and trial found
running healthy.
Car parking area grass cutting machine single phase plug top changed.
BC-1 Magnetic separator and power JB rubber mat laying done.
BC-1 magnetic separator and Motor blowering and cleaning done.
BC-1 take off Pulley both switches checked and found running healthy.
DCS module-21 spare pair taken in line and found running healthy.
2D bunker level not showing, so cleaning and trial run found healthy.

Shift jobs carried


Following Equipment S/D Cleared-
1/ BC-1
2/BC-2
3/ Reclamier
U#1, 12/22 back pr. Line flushing done.
Chimney SPM alarm DT1 check with tarun.
BC-6, belt light found on at 04.50 pm so off it.
BC-6 , bag filter panel and SOV cleaning done.

CCR inform that root blower -1 not run then check at feeder found overload relay
operated, then its winding resistance check 0.8 ohm continuty with earth at zero,
motor terminal check found normal. All connection ok then it start with 36.4 amp
balance in all phase relay range 40-50 amp and setting at 40 amp.

One industrial top change at garden area.


Bucket elevator -1 selection not change from no-2 , then at feeder found aux. block of
contactor not proper fix, so fix it and start group.
All module panel check in between 2-3 hour of interval.

Shift jobs carried


In Unit No. # 2 Vessel No.-22 HH Level probe is showing But High Level Probe is not
showing at DCS end. So Checked at field side material inside the vessel. So Calibrated
the High level probe. Now Ok.

In Unit No. # 1 Vessel No.-22 HH Level probe is showing at DCS end. So checked at
field side no material inside the vessel. So cleaned the level Probe. Now ok.

Engineer Room AC to OFF .


Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP Crusher Building Light to OFF .
In Boiler No.-1 and 2 4th to 7th Floor Light to OFF.
DT-2 temp 76 deg C, DT -5 temp 83 Deg C. DT-6 temp 81 Deg C. and P&V.-4 is in
running condition.
Shift jobs carried

Following Equipment S/D given-


1/ BC-6 (02 times)
2/BC-4
3/ Bucket elevator-1
4/ BC-7A
5/BC-7B

Following Equipment S/D Clear-


1/ BC-6 (02 times)
2/BC-4
3/ Bucket elevator-1
4/ BC-7A
5/BC-7B
Coal feeder 1C clean run motor vibration report from CCR, checked and found its
minor vibration between motor and gear box.
Boiler-2 vessel 12-22 line flushing done.
Boiler-2 bed temp 02TI1116 mv checked found healthy.
Zishu Hozen at Boiler-1 area.
Coal feeder 1A VFD display replaced with screw conveyor 2
Coal Bunker-2A level transmitter power reset done.
Offices AC MCB ON done.
Switchyard and outside area earthing PIT testing date sticker pasting done.
Boiler-1 &2 SA, PA, ID, BFP Motor temperature taken found healthy.
Shift jobs carried
BC-6 Belt not healthy due to Emergency Push button not release & stuck up at field
now open JB & Clean push button by cleanit now Emergency push button healthy &
Release
TPP Garden area Grass cutting M/C ELCB Trip but not healthy so remove ELCB & ELCB
Maintence done now ELCB Healthy & Connect in Grass cutting M/C

Unit-2 MV Workshop Room 1 phase exhaust fan cable & 10 amp pug top provdied &
connection done trial taken found ok
BC-7A&7B Area 24 V Transformer plug top connect & 24 V Handlamp damaged holder
replaced by new & handover to operation team

CCR inform that root blower -1 not run then check at feeder found overload relay
operated, then its winding resistance check 0.8 ohm continuty with earth at zero,
motor terminal check found normal. All connection ok then it start with 36.4 amp
balance in all phase relay range 40-50 amp and setting at 40 amp.

One industrial top change at garden area.


All module panel check in between 2-3 hour of interval.
Coal feeder-2A Bunker level not showing healthy so clean level probe field side now
level ok
OFFices AC MCB OFF
Shift jobs carried
In Unit No. # 1 Vessel No.-12/ 22 Back Pr. Switch Gland to provided . Now Ok.
In Bed ash cooler No.- 1B Cooling water main air PU tube open from isolation valve. So
Reconnected it. Now Ok.
Fly ash Silo No. # 1 and 2 all the JB / Panel / Field Inst. Cleaning to done.

In Compressor House all the auto drain valve is checked and working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.

In Coal feeder -2A Screw Conveyor Vibrator is not On. So checked and found that
feeder is OFF Condition. So ON the feeder and Trial taken. It is working Normally.
In Coal feeder -2A Screw Conveyor 24 Volts hand Lamp Holder to changed.
DT-2 temp 75 deg C, DT -5 temp 85 Deg C. DT-6 temp 83 Deg C. and P&V.-4 is in
running in VFD condition.
Shift jobs carried

Following Equipment S/D given-


1/ BAC-2A
2/BAC-2A discharge MOV
3/ BAC-2B
4/ BAC-2B discharge MOV

Coal feeder 2-B discharge MOV manually close to 10% , due to jam on requirement of
ccr.
Boiler-1 vessel 11-21 back pr. line flushing done.
Cable shifting workshop to chimney analyzer room.

BAC-2A panel not show healty due to its bagfilter side motor get overload check motor
resistance varies due to motor heat . Its continuty with earth is zero then its trail take
in presence of Mr. ketul, nikhil, and deepak nut BAC not move and motor take 4.6 amp
current (2.2 kw, FLA 3.9 amp and relay setting at 4.0 amp) then its manually done free
by maintanance team then again take trail it take 3.6 amp. balance current in all phase.

One transformer with light provide at coal feeder 2A to Mr. ketul


BAC-2A motor cooling fan fixing andcovering done of ccr side motor.
One pvc cooling fan arrange from workshop for BAC motor but its size different so its
require to arrange from china yard.
DT-2 temp 77 deg C, DT -5 temp 86.9 Deg C. DT-6 temp 84.1 Deg C. and P&V-4 is
running.

Shift jobs carried


BAC-2A not Running due to CCR Side motor O/L at Field panel so after healthy check
both Motor current found CCR side motor take avg. 3.8 amp at full rpm & Bag House
side motor takes avg. 1.8 amp. So inform to Operation & Maintencae dept. Maint. Side
checking work U/P. Both motors megger value found ok

BAC-2A Bag House side Motor New Cooling fan fixing & Motor Double Earthing work

BAS RAV trip due to O/L reset done now OK & Working normally
Chimney analyser SPM value found constant so check controller at chimney top work
U/P

Coal feeder -2B outlet MOV not working so check & found MOV side Valve Mechanism
jam condition so release mechanism & given command from CCR now ok
Following Equipment AVI Given & Close
1/ Coal Feeder -2B
2/ Coal Feeder 2B Dischrge MOV
All module panel check in between 2-3 hour of interval.
Coal Feeder -2B put on Manual mode as per requirement of Operation dept. for
Jamming clear
Following Equipment Permit Close
1/ Coal Feeder -2B
2/ Coal Feeder 2B Dischrge MOV
Shift jobs carried
All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.

Following Equipment S/D Clear


1/ Coal Feeder -2A
2/ Coal Feeder 2A Discharge MOV
Coal feeder 2B tripped in Overload F0012 fault three times, Megger taken found motor
healthy, so reset and trial run, found above 2.0 set point of coal flow motor running
healthy.
Coal feeder area one temporary light provided.

Boiler 2 Coal feeder area motor and other instrument & equipment cleaning done.
WTP MCC panel cleaning and blowering done.
Coal feeder area PRDS MOV Control valve and field equipment cleaning done.
Unit-1 vessel 11 level probe cleaning done.
Shift jobs carried
In Unit No. # 2 Coal Feeder -2A Pneumatics Valve Exhust air is coming from DCS. So
Open the one fitting then connected it. Now Ok.
Coal Feeder -1A and 2A put into Local Mode as per Operation requirement.
In BAC-2A Cooling water Valve not open from DCS while giving the Open Command. So
checked and found that Mech. Valve is in jammed condition. So Informed to Shift
Operator.
TG -1 and 2 Ground Floor area field inst. And JB Cleaning to done.
All the Manual Light to OFF Condition.
online CPCB and ETP website is not opened .
P & V. No. # 4 is already is in running condition.

Following Equipment S/D given-


1/ EN mass Conveyor No.-1
2/ Vibrating Screen No.-2
3/ Boiler -2 WTP Side LDB.

Boiler No.-2 Bag house Lighting JB Rubber Mat to laid.


WTP Chemical lab Single Phase MCB Green Tag to provided.
BC-7A /7B area 24 Volts Hand Lamp Plug Top to changed.
DT-2 temp 75 deg C, DT -5 temp 85 Deg C. DT-6 temp 88 Deg C.
Shift jobs carried
BAC-2A not Running due to bag house Side motor O/L at Field panel so after healthy
check both Motor current found CCR side motor take avg. 3.4 amp at full rpm & Bag
House side motor takes avg. 2.6 amp. So check with Maintencae team and its start at
full rpm then it start normally.

Boilor camera maintanance with maintanance team.

CCR inform that root blower no -1 not run then check at feeder found overload relay
operated, then its winding resistance check 0.8 ohm continuty with earth at zero,
motor terminal check found normal. All connection ok then it start with 34.4 amp
balance in all phase relay range 40-50 amp and setting at 40 amp.

Instrument air compressor show not healthy at DCS check and found its vfd fault F66,
so room ac check its show HP/LP so reset and VFD to reset .Now it ok.
All AC power off done.
Chimney analyzer panel cleaning and blowering done.
All module panel check in between 2-3 hour of interval.

One fan start of work shop MVVFD room as tempreture at 44 C. please observe it.
ACC 1 &2 all motor bearing tempreture DE/NDE check found within limit 40-44 Deg-
C
DT-2 temp 74 deg C, DT -5 temp 85 Deg C. DT-6 temp 86 Deg C. at 4.30 p.m.

Following Equipment S/D clear-


1/ EN mass Conveyor No.-1
2/ Vibrating Screen No.-2
3/ Boiler -2 WTP Side LDB.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
Boiler-2 Vessel-22 Level H and HH, level probe cleaning and found healthy.
Boiler-1 Vessel-21 Level H and HH, level probe cleaning and found healthy.
VAM floor equipment cleaning done.
Boiler-2 lighting ON from 4th 7th floor.
ACW Pump house Motor and field JB cleaning done.
Bed ash cooler-1A Motor (crusher side) fan cover loose, so tightness done.
22 mtr Bunker floor light OFF.
DT-2 temp 76, DT-5 temp 87, DT-6 temp 83,
Shift jobs carried
During the Morning Time 01 Nos Conference Room AC is in running condition. So OFF
the AC.
In Unit No. # 2 APH Slave Dome Valve PU tube is Puncture. So air leakage found at site.
So Changed the PU Tube. Now Ok.
In Work Shop MV Drive Exhust Fan is in running condition.
CT Fan area / SSF area / ACW Pump area field inst. And JB Cleaning to done.
TG#1 Put on base at at 11.00 am to 11.32 am due to low load
online CPCB and ETP website is not opened .
P & V. No. # 4 is already is in running condition.

Following Equipment S/D given-


1/ BAC-2A,
2/ Vibrating Screen No.-2
3/ BC-1.
4/ BC-4,
5/ Reclaimer ,
6/ Chimney LDB

BAC-2A CCR Side motor during cable connection open found motor winding inside Y
Phase cable open & Damaged condition & wastcher also rushted condition so replace
wastcher & relugging cable trial taken motor at decouple condition found R-Y-B= 0.7
amp. ( Motor Megger Value avg. 13 Gohm & Resistance Avg. = 14.5 ohm) after trail
taken motor handover to Maint. Team

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities
carried out-
1/ Battery Voltage check- 13.5 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Boiler-2 RSB -28 Cleaning ELCB Testing Manually & Green Tag Provided done

BAC-2A CCR Side Motor Connection open ( DE-G-R-Y-NDE) as per requirment of Maint.
Team
Shift jobs carried
BAC-2A motor connection done andd trail taken with Mr. nikhil pandya ,ccr side
motor take 4.4 amp while bag house side motor take 2.1 amp but BAC not rotate then
its ccr side support rollar sim provide then ccr motor current reduce to 3.6 amp and
bag filter side motor take 1.4 amp and start to rotate at 50% speed referance. Current
and voltage is balance in all phase.

Vibrating floor bag filter ,selector switch found in manual mode and loose condition .
So its tight, now ok.
Coal bunkar 2D lavel show voilet , so check found its transmitter 4-20 ma supply one
wire open so connect it.
Coal bunkar 1D lavel also check as ccr inform it show 3.4 meter, then its connection
tight and it show reading correctly.
U#1, APH discharge valve show faulty so its check with Rakes sir and Pramod sir, and
its SOV and limit switch replacement done.now ok.
Workshop and ccr AHU found in manual mode , so its change to auto mode.
One transformer light check at coal belt 7B, its in put and output supply ok ,till holder
then also light not glow, then buld and holder replacement done. One more trasformer
light provide thair.
BAC 2A motor terminal m-seal packing done.
DT-2 temp 78, DT-5 temp 85, DT-6 temp 85,

Following Equipment S/D given-


1/ BAC-2A,
2/ Vibrating Screen No.-2
3/ BC-1.
4/ BC-4,
5/ Reclaimer ,
6/ Chimney LDB

Shift jobs carried


ACC fan 2D "High Speed Contactor " gets un-hold without any fault , so check and ON
it again.
All unwanted lights switch OFF during shift round
WTP all 3 HP pump cleaning done.
TG building , 4.5 Mtrs all field instrument cleaning done
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.

Shift jobs carried


CHP DCS Room Temp. High so check & found AC trip on HPLP Fault reset done now ok
& Temp. normal

Unit-2 MV Drive room temp. high 43.3 deg. Then AHU set point Decrease 43 to 41 now
temp. normal
Boiler-1 APH SOV JB all connection tightness work
Chimney Analyser room Panels cleaning & Blowering work
Root Blower-1 not start so check & found Motor O/L Reset done now ok
RSB-29 & 31 Boiler-2 Cleaning & Green Tag Pasted done
Root Blower Panel Door Lock found Damaged condition Replaced by new one.

Soot Blower-1 Panel Contatcor clean by cleanit & Blowering done


Power Report Balance upto 09/04/2022
Shift jobs carried
BC-4 motor and power JB cleaning and blowering done.

Enmass conveyor -1 motor earthing broken repaired, and fan cover tightness done.
P-Fan-2 , motor and JB cleaning done.
DT-2 temp 75, DT-5 temp 87, DT-6 temp 85,
Screen floor , Bagfilter panel ,SOV JB, monometer cleaning done.

AHU of MVVFD workshop and CCR found in manual mode so change to auto mode.
Compressor house auto drain manual check

Following Equipment S/D given-


1/ Vibrating screen-2

Following Equipment S/D CLEAR-


1/ Vibrating screen-2

Shift jobs carried

Boiler-1 Vessel-11 Level H and HH, level probe cleaning and found healthy.

Boiler-1 Vessel-21 Level H and HH, level probe cleaning and found healthy.

Boiler-1 11-21 back pressure line flushing done.


All unwanted lights switch OFF during shift round

Soot Blower-1 Panel Contactor clean by clean it & Bowering done

24 Volt LED lights kept for charging at 4.5 Mtrs.

All Energy meter manual reading taken for Power Report.


Power Report prepared

DG report Prepared and upload in SAP


Environment and Plant performance report upload and mail to all.
Shift jobs carried
Battery voltave -13.5, of fire DG, specific gravity 1180-1220
BC7A, chargebale light provide.
Coal feeder area 2A, cablew tray covering done due to material flow.
Drain pot area light cable dressing done.

Lavel probe check of U#1, 11/21 H & HH , found material filled , inform to ccr.
HSD & boiler area camera cleaning done.
U#1, 11/21 conveying line back pr. And seal air pr. Line cleaning done. One tube
change due to choke.

Following Equipment S/D given-


1/ LDB-Boiler-2S/Y side,
2/ Coal crusher-2
3/ BC-6.
4/ P&V-4,
5/ Coal feeder-2A ,
6/ Coal feeder-2A,discharge MOV
7/ Fly ash silo-2 dry
U#1, DCS panel area observed not cool well ,so its duct grill door open.
Reclaimer boom not getting UP/DOWN so check its relay, power supply found ok,
limit check found its both limit UP/DOWN ok.oil lavel in tank also ok, but boom not
getting healthy . Group stop due to BC6 belt on LOTO.
U#2 , put on Base load at 11.30a.m. T 11 MW for half an hour.
Shift jobs carried

In Reclaimer Up / Down problem. So checked the RTD of oil tank. It is out. So properly
inserted the RTD in Oil Tank. RTD is Ok. Then Checked the Oil level switch. It is
working Normally. Then checked in PLC-2 then found that DO is not generated. Then
checked in PLC-1 then found that DI is not generated . So checked the Selrctor switch
in Control desk. Open it. Then found one wire is open condition. So properly fix this
wire in selector switch. also properly loose cable dressing done from PLC panel to
control desk. trial taken it is working Normally.
Unit No. # 1 Vessel No.-12 Showing High signal at DCS end. So cleaned the level probe.
Now ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. (run 45.0 Hz)
All the Manual Light to ON Condition.
Following Equipment S/D Cleared-
1/ BC-6
2/Coal Crusher No.-2 ,
3/ Fly ash silo no.-2 Dry Unloading,
4/ P & V. No.-4.
5. BLR-2 LDB Switch yard side.

DT-5 temp 88 Deg, DT-2 temp 77 Deg, DT-6 temp 84 Deg.


Boiler-2 WTP side, 24 V Light, Extension board, Transformer 24 v Provided.
Coal Feeder Boiler-2 side, 24 V LED hand lamp provided.
C7-AB area one lamp replaced.

Switchyard transformer OLTC oil filteration circuit checked and found healthy.

Shift jobs carried

Boiler-1 Vessel-21 Level H and HH level probe cleaning and Calibration done now ok
Boiler-1 Carbon Black line SOV & Transmittor cleaning & Polythene covered

WTP hall Instrument Panels & JB & SOVs & Transmittor Cleaning & Blowering work
All unwanted lights switch OFF during shift round
Soot Blower-2 Panel Contactor clean by clean it & Bowering done
Power Report Balance upto 10/04/2022
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried

Following Equipment S/D Given


1/ BC-4
2/ BC-6
3/ Coal Crusher-1
BC-1 Magnetic separator not start in remote from DCS, so checked and found Selector
switch in local position, so put in remote and trial run found healthy.
Boiler-2 WTP side ground floor 24 v light, transformer and extension board removed
and put in workshop.
Boiler-2 0.0 mtr wtp side LDB rubber mat laying done.
P&V 2 ON at 10:00 AM and OFF at 11:20 AM.
Charging light given to bunker floor.

TG building lift tripped in sensor fault, reset cleaning and trial run found healthy.
ALL manual light OFF.
Zishu Hozen at Boiler-2 area.
Workshop MV drive temp goes to 45 Deg, so checked and found VAM control system
AIR valve OFF by operation side, So on done and VAM taken in Line.
DCS module panel 86 in fault, ( fault code 2,4 software programming error) so reset
and trial run healthy.
Shift jobs carried

Following Equipment S/D Remove.


1/ BC-4
2/ BC-6
3/ Coal Crusher-1
CHP DCS panel cleaning and blowering done.
WTP DCS cleaning and blowering done.
One 24 volt transformer and led light provide at coal feeder 2A area.
One charging ligjht receive from coal feeder and kept it for charging at 4.5 meter.

One extension boars checking and green tagging done at workshop.


All module panel of both unit check .
Unit No. # 1 Vessel No.-12 Showing High signal at DCS end. So cleaned the level probe.
Now ok.
AHU set point reduce 1 C as observed not cooling well.
U#2 , put on Base load at 2.10 p.m. and normalize at 5.10 p.m..
Physical observation taken of field instrument and motors.
Shift jobs carried

Following Equipment S/D Given


1/ BC-6
2/ BC-7A
3/ BC-7B
4/ Vibrating Screen 2
5/ Soot Blower-2
6/ Bag Filter Crusher Floor
7/ Bag Filter RAV Crusher floor
8/ Boiler-1 LDB S/Y side
9/ Boiler-1 LDB WTP side
10/ Hoist P Fan 1
Following Equipment S/D Clear
1/ Hoist P Fan 1
BC-1 Magnetic separator not start in remote from DCS, so checked and found Selector
switch in local position, so put in remote and trial run found healthy.
Zishu Hozen at ACC area
Boiler-2 Lift 3rd Floor door sensor fault, so Power off from lift cabin.
Repair supply box 61 earthing done.
CEP 2 area earthing cable dressing done.
Cooling fan shifting from limestone building to MV drive room at workshop.
VAM tripped due to steam temperature high, reset and trial run found healthy.
Plant light manual OFF.
Shift jobs carried
Following Equipment S/D Clear
1/ BC-6
2/ BC-7A
3/ BC-7B
4/ Vibrating Screen 2
5/ Soot Blower-2
6/ Bag Filter Crusher Floor
7/ Bag Filter RAV Crusher floor
8/ Boiler-1 LDB S/Y side
9/ Boiler-1 LDB WTP side
10/ Coal feeder -2A & Bunker MOV
MV Drive Room (Unit-2) New Exhaust fan Plug top & Cable provided & Taken in line
ACC 1 &2 Motor temprature taken found within limit
Boiler- 2 4th to 7th floor lights ON for requirement of Operation dept.
BC-7A Handlamp repaired work
Boiler-2 21 no's Vessel found level H-H so clean & calibration done now ok
Boiler-2 12-22 supply Panel Rubber mat Laying work
Coal Bunker-2C Level Transmittor cable fire observed so power supply OFF from
Panel & Coal Bunker level transmittor removing work
UPS Room Battery Charger -1&2 Cleaning work
Plant light STG Building manual ON.
Shift jobs carried
In Coal Bunker -2D level is not correct showing at DCS end. So Reset and Cleaned the
level probe. Now ok.

In Unit No. # 1 firing Floor area all the field Inst. / JB cleaning and Blowerning to done.
In SH Room Both the AC is running condition. So OFF the AC.
In Compressor House all the auto drain valve is checked. It is working normally.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
DT-5 temp 84 Deg, DT-2 temp 75 Deg, DT-6 temp 85 Deg.
In Dosing Room all the Panel cleaning to done.
Boiler - 1 and 2 all the light ON as per operation requirement. After taking the round
Light from floor 4th to 7th floor to OFF Condition.

Shift jobs carried


Following Equipment S/D Given
1/ BC-1
2/ Reclamier
3/ Screen-2
4/ Bucket Elevator-2
5/ Coal Bunker-2C Level Transmitto
6/ Boiler-1 LDB S/Y side
7/ Boiler-1 LDB WTP side

Following Equipment S/D Clear


1/ Coal Bunker-2C Level Transmittor
Hand Blower & Extension Board (1 no's) Handover to Mohd. Taqeer
Zishu Hozen at Switchyard area
Boiler-2 Lift 3rd Floor door sensor fault, so Power off from lift cabin.
Repair supply box 17 Green Tag Updated (Boiler-1)
Hand Blower Green Tag Updated done
Coal Bunker-2C Level Transmittor Damaged cable removing work & Cable termination
work at transmittor & Level Switch & take trial found level healthy (Work with G Shift
Team)
22 mtr. VAM Tank area & STG Building & Reclamier area light OFF
TG-2 Put on Base Load at 13.00 pm for requirenment of Operation dept.
Office AC ON
Shift jobs carried
TG-1, QCNRV not operated, found command is Ok but cylinder jam same inform to
Shift In charge.

Boiler-2, Coal Feeder Seal air pressure showing incorrect valve , transmitter line
flushing done

BC-2. BC-3, BC-4, BC-6, BC-7A & BC-7B all pull cord checked physically , some pull cord
of BC-4 and Bc-6 found without clamping so new clamping done.

Boiler-1 LDB S/Y side , SFU not operated properly , attended it.

2 Nos Ladder shifted from TG building to WWTP hall.


Following Shut down clear.
1. BC-1
2. Reclaimer
3. Boiler-1 LDB S/Y side
4. Boiler-1 LDB WTP side

Shift jobs carried


Following Equipment S/D Given
1/ BC-1
2/ Reclamier
3/ Screen-1
4/ LDB Crusher Building
5/ LDB ACW & CT Fan

Zishu Hozen at ACW Pump House , CT Fan & ACC 1&2 Area
RSB -46 Boiler-2 Green Tag Updated Done
BC-1 & BC-5 Head & Tail side Pull Cord rope Clamping Done
Boiler-2 Lift 3rd Floor due to door sensor fault Door not Close checking work
Underprogress, so Power off from lift cabin.
Control Room Senitizer M/C Maintenece work U/P
MV Drive Room (Unit-2) AHU found in Local Mode So Put in Auto mode
Fly Ash Silo-2 Top Bag Filter not running so check & Found Power Contatcor ADD ON
Block faulty so repaced by new one now ok & Running

Fly Ash Silo-2 Top Bag Filter Filed Panel Maintence done following activities Carried
out
1/ Field Panel Cleaning work
2/ Power & Control Contators & Realy cleaning by CRC & Brush
3/ Panels all Terminations tightness checked.
4/ Field Panel Outdoor Sealing by packing Tape
5/ Power Contactor Faulty ADD ON Block Replace by new one

DT-5 temp 86 Deg, DT-2 temp 76 Deg, DT-6 temp 85 Deg.


Office AC ON
Shift jobs carried
In Unit No.# 1 Air leakage from APH Main Inst. Air Isolation Valve. So PU Tube
tightness to done.
In Unit no. # 1 APH , Vessel No.- 11/21 and 12/22 Ash System JB and field Inst.
Cleaning and blowerning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. (run 45.0 Hz)
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1/ BC-1
2/ Reclamier
3/ Screen-1
4/ LDB Crusher Building
5/ LDB ACW & CT Fan
6/ Vibrating Screen No.-2
7/ Bucket Elevator No.-2

ACW Pump house main Entrance gate LED Light to provided.


Coal Shed area Light ON as per operation requirement.
24 Volts LED Light and Transformer Shifted from 22 Mtrs to electrical shift almirah.

In Unit No. # 1 Cyclone floor ( RSB-11) ELCB checked and green tag to provided.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
Boiler-2 Vessel-11 Level not showing, physically checked found healthy.
Boiler-2 Vessel-11 RTD 02PI1202 checked found healthy.
Boiler-2 Bag house 11-21 and 12-22 SOV JB, Field equipment cleaning done.
Boiler-2 APH SOV JB and field equipment cleaning done.
Boiler-2 vessel 12-22 SOV JB rubber mat laying done.
Dosing room tube light not working, so connection tightness done, and found running
healthy.
Silo Root blower motor and panel cleaning done.
BC-5 Lighting JB open, so packing done.
Coal Shed area BC-1, BC-2 and BC-5 lighting OFF.
Shift jobs carried

Following Equipment S/D Given


1/ BC-1
2/ Reclamier
3/ Screen-2
4/ LDB Crusher Building

Zishu Hozen at 0 mtr. BFP Area (STG Building)


Oil purifier-1 &2 Field Panel in front Insulated Rubber Mat Laying work
Boiler-2 12-22 seal pressure fault so check & found SOV Faulty so replaced by new one
now ok
Boiler-2 12-22 Back Pressure line found choked condition so transmittor flushing done
Instrument Technician Engaged Hanumanji Temple puja
Unit-2 ACC-2F Motor 1 no's earthing lead found Damaged condition now relugging &
connect Earthing strip
P&V-4 Water Pump OFF at 10.00 am & Water line valve close at P&V-4 Floor
DT-5 temp 87 Deg, DT-2 temp 76 Deg, DT-6 temp 85 Deg.
Boiler-2 Lift LIFT UNDERMAINTENCNE Sticker Pasting work
Shift jobs carried
In Unit no. # 2 Vessel No.-12 Seal pr. PU Tube is puncture. So cut it and reconnected it.
Now Ok.
In Unit no. # 2 Vessel No.-22 HH Level probe is showing But H level Probe is not
showing. So cleaned it and calibrated it. Now Ok.
As Per Shift Incharge requirement Service air IFC SP Increased from 39 PSI to 42 PSI.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. Water Pump OFF and Water Valve is
in closed condition.
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1/ BC-1
2/ Reclamier
3/ Screen-2
4/ LDB Crusher Building

In CHP, Crusher Building Light is Not ON. So adjust the Lighting Timer. Now Ok.
DT-5 temp 91 Deg, DT-2 temp 78 Deg, DT-6 temp 87 Deg.
BC-1 and BC-2 motor and Magnetic seperator panel cleaning and Blowerning to done.

In Conference Room second AC Power ON. ( feeder No.- 5354-H)

Shift jobs carried


Boiler-2 Vessel-21 Level H and HH, level probe cleaning and found healthy.
Boiler-2 Vessel-22 Level H and HH, level probe cleaning and found healthy.
ACC-1 Encloser Lights get trip so reset and made ON
BAC 2A and 2B panel Cleaning done.
TG building Exhaust fan Panel Contactor clean by clean it & Bowering done
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried
In Unit no. # 1 J-valve neck Temp. ( 01TI1121 ) T/C cable is in hot condition also burn
condition. Because conduit Pipe is very hot. So GI Seat Cover is provided at site. Now
ubder observations.

In Unit no. # 2 Vessel No.-21 HH and H Level probe is showing at field side. We have
checked and found that no material inside the vessel. So Cleaned it and Calibrated it.
Now Ok.
In Work Shop MV Drive Exhust Fan is in running condition.
All the AC MCB to ON Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. Water Pump OFF and Water Valve is
in closed condition.
All the Manual Light to OFF Condition.
As Per Shift Incharge requirement Bucket Elevator No.- 1 put into VFD to DOL mode.
Then again put into DOL to VFD mode.
As Per Shift Incharge requirement Vibrating Screen No.- 1 put into Remote to Local.
After Completion of work again put into Remote mode.
S/D Given.
1. Vibrating Screen No.-2,
2. Crusher No.-1,
S/D Cleared.
1. Vibrating Screen No.-2,

In Vibrating Screen No.-1 Motor earthing is damaged condition. So again connected it.
Now Ok.
UPS Gallery 5A ON / OFF Switch is not proper fix condition. So Silver Tape to provided.

DT-5 temp 88 Deg, DT-2 temp 77Deg, DT-6 temp 87 Deg.


At Crusher Building Zero mtrs air Blower green tag to Provided.
Shift jobs carried
Boiler-2 Vessel-21 Level H and HH, level probe cleaning and found healthy.
Boiler-2 Vessel-22 Level H and HH, level probe cleaning and found healthy.
ACC-1 Lights get trip so reset and made ON Enclosure & Surrunding area light ing MCB
Trip to be checking in G Shift
Coal Shed area Light ON as per operation requirement.
Dosing Room Motors & Panels Cleaning & Blowering work
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried
In all the 03 Nos Lift telephone checked. It is working Normally.
In Unit No. # 1 Boiler lift Ground floor button board is not proper fix. So Covered by
packing tape. Now ok.
In WTP DCS panel blowerning and Cleaning to done.
All the AC MCB to ON Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. Water Pump also running condition.
Also in P & V. No. # 2 Blower is in ON condition.
All the Manual Light to OFF Condition.
Coal shed area light to OFF and RSB-91 Earthing to done.
TG-1 Put into Base Load as per operation requirement.
S/D Given.
1. Vibrating Screen No.-2,
2. Crusher No.-2,
3. BC-6,

DT-5 temp 88 Deg, DT-2 temp 76Deg, DT-6 temp 87 Deg.


Silo Root blower No. # 1 is not on. Found that O/L at site. So Reset it. Now Ok.

Shift jobs carried


Reclaimer Lighting Transformer wiring done
Housekeeping done at BC7AB area
Engg office Tube rod changed
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. Water Pump also running condition.
Also in P & V. No. # 2 Blower is in ON condition.
Ash conveying vessel-21 high high level sensor cleaned
WTP Bomb calorimeter base found loose so tight it
BC-1 take up pully fault came so reset the limit switch once
Boiler-1 , vessele 11-21 back pressure fault came, so clean the line of Back pressure
transmitter, and switch

S/D Cleared.
1. Vibrating Screen No.-2,
2. Crusher No.-2,
3. BC-6,
DT-5 temp 88 Deg, DT-2 temp 76Deg, DT-6 temp 87 Deg.
Shift jobs carried
BLR#1 11-21 seal fault so check & found 21 no's vessel pressure gauge side tube
damaged condition so cut & reconnect it & seal pressure tube flushing work now ok
Boiler-2 Vessel-22 Level H and HH, level probe cleaning and found healthy.
ACC-1 Lights get trip so reset and made ON Enclosure & Surrunding area light ing MCB
Trip to be checking in G Shift
TG-1 0 mtr. All Control valve cleaning work
CHP MCC & ASH MCC Panels Cleaning work outside
Baghouse -1 Vibrator DOL Starter Cleaning & Tightness checked.
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried
Bed Ash cooler-2A Motor Trip in overload CCR side, three times , so dicede to change
the motor by mechanical team
Spare Bed ash cooler motor checked taking 3Amps, now given to mech deptt. For
replacement
hand lamp collected from BC7AB area
All the AC MCB to ON Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition. Water Pump also running condition.
Also in P & V. No. # 2 Blower is in ON condition.
All the Manual Light to OFF Condition.
BFP-3 balaning line pressure gauge pointer out so checked and repaire it
BC7AB bag filter gauge of bunker 1B, repaired and taken in line
Bag house vessele 11-21 line chocked so clean the back pressure transmitter line

S/D Given.
1. Vibrating Screen No.-2,
2. BC-1
3. BC-2
4. Reclaimer

DT-5 temp 88 Deg, DT-2 temp 76Deg, DT-6 temp 87 Deg.


Shift jobs carried
BAC 2A Motor terminal disconnected and new motor connection done, trial taken still
drawing high current 11Amp, work under progress by maintenance team.

Boiler-2, unloading system actuator open manually as per operation requirement.


Boiler-2 Vessel-21 Level HH without H, level probe connector dusty clean the
connector now OK.

WTP Hall HP pump VFD panel sealing done with brown tape

BAC 2A Isolation given and close.

BAC 2A AVI given and close.


Following Shut down clear.
1. Vibrating Screen No.-2,
2. BC-1
3. BC-2
4. Reclaimer
5. BAC 2A

Shift jobs carried


In SH Room Both the AC and Engineer Room 0ne nos AC is running condition. So OFF
the AC.
In Unit No. # 1 Desuperheater C.V. 01TCV3203 air leakage from SS fitting. So
Connection tightness to done. Now Ok.
In IFC moisture drain to done.
In Chimney analyzer all the panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
DT-5 temp 85 Deg, DT-2 temp 75 Deg, DT-6 temp 86Deg.
Reclaimer Panel Cleaning and Blowerning to done.

At 4.5 Mtrs Exhust fan starter connection tightness and Contractor cleaning to done.
In GSC-2A and 2B Motor Cleaning to done.
In CHP, Crusher Building Light is ON. So OFF the light.
Shift jobs carried
BAC 1A Motor Connection open as per Maintenance requirement

BAC 2A Motor Connection open as per Maintenance requirement

BAC 2A Motor Connection done and direction change , but still taken higher load. Work
under progress by Maintenance team.

24 Volt Hand lamp gioven at BAC 2A


Boiler-2 APH Vessel 2 Cable dressing done

Following shut down given-


1. BAC-1A
2. BAC -2A
3. BC-6
4. Bucket Elevator-1

Shift jobs carried


BuckeT Elevtor -2 trip due to ZSS Proxy Fault so check & found Proxy cable Damaged
so reconnect & trial taken now ok
Unit-2 DE superheater Control Valve Gland Heavy Leakage so Gland bolt tightness &
leakage arrest

Unit-2 MV Dive Roomk AHU found manual mode now put on auto mode

BAC-2A both Motors interchaned & Connection done & motors Double Earthing done
BAC-2A 24V LED & Tarnsformenr Provided & After work collect
TG-1 Put on Base Load at 16.00 pm for requirenment of Operation dept.
BAC 2A AVI given and close.
Following Shut down clear.
1. BAC-2A
2. BC-6
3. Bucket Elevator-1

Shift jobs carried


In CHP Bucket elevator No.-1 ZSS proxy heavy coal material is deposit on it. So Cleaned
the Proxy. Now Ok.

In Unit No. # 2 Vessel No.- 11 /21 and 12/22 SOV JB Connection tightness to done.
In WTP field Inst. blowerning and Cleaning to done.
In Chimney analyzer all the panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP, Crusher Building Light is ON. So OFF the light.
In Boiler 4th to 7th Floor Light to OFF.
In WTP , RO Booster VFD Panel cleaning to done.

Shift jobs carried


Coal Feeder 1A Clean run old motor connection remove and new motor connection
done.

BAC-1A get trip continuously on high current so motor direction change now OK.

Reclaimer Water pump trial taken in local , having water leakage.

Silo Root Blower 1 get trip due to O/L so check and reset

Bucket elevator 1 AVI given and taken in local.

J valve unit-2 VFD drive set point isolator replaced by new one

Following Shut down clear.


1. Coal Feeder 1A
2. BC-1
3. BC-2
4. Reclaimer
5. Bucket Elevator

Shift jobs carried


Boiler-2 FCV 3203 Gland leakage observed arrest done.

STG Lift IR Sensor not working 0 mtr. Check & found in IR Sensor loose connection
tightness now healthy

Unit-2 MV Dive Roomk AHU found manual mode now put on auto mode

STG Building lift telephone not working check & found connector loose , connect
properly now healthy
Cola Feeder-2D fan cover side found abnormal sound so check & found tecno sensor
misalalignment so adjustment done now ok
ACC fan 1E tripped in F066 (cooling fault) reset it.
Boiler-2 Sealing air found low So so transmittor flushing done now value healthy
Coal Feeder-2 area RSB -54 Green Tag updated
Following Shut down clear.
1. BAC-1B
2. Coal Feeder-2D

Shift jobs carried


Fly Silo-1, All motors and Panel cleaning done.
ACW De water pump starter checking done
4.5 Mtrs LDB panel hole sealing done with glass putty
VAM and its VFD panels cleaning done.
Engg office and SH Room AC power switch OFF.
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities
carried out-
1/ Battery Voltage check- 13.4 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1220 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

BAC-1A &1B , 2A &2B Field Panel Indication lamp & Push Button Nomiclature work

STG-2 Enclosure light not glowing so check & found neutral missing at MCB tightness
done now ok
Enmass-1 motor trip due to O/L reset done now ok
Zishu Hozen at ACW & SSF Filter area
During shift round observed CHP DCS 94M Panel BRC Crad changeover Secondary to
Primary
Boiler-1 &2 all bunker level physcially checked & cross check by DCS
Following shut down given & Clear-
1.Enmass-1
2. Bucket elevator-1

Shift jobs carried


In CCR Lift IR Sensor zero mtrs wire is open condition. So wire is reconnected it. Now
Ok.
In Unit No. # 1 and 2 all the coal bunker level transmitter is cleaned.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition.
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1/ Bucket Elevator No.-2
2/ Coal Crusher No.-2,

In Reclaimer Spray water Pump MCB is in OFF Condition. So On the MCB. When trail
taken the heavy water spread out . So OFF the MCB. Also Informed to shift Incharge.
BC-7A / 7B area , 10 Amps TOP and hand Lamp to changed.
At 22 mtrs Hand lamp to provided to operation person.
MPSS Grid is taken in line and PF Put into auto mode.

Shift jobs carried


Coal Feeder 2A operate in manual from VFD as per requirement.
Coal Bunker 2A outlet MOV close manually. ( lever engage problem)
Bunker unloading -2. PRV adjusted
P&V 2 OFF at 11:00 PM
Egg office and SH Room AC power switch OFF.
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried
Bag House-1 Vessel 11-21 vibrator not running, So checked and found contact cleaning
of push button and trial run found healthy.
Soot Blower Unit-2 Ground fault reset and trial run found healthy.
P & V 2 ON at 19:30 hrs. and OFF at 21:30 Hrs.
BC-6 and BC-7 AB motor and power JB cleaning done.
Engg office and SH Room AC power switch OFF.
DT 2 temp 80 Deg, DT-5 temp 85 Deg, DT 6 temp 86 Deg.
Bed Ash Silo Soot Up/Down issue, checked and found overload, reset and trial; run
healthy.
Coal feeder 2A Bunker Outlet MOV limit removed as per operaton requirement and
inform to Mr. RS sir.
VAM tripped three times in Generator Vapour temp High, control valve air adjust as
per Mr. JS sir instruction, and found running healthy.
VAM AHU put in manual to AUTO
OLTC-1 tap position changed from 6 to 3 and adjust generator voltage 11.20 to 11.00
KV.
Shift jobs carried
BLR#1 APH Vessel 2 no's dom valve limit cover found on the floor then close limit all
screw loosen condition so closed limit all screw tightness done
CEP-1 area all MOV & Transmittor Cleaning work
Unit-2 ACC All motors Cleaning work
OLTC-1 tap position changed from 3 to 5 and adjust generator voltage
IFC Filter moisture drain
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared
DG report Prepared and upload in SAP
Environment and Plant performance report upload and mail to all.
Shift jobs carried
In Unit No. # 2 Hood Spray Control Valve ( 02TCV2902) not operating from DCS end.
So checked and found that air Pressure is low. So Set the air Pressure. Then calibration
done and Trial taken. It is working Normally.
In Unit No. # 2 Hood Spray Control Valve ( 02TCV2903) not operating from DCS end.
So checked and found that air Pressure is low. So Set the air Pressure. Then calibration
done and Trial taken. It is working Normally.
In Common DCS Panel No.- 73 M , BRC Comes in fault. LED No.- 2 and 4. So Reset it.
Now Ok.

In Unit No. # 2 second Extraction Pressure Control valve ( 01PCV2301) not operating
fully and reponse is slow. Found that air leakage from o-ring. So Inform to Mr. Tarun.

All the AC MCB to ON Condition.


online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is already is in running condition.
All the Manual Light to OFF Condition.
Silo area Light is ON Condition. So found that Lighting Timer is in bypass condition. So
taken in line. Now Ok.
In IAC No. # 3 Motor connection removed at feeder side.
S/D Given.
1. Vibrating Screen No.-2,
2. Crusher No.-2,
3. BC-4,
4. BC-7A ,
5. BC-7B ,
6. IAC No.-3,
7. BC-1,
8. Reclaimer ,
9. BAC-2B ,

In reclaimer area welding machine connection to done.


Grid island at 13.15 PM and Synchronised at 13.26 PM.
Shift jobs carried

Following S/D clear.


1. Vibrating Screen No.-2,
2. Crusher No.-2,
3. BC-4,
4. BC-7A ,
5. BC-7B ,
6. IAC No.-3,
7. BC-1,
8. Reclaimer ,

Following AVI given and clear.


1. BAC-2B ,
Instrument Air compressor-3 Flow sensor, Flow switch and 02 nos Pressure gauge
removed and shifted to lab.
Workshop MV drive room 03 nos AC water valve open by operation team, ready to
use.
Coal Bunker 2C level showing wrong, so reset and found healthy.
Engg office and SH Room AC power switch OFF.

In Reclaimer Spray water Pump MCB is in OFF Condition. So On the MCB. When trail
taken the heavy water spread out . So OFF the MCB. Also Informed to shift Incharge.

Temporary light and transformer provided near bed ash cooler 2B


Silo area Light not ON Condition. So found that Lighting Timer stuck up condition. So
Clean timer and taken in line.
Shift jobs carried
Following S/D Given
1. Vibrating Screen No.-2,
2. P & V 2 Boiler Side.
3. BC-4,
4. BC-7A ,
5. BC-7B ,
6. Bucket Elevator-1,
7. BC-1,
8. Reclaimer ,

BC-7A/7B area hand lamp plug top re-connection done, and trial found healthy, and
hand over to Operator.
P& V -4 Status checked found healthy, no any water leakage.
Coal Bunker floor hand lamp removed and shifted to shift almirah.
Diesel pump battery health checked, found voltage 12.5 V and Gravity 1.200 to 1.220
found healthy.
Following AVI given.
1. BAC-2B , Put in Local
DT 2 temp 74 Deg, DT-5 temp 84 Deg, DT 6 temp 84 Deg.
Instrument compressor-3 Flow transmitter removed and put in safe custody.
Dosing room TSP pump 3 pressure gauge water leakage attend at two location.
Grid island at 12:55 PM and Synchronized at 13.20 PM.
Shift jobs carried

Power Xmer-1 and 2 change over done. ( Now main Xmer -2 is Charged)

Power X mer-1, Breaker is in rack out.

Reclaimerr water spray supply MCB made ON.

Bucket elevator 1 AVI given and close and taken in local.

HP dosing pump pressure gauge replace with new one.

LP dosing tank magnetic level indicator open and kept in lab

PRDS station all MOV and control Valve blowering done.


Following Shut down clear.
1. Vibrating Screen No.-2,
2. P & V 2 Boiler Side.
3. BC-4,
4. BC-7A ,
5. BC-7B ,
6. Bucket Elevator-1,
7. BC-1,
8. Reclaimer ,
Following Shut down clear.
1. Vibrating Screen No.-2,
2. P & V 2 Boiler Side.
3. BC-4,
4. BC-7A ,
5. BC-7B ,
6. Bucket Elevator-1,
7. BC-1,
8. Reclaimer ,

Shift jobs carried


In 01TCV3305 First stage DUMP Steam temprator Control valve main air line dressing
to done.
VAM and VFD Panel Cleaning to done.
In Compressor House all the auto drain valve is checked. It is working normally.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.

DG Report is uploaded in SAP System. In SAP one reading is showing 1000 KWH.
While the other reading is showing 920 KWH. So mismatch the reading. When again
upload the reading in SAP. Then time formet error is showing in SAP. To be correct.
In WTP RO Booster Pump No.- 1 , 2 and 3 Motor Cleaning to done.
In Unit No. # 2 BAC area Temp. light is ON. So OFF the light.
TG # 2 Enclosure Light and Hall Light to OFF.
Unit No. # 1 Power factor is not maintain in auto. Frequently it will comes in manual
mode.
Shift jobs carried
Following S/D Given
1. Reclaimer ,
2. P & V 2 Boiler Side.
3. BC-1,
4. BC-6.
EN-MASS Conveyor-2 put in local mode as per Mr. APS requirement.
Reclaimer spray water pump motor side cable dressing done.
Bed Ash cooler extension board plug top re-connection done.
EOP-2 power ON and OFF as per operation requirement.
P&V 4 Status checked found healthy.
DT 2 temp 74 Deg, DT-5 temp 85 Deg, DT 6 temp 83 Deg.
C-7A/7B Coal bunker level transmitter cleaning done.
Boiler-1 vessel 12-22 SOV JB rubber mat re-laying done.
Unit-2 truck unloading system actuator connection done.
Workshop AHU put in manual to auto
Engg office and SH Room AC power switch ON.
Shift jobs carried
P&V-4 Water OFF

Following AVI Given


1/ BAC-2B

CHP Line-1 trip so check & found Enamss proxy metal sensor wheel not rotating by
Housing Damaged so inform to operation shift inchage

Bucket elevator 1 AVI given and close and taken in local.

BLR#1 fws 40% Control valve (01LCV3203) air regulator fitting leakage so arrest done

BLR#1 FWS 100% line control valve diaphram air leakage so diaphram cover bolt
tightness done & air leakage arrest

Following S/D Given


1/ Enmass -2

Following S/D Clear


1. P & V 2 Boiler Side.
2. BC-1,
3. BC-6.
4. reclamier

Shift jobs carried


In Unit No. -2 Vessel No.- 12/22 back pr. Transmitter and Back pr. Switch Impluse line
is cleaned as per operation requirement.
In Unit No. # 1 and 2 all the coal bunker level transmitter is cleaned.
Fly ash silo No. # 1 and 2 Field inst. And JB cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report ( already made ) is uploaded in SAP System.
Unit No. # 1 Power factor is not maintain in auto. Frequently it will comes in manual
mode.

En Mass No. # 1 S/D to provided and EN-mass No. -2 AVI to given. Also closed the
Permit.
In CHP EN Mass area Hand Lamp and LED Light to provided at site.
Due to hammer replacement in Coal Crusher No. -2 Shut down to provided. Also
Cleared the shutdown.
In 132 KV Line -1 transformer is showing 7200 reading today. So Informed to hement
Sharma.
In Unit No. # 2 BAC area Mech. Welding machine is ON Condition. So OFF the machine.

Shift jobs carried


Following S/D Clear
1/ Enmass-1

Following AVI Given & clear


1/ BAC-2B
2/ Enmass-1
FAS-1 Pneumatic valve not operate so check physically found valve jam condition so
jam clear now valve working normally
Bed Ash cooler extension board plug top re-connection done.
BLR#2 FCV Control valve greasing work done
P&V 4 Status checked OFF
DT 2 temp 74 Deg, DT-5 temp 85 Deg, DT 6 temp 83 Deg.
1 no's 24 V LED Provided at ENMASS -1 & LED Guard Glass Fixing done

Enmass -1 put on DOL Mode & again Put on VFD Mode

TPP Area unwanted Lights OFF


Workshop AHU put in manual to auto
Engg office and SH Room AC power switch ON.
Shift jobs carried
VAM get trip due to high tempreture, so its again taken in line.
Dozing room , panel and equipment cleaning done.
Compresure , auto drain manual check done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report ( already made ) is uploaded in SAP System.
All module panel unit healthiness check .
ACW all motor and fiels power JB cleaning done.
Booster transformer ,lighing cleaning done.
DT 2 temp 75 Deg, DT-5 temp 87 Deg, DT 6 temp 86 Deg. Room tempreture ok.

Shift jobs carried

Following S/D Clear


1/ Enmass-2
2/ Bucket Elevator -2
3/Coal Feeder-2A
4/ Coal Feeder-2A Discharge MOV
5/ Coal Feeder-2A Pneumatic Valve
6/ Reclamier
7/ BC-1
8/AHF-3 Panel
9/ V. Screen-3
Following AVI Given & clear
1/ BAC-2B

Coal Buker -2A level shows 6 mtr. Check physically found level same as DCS Reading
check as per requirement of CCR
FAS-1 Pneumatic valve not operate so check physically found valve jam condition so
jam clear now valve working normally
BAS Level not showing correct as per abnormalitiy so check in field physically found
level same as DCS Level & Level Transmittor probe cleaning work
P&V 4 Status checked OFF
DT 2 temp 74 Deg, DT-5 temp 88.9 Deg, DT 6 temp 83 Deg.

Roolt Blower-1 motor trip due to O/L reset done & Physically check motor & blower
during running observed abnormal sound at Blower side so inform to Shift Incharge

Mech Workshop Grinder Green Tag Updated done

WTPPump House Motor Cleaning & Blowring work

DG Report Prepared and upload in SAP for 28/04/2022

Engg office and SH Room AC power switch ON.


Shift jobs carried

In Unit No. # 1 PF is not mainting in auto mode. So we have increased the MVAR set
point to 0.6. Then it is maintaing in auto . Under observation. Also reduced the Unit No.
# 1 Gen. Voltage from 11.38 to 11.0 KV by OLTC.
In CHP Line No. -2 is tripped due to Bucket elevator No.-2 is in jammed condition. So
O/L reset. Then started it. Now Ok.
Coal feeder -2A pneumatics Valve S/D to cleared.
At 4.5 Mtrs 03 Nos AHU duct opening to Packed.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.

P & V. No. # 2 is already is in running condition. Also water to filled by open the valve.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1/ Reclaimer,
2/ BC-1,
3. Vibrating screen No.-2,
4. Bucket elevator no.-1,
5. BAC-2B'
6. EN mass No.-2,
7. Coal feeder -2A and Discharge MOV,

In BAC Unit No. # 2 Grinder machine cable to changed due to length short.
En Mass No. # 1 AVI to given. Also closed the Permit.
BAC # 2B AVI to given. Also closed the Permit.
In Unit no. -1 Oil centrifuse LED Light to provided.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
Power Report prepared & DG report Prepared & upload in SAP
Environment and Plant performance report upload and mail to all.
Coal feeder 2A Pneumatic valve not open, so manually open it.
Boiler-2 vessel 11 and 12 level not showing, so level probe cleaning and trial run found
healthy.
Boiler-2 drain mov cleaning done.
Compressor house auto drain manual check
Crusher building light manually off.
TG-2 second extension QC NRV air leakage, inform to operation.
Coal feeder, and clean run motor Boiler-2 cleaning done.
Coal feeder boiler-1 side cable dressing done.
Shift jobs carried

Following S/D Clear

1/ Bucket Elevator -1
2/V.Screen-1
3/ BC-1
4/ BC-6
5/ BC7A 7B Bag Filter
6/ Boiler-1 Bag House-1 Vibrator
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities
carried out-
1/ Battery Voltage check- 13.8 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

BC-7A & 7B Damaged hand lamp repaired & New LED Handlamp Handover done

Bolier-1 soot blower-13 Motor earthing found damaged so relugging & connect.

BAS Level not showing correct as per abnormalitiy so check in field physically found
level same as DCS Level & Level Transmittor probe cleaning work
P&V 4 Status checked OFF
DT 2 temp 74 Deg, DT-5 temp 89 Deg, DT 6 temp 83 Deg.
Vibrator spare core checking from feeder to MCC& MCC to DCS checking done

Coal Feeder-2A Pnumatic Exhaust cylinder air leakage so closed air tube removed &
check command instrument side all healthy checked with Opeartion team.

Boiler-2 Bag House 12 no vessel level high so level probe & calibration done
At 13.30 pm DT-5 Temp. 90 deg .so check & found hot air comes from P&V -2 Side
check in field found water level low so refill water & 10 % valve opening for makeup
water level now temp. under observation
Power Report Balance upto 29/04/2022
Shift jobs carried

In Fly ash silo No. # 1 Plate valve is not operating. So checked and found that inst. Side
is ok. Plate valve is in jammed condition. So informed to shift operator.
In coalFeeder -2A and 2B Pneumatics Vibrator new cable laying and connection done.
Also changed the SOV and Coil. Connection done. Trial taken Now running normally.
System is in under observation.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is already is in running condition.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1/BC-7A / 7B Bag filter,
2/ BC-1,
3. Vibrating screen No.-1,
4. Bucket elevator no.-1,
5. BC-6 ,

Fly ash silo Root Blower No.-1 Not running. Found that O/L condition. So Reset it.
As per Operation requirement Bucket elevator No.-2 put into local then put into auto
mode. Also running in DOL mode as per operation requirement.
In Unit No. -2 Coal feeder -2A Starter double earthing to done. While cable laying in
underprogress.

Shift jobs carried

Silo Root Blower-1 get trip, checked and reset.

Silo Root Blower-2 found trip, checked and reset.

Dosing pump all motors and panel cleaning done.

pu tube shifted from coal feeder to Lab (30 mtr approx)


TG building 4.5 mtrs instrument cleaning done.

All unwanted lights switched OFF during shift round

All Energy meter manual reading taken for Power Report.


Power Report prepared and monthy balancing done.

DG report Prepared and upload in SAP


Environment and Plant performance report not send as PC 267 send for updae and all
other PC not support USB and CD Drive.
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC007 .

01.05.2022 A Sanjay garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
01.05.2022 B Ashvin Jadav VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
01.05.2022 C Tarun Gaur
01.05.2022 C Tarun Gaur VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

02.05.2022 B Amit kumar singh


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
02.05.2022 C Tarun Gaur VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
03.05.2022 A Ashvin Jadav
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
03.05.2022 B
Amit kumar singh
03.05.2022 B
Amit kumar singh

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
03.05.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
04.05.2022 A Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

04.05.2022 B Amit kumar


singh/Tarun Gaur Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
04.05.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
06.05.2022 A Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
05.05.2022 B
Amit kumar singh

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
05.05.2022 C Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
06.05.2022 A Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.
P&V-2 and P&V -4 runing in Parallel by VFD
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

Sanjay Garg /
06.05.2022 B Amit kumar
06.05.2022 B Sanjay Garg /
Amit kumar

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
06.05.2022 C Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Office AC ON
Shift instrument digital log book filled

UPS log digital log book filled.


07.05.2022 A Tarun Gaur

VAM log digital log book filled.


P&V-2 and P&V -4 runing in Parallel by VFD

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

07.05.2022 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

07.05.2022 C Amit kumar singh UPS log digital log book filled.
VAM log digital
Following checklog
listbook filled.
prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

UPS log digital log book filled.

08.05.2022 B Ashvin Jadav VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

10.05.2022 A Ashvin Jadav

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.

10.05.2022 B Amit singh


VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


10.05.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
11.05.2022 A Ashvin Jadav Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


11.05.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
12.05.2022 C Ashvin Jadav 4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
1305.2022 C Ashvin Jadav 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Office AC ON
Shift instrument digital log book filled

14.05.2022 A Tarun Gaur UPS log digital log book filled.

VAM log digital log book filled.


P&V-2 and P&V -4 runing in Parallel by VFD
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
14.05.2022 C Amit kumar singh
14.05.2022 C Amit kumar singh Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

15.05.2022 A Sanjay garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
1505.2022 B Ashvin Jadav 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
15.05.2022 C Tarun Gaur
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

16.05.2022 A Sanjay Garg UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

Amit kumaer
16.05.2022 B singh
UPS log digital log book filled.

VAM log digital log book filled.


Amit kumaer Following check list prepared-
16.05.2022 B 1. Shift instrument check list
singh
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
16.05.2022 C Tarun Gaur VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
17.05.2022 A Amit kumar singh
17.05.2022 A Amit kumar singh

S/D Given.
1. BC-4,
2. Vibrating screen-2 ,
3. Coal Feeder -2C ( 02 Nos.) ,
4. BC-1,
5. Reclaimer ,

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
17.05.2022 B Deepak Chand 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


17.05.2022 C Sanjay Garg
Shift instrument digital log book filled
17.05.2022 C Sanjay Garg

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
18.05.2022 A Deepak Chand UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


18.05.2022 B Amit kumar singh Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

18.05.2022 C Sanjay Garg


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
18.05.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


19.05.2022 B Tarun Gaur
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

20.05.2022 A Tarun Gaur


20.05.2022 A Tarun Gaur

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


20.05.2022 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
20.05.2022 C Ashvin Jadav 2. UPS Check List
20.05.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
21.05.2022 A Tarun Gaur

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


21.05.2022 B Sanjay Garg
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
21.05.2022 C Amit kumar singh 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
22.05.2022 A Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
22.05.2022 B Ashvin Jadav Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
22.05.2022 B Ashvin Jadav

4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
22.05.2022 C Tarun Gaur 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
VAM log digital log book filled.

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

23.05.2022 A Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
23.05.2022 B Ashvin Jadav Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
24.05.2022 A Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
24.05.2022 B Amit kumar singh
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
24.05.2022 B Amit kumar singh
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


24.05.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
25.05.2022 A Ashvin Jadav

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
25.05.2022 A Ashvin Jadav

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
25.05.2022 B Tarun Gaur Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
25.05.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

Office AC ON
Shift instrument digital log book filled

26.05.2022 A Tarun Gaur


UPS log digital log book filled.

VAM log digital log book filled.


P&V-2 and P&V -4 runing in Parallel by VFD
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
26.05.2022 B Amit kumar singh 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

26.05.2022 C Ashvin Jadav

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Office AC ON
Shift instrument digital log book filled

UPS log digital log book filled.


27.05.2022 A Tarun Gaur

VAM log digital log book filled.


P&V-2 and P&V -4 runing in Parallel by VFD

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004

27.05.2022 B Sanjay Garg

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
27.05.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Office AC ON
Shift instrument digital log book filled
28.05.2022 A Tarun Gaur
28.05.2022 A Tarun Gaur
UPS log digital log book filled.

VAM log digital log book filled.


P&V-2 andcheck
Following P&V -4
listruning in Parallel by VFD
prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
Date Shift Engineer Name 6. VAM Check list Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

28.05.2022 B Sanjay Garg


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
28.05.2022 C Amit kumar singh Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

29.05.2022 A Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
29.05.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
29.05.2022 C Tarun Gaur 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .
30.05.2022 A Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
30.05.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.

Following check list prepared-


1. Shift instrument check list
30.05.2022 C Tarun Gaur 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


31.05.2022 A Ashvin Jadav VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
31.05.2022 B Amit kumar singh 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
31.05.2022 B Amit kumar singh 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
25.05.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
In CCR Pi - TV is OFF. So checked and found that HDMI cable open from PC. So connected it. Also ON the TV
from Remote. Now Ok.

In Coal Feeder -2A /2B Vibrator is continuously is ON. When giving the STOP command from DCS end. It is not
STOP. So at field side SOV Power MCB is off . Still it is not stop. So air is isolated from field end. We have
changed the SOV. Trial taken still it is not Stop from DCS end. To be check.

P & V. No. # 2 is water Overflow . So closed the water inlet valve.

Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into auto mode.
Now Ok.

Bucket elevator No.-2 is tripped due to O/L. So reset it. Presently it is running in DOL Mode.

online CPCB and ETP website is not opened .

In RNRP SPC004 Showing Both the nodes is in down condition.

All the Manual Light to OFF Condition.

Unit No. -1 Generator Voltage is low. So Increased the Voltage by OLTC.


S/D Given - Vibrating Screen No.-2 and Coal feeder -2A Vibrator system.

S/D Cleared- Vibrating screen No.-2,


Shift jobs carried

Bag-house-2 Vessel-11 High false signal coming, Level probe calibration done and found running healthy.
Unit-2 IFC panel moisture drain.
Unit-2 DCS panel house keeping done.
Unit-2 Coal feeder area cable removing done.
Coal Crusher-1 motor cleaning done.
Vibrating screen floor hand lamp damaged cable removed and shift to workshop.
P&V 2 water level down, so water filling done.
DT-5 temp 88 Deg, DT-2 temp 74 Deg, DT-6 temp 86Deg.

STG Building 0 mtr. All MOV, Transmittor , Control & Instrumnet JB Cleaning & Blowering work & Control Valv
oil Leakage Arrest work
BFP-1 , 2&3 Motors Cleaning work
Fire Pump-1 trip due to overcurrent by frequent ON & OFF by maintaining water pressure now reset & Put on
local mode
P&V 2 water level down, so water filling done.
TG building 4.5 mtrs instrument cleaning done.
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared and monthy balancing done.
DG report Prepared and upload in SAP
Environment and Plant performance report not send as PC 267 send for updae and all other PC not support
USB and CD Drive.
Shift jobs carried

Tap changer controlar connection check and change as it not goes above 6 ,then check now it goes upto 8 tap.

Following Equipment S/D Cleared.


1/BC-2,
2/ BC-1,
3. BC-4,
4. Coal crusher-2,

ACC fan 1-E, show faulty, then chck at vfd found its out going terminal B- phase cable heated , its power off
done and cable re-connection done after lug. VFD panel checked properly found ok, motor meggar check
found low at then it winding heated with hot blower, then after it at 30 M-ohm. then motor cover pack with
anabond and trail and direction trail take with operator found direction ok motor running normal.
UPS panel cleaning and blowering done.

DT-5 temp 89 Deg, DT-2 temp 77 Deg, DT-6 temp 88Deg.

Shift jobs carried

ACC-1 all 6 no's motors Motors terminals cover & open joints anabond pasting & covering by Packing tape
FAS-1 Pneumatic valve not operate so check physically found valve jam condition so jam clear now valve
working normally
Boiler-2 APH Panel clenaning & rubber mat provided
P&V 2 water level down, so water filling done.
BAC-2A &2B Filed Panel & Level probe JB Cleaning & lowering work
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared and monthy balancing done.
DG report Prepared and upload in SAP
Environment and Plant performance report not send as PC 267 send for updae and all other PC not support
USB and CD Drive.
Shift jobs carried

Following Equipment S/D Given.


1. BC-2,
2. BC-1,
3. BC-6,
4. Coal crusher-2,
5. J Valve-1A,
6. J Valve-1B,
7. ACC fan -2C,
8. ACC fan -2F,
EOP-2 Power ON and OFF as per operation requirement.
Bed ash cooler area extension board cable Re-connection done.
Bed ash cooler area grinder machine TOP replaced.
Boiler-2 Ground floor 1-phase power socket 24v to 230v modification done.
Boiler-2 LDB (boiler-1 side) earthing connection done.
Bag House-2 vibrator trial taken found healthy.
DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.
Flay ash silo ground floor repair supply box-68 rubber mat laying done.
P&V 2 water level down, so water filling done.
PC 364 and 212 (new PC) CD (USB) port not working, so call log to IT dept, and will be resolved up to
tomorrow evening.

Temple MIC volume not coming proper, so its setting distubr, setting done and now running healthy.
Boiler-1 top fire line gauge 16 Kg/Cm2 replaced.
Zishu Hozen at Boiler-2 zero mtr. Area
Shift jobs carried

UPS room three no of light repaired as UPS maintanance job continue.

Following Equipment S/D Remove.


1. BC-2,
2. BC-1,
3. BC-6,
4. Coal crusher-2,
5. J Valve-1A,
6. J Valve-1B,

BC4, put on local mode on requirement of CCR, vivek sharma ji at 5.30 pm to 8.00 pm.
UPS panel cleaning and blowering done and its status check as it on battery power and its 250 amp switch ON,
as battery load indicator get off and inform to pramod sati sir.
Following Equipment S/D Given.
1. SF6 breaker,
2. 132 kv isolator-1,
3. Generator transformer-1,
for tommrow sf6 gas filling job in breaker.

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 88Deg.


P&V 2 water level down, so water filling done.
Physical observation taken of, Cooling tower motor, ACW motor, Reclaimer area, Jockey pump BFP area
equipment.
UPS 1&2 battery voltage check and reading note, with pramod sati sir.
UPS1 one battery by-pass (no. 90) due to voltage abnormal..
VAM panel packing done with ,packing tape.
Shift jobs carried
In Boiler No.-2 APH Main Inst. Air Valve PU Tube tightness to done.
In Compresoor area all the auto drain valve checked it is working normally.
In Boiler no.-1 APH Field inst. And JB cleaning and Blowerning to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP T-1 and T-2 and Coal shed area Light to OFF.
In Fly ash silo Root Blower No.-1 not started found that O/L. So reset it. Now Ok.
Silo Root Blower No. - 1 and 2 motor and Panel cleaning and Blowerning to done.

Shift jobs carried

Following Equipment S/D Given.


1. Vibrating Screen-1,
2. SA Fan-1,
3. BC-1,
4. BC-2,
5. Reclaimer
6. Vibrating feeder Coal feeder
DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.
P&V 2 water level down, so water filling done.
LP Dosing Pump tank level transmitter 02QI3301 level not showing, so new level transmitter installed. And
trial run found healthy.
Boiler-1 top fire line gauge calibration done. And marking done..
Bucket elevator No.-2 is tripped due to O/L. So reset it.
MPHB 22 mtr light manually OFF.
Vibrating motor Coal feeder tripped in overload, so checked and found motor take 2.0 amp, and relay set on
0.6A , so relay set on 1 amp(max range). And trial run found running healthy.
PC 212 (new pc) tpp-general user running normal (work done by IT)
Clamp meter new Lead received.
Shift jobs carried

UPS -1 Battery Bank all Batteries voltage checked .

Following Equipment S/D Remove.


1. 132 kv line-1
2. Reclamier
3. BC-1,
4. CBC-2,
5. V. Screen-1,

UPS -2 Battery Bank all Batteries voltage checked .


Chimney Area Lighting Damaged Cable repair done
ACC-2 Area Lights OFF
DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 88Deg.
P&V 2 water level down, so water filling done.
Root Blower-1 trip due ti O/L Reset done
FAS-1 Pneumatic valve not operate so check physically found valve jam condition so jam clear now valve
working normally
Office AC OFF
VAM panel packing done with ,packing tape.
Shift jobs carried
In Turbine ETS PC SCADA is not showing. So Start the software. Now Ok.
Section room one AC is in ON condition. So OFF the AC.
In Chimney analyzer room all the Panel cleaning and Blowerning to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
P & V. No. # 2 is water level is Low so Open the water valve then closed the water inlet valve.
In Boiler No.-1, 6 th to 7 th floor light to OFF Condition.
Earthing Rod shifted from switchyard to 4.5 mtrs MCC Room.
DT-5 temp 88 Deg, DT-2 temp 72 Deg, DT-6 temp 86 Deg.
Shift jobs carried
Following Equipment S/D Given.
1. BC-4
2. Coal Feeder-1A
3. Coal Feeder-1B.
4. Coal Feeder-1A
5. Coal Feeder-1D
6. Crusher-1

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
WTP Battery Bank Room Temprauture to high due to AC Gas issue now open the door for ventilation ( Battery
Bank -2 found more hot then other)
LP Dosing dosing room Magnetic Level switch not showing level correct checing work U/P
Bucket elevator No.-2 is tripped due to O/L. So reset it.
Instrument Lab 5S Done

P&V-2 & P&V-4 Connect work in parallel operation after sometime during round observed P&V VFD trip due
to Motor Overload(7122 Fault) now P&V-4 Supply OFF & P&V-2 Taken in line now normal running (45 Hz)
PC 212 (new pc) tpp-general user running normal (work done by IT)
BC-4 , BC-7A &7B Bag Filter RAV Motor Timer Operation Bypass done from field Panel
Shift jobs carried

WTP Battery Bank Room Temprauture to high so its door open for ventilation

Following Equipment S/D Remove.


1. Coal crusher-1
2. BC-4,
Coal feeder -1A, motor connection remove and after maintanance its connection done.
Generator-2, CT, JB double earthing done.
Generator-2, NGTR ,TB switch JB double earthing done.
DT-5 temp 87 Deg, DT-2 temp 74 Deg, DT-6 temp 87 Deg.
Coal feeder 1-B , connection open DE-R/Y/B- NDE.
P & V fan 2 & 4 both running normaly after changing current setting .

Grid isolation done at 5.00 pm on requirement of plant and at time of synchronization at 06.20 pm it not
complete even all parameter match , so main TR. 1 charge and then connect to grid and after that
synchronization done at 8.10 pm. So after that line -1 transformer again off done and breaker in isolate
position. ( please take reading of both transformers import/ export as it chare for few minute)

Office AC off done.


U-2, 11-21 , back pr. Seal pressure dome valvecylender air leakage arrested
Shift jobs carried
All unwanted lights (T1,T2 tower, BC-4 Coal shed area) switched OFF during shift round
All Energy meter manual reading taken for Power Report.
DG report not prepared due to PC error.
Environment and Plant performance report send to all concerns.
OLD ac panel, 4.5 mtr VFD panel, and equipment cleaning done at VAM floor
Boilr-2 vessel 12-22 line flushing done.
compressor house auto drain valve manually checked found healthy.
Coal Feeder motor 1C and 1D motor side connection removed as per PTW
P&V 2 water level down, so water filling done.
4.5 mtr switchgear room LDB panel cleaning done.
DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 85 Deg.
Following frequent error coming in PC 364 and 212 while TPP-General user login ( The reference account are
logged OUT) Kindly resolved the issue through IT dept.
Shift jobs carried

Following Equipment S/D Given.


1. BC-6
2. Bag Filter- 7A&7B
3.BC-7A
4. BC-7B

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
1 no's Exhaust Fan Provided at WTP Battery Room
FAS-2 Pneumatic jammed due to closed condition so check & found close side minor exhaust air leakage from
cylinder So Inform to Operation Shift Incharge

Zishu Hozen at TG Building 0 mtr.


EOP-2 power ON and OFF as per operation requirement.
P&V-4 Field Panel Emergency Switch found Damaged Condition Replaced by new one.
Unit-2 Battery charger supply OFF & Unit -2 Battery charger Parallel with Unit-1 Battery Charger
BC-4 , BC-7A &7B Bag Filter RAV Motor Timer Operation Bypass done from field Panel
Shift jobs carried

In Unit No. # 2 Coal Bunker --2B and 2D is empty. Also only Coal feeder - 2C is in running condition. Due to this
Main Steam Pr. Tripping is in bypassed condition. When Normalized it Then tripping taken in line. Now Ok.
In Unit No. # 2 Coal feeder -2B is not started from DCS end. Found that Temp. switch is acted at site. So open
the wire from DCS end. When normalized the Temp. then again taken in line. Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.

P & V. No. # 2 is already is in running condition. Also water to filled by open the valve then closed the valve.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-6
2. Bag Filter- 7A&7B
3.BC-7A
4. BC-7B
5. BAC-2A,
6. EN Mass No.-11,
7. Bucket Elevator No.-1,

BAC-2A LED Light and Transformer is provided to Operation person.


In Unit No. # 1 Coal Feeder -1C and 1D Clean run motor connection removed as per Hement Sharma
requirement.
DT-2 temp 76 Deg, DT-5 temp 85 Deg, DT-6 temp 87 Deg.

Shift jobs carried


All unwanted lights ( Fire pump house )switched OFF during shift round

All Energy meter manual reading taken for Power Report.


DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Coal Bunker Unit-2 all 04 nos level transmitter cleaning done and power reset.
Boiler-2 vessel 12-22 seal pressure fault, line flushing done, and gauge side tube are removed condition, so
fitting the same and trial run found healthy.
Boiler-2 vessel 12 High level coming, so level probe cleaning done, and found running healthy.
SH and Eng. Offices AC power OFF.
TG floor exhaust fan panel cleaning and connection tightness done.
ACC Unit-2 fins cleaning trolley 4 power cable and earthing cable dressing done.

Coal feeder 2D motor fan cover loose and contact with fan, so bolt tightness done and now running healthy.
DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
Shift jobs carried

Following Equipment S/D Given.


1. BC-7A & 7B ( S/D Clear)
2. Bucket Elevator-2
3.Enamss Convyor-2
4. BAC-2A
5. CEP 2A &2B

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.8 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
ACC-1 6 no's Motors both sides Lubrication work done
BC-4 Bag Filter RAL not running when timer bypass now modified timer circuit RAL Running Normally take
0.9 amp all Phase
LP dosing room Drain valve flange water leakage arrested work
BC-4 Bag filter Field Panel Power MCB R phase found heated & damaged condition now heated cable cut &
Relugging & connection done now healthy need to be change Power MCB (40 amp.)
Boiler-2 Furnace Bed Thermocouple 02TI1116 found temprature low check both pair in field JB found existing
pair found open condition then spare pair taaken in line temprature found healthy
Unit-2 Battery charger supply OFF & Unit -2 Battery charger Parallel with Unit-1 Battery Charger
Boiler Lift-1 telephone not working so check & found connector pin loose so remove & again insert telephone
healthy
LP dosing room level gauge now working checking work underprogress
Shift jobs carried
In BC-1 PCS Rope at 270 Mtrs damaged condition. So joint in rope and Clamp to provided. Now Ok.
In WTP Battery room temp. is high. So One external cooling fan and Exhust fan is installed at site. Now Temp.
is under observations.
In Unit No. # 2 Boiler Vesssel No.-11 Level High is showing at DCS end. So checked and found that no material
inside the vessel So cleaned the level probe and calibrated it. Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.

P & V. No. # 2 is already is in running condition. Also water to filled by open the valve then closed the valve.
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1. Bucket Elevator-2
2.Enamss Convyor-2
3. BAC-2A

At BC- 7A and 7B area, 24 Volts Hand Lamp to provided to Operation person.


In Unit No. # 1 Zero mtrs Hydro Pump is not ON. So Plug Top to changed. Now Ok.
In WTP Battery room external Fan connection to done.
Shift jobs carried
One no. LED light provide at crusher floor.

powe off done of BC4 belt on PTW by CCR. & On power after job complete.

Coal crusher-1 power off done and meggar value check found ok .
1. R-E=5.68 G ohm
2. Y-E=6.18 G ohm
3. B-E=5.98 G ohm
Instrument air commpresor -1, vfd reset one time, exhaust fan running on.
Battery room and its tempreture observe at starting of shift it at 40 C ans at end of shift at 38.2 C
U#2, bag house instrument jb and instruent cleaning done.
vibrator feeder of 2C/D made healthy at 04.00 am.
Power Report prepared and monthy balancing done.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
DT-2 temp 72 Deg, DT-5 temp 87 Deg, DT-6 temp 84 Deg.
Shift jobs carried

DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 85 Deg.


SH and Eng. Offices AC power OFF.
Bed ash silo RAV tripped in overload reset ad found jammed so inform to operation.
Following Equipment S/D Cleared.
1. Bucket Elevator-1
2. Vibrating screen 1
3. Coal Crusher-1
Following Equipment S/D Given.
1. Bed ash silo Dry unloading.
Bucket Elevator-1 put in Local and, put in Remote after work completed.
P&V 2 water level down, so water filling done.
BC-7A/7B Motor cleaning done.
Instrument comp-1 alarm coming 2052 (Cooling), So VFD panel cleaning done and DCS room both side door
open and under observation.
Boiler- 2 feed water control valve Gland leakage attend done.
Boiler-2 APH panel and Bag house SOV panel cleaning and sealing done.
TG Building lift sensor fault reset done.
Shift jobs carried
Following Equipment S/D Given.
1. Coal Crusher-1
2. 02MV0910 (Coal feeder 2B discharge MOV)
3. BC-6.
4. ID Fan-1
5. J Valve 1B
6. U-1 Soot Blower
7. 01MV2301
8. SA Fan 1
9. 01MV2302
10. P fan-1
11. J valve-1A
12. 01MV3210
13. PA Fan-1
14. Boiler-1 Ignaitor-1
15. Boiler-1 Ignaitor-2

SH and Eng. Offices AC power ON.


DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 85 Deg.
P&V 2 water level down, so water filling done.
All unwanted lights switched OFF during shift round
Coal feeder Unit- 2 side LED light cable broken, so replaced and light shift in shift almira.
ACC Unit-1 extension board removed and shift in shift almira.
EOP-2 power ON and OFF as per operation requirement.
WTP battery room door packing done and temperature checked found 30 deg C
Coal feeder 2B dis MOV work under progress.
Boiler-2 feed water station equipment cleaning done.

Shift jobs carried

Vibrator cable for coal bunkar 2B checked with Deepak.


MOV and arrangement remove from Coal feeder 1 D, and fixed at 2B, limit setting done and trail taken in
presence of mr. mahes sharma.

Following Equipment S/D Cleared.


1.
2. Vibrating screen 1
3. Coal Crusher-1
Following Equipment S/D Given.
1. Bed ash silo Dry unloading.
Bucket Elevator-1 put in Local and, put in Remote after work completed.
P&V 2 water level down, so water filling done.
BC-7A/7B Motor cleaning done.
Instrument comp-1 alarm coming 2052 (Cooling), So VFD panel cleaning done and DCS room both side door
open and under observation.
Boiler- 2 feed water control valve Gland leakage attend done.
Boiler-2 APH panel and Bag house SOV panel cleaning and sealing done.
TG Building lift sensor fault reset done.
Shift jobs carried
In Boiler No.-2 Coal Feeder -2B running in Local mode also Main feeder motor takes the current 2.7 Amps.
When it is started in Remote mode . Not started. Found that Controller is in hang condition. So Reset the
supply. Now Ok.

Due to change in Coal , SOX factor of Chimney analyzer changed from 0.13 to 0.5. Also changed in DCS also.
In Compresoor area all the auto drain valve checked it is working normally.
In Boiler no.-2 BAC-2A Dome valve is manually operated a per operation requirement.
In WTP Hall area all the field inst. And JB Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP T-1 and T-2 and Crusher Building area Light to ON as per operation requirement.
In Unit No. # 2 coal feeder area 24 Volts LED and Transformer shifted to shift almirah.
One no. 24 Volts LED light put into charging point at 4.5 mtrs.

Shift jobs carried

Following Equipment S/D Given.


1. Vibrating Screen-1.
2. Reclaimer.
3. BC-1.
4. Bed Ash Silo Dry Unloading.
5. Coal feeder 2B.
6. 02MV0910
7. DT-4
8. PCC-2A

SH and Eng. Offices AC power ON.


DT-2 temp 73 Deg, DT-5 temp 85 Deg, DT-6 temp 84 Deg.
P&V 2 water level down, so water filling done.
All unwanted lights switched OFF during shift round
EOP-2 power ON and OFF as per operation requirement.
Fire pump house instrument cleaning done.
Unit-1 Drum pressure gauge cleaning done and due date changed.

Temple MIC volume not coming proper, so its setting disturb, so setting done and now running healthy.
WTP battery room temperature checked found 30 deg C.
Fire Pump House Fire Engine Battery & Charger Maintenance & Following activities carried out-
1/ Battery Voltage check- 13.6 v dc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness d

Following Equipment S/D Clear.


1. Bed Ash Silo Dry Unloading.
2. Coal feeder 2B.
3. 02MV0910.
Shift jobs carried
Grid Island But Not Synchronised.So Hement sharma and Tarun Mandawat comes at site. Voltage is match but
frequency is not match. Our frequency is less than the grid frequenccy. So Set point of frrequency in LMS PC
changed from 49.7 to 50 Hz. Then synchronised the grid. Now Ok.
In Boiler No.-2 Coal Feeder -2C running in Local mode When it is started in Remote mode .It is running
normally.
In Compresoor area all the auto drain valve checked it is working normally.
In Unit No. # 2 Vessel No.-12 ,22 Back Pr. Transmitter Impluse line cleaned.
In CHP DCS Room Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP T-1 and T-2 and Crusher Building area Light to ON as per operation requirement.
In HP Dosing Room motor cleaning to done.
Hand Lamp to Provided at BC-7A / 7B area.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF (ACC-2) during shift round
DT-2 temp 78 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
Crusher building light ON as per operation requirement.
WTP pump house motor and JB cleaning done.
STG MCC panel cleaning done.
Coal Feeder 2C clean run motor tripped in overload (02 times) reset it and current checked found 1.0 amp
balanced load taken.
Clean run motor power OFF and ON as per operation requirement.
Boiler-2 bag house-22 level High showing, so level probe cleaning and trial run found healthy.
Unit-2 APH balancing valve 8107 air tube loose and limit cable hanging, so both point attend.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF during shift round
DT-2 temp 77 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
Unit-2 bag house 12 and 21 level probe cleaning done.
WTP High pressure pump panel sealing done.
U-2 vessel-21 dome valve fitting tightness done.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
BC7-A/B and Crusher floor light on as per operation requirement.
BC7-A/B area lighting JB cover fitting done.
4.5 Mtr switchgear room boiler MCC panel cleaning done.
Generator transformer-2 breaker put in remote to local
Shift jobs carried

Following Equipment S/D Given.


1. BC-4(Clear)
2. BC-4 Bag Filter

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 12.9 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
Bucket Elevator-1 put in Local and, put in Remote after work completed.
Mech Workshop Grinder M/C New cable connection & Green tag Pasting work
Bed Ash Silo RAV Trip Due to Overload Reset done
EOP-2 power ON and OFF as per operation requirement.

BC-4 All Pullchrod cable Gland sealing , cable dressing & all Pullchrod covered by Ploythene covering work
Boiler-2 Ground Floor all E&I Equipment Cleaning & Blowering work
Office AC ON
Shift jobs carried
Coal feeder 2 C, panel wiring check as it not run in remote mode and its terminal connection also tightness
done at panel and field LCS. Then its running normaly.
Clean run motor of 2-C,get overload at 2.20 am,then check found new motor tempreture normal and winding
resistance at 64.2 ohm and meggar value at 200 M ohm.then its start with 1.4 amp and after two minute its
tempeture rise to 4.1 amp and again trip.
After cleaning jam clean run motor start with 1.5 amp balance and running with 1.1 amp balance
CCR inform that coal feeder 2C not show load, so check and found its wire connection open at controllar so
connect it properly, now ok.
physical observation taken of, turbine and boiler area for WTI & SBO.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF during shift round
DT-2 temp 78 Deg, DT-5 temp 88 Deg, DT-6 temp 86 Deg.
Coal feeder 2C field JB blowering cleaning and packing done.
VAM set point reduce of workshop MVVFD room 42.5 to 41.5 C
At 4.5 meter, MPDB panel two hole packing done.
U1 &U 2 , lift door sensor cleaning done.
Shift jobs carried
In ACC Fan-1E, VFD Output Yellow cable heated and Temp. is showing 90 degree. So carbon cleaned ,
tignetness done and tape is provided. Now connected. Now temp. is under observations. ( R-Phase Temp-38.5
Degree , Y-Phase Temp.- 37.9 Degree and B-phase Temp.-- 41.2 Degree ).

In Bed ash silo RAV is not running. So checked and found that O/L. So Reset it. Now Ok.

P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water Overflow . So closed the water inlet
valve.
In Coal Feeder-2C Local Control Panel Cleaning and Packing tape to Provided.
In Unit No. # 2 all the O2 Probe and Controller Polythene coverning to done.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
S/D Given - BC-6,

Shift jobs carried


SH and Eng. Offices AC power ON and OFF as per requirement.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 78 Deg, DT-5 temp 87 Deg, DT-6 temp 82 Deg.
VAM tripped in High vapour temperature, reset and trial found healthy.
Chimney O2 value zero for 15 minutes, physically checked and found healthy.
Boiler-2 vessel 11-21 back pressure line cleaning done.
CCR AHU manual to AUTO change over done.
Sox set point changed in DCS 0.25 to 0.15

ACC-1E ( R-Phase Temp-40.5 Degree , Y-Phase Temp.- 30.8 Degree and B-phase Temp.-- 90.0 Degree ).
P & V. No. # 2 and 4 is in running condition.
WTP RSB-78 ELCB checked and green tag provided.
BFP all 03 motors cleaning done.
24 V hand lamp repaired and put in workshop.
Shift jobs carried

STG Building 0 mtr & 4.5 mtr Instruments cleaning work


ACC-1E ( R-Phase Temp-40.5 Degree , Y-Phase Temp.- 30.8 Degree and B-phase Temp.-- 90.0 Degree ).
Boiler-2 21 no's vessel level high so clean & calibration done
P&V 2 water level down, so water filling done.
HP Dosing room Motors & Panels cleaning work
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared and monthy balancing done.
Environment and Plant performance report send to all concerns.
DG report Prepared and upload in SAP
Shift jobs carried
In ACC Fan-1E, VFD Output Yellow cable heated and Temp. is showing 90 degree. So Changed the Copper lug
and loop cable termination interchanged from VFD Out put to Contractor side. Now connected. also cooling
fan Installed at panel end.Now temp. is under observations. ( R-Phase Temp-33.2 Degree , Y-Phase Temp.-
33.1Degree and B-phase Temp.-- 33.5 Degree ).

In Unit no. # 2 Bucket Elevator Put into local mode as per APS requirement. Also Put into local mode.

P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water Overflow . So closed the water inlet
valve.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into auto mode.
Now Ok.
In LP Dosing pump No. # 1 and 2 Not started at panel side. So checked and found that low Level switch is
acted. So reset it. Now running normally.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

S/D Given.
1. BC-6 ( 02 Nos.) ,
2. ACC Fan -1B ,
3. Coal Feeder -2B ,
4. BC-4,
5. BC-4 Bag Filter ,
6. Reclaimer ,

In CHP DCS Room Panel Cleaning and Blowerning to done.


All the AC MCB to ON Condition.

Shift jobs carried


ACC fan 1-B , current check at vfd and breaker it take 90 kw, 150 amp at 49.5 Hz.
Line 2, transformer sf6 breaker 132kv side , sf6 gas top-up done 0.4 Mpa tp 0.5 Mpa , with proper
arrangement.
S/D Remove.
1. BC-6 ( 02 Nos.) ,
2. Coal feeder -2B

WTP, air leakage arresting done of actuator.


Coal feeder 2C, pnumatic valve check commond proper ok.
Auto drain check manually of commressor house.
SWAS room tss physically check field side.
DT-2 temp 78 Deg, DT-5 temp 87 Deg, DT-6 temp 82 Deg.
P&V no 2 water lavel check found normal and cooling.
ACC - 1 E , vfd panel y phase cable terminal check both side after close its at 36 C.
SH and Eng. Offices AC power ON and OFF as per requirement.
HP Dosing room one light remove and shift to next place.
U#2, bed ash cooler area one industrial plug top change.
Shift jobs carried

STG Building 9 mtr. RSB Panel - 51 , 52 &53 all ELCB Testing manulally & Cleani ng work

ACC-1E ( R-Phase Temp-38.5 Degree , Y-Phase Temp.- 38.8 Degree and B-phase Temp.-- 38.1 Degree ).
STG Building 9 mtr. Exhaust Fan Panel Cleani ng & Blowering work
Boiler-2 12-22 comes in seal pressure fault so check & found voltage drop in Panel after giving command
checking work U/P
12 no's vessel faulty Pressure gauge replaced by new one
Chimney NOX Data fluctuation in DCS so check in field found controller display hang condition so auto
calibration done now ok
All unwanted lights switched OFF during shift round
All Energy meter manual reading taken for Power Report.
Power Report prepared and monthy balancing done.
Environment and Plant performance report send to all concerns.
DG report Prepared and upload in SAP
Shift jobs carried

Boiler-2 , 12-22 comes in seal pressure fault so check & found voltage drop in Panel after giving command , so
its solenoid coil check found its loose so tight and at DCS, terminal also contact in open condition so connect it.
Now ok.
At BACof U#2one no of industrial top and cable change of grinder .
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water lavel ok.

ACC-1E ( R-Phase Temp-35.5 Degree , Y-Phase Temp.- 35.8 Degree and B-phase Temp.-- 36.1 Degree ).
CHP DCS room room AC not work proper so one exhaust fan shift and start thair. its outdoor unit cleaning
done with water.
AVI provide of coal feeder 2C on AVI-5261 & close it.
WTP furnace contactor cleaning and contact tightness done.
S/D Given.
1. BC-4,
2. Vibrating screen-2 ,
3. Coal Feeder -2C ( 02 Nos.) ,
4. BC-1,
5. Reclaimer ,
6. ID Fan-1

One earthing done at DCS panel no. 92


All the AC MCB to ON Condition.
EOP-2 power ON and OFF as per operation requirement.
S/D Remove.
1. BC-4,
2. Vibrating screen-2 ,
3. BC-1,
4. Reclaimer ,
One single phase extension board provide to instrument at commpresor room.please collect it.
Shift jobs carried
IAC-1 get trip due to VFD over temp, so open the panel door and exhaust fan provided.
Coal Feeder 1C , AVI given and close two times.
Bag House Vessel 12-22 and 21 level probe checking done calibrate the probe.
WTP Bomb calorimeter cylinder gauge replaced.
VAP air pressure drop found air valve closed , open the valve.
WTP locker area new lights installed.
CCR AHU manual to AUTO change over done.
SH and Eng. Offices AC power ON and OFF as per requirement.

ACC-1E ( R-Phase Temp-33.5 Degree , Y-Phase Temp.- 33.8 Degree and B-phase Temp.-- 33.0 Degree ).
CHP DCS Room Door Open for room cooling from compressore side. To be check.
Shift jobs carried
In Unit No. # 2 Coal feeder--2C is not running in Remote mode. So Checked and found that VFD and Panel is in
Local Mode. So Put into remote mode. Now Ok.
At 4.00 AM Suddendly the Chimney analyzer all the rading showing high variation from high to low and zero
value. So OFFt the Power of controller. Then ON. Controller is showing Flash Prom fehler fault. So Informed to
Mr. tarun. He told me changed the controller. So we have changed the conroller. Now reading are showing
normally. Under observation.
In CHP DCS Room AC gives the hot air. So AC is OFF Condition. Present Temp. is 38 degree.
In Compresoor area all the auto drain valve checked it is working normally.
TG Building Lift IR sensor is not working condition. So adjust it. Now Ok.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
At BC- 7A and 7B area, 24 Volts Hand Lamp to provided to Operation person.
In ash root Blower No. # 1 is not ON from DCS. So reset the O/L. Now Ok.

ACC-1E ( R-Phase Temp-36.5 Degree , Y-Phase Temp.- 36.7 Degree and B-phase Temp.-- 36.9 Degree ).

Shift jobs carried


Following Equipment S/D Given and close.
1. BC-3
2. BC-6
3. Vibrating Screen-2
SH and Eng. Offices AC power ON.
EOP-2 power ON and OFF as per operation requirement.
ACC-1 and ACC-2 Ground Floor Self maintenance done.
All unwanted lights switched OFF during shift round
P&V no-2 Tank water found empty ,so fill the tank and minor open the water valve.
Unit-1, ACC Mist fan Earthing found loose , tighten the same.
Unit-02, Coal bunker all level transmitter cleaning done.
Behind CCR bunch of Ethernet cable found loose and hanging, proper cable dressing done.
CCR AHU turn in manual to so change over to auto mode.
Shift jobs carried
Air leakage of IFC arrested after bypass air line in presence of ccr person.Mr ketul sharma.
U#2, APC , vessal no.02, seal air fault , check and found dome in open position, so cheked dome SOV, connector
loose ,so tight it and trail taken manually and then check from ccr , working ok.

VAM, steam control valve PU- tube laying from coal feeder 1A load cell purging air valve and taken in line for
VAM operation. ( so in case of VAM trip please check line from coal feeder purging air valve.

Power off done of PA fan-1 on PTW.


BAC-2B , not run so check and found its vfd show, OPF fault so its reset and start normally at 3.10 pm.
WTP furnace earthing provide.
At 4.5 meter, RSB no. 50 indoor earthing done.
SH and Eng. Offices AC power ON and OFF as per requirement.
DT-2 temp 74 Deg, DT-5 temp 88 Deg, DT-6 temp 85 Deg.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water level check and fill.
Shift jobs carried
In WTP Bomb calorimeter Air leakage from regulator side. So fitting tightness to done. Now ok.
In Unit No. # 1 O2 probe Polythene Coverning to done.
In Unit No. # 1 APH JB connection tightness to done.
At 4.5 mtrs TG Building field Inst. Cleaning to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
At Coal feeder area, Charging Light to provided to Operation person.
Dereator Floor area Light ON as per Operation person requirement.
Unit No. # 1 Soot Blower Panel connection tightness and cleaning to done.

Shift jobs carried


Following Equipment S/D Given
1. BC-1 ( Clear)
2. ACC-2A
3. ACC-2A Lube Oil
Crusher-2 HT Breaker Motor Space Heater indication Lamp wiring done & taken in line
BC-6 not start so check & found Head Pully Guard limit not act , Guard found loosen condition , Guard limit
tightness done now ok
BC-1 stop during running so check in field found material on side head pully & limit not act so limit bypass
done ( Discussion with Shift Incharge & Concern SH(o&m))
FAS-2 Pneumatic not open so checked manually 2-3 times & found plate jammed condition so jammed clear &
handover to operation dept.
Coal Feeder-2B Level not showing healthy at DCS so Power reset done now ok
ACWPump house DP Transmittor area Cable Dressing work
Following Equipment AVI Given & Close
1/ BAC-2B
DT-2 temp 74 Deg, DT-5 temp 87.8 Deg, DT-6 temp 85 Deg.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water level check and fill.

Shift jobs carried


Following Equipment S/D Given and close.
1. BC-1
2. Reclamier
3. Vibrating Screen-2
4. BC-4
SH and Eng. Offices AC power ON.
EOP-2 power ON and OFF as per operation requirement.
Boiler-1 &2 E&I Equipment Cleaning & Blowering work
All unwanted lights switched OFF during shift round
Vibrating Screen-2 Feeder PM Following Activities done-
1/ Power & Control Circuit Tightness checked.
2/ Power Contactor fixed & Moving Contact found Heatup Condition Replaced by new one.
3/ SFU Fuse Grip found loose condition so tightness done & 1 no's Power fuse replaced by new one due to
fuse aging & corroded.
4/ Feeder Cleaning done

TPE-10 Extension Board Green Tag Updated work


Coal Feeder -2 area 24 V LED Light Plug top found damaged condition so replaced by new one
Temple Power JB found Open Condition so close done
CHP DCS (91-M CHP Ash) Panel BRC Changed Primary to Secondary
CHP DCS Room Temprature high so new exhaust fan shifting & running niw temprature under observation
Shift jobs carried

In Coal Feeder -2B is frequently tripped due to plough discharge. So checked at field side connection is loose
and limit switch groove position is not correct. So corrected it. Then trial taken it is working normally.
CHP AC is running normally . Also cooling fan is OFF position.
In Unit No. # 2 APH , Vessel No.-11/21 and 12/22 field Inst. And JB cleaning and blowerning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is already is in running condition.
All the Manual Light to ON Condition.
Following Equipment S/D Closed.
1. BC-1
2. Reclamier
3. ACC Fan-2B , 2C and 2F and ACC LOP-2B ,

BAC-2B AVI is given also Closed the AVI.


Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into auto mode.
Now Ok.
Boiler Lift-1 inside Open panel Packing Tape to provided.
At 22 mtrs Bunker light ON as per Operation requirement.
DT-2 temp 76 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF (Coal Shed, BC-5 and 3 and 22 mtr) during shift round
DT-2 temp 75 Deg, DT-5 temp 88 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
Boiler-2 feed water station and De-super heater equipment cleaning done.
Boiler-2 soot blower panel cleaning and sealing done and rubber mat laying done.
Compressor 1 and 2 panel cleaning done.
Boiler-2 vessel 11-21 back pressure line cleaning done.
Compressor house repair supply box-97 checking done, and green tag provided.
Shift jobs carried
Following Equipment S/D Given
1. BC-1(Clear)
2. Reclamier(Clear)
3. Crusher-1(Clear)
4. BC-7A&7B Bag Filter
SH and Eng. Offices AC power ON.
Coal Feeder Area Welding M/C Green Tag Updated done
BC-4 Area 24 V Power JB Door close & Packing work
All unwanted lights switched OFF during shift round
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 12.9 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1220 & Max-1260
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
CHP MCC Back side AC Power Supply JB Close & Covering work
Zishu Hozen at Reclamier Area
P&V 2 water overflow found during shift round so valve closed & P&V-4 Water Level OK

Enmass Floor ZSS 2 no's JB Open condition so close & Packing done
Shift jobs carried

In Unit No.# 1 Furnace O/L temp. is not showing at DCS end. So changed the Thermocouple. Now Ok.
In all the Lift Telephone checked it is working normally.
In Compresoor area all the auto drain valve checked it is working normally.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is already is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Following Equipment S/D Closed.
1. BC-7A / 7B bag Filter Panel

At 22 mtrs LED and Transformer and Charging light to provided to operation person.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
BC-7A/7B area lamp to provided.
DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.

Shift jobs carried


Coal bunkar 2C lavel not show at DCS so its probe cleaning and connection tight done.now ok.
U#2, feed water station control valve, MOV cleaning and blowering done.
Compresoor house all the auto drain valve checked it is working normally.
Exhaust fan panel cleaning done at 4.5 meter.
STG Building 9 mtr. RSB Panel - 51 , 52 &53 all ELCB Testing manulally & Cleani ng work
U#2 bag house-22 level High showing, so level probe cleaning and trial run found healthy.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF during shift round
DT-2 temp 74 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.

Shift jobs carried


In WTP DCS Room Panel Cleaning and Blowerning to done.
In WTP RO HPP panel Packing tape to done.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water filled due to low water.
In Engineer Room AC is ON as per requirement.
IFC filter drained to done.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
S/D Given.
1. BC-1,
2. BC-4 ,

Bucket Elevator No.-1 put into manual and DOL as per Operation requirement. Then again put into Remote
and VFD mode.
Barring Gear of unit no.# 2 ON/OFF as per operation requirement.
DG Report is uploaded in SAP System.
Shift jobs carried
Following S/D Clear.
1. BC-1,
2. BC-4 ,
Bed Ash Cooler 2B area Grinder Plug top replaced.
En-Mass area 24V hand lamp provided.
WTP pump house motor and JB cleaning done.
BC-1 head end side pull cord rope proper dressing done.
Fly ash silo 2 fork level switch cleaning and trial run healthy.
WTP DCS panel cleaning and blowering done.
DT-2 temp 78 Deg, DT-5 temp 76 Deg, DT-6 temp 82 Deg.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water filled due to low water.

Shift jobs carried


Root Blower- 1&2 Motors & Panel Cleaning & Blowering work
DCS-1 Side 1 phase ELCB Green Tag Updated work
Battery Chager -1 Back side Door Hole sealing by Packing Tape
BAC-2A &2B Field Panel & Instrument JB Clenaing & Blowering work
U#2 bag house-22 level High showing, so level probe cleaning and trial run found healthy.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF during shift round
DT-2 temp 74 Deg, DT-5 temp 87.8 Deg, DT-6 temp 86 Deg.

Shift jobs carried


In Bed ash silo Gate Valve is not Opened. So Found that SOV Coil is in loose condition. So Tightness done. Now
ok.
In WTP Furnace system is not working condition. So checked and found that sensor break alarm is showing in
controller. So Changed the T/C. Now under observations.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water filled due to low water.
All the AC MCB to ON Condition.
In Fly ash silo Top Green Tag to provided.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

S/D Given.
1. BC-4,
2. BC-4 Bag Filter ,
3. Coal Feeder-2A,
4. ACC fan-2D and LOP ,
5. Reclaimer ,
6. Vibrating Screen No.-1,

Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into auto mode.
Now Ok.
Barring Gear of unit no.# 2 ON/OFF as per operation requirement.
In Unit no. # 2 BAC welding machine is not ON. So ON the MCB. Now Ok.
Shift jobs carried

Following S/D Given.


1. ACC-2E,
2. LOP ACC-2E ,
3. Coal feeder 2C ,
Boiler-2 vessel-21 level high showing, so cleaning done and found healthy.
WTP furnace connection loose, so re-connection and tightness done, trial running healthy.
Calibration Sticker pasting done at coal feeder panel.
DT-2 temp 75 Deg, DT-5 temp 88 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power OFF.
Following S/D Clear.
1. Coal feeder 2C ,
Following AVI Given and Clear.
1. Bed ash cooler 2B
ACC-2D area Barring heater top replaced.
Bed Ash cooler 2B trial taken, ,motor tripped in overload, reset and trial run found CCR side motor taking
3.5Amp Balanced current, and ID fan side motor taking 1.5 Amp balanced current.
Shift jobs carried

Following S/D Given.


1. BC-1 (02 times),
2. BC-6 ,
3. Reclaimer ,
4. Bucket Elevator-1,
5. Bed Ash Cooler 1A ,
Boiler-2 Vessel-22 level high so line cleaning done, and trial run found healthy.
IBD pump local panel rubber mat laying done.
Calibration Sticker pasting done at Chimney, SOX panel, 02 probe unit. etc.
DT-2 temp 75 Deg, DT-5 temp 88 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
Calibration sheet filled from field equipment.
Zishu Hozen at HSD Area.
BC-4 motor power JB double earthing provision done.
CHP MCC RCCB tripped condition, reset and trial run found healthy.
Bed Ash cooler-2B area New extension board provided and Grinder Plug-top replaced.
Switchgear room fire extinguisher checked with fire safety team.

Following S/D Given.


1. BC-1 (01 times),
2. BC-6 ,
3. Bucket Elevator-1,
Shift jobs carried
Following S/D Remove..
1. BC-1,
2. Reclaimer ,
Clean run motor of Coalfeeder 2-D check found normal and it take 1.3 amp and bect take 2.1 amp. Motor
cleaning done.
Bed ash coler 2-B , 24 volt light repairing done.
Earh pit resistanance value tagging done.
DT-2 temp 73 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.
SH and Eng. Offices AC power OFF.
ACC -1 , area light not glow check and found its timer in off posyion so by-pass it and light glow on.
Following AVI Given and Clear.
1. Bed ash cooler 2B
Coal bunker 2-B , lavel sensor not work so, ist probe check and cleaning done, now ok.
Bag house 12-21 lavel probe checking and calibration done.
TG Building , 04 flow transmiter and 06 no of pr. Transmiter calibration sticker provide at 4.5 meter and coal
feeder.
Shift jobs carried
In Unit No. # 2 Vessel No.-12 ,22 Back Pr. Transmitter / Switch Impluse line cleaned.

In Coal Feeder -2B Tripped due to F0012 fault. Motor Stall - excessive load. So Informed to shift incharge. As
per Operation requirement feeder taken in local mode. Presently running in Local mode. Clean Run is also
tripped So reset it.
In Compresoor area all the auto drain valve checked it is working normally.
At Firing Floor area field Inst. Cleaning to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
BAC-2B Shutdown to cleared and put into Remote mode.
In Vibrating Screen No.# 1 and 2 Motor and Power JB Cleaned.
In WTP Pump house motor cleaned.
DT-2 temp 74 Deg, DT-5 temp 87 Deg, DT-6 temp 84 Deg.

Shift jobs carried

Following S/D Given.


1. BC-1 (02 times),
2. Reclaimer ,
3. Coal feeder-2B ,
4. 02MV0910 ,
5. GSC-2A ,
6. GSC-2B,
7. 01MV0912,
Zishu Hozen at BC-1 tail end Area.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.

Following S/D Clear.


1. 01MV0912 ,
2. Reclaimer ,
3. BC-1 (02 times),
Following AVI Given.
1. Coal feeder-2B ,
2. 02MV0910 ,
Clean run 2B motor direction reverse and forward done as per operation requirement.
EOP-2 power ON and OFF as per operation requirement.

Coal feeder-2B Pneumatic valve not closed, so forced closed through air, but due to jamming not closed, so
inform to operation dept.
Shift jobs carried
Following S/D Remove..
1. GSC-2A,
2. GSC-2B ,
Crusher-2 Motor Both Sides Lubrication Done
Switchyard 2no's 1 phase supply Socket Green Tag Updated done
Clean Run Motor 1C &1D Reconnection done
DT-2 temp 73 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.
SH and Eng. Offices AC power OFF.
Coal Feeder 2B Handlamp Provide work done
Following S/D Given
1. Mist-2A,
2. Mist-2B ,
Boiler Bunker Air Blaster work shift Technician Engaged with General Shift
Coal Feeder-2B Pneumatic valve not open so open with Mech. Team by chain block
Shift jobs carried
In Coal feeder -2B Bunker Level Transmitter level is not showing correct. So reset the power supply. Now ok.
In Unit No. # 2 Vessel No.-12 /22 PU Tube dressing to done.
WTP DCS panel cleaning and blowering done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.

In Unit No.# 1 Coal feeder -1D main motor connection to done. Also motor earthing and JB packing to done.
CHP crusher building Lighting ON as per operation requirement.
In Inst. Compressor No. # 1 and 2 Motor cleaning to done.
DT-2 temp 74 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.

Shift jobs carried


Following Equipment S/D Given.
1. BC-4(Clear)
2. V.Screen-1&2(Clear)
3.BC-2(Clear)
BC-1(Clear)
Coal Feedr-1A &1B

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
Following Motors Lubrication Done
1/J Valve 2B
2/ CEP-1A
3/ SAFAN-2
ACC-2 RSB-63 &64 Green Tag Updated work
Boiler-1 APH 24 V LED Given
Zishu Hozen at Switchyard Area
Dosing Room LP Dosing tank Level not showing so new level Gauge Provided & checked water level now ok

Power Report monthy balancing done upto 25/05/2022.


DCS-1 Side Hole Sealing by PackingTape
Boiler-2 Bed Thermocoule Panel Door found Open Condition so closed it
Shift jobs carried
BC-4 take-up pully guard limit checking done as it not work due to guard not fix proper, so open and fix
properly.
Coal bunkar 2-D blaste4r (BIG) termination and trail taken working ok.
BC7A &B , glass change of hand lamp.
WTP area motors blowering done. ,
DT-2 temp 73 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.
SH and Eng. Offices AC power OFF.
WTP workshop one industrial change due to damage.
Boiler-2 bag house-22 level High showing, so level probe cleaning and trial run found healthy.
CCR AHU manual to AUTO change over done.
Generator-1 , volatage set at 11.2 kv as per discussion on meeting, please maintain at same. Its alarm setting
11.3 to 11.4 kv in DCS.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF (fire pump house, BC-2, BC-4 and BC-5) during shift round
DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
Boiler-2 veseel-12 level high show, so probe cleaning and their after checked found healthy.
Bed material RAV JB cleaning and sealing done.
HP Dosing room Motors & Panels cleaning work
BC-2 Motor and field power JB cleaning done.

Following Equipment S/D Given.


1. ID Fan-1
2. J Valve 1B
3. U-1 Soot Blower
4. 01MV2301
5. SA Fan 1
6. 01MV2302
7. P fan-1
8. J valve-1A
9. 01MV3210
10. PA Fan-1
11. Boiler-1 Ignaitor-1
12. Boiler-1 Ignaitor-2
Following Equipment S/D Given& Clear. Shift jobs carried
1. Reclamier
2. BC-7A &7B
3.Enmass -2
4. Crusher-2
5. Coal Bunker MOV 1D
6. Coal Bunker-2D

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
Following Motors Lubrication Done
1/ACW-2
2/ CT FAN-1
3/ CT FAN-2
4/ CT FAN-3
ACW PUMP House 1 phase supply socket ELCB Green tag updated
CT FAN-1 ,2 &3 Motors Cleaning work
New Panel Making work shift technician with Ge
Bunker area LED Handlamp Damaged Plug Top Replaced Work
Power Report monthy balancing done upto 25/05/2022.
BC-4 Belt tare comes so check & found proxy loose & broken condition so metal sensing work ok & trial from
CCR OK
Temple Loudspeaker not working so checked & found speaker wire removed condition so connect wire now
loud speaker healthy
Shift jobs carried
In Coal feeder -1A Pneumatics valve is not operating from DCS. Found that SOV is not working condition. So
changed the SOV from Coal Feeder -1A Pneumatics valve. Also closed limit is heavily coal inside. So cleaned it
and installed at site. Our limit is working normally. But limit mech. groove is not present at site. So Informed
to shift incharge.

In Coal Feeder -2B Tripped due to F0012 fault. Motor Stall - excessive load. So Changed the VFD Display unit.
In this display found that feeder direction is reversed. So changed the direction. Now working normally.

All the AC MCB to OFF Condition.


online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is already is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
In BAS RAV is not ON. So Reset the O/L setting. Now Ok.
In LHS side welding machine welding Green tag to provided.
DT-2 temp 75 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
At 22 Mtrs / U-2 Coal feeder area Light to ON as per operation requirement.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
BC-7AB and BC-6 area light not run, so checked and found MCB is OFF, So on done.
DT-2 temp 76 Deg, DT-5 temp 90 Deg, DT-6 temp 84 Deg.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.

Boiler-2 veseel-12 and 21 level high-high show, so probe cleaning and their after checked found healthy.
02TCV3203 continue going to manual, so air checked and adjust and command checked .
BC-7A/B Motor and Power JB cleaning done.
BC-6 lighting JB, cover so open, so bolt fix and tightness done.
BC-7 A/B area Bag filter panel cable hanging, so dressing done.
Shift jobs carried
Following Equipment S/D Given
1. BC-6(Clear)
2. JVALVE-1A
3.J VALVE-1B
4. Crusher-2(Clear)

DT-5 temp 88 Deg, DT-2 temp 75 Deg, DT-6 temp 86 Deg.


P&V 2 water level down, so water filling done.
Crusher House Hydralic M/C spark observed at feeder in Power Contactor so check & found Dust inside
contactor coil so clean contatcor & again fix now OK Motor Running Normally
Crusher House Hydralic M/C 1 no's Piston not working so check & found plunger jammed condition so clean
& trial taken now both SOV working normally
Bed Ash Silo Water valve solenoid vlave air leakage arrested work
Zishu Hozen at T1&T2 Tower Area
STG Building Lift Comes in F1 Fault so Supply OFF & Reset fault now lift healthy
Unwanted Lights off at 22 mtr. & coal feeder area
Power Report monthy balancing done upto 27/05/2022.
Shift jobs carried

In Coal Feeder -2A Pneumatics valve is closed. So Opened the Pneumatics Valve at site by open the closed
tube. After opened condition Air line is closed condition. At field side short the open limit wire. Then feeder
taken in line.
In reclaimer Up / Down is not happen from switch. At site found that switch is free. So tight the chacknet. Now
Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 and 4 is already is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
S/D Cleared- Unit No. - J-Valve Fan -1A and 1B.
At 22 Mtrs Light to ON as per operation requirement.
Coal Feeder -2B Hand lamp to Provided.
Boiler no.# 1 LDB panel floor wise Sticker pasted at site.

Shift jobs carried


Coal Buker -2A level shows 6 mtr. Check physically found level same as DCS Reading check as per requirement
of CCR
Unit No. # 1 Power factor is not maintain in auto. Frequently it will comes in manual mode. Till 2.00 am

P&V 4 Status checked found healthy.


In WTP RO Booster Pump No.- 1 , 2 and 3 Motor Cleaning to done.
DT-2 temp 76 Deg, DT-5 temp 90 Deg, DT-6 temp 84 Deg.
Chimney aviation light found not glow, so check found timer stuck ,so relese it.
U#2 4th floor to 7th floor light ON and OFF on requirement of CCR.
All Energy meter manual reading taken for Power Report.
WTP Hall all equipment cleaning done.
Environment and Plant performance report send to all concerns.
CHP panel , CHP DCS blowering and cleaning done.
Shift jobs carried
11 KV Generator Voltage is reduced to 11. So increased the voltage by tap changing.
MVAR is not maintaing in auto mode. So Informed to MPSS person he told me that all the capacitor bank is in
running condition. So Increased the SP from 0.3 to 0.7 . Now under observation.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water filled due to low water.
WTP and Pump house area Motor Cleaning and Blowerning to done.
In Compresoor area all the auto drain valve checked it is working normally.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Pump House area all the MOV , field Inst. And Panel Cleaning and Blowerning to done.
DG Report is uploaded in SAP System.

Shift jobs carried


P&V 2 water level down, so water filling done.
BC-1 and 2 Motor and Power JB cleaning done.
TG floor exhaust fan panel cleaning and connection tightness done.
Coal feeder area light not run, so checked and found MCB is OFF from VAM floor, So ON done.
DT-2 temp 74 Deg, DT-5 temp 90 Deg, DT-6 temp 86 Deg.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
Reclaimer Up down Switch Check nut tightness done.
Coal feeder 2A/2B vertical line vibrator not working, checked found SOV air isolate, so on done and trial run
found healthy.
WTP DCS panel cleaning and blowering done.
22 Mtr Bunker floor light ON.

Shift jobs carried


Unit-2 CEP-1&2 and Drain Pot 1&2 Motors Cleaning & Blowering work
Chimney aviation light found not glow, so check found timer stuck ,so relese it.
P&V 4 Status checked found healthy.
WTP Area Ultrfiltration system Instruments cleaning work
DT-2 temp 76 Deg, DT-5 temp 89 Deg, DT-6 temp 84 Deg.
Chimney aviation light found not glow, so check found timer stuck ,so relese it.
U#2 4th floor to 7th floor light ON and OFF on requirement of CCR.
All Energy meter manual reading taken for Power Report.
Dosing room HP , LP & Morpholine Panel & all Pressure Gauge & Level Gauge Cleaning work
Environment and Plant performance report send to all concerns.
Shift jobs carried
11 KV Generator Voltage is reduced to 11. So increased the voltage by tap changing. ( 03 Times )
At 4.5 mtrs switchyard room is very hot. So P&V. HZ increased from 33 to 35 HZ.

In Chimney analyzer PC all the parameter is showing NA. So we have restart the PC . Even data is not showing
in PC. Also tightness the Connector , RJ-45, and Ehernet cable. Then Informed to Mr. tarun and talk to M/s.
adage person. After some time data is showing in PC.
MVAR is not maintaing in auto mode. So Informed to MPSS person he told me that all the capacitor bank is in
running condition. Also Increased the Power factor by excitation. Now Under observations.

P & V. No. # 2 and 4 is in running condition .


In Unit No. # 2 Barring Gear ON/OFF as per requirement.
BC-5 Tunnel area repair Supply Box green tag to Provided.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
S/D given.
1. Vibrating Screen No.-2,
2. BC-6,
BAS RAV motor proper Earthing to done.
DT-5 temp 89 Deg, DT-2 temp 74 Deg, DT-6 temp 86 Deg.

Shift jobs carried


P&V 2 water level down, so water filling done.

Coal Bunker 2B level not showing, so level transmitter cleaning and power reset, and found healthy.
Bag house-2 vessel -11 high-high showing, so level probe calibrate and trial run found healthy.
Instrument lab Spare hooter maintenance done.
DT-2 temp 72 Deg, DT-5 temp 88 Deg, DT-6 temp 86 Deg.
SH and Eng. Offices AC power OFF.
compressor house auto drain valve manually checked found healthy.
ACC -1 ground floor light MCB off, so ON done.
Chimney aviation light found not glow, so check found timer stuck ,so reset it.
ACC-1 repair supply box-27 ELCB check and green tag updated done.
CHP building screen floor LED light plug top replaced.
ACC-1 lighting JB sealing done.
Shift jobs carried
Soot Blower-1 Panel cleaning & Blowering work & All Contactor tightness checking work
Power Report & DG Aux. Report Balanced upto 30/05/2022
P&V 4 &2 Status checked found healthy.
Unit-2 0 mtr. Instruments & Power JB Cleaning & Blowering work
DT-2 temp 76 Deg, DT-5 temp 90 Deg, DT-6 temp 84 Deg.
Chimney Analyser room Panels , JB cleaning work
22 mtr Bunker floor light ON & OFF. As per requirement of Opeartion dept.
All Energy meter manual reading taken for Power Report.
IFC filter drained to done.
Environment and Plant performance report send to all concerns.
P&V VFD RPM increase 33 to 40 due to DT-5 Temprature 90.8 deg. To be observation condition
STG Building Lift not working to be check in General Shift
Shift jobs carried
Following Equipment S/D Given
1. BC-1 (two times)
2. BC-2
3.BC-3
4. BC-4
5. Crusher-2
6. Reclaimer
7. DT-4
8. PCC-2A
9. Bed Ash vcooler-2B Dome Valve air isolation. (Key no. 599)

Following Equipment AVI Given


1. ID fan-1
2. PA fan-1
3. J Valve-1A
4. J Valbve-1B
P&V 2 water level down, so water filling done.
DT-2 temp 72 Deg, DT-5 temp 88 Deg, DT-6 temp 86 Deg.
SH and Eng. Offices AC power ON.

Following Equipment S/D Clear


1. BC-1 (two times)
2. BC-2
3.BC-3
4. BC-4
5. Crusher-2
6. Reclaimer
Bed Ash Cooler-2B dome valve not operate from CCR, manual operate it, and inform to operation for Jamming
clear.
AHU ON and chilled water valve open 4.5mtr mv drive room, due to MV drive ON at AVI.
CT fan-1 power JB sealing and packing done.
Bed Ash Cooler-1B dome valve not operate from CCR, checked and found AIR isolate, so ON done, trial run
found healthy.
O2 level probe shifting from WTP lab to Boiler-1 O2 platform.
Zishu Hozen at BFP Area
Shift jobs carried
AHU on done of 4.5 meter MVvfd room as its in require to start by CCR.
PA Fan-1 ,breaker get off as alarm off (U2_over ), then check its fuse, inv cell, control panel, found all are ok
then Generator -1 ,voltage reduce from 11.23 kv to 11.00 kv and it start normally, so please at time of start of
HT Drive please ensure generator voltage at near 11.00 kv.
J- valve vfd feeder reset from vfd panel , as it not show healthy at DCS.
O2, probe checked of boiler-1, RHS and calibration done.
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
SH and Eng. Offices AC power OFF.
ID Fan-1 & PA Fan -1 , j-valve in running condition.
BC-3, belt get off three time , so check ak feeder found ok , motor winding resintance at 0.4 ohm and no
meggar value at 200 M-ohm , then it start but again off after 5 minute due to belt slip alarm, so its proxy check
ok, but its disk found heavy grese so clean and start it nornally.
AVI provide of BAC- 1A Two times.
shut down clear of BAC-2B , air line.

CHP, tool room light not glow so check at feeder found panel off , so talk to pandya sir and its power ON done.

Shift jobs carried


After OFF the Unit No. # 1 ID and PA Fan VAM AHU of 4.5 Mtrs to closed.
IFC filter drained to done.
Unit No. # 2 APH JB Connection tightness to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.

After OFF the Unit No. # 1 ID and PA Fan Generator Voltage Increased from 11 to 11.2 KV by tap changer.
In CHP area Coal shed , BC-3 /4 /5 Light to OFF.
In Dosing Room Motor cleaning to done.
AVI of Unit No. # 1 J-valve Fan -1A and 1B , ID fan and PA fan to closed.
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared-
01.06.2022 A Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC007.


01.06.2022 B Amit kumar singh

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
01.06.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
02.06.2022 A Amit kumar singh 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
02.06.2022 A Amit kumar singh

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
02.06.2022 B Tarun Gaur
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
02.06.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
03.06.2022 B Tarun Gaur

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled

UPS log digital log book filled.


03.06.2022 B Amit kumar singh VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
03.06.2022 C Ashvin Jadav 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled

UPS log digital log book filled.

04.06.2022 A Tarun Gaur

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled

04.06.2022 B Gajendra Pandya


UPS log digital log book filled.
04.06.2022 B Gajendra Pandya
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
04.06.2022 C Amit kumar singh Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled


UPS log digital log book filled.
05.06.2022 A Tarun Gaur VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
05.06.2022 B Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
05.06.2022 B Ashvin Jadav
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


05.06.2022 C Gajendra Pandya 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

Shift instrument digital log book filled


06.06.2022 A Amit kumar singh UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

06.06.2022 B Ashvin Jadav Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital
Following checklog
listbook filled.
prepared-
06.06.2022 C Tarun Gaur
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
Date Shift Engineer Name 6. VAM Check list Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
07.06.2022 A Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


07.06.2022 B Tarun Gaur
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM
Shift Check
round takenlist
found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled

UPS log digital log book filled.

07.06.2022 C Amit kumar singh


VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
Date Shift Engineer Name 6. VAM Check list Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


08.06.2022 A Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

08.06.2022 B Amit kumar singh Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
08.06.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
09.06.2022 A Amit kumar singh
09.06.2022 A Amit kumar singh
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

09.06.2022 B Tarun Gaur UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
09.06.2022 C Ashvin Jadav 5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
09.06.2022 C Ashvin Jadav

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
10.06.2022 A Tarun Gaur
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Unwanted Lights OFF During morning round

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
11.06.2022 B Tarun Gaur
VAM log digital
Following checkloglistbook filled.
prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM
Shift Check
round takenlist
found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
09.06.2022 C Ashvin Jadav 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument log book filled

UPS round taken & log book filled.

VAM log digital log book filled.


12.06.2022 A Tarun Mandawat Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Unwanted Lights OFF During morning round

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
12.06.2022 C Tarun Gaur 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
13.06.2022 A Ashvin Jadav
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


13.06.2022 B Tarun Gaur UPS log digital log book filled.
VAM log digital
Following checkloglistbook filled.
prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM
Shift Check
round takenlist
found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

13.06.2022 C Sanjay Garg


Shift instrument digital log book filled
UPS log digital log book filled.
13.06.2022 C Sanjay Garg VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


14.06.2022 A Tarun Gaur UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
14.06.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
14.06.2022 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


15.06.2022 A Gajendra Pandya UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
15.06.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
15.06.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

16.06.2022 A Tarun Mandawat Lighting made off in morning which are in manual
mode.
Shift instrument digital log book filled
UPS log book filled.
VAM log book filled.
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
16.06.2022 B Tarun Gaur 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
16.06.2022 C Ashvin Jadav 4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
17.06.2022 A Tarun Gaur
Lighting made off in morning which are in manual
mode.
Shift instrument digital log book filled
UPS log book filled.
VAM log book filled.
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


17.06.2022 B Sanjay Garg
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
17.06.2022 C Ashvin Jadav 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
17.06.2022 C Ashvin Jadav

5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Lighting made off in morning which are in manual


18.06.2022 A Tarun Gaur mode.

Shift instrument digital log book filled


UPS log book filled.
VAM log book filled.
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Unwanted Lights OFF During morning round

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


18.06.2022 B Sanjay Garg
18.06.2022 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
18.06.2022 C Gajendra Pandya 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


19.06.2022 A Sanjay Garg Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
19.06.2022 B Ashvin Jadav 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
19.06.2022 C Tarun Gaur 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


20.06.2022 A Sanjay Garg Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
20.06.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
20.06.2022 C Tarun Gaur 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


21.06.2022 A Tarun Mandawat 1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Main IFC packing packing tape covering done on
controller .
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
21.06.2022 B Ashvin Jadav
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
21.06.2022 C Sanjay Garg
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


22.06.2022 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
22.06.2022 B Tarun Gaur
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
22.06.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
23.06.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

24.06.2022 A Tarun Gaur


UPS log digital log book filled.
24.06.2022 A Tarun Gaur

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled

UPS log digital log book filled.


24.06.2022 B Sanjay Garg

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

24.06.2022 C Ashvin Jadav


Following check list prepared-
1. Shift instrument check list
24.06.2022 C Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004

Shift instrument digital log book filled


25.06.2022 D Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
25.06.2022 C Tarun Gaur 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
25.06.2022 C Tarun Gaur

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

20.06.2022 A Sanjay Garg UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
26.06.2022 B Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
26.06.2022 C Tarun Gaur 3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
26.06.2022 C Tarun Gaur

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

27.06.2022 A Sanjay Garg UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
27.06.2022 B Ashvin Jadav 4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
27.06.2022 B Ashvin Jadav 4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
27.06.2022 C Tarun Gaur 4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
27.06.2022 B Ashvin Jadav

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


28.06.2022 C Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
29.06.2022 A Ashvin Jadav 2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Date Shift Engineer Name Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

29.06.2022 B Tarun Gaur Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Office AC OFF

TG-2 Generator Space heater ON due to winding


temprature comes 36 deg.

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


29.06.2022 C Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
30.06.2022 C Gajendra Pandya VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried

Following Equipment S/D Given


1. BC-6
2. Crusher-2
3. 02MV0906
Following Equipment AVI Close
1. Bed Ash Cooler-1A
Following Equipment S/D Clear
1. 12MV2306

P&V 2 water level down, so water filling done.


DT-2 temp 74 Deg, DT-5 temp 87 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
CT fan area lighting JB Covering and sealing done.
P&V 4 status checked found healthy.
Fly ash silo-1RAV motor cover loose, so fitting done.
BC-3 area cable hanging, so dressing done.
EOP-2 Power ON and OFF as per operation requirement.
Fly ash silo ground floor repair supply box and lighting LDB rubber mat laying done.
Boiler-2 feed water station, De-super heater station, and firing floor area equipment’s rain
protection covering work done.
Shift jobs carried

Following Equipment S/D Given


1. ACC FAN 2-A
2. ACC FAN 2-B
3. ACC FAN 2-C
4. ACC FAN 2-D
5. ACC FAN 2-E
6. ACC FAN 2-F
7. CEP 2-A & 2- B
8. DRAIN POT PUMP -2A & 2B

Following Equipment AVI Given & Remove.


1. ID FAN- 1
2. PA FAN-1
3. J - VALVE -1-A
4. J - VALVE -1-B
TG Building 0 meter RSB no. 48 , ELCB , check and green tag provide.
During start of PA Fan-1, generator voltage reduse to 11.00 kv but then also it not start, so after
updating its parameter by , Pramod sati sir, its start normally.
As J-Valve no. 1A stop from CCR ,1B get start and not stop from CCR , then its stop from field LCS.

DT-5 temp 89 Deg, DT-2 temp 77 Deg, DT-6 temp 88Deg.


Workshop MVVFD, room AHU find in manual mode so its change to Auto mode.
U#1, Mvvfd room , AHU start and stop during AVI of IDFAN & PAFAN
U#2, Bed thermocouple JB polythene covering done.

Shift jobs carried


In Chimney analyzer SOX reading is showing low. So as per shift incharge requirement factor
changed from 0.15 to 1.0 in chimney analyzer PC. Also changed in DCS also. Now it is showing 125
mg/nm3.

In Unit no. # 1 Boiler top , CV positioner, Pr. Switch and transmitter polythene Coverning to done.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Unit No. # 1 Generator Voltage Increased from 11 to 11.2 KV by tap changer.
In CHP area T-1 and T-2 Tower , BC-3 /4 /5 Light to OFF.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into
auto mode. Now Ok.

Shift jobs carried

Following Equipment S/D Given


1. BC 7A
2. BC 7B
3. COAL CRUSHER 2
4. RECLAIMER
5. BC 1
6. J- VALVE 1A
7. COAL FEEDER 1A,1B, 1C, 1D
BFP 1,2, 3 motor cleaning done.
Following Equipment S/D Clear
1. 12MV2306
CHP dcs blowering and cleaning done.
U#2, control valve gland leakage arresting done.

BAC 2B, Dome valve not operate so its , valve found close so open it, and operate manually.
SH and Eng. Offices AC power ON.
Polythene covering done of 03 MOV at no.1 feed water,
Ignitor floor , 1A burner , SOV polythene covering done.
Following Equipment S/D Given
1. BC 7A
2. BC 7B
3. COAL CRUSHER 2
4. RECLAIMER
5. BC 1
U#2, RSB No 25, ELCB checked and green tagging done.
SOX, coeeficient change from 1.0 to 0.5 in cpcb desk and 0.345 to 0.18 in DCS as per requirement of
plant.

Shift jobs carried

Following Equipment S/D Clear


1. DT-4
2. PCC-2A

WTP DCS Room AC Outdoor unit Double Earthing work done


1 No's 24 V LED Handlamp Prepared work
Switchyrad Lighting Timer Adjustment work
DT-5 temp 89 Deg, DT-2 temp 78 Deg, DT-6 temp 88Deg.
Workshop MVVFD, room AHU find in manual mode so its change to Auto mode.

STG buidling lift Telephone not working due to connector cable faulty so repalced by new one
Bolier-2 Firing floor soot blower drain mov left & right Polythene covering work
OFFICE AC OFF
Coal Feeder-2A Pneumatic valve air charged to closed condition so checked & found cylinder
leakage condition so manually plate valve open & air valve closed
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Capacitor bank OFF from MPSS due to load reduced.
DT-2 temp 78 Deg, DT-5 temp 88 Deg, DT-6 temp 86 Deg.
BC-2 Motor and power JB cleaning done.
compressor house auto drain valve manually checked found healthy.
Bag house-2 vessel 12-22 line flushing done.
Boiler-2 feed water station, De-super heater station area equipment’s cleaning done.
Chimney aviation light off, so check found timer stuck ,so reset it.
BC-2 area 24V LED provided.
Coal shed, BC-1,2 and 3 area light OFF at 10 :00 PM and ON at 01:00 AM.
Shift jobs carried
Following Equipment S/D Given & Clear
1.BC-1
2. BC-2
3. BC-5

1 no's 24 V LED Handlamp Handover to CHP Person ( Mukeshnath) for maint. Work
Crusher-2 11 KV HT Panel Space Heater indication now glowing check & found Lamp Fuse so
Replace by new one now Indication Lamp Healthy
Switchyrad Lighting Timer Adjustment work
DT-5 temp 89 Deg, DT-2 temp 77.6 Deg, DT-6 temp 87.8Deg.
Workshop MVVFD, room AHU find in manual mode so its change to Auto mode.

STG buidling lift Telephone not working due to connector cable faulty so repalced by new one
Coal Feeder area lights found ON Condition so check & found lighting timer stuckup now timer reset
& taken in line
OFFICE AC ON
Zishu Hozen at Turbine 1 &2 Enclosure Area
P&V -2 side hot air observed at PCC Room so check & found Water pumpMotor running but Pump
suction issue now Temp. under observation
Unit-2 0 mtr. All Instrument Euipments Ploythene Covering work
Shift jobs carried

Following Equipment S/D Given & Clear


1. GENERATOR-2
2. BARRING GEAR-2
3. AVR-2

P&V -2 side hot air observed at PCC Room so its valve cleaning done due to sludge accumulated
thair & Suction valve adjusnment done.
02MOV0906 Feeder not healthy , so check and fount its ,sliding contol wiring contact plate loose ,
after tight it work ok.
U#1, boiler area lights ON as per requirement of CCR and off as job complete.
DT-5 temp 88 Deg, DT-2 temp 77.6 Deg, DT-6 temp 87.8Deg.
PA phone checked of boiler area and repaired.
ETP data not sohow properly so its power rset done.
U#1, feed watewr station contol valve leakage arresing done.
One no. of transformer light provide at BAC-2A, and recive it.
U#1, Generator voltage maintain at 11.2 kv, and power factor above 0.98
CHP DCS room teprature at 44.6 C so check found AC show HP/LP alarm so its reset and outdoor
unit cleaning done.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 78 Deg, DT-5 temp 89 Deg, DT-6 temp 87 Deg.
ACC-1 CEP and Ejector area light tripping, Kindly check in G shift.
Bed ash cooler-2B hopper level high showing, connection tightness done.
All unwanted lights switched OFF (Acid tank and BC-6 area) during shift round
Boiler-2 Bed material RAV and equipment cleaning done.
SH and Eng. Offices AC power OFF.
Bucket Elevator-1 Isolation and AVI given and close.

Coal feeder 2B motor earthing broken, so new replacement done. And Both motor cleaning done.
Shift jobs carried

Following Equipment S/D Given & Clear


1.BC-1
2. BC-2
3. Screen-1&2

1 no's 24 V LED Handlamp Repaired & Handover to CHP Person ( Mukeshnath) for maint. Work

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.8 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

RO & DM Panel PH Value High 8.98 so changed PH Water solution & then PH Value 7.54 normal

DT-5 temp 87 Deg, DT-2 temp 75 Deg, DT-6 temp 85 Deg.


Workshop MVVFD, room AHU find in manual mode so its change to Auto mode.
RSB-68 NO's (FAS) & RSB-54 VAM Room Green Tag Updated Done
In Chimney analyzer SOX reading is showing high. So as per shift incharge requirement factor
changed from 0.5 to 0.3 in chimney analyzer PC. Also changed in DCS also.
OFFICE AC ON
Zishu Hozen at Fire Pump House
P&V 2 water level down, so water filling done. P&V-4 Running normally
RO & DM Panel Gland Hole Done & Covered by Metal Sheet Cover.
Shift jobs carried

Following Equipment S/D Cleared


1.J valve-1A
2. Mist Fan2A
3. Mist Fan2B

Boiler-1 unwanted Lights made OFF after work completion at Firing floor
Hydrazine dosing pump not running, so checked its tank level stuck so reset it and run the pump
Scissor Lift checked for its operation behind workshop
DT-5 temp 89 Deg, DT-2 temp 77.6 Deg, DT-6 temp 87.8Deg.
Workshop MVVFD, room AHU find in manual mode so its change to Auto mode.
Boiler-1 Lift telephone hand set changed
OFFICE AC Made Off at 6.00 pm

Shift jobs carried


Boiler-2 veseel-12 and 21 level high-high show, so probe cleaning and their after checked found
healthy.
CHP DCS room teprature at 44.6 C so check found AC show HP/LP alarm so its reset and outdoor
unit cleaning done.
One no. of hand lamp provide at coal crusher, and recive it.
At 4.5 metre U#1, control valve , MOV cleaning and blowering done.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
All unwanted lights switched OFF (Acid tank and BC-6 area) during shift round
DT-2 temp 78 Deg, DT-5 temp 89 Deg, DT-6 temp 87 Deg.
CHP DCS Room cleaning and blowering done.
Shift jobs carried

Following Equipment S/D Given & Clear


1.BC-4

Boiler-1 Furnace LED Light Damaged Plug Top Repalced by new one
Unit-2 BLR vessel no. 11-21 & 12-22 & APH SOV JB all connection tighteness checked
FAS-1 &2 Instrument Panels & SOV Cleaning work
DT-5 temp 87 Deg, DT-2 temp 75 Deg, DT-6 temp 85 Deg.
Workshop MV VFD, room AHU find in manual mode so its change to Auto mode.
Unit-1 BLR Left & Right O2 Pobe Polythene covering work
OFFICE AC OFF
P&V 2 water level down, so water filling done. P&V-4 Running normally
DG Reading upload I SAP on 04/06/2022
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
DT-2 temp 78 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
SH and Eng. Offices AC power OFF.
Workshop AHU comes in manual, So put in AUTO.
C7-AB area bunker level transmitter cleaning done.
WTP high pressure pump panel cleaning done.
ACW-1 VFD panel cleaning done.
N-Mass Conveyor 1& 2 Motor and power JB cleaning done.
P&V 2 water level down, so water filling done.
Coal feeder 1&2, Bunker floor and Boiler 1&2 ( 3rd & 4th floor) light ON.
Shift jobs carried
APH-2 of boiler-2 isolation air leakage arrested.
APH-2 vessele-1 dom valve limit bolt found loose so tight it

BFP 1,2, 3 motor cleaning done.


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.

DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 86 Deg.


CHP DCS Room cleaning and blowering done.
Shift jobs carried

Following Equipment S/D Given


1. BC 5
2. BC 6
3. vibrating screen-1
4. BAC-2B
5. COAL FEEDER-1B , PNUMATIC VALVE
6. COAL FEEDER-1D , PNUMATIC VALVE
7. COAL FEEDER-1C , PNUMATIC VALVE
WTP N -pit , area polythene covering done.
P&V, water leakage observed after valve close due to drain pipie jam ,its pokine done but not fully
clean due to bend in pipe, after cleaning plateform by kamlesh leakage reduce.
Coal bunkar , 2A, discharge MOV, feeder checked but its trail not taken due to maintanance team
working on coal circuit.
DT-5 temp 87 Deg, DT-2 temp 75 Deg, DT-6 temp 85 Deg.
Workshop MV VFD, room AHU find in manual mode so its change to Auto mode two time.
Barring gear-2 , AVI provide and AVI close on requirement of CCR
Zishu Hozen at ACW area
EOP pump power on and off done as requirement of rotation of turbine.
Instrument air commpresor ,motor bearing tempreture at DE/NDE/TERMINAL at 57/47/46 C.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
DT-2 temp 76 Deg, DT-5 temp 88 Deg, DT-6 temp 87 Deg.
SH and Eng. Offices AC power OFF.
Following Equipment S/D Clear
1. BC 5
2. BC 6
3. vibrating screen-1
4. BAC-2B
P&V 2 water level down, so water filling done.
C7-AB area hand lamp repair and plug top replaced.
Boiler-1 furnace floor 24v LED plug top replaced.
Boiler-1 coal feeder area extra light OFF.
Silo roots blower room cleaning done.
Bunker floor light ON.
Coal feeder 1B, 1C and 1D pneumatic valve SOV removed, open/close limit removed and air tube
removed as per PTW requirement.
4.5 Mtr area transmitter cleaning and blowering done.
Shift jobs carried
BLR#2 IFC Power Cable Found on floor now proper dressing work
BLR#2 Firing floor all Instruments cleaning work
Compreesor IFC Filter moisture drain
Soot Blower-2 Panels Cleaning & Blowering work
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 86 Deg.
Shift jobs carried

Following Equipment S/D Clear


1. BC 4
2. Crusher-1
3. BAC-2A
4. Air Isolation BAC-2A (TP-599)
P&V 2 water level down, so water filling done.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
Bed ash silo-2 pneumatic valve not open, so hammering and trial taken found healthy.
WTP Bomb calorimeter sampling point leakage, so arrested done, But air issue work under
progress.
Zishu Hozen at Boiler-2
PA fan-1 hoist power JB fuse removed.
Bag house-2 welding machine checked and green tag provided.
Boiler-1 wind box 24v LED plug top replaced.
ACC-1 timer JB open, so closed done.
ACC-1 fines cleaning trolley motor fan cover loose, so fitting done.
Shift jobs carried
GT-1 Transformer Stopped & GT-2 Taken in line changeover as per requirment of Cement Plant
DT-2 temp 76 Deg, DT-5 temp 87.6 Deg, DT-6 temp 87 Deg.
SH and Eng. Offices AC power OFF.

Following Equipment S/D Clear


1. BC 4
2. Crusher-1
3. BAC-2A
4. Air Isolation BAC-2A (TP-599)
P&V 2 water level down, so water filling done.
Boiler-2 Bunker 2A ,2B , 2C &2D Level physically cheked & confirm to operation dept.
BAC-2B DOM Stuck up & not operate so manually open & handover to operation dept.
Boiler-2 CO Miantenance work with General team
2 no's handlamp repaired work at Electrical Workshop
WTP Pump House motors cleaning & Blowering work
Boiler-2 Bunker 2A ,2B , 2C &2D Level Transmittor cleaning work done
Shift jobs carried
Coal feeder 2 B,outlet pnumetic gate get open so check and its operate forcely to open it.
Two hand lamp with one transformer provide at coal feeder floor for cleaning job and one faulty
transformer repaired and shit to workshop.
Coal feeder 2B not show healthy at DCS so check and found its selector switch in local mode while in
remote mode at controllar.

MVAR is not maintaing in auto mode. So Informed to MPSS person but all capacitor bank is ON thair.
So Increased the SP from 0.3 to 0.65 for one hour then it change t original set point

All Energy meter manual reading taken for Power Report.


DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
DT-2 temp 76 Deg, DT-5 temp 84 Deg, DT-6 temp 88 Deg.
Shift jobs carried

Following Equipment S/D given


1. BC 4
2. Vibrating screen-2
3. Reclaimer
4. Coal feeder-1A,1B,1C,1D

Following Equipment S/D Cleared


1. BC 4
2. Reclaimer
3. Coal feeder 1A,1B
4. Bed ash cooler-1A

DT-2 temp 73 Deg, DT-5 temp 84 Deg, DT-6 temp 84 Deg.


SH and Eng. Offices AC power ON.
Polythen covering work at oil firing station
Lighting given at coal feeder area
Zishu Hozen at silo area

Shift jobs carried

Grid ssynchronization done with generator -1, at 05.10 p.m. , so before it 35MVA TR-2 charge, after
check physiaclly in field and panel.please take both TRANSFORMER reading today.
35MVA TR-1, power off at 6.20 pm, after synchronization and its selectror switch put on Local mode of both
breaker 11 KV, & 132 KV
P&V 2 water level down, so water filling done.
At TG-2 one extension board provide on requirement of CCR.
Boiler--2,APH back pr. Not show at DCS, so its line flushing done.
Boileer-2, APH vessal 2no. DOM valve close limit not work , so check and its damaged limit switch
repaire and fix , trail taken work perfactlly.
WTP bomb calorimeter drain valve not working so checked and found plunger jam condition so its
clean and now work ok.
35MVA TR-2, winding tempreture goes upto 72C at 3.45 pm, so check physically found , silika gel,
breather, MOG, WTI / OTI indicator , OLTC all are ok.
DT-2 temp 77 Deg, DT-5 temp 86 Deg, DT-6 temp 88 Deg.
SH and Eng. Offices AC power OFF.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 77 Deg, DT-5 temp 88 Deg, DT-6 temp 87 Deg.
BC-4 belt Light ON and OFF as per operation requirement.
P&V 2 water level down, so water filling done.
APH unit-2 instrument cleaning and blowering done.
Unit-2 Bag house instrument cleaning and blowering done.
Fire pump house Motor and power JB cleaning done.
Boiler-1 Bag house light ON as per operation requirement.
Lighting LDB panel cleaning and blowering done at 4.5 Mtr.
Shift jobs carried

Following Equipment S/D given


1. BC 4
2. Vibrating screen-2
3. BC-2
4. BC-5
U#2, coal bunkar outlet MOV ,manually operate in presence of CCR person it operate ok
Lighting timer stuck of security gate so reset and setting done.
From CHP building , 2, Transformer, 01, extension board, 05 LED, 03 Hand lamp and spare cables
shifted to workshop
P&V 2 water level down, so water filling done.
Seizer lift shifted to mechanical workshop.
U#2, bag hoiuse 11/21 12/22 lavel probe checked and calibration done. Now ok.
DT-2 temp 73 Deg, DT-5 temp 84 Deg, DT-6 temp 84 Deg.

BC-5, field instrument , pullchord polythene covering done.


Shift jobs carried

Following Equipment S/D Clear


1. BC 4
2. Vibrating screen-2
3. BC-2
4. BC-5

BAC-1A &1B VFD Panel Preventive Maintenance work following activities carried out-
1/ Power & Control Terminal Cleaning by CRC & Tightness checked .
2/ VFD physically Inspection & Terminal tightness checked & cleaning.
3/ Panels DustFilter Cleaning done.
4/ Opening hole sealing work
P&V-2 Stopped and P&V-4 VFD Running 50 Hz for DT-5 Temprature Control observation to be
checked temrature in shift.

Crusher Building 0 mtr. W/M not working so check & found Plug top Y Phase cable open so connect now supply
healthy but current not increse so current selector switch adjustment done now current adjust as per
requirement & M/C handover to CHP Person ( Mukeshnath)
Coal Feeder-1A, 1B , 1C & 1D Pneumatic valve limit cleaning & Packing work
Coal Feeder 1 Instruments JB's Covering by Ploythene
STG Building lift F6 Fault comes so check & found IR Sensor both 0 mtr & 9 mtr malfunctioining so
Adjustment in IR Sensor now lift healthy
CHP Building 0 mtr. RSB-81 Green tag Updated
DT-2 temp 77 Deg, DT-5 temp 88.1 Deg, DT-6 temp 87 Deg.
SH and Eng. Offices AC power OFF.
Shift jobs carried

All Energy meter manual reading taken for Power Report.


DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 77 Deg, DT-5 temp 87 Deg, DT-6 temp 85 Deg.
P&V 4 status checked found healthy.
ACC-1 lighting JB sealing and packing done.
Boiler-1 lift door sensor fault reset.
Boiler-1 light off from 3rd to 7th floor.
Vibrating screen-1 and 2 motor and power JB cleaning done.
MPHN lift IR sensor operate, so setting done, now healthy.
Unit-2 ground floor instrument JB, APH JB and vessel 11-21 ,12-22 instrument cleaning done.

Boiler-2 IFC, and Compressor IFC moisture drain done.

BC-6 Belt tear fault coming two times, so proxy cleaning done, at same time crusher-1 PMT are not
coming, after some times its coming, so fault checking not done due to plant running.

Shift jobs carried

Following Equipment S/D given


1. BC 4
2. Vibrating screen-2
3. Crusher-1
4. Reclamier
P&V-2 Stopped and P&V-4 VFD Running 40 Hz for DT-5 Temprature Control observation to be
checked temrature in shift.
Crusher House 0 mtr. W/M Double Erthing done
Switchyard 1 phase supply socket green tag updated
Zishu Hozen at Compressor House
BAC-2B Dome comes in fault so checked & found limit not pressed properly so limit switch replaced
now ok & system healthy
U#2, bag hoiuse 11/21 12/22 lavel probe checked and calibration done. Now ok.
DT-2 temp 77 Deg, DT-5 temp 87 Deg, DT-6 temp 86 Deg.
Unit-2 vessel-2 dome fault comes checked & found sov connector loose so tightness done now
system healthy

P&V MCC all P&V -1 ,3 ,5 And ACC Side P&V Power Supply OFF only P&V-2 &4 Suppy healthy
BC-5, field instrument , pullchord polythene covering done.
Shift jobs carried

Following Equipment S/D Clear


1. Reclamier
2. Vibrating screen-1
3. Coal Bunker-1D MOV

P&V-2 Water filling work and P&V-2 Running condition


PA-2 Fan Motor Both side Greasing done
WTP MCC & Fire MCC Outside Panels Cleaning work
Workshop MV drive AHU comes in manual mode then put in Auto mode
APH-2 Vessel -2 dome come in fault so SOV Cleaning & again connect now OK
FAS-1 &2 Instrument Panels & SOV Cleaning work
APH-2 12-22 Seal Pressure SS air tube dressing work
DT-2 temp 76 Deg, DT-5 temp 88.5 Deg, DT-6 temp 84 Deg.
SH and Eng. Offices AC power OFF.
Shift jobs carried
Coal bunkar 2 A, lavel not show properly so, its lavel probe cleaning done and reset.
Lights at 22 meter found on off position , so ON it on requirement of CCR.
U#2, APH show faulty at CCR , so check at field found its leakage at SOV so its leakage arrasting
done.
CHP DCS cleaning and blowering done.
DT-2 temp 77 Deg, DT-5 temp 89 Deg, DT-6 temp 85 Deg.
P&V 4 status checked found healthy.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Two hand lamp with two transformer repaired at workshop.
One hand lamp provide at BC7A &B.

Shift jobs carried


Air blaster loose PU tube new fitting provided & trial done.
2A-2B pneumatic actuator checked found main air valve closed so opened and trial done working
healthy.

MOT-2 tank level showing violet at DCS , so checked connection found proper tight ,afterwards
checked MA found >20 so a pot installed at field for resistance correction & value matched as
physical.
PA fan-2 physical inspection done & found NDE temp. healthy(in range).
MJ Engineer shutdown tools checked & green tagging done.
Operation doubt resolved for BC-1 auto operation
P&V -2 found overflow so water valve closed.
DT-2 temp 75Deg, DT-5 temp 86 Deg, DT-6 temp 86 Deg.
Gen. volatge mainted around 11.2 as per losses reduction requirement.
PF comes in manual so adjusted& again taken in auto.
BAC-2A 1no. LED & transformer provided
EOP-2 Power ON and OFF as per operation requirement.
Shift jobs carried
BAC-A Panel seal pressure switch air leakage so damaged air tube cut & connect now ok

BLR#2 DCV (02TCV3203) regulator fitting air leakage , ow arreseted & fitting tightness done
BLR#2 Desuperheater control valve cleaning work
Chimney aviation light off, so check found timer stuck ,so reset it.
DT-2 temp 76 Deg, DT-5 temp 88.2 Deg, DT-6 temp 85 Deg.
P&V -2 running & water fillup done
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Two hand lamp with two transformer repaired at workshop.
Unwanted Lights OFF During shift round (coal shed , boiler& BC-5 Hopper)
Shift jobs carried

Following Equipment S/D Given


1. EN-Mass Conveyor-1
2. Vibrating screen-1
3. Vibrating screen-2
4. Coal Crusher- 1
5. SA-1
6. ID-1
7. PA-1
Zishu Hozen at 15 mtr floor
compressor house auto drain valve manually checked found healthy.
DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.

Boiler-1 SA, PA and ID fan DE/NDE BRG and vibration probe connection removed as per MMD PTW.
Reclaimer travelling hooter not run, checked and found its cable from JB are burnt due to dust and
water leakage near JB, so re-connection done, then after trial taken found hooter still not run due to
tripping in power circuit.

Shift jobs carried

Following Equipment S/D Clear


1. Screen-1
2. Scree-2
3. Enmass-1
4. Crusher-1

P&V-2 Water filling work and P&V-2 Running condition


BC-7A &7B Bunker-2 transmittor cleaning work
Unit-2 12-22 Power jb rubber mat laying work
Workshop MV drive AHU comes in manual mode then put in Auto mode
1 no's 24 V Transformer & handlamp provided PA-1 Fan area
Heater geen tag updated done ( M.J. Contactor)
Boiler-1 9 mtr. Floor LED Light reapired work
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
SH and Eng. Offices AC power OFF.
Shift jobs carried
In Unit No. # 2 Coal Bunker Level Transmitter -2C level is not showing correctly. So Reset the Power
supply. Now Ok.
BAC-2A and 2B Inst. Panel and Level probe JB Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Chimney analyzer avitation light is not ON. So checked and found that Timer is structed. So Reset
it. Now Ok.
Coal shed, T-1 and T-2 area light OFF .
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is OFF. Then put into
auto mode. Now Ok.
In GSC-2A and 2B motor Cleaning to done.

Shift jobs carried

Following Equipment S/D Given


1. BC-1
2. Reclamier
3. V.Screen-1
4. Bed Ash cooler1A & 1B
5. BAC 2 BVALVE
WTP MCC & Fire MCC Outside Panels Cleaning work
compressor house auto drain valve manually checked found healthy.
DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
Boiler-1 cyclone floor 24 V LED not glowing problem attend & rectify.
P&V-2 running & water filling work
EOP-2 Power ON and OFF as per operation requirement.
Reclamier cabin emergency button not working so attend & rectify with G Shift Team

Shift jobs carried

Following Equipment S/D Clear


1. Vibrating screen-1
2. BC-1
3. Reclaimer
4. BAC-2B Dome valve Air
compressor house auto drain valve manually checked found healthy.
DT-2 temp 72 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
SH and Eng. Offices AC power OFF.
Bunker-2D level wrong showing, so level transmitter cleaning and power reset, found running
healthy.
Reclaimer cable dressing work done.
Bed ash cooler-1A air valve close, so ON done.
CHP DCS AC not working ( due to this IAC-1 temp fault coming) two no’s fan provided for cooling.
P&V 2 water level down, so water filling done.
S/D vendor-02 no’s Hand drill m/c Green tag provided, 02 no’s Top given and 10 Mtr cable
provided.
Bucket elevator-2 local to Remote and Remote Local done, as per operation requirement.
Bed ash Silo RAV tripped in O/L, reset it.
ACC-2 area light On as per Maint team requirement.
24V charging light received from operation, so put in charging.
Shift jobs carried
In CHP DCS Room In Inst. Air Compressor No. # 1 VFD Cooling fan is installed . Now No fault is
showing in VFD.
In Reclaimer left / right is not happened. Found that Left / Right switch is not working condition. So
replaced the switch. Now Ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Chimney analyzer avitation light is not ON. So checked and found that Timer is structed. So Reset
it. Now Ok.
Unit no. # 2 ACC Light to OFF.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
In Unit No. # 1 furnace all the LED light to ON. So OFF the light. Now ok.
Unit no.# 1 Soot blower panel cleaning to done.

Shift jobs carried

Following Equipment S/D Given


1. BC-1 bag filter
2. V.Screen-1
3. Bucket Elevator-1
unit-1 2nd extraction QCNRV open limit not shown, so set its open limit, now OK
Boiler-1 J valve MOV polyethene covering done
SOX factor changed from0.2 to 0.3 as per opration required in both DCS and CPCB PC
compressor house auto drain valve manually checked found healthy.
DT-2 temp 74 Deg, DT-5 temp 85 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
welding machine one Top changed to MJ engg
EOP-2 Power ON and OFF as per operation requirement.
Boiler-1 Filed RSB ELCB cleaning work at firing floor
mandir side lighting tower time set correctly, under observation
Emergency Charging Light put on charging at 4.5 mtr room for next shift requirement
Shift jobs carried
Following Equipment S/D Clear
1. Vibrating screen-1
2. Bucket Elevator-1
compressor house auto drain valve manually checked found healthy.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 87 Deg.
SH and Eng. Offices AC power OFF.
P&V 2 water level down, so water filling done.
Chimney aviation light off, so check found timer stuck ,so reset it.
Workshop Grinder m/c cable damaged, so re-connection done.
BLR-1 Drum floor 1 phase welding m/c tripped, so checked found TOP loose connection, correction
done and trial found healthy.
BLR-1 Ignitor floor 24v LED and transformer connection done.
ACC-1 ground floor temporary light provided.
BC-7A &7B air actuator cable laying done up to DCS.
Water cooler ( compressor) auto drain not working, so plunders release, and working normal.
Temple area light off, so check found timer stuck ,so reset it.
Shift jobs carried
In Unit No. # 1 Boiler side ID ,PA and SA fan Vibration Sensor cable dressing and packing to done.
In Compresoor area all the auto drain valve checked it is working normally.
In WTP Hall area all the field Inst. Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
WTP MCC & Fire MCC Outside Panels Cleaning work done.
Silo roots blower Panel and motor cleaning done.
DT-2 temp 73 Deg, DT-5 temp 89 Deg, DT-6 temp 86 Deg.

Shift jobs carried


Following Equipment S/D Given
1. BC-1
2. Reclaimer
3. BC-4
4. BAG FILTER BC-7A&7B
5. GENERATOR TRANSFORMER-2
6.132KV ISOLATOR-1 TPP LINE-2 TOWER SIDE

1no. Dome found glass crack & laying on the floor so removed & thrown to scrapyard.
1no. LED & transformer provided to boiler shutdown operation team at cycloine floor.
ACC-1 RSB power made ON as per maint. Requirement.
P&V-2 water valve open & close as per requirement.
Boiler-2 Hopper level-21 level probe checked as per operation requirement ,found same at Dcs &
physical condition.
CHP 7A-7B air actuator taken in plough discharge panel,gland done & sov side connection done.

Shift jobs carried


Following Equipment S/D Clear
1. BC-1
2. Reclaimer
3. BC-4
4. BAG FILTER BC-7A&7B

compressor house auto drain valve manually checked found healthy.


DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 87 Deg.
SH and Eng. Offices AC power OFF.
P&V 2 water level down, so water filling done.
Chimney aviation light off, so check found timer stuck ,so reset it.
BFP room AHU comes in manual mode now put on auto mode
Bag house-1 12 vessel poppet valve air isolation & cylinder open & close tube removed & air
released
Bag house-1 12 nos vessel chamber purging air isolation & SOV 1 tube removed
WTP Lab bomb calorimeter system not working so change monitor now system healthy
BC-5 Motor T-2 Bag filter VFD Panel & RSB Panel cleaning & Blowering work
Bolier-1 cyclone floor LED Light power cable sparking so check & found cable melt & Connection
removed condition then cut damaged cable & connect healthy cable in LED now OK & Handover to
concern person
2 no's charging Light handover to civil person for ACC work
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report not send ( due to CD read issue).
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 83 Deg.
Chimney aviation light off, so check found timer stuck ,so reset it.
All unwanted lights switched OFF (BC-6 area) during shift round
Drain pot 1A motor double earthing provided.
BC-7A/7B Motor & power JB cleaning done.
Unit-2 vessel-2 level High comes checked & probe cleaning done.
BLR-2 0.0 Mtr area drain MOV, J valve MOV, Bed ash cooler local JBV, APH JB equipment’s cleaning
and blowering done.
Bed ash cooler local JB rubber mat laying done.
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
Following Equipment S/D Given
1. T-1 & T-2 Tower Bag filter
2. AFR
3.Soot Blower-1

ID-2 Fan Motor both side Lubrication work done


ACC-2 Ground floor 2 no'schargable light collect & put in charging.
Zishu Hozen at ACW area
P&V-2 Running & water filling to be check
Instrument technician engage with G Shift Team
Office AC ON
Shift jobs carried
Due to Greasing work of ID Fan no.-2 motor tripping Value is increased from 90 to 110 degree. After
normalized the temp. Again Tripping value set to 90 degree.
In Unit no. # 1 Coal feeder -1D pneumatics valve open and close limit installation , and PU tube
connection to done. Trial is pending due to S/D condition.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. T-1 & T-2 Tower Bag filter
2. AFR

In Chimney analyzer avitation light is not ON. So checked and found that Timer is structed. So Reset
it. Now Ok.
Unit no. # 1 SA fan S/D to given also Power and earthing cable removed.
02 nos charging light to provided to civil dept.
Unit no. # 2 ACC Light to ON.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 89 Deg, DT-6 temp 83 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (BC-4 & BLR-2 area) during shift round
U#2 vessel 11-21 line flushing done.
BLR-2 feed water station equipment cleaning and blowering done.
BLR-2 soot blower panel cleaning done.
Coal feeder 2D motor side double earthing provided and cable dressing done.
AC & vent MCC door lock damaged, so replaced.
SA-1 motor side power cable poltythene covering done.
Shift jobs carried
Following Equipment S/D Given
1. BC-1
2. Reclaimer
3. BC-7A &7B
4. Coal Feeder -2A

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.8 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
5/ DM Water added in cell

1no. 4 2v LED & Extension Board provided toAPH -1 Area ( Taqueer)


1 no's 32 amp plug top replacement at W/M (J.M .Engineering)
P&V-2 water valve close due to water overflow
Boiler-1 SA FAN RTD Connection removed , noted & pasted at DCS-1 Notice Board & SA-1 Motor DE
&NDE Side RTD Removed & shift Eng. Room tarun table
2 No's Rechargable light collect & put on charging at 4.5 mtr.
Monthly Power Report Balaced upto 17/06/2022
Zishu Hozen at silo area
Shift jobs carried
In Unit no. # 2 FW 100% Valve 02LCV3202 found that gland leakage at site. So Gland tightness to
done. Now no leakage at site.
In Unit no. # 1 Coal feeder -1A pneumatics valve open and close limit installation , and PU tube
connection to done. Trial is pending due to S/D condition.
CHP AC is started. Now it is running normally and Room temp. is 30 Degree.
Unit No. # 1 vessel No.-22 popette valve S/D to provided. Also Vessel No.-12 popette valve S/D to
cleared.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-1
2. Reclaimer
3. BC-7A &7B
4. Coal Feeder -2A

In Coal feeder-2A old motor connection removed at site. Also New Motor connection to done. Trial
taken it is working normally. Old motor shifted to WTP workshop.
In mech. Workshop welding machine cable is shorted. So Cut the cable and connection done. Now
ok.
Unit no. #1 SA fan Motor Polythene coverning to done.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
CHP DCS Equipment cleaning and blowring done
DT-2 temp 75 Deg, DT-5 temp 89 Deg, DT-6 temp 83 Deg.
DC charging Light given to operation
CHP DCS VFD panel and Room DOOR packed with packing tape

Shift jobs carried


In CHP dcs Room AC is running Normally. Room temp.= 27 Degree.
In Unit no. # 1 Coal feeder -1C pneumatics valve open and close limit installation , and PU tube
connection to done. Trial is pending due to S/D condition.
P & V. No. # 2 is in running condition and P & V. No. # 2 is water filled due to low water.
In unit No. # 2 Vessel no.-22 level is not showing at DCS end. So checked at field side no material
inside the vessel. So informed to shift incharge.
In Compresoor area all the auto drain valve checked it is working normally.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Grid island at 9.20 AM due to the voltage Dip. During the synchroniusing command is not generated.
Voltage is matched but frequency is not mached. So frequency SP is 49.9 HZ. Then after 2 to 3 times
grid is synchronised.

Clean Run motor -2B motor is not roating. So Clean run Power MCB to OFF ( S/D is provided to
mech. Person for Gear box checking purpose.) While Feeder is in running condition.
Hand lamp and LED light provided to Mr. Vishal Sharma.
Near SA fan no.# 1 Bearing Heater plug Top to changed.
Shift jobs carried
U#2 coal bunker level transmitter cleaning done.
Dosing room panel cleaning and blowering done.
U#2 APH vessel-1 seal pressure gauge fitting tightness done.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights ON during shift round
Clean Run motor -2B S/D clear, and motor side connection done.
Inst Comp 1 & 2 motor and Power JB cleaning done.
Coal feeder area RSB door lose, so tightness done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V-2 Running water level check found ok
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 83 Deg.
ACC-1 Lube oil feeder faulty transducer replaced by new one
Dosing room panel cleaning and blowering done.
Coal Feeder 1A , 1B , 1C &1d vfd Panel cleaning & Blowering work done
TG-1tr. Control valves & MOV's cleaning work
IFC Filter Moisture Drain
Shift jobs carried
In Unit no. # 1 Coal feeder -1B pneumatics valve close limit is not working condition. So new Limit
switch is installed at site. Trial taken it is working normally.
In Unit no. # 1 Coal feeder -1B pneumatics valve open and close limit installation , and PU tube
connection to done. Trial is pending.
Pi TV is OFF condition. So ON from remote. Also HDMI-1 is selected. Now ok.
P & V. No. # 2 is in running condition and P & V. No. # 2 is water filled due to low water.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
Coal Feeder -2D main motor earthing is damaged condition. So Reconnected it. Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given and Cleared.
1. BC-1
2. Reclaimer
3. BC-7A &7B
4. BC-1
5. BC-4

In Boiler No. # 1 Burner Floor grinder Machine Green tag to provided.


Shift jobs carried
Boiler-1 Grinder Cable replaced. And Transformer replaced
CHP Building 0 Mtr. RSB inside short circuit due to rat inside, so remove and taken in line found
healthy.
BC-1 Belt sway-05 bypassed from DCS panel 93-9A, TB1-7 and 8. (cable removed)
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
Grid island at 17:01 Hrs. and synchronized at 17:31 Hrs.
All manual lights ON during shift round
Coal Shed BC-3 LED light replacement required
SA-1 RTD hole packing by cotton, as per MMD requirement.
Unit-1 Bag House -11 Poppet valve and actuator isolation done as per PTW.
Boiler-1 Bed thermocouple JB checking done.
U -2 Unloading system Actuator, Transmitter, and SOV polythene covering done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V-2 Running water level check found ok
DT-2 temp 72 Deg, DT-5 temp 87 Deg, DT-6 temp 83 Deg.

Bolier-1 Lift comes in F5 fault (Read Switch )at 0 mtr. Now apply cabin emergency & lift 0 mtr.
UPS & Battery charger Panel cleaning outside
CHP MCC Panels outside cleanng work
P&V-2 Running water level check & fillup.

Bolier-1 Lift emergency released ,now working healthy.


EOP-2 Power ON and OFF as per operation requirement.
M/s vernos team grinder machine 10a plug top provide ,green tagging done & cable 5 mtr
connected for extension
Bagfilter BC-7B checked as not operating from CCR ,found ral jamming & tripping on overload ,so
informed to operation
P&V-2 water level checked found ok.

Shutdown given
1.BC-7A
2.BC-7B
3.BC-7ab bagfilter
4.BC-1
5.Reclaimer

Boiler-2 21 no. hopper level probe checked & cleaned as per operation requirement
LP heater control valve 01LCV3304 checked & air pressure increased as per requirement, trial done
now working healthy & in line.
Boiler-1 Bed thermocouple inspection done found 2 no. t/c well in damaged condition so need to be
replaced.
Walkie tallkie switch issue resolved as per operation requirement
Shift jobs carried

Shutdown Clear
1.BC-7A
2.BC-7B
3.BC-7ab bagfilter
4.BC-1
5.Reclaimer

Limestone area plug top replaced and green tag provided.


Chimney aviation light found not glow, so check found timer stuck ,so release it.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
ACC-1 area plug top provided, Drill M/c checking done, 24 V transformer and light provided, single
phase extension board provided.
All manual lights ON during shift round
Boiler-1 Thermocouple replaced 02 nos.

Shift jobs carried


In Unit no. # 2 Sec. Stage DSH Control Valve 02TCV3203 found that gland leakage at site. So Gland
tightness to done. Now no leakage at site.
SH room one nos AC to OFF.
In WTP DCS panel Cleaning and blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Unit No. # 2 Ejector side 220 Volts LED Light to provided.
In Unit no. # 1 Grinding machine plug Top to changed.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.

Shift jobs carried


Shutdown Given
1.BC-3
2.Vibrating Scren-1
3.Coal Fffder-1A
4.Coal Fffder-1B
5.Coal Fffder-1C
6.Coal Fffder-1D
7. 132KV Line-1 Isolator (02 times)
8.GT-1 (02 times)

Shutdown Clear
1.Coal Fffder-1A
2.Coal Fffder-1B
3.Coal Fffder-1C
4.Coal Fffder-1D
5. 132KV Line-2 Isolator
6.GT-2

Jockey pump not run, so checked and found Fire water MCC-A tripped in Overload 1059 A, PCC end
breaker PCC-3A-6A, so reset and trial run found healthy.
132 KV Line-2 and GT-2 Charged and taken in line, and 132 Line-1 and GT-1 taken in S/D.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
All manual lights OFF during shift round
U#2 coal bunker level transmitter cleaning done.
U#2 Bed ash cooler RTD, transmitter, actuator, and flow switch poltythene covering done.
U#2 drum floor pressure gauge calibration sticker pasting done.
ACC-2 welding m/c plug top 32 A, and green tag provided.
Shift jobs carried
Shutdown Clear
1.BC-3
2.Screen-1

Following Abnormalities attaend at Fly ash silo Top


1/RSB-70 Panel faulty ELCB checked cleaning by CRC Tested now ok.
2/ FAS-2 Bag Filter motor earthing found damaged condition now double Earthing done.
Chimney aviation light found not glow, so check found timer stuck ,so release it.
P&V 2 water level down, so water filling done.
DT-2 temp 73.5 Deg, DT-5 temp 88 Deg, DT-6 temp 84 Deg.
ACC-1B & ACC-1E faulty transducer replaced by new one now current showing healthy at DCS
( Abnormality)
All manual lights ON during shift round
Boiler-1 FCV 100% line control valve Maintenace work With G Shift team
Boiler-2 Bag house vessel-11 level High so check & found material inside inform to shift incharge
STG Building lift F6 Fault comes so check & found IR Sensor both 0 mtr & 9 mtr malfunctioining so
Adjustment in IR Sensor now lift healthy & lift telephone not wotking check & found connector
loose so reconnect now ok
Shift jobs carried
One Nos boiler operator desk PC is hang condition also mouse is not working condition. So PC is
restarted. Now Ok.
In Compressor House all the auto drain valve checked it is working Normally.
In Fly ash silo No. # 1 and 2 Cleaning and blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
MVAR Set point changed from 0.6 to 0.3 . Now running Normally.
24 Volts LED light Put into charging mode.
In WTP RO Booster pump Motor cleaning to done.
In CHP T-1 , T-2 , and BC-4 Light ON as Per Operation requirement.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 72 Deg, DT-5 temp 87 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (BLR-2 & WTP tank area) during shift round
U#2 Vessel-11 level high coming, so cleaning ant trial run found healthy.
Vam floor equipment cleaning done.
Engg. Office AC power OFF.
Fire pump house and BC-6 motor cleaning done.
Shift jobs carried
Shutdown Given
1.BC-6
2.132 KV Isolator-2
3. GT-2 Transformer

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 12.7 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Crusher-2 11 KV HT Panel new protection relay current feedback not available so one current
transducer installaion & wiring done now current feedback halthy at DCS
P&V 2 water level down, so water filling done.
DT-2 temp 72.5 Deg, DT-5 temp 87 Deg, DT-6 temp 84 Deg.
1 No's W/M 3 phase plug top found Damaged replaced by new one(ACC-2 Area)
All manual lights OFF during shift round
BC-3 Take up pully fault indication shows at DCS so check in field found Pully guard rope not in
proper position so adjustement done now BC-3 Healthy
ACC-2 Area 3 pahse supply extension board green tag updated done
Lime stone side DCS Panel 86-M BRC card Fault so reset now ok
BLR- 2 fws 100% line control valve bypass (02CC3202) air regulator air leakage so air leakage
arrested
Shift jobs carried

In Unit No. # 1 APH I/L FG Temp. ( TI 952 / TI 952A ) Both the RTD opened from site. And Cleaned
heavy material deposit on the RTD. Then inserted it. Also Packing and Connection tightness to done.
In Unit no. # 1 DSH C.V. 01TCV3201 m-Seal to provided to main air isolation valve due to fitting
open at site.
All the DSH Control Valve cable dressing to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-6

Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
Following Equipment S/D Given.
1. CT fan no.-3 ,
2. 12MV4303,

In Unit No. # 2 ACC fan area 04 Nos LED Light , 02 Nos Transformer and 02 Nos Extension board to
provided.
In Unit No. # 2 ACC fan area repair Supply Box power is not showing. So at feeder side 02 nos fuse
blown. So changed the fuse. Now ok.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 89 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (22 Mtr. area) during shift round
U#2 FWS MOV, control valve, and field equipment cleaning done,
BLR 0.0 Mtr. Area drain Mov, Local JB, and bag house equipment cleaning and blowering done.

Engg. Office AC power OFF.


BC-1 & 2 Motor and power JB cleaning done.
Shift jobs carried
In Unit no. # 1 DSH C.V. 01TCV3201 / 01TCV3203 Control valve calibration done as per
requirement. Also checked from CCR. It is working Normally.
All the Unit no. # 1 DSH control Valve Calibration done also checked from CCR. It is working
Normally.
Unit No. # 2 bed material Temp. 02TI1116 out. So Spare pair of TI1117 to Provided.
BAC-2A and 2B Back. Pr. Transmitter impluse line cleaned as per Operation requirement.
Bed ash silo level is not showing correctly. So probe cleaned and power Reset. Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
All the Manual Light to ON Condition.
Following Equipment S/D Given and cleared..
1. BC-7A,
2.BC-7B,
3. Vibrating screen No.-1,

Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
Boiler No.-1 lift in fault condition. So Reset it. Now ok.
In ACC area welding machine plug Top to provided.
ACC Zero mtrs 01 Nos street light connection to done. Now it is working normally.
TG-2 Enclosure Light is not ON. Found that MCBis tripped. So ON the MCB. Now Ok.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (22 Mtr. area) during shift round
FCS-1 contol air valve air valve fitting Mseal fixing work
WTP DCS Panel cleaning work
Engg. Office AC power OFF.
WTP Pump House motors cleaning & Blowering work
Shift jobs carried
In Unit no. # 1 FWS C.V. 01LCV3201 / 01LCV3202 and 01LCV3203 Control valve calibration done as
per requirement. Also checked from CCR. It is working Normally.
In Unit no. # 1 FWS C.V. 01LCV3201 / 01LCV3202 and 01LCV3203 Control valve Positioner
Polythene Covering to done.
P & V. No. # 2 is in running condition and P & V. No. # 2 is water is overflow. So water filling valve
to closed.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given .
1. Mist. Fan -1B ,

Unit No. # 2 EOP start ans stop as Per operation requirement.


Unit No. # 1 Boiler, 6 th floor welding machine double earthing to done.

In ACC area grinder machine is not ON. Found that cable open at plug top. So connected it. Now Ok.
Shift jobs carried
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched ON during shift round
Engg. Office AC power OFF.
Mist fan 1B S/D clear, Mist fan 1A S/D given
Fly ash silo-1 area Motor cleaning and blowering done.
BC-5 area cable dressing done.
ACC area temporary connection done.
U-2 bed material RAV panel and equipment’s cleaning done.
U-2 boiler back pressure transmitter cover fixing done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF during shift round
Drain pot-1A Feeder faulty Transducer replaced by new one now current healthy shows in DCS
Drain Pot 1A Feeder Maintenace work done
BC-7A Trip due to overload reset done
BLR#1 Depsuperheater all control valve cleaning work
BLR#2 Bed Thermocouple JB Cleaning & covered by Polythene
Dosing Rom E&I Equipment cleaning and blowering done.
Shift jobs carried
In Unit no. # 1 FWS C.V. 01LCV3201 / 01LCV3202 and 01LCV3203 Control valve cable dressing to
done.
In Unit no. # 1 DSH C.V. 01TCV3203 Air filter guage is damaged condition. So Replaced the guage.
Also In TCV3204 Positioner Guage is not working condition. So Replaced it. Now ok.

In unit No. # 1 ACC Zero mtrs Fire station pr. Switch and Inst. JB polythene coverning to done.
P & V. No. # 2 is in running condition and P & V. No. # 2 is water is filled. also water filling valve to
closed.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into
auto mode. Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given .
1. BC-7B ,
2. BC-7A ,
3. Vibrating Screen No.-1,

Unit No. # 1 Boiler, 6 th floor RSB-21 three phase ELCB is not working condition. So Cleaned by
cleanit. Now ok.
In Unit No. # 1 APH side grinder machine green tag to provided.
01 Nos 220 Volts extension board provided at Unit No.# 1 APH area.
Shift jobs carried
P&V 2 water level down, so water filling done.
DT-2 temp 73 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
Engg. Office AC power OFF.
ACC area temporary connection done.

Following Equipment S/D clear .


1. BC-7B ,
2. BC-7A ,
3. Vibrating Screen No.-1,
Following Equipment S/D Given .
1. ID Fan-1
2. J Valve 1B
3. U-1 Soot Blower
4. 01MV2301
5. SA Fan 1
6. 01MV2302
7. P fan-1
8. J valve-1A
9. 01MV3210
10. PA Fan-1
11. Boiler-1 Ignaitor-1
12. Boiler-1 Ignaitor-2

BLR-1 PA fan RTD and Vibration, installation, connection and cable dressing done.
BLR-1 ID fan RTD and Vibration, installation, connection and cable dressing done.
BLR-1 Bag House -11 chamber cylinder air tube fixing, and s/d clear.
BLR-1 Bag House -12-21 chamber cylinder air tube fixing.
BLR-2 P fan RTD remove, and shift to TG-2 LP heater.
Boiler area temporary connection done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 74 Deg, DT-5 temp 89 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF during shift round
FAS-2 Fork switch contiune act so clean it now ok & system healthy
compressor house auto drain valve manually checked found healthy.
ACC-2 Ejector floor 1 no 24v LED & 24V Transformer provided done
P&V-2 VFD Frequency increase 37 to 45 Hz due to DT-5 Temprature 91 deg. When temp. decrease
upto 89 deg. VFD Hz dcerease 45 to 37 Hz.
EOP-2 Power ON and OFF as per operation requirement.
WTP Hall Rom E&I Equipment cleaning and blowering done.
Shift jobs carried
P&V 2 water level down, so water filling done.
DT-2 temp 72 Deg, DT-5 temp 88 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF and ON during shift round
Engg. Office AC power ON and OFF.
ACC area temporary connection done.
Following Equipment S/D clear .
1. 132KV ISOLATOR-1 TPP LINE-2 TOWER SIDE
2. GENERATOR TRANSFORMER-2
3. UNIT-1 SOOT BLOWER
4. BED ASH COOLER-1B
5. BED ASH COOLER-1A
6. ID FAN-1
7. RETURN WATER INLET MOV OF COOLING TOWER CELL-3
8. COOLING TOWER FAN-3
9. BC-7A/B Bag filter
10. BC-6

Following Equipment S/D Given .


1.BC-7A/B Bag filter
2.BC-6
3. COOLING TOWER FAN-2
4. RETURN WATER INLET MOV OF COOLING TOWER CELL-2
5. 132KV ISOLATOR-1 TPP LINE-1 TOWER SIDE
6. GENERATOR TRANSFORMER-1

Coal bunker-2 level transmitter cleaning done.


Bed ash cooler 1A,1B flow switch, actuator, RTD equipment’s polythene covering done.
Boiler area temporary connection done.
EOP-2 power ON and OFF as per operation requirement.
GTr-2 Charged and Taken in line, and GT-1 S/d given .
BLR-2 BH-21 HH and H level probe calibration done, now running healthy.
Fly ash silo-2 fork switch in fault, so cleaning done and found healthy.
CHP building wash room 02 light installation done.
Extension board repaired and cable provided.
02 Grinder and 01 drill m/c Top provided and green tag provided.
BLR-1 J valve thermocouple termination done.
Shift jobs carried

In CHP Coal Crusher No.-2 permit is not showing at DCS end. So checked at Breaker side there is no
fault. So checked in logic found that fan Bearing temp. T2 is showing 86 degree. So informed to shift
Incharge. Also crusher Line # 2 is started.
As per shift Incharge requirement Vibrating Screen No. # 1 put into Local mode. Then again Put into
Remote mode.

DT-5 temp. is increased to 90 degree. So P&V.-2 HZ increased from 33 to 40 Hz. Under observation.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In ACC Unit no.# 2 unwanted light to OFF condition.
In unit no. # 1 APH area Extension board is tripped. So found that Grinder cable shorted. So cut the
cable and reconnected it. Now ok.
In Compressor House all the auto drain valve checked it is working Normally.
In Unit no. # 2 Bag house 11-21 and 12-22 Inst. SOV JB connection tightness to done.

Shift jobs carried


DT-5 temp. is increased to 90 degree. So P&V.-2 HZ increased from 40 to 45 Hz. Under observation.

DT-2 temp 74 Deg, DT-5 temp 89 Deg, DT-6 temp 84 Deg.


compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
Engg. Office AC power ON
ACC and Boiler area temporary connection done.
EOP-2 power ON and OFF as per operation requirement.
Following Equipment S/D Given .
1.Vibrating Screen-2
2. Coal Crusher-2
3. Bed ash cooler-2A

Following Equipment S/D clear .


1.SA-1
2. PA-1
2A Bunker level transmitter cleaning and power reset done.
BH-2 Hopper-21 HH and H probe removed and calibration done.
SA-1 positioner SOV PU tube puncture, SO tube replaced and polythene covering done.
Shift jobs carried
Shutdown Clear
1Screen-2
2.Crusher-2
3. BAC-2

Following Abnormalities attaend at Crusher Floor


1/Crusher floor Bag Filter Motor cleaning & Covering by Canopy
2/ Crusher Floor 24 V Transformer found dusty condition , cleaning done.
Chimney aviation light found not glow, so check found timer stuck ,so release it.
P&V 2 water level down, so water filling done.
DT-2 temp 73.5 Deg, DT-5 temp 88 Deg, DT-6 temp 84 Deg.
Crusher-1 Motor both side Greasing done
All manual lights ON during shift round
Boiler-1 area W/M Cable connected & 3 phase plug top replaced & Green tag updated done

Security tower Switchyard back side timer ON & OFF time reset done( 19:15 Pm to 5:30 Am)
Chimney Analyser room Back side Power JB Covering by Polythene
BC-4 CCTV Camera not working so check & found Power Socket loose condition tightness done now
healthy

Boiler-1 RTD JB Polythene covering done


BFP MV Drive all AC JB Polythene covering done
Shift jobs carried

In Jocky Pump No.-1 and 2 is not started as per shift incharge at 3.00 AM. So checked and found that
there is no supply in MCC. So checked at incomer side found that fault LED is showing . So Reset it.
Then charged the breaker. Also informed to Hement Sharma. At 5.30 AM again breaker tripped. So
charged the income breaker.
In Unit No. # 2 APH Vessel No.-1 Dome Valve PU tube is leakage. So cut the PU tube and reconnected
it. Now ok.
Fly ash silo No.-1 and 2 field inst. And JB Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In ACC Unit no.# 2 unwanted light shifted to BFP-3 zero mtrs area.
At TG floor area 02 nos light to OFF.
01 nos 24 Volts LED Light Put into charging mode.
ACC side extension board Power is not showing So checked and found that in repair supply box
ELCB Tripped condition. So ON the ELCB . Now Ok.
DT-5 temp. is showing Normally- 88 Degree. ( P & V-2 Nos running at -45 HZ )

Shift jobs carried


Boiler 0 mtr bed ash cooler local JB rubber mat clean and placed properly
coal shed RSB JB cover found loose so tight it
Boiler-2 Bed material RAV and equipment cleaning done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
coal shed area lights made ON due to requirement
DT-5 temp. is showing Normally- 88 Degree. ( P & V-2 Nos running at -45 HZ )
Date Shift Engineer Name

01.07.2022 A Tarun Gaur

Date Shift Engineer Name

01.07.2022 B Sanjay Garg


Date Shift Engineer Name

01.07.2022 C Amit kumar singh

Date Shift Engineer Name

02.07.2022 A Tarun Gaur


Date Shift Engineer Name

02.07.2022 B Sanjay Garg

Date Shift Engineer Name

02.07.2022 C Amit kumar singh


02.07.2022 C Amit kumar singh

Date Shift Engineer Name

03.07.2022 A Sanjay Garg

Date Shift Engineer Name

03.07.2022 C Tarun Gaur

Date Shift Engineer Name


04.07.2022 A Sanjay Garg

Date Shift Engineer Name

04.07.2022 C Tarun Gaur

Date Shift Engineer Name


05.07.2022 A Ashvin Jadav

Date Shift Engineer Name

05.07.2022 B Amit kumar singh

Date Shift Engineer Name


05.07.2022 C Sanjay Garg

Date Shift Engineer Name

06.07.2022 D Ashvin Jadav


Date Shift Engineer Name

06.07.2022 C Sanjay Garg

Date Shift Engineer Name

07.07.2022 C Ashvin Jadav

Date Shift Engineer Name


08.07.2022 A Tarun Gaur

Date Shift Engineer Name

08.07.2022 B Sanjay Garg

Date Shift Engineer Name

08.07.2022 C Ashvin Jadav


08.07.2022 C Ashvin Jadav

Date Shift Engineer Name

09.07.2022 D Sanjay Garg

Date Shift Engineer Name

09.07.2022 N Tarun Gaur


09.07.2022 N Tarun Gaur

Date Shift Engineer Name

10.07.2022 A Sanjay Garg

Date Shift Engineer Name

10.07.2022 B Ashvin Jadav


10.07.2022 B Ashvin Jadav

Date Shift Engineer Name

10.07.2022 C Tarun Gaur

Date Shift Engineer Name

11.07.2022 A Sanjay Garg


Date Shift Engineer Name

11.07.2022 B Ashvin Jadav

Date Shift Engineer Name

12.07.2022 D Ashvin Jadav

Date Shift Engineer Name

12.07.2022 C Gajendra Pandya


12.07.2022 C Gajendra Pandya

Date Shift Engineer Name

13.07.2022 A Ashvin Jadav

Date Shift Engineer Name

13.07.2022 B Tarun Gaur


Date Shift Engineer Name

13.07.2022 C Gajendra Pandya

Date Shift Engineer Name

14.07.2022 A Tarun Gaur

Date Shift Engineer Name

14.07.2022 B Gajendra Pandya


14.07.2022 B Gajendra Pandya

Date Shift Engineer Name

14.07.2022 C Ashvin Jadav

Date Shift Engineer Name

15.07.2022 A Tarun Gaur


Date Shift Engineer Name

15.07.2022 B Sanjay Garg


Date Shift Engineer Name

15.07.2022 C Ashvin Jadav

Date Shift Engineer Name

16.07.2022 A Tarun Gaur

Date Shift Engineer Name


16.07.2022 B Sanjay Garg

Date Shift Engineer Name

17.07.2022 A Sanjay Garg

Date Shift Engineer Name

17.07.2022 B Ashvin Jadav

Date Shift Engineer Name

17.07.2022 C Tarun Gaur


17.07.2022 C Tarun Gaur

Date Shift Engineer Name

18.07.2022 A Sanjay Garg

Date Shift Engineer Name

18.07.2022 C Tarun Gaur


18.07.2022 C Tarun Gaur

Date Shift Engineer Name

19.07.2022 A Ashvin Jadav

Date Shift Engineer Name

19.07.2022 B Tarun Mandawat


19.07.2022 B Tarun Mandawat

Date Shift Engineer Name

19.07.2022 C Sanjay Garg

Date Shift Engineer Name

20.07.2022 A Ashvin Jadav


Date Shift Engineer Name

20.07.2022 A Tarun Gaur

Date Shift Engineer Name

20.07.2022 C Sanjay Garg

Date Shift Engineer Name


21.07.2022 A Tarun Gaur

Date Shift Engineer Name

21.07.2022 B Gajendra Pandya

Date Shift Engineer Name

21.07.2022 C Ashvin Jadav


21.07.2022 C Ashvin Jadav

Date Shift Engineer Name

22.07.2022 A Tarun Gaur

Date Shift Engineer Name

22.07.2022 A Sanjay Garg


22.07.2022 A Sanjay Garg

Date Shift Engineer Name

22.07.2022 C Ashvin Jadav

Date Shift Engineer Name

23.07.2022 A Tarun Gaur


23.07.2022 A Tarun Gaur

Date Shift Engineer Name

23.07.2022 B Sanjay Garg

Date Shift Engineer Name

23.07.2022 C Tarun Mandawat


Date Shift Engineer Name

24.07.2022 A Sanjay Garg

Date Shift Engineer Name

24.07.2022 B Ashvin Jadav

Date Shift Engineer Name

24.07.2022 C Tarun Gaur


Date Shift Engineer Name

25.07.2022 A Sanjay Garg

Date Shift Engineer Name

25.07.2022 B Ashvin Jadav


Date Shift Engineer Name

25.07.2022 C Tarun Gaur

Date Shift Engineer Name

26.07.2022 A Tarun Mandawat

Date Shift Engineer Name

26.07.2022 B Ashvin Jadav


Date Shift Engineer Name

26.07.2022 C Sanjay Garg

Date Shift Engineer Name

27.07.2022 A Ashvin Jadav

Date Shift Engineer Name

27.07.2022 B Tarun Gaur


27.07.2022 B Tarun Gaur

Date Shift Engineer Name

27.07.2022 C Sanjay Garg

Date Shift Engineer Name

28.07.2022 B Tarun Gaur

Date Shift Engineer Name


28.07.2022 C Ashvin Jadav

Date Shift Engineer Name

29.07.2022 A Tarun Gaur

Date Shift Engineer Name

29.07.2022 B Sanjay Garg


29.07.2022 B Sanjay Garg

Date Shift Engineer Name

29.07.2022 C Ashvin Jadav

Date Shift Engineer Name

30.07.2022 A Sanjay Garg


30.07.2022 A Sanjay Garg

Date Shift Engineer Name

30.07.2022 C Tarun Gaur

Date Shift Engineer Name

31.07.2022 A Sanjay Garg

Date Shift Engineer Name

31.07.2022 B Ashvin Jadav


31.07.2022 B Ashvin Jadav

Date Shift Engineer Name

31.07.2022 C Tarun Gaur

Date Shift Engineer Name

29.07.2022 B Sanjay Garg


29.07.2022 B Sanjay Garg
Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


BLR#1 Lift supply OFF at lift cabin due to heavy raining

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Office AC OFF
Regular jobs

RNRP all nodes found Normal except SPC007.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Office AC OFF
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Office AC OFF
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Office AC OFF
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Office AC ON
Coal Shed area light OFF

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Office AC ON

Coal Shed area light OFF


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

All Unwanted Light OFF


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
DT-2 -82deg , DT-5-85deg,DT-6 -83deg.
TG -1 01TCV2905 not operating from CCR so air adjusted &
calibration done, now working healthy.
TG-2 HP heater CV air leakage observed so tube replced &
rectified the leakage.
Tg-2 CE recycle MOV connection removal as limit not
operating properly.work is u/p
UPS & VAM round taken found healthy.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


DG Aux. report upload in SAP for 19/07/2022
Power Report Balance upto 19/07/2022
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Enmass-1 Put on Local mode as per requirement

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

SH and Eng. Offices AC power ON


Boiler-1 lift stop at 2nd floor due to heavy rain
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

SH and Eng. Offices AC power ON

Monthly Power Report Balance upto 22/07/2022

Boiler-1 lift start as per requirement of Maint. Dept.

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift round taken found drives running normal
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
6. VAM Check list

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift round taken found drives running normal
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Regular jobs
RNRP all nodes found Normal except SPC007.
Shift round taken found drives running normal

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Regular jobs
Shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .
UPS Check List filled.
Shift instrument digital log book filled

a) Generator-1 / 2 checklist
b)VAM Check list
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list
Following check list prepared-
1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal


Coal Shed area light ON As per requirement of Operation dept.
Bucket Elevator-2 put in Remote and VFD mode as per
operation requirement.
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

22 mtr . Light ON as per requirement

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
RNRP all nodes found Normal except SPC007.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared-


1. Shift instrument check list
2. UPS Check List
3. Generator-1  checklist
4. Generator-2  checklist
5. Electrical checklist
6. VAM Check list

Shift round taken found drives running normal

Bed ash cooler-2A stopped in running condition without


alarm, so power OFF and ON, and trial taken found running
healthy.
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
Monthly Power Report Balance upto 31/07/2022

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal except SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Shift jobs carried

Following Equipment S/D Given


1. Reclamier
2. Bucket Elevator-2
3. BC-2
4. Clean Run -2B
3. 02MV0906
Following Equipment S/D Clear
1. Clean Run -2B
fire MCC -B incomer breaker trip due to ground fault at CHP PCC-3B now after reset fault breaker again ON
& take under observation

Following Excersie Done Fire MCC -A Side for fault trace--


1/ All running feeder start one by one for trace any abnormalities but no abnormalities observed during running Motors Ex.
RAW Water & Jockey -2 & Potable-2 feeders.
2/ All unwanted feeders supply OFF
P&V 2 water level down, so water filling done.
DT-2 temp 74 Deg, DT-5 temp 88.5 Deg, DT-6 temp 85 Deg.
SH and Eng. Offices AC power ON.
BC-7A &7B Area faulty light repaired work
P&V 4 status checked found healthy.
ACC-2 Ejector floor 1 nos LED Light disalocation due to ACC-2 Mech. Work
Dosing room LP tank Level gauge stuckup so magnet adjustment now ok & under observation

BLR#2 2 no's APH vessel & 2no's DOM Valve limit bolt found loose condition so tightness done now ok
Clean Run-2BMotor Connection removed as per requirement of Mech. Dept. & after permit closed Motor
connection done
Shift jobs carried

Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. ( frequency -45 HZ )
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-1 ,
2. Reclaimer ,
3. Bucket Elevator No.-2 ,

4.5 mtrs finger machine Power Supply adaptor changed from CCR unit No. # 1 DCS room.
Unit No. # 1 APH LED light is not glow. Found that top damaged condition. So changed the TOP. Now Ok.

In BC-7A / 7B area Hand lamp to Provided.


Shift jobs carried
ACC-2 , additional lights power off done.
WTP pump house motor cleaning done.
Boiler #1, zero meter LDB found in open postion , so its provide nut and lock it.
Street light JB near scrap yard found open and water inside , so clean it and packing done.

Boiler #1, fourth floor 24 volt light not glow due to its connection open from industrial socket so connect it.
U#2 , Bag house back pr. Transmitter, polythene covering done.
U#2 , APH JB and equipment cleaning done.
Work shop Mvvfd room , cooling fan stop by prateek as its room and envoirnment temp. down.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Shift jobs carried

Following Equipment S/D Given


1. Reclamier
2. Bucket Elevator-1
3. BC-1
4. Jockey Pump-2

Following Equipment S/D Clear


1. CT -2 Fan
2/ CT-2 Fan MOV
fire MCC -B incomer breaker trip due to ground fault at CHP PCC-3B now after reset fault breaker again ON
& take under observation

Fire MCC -B Side all running motors feeders meggering done found Jockey -2 Power cable megger value found 0 mega ohm
so check in motor side connection open & taken both motor & Power cable megger found motor megger value OK but
Power cable Y Phase found ground. now cable puncture location checking work underprogress
P&V 2 water level down, so water filling done. P&V-2 VFD frequency decrease 45 Hz to 37 Hz
DT-2 temp 72 Deg, DT-5 temp 87.5 Deg, DT-6 temp 83 Deg.
SH and Eng. Offices AC power ON.
Boiler-1 Lift found in F5(Reed Switch malfuntioning) fault during shift round now power supply off &
Power supply ON at 11.00 am now lift healthy
P&V 4 status checked found healthy.
APH-1 area 230 V extension board not working so check & found neutral wire open in plug top then connect
now supply healthy
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.2 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Boiler-1 11 & 12 nos vessel show not showing level so check in field found material not in vessel
BLR#2 Desuperheater control valve 3203 gland leakage arrest & control valve cleaning work
Shift jobs carried
As per Brajesh Verma requirement Boiler Lighting time to changed. ( old Time- 19.10 PM and New time-
18.40 PM )
Jocky Pump No.-2 power cable Yellow phase cut 02 times , Still it is showing shorted to ground. Dryer-1 and
2 Power cable may be used.
In Unit no. # 1 APH side 24 volts LED light and transformer to provided.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 2 is in running condition. ( frequency -33 HZ )
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-1 ,
2. Reclaimer ,
3. Bucket Elevator No.-1 ,

Following Equipment S/D Given.


1. Coal Feeder -1A ,
2. Coal feeder -1B ,
3. Coal feeder -1C ,
4. Coal Feeder -1D,

In Coal Feeder -1B bunker O/L MOV Command is going to Continuous and motor heat condition. So feeder
side problem. So changed the feeder. Now ok.

Unit No. # 1 Boiler Lift telephone is not working condition. Found that connector loose condition. So
tightness done. Now ok.
Shift jobs carried
APH-2 of boiler-2 isolation air leakage arrested.
BLR#2 IFC Power Cable Found on floor now proper dressing work
MVAR is not maintaing in auto mode. So Informed to MPSS person but all capacitor bank is ON thair. So
Increased the SP from 0.3 to 0.65 for one hour then it change t original set point
APH unit-2 instrument cleaning and blowering done.
Boiler-2 IFC, and Compressor IFC moisture drain done.
Unit-2 vessel-2 dome fault comes checked & found sov connector loose so tightness done now system
healthy
One hand lamp provide at BC7A &B.
In WTP Hall area all the field Inst. Cleaning to done.
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
Shift jobs carried
In CCR lift comes in fault condition. So Reset the Power Supply. Now ok.
P & V. No. # 2 and 4 is in running condition and P & V. No. # 2 is water Overflow . So closed the water inlet
valve.
In Unit No. # 2 EOP Start and Stop as per operation requirement.
BC-4 Motor and Power JB Cleaning to done.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Cleared.
1. Coal Feeder -1A ,
2. Coal feeder -1B ,
3. Coal feeder -1C ,
4. Coal Feeder -1D,

ACW Dischrge Header Preesure switch and Transmitter Packing to done.


DG report Prepared and upload in SAP
WTP DCS Panel Cleaning and Blowerning to done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 72 Deg, DT-5 temp 87 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (22 Mtr. area) during shift round
TG-1 &TG-2 0 mtr all Instruments Equipments cleaning work
WTP MCC & Fire MCC Panels Cleaing Outside
1 no's Damaged plug top repaired extension Board at Boiler -1 APH Area
WTP Pump house E&I Equipments cleaning & Blowering work
Shift jobs carried
In Coal Feeder -1B / 1C level is not showing correctly at DCS end. So reset the power supply and cleaned the
Probe. Now ok.
In Unit no. # 2 Vessel No.-11 level high is not showing at DCS end. So cailbrated the level probe. Now ok.

Coal feeder -2B is tripped due to Motor Stall ( F0012 ) also motor takes the 5 Amps current. So informed to
shift incharge. After mech. Work at site then started it. It is running normally.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following AVI to given.
1. Coal Feeder -1A ,
2. Coal feeder -1B ,
3. Coal feeder -1C ,
4. Coal Feeder -1D,

Following S/D to given.


1. Dryer Pump -1 ,
2. Dryer pump -2 ,
3.En mass conv.-2 ,
4. Coal Feeder -1D Bunker O/L MOV,
5. BC-2,

Coal feeder -1B main feeder motor connection done as per requirement.
11 KV Voltage is less So increased the Voltage.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 2 water level down, so water filling done.
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
BAC-2B level probe cable found hanging condition so proper dressing done
UPS Room Battery charger Panel & UPS Panel cleaning outside
CHP MCC & ash handling MCC Panels Cleaing Outside
Following Euipment Shutdown Clear
1/ BC-2
TG-1 Got island at 3.32 am due to voltage fluctuaton & again synchronised at 3.48 am
Shift jobs carried
Following Equipment S/D Given .
1. BC-2
2. BC-4
3. Coal feeder 2C
Following Equipment AVI Given and close.
1. Coal feeder 2C
Following Equipment S/D clear.
1. Coal feeder 2C
DT-2 temp 74 Deg, DT-5 temp 89 Deg, DT-6 temp 84 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
Engg. Office AC power ON
MPHB Lift IR sensor hanging. So adjustment done
Coal bunker 2A level transmitter cleaning done.
U#2 BH 12-22 back pressure transmitter line flushing done.
fire pump house area fire water hose removed and put in fire hose box.
MPHB 22 Mtr area 24v lamp provided.
ACC-1 Area welding m/c top provided.
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
Shift jobs carried
U#1 ,ACC vent branch pipe P2,01PI4403 reading get voilet then check and connection tightness done, its
display found not show while reading get ok. Then its polythene covering done.
U#1 ,ACC vent branch pipe P1,01PI4402 its polythene covering done.
P&V2 ,water lavel checked found normal.
All the AC MCB to OFF Condition.
Coal feeder 2B, tare- calibration, nullyfying, and impulse calibration done with Pramod sir.
BAC-2A level probe cleaning done as its High lavael show continue, now ok.
Extension board supply check at APH as it not work due to loose connection.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-2 ,
2. BC-4 ,
3. COAL FEEDER 2C ,

Following Equipment AVI Given,


1. Coal feeder -1B ,
2. Coal feeder -1C ,
3. Coal Feeder -1D,

COAL FEEDER 2C, bunker outlet MOV motor got heated during trail, its winditng restanance at 15.9 ohm,
But its meggar value at 3.5 m-ohm ,so its trail to be check after hot bloweringan meggar value rise.

Shift jobs carried


In CCR lift comes is continuous operated. So adjust the timer. Now ok.
In Compressor House all the auto drain valve checked it is working Normally.
In WTP Hall area all the field Inst. Cleaning to done.
Coal feeder -2B is tripped due to Motor Stall ( F0012 ) also motor takes the 5 Amps current. So informed to
shift incharge.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Chimney analzer avitation light is not ON. So we have try to ON the MCB then tripped the MCB. To be
check in day time.
Unit No. -1 MVR is not run in auto mode. So at MPSS side one capacitor bank is ON. Then put into auto mode.
Now Ok.
At 22 mtrs LED light to provided as per operation requirement.
In unit No. # 1 ACC zero mtrs Light is not On. Found that MCB is tripped. So ON the MCB. Now ok.
In unit No. # 2 ACC zero mtrs Light is not On. Found that MCB is tripped. So ON the MCB. So again tripped. To
be check in day time.

Shift jobs carried

Following Equipment S/D Given and close .


1. BC-7A
2. BC-7B
3. Coal feeder 2C
4. BC-5 2.
5. Coal feeder 2B

Following Equipment AVI Close,


1. Coal feeder -1B ,
2. Coal feeder -1C ,
3. Coal Feeder -1D,
P & V. No. # 2 is in running condition. In P.& V. No.-2 water is filled .
DT-2 temp 72 Deg, DT-5 temp 87 Deg, DT-6 temp 81 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
Engg. Office AC power ON and OFF as per schedule.
Coal Bunker U# 2 level transmitter cleaning done
Bed ash cooler U# 2 local JB rubber mat laying done.
U#2 BH-21 level HH showing, Material cleaning and trial taken found healthy.
U#2 oil station RTD polythene covering done.
PA fan # 2 Discharge duct RTD polythene covering done.
Chimney aviation light checked and found MCB working normal.
MPHB 22 Mtr area 24v lamp repaired.
C7-AB bag filter 2B not run checked, and trial run found healthy.
Coal feeder -2B is tripped due to Motor Stall ( F0012 ) also motor takes the 5 Amps current. So informed to
shift incharge.
Following Equipment AVI given and Close,
1. Coal feeder 2B
Coal feeder 2B de-coupled trial taken as per requirement, and found running healthy.
Bunker 2B bag filter not running, checked and found loose connection, tightness done, and trial taken found
running healthy.
Bunker 2A bag filter not running, checked and found Local/Remote change over done, and trial taken found
running healthy.
Shift jobs carried
Unit No. -1 MVR is not run in auto mode. So at MPSS side all the capicator bank is in running condition. So
Set point Increased from 0.3 to 0.6 . Now ok.
In Unit no. # 1 master UPS some time alarm LED is showing But it is automatically OFF. While no alarm is
showing on panel board.
In Unit no. # 1 master UPS some time alarm LED is showing But it is automatically OFF. While no alarm is
showing on panel board.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
one 24 Volts LED Light provided to Operation person.
In Coal feeder -2B LED light provided .
At 22 mtrs tranformer side lighting Top ( 10 Amps ) to changed.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report not send ( due to CD read issue).
P&V 2 water level down, so water filling done.
DT-2 temp 71 Deg, DT-5 temp 86 Deg, DT-6 temp 89 Deg.
Chimney aviation light off, so check found timer stuck ,so reset it.
All unwanted lights switched OFF (BLR & TG) during shift round
compressor house auto drain valve manually checked found healthy.
TG-1 Got island at 22.29 hrs. due to voltage fluctuation & again synchronized at 22.45 hrs.
Reclaimer boom belt left/right not operate, so checked and found tripped in overcurrent (02 times) reset
and inform for checking overcurrent.
BLR-2 BH-11 level high, so cleaning and taken in line found running healthy.
BLR-2 firing floor repair supply box-26 rubber mat laying done.
VAM system equipment’s blowering done.
SH and Eng. Offices AC power ON.
MPHB Exhaust fan panel cleaning and blowering done.
Coal Shed area Light ON as per operation requirement.
Shift jobs carried
Following Equipment S/D Given .
1. BC-5
2. BC-4
3. Reclamier

Following Equipment AVI Given and close.


1. Coal feeder 1D
ACC-1 fan 1 to 6 motors both side Lubrication done
DT-2 temp 71 Deg, DT-5 temp 86 Deg, DT-6 temp 83 Deg.
compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
Engg. Office AC power ON
P&V-2 stopped due to water seepage at Unit-1 MV Drive room & P&V-4 taken in line
Drill M/C Green Tag updated done
Bucket Elevator-1 put on local mode as per requirement of APS Sir
P&V-2 duct top polythene covering work for eliminating water seepage
Power Report Balance upto 07/07/2022
Hanuman Temple Loud speaker Polythene Covering work
Shift jobs carried
Unit No. -1 MVR is not run in auto mode. So at MPSS side all the capacitor bank is ON. So we have increased
the SP to 0.7. Now it is ok.
In Chimney analzer PC all the data is showing NA. So we have checked and found that internet not connected
is showing in PC. All the connector tightness to done also PC is restared. Still it is showing internet not
connected.
In Unit No. # 1 ID fan -1 MV drive electrical Panel polythene coverning to done.
In Chimney analyzer all the panel Cleaning and Blowerning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is in running condition. ( frequency -40 HZ )
All the Manual Light to ON Condition.
Following Equipment S/D Cleared .
1. BC-5
2. BC-4
3. Reclamier
Bucket Elevator-1 put on local mode to Remote mode. Also VFD put DOL to VFD mode.
At 22 mtrs Light to ON as per operation requirement.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report not send ( due to CD read issue).
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 85 Deg, DT-6 temp 79 Deg.
Coal Shed area Light ON as per operation requirement.
All unwanted lights switched OFF (BLR & TG) during shift round
compressor house auto drain valve manually checked found healthy.
U# 2 firing floor equipment cleaning done.
Burner 2A & 2B MOV cleaning done.
U# 2 coal feeder floor vertical line vibrator not run, checked and found sir valve close, so open done and trial
run found healthy.
GSC-1A &1B motor cleaning done.
Shift jobs carried
In Unit No. # 1 Coal feeder -1D Zero and span calibration to done.
In TG Floor Lift Contionuous operated at floor No.-3 . So cleaned the IR Sensor. Now Ok.
In Unit No. # 1 Boiler Lift comes in fault. So Reset it and Cleaned the door sensor. Now ok.
At 22 mtrs area hand lamp to changed.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is in running condition. ( frequency -40 HZ )
All the Manual Light to ON Condition.
Following Equipment S/D Given .
1. BC-6
2. Coal Crusher No.-1,

Following Equipment S/D Cleared,


1. Coal feeder -1A ,
2. Coal feeder -1B ,
3. Coal Feeder -1C,
4. Coal Feeder -1D,
5. BC-6,
6. Coal Crusher No.-1

At 22 mtrs Light to ON as per operation requirement.

Shift jobs carried


All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 water level down, Water level OK.
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
Coal Shed area Light ON as per operation requirement.
2 no's LED & 1 no's 24 V Transformer handover ACC-2 Area
Reclaimer boom belt left/right not operate, so checked and found tripped in overcurrent (02 times) reset
and inform for checking overcurrent during check found abnormal sound observed gyration motor gear box
& pinion teeth side
STG Building 0 & 4.5 mtr all instruments cleaning & blowering work
20 amp plug top replacement at 24 V Transformer & 1 no's extension Board 10 amp. Plug top replacement
work
Shift jobs carried

Coal feeder -2B Clean run motor out from the location and Checked and found that Motor shaft damaged
condition. Also gear box assembly is damaged. Also Clean run motor connection removed at site and kept in
Inst. lab.So Inform to shift incharge. Presently feeder is in shutdown condition.

In reclaimer trial taken Motor takes 7 to 8 Apms current. So Informed to APS and Shift Incharge.
Unit No. -1 MVR is not run in auto mode. So we have increaed the SP to 0.7.
Coal feeder -2B pneumatics valve shutdown to provided.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Dosing Room all the Inst. Panel Cleaning to done.

Following Equipment S/D Given .


1. Coal feeder -2B ,
2. ,Coal feeder -2B O/L MOV,
3. Coal Feeder-2B pneumatics Valve,
4. reclaimer,

Following Equipment Cleared .


1. reclaimer,

Charging Light to provided at Coal feeder -2B area.


Shift jobs carried
All manual lights switched ON (BLR & TG) during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
Clean run 2B motor replaced with 1A and trial run found running healthy.
Chimney analyzer panel cleaning and blowering done.
02MV 3202 MOV feed water station MOV gland leakage attend done.
BC-4 area hand lamp provided.
Following Equipment S/D Clear & Given.
1. ID Fan-1
2. J Valve 1B
3. U-1 Soot Blower
4. 01MV2301
5. SA Fan 1
6. 01MV2302
7. P fan-1
8. J valve-1A
9. 01MV3210
10. PA Fan-1
11. Boiler-1 Ignaitor-1
12. Boiler-1 Ignaitor-2

BC-7A/B area hand lamp and holder replaced.


ACC-2 area 02 no’s hand lamp replaced.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 water level down, Water level OK.
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
Booiler-1 near PA Fan Rsb Panel 3 phase supply W/M socket flash occur & 3 phase fuse found blown in
Feeder now 125 A fuse replaced & RSB Panel supply heathy
HP Dosing room motors & Panels cleaning & Blowering work
Boiler-1 all drain MOV Cleaning work
STG Building 0 mtr all instruments cleaning & blowering work
Shift jobs carried
Unit No. -1 MVR is not run in auto mode. So we have incresed the excitation also SP to 0.5.
11 KV Voltage is less So increased the tap Change.
In CHP BC-3 and BC-5 take up Pulley Limit switch polythene Coverning to done.
In Workshop MV drive room AC JB and Chimney analyzer polythene coverning to done.
BC-7A &7B Area 04 nos Permanent light is not working condition. So Informed to hement Sharma.
Unit No. # 1 APH area grinding machine Top to changed.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In ACC area welding machine lead cable lug to changed.

Following Equipment S/D Given .


1. BC-2 ,
2. BC-4,
3. ACC fan -2F,
4. reclaimer,
24 Volts LED light Provided to Operation person and collected it.

Shift jobs carried


All manual lights switched ON (BLR & TG) during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 85 Deg, DT-6 temp 79 Deg.
BLR-1 near extension board and plug top provided.
24V lamp provided C7-AB area
APH-1 area hand lamp with cable provided.
ACC-2 area light OFF.
Following Equipment S/D clear .
1. BC-2 ,
2. BC-4,
3. ACC fan -2F,
4. Reclaimer,
ID-1 area welding M/c plug top connection provided.
U-2 Bed material RAV JB and equipment cleaning done.
Shift jobs carried
All manual lights switched OFF during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
Following Equipment AVI Given & clear .
1. Coal feeder-2B,
01MV0907 Bunker Dis MOV Isolate and Connection removed as per PTW requirement.
C7-AB area lamp replaced.
C7-AB area Ladder shifting work for lighting maintenance work.
Following Equipment S/D Given & clear .
1. BC-6 ,
2. Reclaimer,
3. Coal feeder-2B,
22 mtr area light ON
ACC area temporary light tripping , so connection change over and lighting ON
SOX factor of Chimney analyzer changed from 0.13 to 1.0. Also changed in DCS also.
U#2 BH-21 level H and HH showing, so level probe cleaning done and found running healthy.
01MV0916, 01MV0913 and 01MV 0915 feeder OFF, so ON done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 water level down, Water level OK.
DT-2 temp 72 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
Clean Run-2A motor trip in overload 3.6amp, two times, so stopped the clean run motor and OFF its MCB,
operation team checked the jaming but they clear from their side, Now mechanical jamming checking
pending from their side
Charging Light to provided at Coal feeder area.
Unit-2 HP heater control valve(3301) air tube leakage found, so change the tube now OK

Shift jobs carried


All manual lights switched OFF during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.

Following Equipment S/D Given.


1. BC-2,
2. BC-6,
3. BC-7A,
4. BC-7B,
5. Clean run 2A ,

Clean run motor 2A de-coupled trial taken found 0.6 Amp balanced current, inform to OPD, and MMD.
SOX factor of Chimney analyzer changed from 1.0 to 0.3. Also changed in DCS also.
BC-6 local trial taken and put in remote as per MMD requirement.
Bucket elevator-1 put in local and DoL mode as per MMD requirement.
CEMS data PC off, so checked and found power supply loose, so tightness done, Restart and put in Online.

CF-2B feeder outlet MOV not operate, so checked and found feeder OFF, so ON done, and trial run found
healthy.
EQMS panel rubber mat laying done.
Generator transformer 2 breaker rack out done.
Shift jobs carried
BLR#1 01FCV0916 SA FAN mov not operated so checked manually found jammed then checked by DCS now
OK
compressor house auto drain valve manually checked found healthy.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.
ASH pressure Switch JB Polythene covering work( Unit-2)
ACW Pump House Discharge Header Pressure switch Polythene covering work
Clean Run 2A Motor Double Earthing Done
Coal Shed area Light ON as per operation requirement.
Following Equipment S/D clear .
1. BC-2 ,
2. BC-4,
3. BC-7A,
4. BC-7B,
STG Building Lift floor command continue so check & found IR Sensor Malfunctioning so adjustment done
now ok
1 no's Long cable Extension Board Handover to Mr. Taqueer
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 water level down, Water level OK.
DT-2 temp 70 Deg, DT-5 temp 81 Deg, DT-6 temp 82 Deg.
Bag House-11-21 and 12-22 level probe checked and calibrated
Charging Light to provided at Coal feeder area.
coal bunker-2B level probe reset and clean it
Sox factor changed in CPCB PC and DCS as required by Operation team
Raw water pump 1&2 motor cleaning done
Shift jobs carried
All manual lights switched OFF during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 85 Deg, DT-6 temp 79 Deg.

Following Equipment S/D Given.


1. BC-2,
2. BC-4,
3. BC-6
4. V.SCREEN-1
,

Following Equipment S/D clear .


1. BC-2 ,
2. BC-4,

MIST FAN 1A Feeder faulty transducer replaced by new one now current showing healthy in DCS
T-2 Tower area handlamp repaired work
Bucket elevator-1 put in local and DoL mode as per MMD requirement.
STG Building Lift floor command continue so check & found IR Sensor Malfunctioning so adjustment done
now ok
Coal Feeder 1C MOV not operate from DCS so check in field found MOV Switch mode manual now put on
auto mode
Boiler-1 Bed thermocouple 1109 found down condition so adjustment done.
Shift jobs carried
Bucket elevator-1 put in Remote and VFD mode
compressor house auto drain valve manually checked found healthy.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 83 Deg, DT-6 temp 82 Deg.
Coal bunker -1C discharge MOV motor connection done, its feeder found faulty so replace it, Now trial
pending from operation side
Clean Run-2A motor running but gearbox not running, so maintenance team checked and found that gear
box problem , so Motor MCB stopped
Coal RSB-91 earthing tightness done and coal shed Lights made ON
Extention board and LED lights collected from Vender Vernoj-4nos extention board, 2 nos Lighting
transformer,1nos LED Light
Following Equipment S/D clear .
1. Vibrating screen-1
2 Bc-6
STG Building Lift floor command continue so check & found IR Sensor Malfunctioning so adjustment done
now ok
Security tower behind switchyard Lighting timer corrected
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report not send ( due to CD read issue).
P&V 4 healthiness checked, found running healthy..
DT-2 temp 73 Deg, DT-5 temp 85 Deg, DT-6 temp 80 Deg.
22 Mtr. light ON as per operation requirement.
Drain MOV, J valve MOV, BAC local JB, APH JB, cleaning done.
compressor house auto drain valve manually checked found healthy.
CEP 2A & 2B motor cleaning done.
U #2 BH-22 vessel high showing, so level probe cleaning done.
SH and Eng. Offices AC power ON.
APH JB rubber mat & 0 Mtr. RSB rubber mat proper laying done.
Shift jobs carried
All manual lights switched OFF during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 72.7 Deg, DT-5 temp 86.4 Deg, DT-6 temp 79 Deg.

Following Equipment S/D Given.


1. BC-1,
2. BC-4,
3. Clean Run -2A
4. V.SCREEN-1

MIST 1B Feeder Preventive Maintenance work following activities carried out-


1/ Power & Control Terminal Cleaning by CRC & Tightness checked .
2/Power Cable B Phase cable Insulation damaged near Power Contatcor so Insulation Tap Provided & Dressing work
3/ Feeder Cleaning work by Brush
MIST FAN 1B Feeder faulty transducer replaced by new one now current showing healthy in DCS
1 no's handlamp repaired & handover to APS Sir(CHP)
Bucket elevator-1 put in local and DoL mode as per MMD requirement.
STG Building Lift floor command continue so check & found IR Sensor Malfunctioning so adjustment done
now ok & IR Sensor Box Covering by Aluminium tap aviod malfunctioing
Boiler-1 Coal Feeder 1A Pneumatic cylinder hose pipe air leakage arresting work
Coal Feeder 1C MOV Feeder faulty Contatcor Replaced by new one trial work U/P
SA-1 Fan flow transmittor air release work for flow value shows high at DCS
Shift jobs carried

In Unit No. # 1 ID fan is not started from DCS end. Ai MV Drive side Overload alarm is showing at DCS end. So
Informed to hement sharma / Tarun Mandawat. Then changed the internal setting . Then it is started. Now
Ok.
In Unit No. # 1 SA fan is not started from DCS end. Ai VFD side MCB is in OFF Condition. So ON the MCB. Now
Ok.
At 4.5 Mtrs MV Drive Room VAM system is Started. After stop the ID/PA VAM is also OFF.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is in running condition.
All the Manual Light to ON Condition.

Following Equipment Cleared .


1. ID Fan-1
2. J Valve 1B
3. U-1 Soot Blower
4. 01MV2301
5. SA Fan 1
6. 01MV2302
7. P fan-1
8. J valve-1A
9. 01MV3210
10. PA Fan-1
11. Boiler-1 Ignaitor-1
12. Boiler-1 Ignaitor-2
13. BC-1,
14. BC-4,
15. Clean Run -2A
16. V.SCREEN-1

Clean Run Motor 2A Motor connection done and Permit closed . Trial taken it is working normally.

Unit No.-2B Vibrator is not ON. Also fuse blown at feeder side. So checked and found that one Phase is
shorted at motor terminal box. So cut and lug. Then it is started. It is working normally.
Bucket elevator-1 put in Remote and VFD mode as per MMD requirement.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report not send ( due to CD read issue).
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
Coal shed & 22 Mtr. light ON as per operation requirement.
BFP all 3 motor cleaning done.
compressor house auto drain valve manually checked found healthy.
WTP DCS room panel cleaning and blowering done.
U #2 BH-22 vessel high showing, so level probe cleaning done.
SH and Eng. Offices AC power ON.
Boiler-2 IFC, and Compressor IFC moisture drain done.
Shift jobs carried
All manual lights switched OFF during shift round
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 72.7 Deg, DT-5 temp 86.4 Deg, DT-6 temp 79 Deg.
Following Equipment S/D Given.
1. BC-7A,
2. V.SCREEN-1

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.5 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Unit No.2 Bunker -2B Vibrator is not ON. Also check feeder side motor Overload tripping then check Bunker
2B coal feeder side vibrator connection open & meggering value checked found OK but Resistance value
Unbalance & motor kept in Electrical W/S motor Open & found motor winding burn due to interturn short.
Rest of Vibrator motor working normally

ACC Area 3 phase W/M not working so check & found 1 wire open in plug top now connected & W/M
working normally
HSD Room Oil Pump-1 not working so check in feeder side Locking arrangement found misalignment now
adjustment done & feeder ON & put on Local mode
Boler-2 seal fault comes so flushing air line now work ok
BLR#2 vessel 12-22 SOV JB Power source panel inside heavy dust found so cleaning Blowring & cable
dressing done
BLR#2 vessel 11-21 SOV JB Power source panel inside heavy dust found so cleaning Blowring & cable
dressing done
Shift jobs carried
Chimney analyzer PC is OFF Condition. So ON the CPU. Now ok.
In Boiler No.# 2 APH SOV panel and Dome Valve Cleaning and Blowerning to done.
In Compressor House all the auto drain valve checked it is working Normally.
All the AC MCB to OFF Condition.
In RNRP SPC004 Showing Both the nodes is in down condition.
P & V. No. # 4 is in running condition.
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-7A,
2. V.SCREEN-1

Unit No. # 1 Boiler Bucket elevator is not stopped from PB. So connection tightness and clean the contact.
Now ok.
BC-7A area and 22 mtrs Bunker area hand lamp to changed.
At 22 mtrs Bunker area light ON as per operation requirement.

Shift jobs carried


In Unit no. # 2 Vessel No.-22 nos Dome valve leakage arrested and PU tube dressing to done.
In IFC Moisture drain to done.
P & V. No. # 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 2 ACC side welding machine Double earthing to done.
In Unit No. # 2 ACC side 24 volts Transformer / LED Light connection to done also Plug Top to changed.

In Unit No. # 2 ACC side grinding machine Plug top to changed and Green tag updated.
In CHP Building 24 Volts LED Light Repaired.
Shift jobs carried
P&V 4 status checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
compressor house auto drain valve manually checked found healthy.
SH and Eng. Offices AC power ON and OFF as per requirement.
SS tube cutting and hand over to MMD for transmitter work.
3201,3202 & 3203 control valve gland leakage attend done.
CHP DCS room blowering and cleaning done.
24 v hand lamp provided at BC-3
2A clean run mootr earthing provided.
RSB-78 at WTP ELCB check and green tag provided.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
Plant Information display screen not showing in CCR check & found HIDMI Cbale connector loose so again
reconnect now screen display healthy
BC-7 & 7B Motor Cleaning & Blowering work
BC-7A & 7B Area Handlamp Provided done
Bed ash silo level show wrong at DCS so level probe clean & level reset now level healthy
WTP RO (Q 4907 Water Ph ) SENSOR Fitting water leakage so fitting tightness done by taflone tape

Dosing room all E&I Equipment cleaning & Blowering work


Shift jobs carried
Due to comman Shutdown VAM System is fully OFF condition. All the START / STOP procedure Pasted on
VAM panel as per discussion with Mr. Jaswant singh.
In Unit No. # 1 and 2 DCS System , UPS ( 5 TR ) AC is in ON Condition.
In BFP Auto start pressure SP is changed from 90 to -100 Kg/ cm2. Due to OFF the Standby AC. Pl normalize
it. ( PCU-2 , M-2 and Block No.-6678 )
P & V. No. # 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
TG-1 Stopped at 9.03 AM.
Boiler -2 Lift 02 Person trapped inside also 6 F fault is showing at Display. So informed to Pandaya Ji. Then
person away from lift. Present fault is showing on the display.

Following Equipment S/D Given.


1. BC-7A,
2. BC-7B,
3. ACC fan -1C,
4. V.SCREEN-1,
5. ACC fan-1F,
6. GT-1,
7. COB-1,
8. PCC-3A I/C ,
9. PCC-1B I/C ,
10. Gen Transformer -1,
11. PCC-1A I/C,

ACW Pump House area Lighting transformer Bypassed as Per taqueer requirement.
Generator transformer 2 breaker rack in done. Also line is in charged condition.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send
P&V 4 healthiness checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 82 Deg, DT-6 temp 79 Deg.
Generator-1 MIMIC Panel Display Generator Earthing alarm display so check & found rotor volatge
unbalance so open exiter chmaber & blowering done slip ring & carbon brush also clean by blower now
after sometime alarm reset & rotor voltage normal 70V dc

Boiler-1 &2 LIFT supply OFF from lift cabin due to heavy rain & both lift comes in Fault Boiler 1 lift stop on
2nd floor & Boiler-2 lift stop on 0 mtr.
ACC-2F fan not start due to lube oil pump oil flow low so check flow switch manually found working but
when flow switch connect alarm continue then one another spare cable with switch changed now same
position continue so mech. Side checking work due
ALL AC 's OFF when temprature normal
WTP Pump House motors cleaning & Blowering work
Shift jobs carried
All manual lights switched OFF during shift round (BC-5 Hopper and Tunnel)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 74 Deg, DT-5 temp 84 Deg, DT-6 temp 80 Deg.

Following Equipment S/D Given.


1. BC-2,
2. BC-4, (02 times)
3. Coal Crusher-1,
4. J Valve-1A,
5. J Valve-1B ,
6. ACC-2F,
7. LOP-2F,

ACW area timer stuck up, so reset and taken in line.


BC-2 area Hand lamp provided.
Workshop mv drive room pedestal fan OFF.
2nd extraction QC NRV limit set as per operation requirement.
BLR-2 BH-22 level HH showing, so level probe cleaning and trial run found healthy.
02MV2905 not operate, so check and found close limit issue, so work U/P.
ACC-2F & LOP-2F feeder isolate, and both connection removing pending as per PTW.

Shift jobs carried


ACC-fan 2F main motor & lube oil pump motor connection removal & noted in log book.
ACC-fan 2F flow switch & vibration probe removed & placed in Inst. Lab.
24 volt transformer & LED provided to ACC fan working team.
TG floor LDB door locking arrangement found loose so tightness done.

Rubber mat found at misplaced location so placed properly.

P & V. No. # 4 is in running condition.


All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-4
2. BC-2
3.Coal Crusher-1
S/D given
1.Drain pot pump-1A
2.02Mv2905

Welding machine connection checked as per maintr. Team requirement


BC-7A area hand lamp to changed.
MV drive workshop room panel lower cover tightness done as found loose.

Shift jobs carried


In Unit No. # 2 Vessel No.-21 level probe H showing at DCS end. So checked at site found that No meterial
inside the vessel. So cleaned and calibrated the level probe. Now ok.

In TG Floor Lift Telephone is not working condition. Found that dial tone is not present. To be check.

In Unit no. # 1 master UPS some time alarm LED is showing But it is automatically OFF. While no alarm is
showing on panel board.
In WTP Hall area all the field Inst. Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is not uploaded in SAP System. Because Password is changed.
one 24 Volts LED Light provided to Operation person.
In Coal feeder -2B LED light provided .
At 22 mtrs tranformer side lighting Top ( 10 Amps ) to changed.
At BC-7A and 7B area hand lamp to repaired.
In WTP house motor cleaning and Blowerning to done.
In Boiler No.# 2 , 4th to 7th floor Light to OFF Condition.
At 22 mtrs Light to ON and OFF as per operation requirement.
Shift jobs carried
All manual lights switched OFF during shift round (BC-5 & coal shed)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy..
DT-2 temp 74 Deg, DT-5 temp 86 Deg, DT-6 temp 84 Deg.
Following Equipment S/D Given.
1. Coal Crusher-1,
2. DRAIN POT PUMP-1B
EOP-2 Power ON and OFF as per operation requirement.
C7-A/B area lamp changed
24v transformer shift from Boiler-1 to workshop.
Following Equipment S/D Clear.
1. DRAIN POT PUMP-1B
SH and Eng. Offices AC power ON.
02TI1128 violet, so element replaced and trial run healthy.
U-2 Coal bunker transmitter cleaning done.
Shift jobs carried
All manual lights switched OFF during shift round (BC-5 & coal shed)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy.& P&V-2 Blower ON due to DT-2 Winding temp. high (84 deg.)
DT-2 temp 85 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
Following Equipment S/D Given.
1. ID-1
2. PA-1
3. SA-1
4. Jvalve-1A &1B

Following Equipment S/D Clear


1. Coal Crusher-1,
2. TG-2 CE MOV 02MV2905
C7-A/B area lamp changed
24 V LED Provided at Coal Bunker Area
ACC-2D fan VFD trip due to overcurrent reset done now running normally
SH and Eng. Offices AC power OFF
Bag House-1 &2 Field Panel & JB's cleaning & Blowering work
Line -1 Enmass conveyor -1 ZSS comes now in field Proxy adjustment done then ZSS healthy
Shift jobs carried
Fly ash Silo No. # 1 and 2 all the field Inst. , Panel , SOV, Limit switch Cleaning and blowerning to done.
In Engineer Room one AC is ON condition. So OFF the AC. Now Ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Unit No. # 1 ACC Area gallery Light is not ON. So ON the MCB. Now Ok.
Unit No. # 1 ACC Area , Ejector Floor area tempoary LED Light is mounted at site.

Unit No. # 1 ACC Area , Ejector Floor area LED Light is Not On. So ON the MCB. Also Tripped. To be check.
In CHP MCC Panel Cleaning to done.
DT-2 temp 83 Deg, DT-5 temp 85 Deg, DT-6 temp 84 Deg.

Shift jobs carried


All manual lights switched OFF during shift round (BC-5 & coal shed)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy.& P&V-2 Blower ON due to DT-2 Winding temp. high (84 deg.)
DT-2 temp 82 Deg, DT-5 temp 84.5 Deg, DT-6 temp 81 Deg.
Following Equipment S/D Given.
1. Enmass -1
2.Coal Crusher-1
3. Enmass-2

Following Equipment AVI Given


1. Enmass -1
2. ACC-2F Lube Oil
1 no's LED Light Handover to Mr. A.P.Srivastav
1 no's 10Amp. Plug top replaced in extension Board & Extension Board handover to Mr. Shravan Singh
ACC-2F Flow switch assemble & trial work
SH and Eng. Offices AC power ON
ACC-2F Motor & Lube Oil motor connection done & earthing also connected as per drawing
GT-1 Tap changer counter not increase after tap position changed so check & found aux. supply healthy but
counter base plate stuck with counter so plate adjsutment done & counter raise as per tap position . To be
observation during shift
TG-2 enclosure camera remove & kept in lab
3 no's spare flow switch check in instrument lab & kept in 25 no's locker
Shift jobs carried
P&V 4 status checked, found running healthy..
DT-2 temp 72 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
ACC-2F shutdown clear and its vibration probe connected, trial pending from operation side
Coal feeder-2B trip in Motor stall fault two times, so checked the feeder jaming, then run the feeder in more
tonnage then it run normally
Genrator-2 shutdown given to E&I for inspection
boiler-1 Lift reset and start it
ACC are light checked running normal
24 v hand lamp provided at coal feeder area

RSB-78 at WTP ELCB check and green tag provided.


Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 healthiness checked, found running healthy..
DT-2 temp 84 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
Deaerator area light ON as per operation requirement.

Coal feeder-2B trip in Motor stall fault three times, so checked the feeder jamming, then run the feeder in
more tonnage then it run normally. (motor resi checked found 9.5 ohms balance, and amp taken 1.6amp
balanced)
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (BLR-2) during shift round
Barring gear-2 motor and panel cleaning done.
4.5 Mtr area exhaust fan starter cleaning and maintenance work done.
U#2 BH-21 level H showing, Material cleaning and trial taken found healthy.
BLR-2 firing floor repair supply box-26 rubber mat laying done.
BLR-2 drain mov at 0.0 Mtr area cleaning done.
Following Equipment S/D Given.
1. Coal Feeder-2B
Shift jobs carried
All manual lights switched OFF during shift round (BC-5 & coal shed)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy.& P&V-2 Blower ON
DT-2 temp 82 Deg, DT-5 temp 84.5 Deg, DT-6 temp 81 Deg.

Following Equipment S/D Given.


1. V.Screen-2
2.Coal Crusher-2
3. Coal Feeder-2B
4. Coal Feeder-2B Discharge MOV
5. Coal Feeder 2B Pneumatic plate valve

Following Equipment AVI Given


1/ Coal Feeder-2B
2/ Coal Feeder 2B Discharge MOV

1 no's LED Light Repair at Screen Floor


1 no's Hand Lamp Repair at T-2 Tower BC-2 Conveyor
LS MCC LDB-37 1 earthing found damaged condition so relugging & connected
Coal Feeder-2B Motor Tripped due to motor stall so motor decouple from gearbox & trial taken found taken 2.8.
amp. At no load but again motor couple with gearbox & trial taken motor trip due to motor stall so physically
inspection by mech. Dept found belt tight running now further checking work U/P
Boiler-1 all flow transmittor zero checked with G Shift Team
VAM tripped AT 13.10 PM due to High vapour temperature, reset and trial found healthy.
Coal Feeder-2C VFD Panel CDP found hang condtion so check & found communication cable loose at VFD so
reconnect & adjustment done now data display at CDP
Shift jobs carried
In Coal Feeder -2B tripped on Motor stall ( F0012 fault ) . So changed the VFD Parameter.
1. Parameter-2110 - Torque Booster Curr Increased from 100 % to 200 %.
2. Parameter-2202 - Accleator time Increased from 4.0 sec. to 7.0 Sec.
3. Parameter-3012 - Motor Stall time Increased from 20.0 sec. to 25.0 Sec.
Now it is running Normally.

In ACW-1 discharge MOV Connection to done. At field side it is in manually opened condition. As per HOD
( TPP ) this MOV is not operated electricaaly. Only used in emergency purpose. So MOV feeder is in Rack out
condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D cleared.


1. V.Screen-2
2.Coal Crusher-2
3. Coal Feeder-2B
4. Coal Feeder-2B Discharge MOV
5. Coal Feeder 2B Pneumatic plate valve
6. ACW Pump No.-1,
7. ACW Pump No.-1 Dicharge MOV,

ACW Pump No.-1 S/D Cleared and VFD Supply is in charged condition.
In Coal feeder -2B Vibrator Motor box is opened condition. Also touch with supply . So Main feeder is
tripped. So at field side Starter is in Locked condition. Also approach is not Present at side. To be check.

at Unit No. # 1 J-valve grinder Machine Plug top to changed.


Shift jobs carried
All Energy meter manual reading taken for Power Report.
DG report Prepared and upload in SAP
Environment and Plant performance report send to all concerns.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 85 Deg, DT-6 temp 79 Deg.
MPHB staircase area light ON as per operation requirement.
Bucket Elevator-2 put in local and DOL as per operation requirement, and then put in remote and VFD after
work completed.
compressor house auto drain valve manually checked found healthy.
All unwanted lights switched OFF (BLR-2) during shift round
WTP Pump House motors cleaning & Blowering work
Coal feeder 2A & 2B motor and clean run motor cleaning done.
Ahu panel and old ac panel cleaning done.
VAM floor panel cleaning done.
Shift jobs carried
All manual lights switched OFF during shift round (BC-5 & coal shed)
compressor house auto drain valve manually checked found healthy.
P&V 4 status checked, found running healthy.& P&V-2 Blower ON
DT-2 temp 82 Deg, DT-5 temp 84.5 Deg, DT-6 temp 81 Deg.
Following Equipment S/D Given.
1. V.Screen-2
2BC-7B
3. Coal Feeder-1A
4. Chiller Pump-1

Following Equipment shutdown clear


1/ Coal Feeder-2B
CCR 4 no's walkie taklie found not working so repaired & handover to CCR Shift Incharge
BC-4 Camera not showing so checked & found Power supply socket loose condition so open & reconnect
now camera working
LS MCC LDB-37 1 earthing found damaged condition so relugging & connected
Bag House-2 21 nos vessel level H-H so check & found material inside so clean & calibration done
Coal Bunker 2B Vibrator not working so check & found motor Terminal box open & touch with terminal so
terminal box cover by Packing tape & motor megger & resistance value checked found ok then trial vibrator
fromCCR & Field working normally
Unit-1 AHF Panel found in Fault so OFF & again ON now working Normally
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.5 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Coal Feeder-1B ,1C & 1D put on Local mode from VFD Panel as per requirement of Operation dept. ( Mr.
Mahto)
Shift jobs carried
In VAM System is not properly Cooled. So checked at site and found that Steam control valve is not properly
opened. So increased the air pr. Now It is ok.
Coal Feeder -2B Discharge MOV ( 01MV0910 ) is not operated from DCS end. So checked at feeder side. It is
in tripped condition. So Reset the O/L . Now ok.
BAC-2B level probe cable Cleaned and Calibrated it. Also in cable proper packing to done.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. V.Screen-2
2 BC-7B

Due to rain , Boiler No.-2 Lift to OFF Condition.


At 22 mtrs Light ON as per operation requirement.
At BC-7A and 7B area hand lamp to Changed.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
P&V 4 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 85 Deg, DT-6 temp 86 Deg.
MPHB staircase area light ON as per operation requirement.
All unwanted lights switched OFF (BLR-2) during shift round
Coal bunker-2B Vibrator checked found supply through upto JB ,need to be checked at field connection

Coal feeder-2B Clean run motor tripped after starting , so feeder put in local by operation team , now
running healthy without clean run in line.
TG-1 CV cleaning done at 0mtr TG floor
Shift jobs carried

In BAC-2B Seal pr. Is showing 2.0 kg /cm2. So checked at our side limit switch is Ok. But seal is damaged
condition. So informed to shift incharge. After completion of seal changed. Now it is running normally.

As Per shift incharge requirement Coal feeder -2B Put into auto mode also clean run motor MCB is in OFF
condition.
P & V. No. # 2 and 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Coal feeder -2B Clean run motor O/L reset by 3 to 4 times as per shift incharge requirement.
Coal Feeder -2B Bunker O/L MOV ( 01MV0906 ) is not operated from DCS end. So checked at feeder side. It
is in tripped condition. So Reset the O/L . Now ok.
At Coal feeder -2B hand Lamp to Provided.
Boiler -1 Lift Power ON as per shift incharge required. Also door foot step cleaned.
Coal Feeder -2B is in jammed condition. Work is under progress.
Shift jobs carried
Switchyard area cooling fan JB rubber mat laying done.
ACW area timer stuck up, so reset and taken in line.
02MV0906 direction changed and normalized as per operation requirement.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 86 Deg, DT-6 temp 80 Deg.
BC-2 and BC-5 motor and power JB cleaning done.
Bed material RAV panel and equipment cleaning done.
compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
SH and Eng. Offices AC power OFF.
Boiler-2 ground floor drain MOV cleaning done.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
P&V 2&4 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.
Boiler-2 & 22 mtr. Lights ON as per requirement of operation dept.
All unwanted lights switched OFF (BLR-2) during shift round
Coal bunker-2B Vibrator not start so check in field side found Motor Megger Value from P-E =OK but P-P
=open ( 2 phase) & resistance value checked & found motor winding open so motor connection open form
DOL Starter
Soot Blower-1 Panel Cleaning & Contactor terminal tightness checked
BLR#2 11-21 level not showing so probe clean & calibration done now level healthy & 21 no's vessel
material inside so inform to shift incharge
BLR#2 12-21 level not showing so probe clean & calibration done now level healthy
TG-2 Control valve cleaning at 0 mtr. area
Shift jobs carried
In VAM System is not properly Cooled. So checked at site and found that Steam control valve is not properly
opened. So increased the air pr. Now It is ok.
Unit No. # 1 APH S/D to provided also Seal pr.Guage to changed.
In UPS Alarm is frequently coming at Unit No. # 1 annunication window. So removed the wire from 20-7A-
TB2-1/2. ( 01UPS-08 , Overheat alarm )
As Per shift incharge requirement Coal feeder -2C VFD Put into manual mode also clean run motor started
at panel end. Also panel is in Local mode.
P & V. No. # 2 and 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. V.Screen-1 ,
2. V.screen -2,
3. BC-4,
4. Coal Feeder -1B,

At BC-7A / 7 B area , 24 Volts hand lamp Holder to changed.


02 Nos hand lamp to provided at VS-1 and 2.
Due to rain , Boiler No.-1 Lift to OFF Condition. ( At floor No.-2)
Coal Shed area and 22 mtrs Light to OFF .
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
SH and Eng. Offices AC power OFF.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 86 Deg, DT-6 temp 80 Deg.
Following Equipment S/D Clear.
1. V.Screen-1 ,
2. V.screen -2,
3. BC-4,
4. Coal Feeder -2C,

Following Equipment S/D Given.


1. Coal Feeder -2C,
Following Equipment AVI Given and clear.
1. Coal Feeder -2C,
Clean run 2c tripped in overload, reset it.
WTP DCS Panel Cleaning and Blowering done.
HPP vfd panel clean, and rubber mat laying done.
Silo root blower motor cleaning done.
Coal feeder area air blower connection provided.
Charging Light to provide at Coal feeder area.
Shift jobs carried
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
P&V 2 &4 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.
Boiler-2 & 22 mtr. Lights ON as per requirement of operation dept.
All unwanted lights switched OFF (BLR-2) during shift round
TG-2 0 mtr 02LCV 3302 & 3301 control valve gland water leakage so leakage arrested done now ok
CHP MCC PCC & MCC Panels Outside cleaning work
Workshop MV Drive room back side AC Power supply JB covering by Packing tape
BC-5 tunnel Dewatering pump not working so check & found 3 phase MCB Trip when supply ON pump so
motor resistance check found R-Y = 653 ohm, Y-B= 654 ohm & B-R = 13 ohm (Resistance Unbalance ) &
megger value checked found R & Y phase value ok but B phase megger value flucuation need to replaced
dewatering pump.
IFC Filter moisture drain
Shift jobs carried
BC-5 tunnel spare Dewatering pump shifted with operation & with extension connction done.
Coal Shed area and 22 mtrs Light to OFF .
Air blaster fitting found damaged so removed from blaster & welding to be done (U/P)
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. Coal crusher-2 ,
2 AHF panel-1

EOP-2 Power ON and OFF as per operation requirement.


DT-2 80deg , DT-5-84deg & DT-6 -81deg.
Coal feeder 2C discharge MOV checked as per operation requirement found working healthy
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
SH and Eng. Offices AC power OFF.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 86 Deg, DT-6 temp 80 Deg.
Following Equipment S/D Clear.
1. Coal crusher-2 ,

BC-1 tripped in ZSS fault, so controller connection tightness done, and trial found running healthy.
Coal Bunker air blaster fitting arrange and fixing done, trial run healthy.
Compressor house IFC PSI changed 65 PSI, as per operation requirement.
De-watering pump connection given at BC-5 area.
02 hand lamp repaired at workshop.
01 hand lamp provided at coal feeder , and one was in 22 mtr area.
Shift jobs carried
Coal Feeder -2D pneumatics Valve open Not showing at DCS end. So Limit adjustment done. Now Ok.
In Compressor House all the auto drain valve checked it is working Normally.
In Chimney analyzer all the panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Chimney avitation light is not ON. So checked and found that Timer is not working condition. Need to
check.
In BC-5 Underground water Pump is not ON. So supply is ON. Now Ok.
In Unit No. # 2 Coal feeder area Handlamp to Provided.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
SH and Eng. Offices AC power ON.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
Following Equipment S/D Given.
1. BC-6 ,
2. Bucket Elevator -2,
3. AHF Panel-3,

Following Equipment AVI Given.


1. Bucket Elevator -2,
Bucket Elevator-2 put in local and DOL mode as per operation requirement.
Chimney aviation light faulty circuit disconnect, and timer work U/P.
Coal feeder area LED light plug top connection given.
Coal bunker level transmitter cleaning done.
IAC-1 water valve SOV air tube leakage, so re-connection done.
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
SH and Eng. Offices AC power OFF.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 86 Deg, DT-6 temp 80 Deg.
Following Equipment S/D Clear.
1.BC-6
Following Equipment S/D Given.
1.Coal Feeder-2B
Coal Feeder 2B Pnumatic not operate from DCS so operate manually also change hoze pipe & found
pnumatic valve jammed condition so inform shift incharge
CEP -2 Power supply Panel door lock found damaged so ajdustment done & door lock & rubber mat laying
work
Service Air Compressor-3 Trial done found running normally
ACC-2 All 6 no's motor both Side Lubrication done
1 no's LED Provided at Coal feeder area
01 hand lamp Repaireded at coal feeder
Shift jobs carried
In boiler No. # 2 Vessel No.-22 level probe is showing High showing at DCS end. So calibration done. Now ok.
In IFC Moisture drain to done.
In Unit No. # 2 APH Side all the Inst. And SOV panel Cleaning
Electrical Report is generated.
EMS Report is generated in the System and not mail to all the concered person. Because CD is not working
condition.
DG Report is uploaded in SAP System.
In ACC fan -2C main motor one earthing is damaged condition. So Reconnected it. Now ok.
In Dosing Room all the motor Cleaning to done.
In Unit No. # 2 ACC Side unwanted side Light to OFF.
At 22 mtrs Light ON as per operation requirement.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
All manual lights switched ON during shift round
SH and Eng. Offices AC power OFF.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 86 Deg, DT-6 temp 79 Deg.
Following Equipment S/D Clear.
1.BC-5
2. Hopper Belt feeder
3. BLR#1 APH 1&2
Coal feeder-22mtr area LED Light provided done ,& 1 no's LED Reapaired done
Hand Blower damaged plug top replaced by new one
Coal feeder 2B outlet damper(02MV906) not operate so feeder side motor connection interchnaged done
Coal feeder-2B Pneumatic valve open limit setting & proper fixing by nut bolt
Instrument technician engage with G Shift team form polythene covering
Coal Feeder-2B put on Local mode as per requirement
Shift jobs carried
In boiler No. # 2 Vessel No.-11-21 level probe is showing High showing at DCS end. So calibration done. Now
ok.
In IFC Moisture drain to done.

Electrical Report is generated.


EMS Report is generated in the System and not mail to all the concerned person. Because CD is not working
condition.
DG Report is uploaded in SAP System.
In Unit No. # 2 ACC Side unwanted side Light to OFF.
At 22 mtrs Light ON as per operation requirement.
Dosing room panel cleaning and blowering done.
S/G room lighting booster transformer panel cleaning done.
Bed ash cooler-2A stopped in running condition without alarm, so power OFF and ON, and trial taken found
running healthy.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
All manual lights switched OFF during shift round
SH and Eng. Offices AC power ON.
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
Following Equipment S/D Given.
1. BC-5 ,
2. Bucket Elevator -2,
3. BC-3
4. BC-3 Coal shed trolly

Following Equipment AVI Given.


1. Bucket Elevator -2,
Bucket Elevator-2 put in local and DOL mode as per operation requirement.
CEP-1A &2B and j valve 2B Motor Both side Lubrication work
Coal Bunker area 24V Handlamp repaired work
Instrument tecnician engaged with G Shift team

Boiler-2 lift malfunctioning between 1 to 4th floor & door not open at 1st & 2nd floor so lift stopped 4th
floor & lift inside emergency button pressed( reed switch malfunctioning)

Shift jobs carried


Unit No. # 1 Oil Gun-1A and 1B Flame scanner is installed at site and checking done. Now it is working
Normally.
In Inst. Lab common Locker 5'S to done.
In WTP Hall area all the field Inst. And panel Cleaning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D cleared.
1. BC-5 ,
2. Bucket Elevator -2,
3. BC-3
4. BC-3 Coal shed trolly
5. Clean Run Motor -1B,

Following Equipment S/D Given.


1. Unit No. # 1 PA Fan ,
2. Unit No. # 1 SA Fan,

At 22 mtrs Light ON as per operation requirement.


Clean run -2B Motor earthing is damaged condition. So proper earthing to done.
In Bucket Elevator No.-2 Put into Remote and VFD Mode.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 87 Deg, DT-6 temp 80 Deg.
compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
VAM area, Coal feeder and Deaerator area light ON.
HP dosing and ACW area motor cleaning done.
Boiler-1 area 6th and 7th floor light OFF.
Bed ash cooler-2 area emergency light provided.
U# 2 feed water station, De-superheating station MOV and control valve cleaning done
Workshop MV Drive room exhaust fan OFF.
Bed ash cooler-2B level high check.
Shift jobs carried
In BAC-2A is not started from DCS end. So Changed the Server from 2 to 1. then Checked the command from
Server-2. Then Start / Stop Command is Ok.

In Unit No. # 2 Vessel No.-11 / 21 and 12/22 High Level probe checked. Cleaned it and Calibrated it. Now Ok.
In Unit No. # 2 APH Vessel No.-2 Ait tube leakaged. So Changed the PU tube. Now ok.
All the AC MCB to ON Condition.
P & V. No. # 2 and 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. BC-1 ,
2.BC -2,
3. BC-5,
4. Bucket Elevator No.-2,

As Per Requirement Bucket Elevator No.-2 Put into Local and DOL Mode. ( Running in AVI )
At workshop area extension Board Plug top to changed.
At Coal feeder Unit No. # 1 welding machine earthing lug to provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 87 Deg, DT-6 temp 80 Deg.
compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Unit-1 &2 CEP Motors & Power JB Cleanaing work
HP dosing and ACW area motor cleaning done.
TPP Area unwanted lights OFF
Compressor house all Instruments ,SOVs. JB' s Cleaning work
WTP Hall all Instruments ,SOVs. JB' s Cleaning work
Shift jobs carried
In Coal feeder -2B pneumatics Valve Limit switch is not showing at DCS end. So Limit Switch Adjusted at Site.
Now Ok.
In Unit No. # 2 Coal feeder -2D Bunker Level Transmitter is not correctly showing at DCS end. So Cleaned the
Level Probe. Now Ok.

Fly ash Silo No. # 1 and 2 all the field Inst. , Panel , SOV, Limit switch Cleaning and blowerning to done.
All the AC MCB to OFF Condition.
P & V. No. # 2 and 4 is in running condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
At 22 Mtrs Light to OFF.
Bed ash silo RAV is tripped due to O/L. So Reset it. Now Ok.
At BC- 7A / 7B Area Hand Lamp to provided.
At Silo area Light is ON. So Found that Lighting Timer Structed. So Reset it. Now Ok.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 87 Deg, DT-6 temp 80 Deg.
compressor house auto drain valve manually checked found healthy.
22 Mtr. Area 24v transformer connection done.
BC-7A/7B motor and power JB cleaning done.
All the Manual Light to ON ( BC-5 hopper, Coal feeder-2, 22 mtr Bunker, MPHB staircase etc.).
U#2 BH-22 level H showing, Material cleaning and trial taken found healthy.
B # 2 bed material RAV panel and equipment cleaning done.
SH and Eng. Offices AC power ON.
Workshop AHU put manual to AUTO

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 87 Deg, DT-6 temp 80 Deg.
compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Near Crusher Building Drinking water area Street light no. 65 not glowing so check & found connection open
so reconnect now light glowing (Old Abnormalities)
STG Building area RSB-51 , 52 &53 Cleaning & manually ELCB Testing found OK
VAM HTG Generator temp. high (141.2) so steam valve regulator air pressure decrease & after sometimes
checked Vapour Generator temp. reduce upto 121.7 deg.
BLR=1 COAL BUNKER 1A &1D Level flucations so Power reset & fields side Transmittor level probe cleaning
now level healthy
HSD Pump House Light ON as per requirement of operation dept.
HSD Pump House Oil Pump-2 start at 4.15 am
TG-2 9 mtr. Floor all instruments equipments & Panels cleaning work
Shift jobs carried
Unit No. # 1 Oil Gun-1A and 1B Flame scanner is installed at site and checking done. Now it is working
Normally.
In Inst. Lab common Locker 5'S to done.
In WTP Hall area all the field Inst. And panel Cleaning to done.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D cleared.


1. BC-5 ,
2. Bucket Elevator -2,
3. BC-3
4. BC-3 Coal shed trolly
5. Clean Run Motor -1B,
Following Equipment S/D Given.
1. Unit No. # 1 PA Fan ,
2. Unit No. # 1 SA Fan,

At 22 mtrs Light ON as per operation requirement.


Clean run -2B Motor earthing is damaged condition. So proper earthing to done.
In Bucket Elevator No.-2 Put into Remote and VFD Mode.
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


01.08.2022 B Ashvin Jadav
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled
01.08.2022 C Tarun Gaur
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

02.08.2022 A Ashvin Jadav


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


02.08.2022 B Gajendra Pandya
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
02.08.2022 C Sanjay Garg

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


03.08.2022 A Ashvin Jadav

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
03.08.2022 B Tarun Gaur b) Generator-2  checklist
c) Elect. Shift checklist

Boiler-1 lift stopped at 2nd floor due to


heavy rain inside cabin emergency push
button apply

Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal except


03.08.2022 C Sanjay Garg SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled
04.08.2022 C Ashvin Jadav
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


05.08.2022 A Amit kumar singh

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .
UPS Check List filled.
Shift instrument digital log book filled

05.08.2022 B Sanjay Garg


UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


05.08.2022 C Ashvin Jadav
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

06.08.2022 A Tarun Gaur


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Note-
1/ Boiler-1 lift not working due to door
fault.(2nd floor)
2/ Boiler-2 lift not working due to reed
switch malfunctioning(2nd floor)

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

06.08.2022 B Sanjay Garg


06.08.2022 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled
06.08.2022 C Gajendra Pandya
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .
UPS Check List filled.
07.08.2022 B Sanjay Garg
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

07.08.2022 B Ashvin Jadav


RNRP all nodes found Normal except
SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
07.08.2022 C Tarun Gaur
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


08.08.2022 A Sanjay Garg Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
08.08.2022 B Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
08.08.2022 B Ashvin Jadav

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
08.08.2022 C Tarun Gaur
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
09.08.2022 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


09.08.2022 C Sanjay Garg SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

10.08.2022 A Ashvin Jadav


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
10.08.2022 B Tarun Gaur
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


10.08.2022 C Sanjay Garg SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

11.08.2022 A Tarun Gaur UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
11.08.2022 C Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

12.08.2022 A Sanjay Garg


UPS Check List filled.
12.08.2022 A Sanjay Garg
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.


12.08.2022 B Tarun Gaur

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Boiler-1 Lift stopped at 2nd floor due to
heavy rain
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
12.08.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
12.08.2022 C Ashvin Jadav

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


Shift instrument digital log book filled

13.08.2022 A Tarun Gaur


UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


13.08.2022 B Sanjay Garg
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
13.08.2022 C Amit kumar singh UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

14.08.2022 A Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


14.08.2022 B Ashvin Jadav Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled
14.08.2022 C Tarun Gaur UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
15.08.2022 A Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
15.08.2022 B Tarun Gaur
a) Generator-1  checklist
b) Generator-2  checklist
15.08.2022 B Tarun Gaur

c) Elect. Shift checklist

Note-
1/ Boiler-1 lift suppy OFF due to heavy rain(2nd
floor) at 9.30 pm

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
15.08.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


16.08.2022 B Gajendra Pandya

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

16.08.2022 C Sanjay Garg


RNRP all nodes found Normal except
SPC004.
16.08.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

17.08.2022 A Ashvin Jadav

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


17.08.2022 C Sanjay Garg
17.08.2022 C Sanjay Garg

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
18.08.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

Shift instrument digital log book filled


UPS log digital log book filled.
19.08.2022 A Tarun Gaur
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

19.08.2022 B Sanjay Garg


19.08.2022 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

19.08.2022 C Ashvin Jadav Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

TG-2 Space heater current measurement found R-


11.0amp , Y-11 amp & B-11.2 amp
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
20.08.2022 A Tarun Gaur
a) Generator-1  checklist

b) Generator-2  checklist
20.08.2022 A Tarun Gaur

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

20.08.2022 B Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
20.08.2022 C Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

21.08.2022 A Sanjay Garg


21.08.2022 A Sanjay Garg UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .
UPS Check List filled.
21.08.2022 B Gajendra Pandya
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
21.08.2022 C Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


Shift instrument digital log book filled
22.08.2022 A Sanjay Garg
22.08.2022 A Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

22.08.2022 B Ashvin Jadav RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
22.08.2022 C Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

23.08.2022 A Ashvin Jadav

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
23.08.2022 C Gajendra Pandya
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


24.08.2022 A Ashvin Jadav Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


24.08.2022 B Gajendra Pandya Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


24.08.2022 C Tarun Gaur VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


25.08.2022 A Gajendra Pandya

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

25.08.2022 C Ashvin Jadav


RNRP all nodes found Normal except SPC004.

25.08.2022 C Ashvin Jadav


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


26.08.2022 A Tarun Gaur Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

26.08.2022 B Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
26.08.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
27.08.2022 A Tarun Gaur c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

27.08.2022 B Sanjay Garg


RNRP all nodes found Normal.

27.08.2022 B Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


27.08.2022 C Tarun Mandawat
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .

UPS Check List filled.


28.08.2022 A Sanjay Garg Shift instrument digital log book filled
28.08.2022 A Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
28.08.2022 B Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
28.08.2022 C Tarun Gaur UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal except


SPC004 .
UPS Check List filled.
Shift instrument digital log book filled

29.08.2022 A Sanjay Garg UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

29.08.2022 B Ashvin Jadav Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


29.08.2022 C Tarun Gaur
Shift instrument digital log book filled
29.08.2022 C Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

30.08.2022 A Ashvin Jadav


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

30.08.2022 B Gajendra Pandya


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


30.08.2022 C Sanjay Garg
30.08.2022 C Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

31.08.2022 B Tarun Gaur


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
31.08.2022 C Sanjay Garg
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 81 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1. BC-6 ,
2.Bucket Elevator No.-2, also put in remote and VFD mode.
Reclaimer PCRD cable loose, so correction done.

All the Manual Light to ON ( BC-5 hopper, Coal feeder-2, 22 mtr Bunker, MPHB staircase etc.).
U#2 BH-22 level H showing, Material cleaning and trial taken found healthy.
SH and Eng. Offices AC power OFF.
Boiler-1 furnace charging light provided.
01MV0905, 01MV0906 and 01MV908 control fuse replaced and trial taken found healthy.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 81 Deg, DT-5 temp 87 Deg, DT-6 temp 80 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP

Unit-2 coal feeder2 C Vibrator not running so check & found Feeder MCB trip so motor
megger & resistance value checked found ok when vibrator ON feeder MCB trip need to be
checked motor in G Shift (Motor connection open from field JB )
BLR#2 22 no's vessel level high so clean & calibration done
TPP Area unwanted lights OFF
PA-1 Power JB Rubber Mat laying work
Enmaas Conveyor-1 trip due to O/L so feeder supply OFF as per requirement of operation
dept. for jamming clear
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 81 Deg, DT-5 temp 85 Deg, DT-6 temp 81 Deg.


Coal bunker-2C level transmitter cleaning done.
Following Equipment S/D Given.
1. BC-4 ,
2.Bucket Elevator No.-2,
3.EN-MASS CONVEYOR-1,
4.BLR-1 100% F/W MAIN MANNUAL ISOLATION VALVE, 01MV3207,
5.PA FAN-1,
6.J-VALVE FAN 1A ,
7.J-VALVE FAN-1B (VVFD),
8.CT fan-1,
Following Equipment AVI Given.
1. EN-MASS CONVEYOR-1, also put in Local as per MMD requirement
2.Bucket Elevator No.-2, also put in Local and DOL mode, as per MMD requirement,
All the Manual Light to OFF ( BC-5 hopper, Coal feeder-2, 22 mtr Bunker, MPHB staircase
etc.).
U#2 BH-12 level H showing, Material cleaning and trial taken found healthy.
2C Bunker Vibrator ACC side taken in line, Boiler side motor are open, so connection removed.

EOP-2 Power ON and OFF as per operation requirement.


Boiler-1 broken DC light removed with pole, and shift to workshop.
U#1 BH-21 level HH probe not available, so mounting arrangement done.
BLR-1 MV drivr AHU off, due to fan stoppage.
BC-7A area 24V LED repaired and hand over to operation.
Coal feeder-2 area charging light removed.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 81 Deg.


Coal bunker-2C level transmitter cleaning done.
Following Equipment S/D Cleared
1. BC-4 ,
2.Bucket Elevator No.-2,
3.EN-MASS CONVEYOR-1,
Plough discharge-2A not running so checked and found overload, so reset it
RSB Box at 4.5 mter under maintanance at 4.5 mter outside area.
Desuperheating valve (02TCV3203) of boiler-2 steam leakage at 9.50 pm, so isolate it by
operation team
LED lights provided to mech team at boiler-1

Shift jobs carried


Unit No. -1 MVR is not run in auto mode. So we have incresed the excitation also SP to 0.3.
In Unit No. # 2 Desuperheater Station 02TCV3203 Gland Tightness to done. Also moisture
removed from air filter regulator. When valve is operated from DCS. It is operated from 0 to
32 %. Presently valve is in hot condition and Gland may replace.
As Per Operation requirement , Coal feeder -2B Clean Run Motor MCB is in OFF Condition. Due
to clean run chain broken.
In BAC-2B Dome Valve Seal pr. Is showing at DCS end. So checked our side it is working
normally. Mecanical Person work is underprogress.
In Chimney analyzer all the panel Cleaning and Blowerning to done.
Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
BC-3 Light ON as per Operation requirement.
at 24 Volts Light shift to 4.5 Mtrs and put into Charging mode.
At 22 mtrs Temp. Light is not ON. So ON the MCB. Now ok.
Dosing Room Motor Cleaning to done.
At BAC-2B tempoary light to Provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 80 Deg C , DT-5 temp 86 Deg C , DT-6 temp 80 Deg C.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-1 ,
2. Bucket Elevator No.-2,
3. Vibrating Screen-2,
4. Coal feeder 2B,
5. 02MV910,
6. Plate valve Coal feeder 2B ,
Following Equipment AVI Given.
1.Bucket Elevator No.-2, also put in Local and DOL mode, as per MMD requirement,
All the Manual Light to OFF ( BC-5 hopper, Coal feeder-2, 22 mtr Bunker, MPHB staircase
etc.).
U#2 BH-12 level H showing, Material cleaning and trial taken found healthy.
EOP-2 Power ON and OFF as per operation requirement.
Coal bunker-2Unit-2 level transmitter cleaning done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 80 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.


Bucket elevator-1 put in local and DoL mode as per MMD requirement.
Following Equipment S/D Cleared
1. Screen -2
2.Bucket Elevator No.-2,
3.BC-1
2 NO's LED Light collect from ACC-2 Area
1 no's LED Light provided BAC-2A Area
2 no's Handalmp repaired & handover to coal feeder area ( Mr. Taqueer)
Coal Shed Area Light ON as per requirement on operation dept.
Following Equipment AVI Given.
1.Coal Feeder-2B & Discharge MOV

Bucket Elevator -1 ZSS switch cleaning & checknut tightness

BAC-2A back pressure not show so transmittor line flushing done now back pressure healthy
Bolier area Lighting timer On time

Coal Feeder-2D not running so checking & found VFD Panel side weigh controller value found
hang condition so reset controller supply now Coal feeder 2D Running normally

TG Building lift telephone replaced by new one telephone


Shift jobs carried
In BC-1 Belt Take off Pulley is showing at DCS end. So checked and found that At T-1 tower
zero mtrs Limit Switch internal assembley is damaged condition. Also wire bound at Limit
Switch. Now Ok. To be check.
In Unit No. # 2 Boiler Vessel No.--21 HH Level Probe is showing at DCS end. So Cleaned and
calibrated it. Now ok.
In Compressor House all the auto drain valve Checked and working Normally.
Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In Chimney avitation light is not ON. So ON the MCB. Now Ok.
At BC-2 Belt Light is not ON. When ON the MCB. Then it is tripped. To be check.
In Compressor House all the motor and Power JB Cleaning to done.
DT-2 temp 80 Deg, DT-5 temp 86 Deg, DT-6 temp 81 Deg.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 80 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP

Smoke observed in Reclaimer cable tray towards bucket wheel, found 1.5 sq. mm two cables
insulation damaged, so replaced one meter cable, and trial run found healthy.

Bed ash cooler 1B area 24v transformer, extension board and light provided. And welding
m/c connection done.
ACW area motor cleaning done.
Boiler-1 De-superheating station area barricading done.
Bed ash cooler 1B dome valve fault, so cleaning by operation and trial run healthy.
BLR-2 BH 21 level high, so level probe cleaning and trial run healthy.
BLR-1 BH 21 level high, so level probe cleaning and trial run healthy.
Shift jobs carried

BC5, Belt not start while show PMT at DCS, so its feeder power and control sullpy check found
ok, then check at field found a lot of material found at tail end so cleaning job continue.

Boiler-1 vessel 12-22 seal pressure fault, line flushing done,as it not work properly.
BAC 1A in AVI, and local mode .

Following Equipment S/D Given.


1. BC-5,
2. BAC-1A,
3. BAC 2B,
4. Belt feeding floor belt,

De superheater valve TCV 3201 , Leakage arresting done. And trail taken and running in
circuit.
BC1, Belt show belt sway switch operated so check with tarun and start belt.
Reclaimer , area equipment observation taken.
Fly ash silo pnumatic gate check as, ccr inform it not work , check with attender it work ok in
field

Shift jobs carried


In BAC-1A Level probe is showing High at DCS end. So Cleaned the level probe and calibrated
it. Now ok.
In Unit No. # 1 Vessel No.-11 High level probe faulty when supply is ON then main MCB is
tripped. So Changed the level probe from Unit No. # 2 Vessel No.-11. Now Ok.
In Unit No. # 1 DSH CV No.-01TCV3202 Valve is passing Condition. When we closed the valve
manually from scale it is opened 20 to 40 %. As per Tarun / sati Ji valve is manually is fully
closed and Air Line is closed condition. Also Inform to Operator to check wheater Passing or
not.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1. BC-5,
2. BAC-1A,
3. Belt feeding floor belt,

Following Equipment S/D Given.


1. BAC-1B ,

Chimney Avitation Light is Not ON. So ON the MCB. Now Ok.


Coal Shed Area and BC-5 Hooper area Light ON as per requirement on operation dept.

BC-6 area Hand Lamp to Provided , BC-7A and 7B area extension board and hand lamp to
provided.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 85 Deg, DT-6 temp 80 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP

Bed ash cooler-1A tripped in overload, reset it, and trial taken found (BLR-2 side relay) 3.4 A,
3.7 A, 3.5 A and (BLR-1 side relay) 2.2 A, 2.3 A, 2.1 A. inform to operation for overload.

Chimney aviation light off, so check found timer stuck ,so reset it.
BC-6 area 24v transformer provided.
ACC-1 RSB-27 door bolt loose, so tightness done.
Deaerator area Light ON as per operation requirement.
WTP MCC panel cleaning done.
Workshop MV drive room exhaust fan OFF.
BLR-1 BH 11 level high, so level probe cleaning and trial run healthy.
BLR-1 BH 12 level high high , so level probe cleaning and trial run healthy.
Bed ash cooler 1A back pressure line cleaning done.

Shift jobs carried

DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 80 Deg.


P&V 4 and 2 status checked, found running healthy..
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-5,
2. Screen-1
3. Screen-2
4. BC-4
5. PRDS 12MV2306
6. CT-2

Hilti M/ C Green Tag updated done


Boiler-1 0 mtr. Area W/M Double Earthing done
ID-1 & PA-1 Motor both side Greasing done
SWAS Room Drum Sample not drain so checked & found Drum line SOV Plunger jammed
condition so clean it now working normally
BAC-1A Level high so checked clean & calibration now ok
Spare Control valve shif WTP Lab to Inst. Lab

Boiler-1 ID-1 &PA-1 Motor Bearing Temprature bypass for motor Lubrication Purpose

PRDS MOV 12MV2306 remove from location & shift to instrument lab

Shift jobs carried


In BAC-1A Level probe is showing High at DCS end at sometime also Vessel is Overflow. So
Changed the level probe from Unit No.-2B BAC then installed at site. Trial taken it is running
Normally.
In Unit No. # 1 ID fan Motor DE / NDE end Bearing Temp. is normal. So Tripping taken in line.
But In PA fan Motor DE / NDE end Bearing Temp. is -70 Degree. So tripping is not taken in
line.
In Chimney analyzer Internet not connected is showing in PC. So all the connection tightness
done and Modem Power supply Reset. Now Ok.
In Coal Feeder -1B Air Blaster -01 Nos. Not operating at DCS end. So at site found that I/L
valve of SOV is closed condition. So Opened the valve. Now ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Given.
1. BC-5,
2. Screen-1
3. Screen-2
4. BC-4
5. CT -1
6. CT-2

In WTP Furnace Main supply Tripped found that 20 Amps Power Socket burn. So Replaced the
socket. Now Ok.

In Vibrating Screen floor area LED Supply cable is short at joint. So Reconnected it. Now ok.
In Boiler ON Lighting Time changed from 18.40 PM to 19.10 PM.

In BC-5 is sudeenly Tripped at feeder side no O/L. Also not running in manual . So Changed
the feeder from BC-3. Still it is not running in Local Mode. So released the EPB. Then start in
Local. Now ok. Then put into remote mode.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 83 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.

All Energy meter manual reading taken for Power Report.


Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Bed ash cooler-1B conveying back pressure not coming so line flushing done, again same
problem so checked at bed ash cooler backpressure Line, there is no pressure in the line, so
operation team checked the puppet valve out let found some jamming
Boiler-1 Vessele 11-21 level probe chedcked
Desuperheating valve(01TVC3202) and(01TCV3203) not closed fully only upto 14% so
greasing done in its spindle, now closed fully
Bed ash cooler-1B found not running so checked wter valve limt in next shift

Shift jobs carried


In CHP Crusher Bag Filter RAV is not ON from DCS. So checked and found that feeder is not
Ok. So checked and found that timer relay is faulty. So Replaced the ON timer relay. Then trial
taken it is working normally.

In BAC-1B is not started from DCS end. Found that O/L at site. So reset it. So again started .
Then one motor takes 11 A and other motor takes 8 A. Also megger done. It is ok. Then
informed to shift incharge . Mech. Side ( jamming / Position out. ) . After completing the mech.
work Then it is started it takes the 3.5 A. Now ok.
In CCR lift O and C fault is showing on display. So OFF the Power and Informed to hement
sharma.
In Unit No. # 1 bag house 12-22 rubber mat laid.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Given.


1. BAC-1B,

Following Equipment S/D Cleared.


1. BAC-1B,

In WTP High pr. Pump VFD Cleaning and Blowerning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 83 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-1,
2. BC-2,
3. BC-4,
4. Reclaimer,
Following Equipment S/D Clear.
1. BC-1,
2. BC-2,
3. BC-4,
4. Reclaimer,
EN-Mass Conve-1 & 2 motor cleaning done.
Screen floor cable dressing done.
All the Manual Light to ON ( 22 mtr Bunker, MPHB staircase etc.).
Bed ash cooler-1B level probe calibration done.
BH 11-21 & 12-22 level probe calibration done due to H and HH level.
SH and Eng. Offices AC power ON and OFF as per requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 82 Deg.


All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Dosing Pump room Motors , Panel & Power JB's Cleaning & Blowering work
BC-7A & 7B Area Handlamp Providing work
Baghouse-1 12-22 Vessel level not showing inDCS so checked in field clean & calibration done
but material inside vessel so inform to CCR (Mahesh Sharma)
IAC-1 loading & unloading setting changed in DCS as per requirement shift incharge
Loading Unloading
Previous 4.0 kg 4.5 kg
New 4.5 kg 5.0 kg

All office AC found ON Condition during shift round so OFF

Shift jobs carried


In BAC-1B Level probe is showing is not showing High at DCS end . So Cleaned the Level
probe also calibrated it. Also removed the Connector due to rustrated.Trial taken it is running
Normally.
In Fly ash Silo No. # 1 Fork level switch is contionuous is showing at site. So at site heavy dust
deposit at site also cleaned the level probe. Now ok.
In Inst. Lab. Electronice Card changed in Faulty Level Probe . Also Calibrated the Level probe.
Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1. BC-6,
2. Vib. Screen No.-1,
3. Chilled Water No.-1,
4. Generator No.-2,
Drill machine Plug top to changed.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg, DT-5 temp 86 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
All the Manual Light to ON ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
1. BC-6,
2. Vib. Screen No.-1,
SH and Eng. Offices AC power OFF .
EOP-2 Power ON and OFF as per operation requirement.
BC-4 pull switch coming, checked and found one pull cord act, so reset it.
WTI point closed at 15 mtr. Nomenclature provided.
01MV0906 trial taken and found open but not close, due to jamming , inform to operation.
BC-5 belt tear fault coming, so cleaning and reset done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 82 Deg.


All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
CHP MCC & Ash MCC Panel Cleaning outside
BC-3 Coal shed area handlamp repaired work

Soot Blower-1 Drain temp. (01TI070) not increase so checked in field found soot blower -15
steam continue blowing after steam line charging checked & found closed limit not pressed so
limit adjustment done now temprature increase normally
BLR#1 APH vessel -2 closed limit found in fault in DCS so checked in filed found limit not
pressed bolt so bolt tightness done now limit working normally
All office AC found ON Condition during shift round so OFF
Following Equipment S/D Given
1/ BC-3
Compressor house all Instruements cleaning work
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C , DT-5 temp 84 Deg C , DT-6 temp 81 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).

Following Equipment S/D Given.


1. BC-1,
2. BC-2,
3. BC-3,
4. Reclaimer,
SH and Eng. Offices AC power ON.

Following Equipment S/D clear.


1. BC-1,
2. BC-2,
3. BC-3, (02 times)
4. Reclaimer,
BC-3 local/Remote changeover as per operation requirement.
BLR-1 RSB-19 at 4th floor health checked and green tag provided.
Coal bunker 1B level transmitter cleaning and power reset.
BH-11 level High, so checked and found actual level high so inform to operation.
Service air IFC changed from 52 to 56 PSI.
Shift jobs carried
In BC-3 Cable trolley AFR Side proximeter Switch is in damaged condition. So checked and
found that Base assembly of proximeter Switch is damaged condition. Welding is required.
Due to shift incharge requirement new proximeter Switch connection done and mounted to
cable Tray near to proximeter Switch location.
In reclaimer Left / Right VFD Tripped on over load condition. It takes 14-15 Amps Current .
May be jammed condition. So Informed to Shift Incharge.
In IFC moisture drained to done.
Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In reclaimer Back side Light is not ON. Found that MCB is tripped condition. When ON the
MCB again tripped. So as per shift incharge requirement Tempoary new Light is mounted at
site.
At BC-7A /7B 02 Nos hand lamp to changed.
In Chimney avitation light is ON single floor area. To be check.
In CHP , Screen floor area Permenent light is not ON. MCB is tripped. To be check.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C , DT-5 temp 84 Deg C , DT-6 temp 83 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).

Following Equipment S/D Given.


1. RECLAIMER,
2. CEP-2B OUTLET MOV, 02MV2902 ,
3. CEP-2B ,
4. JOCKEY PUMP-2,
5. VIBRATING SCREEN-1,
SH and Eng. Offices AC power ON.
U # 1 Coal bunker level transmitter cleaning done.
BH-21 level High, so checked and found actual level high so inform to operation.
Following Equipment AVI Given.
1. RECLAIMER,
Reclaimer left/right motor Current checked found 7.5 Amp balanced. ( After Pinion replacement by MMD).
Welding m/c top provided at 0.0 Mtr. BLR-1 .
TG-1 load throw from 13.5 MW to 4.0 MW, Checking work under progress.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear
1. RECLAIMER,
2. CEP-2B OUTLET MOV, 02MV2902 ,
3. CEP-2B ,
4.VIBRATING SCREEN-1,

Following Equipment AVI Given & Clear


2. Reclamier
SH and Eng. Offices AC power OFF .
Following Equipment Shutdown Given
2. Reclamier

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 12.9 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Fire Pump House area Hoist Due Date sticker updated done
Crusher-1 Motors Both Side Lubrication work done
Reclaimer left/right motorVFD trip due to overcurrent reset & again start takes 16 amp again trip so infrom
to Mr. Srivastav
Reclamier Room Left right boom belt drive Panel inside cable dressing work
Shift jobs carried
In Unit No. # 1 Coal Bunker Level- 1C and 1D is not showing correctly at DCS end. So Power
Reset and Probe Cleaning to done. Now ok.
In Compressor House all the auto drain valve checked and working normally.
In Fly ash Silo No. # 1 and 2 , field Inst. , All the panel cleaning and Blowerning to done.

Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
At coal shed light ON as per operation requirement.
At 22 mtrs Light ON as per operation requirement.
At WTP RO Water Pump Motor Cleaning to done.
At Screen Floor area 02 Nos , 24 Volts Lamp to Provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C , DT-5 temp 84 Deg C , DT-6 temp 83 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Boiler-1 lift power supply off due to heavy rain at 2nd floor
SH and Eng. Offices AC power OFF.

Fly ash silo -2 gate valve not open so check & found supply not found in sov so trace cable & contactor
tightness & cleaning by CRC now gate valve supply healthy & gate valve open system running normally
IAC-2 VFD Trip due to undervoltage due to heavy voltage dip observed after physically checked reset done
now VFD Heaalthy
Following Equipment AVI Given & Close.
1. RECLAIMER,
Reclaimer left/right motor Current checked decouple condition found R-5.5 , Y-5.3 , B-5.6 amp current balanced
Reclamier area cabin surrounding light MCB trip so check & found Lighting cable damaged near cable tray
so cut rejoint & dressing now lighting supply healthy
STG Building Hoist Due date Sticker updated done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 80 Deg.
CF-2A,2B main and clean run motor cleaning done.
All the Manual Light to ON ( Crusher building.).

Following Equipment S/D Clear.


1. BC-1,
2. Coal Crusher No.-1,
3. Vibrating Screeb No.-1,
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP

BLR-1 Bag house purging and conveying system not running as per previous shift report, checked and found
one 1 pole MCB tripped from CHP DCS panel, so thoroughly checked in field with Mr. Pramod sati sir and
found 11-21 SOV panel one ckt are fault, so remove the connector from ckt. and trial taken found running
normal. Also from BH top header actuator airline changed of 11-21 and 12-22 .

Again 12-22 header actuator close, so air tube reversed.


Bag house 11-21 level probe and header actuator cable, and SOV sealing done.
Barring gear-2 motor and panel cleaning done.
Shift jobs carried

In Unit no. # 1 vessel No.-11 /21 main MCB is Tripped. Also Connector removed at site. So we
connected the connector . After some time again tripped the MCB. So all the level Probe
connection tightness done. Then ON the MCB . After some times again tripped. So removed the
connector and As per Sanjay nath this connector is going to header SOV. So checked the Vessel
No.-11 Header sov. found that Coil resistence is 1.5 ohms. So changed the SOV. trial taken it is
working normally. Header SOV-21 Work is under progress. Also Informed to Mr. Taun.

In IFC moisture drained to done.


P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1. BC-1,
2. Vib. Screen No.-1,
3. Coal Crusher No..-1,
4. reclaimer,
Generator No.-2 Breaker S/D to cleared.
HSD Area Oil pump no. # 2 not started from field side. So ON the feeder from feeder side. Also
Informed to pandaya Ji.

BC-5 Tunnel area Single Phase extension board taken and placed at WTP workshop area.
Shift jobs carried
Chimney avaition light cyclic timer installation & taken in line

Reclamier area grinding m/c connction done


P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Clear.

2. Vib. Screen No.-1,


3. Coal Crusher No..-1,

Crusher Building Screen floor 1 no' s handlamp repaired done


BAC-1A Level high so checked clean & calibration now ok
Unit-1 Bag house 11-21 vessel seal pressure leakage arrested done
BAC-1B Level high so checked clean & calibration now ok
Crusher Floor 0 mtr. AreaW/M Green tag updated done
Chimney analyser controller calibration done

ACC-1 Light not on so check & found timer stuckup so adjustment & reset now ok
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.
Bed Ash Cooler 1A over flow, so level probe calibration done.
CF-1B 24 v hand lamp and LED repaired.
Fly ash silo-2 motor and panel cleaning done.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
3rd floor of Boiler-2 transformer 24v removed and put in shift Almira.
Silo-1 panel hole sealing done.
Bed ash cooler-1 area light provided.
APH O/L temp 01TI0952 RTD checked as per OPD requirement, and found healthy.
Shift jobs carried

All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).

In IFC moisture drained to done.


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.
All the Manual Light to On Condition.

Following Equipment S/D Given.

2. Vib. Screen No.-1,


3. FAS-2 Panumatic air isolation

Boiler-1 bag house 0 mtr. W/M 3 phase damaged plug top replaced by new one & Green Tag
Provided
Fabrication yard W/M Checked & Green tag updated
CHP Area Grinder Green tag Updated
Boiler-1 lift taken in line
Shift jobs carried
In Chilled water Pump No.-1 trial taken but direction is reversed. So Changed the phase from
feeder side. Then trial taken it is working Normally. Motor current- 7 amps. Present Feeder is
ON also in Emergency Condition.
In reclaimer AVI is given .But L/R VFD taken 15 Amps current and Tripped. So Again AVI and
S/D To provided.

As per Maintences requirement 230 Volts Tempoary light is provided at Reclaimer side.

In Unit No. # 1 bag House light is not ON. Found that timer is structed. So Reset it. Now ok.
All the AC MCB to OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared

1. Vib. Screen No.-1,


2. FAS-2 Panumatic air isolation

In fly ash Silo No.-2 Plate valve limit switch , SOV and PU Tube connected and trial taken. It is
working Normally.
Shift jobs carried
Boiler-1 APH vessel no.1 dome valve limit open close issue, so limit and link cleaning done
and found healthy.
WTP all instrument cleaning dsone.
MVAR is not maintaing in auto mode. So Informed to MPSS person but all capacitor bank is ON thair. So
Increased the SP from 0.3 to 0.65 for one hour then it change t original set point
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
DT-2 temp 82 Deg, DT-5 temp 83.2 Deg, DT-6 temp 77.8 Deg.

BLR 0.0 Mtr. Area drain Mov, Local JB, and bag house equipment cleaning and blowering done.
One 24 volt light repairing done at Coal feeder 1A.
Boiler 1, drain MOV cleaning and blowering done.
Shift jobs carried
Unit-1 Boiler lift Telephone Connection tightness done and checked it is working Normally.
In Chimney analyzer all the Panel Cleaning and Blowerning to done.
In IFC moisture drained to done.
At Compressor House all the auto drain valve checked. It is working Normally.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
At BC-7A /7B 01 Nos hand lamp to changed.
At BC-7B Motor Cleaning to done.
DG Report is uploaded in SAP System.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Following Equipment S/D Given and Clear.
1. BC-5,
SH and Eng. Offices AC power OFF .
IAC 1 and 2, BC-2 motor cleaning done.
Bucket elevator floor field instrument cleaning done.
Magnetic separator and coal sampler panel cleaning done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.


All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
CHP MCC & Ash MCC Panel Cleaning outside
BLR#1 SA FAN RTD JB Ploythene covering work done
BLR#1 Ground floor 6 no's drain MOV Cleaning work
BLR#1 APH Air isolation valve handle air leakage sp handle bolt tightness & leakage arrested
All office AC found ON Condition during shift round so OFF
BFP-1 ,2 &3 Motors cleaning work
TPP Area unwanted light OFF during shift round
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
EOP-2 Power ON and OFF as per operation requirement.
C7-AB area hand lamp replaced.
Bed ash cooler 1B level high showing, so level probe cleaning done, now showing healthy.
WTP DCS panel cleaning and blowering done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Bag house-1 11 vessel level found H-H check in field found material inside so inform to CCR
SH and Eng. Offices AC power OFF .
CHP Screen floor Bag filter Panel & Instruement Cleaning work
Boiler-2 RSB-26 Rubber mat laying work
In IFC moisture drained to done.
Switchyard GT-1 oil tank silia gel found Pink condition so replaced by new silica gel also two bolt found
rusted condition so replaced by new one
Generator-2 Space Heater ON due to winding temprature decrese upto 34 deg.
At 8.45 pm during heavy thuderstorm Generator-1 euipment & Generator-1 Earthing alarm observed at
announcitaor panel& automatically reset within second physically checked Generator Protection Panel no
any abnormalities & alarm observed Rotor voltage found +56 & -56 Vdc (115 V) within limit

Generator-2 space heater current checked found r- 10 amp , y-10 amp & B=5.1 amp so
checked resistance from feeder end found R-Y= 45 ohm , Y-B= 75 ohm & B-R= 75 ohm need to
check physically space heater coil
Shift jobs carried
In Unit no. # 1 vessel No.-21 level probe Showing High value. So Cleaned and calibrated the
level probe. Now ok.
In Unit no. # 1 vessel No.-21 level probe Showing High High value. So Cleaned the level probe.
Now ok.
In TG. # 1 and 2 , all the field Inst. , MOV , CV cleaning and Blowerning to done.
Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
At 22 mtrs LED Light is not ON. So checked and found that in Plug Top wire is opened. So
Reconnected it. Now ok.
At Soot Blower Room Motor and panel Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 81 Deg.
compressor house auto drain valve Opened for requirement of Mech deptt.
Boiler-1 APH level sensor checked and its MCB made ON
Following Equipment S/D Clear.
1. BC-5,
Reclaimer Breaker trip during its trial, so checked and found its Lighting Transformer Earth fault, now
switch OFF Lighting transformer
SH and Eng. Offices AC power OFF .
Compressor house RSB supply found missing , so checked its cable found Loose on Incomer MCB , so tight it
Lighting material shifting at Reclaimer - Lighting transformer, LED and Extention board
Coal shed and 22 mter Lights made ON as per requirement
Shift jobs carried
In Unit No. # 1 APH Vessel No.-2 Dom valve Air leakage from PU Tube. So tightness to done.
Now ok.
In IFC moisture drained to done.
In Unit No. # 1 Bag House Vessel No.-11-21 SOV JB Packing to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
At BC-7A / 7B area 01 Nos Hand lamp to provided.
At BC-5 Tunnel Dewaterning Pump is not ON. Found that MCB is in OFF Condition. So ON the
MCB. Now Ok.
In HP Dosing Room Motor Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 82 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
EOP-2 Power ON and OFF as per operation requirement.

Following Equipment S/D Clear.


1. COOLING TOWER FAN-2,
2. SA FAN-2 LT MOTOR / 02AN0903, 12MCC5325-C/2AN0905AVFD_R ,
3. P FAN-2,
4. J-VALVE-2B (VVFD),
5. PA FAN-2,
6. ID FAN-2,
7. J-VALVE FAN-2A (DOL) 12MCC5327-B / 02AN00905A,
8. COAL CRUSHER-1 BUS I-13 / AJ1609-A,
BLR-1 welding M/C Plug top provided, and green tag update.
Coal feeder-1 area cable dressing done.
Coal feeder floor 24 v Light (03 nos) shift to workshop.
Following Equipment AVI Given.
1. Reclaimer,
Reclaimer power I/c MCCB ON at that time smoke and sparking sound observed in cable tray, so checked
and found UPS power MCB tripped, so checked in cable tray but not found any abnormal, so again power
ON and found running healthy.
BH 12-22 seal pressure valve not close in sequence, so physically checked open/close are OK, but in
sequence valve are not close, and one cycle are running healthy and under observation.
Shift jobs carried
In Bed ash Cooler -1A / 1B High level Probe Cleaned as per operation requirement.
In Compressor House all the auto drain valve checked and working normally.
Electrical Report is generated.

EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
In CHP Bucket Elevator is not Start from DCS end. So main Contractor is not working
condition. So Changed the Contractor by Hement Sharma / Gajendra pandaya. Then trial taken
it is working Normally.
In CHP at around 00.35 AM when Start the Line -2 Bucket elevator from Remote. Then it is not
On also immedately tripped also running feedback is not showing at DCS end. Also in Local
mode it is not started. Then bucket elevator No.-1 is started it is not started from local as well
as remote. So informed to hement sharma. he told me that ADom Block may be problem. So
Changed the Adom Block. Then trial taken. it is running normally.
In reclaimer Transformer temp. is showing normally.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Fire pump house motor and power JB cleaning done.
Coal shed area light ON.
Lighting LDB panel cleaning and blowering done.
Boiler -1 drain MOV, J valve MOV, APH JB cleaning and blowering done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 82 Deg.
Monthly Power Report Balanced upto 18/08/2022
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
BC-4 & BC-6 Motors both side Greasing done
BC-4 Motors & Power JB Cleaning work
BC-6 Motors & Power JB Cleaning work
Limestone fabrication yard RSB-71 Earthing found damaged conition so repair & reconnect
Following Equipment S/D Given & Clear
1. Clean Run 1A
Unit-1 firing floor ingitor & Burner Panel & SOV's cleaning work
UPS-1&2 panel cleaning outside
Shift jobs carried
In Unit No. # 1 MVAR is not run in auto mode. So Decreased the excitation . Then put into auto
mode. Now it is running Normally.
In Coal Feeder -1B Bunker O/L MOV close command is not going to CCR. So checked at feeder
side it is Ok. So checked at field side found that torque switch is acted. So Release the torque
switch. Then supply is found at feeder side. Since feeder is in running condition. so Close Trial
is pending condition.
In Unit No. # 1 BAC-1B level probe is showing High value. So cleaned the level Probe. Now ok.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At coal shed light ON as per operation requirement.
At 22 mtrs. light ON as per operation requirement.
At Screen Floor area 02 Nos , 24 Volts Lamp to Provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 84 Deg, DT-6 temp 79 Deg.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Clean run 1A motor tripped in overload, reset and trial taken found running healthy, and 1.1 Amp balanced
current taken.
Bed ash cooler-1B both motor cleaning done.
Deaerator area light ON.
TG floor exhaust fan panel cleaning and blowering done.
BH-12 level H showing, checked and found actual level high, so inform to OPD.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 78 Deg.
Monthly Power Report Balanced upto 19/08/2022

All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
BAS silo level shows false 10 mtr. So clean probe reset now ok & level display 2.7 mtr.
FAS-1 silo level shows false 9.4 mtr. So clean probe reset now ok & level display 4.7 mtr.
BLR#1 21 Vessel shows H-H so check & found material inside so inform to shift incharge
BLR#1 11 Vessel not shows level at DCS so clean & calibration done
BAC-1A &1B Dome valve not operate from CCR checked dome jammed condition manual operated as per
requirement of shift now ok
Following Equipment S/D Given.
1. BC-1,BC-2 , BC-3 , Screen-2
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.4 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Shift jobs carried


In Bed ash Silo level is not showing correctly at DCS end. So Cleaned the level probe and
power Reset. Now ok.
In Unit No. # 1 Coal Bunkerbag Filter- 1C Running F/B is not showing at DCS end. So checked
at field side DCS wire of Running F/B is opened at TB end. So Connected it and trial taken. It is
working normally.
Following Equipment S/D Cleared.
1. BC-1,BC-2 , BC-3 , Screen-2
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In Unit no. # 2 vessel No.-11 level Probe Installed at site and Calibration done. Now ok.
At Screen Floor area 02 Nos , 24 Volts Lamp to changed and LED Light to provided.
BC-1 Motor greasing to done.
Vibrating screen no.-2 put into local mode as per maintences person requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 78 Deg.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
WTP all instrument cleaning done.
boiler-1 feed water instruments cleaning done
Lights provided at coal feeder area

Shift jobs carried


In Unit no. # 2 bed Ash cooler-2B level probe Installed at site and Calibrated it. Now it is
running normally.
At Compressor House all the auto drain valve checked. It is working Normally.
In WTP hall area field Inst. Cleaning and blowerning to done.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
At BC-7A /7B 01 Nos hand lamp to changed.
Fly ash Route Blower no.-1 not started from DCS end. So checked at site and found that O/L.
So Reset it. Now ok.
At CHP coal shed light to OFF Condition.
At 22 mtrs Light to OFF Condition.
Shift jobs carried
BC7AB motors and power JB blowring done

coal shed area Lighting timer adjusted as per requirement


Bunker floor lights made ON as per requirement
Distribution Transformer tempratures as DT2-81, DT5-84, DT6-79
crusher house bucket elevatore floor Instruments cleaning done
Magnetic saparator panel cleaning done
Boiler-2 12-22 SOV JB rubber mate properly placed
IFC filter drain done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 83 Deg, DT-6 temp 78 Deg.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Bolier-1 Control valve cleaning work
Unit-1 &2 MOV MCC Cleaning work
Lights provided at coal feeder area
Grid island at 22.21 pm & again synchronised at 22.51 pm

Shift jobs carried


As Per shift Incharge requirement Unit No. # 1 air blaster panel main air Valve closed also SOV
Air valve closed.
In Unit no. # 1 vessel No.-11 /21 and 12 /22 level probe high and Very High packing and Cover
to provided.

In Chimney analyser area All the panel Cleaning and blowerning to done.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. Vib. Screen No.-1,
2. Vib. Scrren No.-2,
2. BAC-1A ( 02 times ) ,

At 22 Mtrs LED Bulb to Provided.


In WTP, Oven Silica Gel is put into hot condition.

As per Maintences requirement BAC-1A AVI is Given and Local to selected from Panel end.
At 22 mtrs Light to OFF Condition.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).

Following Equipment S/D Clear.


1. Vib. Screen No.-1,
2. Vib. Screen No.-2, ,
3. Air valve bed ash cooler 1A,
SH and Eng. Offices AC power OFF .
Bed Ash cooler are 02 chargeable light provided.
Following Equipment S/D Clear.
1. Bed Ash Cooler 1A, (put in Local as per operation requirement.
01 chargeable light repaired.
WTP HPP VFD panel sealing work done.
Bed Ash Cooler-1B Dome Valve Fault, Checked and found jammed so inform to OPD.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg, DT-5 temp 83 Deg, DT-6 temp 78 Deg.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report not send to all concerns. Due to report not open
DG Aux. report upload in SAP
Enmass-2 not start so check & found proxy switch malfunctioning to be check in G Shift
Coal Feeder-2B Clean run motor connection remove as per requirement of operation dept
Coal feeder -1B New motor trial work found current normal
Grid island at 22.21 pm & again synchronised at 22.51 pm
Unit-2 Coal feeder & BAC VFD Panel cleaning & Blowering work
Serviceair recevier-2 moisture drain continue so manual valve closed to be checked G Shift

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 79 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).

Following Equipment S/D Given.


1.COAL BUNKER -1C DISCHARGE MOV 01MV0907,
2.VIBRATING SCREEN-2,
3.EN-MASS CONVEYOR-2,
4.BC-5,
SH and Eng. Offices AC power ON.

Following Equipment S/D Clear.


1.INLET STEAM MAIN MOV AT 4.5 MTR., TURBINE-2, 02MV2305,
2.GENERATOR-2 SPACE HEATER,
3.AVR GENERATOR-2,
4.NLET STEAM BY-PASS MOV AT 4.5 MTR., TURBINE-2, 02MV2306,
5.GENERATOR-2,
6.EN-MASS CONVEYOR-2,

Following Equipment AVI Given and Clear.


1.EN-MASS CONVEYOR-2, (Loacl to Remote change over as per OPD requirement)
Environment and Plant performance report send to all concerns.
Bucket Elevator -2 VFD/DOL Local/Remote change over as per OPD requirement.
Bed ash cooler-1A and 15 Mtr Swass room Charging light provided.
EN-mass Cov-2 Proxy removed, due to not sensing. Also new proxy installed by G shift and Trial run healthy
and hand over for operation.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 82 Deg, DT-6 temp 75 Deg.
All Energy meter manual reading taken for Power Report.
BC-1 and BC-2 shut down given and cancelled after jam clearing work
DG Aux. report upload in SAP
Clean run 1A motor trial taken Amp balanced current 0.7A taken.
BC-1 belt taking more amps 39A and OFF after some time, so checked and found that belt is fill of Water
during its length
Instrument compressor-1 shutdown alarm coming in its PLC so reset it
WTP area fild Instrument cleaning work
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 79 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Following Equipment S/D Given.
1.COAL CRUSHER-1,
SH and Eng. Offices AC power ON.
BC-1 area location 270 Mtr. Rope broken, replacement are pending.
BC-1 Local/Remote change over as per OPD requirement.
EOP-2 Power ON and OFF as per operation requirement.
1 phase extension board provided in workshop.
BC-7A area transformer connection and lamp replaced.
VAM Floor new lock provided, and key are available with technician.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 80 Deg, DT-6 temp 78 Deg.
Bed material RAV hinj fixing work
BC-1 tail end Guard Limit pull rope adjusted to made it NC healthy
Following Equipment S/D Clear.
1. Coal crusher-1
SH and Eng. Offices AC power OFF .
Bed Ash cooler light provided.
SWAS room 6 stream silica panel drum sample-1&2 pu tube connection done
BC-1 Pull rope changed at 270 mtere pull card
Boiler-1 RSB-7 cable dressing done
cola bunker area LED light provided
T2 tower hand lamp repaired
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 82 Deg, DT-6 temp 75 Deg.
All Energy meter manual reading taken for Power Report.
IAC-1 Frequently trip due to Element temp. high so check compressor screw RTD found connector loose so
connector tight by cable tie trial taken found ok
DG Aux. report upload in SAP

Baghouse-1 21 no's vessel vibrator not running so check meegering value found 1 phase open & resistance
value not balanced motor 1 phase found open to be check G Shift connection remove from motor

Baghouse-1 vessel-21 level H-H so check & found material inside so inform to Desk engineer
Baghouse-1 11-21 balancing valve limit adjustment work done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 79 Deg.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Following Equipment S/D Given.
1.BC-5, 2. BC-5 hopper belt 3. Bag house air valve
Following Equipment S/D cleared
1.Coal feeder-2B 2. Coal bunker-1C MOV 3. Bed ash cooler-2B 4. Bag house air valve
soot blower-15 limit checked
Bag House-1 11-21 seal pressure checked found seal break now replaced by maintanance dept.
All office AC made ON as per requirement
Rubber mat palced at boiler-2 RSB-28
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
At 05:00 AM ACW-2 stopped during running condition, at that time other ACW 1& 3 are violate, pressure
goes to zero, So again ON all ACW pump and then after pressure comes to normal, and ACW-1 put in AUTO
mode, during this event ACW-2 set point also goes to ZERO, now system are running normal under
observation.
Bed ash cooler-1A both motor cleaning done.
WTP pump house Motor cleaning done.
Boiler-1 drain MOV, J valve MOV, APH JB and field equipment cleaning and blowering done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 79 Deg.
ACC-2 Area RSB-64 Cleaning & Rubber mat laying work
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Following Equipment S/D Given.
1street light LDB-5304-F , 2. Reclamier , 3. BC-1
CT-2 & CT-3 Motors both sides Lubrication work done
1 no's handlamp repaired at BC-2 Belt Conveyor
CT-2 &CT-3 Motors & Power JB Clenaing work
All office AC made ON as per requirement
Instrument air recevier-2 auto drain timer adjstment from 8 hrs to 1 hrs. due to heavy moisture
SWAS Room drum water pu tube installation done & nomiclature pasting at SWAS Panel
Coal feeder-1A Motor sound observed check & found fan cover loose so adjustment done now ok
Shift jobs carried
In Unit No. # 1 MVAR is not run in auto mode. So Decreased the excitation . Then put into auto
mode. Now it is running Normally.
In Coal feeder -1A techo is not showing at Controller side. So checked and found that Techo
motor cover is not properly fixed condition. So fixed the cover. Now ok.
As Per shift Incharge Unit no. # 1 Vessel no.-21 Purging is not done in auto mode. So checked
the DP Trasmitter. Its Impluse line is in chocked condition. So cleaned the impluse line and
tightness the fitting. Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At coal shed light ON as per operation requirement.

Following Equipment S/D cleared.


1Street light LDB-5304-F ,
2. Reclamier ,
3. BC-1
At Coal Feeder-1B hand lamp to changed.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Dosing room panel and equipment cleaning done.
Manual light OFF (BC-6), and manual light ON (CT fan area), as per operation requirement.
ACW-1 VFD panel and LDB panel cleaning done.
IAC-2 water valve SOV main air leakage, so PU tube tightness done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.
Reclamier cabin inside tubelight not glowing so rod adjustment now light glowing
All the Manual Light to OFF ( 22 mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Following Equipment S/D Given.
1. Reclamier , 2. BC-1
Following Equipment S/D Clear
1.Boiler-1 Bucket Elevator
CCR shift incharge deskPC mouse not working so check &trace cable found loose so put another port now
mouse working
SWAS Room drum water ( Sample-3) leakage so change fitting now working & leakage arrest
All office AC made ON as per requirement
SWAS Room silica superheated steam panel nomiclature sticker pasting work

Fire Pump House Fire Engine Battery & Charger Maintenance & Following activities carried
out-
1/ Battery Voltage check- 13.2 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
5/ Distriiled water topup in battery cell

Grid Supply ailure due to voltage fluctuation at 10.24 am & again synchrozined at 10.44 am
During shift round TG-1 Generator Protection Panel Equipment Earting alarm observed now alarm reset
after sometiomes to be underobservation during shift
Shift jobs carried
During shift round TG-1 Generator Protection Panel Equipment Earting alarm observed . So Informed to
Hement Sharma. Then Cleaned the carbon Brush at both the side of generator. Now no alarm is showing.
Under observation.
During CHP running BC-5 Belt is tripped. So checked and found that belt Tear is showing at
DCS end. So Checked at site and found that material on the Belt tear. So cleaned it. Now ok.

online CPCB and ETP website is not opened .


All the Manual Light to ON Condition.
At coal shed light ON as per operation requirement.
Following Equipment S/D Cleared.
1. Reclamier , 2. BC-1
At BC-7A / 7B area 01 Nos Hand lamp and Holder to Changed.
Unit No. # 2 Boiler area up to 3 rd floor light ON as per requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.

BAC-1A not starting from local push button as per requirement so checked found "OPF" alarm on
VFD,afterwards checked towards motor end -resistance & megger value found healthy.work is U/P

Manual light OFF (BC-6), and manual light ON (CT fan area), as per operation requirement.
Light lamp arranged for 22mtr floor operation team.

Shift jobs carried


Unit No. # 1 BAC-1A is not started Local as well as Remote. After Some Times it will be tripped
on OPF Fault. So Changed the VFD from Unit No. # 2 BAC . Then trial taken still it is tripped on
OPF fault. So Informed to hement sharma . He comes at site. Then Local VCS is checked then it
is in OFF Condition.So ON the VCS. Then Trial taken . it is working Normally. Presently it is
running in Local mode.
Unit No. # 2 BAC-2B VFD mounted in the panel also all the connection done.
Unit No. # 1 BAC-1A Inst. Side permit Closed also Inst. Air Valve is in Opened Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. BC-1,
2. Reclaimer ,

At Reclaimer area Extension board to provided as Per mech. Requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power OFF .
FAS-2 truck loading system check as per operation requirement, found running healthy.
Screen floor equipment cleaning done.
Drain pot-2 area De-watering pump starter contactor cleaning done.
CHP coal shed area lighting timer power OFF, so ON done.
BC-7A/B motor cleaning done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.

Coal feeder -1A level showing false at DCS so MCB off & reset

1 no's handlamp repaired atCoal feeder- 1B


Light lamp arranged for 22mtr floor operation team.
TG- 1&2 0 mtr MOV Cleaning work done
Following Equipment S/D Given.
1. Coal feeder 1B
Silo Roots Blowers 1&2 motors cleaning work

Shift jobs carried

In BAC # 1A Seal Pr. Guage is not showing at DCS end. So at site found that Seal pr. Guage is
not present at site. So Installed the seal pr. Guage then trial taken it is working Normally.

In BAC-1A permit is in closed condition and put into Remote mode.


In Fly ash Silo No. # 2 Rubber mat laid at panel end.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1. Coal Feeder -1B pneumatics Valve,
2.Coal Feeder -1B Discharge MOV ,
3. Coal Feeder -1B,
4. Vibrating Screen No.-2 ,

Following Equipment S/D Cleared.


1. Coal Feeder -1B pneumatics Valve,
2.Coal Feeder -1B Discharge MOV ,
3. Coal Feeder -1B,

Coal Feeder -1B AVI is given also Closed the AVI.


In Switch yard side In Transfomer - 1 /2 OLTC panel Rubber mat to laid.
At 22 Mtrs , Coal feeder area and Coal shed light to OFF.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 84 Deg C , DT-6 temp 81 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power OFF .
Following Equipment S/D Clear.
1.Vibrating Screen-2,
2. Reclaimer ,
3. BC-1,

Following Equipment AVI Given & Clear.


1.BC-1,
2.Reclaimer,
Main Transformer -1 silica gel replaced. (and removed silica put in oven for charging)
Boiler are 02 extension board removed & shift to workshop and shift almirah.
Reclaimer pull cord switch act, so reset it.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.

Chimney Analyser room Panels Cleaning works


Chimney Analyser room Panels Cleaning works

BFP-1 ,2 &3 Motors cleaning work


Reclamier Boom trip due to overcurrent reset done now ok
Coal feeder-1A Hz incresed from 7 Hz to 9.5 Hz as per requirement of operation dept
Monthly Power Report Balanced upto 28/08/2022
Boiler-1 lift coems in 0 fault at 5th floor so power supply off from cabin

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON.
Following Equipment S/D Clear.
1.Vibrating Screen-1,
2.Vibrating Screen-2 ,
Staircase light and PA system abnormality attend and inform to operation.
Boiler-1 Lift machine room pulley reset and trial run healthy, and hand over for operation.
EOP-2 Power ON and OFF as per operation requirement.
Silo PA system receiver connection issue resolved and now running healthy.
GSC -1A motor fan cover loose, so tightness done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 80 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
Switchyard Transformer LT panels staires Rubber mat placed
SH and Eng. Offices AC power OFF .
Following Equipment S/D Clear.
1.Vibrating screen-1
2. Vibrating screen-2
Bunker Levlel transmitter power reset once
Main Transformer -2 silica gel replaced. (and removed silica put in oven for charging)
Coal shed area lights ON as per requirement
ETP data cross checking work
Power Cable connection done in New vibration sysytem near PA Fan-1

Shift jobs carried


MVAR is in Local mode. So put into Auto mode. Also running Normally.
In Compressor House all the auto drain valve checked and working normally.
In BAC-1A and 1B level Probe Cover to provided.
Fly ash Area Field Inst. And Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.

In Unit No. # 1 Coal Feeder -1B techo motor cover loose condition. So Tight the cover. Now Ok.
LED Light Put into Charging mode at 4.5 mtrs.
Fly ash root blower panel and Motor Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 79 Deg C.
compressor house auto drain valve manually checked found healthy.
Coal shed area lights ON as per requirement
SH and Eng. Offices AC power OFF .
Following Equipment S/D Clear.
1.BC-1
2. BC-3
3. Reclamier
Switvhyard Footpath Walkway Painting work
Monthly Power Report Balanced upto 30/08/2022
BC-3 Takeup pully Zig zag limits assembled & Checked
BLR#1 11-21 comes in seal pressure fault checked field side Seal pressure tubes removed condition so
reconnect it now ok

Shift jobs carried


In Coal Crusher No.-2 Meter Reading is showing Error. So Control Supply is OFF then ON the
supply. Now Ok.
In BAC-1A Level probe cable dressing to done.
Chimney Analyzer Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Following Equipment S/D Given abd Cleared.
1.BC-1
2. BC-5

At BC-7A / 7B area Hand lamp to changed.


urrent balanced
a
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

01.09.2022 A Tarun Gaur

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


01.09.2022 B Tarun Mandawat

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


01.09.2022 C Gajendra Pandya SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


02.09.2022 A Tarun Mandawat

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal except
SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


02.09.2022 B Tarun Gaur

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal except


02.09.2022 C Gajendra Pandya SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


03.09.2022 A Tarun Gaur
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

03.09.2022 B Sanjay Garg


UPS Check List filled.
03.09.2022 B Sanjay Garg
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


03.09.2022 C Gajendra Pandya SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


04.09.2022 A Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

04.09.2022 C Tarun Gaur


RNRP all nodes found Normal except
SPC004.
04.09.2022 C Tarun Gaur Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled

05.09.2022 A Sanjay Garg


UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

05.09.2022 B Ashvin Jadav


05.09.2022 B Ashvin Jadav

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal except


SPC004.
05.09.2022 C Tarun Gaur Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

06.09.2022 A Ashvin Jadav


06.09.2022 A Ashvin Jadav
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

06.09.2022 B Gajendra Pandya


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

06.09.2022 C Sanjay Garg RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

06.09.2022 A Ashvin Jadav

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


07.09.2022 B Tarun Gaur

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

07.09.2022 C Sanjay Garg


07.09.2022 C Sanjay Garg RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


08.09.2022 A Tarun Gaur

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

08.09.2022 B Tarun Mandawat

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
08.09.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

09.09.2022 A Gajendra Pandya

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

UPS Check List filled.

09.09.2022 B Sanjay Garg


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
09.09.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

10.09.2022 A Gajendra Pandya


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


10.09.2022 B Sanjay Garg
Shift instrument digital log book filled
10.09.2022 B Sanjay Garg

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


10.09.2022 C Tarun Gaur Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


11.09.2022 A Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


11.09.2022 B Ashvin Jadav

UPS log digital log book filled.


11.09.2022 B Ashvin Jadav

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


11.09.2022 C Tarun Gaur Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

b) Generator-2  checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

12.09.2022 A Sanjay Garg UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

12.09.2022 B Ashvin Jadav


12.09.2022 B Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.

12.09.2022 C Tarun Gaur

VAM log digital log book filled.

Following check list prepared

b) Generator-2  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

13.09.2022 A Ashvin Jadav

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
13.09.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

14.09.2022 A Ashvin Jadav

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

14.09.2022 B Tarun Gaur

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal.


14.09.2022 C Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

15.09.2022 A Tarun Gaur


UPS log digital log book filled.
15.09.2022 A Tarun Gaur

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
15.09.2022 B Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
15.09.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


16.09.2022 A Tarun Gaur UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

16.09.2022 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
16.09.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
16.09.2022 C Ashvin Jadav

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


17.09.2022 A Sanjay Garg
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


shift round taken drives running normal

RNRP all nodes found Normal.

17.09.2022 B Tarun Gaur

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

18.09.2022 B Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
18.09.2022 C Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

19.09.2022 A Gajendra Pandya


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
b) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

19.09.2022 B Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal.


19.09.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

20.09.2022 B Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal
RNRP all nodes found Normal.
20.09.2022 C Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

21.09.2022 B Ashvin Jadav

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
21.09.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

22.09.2022 B Gajendra Pandya

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
22.09.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

23.09.2022 B Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

23.09.2022 C Ashvin Jadav


a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

24.09.2022 A Gajendra Pandya

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
b) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


24.09.2022 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
24.09.2022 C Amit kumar singh
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

25.09.2022 A Sanjay Garg UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
25.09.2022 A Sanjay Garg

VAM log digital log book filled.


a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.

26.09.2022 B Ashvin Jadav

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

26.09.2022 C Sanjay Garg


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


27.09.2022 A Ashvin Jadav

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal.


27.09.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.

28.09.2022 A Ashvin Jadav

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

28.09.2022 B Gajendra Pandya

VAM log digital log book filled.


Following check list prepared

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal.
28.09.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
29.09.2022 B Gajendra Pandya

VAM log digital log book filled.


Following check list prepared

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


29.09.2022 C Ashvin Jadav
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

30.09.2022 A Gajendra Pandya

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


30.09.2022 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
30.09.2022 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.BC-6 ,
2.BC-7B &BC-7A
3. BC-5
4. Coal feeder-1B
5. Coal feeder 1Bdischarge MOV
6. Coal feeder 1B Pneumatic valve
7. ACC-2A
8. ACC-2A Lube oil
1 no's extension board handover to mr. sharvan singh
Folowing Equpiment S/D Clear
1/ Coal feeder-1B
2/ Coal feeder-1B Discharge MOV
3/ Coal Feeder -1B Pneumatic valve
Mech. Maint. Grinder Plug top replaced work
Lube oil 2A Motor connection removed as per requirement of Mech. Maint. Dept
SH and Eng. Offices AC power ON.
Bag House-1 12-22 seal pressure fault line flushing done now ok
Unit-1 MV Drive room false ceiling found fall so refixing done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

Inst. Air header diversion line near baghouse-1 leakage arrested .

Following Equipment S/D Clear.


1.BC-6 ,
2.BC-7B &BC-7A
3. BC-5
4. ACC-2A
5. ACC-2A Lube oil
handlamp fault rectied at T-2 tower as per operation requirement.
Lube oil 2A Motor having some abnormal sound after decoupling ,so replced with new motor, trial done wo
healthy.
SH and Eng. Offices AC power made OFF
Boiler-2 APH air leakage arrested .

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 80 Deg, DT-5 temp 82 Deg, DT-6 temp 80 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Spare cable shifted from switchyard to Electrical workshop
coal feeder-1Cand1D motor cleaning done
TPP Area unwanted lights OFF
Boiler-1 bag house vessel 12 level high , so clean the level probe
Dosing room field equipment cleaning done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 85 Deg, DT-6 temp 82 Deg.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-5
2. BC-5 ground hopper motor
3. BC-4
4. Reclaimer
Boiler-2 field instruments preventive checking & PU tube replacing work at boiler-2 APH
Boiler Welding machine double earthing done.
Crusher ground floor welding machine green stickering done.
Boiler-1 running smoothly in APC mode.
SH and Eng. Offices AC power ON.
Boiler-1 1C,1D & 1B coal feeder vfd max rpm locking increased from 15hz to 18 hz.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

Boiler-11 APH Vessel no.2 Level probe GI Cover Provided

Following Equipment S/D Clear


1. BC-5
2. BC-5 ground hopper motor
3. BC-4
4. Reclaimer
Baghouse-1 11-21 & 12-22 SOV Panels cleaning work
Lube oil 2A Motor having some abnormal sound after decoupling ,so replced with new motor, trial done wo
healthy.
SH and Eng. Offices AC power made OFF
Swithcyard lights not glowing so check & found lighting timer stuckup so reset now ok
T1 tower & Coal Shed area Light ON

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
CHP DCS module NPN card fault came and reset automatically in few seconds
Boiler-1 RSB-7 rubber mat provided
TPP Area unwanted lights OFF
Reclaimer boom left right VFD trip in over load once, so inform to shift incharge
VAM floor panel blowing done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 82 Deg, DT-5 temp 85 Deg, DT-6 temp 80 Deg.


compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-1
2. Reclamier

Coal feeder area & 22 Mtr Area RSB Panel Green Tag Updated done
New Rubber mat provided at Coal feeder area Blaster Panel & Switchyard GT -1 Fan JB
Boiler-1 lift Housekeeping & Telephone Repaired work
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.2 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
SH and Eng. Offices AC power ON.
ACC-2 Area Earth Pit top cover Provided
BAC 1A &1B Field Panel Rubber Mat Provided Done
Shift jobs carried
As per AP Shirvastava requirement , In BC-5 Head end 02 Nos Street Light is not ON Condition from long tim
So checked and found that wire is removed from JB. So reconnected the wire. Then Trial taken it is working
normally.

In Unit no. # 1 Generator Voltage is increased up to 11.44 Voltage. So reduced the OLTC tap changed. Now O

In Boiler No. # 1 SOX analyser , chiller unit is not working condition. So changed the relay also Fan is in jam
condition. Also trial taken . It is not working condition. So Informed to tarun.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At coal shed light ON as per operation requirement.
Following Equipment S/D cleared.
1. Reclamier ,
2. BC-1
In BC-7A / 7B Light is not ON condition. So checked and found that MCB is OFF Condition. So ON the MCB. N
Ok.
In Unit No. # 1 and 2 Coal feeder area Light is not ON condition. So checked and found that Lighting timer is
structed condition. So Reset it. Now Ok.
In Unit No. # 1 Vessel No.-12 Level Probe high is not showing at DCS end. So cleaned and calibrated the leve
probe. Now Ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 83 Deg, DT-5 temp 83 Deg, DT-6 temp 81 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
APH seal pressure switch line flushing done
APH back pressure transmitter line flushing done
APH-1 vessel-1 seal checking done
GSC-1A and 1B motors blowring done
TPP Area unwanted lights OFF
Shift jobs carried
In Boiler No. # 1 SOX analyser , chiller unit is not working condition. So changed the chiller unit from WTP l
spare chiller unit. Also trial taken . It is not working condition.
In Compressor House all the auto drain valve checked and working normally.
In Unit No. # 1 Bag House Vessel No.--21 Dome Valve PU Tube dressing to done.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 2 EOP Pump Power ON/OFF as per Operation requirement.
In Coal Shed area Light to OFF.
In BC-7A / 7B Light and Unit No. # 1 and 2 Light to OFF.
In BC-7A / 7B area hand lamp to changed.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..

DT-2 temp 83 Deg, DT-5 temp 83 Deg, DT-6 temp 81 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Clean run 1B new Motor connection done & trial taken found running reverse direction so connection chan
from VFD Panel side MCB now running normally
APH-1 vessel-1 seal checking done
WTP Hall E&I Equipment cleaning work
Bucket Elevator-2 Put on Local mode as per rquirement of operation dept. now after Jammed clear again pu
Remote mode
Shift jobs carried
In Unit no. # 1 APH Vessel No.-2 Dome Valve closed feedback is not showing at DCS end. So closed Limit set
manually operated 2 to 3 Times. Now Ok.
In Unit no. # 1 APH Seal pr. Is not showing at DCS end. So Cleaned the impluse line. Now Ok.
Unit No. # 1 Vessel No.- 11/21 and 12/22 field Inst. Cleaning and Blowerning to done.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1. BC-1
2. BC-2
3. BC-5

In Coal Feeder -1B Clean run tripped due to O/L. So Reset it as per operation requirement.
At VAM Unit No. # 1 and 2 Coal feeder area Lighting Timer is not working condition. So checked and found
clock supply is OFF. So ON the MCB. Also Set the ON/OFF time of the clock. Now Ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power OFF .
Following Equipment S/D Given.
1.COAL FEEDER-2D DISCHARGE MOV, 02MV0912,
2. MAIN STEAM MOV, BOILER-2, 02MV2301,
3. BLR-2_IGN-1,
4. UNIT-2 SOOT BLOWER POWER-1,
5.COAL FEEDER-2C DISCHARGE MOV 02MV0911.
6. COAL FEEDER-2A DISCHARGE MOV 02MV0909,
7. SA FAN-2 LT MOTOR / 02AN0903,
8. P FAN-2,
9. J-VALVE-2A (VVFD)
10. PA FAN-2
11. ID FAN-2,
12. J-VALVE FAN-2A (DOL),
13. COAL FEEDER-2B DISCHARGE MOV 02MV0910.
14. BOILER-2 IGNITOR-2,
15. BLR-2 DE-SUPER HEATING I/L MAIN (MOV) 02MV3210,

Following Equipment S/D Clear.


1. BC-1
2. BC-2
3. BC-5
C7A/B Pull cord manual operate/reset and status checked in DCS.
SA-1 bearing temp 01TI0923 hunting, so JB connection tightness done, and under observation.
Crusher area street light ON condition, so checked and found timer bypass, so taken in line.
Crusher building LDB earthing open, so connection tightness done.
Clean run 1B tripped in overload, so reset done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..

DT-2 temp 83 Deg, DT-5 temp 83 Deg, DT-6 temp 79 Deg.


compressor house auto drain valve manually checked found healthy.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
BLR#1 APH Line common outlet conveying solenoid valve limit gland found remove condition so gland tigh
done & limit adjustment done
BLR#1 6no's drain mov cleaning done
VAM tripped due to High vapour temperature, reset and trial found healthy.
ACC-2A lube oil motor trip due to overload now reset & current checked found R-2.1 amp , y-2.2 amp , b- 2.
amp , so inform to shift incharge mech side checking pending
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON .
Following Equipment S/D Given.
1.FLY ASH SILO-2 DRY UNLODAING PNEUMATIC VAlVE,
2.BC-6 (02 times),
3. Coal Crusher-2,
ACC-2A LOP relay setting change from 2.1 A to 2.3 and trial run healthy also SFU ON/OFF issue resolved.
Fire Engine trial taken found running healthy.
Following Equipment S/D Clear.
1. BC-6
Solar (YMH) consumption update and upload in SAP.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 84 Deg C, DT-5 temp 84 Deg C , DT-6 temp 82 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
AVI given to Bucket Elevator-2
Following Equipment S/D Given.
1.Bucket Elevator-2
Following Equipment S/D Clear.
1. Coal crusher-2
2. BC-6
Grid parameter hanged due to meter power OFF from MPSS side shutdown at 2.30 p.m, Now temporary supply given to G
meter and resume the Data normal
ACC-2A fan motor NDE bearing found minor sound
Lub oil pump of ACC-2A trip , so checked and found relay setting is less than motor name plate rating now relay setting
incfreased to 2.6 amps, running normal during shift
Boiler-1 APH-1 seal pressure fault came, need to check further
switchyard side lighting timer adjusted
Shift jobs carried
MVAR is in Local mode. So Decreased the excitation also put into Auto mode. Also running Normally.
In Compressor House all the auto drain valve checked and working normally.
In CHP Bucket Elevator No.-2 Put into Remote and VFD mode. Also AVI and permit to closed.

In Unit no. # 1 APH Seal pr. Is not showing at DCS end. So Cleaned the impluse line. Also checked the master
Vessel seal Pr.-4.5 kg/cm2 while slave Vessel is showing 3.0 kg/cm2. So Informed to shift Incharge.

Electrical Report is generated.


EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON .

Following Equipment S/D Given.


1.APH-1 INST AIR VALVE,
2.BUCKET ELEVATOR-2,
3. Coal Crusher-2,
4.Vibrating Screen-1,
5. Vibrating Screen-2,

APH svessle-2 pressure gauge fitting, air tube, dome limit, level probe disconnect as per MMD PTW, and Connect as per
requirement.
Fly ash silo-2 control panel door lock provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 82 Deg C , DT-6 temp 81 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
AVI given to Bucket Elevator-2
Following Equipment S/D Clear
1.Bucket Elevator-2
2.creen-1 &2
3. APH -1 Vessel-2

Following Equipment S/D Clear.


1. Coal crusher-2
2. BC-6
4.5 mtr. Exhaust fan DOL sarter 1no's Earthing found damaged so repair & again connect
APHsvessle-2 pressure gauge fitting, air tube, dome limit, level probe connect as per MMD PTW
APH Vessle -2 Dome valve limit found damaged condition so replaced by sparet trial taken found ok
CHP DCS Room back side door Packing by Packing tape
Sootblower-1 cabinet control MCB trip so check & found control cable insulation damaged & touch body so damaged insu
cut & cable connect now cabinet supply healthy
Office AC Supply OFF
Shift jobs carried
In Unit No. # 2 Lift Telephone is not working found that dial tone is not present in Telephone. All other lift
telephone is working normally.
In TG # 1 Lift sensor adjustement to done.
Unit No. # 1 Vessel No.- 12/22 seal pr. is not showing at DCS. So cleaned the impluse line. Now Ok.
Coal Feeder -1B Bunker O/L MOV (01MV0906) giving the open Command then motor is operating But valv
not opened. When we try to manually then lever in not disinaged. To be check.
At BC-2 area Hand lamp to repaired.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
BFP-1 , 2 and 3 Motor Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 80 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON .

Following Equipment S/D Given.


1.V.Screen-1
2.V.Screen-2
3. BC-4
4.Soot Blower-1

Boiler-2 LIFT Telephone not working so check & found connector cable faulty so repalced by spare cable now telephone w
normally
Fly ash silo-2 control panel door lock provided.
STG Building lift IR sensor Packing & Adjustment work
BFP-3 MV Drive filter cleaning work
2 no's LED Lights repaired & handover to operation team at coal feeder-1 area
Boiler-2 ift cabin faulty light replaced by new now glowing
1 no's 24 V transformer faulty socket repalced by new socket at coal feeder -1 area
Monthly Power Report Balanced upto 07/09/2022
Coal feeder-1B Outlet MOV Motor decoupled & trial taken found current R- 1.4 amp , Y- 1.1 Amp & B- 1.4 Amp
WTP ETP Panel Calibration stikcer update done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 82 Deg C , DT-6 temp 81 Deg C.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
Hand lamp repair at 22mtr floor as not working
Boiler-1 bunker discharge MOV-1b limit setting done as per operation requirement, and trial done from DCs.

Following Equipment S/D Clear


1.V.Screen-1
2.V.Screen-2
3. BC-4
4.Soot Blower-1

Boiler-1 bed temperature 01ti1118 not showing healhty so checked & tightness done at field JB , afterwards showing healt

Boiler top fire header pr. Gauge checked found healthy, stickering done.
All office Ac supply made off .
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Manual light OFF (BC-6), and manual light ON (CT fan area), as per operation requirement.
TG floor LDB 7 and 8 earthing loose, so re-lugging done.
WTP MCC cleaning and blowering done.
Boiler-1 Vessel No.-11 and 12 High Level Probe is showing at DCS end. So Cleaned and calibrated it. Now ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 82 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON .

Following Equipment S/D Given.


1.Bucket Elevator-2
2. BC-1
3.Reclaimer
4. Bag filter BC7AB
5. APH-1 Instrument air valve

Boiler-2 LIFT Telephone not working so check & found connector cable faulty so need to replace
21-22 vessel seal pressure checking and line flushing done

Shift jobs carried


In CHP EN-mass No. -2 is Tripped. Max current at DCS is 17.35 Amps. At feeder side O/L is showing so Rese
As per operation Person Chain is sliped condition. So Line no. # 1 is started.
In Bed ash silo RAV is tripped due to O/L. So reset it. Now Ok.
In Reclaimer Top cabin Emergency switch connection tightness to done. Then Trial taken. It is working
Normally.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In Unit No. # 1 APH shutdown cleared and Inst. Isolation valve is opened.

Following Equipment S/D Cleared.


1.Bucket Elevator-2
2. BC-1
3.Reclaimer
4. Bag filter BC7AB
5. APH-1 Instrument air valve

In Unit No. # 1 APH main Inst. Line Valve air leakage arrested.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
BC-7A/B Motor cleaning and blowering done.
22 Mtr. Area hand lamp repaired and hand over to operation team.
CHP MCC back side door hole sealing and packing done.
Boiler-1 Vessel No.-11 and 12 High Level Probe is showing at DCS end. So Cleaned and calibrated it. Now ok.
Dosing room field equipment and panel cleaning and blowering done.
Boiler-1 drain MOV cleaning and blowering done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 84 Deg C, DT-5 temp 85 Deg C , DT-6 temp 83 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc.).
SH and Eng. Offices AC power ON .
Following Equipment S/D Given.
1.Enmass-2
2. BAC-1B dome valve solenoid
3. BC4
Enmass-2 trip from DCS so checked and found jamming need to clear
Crusher-1 stop in bearing temprature high 84c
Gauge marking done at CEP-1B discharge gauge
Bag house-12-22 puppet valve MCB found trip, now rectify it
CHP DCS outdoor AC earthing tightness done
Portable grinder plug top replaced
CEP area and CHP DCS blowring done
Hot well positioner control valve gland seal with putty
Shift jobs carried

when in CHP EN-mass No. -2 S/D is cleared. Then after some time CHP EN-mass No. -2 is Tripped. At site
supporting structure is damaged condition. Then Line No. # 1 is started. After Some time EN-mass No.-1 Tr
due to broken of chain hook. After Completion of Mech. work then Line # 1 is started. Now it is running nor

LED Light is Provided at EN-mass area in CHP.


In CCR Lift at Floor No.-2 Push Button Cover packing to done.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In Unit No. # 1 BAC-1B shutdown cleared and Inst. Isolation valve is opened.
Following Equipment S/D Given.
1.Enmass-2
Following Equipment S/D Cleared.
1.Enmass-2
2. BAC-1B dome valve solenoid
3. BC4

In Chimney analyser room panel cleaning and Blowerning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP

Baghouse-1 vessel-12 vessel seal pressure fault so checked & found pu tube leakage so change pu tube & leakage arrested

Baghouse-1 12 nos vessel gauge found faulty so replaced by new one


Doosing room motors cleaning & blowering work
Dosing room field equipment and panel cleaning and blowering done.
Shift jobs carried
In Unit No. # 1 Master UPS System Continuous Showing Fan Failure alarm in Local Display Panel. Need to ch

Bed Ash Cooler -1A Dome Valve is not Operating from DCS end. So manually it is operated from 2 to 3 times
working normally.
Bed Ash Cooler -1A Local panel Rubber mat to laid.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Coal Shed area Light to OFF.
In WTP repair Supply Box No.-76 Green tag to provided.
In WTP area motor Cleaning to done.
Following Equipment S/D Given.
1. Vib. Screen No. -1

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 84 Deg C, DT-5 temp 85 Deg C , DT-6 temp 80 Deg C.
Raw ,material feed system line gauge packing tap provided.
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase ACW and Switchyard etc. ).
BLR-1 lift inside JB door open so packing done.
Following Equipment AVI Given and Clear.
1. EN-Mass Conv-2 (Also put in Local/Remote as per MMD requirement.
Following Equipment S/D Clear.
1.Vib. Screen.-1
2. EN-Mass Conv-2.
24v transformer & 02 hand lamp provided at 15 meter, and welding m/c connection given 1D Bunker area.
Fire water pump-1 put in Local.
BC-2 and BC-5 motor and power JB cleaning done.
Jockey pump 2 pressure switch setting changed from 3 to 2 Kg/Cm2 as per requirement.
U-2 Bed ash cooler level probe JB sealing done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
BAC=1A &1B Field Panel & Level Probe cleaning work done
TG-2 9 mtr. All Pressure switch covering by packing tape & tansmittor & control valve cleaning work done
GSC Blower 2A &2B Motor Cleaning work
BAC-1A not start so check & found J2 relay open & running to be chec k pressure switch in G Shift
4.5 mtr. MV Drive room 230V Supply Board Green tag updated done
Shift jobs carried

In BAC No. # 1A Pressure switch Relay opened at Panel end. So checked at site and found that PS is not Pres
at site only connector is available at site. Due to leakage of water in BAC-1A. Water inside the connector. So
removed the connector also tapeing to done in both the wire. Also Relay mounted in the panel .Now ok.

In BAC No. # 1A level Probe is showing High Value. So Cleaned and calibrated the level probe. Now Ok.

In Unit No. # 1 fly ash system Vessel No.-12 / 22 seal Pr. Is not showing at DCS end. So cleaned the impluse
Now Ok.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1.Bucket Elevator -2
2. BAC-1A,
3. CT Fan No.-22
4. Vib Screen No.-1

Unit No. # 1 Coal Feeder -1D Clean run motor O/L. So Reset it as per operation requirement.
In CEP-2B Motor earthing to done.
In Mech. Grinder Green Tag to provided.
In UPS Room 02 Nos Tube Rod to changed.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 85 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
BAC-1A overflow, so level probe calibration done and handover for operation.
N-pit platform area cable dressing done.
Following Equipment S/D Clear.
1.Bucket Elevator -2
2. BAC-1A,
3. CT Fan No.-2
4. Vib Screen No.-1

U-1 Coal bunker level transmitter cleaning done.


BLR-2 area 24v LED and extension board provided for fire line work.
Coal feeder area 24v LED and hand lamp provided.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Coal Feeder -1D motor open s per requirment of operation dept.

Following Equipment S/D Given


1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov

Following Equipment AVIGiven


1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov

2 NO'S handlamp repaired at Coal feeder -1D Area


Chimney analyser room SOX-1 &2 Panel geen tag updated done
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 85 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made ON .
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
EOP-2 Power ON and OFF as per operation requirement.
1D clean run motor direction reverse/forward as per OPD requirement.

Following Equipment S/D Given.


1. COAL FEEDER-1D,
2. BELT CONVEYOR-7B (BC-7B),
3. BELT CONVEYOR-7A (BC-7A),
4. BC-1,
5. IBD Pump 1 & 2,

Following Equipment AVI Given.


1. COAL FEEDER-1D,
FAS-2 plate valve not operate so power reset and trial run healthy.

Sootblower-1 cabinet control MCB trip so check & reset, also soot blower-1 manually out/reverse as per OPD requirement
Coal fefder-1D main motor connection done.

Shift jobs carried


In Unit No. # 1 APH JB / All the SOV Connection tightness and Cleaning to done.
In Unit No. # 1 Coal feeder -1D level is not showing correctly. So power supply reset. Now ok.
In Compressor House all the auto drain valve checked and working normally.
AVI is given to Coal Feeder - 1D.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP

In Coal Feeder -1D 24 Volts hand lamp to repaired and LED light provided as per operation requirement.
In Inst. Air Compressor No.-1 and 2 Power JB and Motor Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
CT fan -1 isolation time CT fan-1 & 2 stop from DCS, and then CT-1 isolate from field panel, after LOTO providing, CT fan-2
started from DCS, Kindly follow this procedure vice-versa at S/d clear time also.
All office Ac supply made ON .
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
EOP-2 Power ON and OFF as per operation requirement.
Sox factor changed in CPCB PC and DCS 0.3 to 0.2 as required by Operation team

Following Equipment S/D Given.


1. COAL FEEDER-1D,
2. COOLING TOWER FAN-1,
3. EN-MASS CONVEYOR-2,
4. BH-1, 12-22 INST AIR VALVE,
5. COAL CRUSHER-1,
6. VIBRATING SCREEN-1,
7. VIBRATING SCREEN-2,
8. Reclaimer,

Following Equipment AVI Given.


1. COAL FEEDER-1D,
CT fan area cable dressing done.
24v light repaired at elect workshop.
one Charging light received and put in charging, and other light given to operation team.

BH-1, vessel 12-22 seal pressure fault, so line flushing done, and seal pressure check, also MMD side seal replacement wor
connection removed and again connect after MMD work completed for seal replacement, and hand over for operation.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 85 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
BAC-1A overflow, so level probe calibration done and handover for operation.
Compressor House SAC-2 waterwall line SOV pu tube fitting found broken condition so fitting replaced by new one & SOV
in line

Following Equipment S/D Given.


1. COAL FEEDER-1D,
2. COOLING TOWER FAN-1,
3. EN-MASS CONVEYOR-2,
4. COAL CRUSHER-1,
5. VIBRATING SCREEN-1,
6. VIBRATING SCREEN-2,
7. Reclaimer,

Following Equipment S/D Given


1.Coal feeder-1B
2. Coal feeder-1B Mov
3. Coal feeder -1B Pneumatic mov

Col feeder 1B area handlamp repaired work


Coal feeder area 24v LED and hand lamp provided.
Boiler-1 mech. Grinder damaged plugtop repalced by new one

Shift jobs carried

In Unit No. # 1 Coal feeder -1D level is started from DCS. It is not started. Then Started in local mode. VFD st
but feeder is not running. Then Increased the RPM. Due to heavy load on the belt around 100 Kg. Then alarm
A2010 is showing on VFD display. Motor Over temp. So informed to Shift Operator

Unit No. # 1 and 2 TG Building zero mtrs field inst. Cleaning to done.
Permit to Coal Feeder - 1B.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
TG-1 MOT Tank side light ON as per operation requirement

In Coal Feeder -1C Clean run Motor O/L ( 03 Times ) and Coal Feeder -1D Clean Run O/L Reset 01 times.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
All office Ac supply made ON .
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
EOP-2 Power ON and OFF as per operation requirement.
Sox factor changed in CPCB PC and DCS 0.3 to 0.2 as required by Operation team
Following Equipment S/D Given
1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov

Following Equipment AVI Given


1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov

Chimney analyser room Window packed by packing tape


UPS-1 master panel packing by packing tape
APH -1 pressure not shows so line flushing done now ok
Coal feeder area lighting timer adjustment done(VAM Room )
RSB-32 Panel Rubber mat laying work
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 81 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
Hand Lamp prepaired 3 Nos in workshop
coal feeder I B pnumatic valve open limit not showing at CCR, so checked and set the limit
Desuperheating valves spindel lubricate for smooth operation
CCR AHU manual mode, so change in auto mode
Coal feeder-1D AVI given to tauqueer
coal feeder-1D trip in motor stall protection and motor not running, still jam clearing work under progress

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Manual Light to ON ( BC-5 hopper, BLR-1 Bag house etc. ).
Silo roots blower motor and panel cleaning done.
Barring gear-1 motor and panel cleaning done.
Boiler-1 Vessel No.-11 and 12 High Level Probe is showing at DCS end. So Cleaned and calibrated it. Now ok.
BLR-1 Drain MOV, and J valve MOV cleaning and blowering done.
Coal feeder-1D AVI Close.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
All office Ac supply made ON .
All the Manual Light to OFF ( 22 Mtr Bunker, Coal feeder, Coal shed. MPHB staircase etc. ).
Coal Feeder-1D Bunker level flucuation so reset transmittor power supply now ok
Following Equipment S/D Given
1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov
4. Enmass Conveyor-1
5. Bucket Elevator -1

Following Equipment S/D clear


1.Coal feeder-1D
2. Coal feeder-1D Mov
3. Coal feeder -1D Pneumatic mov

Zishu Hozen at Boiler-1 Area


IAC-2 Trip due to Element temprature high due to normal element temprature clearance given to CCR
All Office AC ON During Morning
Soot Blower-1 not start due to DCS & Field Panel side control fuse blown checking work U/P
RSB-21 Panel Rubber mat laying work
Shift jobs carried

In Unit No. # 1 Soot Blower Drain MOV ( 01MV0702 and 01MV0703) feedback is not showing at DCS end. So
Checked at Panel side in Relay Loop wire is damaged condition. So New wire is provided. Then trial taken fr
DCS end. Both the MOV is working normally. All oil top up and restoliene provided at Valve side.

In Unit No. # 1 Soot Blower No.-9 is not operating from DCS end. So checked and found that Backward limit
switch Position is not correct. So corrected the Limit switch Position. Then Trial taken it is working Normal

In VAM System is tripped due to High Vapour Temp. So reset it. Then it is started it is working normally.
Only Soot Blower No.-1 and 14 is not running condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. Enmass Conveyor-1
2. Bucket Elevator -1
Coal shed Light ON as per Operation requirement.
T-1 Tower Lighting Time ON time set to 6.00 PM.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
BC-6 Motor and panel cleaning and blowering done.
Lighting booster transformer cleaning and blowering done.
Dosing room panel and field equipment cleaning and blowering done.
Vam area water leakage bucket drain done.
BH-1vessel-22 level high, so level probe cleaning and trial run healthy.

Shift jobs carried


In Fly ash Silo No. # 2 gate valve is not operating in auto mode. So Checked and found that Closed limit swit
not showing. So adjust the limit switch. Trial taken. It is working normally.
In Unit No. 3 1 Soot Blower No. # 14 is not operating from DCS end. So checked and found that at field side A
Switch is burn. Also internal wiring is rustrated. When giving the Command Then Control MCB is tripped. S
Informed to Pandaya Ji.
In Unit No. # 1 Vessel No.-11/21/12 and 22 Level Probe high is not showing at DCS end. So cleaned and
calibrated the level probe. Now Ok.
P&V 4 and 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
At GSC -1A , 1B Motor Cleaning to done.
At 22 mtrs , 24 Volts hand lamp to Repaired.

Unit-1 sootblower #14 Damaged Selector switch replaced & Field Panel side Old Wire replaced by new wir
Rusted Old TB also replaced by new TB .
Unit-1 sootblower #14 When supply healthy control MCB trip so check & found soot blower-14 Field limit
wiring short each other due to insulation damaged so reinsulation done & take trial both remote & local no
soot blower running noramlly 0.8 amp
Soot Blower- 14 Filed Limit adjustment done
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
Clean run -1B motor trip due to overload reset done
All the Manual Light to ON Condition.
Office AC Supply OFF

Shift jobs carried


As per Operation requirement Coal feeder - 1B Discharge MOV ( 01MV0910 ) Open feedback set.Now Ok.
In WTP high Pr. VFD panel to cleaning to done.
All the AC MCB to OFF Condition.
Rubber MAT to laid at WTP lighting LDB.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Coal Feeder - 1B AVI and Permit closed.
In Coal Feeder -1C Bunker O/L MOV ( 01MV0907) Motor removed and Megger done checked the Motor Current unbalance
( 3.2 , 4.5 and 5.0 Amps.) .Motor is kept at WTP Electrical workshop Room.
In Coal Feeder -1B Clean run motor checked and Ok. And current is showing 0.7 Amps. Also feeder taken in line.
02 Nos hand lamp to Provided at Coal feeder area.
At 22 mtrs , Light ON as per operation requirement.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
02LCV3203, 02LCV3202, 02LCV3201 Control valve air leakage attend and main air Isolate.
De-super heater station control valve of boiler-2 air leakage attend and main air isolate.
Following Equipment AVI Given & Cleared.
1. Coal Feeder 1C
2 nos. Hand lamp shifting from coal feeder to workshop.
Coal shed Light ON as per Operation requirement.

Shift jobs carried


In Fly ash Silo No. # 2 gate valve is not operating in auto mode. So Checked and found that silo full alarm co
now clean the sensor it is OK

Following shutdown given:


1 soot blower unit-1
2 BC1
3 BC3
4 BC5
5 bucket elevator-1

Coal feeder-1C in AVI


Two new LED Lights issued to mechanical deptt
Tool box mike volume adjusted to normal
All the Manual Light to OFF Condition.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( ACW area, Bag House-1, Coal shed. MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1. CT Fan No.-3,
2. Coal feeder 1B (Clean run motor connection removed)

Following Equipment S/D Clear.


1. BC-1,
2. BC-3,
3. CT Fan No.-3
4. BC-5,
5. Bucket Elevator-1,
6. Coal feeder 1C ,
7. Soot blower-1
Clean run 1A motor shaft found damaged, so motor connection removed and motor shift to workshop, Clean run 2A moto
removed and shift to 1A and motor connection given, trial run found 1.0 A balance load taken, also its relay setting change
from 1.2 A to 1.0 A as per instruction.

Following Equipment AVI Close.


1. Coal feeder 1C,
Clean run 1B tripped in overload, reset it.
BH-1 temp 01TI1202 and 01TI1204 checked and found healthy inform to CCR.
Crusher floor bucket elevator floor equipment cleaning and blowering done.
Shift jobs carried
Unit no. # 1 Clean run Motor connection done . Also permit closed. During the trial time Motor direction is
reversed also Motor fell down from the location.Found that Motor to Gear Box allen key thread damaged in
box. So Operation person changed the Gear Box.After trial taken it is taking 0.8 Amps current. Now running
normally.
Unit No. # 1 and 2 TG Building zero mtrs field inst. Cleaning to done.
Unit No. # 1 QCNRV ( 01CV2302 / 01CV2304) JB Cleaning and Packing to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
IFC Filter drain to done.
At BC-7A / 7B area hand lamp to provided to Operation person.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Bunker area, Coal shed. MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
BH-11&12 level probe checking done as per CCR requirement.

Following Equipment S/D Clear.


1. EN-MASS CONVEYOR-1 ,
2. BC-4,
3. VIBRATING SCREEN-1,
4. VIBRATING SCREEN-2,
MT-1 and 2 Silica gel replaced.
Bunker floor hand lamp provided.
Silo-1 RAV motor overload tripped reset it.
Assembly point speaker maintenance done.
CHP DCS panel cleaning and blowering done.
Shift jobs carried

Unit no. # 1 Coal Feeder -1C Tripped due to Temp. switch acted at site. At site Temp. is normal and cable ma
ground. So proper cable Packing to done . After this is normal.Now it is running Normally.

Unit No. # 1 Soot Blower Panel all the MCB ON as Per Operation requirement.
Unit No. # 1 Desuperheater control Valve is not Fully closed due to Low Inst. Air Pressure. Due to carbon bl
unloading . After Unloading and Pr. Is Normal . Then all the Control valve is Normal.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 3 rd Floor welding JB Earthing tightness to done.
In Unit No. # 1 coal feeder area repair Supply Box no. # 7 Rubber mat to laid.
In Unit No. # 1 fly ash system Vessel No.-12 / 22 balancing valve is showing open and closed feedback. Mech
Valve is in jammed condition. Also set the limit switch. Now Ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Given and Clear.
1. Reclaimer,

Following Equipment S/D Clear.


1. Vibrating Screen-2,
2. BC-1,
3. Reclaimer,

Following Equipment S/D Given.


1. 01MV0911,
Reclaimer CRD cable alignment work done.
Coal feeder 1C dis mov damaged shaft key replaced by MMD and open/close trial run healthy and hand over for operation

Shift jobs carried


In Unit No. # 1 fly ash system Vessel No.-12 / 22 seal Pr. Is not showing at DCS end. So cleaned the impluse
Now Ok.
In Compressor House all the auto drain valve checked and working normally.
In WTP DCS panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In BC-7A/7B area 02 Nos Hand lamp to provided.
In VAM System Control Valve Pr. Is increased since Chilled water temp. is increased.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 78 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Given and Clear.
1. Reclaimer,

Following Equipment S/D Clear.


1. En mass-2
2. BE-2
3. Reclaimer,
Reclaimer CRD cable limit set, now limit working normally
Reclaimer CRD cable found elevated due to coal deposition in trench, clean some coal, now further cleaning needed from
team
Lamp provided at coal bunker
Bed ash cooler-1A back pressure line flushing two times , need to check seal by mech deptt

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
MOT tank area light ON, and charging light provided at BAC-1A area.
UPS-1 master panel fan failure alarm showing, but fan are running condition, so under observation.
Bed ash cooler-1A level high, so probe checking done.
BLR-1 BH-12-22 seal pressure fault, so pressure switch cleaning done, also back pressure transmitter cleaning done.
Roof Solar ABPS School-2 reading not showing in online site, so manual avg reading taken, also checking pending .
Shift jobs carried
Unit No. # 1 Turbine is manually Tripped due to Low Turbine Inlet Pr. Also at Boiler side all the Coal feeder
is in Jammed condition.

EN-mass Conveyor No.-2 Put into Local mode as per Operation requirement. Also put into Remote mode.
Unit No. # 1 Boiler Light up after tacking the Oil Gun - 1A and 1B.
Unit No. # 1 Flame Sensor mounted for the Oil Gun - 1A and 1B.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At Coal feeder area 02 Nos charging Light , 02 Nos LED Light , 01 Nos Extension Board and Transformer to provided.

Following Equipment S/D Cleard.


1. En mass-2
2. BE-2

BAC-1B put into Local mode as per operation requirement again put into Remote mode.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
TG-1 Synchronized at 23:42 hrs. and put in base load 10MW at 01:00 Hrs.
Drum level MFT coming at 01:00hrs. So bypassed drum level HH MFT and again taken in line at 05:00 Hrs.as per OPD
requirement.
Following Equipment S/D Given.
1. Coal Feeder -1B,
2. Coal Feeder -1C,
Following Equipment AVI Given and Close.
1. Coal Feeder -1B,
Following Equipment S/D Clear.
1. Coal Feeder -1B,
2. 01MV3207,
Boiler-1 S/y side 6th floor area light on as per OPD requirement.
Inst. Air comp motor and power JB cleaning done.
Auto Hand sanitizer machine removed from CCR and shift to LAB as per Inst.
Bed ash cooler-1B High level probe checking as per OPD requirement.
Coal feeder 1B Dis Pneumatic valve Open limit set.
Shift jobs carried
In Fly ash Silo No. # 2 gate valve is not operating in auto mode. So Checked and found that silo full alarm co
now clean the sensor it is OK

Following shutdown given:


1 BC-7A
2 BC-7B
3 Coal crusher-2
4 Coal feeder-1C
5 Coal feeder-1C Pnumetic air va;lve
6 Coal feeder-1C MOV911

Coal feeder-1C AVI given and cancelled


a 24 volt transformer shifted and installed at coal feeder area
Extention board collected from coal feeder area
All the Manual Light to OFF Condition.

Shift jobs carried


In Unit No. # 1 Second Stage DSH Station Control Valve ( 01TCV3203) showing 12 % Feedback even Comma
0% . So calibrated the control valve then feedback is showing 0% when command is 0 %. When Control val
taken in line. Then again it is showing 5 % Feedback when command is 0 %.Also in positioner inside air sou
observed. So changed the Positioner from Unit No. # 2 DSH Station.( 01TCV3201) . Also mounted at site and
calibrated the control valve. now it is working normally.

All the AC MCB to OFF Condition.


P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Coal feeder-1C AVI is given also Permit and AVI to closed.

Following shutdown Cleared:


1 BC-7A
2 BC-7B
3 Coal crusher-2
4 Coal feeder-1C
5 Coal feeder-1C Pnumetic air va;lve
6 Coal feeder-1C MOV911

BFP-1 , 2 and 3 Motor cleaning to done.

MVAR is in Local mode. So Decreased the excitation also put into Auto mode. Also running Normally.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
CT Fan -1 , power off done as abnormal sound from its coupling , after that ct fan-2 start in vfd mode.
UPS, fan failure alarmof master 1 at 11.15 pm, so its panel, and all cooling fan check all are running ok ,then its alarm rese
CT fan -1 , door lock limit switch check and tight done.
U#1, Feed water station , by paas line mov found leakage , so its tight with help of operation team.
In Unit No. # 1 Coal feeder -1D level is not showing correctly. So power supply reset. Now ok.
In BC-7A / 7B Light is in off condition. So ON it as CHP group running.
Shift jobs carried

In CHP MCC , AFR Breaker is tripped . So checked and found that Breaker side no trip indication. It is trippe
to Earth fault. So OFF the control supply. Then No fault indication on display. Then ON the breaker. Now Ok

Following shutdown given:


1. EN mass Conveyor No.-2,
In Fly ash Silo No.-2 main Inst. Air line PU Tube Leakage arrested at site.
P&V 4 and 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Chimney analyser room panel cleaning and Blowerning to done.
Following shutdown Closed:
1. EN mass Conveyor No.-2,

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
P fan-1 health checked, found healthy, so feeder rack in and clearance given to operation for start.
Coal feede-1C main motor direction reverse/forward as per operation requirement.

Following Equipment S/D Clear.


1. COAL FEEDER-1C DISCHARGE MOV,
2. COAL FEEDER-1C,
3. COAL FEEDER-1C DISCHARGE PANUMATIC PLATE VALVE,
4. EN-MASS CONVEYOR-2
5. Reclaimer

1C coal feeder area 24v light faulty cable replaced.


Following Equipment AVI Clear.
1. COAL FEEDER-1C DISCHARGE MOV,
2. COAL FEEDER-1C,
3. COAL FEEDER-1C DISCHARGE PANUMATIC PLATE VALVE,
4. EN-MASS CONVEYOR-2,

01TI1204 BH-12 RTD checked and status confirm to OPD.


BLR-1 BH-12 HH level probe replaced with BLR-2 BH-22 HH level probe, and trial run healthy, hand over for operation.
Shift jobs carried

In Inst. Air Compressor No. # 2 is tripped due to High element temp. 02 times. As per Shift incharge
requirement IAC # 1 as a Master. As per DCS Both the Inst. Air compressor No. # 1 and 2 loading pr. Setting
Kg/cm2. So Changed the IAC No. # 2 setting to 3.9 kg/cm2. Now under Observations. After some time he to
that Changed the IAC No. # 2 setting to 4.0 kg/cm2.
BC-1 Belt is Tripped due to Chute level Proxy. At site found that Heavy big material comes in coal. Due to th
Belt is tripped. So Informed to shift incharge.
In BAC-1B rubber mat is not proper. So Rubber mat to provided.
In Boiler No. # 1 06 Nos drain MOV and APH JB Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Fire water pump house and at 22 mtrs light ON as per Operation requirement.
At WTP Pump House Motor Cleaning to done.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All office Ac supply made ON .
All the Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1. COAL BUNKER -1C DISCHARGE MOV 01MV0907,
2. COAL FEEDER-1C, (02 times),
3. EN-MASS CONVEYOR-2, (01 times),

Following Equipment AVI Given.


1.EN-MASS CONVEYOR-2, (also put in Local as per MMD requirement)

Following Equipment S/D Given.


1. COAL BUNKER -1C DISCHARGE MOV 01MV0907,
2. COAL FEEDER-1C, (02 times)
3. EN-MASS CONVEYOR-2, (02 times)
4. Vibrating Screen-1,
5. Vibrating Screen-2,
6. BC-1,
7. BC-2,

EOP-2 Power ON and OFF as per OPD requirement.


Boiler-2 Ignitor floor area cable dressing done.
ACW-1 Dis MOV Earthing correction done.
BC-1 Chute level proxy act, so physically checked found running healthy inform to OPD.
1A bed ash conveying pressure switch setting change from 1.5 bar to 3.0 bar as per OPD requirement.
Shift jobs carried

In BAC-1A Conveyoing air Pressure is not showing at DCS end. While In BAC-1B it is showing . During this ti
Carbon black truck is unloading . So small decreased the Pr. Switch setting of BAC-1A. ( PS-4 ). Then it is sho
Normally.

In Coal Bunker Level transmiiter -1D Level is not showing correctly. So Reset the power Supply. Now ok.
In Unit No. # 1 DCS Cleaning to done.
In WTP hall area All the Inst. Panel and Field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Fire water pump house light ON as per Operation requirement.
Fire water pump house lighting timer is structed. So bypass it. To be check.
one 24 Volts Light put into charging mode at 4.5 mtrs.
Due to Coal change in Coal feeder -1C Belt weight is showing 1 to 2 kg/cm2. So RPM is High and TPH is not
showing at DCS end.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All office Ac supply made ON .
All the Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Clear.
1.EN-MASS CONVEYOR-2, (also put in Remote a)
Following Equipment AVI Given.
1.EN-MASS CONVEYOR-2, (also put in Local as per MMD requirement)
2. UNIT-1 SOOT BLOWER,

Following Equipment S/D Given.


1. EN-MASS CONVEYOR-2,
2. UNIT-1 SOOT BLOWER,
3. BELT CONVEYOR-7B (BC-7B),
4. BELT CONVEYOR-7A (BC-7A),
5. Coal Crusher-1,
6.Boiler-2 S/D PTW,
7. Coal Feeder-1C,
8. BC-1,
9.Reclaimer,

EOP-2 Power ON and OFF as per OPD requirement.


WTP LDB earthing correction done.
RSB 5306-E power ON
Following Equipment S/D Clear.
1. BELT CONVEYOR-7B (BC-7B),
2. BELT CONVEYOR-7A (BC-7A),
Coal bunker level transmitter cleaning done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
ETP data power reset
Coal feeder-1C calibration done
Coal feeder Load cell shifted in instrument lab

Following Equipment S/D Clear.


1. Reclaimer
2. En mass-2
3. Coal feeder-1C
4. BC-1
5. coal crusher-1
6. Soot blower-1

TG building exhaust panle cleaning done


Following Equipment AVI given and cleared
1. En mass-2
2. Coal feeder-1C
3. Soot blower-1
Shift jobs carried

In Boiler No. # 1 and 2 Lift Telephone are checked. Both are working normally.
At TG # 1 and 2 zero mtrs MOV , CV, and field Inst. Cleaning to done.
In Unit No. # 1 Vessel No.-11 High level is not showing at DCS end. So Calibrated and Cleaned the level Prob
Now Ok.
In WTP hall area All the Inst. Panel and Field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Unit No. # 1 Bag House Light ON as per Operation requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All office Ac supply made off .
All the Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
WTP mix bed conductivity meter inlet line Pu tube damaged so replaced it
Mix bed conductivity meter drain line leakage arrested
compressor-2 trip in element temp high once

Following Equipment S/D Clear.


1. BC-1
2. Vibrating screen-2
3. Coal Crusher-1
4. BC7A
5. BC7B

WTP pump house light found faulty , so arranged temporary light


Bucket elevator main feeder outgoing TB found heat up , so replaced it
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1. Coal Feeder -1C,
Following Equipment AVI Given and Close.
1. Coal Feeder -1C,
Clean run 1c tripped in overload (02 times) reset it.
Clean run 1C direction reverse/forward as per OPD requirement.
SILO area light MCB off, so ON done.
Crusher side street light OFF, so checked found timer stuck up, so reset and trial run healthy.
WTP MCC cleaning and blowering done.
Reclaimer tripped in belt Misalignment Fault, reset and trial run healthy.
Boiler-1 drain MOV cleaning and blowering done.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 85 Deg C , DT-6 temp 80 Deg C.
All office Ac supply made ON .
All the Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Given.
1.EN-MASS CONVEYOR-2, (also put in Local as per MMD requirement)
2. Coal Feeder-1C - (also put in Local as per MMD requirement)

Following Equipment S/D Given.


1. EN-MASS CONVEYOR-2,
2. Coal Feeder-1C
3. BELT CONVEYOR-7B (BC-7B),
4. BELT CONVEYOR-7A (BC-7A),
5. Instrument compressor-2
6.Vibrating screen-2

Coal feeder-1C shutdown cleared


Switchyard fencing grass removal work
CT fan MCB and meter sticker pasting work
Boiler-2 Bag house 12-22 conveying line valve(SV8134) fitting leakage, so changed the fitting
BAC-1A dome valve checked working normally

Shift jobs carried


In WTP Furnace is not increasing Temp. . So checked and found that Contractor wire is loose condition.So
tightness the wire. Now it is working Normally.

In IAC No. # 2 Flow switch is not showing at DCS end. So adjust the flow switch. Now it is showing Normally
In Coal feeder - 1C feeder is tripped due to Clean Run proxy. So at site adjust the Proxy. Now Ok.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
IAC No. 3 2 AVI is given also Permit and AVI to closed.

Following Equipment S/D Cleared.


1. EN-MASS CONVEYOR-2,
2. Coal Feeder-1C
3. BELT CONVEYOR-7B (BC-7B),
4. BELT CONVEYOR-7A (BC-7A),
5. Instrument compressor-2
6.Vibrating screen-2

In Compressor House lighting timer Bypass due to maintences requirement.


In IAC No. # 2 24 Volts Transformer is Provided to mech. Dept.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to ON ( Bunker floor and fire pump house area. ).
AC and Vent MCC cleaning and blowering done.
Jockey pump 2 OPD observation continue ON from 15:30 hrs. to 00:30 hrs, so manually OFF from push button and under
observation..
MPHB Lift door sensor fault, so cleaning and trial taken found running healthy.
Boiler-2 drain MOV cleaning and blowering done.
Dosing room panel and field equipment cleaning and blowering done.
Lighting booster transformer cleaning and blowering done.
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

01.10.2022 A Gajendra Pandya


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

02.10.2022 A Ashvin Jadav UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
02.10.2022 B Tarun Mandawat
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

02.10.2022 C Tarun Gaur


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.


03.10.2022 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

RNRP all nodes found Normal.


03.10.2022 C Tarun Gaur
03.10.2022 C Tarun Gaur
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

04.10.2022 C Sanjay Garg RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

05.10.2022 B Tarun Gaur

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal
RNRP all nodes found Normal.
Shift instrument digital log book filled
05.10.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

06.10.2022 B Tarun Gaur

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
06.10.2022 C Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
06.10.2022 C Ashvin Jadav

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.

07.10.2022 A Gajendra Pandya


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

07.10.2022 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
07.10.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

08.10.2022 A Tarun Gaur

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

08.10.2022 B Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
08.10.2022 C Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

09.10.2022 A Sanjay Garg RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
09.10.2022 B Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


10.10.2022 A Sanjay Garg Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
10.10.2022 B Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
10.10.2022 C Tarun Gaur
Following check list prepared

a) Generator-1  checklist
10.10.2022 C Tarun Gaur

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

11.10.2022 A Ashvin Jadav Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
11.10.2022 C Sanjay Garg UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.

12.10.2022 A Gajendra Pandya


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


12.10.2022 B Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal.


12.10.2022 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

13.10.2022 A Gajendra Pandya

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


13.10.2022 B Tarun Gaur

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
13.10.2022 C Ashvin Jadav
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

14.10.2022 A Tarun Gaur

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

14.10.2022 B Sanjay Garg


14.10.2022 B Sanjay Garg
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
14.10.2022 C Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

15.10.2022 A Tarun Gaur

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

15.10.2022 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw

RNRP all nodes found Normal except SPC004.


15.10.2022 C Gajendra Pandya
Shift instrument digital log book filled
15.10.2022 C Gajendra Pandya
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

16.10.2022 A Sanjay Garg


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
16.10.2022 B Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
16.10.2022 C Tarun Gaur UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
16.10.2022 C Tarun Gaur

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

17.10.2022 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
17.10.2022 B Ashvin Jadav
Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
17.10.2022 C Tarun Gaur
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


18.10.2022 A Ashvin Jadav
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
18.10.2022 B Gajendra Pandya VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


19.10.2022 A Ashvin Jadav
19.10.2022 A Ashvin Jadav
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
19.10.2022 B Tarun Gaur VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

19.10.2022 C Sanjay Garg RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


20.10.2022 A Gajendra Pandya
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
20.10.2022 B Tarun Gaur
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
20.10.2022 C Ashvin Jadav Following check list prepared

a) Generator-1  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

21.10.2022 A Tarun Gaur


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

21.10.2022 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
21.10.2022 C Ashvin Jadav
21.10.2022 C Ashvin Jadav
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

22.10.2022 D Tarun Gaur UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
22.10.2022 N Gajendra Pandya Following check list prepared

a) Generator-1  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
UPS log digital log book filled.
VAM log digital log book filled.

23.10.2022 A Tarun Gaur


23.10.2022 A Tarun Gaur
Following check list prepared

a) Generator-1  checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
23.10.2022 B Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
23.10.2022 C Gajendra Pandya
Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

24.10.2022 A Ashvin Jadav


VAM log digital log book filled.

Following check list prepared


24.10.2022 A Ashvin Jadav

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
24.10.2022 C Tarun Gaur VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

25.10.2022 A Gajendra Pandya


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
25.10.2022 B Ashvin Jadav

b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
25.10.2022 C Tarun Gaur Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
26.10.2022 B Gajendra Pandya Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
26.10.2022 C Ashvin Jadav
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

27.10.2022 A Gajendra Pandya


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

27.10.2022 B Ashvin Jadav

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
27.10.2022 C Tarun Gaur
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

28.10.2022 A Amit kumar singh

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

28.10.2022 B Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
28.10.2022 C Ashvin Jadav
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

29.10.2022 B Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
29.10.2022 C Tarun Gaur

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

30.10.2022 A Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
30.10.2022 A Sanjay Garg

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
30.10.2022 B Ashvin Jadav
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
30.10.2022 C Tarun Gaur

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

31.10.2022 A Ashvin Jadav


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

31.10.2022 B Tarun Gaur

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
31.10.2022 C Sanjay Garg
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 82 Deg C , DT-6 temp 85 Deg C.
All office Ac supply made ON .
All the Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1. BC7A
2. BC7B
3. Reclaimer
4. BC-1

ETP panel double earthing repaired


Jockey Pump-2 not stop auto, so pressure switch adjusted to 7.5 kg
BC-1 chut level trip came , so checked and found that proxy flap not balaced , so informe to CHP person for free and balace
chut flap
T-1 and T-2 Tower equipments cleaning done

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
compressor house auto drain valve manually checked found healthy.
All the Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
EOP-2 Power ON and OFF as per OPD requirement.
Following Equipment AVI Given.
1.Coal Feeder-1B,
Following Equipment S/D Given.
1. Coal Feeder-1B,
Reclaimer CRD cable stop limit act at 350 Mtr. location, so limit set and trial run healthy.
Boiler-1 Flame sensor removed and put in LAB locker-11.
Coal feeder-1 area 04 light removed and hand over 03 nos to OPD, and 01 light in workshop.

Bucket Elevator-2 feeder (which was originally in Boiler MCC-1 feeder) check and fuse replaced, trial run healthy, so put in
boiler-1 MCC feeder and boiler-1 Bucket elevator feeder ( which was originally in boiler-2 ) put in boiler-2 MCC..

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
BC-2 pull cord act , so checked physically by acting pull chord but not traced , so bypass the group ZZ1637 - Further need to
checked
RSB -98 nearby cable dressing done as found not proper.
All the Manual Light to ON( Coal shed, Bunker floor MPHB staircase etc. ).
WTP motor blowering done.
Boiler firing floor instruments blowering done.
Heckathon idea implementation done in system.
Green circle colony maintenance audit PPt updated & send to WCM team.

Shift jobs carried


Generator-1 euipment & Generator-1 Earthing alarm observed at checked Generator Protection Panel Ro
voltage found +24.8 & -109 Vdc (117 V) at 19.5 MW so Excilter side cleaning work but voltage same under
observation condition.

Coal Feeder-1C feeder outlet MOV not open fully so manually close & again open by DCS commanad now op
Crusher-1 not start so HT Panel relay revert signal pressed & reset now again command from DCS now run
normally
In WTP hall area All the Inst. Panel and Field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Unit No. # 1 Bag House Light ON as per Operation requirement.

Shift jobs carried

In Unit No. # 1 Coal Feeder 1C Discharge MOV ( 01MV911) is not operating from DCS. Manually Open and C
from Handle / Lever. So Opened the MOV from Unit No. # 2 Coal feeder --2B O/L MOV. And Mounted at Uni
1 Coal feeder -1C. Open Limit is set. But Trial / Close Limit is pending . Removed MOV is Placed in Inst. Lab.

In SWAS Room Unit No. # 1 Drum conductivity is not showing in the controller. So adjust the flow in rotame
Now Ok.

In SWAS Room water Leakage from saturated steam sample SOV -left and Right fitting tightness to done. No
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
24 Volts hand lamp to provided and LED lamp Plug top provided at Coal feeder area.
In Unit No. # 1 generator Brush voltage alarm in Panel.
In MVAR is not run in auto mode. So Put into auto mode for decreased the excitation. Now Ok.

Shift jobs carried

Generator-1 euipment & Generator-1 Earthing alarm observed at checked Generator Protection Panel Ro
voltage found +24.8 & -109 Vdc (117 V) at 19.5 MW so Excilter side cleaning work but voltage same under
observation condition.
Boiler-1 Flame sensor removed and put in LAB locker-11.
HP & LP Dosing room motors cleaning & blowering work
In WTP hall area All the Inst. Panel and Field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Unit No. # 1 Bag House Light ON as per Operation requirement.

Shift jobs carried


In Unit No. # 1 Coal feeder -1D is tripped due to Temp. High switch. After temp. Normal. Now it is working
normally.

In Unit No. # 1 Coal feeder -1C I Discharge MOV Trial taken. When giving the open Command Valve is Closed
Changed the Motor Phase wire. When giving the Closed Command Valve is closed. But giving the Open Com
Valve is not operating. In MOV open and Close toreque reset button is broken also wiring to be check. prese
MOV Feeder is rackout condition.
In Unit No. # 1 Coal feeder -1D Discharge MOV open limit to set as per operation requirement.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At Fire Pump House Motor Cleaning to done.

Shift jobs carried


Coal Feeder 1C &1D vibrator not working from push button so vibrator check & found dust inside now clea
done & trial taken found ok
BLR#2 APH Panel cleaning & SOV Connector tightness work
1 no's handlamp handover to mr. ketul sharma at 22 mtr. Bunker area
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
Following Equipment S/D Given & clear
1.BC-6
2. Sreen#2
All the Manual Light to ON Condition.
BC- 7A & 7B Area handlmap repaired work done
In Unit No. # 1 generator Brush voltage alarm in Panel.
In MVAR is not run in auto mode. So Put into auto mode for decreased the excitation. Now Ok.
Compressor house Lighting timer Timing reset done

Shift jobs carried

Compressor house auto drain valve manually checked found healthy.


In Compressor House IFC Moisture Drain to done.
In Chimney analyzer room all the Panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At HP Dosing Room Motor Cleaning to done.
Hand Blower is Provided to Operation Person.

Shift jobs carried


ACC- 1 all 6 no's Motors Both Sides Lubrication done
Coal Feeder -1C Open & close limit set trial taken now ok
Coal Feeder-1 A 1B 1C & 1D Knocker cable laying & temination both DCS & Field side
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
Following Equipment S/D Given
1.BAC -1 Dome Valve
2. Jockey Pump-2
All the Manual Light to ON Condition.

Following Equipment S/D Clear


1.BAC -1 Dome Valve
2. Jockey Pump-2
3. Jockey Pump-1
4. Screen-2
5. Emass-2
6. APH -1
7. BC-7A & 7B

BC-7A & 7B area cable laying work with G Shift Team

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, and BLR -1 &2 4th to 7th floor etc. ).
GSC-1A & 1B motor cleaning and blowering done.
WTP HPP VFD panel cleaning and blowering done.
WTP hall instrument cleaning and blowering done.
1C & 1D Rocker not working, checked and found jammed, so removed from position, cleanaing and trial run healthy, so ha
for operation.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 79 Deg C.

Following Equipment S/D Given.


1.Coal crusher-2
2.BC-1
3.BC-2
4.EnMass-2
5.MOV0911
6.Pnumatic air valve of coal feeder-1C

Following Equipment S/D Cleared


1. MOV0911
Nomenclature done at Instrument JBs at BC-1
Coal feeder discharge MOV0911 of 1C open close limit set
CT fan-1 Field main MCB found OFF so ON it
coal feeder 1C &1D pipe Knoker cleaning done and trial done now OK
Reclaimer Left right movement checked found OK, informed to operation
Shift jobs carried
Coal Feeder 1A &1B and 1C & 1D knocker is not operating from DCS. So Checked at field side Local it is oper
normally. So all the connection tightness to done & trial taken found ok
In Unit No. # 1 Coal feeder -1D Discharge MOV open limit to set as per operation requirement.
Coal Feeder -1C O/L MOV Mech. Shaft rod is broken from the actuator. So Informed to Shift incharge. Also w
work is completed.
In Unit No. # 1 Vessel No.-12 is showing HH Level Probe. So cleaned the Level Probe. Now ok.
In Unit No. # 1 Coal feeder -1D is tripped due to Temp. High switch. After temp. Normal. Now it is working
normally.
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Given.
1.Coal crusher-2
2.BC-1
3.BC-2
4.EnMass-2

In BC-5 Single Phase dewaterning Pump 02 Nos extension Board is supply also Trial taken it is working no
In MVAR is not run in auto mode. So Put into auto mode for decreased the excitation. Now Ok.
EN Mass No.-2 AVI is given also AVI and Permit to closed.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
Main steam temp goes to 68 kG, so bypassed and again taken in line as per OPD requirement.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house etc.)
Coal feeder area 24V light top loose connection tightness done.
Clean run 1C motor overload tripped, reset it.
Dosing room equipment and panel cleaning and blowering done.
BH-12-22 seal pressure fault, so pressure switch cleaning and trial run healthy.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 82 Deg C, DT-5 temp 83 Deg C , DT-6 temp 79 Deg C.

Following Equipment S/D Given.


1.Enmass-2
2.BC-5 Dewatering Pump
3.BAC-1B
6.Coal Feeder-1C(2 times)

Following Equipment AVI Given.


1.Enmass-2
2.BAC-1B
3.Coal Feeder-1C
ACC-2 All 6 no's Motors Both Sides Greasing done
Boiler-2 Lift stopped at 2 nd floor due to heavy rain Emergency Push button apply inside cabin
WTP Bombcalorimeter air cylinder gauge found damaged so gauge repair & calibration done
CCR Walkie Talkie side button found broken so chenge by new button & handover to CCR
Enmaas-2 AVI Given & Put on Local Mode as Mec. Maint. Requirement
All office Ac supply made ON .
Shift jobs carried
In Reclaimer Forward / Reversed not happen from control desk. Then found that Stopper Limit switch is ac
Reset the Limit switch. Then Trial taken it is working normally.
In Coal feeder -1C Feeder is tripped due to Clean run Proxy . At site ZSS Proxy broken condition. So adjust th
at site. Then trial taken it is working Normally.
In Unit No.# 1 Air Leakage from SOV 1302 from PU tube. So changed the PU Tube. Now Ok.
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Closed.
1.Enmass-2
2.BC-5 Dewatering Pump
3.Coal Feeder-1C(2 times)

Following Equipment AVI Closed.


1.Enmass-2
2.BAC-1B
3.Coal Feeder-1C

BAC-1B AVI is given also AVI and S/D to provided.


In BC-5 Single Phase dewaterning Pump ELCB is tripped when ON the Pump. Further checking are required
In Compressor House ON lighting time set to 6.00PM.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Bed ash cooler area extention Board provided
BH-12-22 coveying time reduced , coveying drop at 1.2kg pressure, so pressure switch line flushing done

Shift jobs carried

In Unit No.#1 Vessel No.-12/22 Conveying is not stop. So Checked at field side Impluse line of Back Pr. Swit
Transmiiter is chocked condition. So Cleaned the Impluse line. Then taken in line. Now it is working Norma

In Unit No. # 1 Coal feeder -1A and 1B knocker is not operating from DCS end. So checked at field side In Kn
assembly plunger is in jammed condition. So Cleaned the plunger. Then Trial taken it is working Normally.

In BAC-1A level probe is contionuous showing High at DCS end. So Cleaned and calibrated the Level Probe.

In BAC-1A Dome Valve is not operating from DCS end. So manually it is operated 2 to 3 times. Now it is wor
Normally.
P&V 4 and 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
At 22 mtrs area LED light to Provided.
In BAC-1B AVI to given also AVI and Permit to closed.
In Vibrating Screen No. # 2 Motor one earthing is open at site. So reconnected it. Now Ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
BAC-1A & 1B water valve SOV air tube removed condition, So connect the same.
U-1 APH seal pressure fault, pressure switch cleaning done.
1C Coal feeder temp goes to above 60 deg C, OPD requirement bypassed and again taken in line.
Coal feeder AB vertical line Knocker not working, so Dismantle and cleaning the same but still not in operation.
22 Mtr LED light cable Re-connection done.
WTP RO booster pump cleaning and blowering done.

Shift jobs carried

In Unit No. # 1 Coal feeder -1A and 1B knocker is not operating from DCS end. So checked at field side In Kn
assembly plunger is in jammed condition. So Cleaned the plunger. Then Trial taken it is working Normally.

In Unit No. # 1 Soot Blower No. # 15 is not started from DCS end. So Checked at field side at Local Operation
Holding is not happen . So informed to Pandaya.
All the AC MCB to ON Condition.
P&V 4 and 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In CT Fan # 1 AVI to given also AVI and Permit to closed.

In Vibrating Screen No. # 1 Motor one earthing is damaged at site. So welding and reconnected it. Now Ok.
EOP-2 Power ON and OFF as per OPD requirement.
Following Equipment S/D given and Closed.
1.BC-3,
2.BC-3 trolley
3. CT fan No. # 1,

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
BH-12-22 seal pressure fault, so pressure switch cleaning and trial run healthy.
BLR-1 drain mov cleaning and blowering done.
AFR area 3-phase extension board removed and shift to WTP workshop.
ACW pump house lighting timer stuck up , so reset and trial run healthy.
C7AB are 24v hand lamp replaced.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
STG 9 mtr RSB Panels ELCB Testing & Cleaning work
STG Building Exhaust Fan Panels Cleaning work
Reclamier Boom belt trip due to overcurrent reset done
BC-5 Tunnel Dewatering not start check & found MCB off so ON MCB now ok
Following Equipment S/D Given & clear
1/ Enmass-2
Following Equipment AVI Given & clear
1/ Enmass-2
WTP hall instruments cleaning and blowering done.
APC & Env. Report not send to concern person due to CD not open at PC
Boiler-1 Vessel-22 level not showing at DCS so clean & calibration done now level ok
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 83 Deg C, DT-5 temp 84 Deg C , DT-6 temp 80 Deg C.
Office Ac supply made ON .
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.En-Mass Conv-1
2.Vibrating Screen-2
3.Coal Feeder-1B

Following Equipment AVI Given


1/ En-Mass Conv-1 ( Also Put in Local as per MMD requirement)
Middle Get 20 A top replaced.
C7B bag filter RAV tripped in overload, so checked resistance found 16.3 ohms balance, also found RAV jammed, so inform
for Jammed clearing,
Coal feeder 1B main motor De-coupled trial taken, found running healthy at 6.0 hz, 1.0Amp balanced load taken.
Cola feeder 1B pneumatic valve close limit replaced by new one, and trial run healthy.

Shift jobs carried


In Unit No. # 1 Vessel No.--12 /22 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is
chocked condition. So cleaned the impluse line. Now ok.
In BAC -1B level probe is showing at high Value. At site found that due to wet material Level is showing hig
So Informed to shift incharge.
In BAC -1A level probe is showing at high Value. At site found that Level Probe is Ok. Material is inside the v
Now ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Coal feeder -1B Clean Run Running in AVI Mode.
Following Equipment S/D Given.
1. BAC-1B ,
2. BAC-1B Dome Valve.

At BAC-1B LED Light , 24 Volts Transformer , Extension Board Provided as per Maintences requirement.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 81 Deg C, DT-5 temp 82 Deg C , DT-6 temp 79 Deg C.
Office Ac supply made ON .
Welding machine temporary supply disconnect from AFR side
AVI closed coal feeder-1B
Coal feeder-1B motor connection and Techo removed for gear box replacement work

Following Equipment S/D Given.


1.En-Mass Conv-1
2.Vibrating Screen-1
3. BC-4
4. Bed Ash cooler-1B

Following Equipment AVI Given


1 En-Mass Conv-1 ( Also Put in Local as per MMD requirement)
2. Bed ash cooler-1B(Also Put in Local as per operation team requirement)Two isolation
Damaged LED Light recoverd from coal feeder one nos
one small LED light cover repaired at coal feeder
LOTO box cover fix at coal feeder-1B MCB
Bag house 12-22 seal presure line flushing two times

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.En-Mass Conv-1
2.Vibrating Screen-1
3. BC-4

Following Equipment AVI Given


1 En-Mass Conv-1 ( Also Put in remote mode as AVI closed)
Coal feeder 1D local JB polythene covering done.
U-1 Coal bunker level transmitter cleaning done.
Coal feder-1C frequently stopped, so checked and found new installed tachometer not working, due to mechanical shaft ja
so after mechanical work completed, ZSS and coal feeder running normal.
24v LED provided in coal feeder area to Mr. Vikas Bhoir.
Compressor area lighting timer stuck-up so reset and trial run healthy.
U-2 ACC all 6 motor power JB cleaning and blowering done.
Shift jobs carried
In CHP , EN Mass No.-2 Tripped due to O/L . Also at site material jammed condition. Also Put into Local mode as per opera
requirement. So In CHP line No. # 1 is started.
In Unit No. # 1 boiler second floor switchyard side light is not ON. So ON the ELCB. Now Ok.
In WTP MCC Room panel Blowerning to done.
In BAC -1A and 1B level probe GI Cover to provided.
In Engineer Room AC is ON . So OFF the AC.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 81 Deg C , DT-6 temp 79 Deg C.
Office Ac supply made ON .
Soot blower 15 contactor add on Block changed and trial taken running normal
LOTO hasp repaired in CCR

Following Equipment S/D Given.


1.En-Mass Conv-1
2.BC6
3. Bag filter BC7AB
4. Coal feeder-1B

Following Equipment AVI Given


1 En-Mass Conv-1 ( Also Put in Local as per MMD requirement)
2. Bed ash cooler-1B(Also Put in Local as per operation team requirement)Two isolation
Bag house 12-22 seal presure line flushing two times
Lift IR sonsor checking work
UPS fan sensor alarm coming

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.En-Mass Conv-1
2.Bag Filter- 7A& 7B
3. BC-6
4. Clean run -1B

Following Equipment AVI Given


1 Coal Feeder-1B

Following Equipment AVI Close


1 BAC-1B
2. Enmass-1
3. Clean run -1B
CEP-1A & 2B & ACW-2 Motors both sides Greasing done

Clean run motor-1B Shaft found jam so new clean run motor handover to mech. Dept. connection done found 1.1. amp

COAL Feeder-1B Motor connection and Techo connect done


UPS Fan failure alarm reset done
BAS-1 Suit not up & down so checked & found contactor stuckup so power supply reset now healthy
Mech. Grinder not work so check & found neutral wire disconeect & reconnect it now ok
Clean run 1C ZSS Switch taken in line after clearance from operation dept. ( Mr. Mahto)
TG Building lift IR Sensor changed wit new one trial taken found ok
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house etc and Boiler 4th to 7th floor.)
Coal feeder 1B close limit plate setting done as per operation requirement.
Dosing room equipment and panel cleaning and blowering done.
C7B RAV tripped condition , so reset and trial run healthy.
BED ASH Cooler-1B AVI given.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 79 Deg C.
Office Ac supply made ON .
UPS Fan failure alarm reset done

Following Equipment S/D Given.


1.En-Mass Conv-1
2.Screen-2

3. Coal feeder-1B

Following Equipment AVI Given


1 En-Mass Conv-1 ( Also Put in Local as per MMD requirement)
2. Bed ash cooler-1B(Also Put in Local as per operation team requirement)Two isolation
3. Coal feeder 1B (Close)
DSLC TG-1 Base load set point 12500 kw
J Valve -1A Motors both sides Greasing done
ACC-1 all 6 no's fan motors Power JB Cleaning work
Monthly Power Report balanced upto 13/10/2022
Shift jobs carried
In the Reclaimer , Not Tripped from EPB in control desk. So checked at site and found that In PLC DI wire is
shorted in the contractor. Permently DI High signal going to PLC. So Connected the wire as per drawings. Th
taken . It is working Normally.
In Unit No. # 1 Vessel No.--12 /22 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is
chocked condition. So cleaned the impluse line. Now ok.
In BAC# 1B VFD is not started in Local mode. So fault at VFD side. So Reset it. Now ok.
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Closed.
1.Enmass-1
2.BC-7A
3.BC-7B
4. Vibrating screen No.-2,

Following Equipment AVI Closed.


1.Enmass-

EN mass No.-1 AVI and S/D to provided. Also Put into Local mode.
DSLC TG-1 Base load set point 12500 kw
In Cooling Tower side light is not ON. So ON the ELCB. Now ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Following Equipment AVI and S/D Closed.
1.Coal feeder-1B
TG-1 2nd ext. QC NRV Open limit not showing, so adjust the same.
U # 1 Vessel No.12 level high showing, so level probe cleaning and physically level check and found material inside, so info
CCR.
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 79 Deg C.
Office Ac supply made ON .
UPS Fan failure alarm reset done

Following Equipment S/D Given.


1.BC-4 (2 times)
2.BC-4 Bag filter
3. Screen-1 &2
4. Jockey -1 ( Closed)
5. Cola feeder- 1B
6. BC-3

Following Equipment AVI Given


1/BAC-1B( Closed)
2/ Coal Feeder -1B

DSLC TG-1 Base load set point 12500 kw


Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 12.7 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
5/ Distrilled Water topup done

Bag house 12-22 seal presure line flushing two times NRV Leakage so inform to shift incharge
Generator-2 Space heater ON & OFF
IAC-2 not comes in loading condition so check & found Loading & Unloading SOV connector stuckup so clean & adjust now
working normally
Shift jobs carried

In Jocky Pump No.-1 VFD RPM is showing at -3 at DCS. So checked at VFD side , display is showing F4981 fa
External temp. is high. So reset it and again it is started. Then Motor takes high current and motor overload
VFD is tripped. So informed to shift incharge. At site found that gland is over tightness done. after completin
Mech. work then Trial taken it is working normally. Also current is normal at 16 Amps.

In Unit No. # 1 Vessel No.--12 /22 back pr. Switch and Transmitter , Seal Pr.is not showing at DCS end. So checked and foun
Impluse line is chocked condition. So cleaned the impluse line. Now ok.
In MVAR is not run in auto mode. So Put into auto mode for Increased the excitation. Now Ok.
In Coal feeder -1B Bunker O/L MOV is not operated from DCS end. So checked our side open and Close com
going to DCS. Also Motor current tacking to 1.8 Amps. But Mech. Shaft assembly is not moving at site. So Inf
to shift incharge.
All the AC MCB to OFF Condition.
P&V 4 and 2 status checked, found running healthy..
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Given.


1.BC-4 (2 times)
2.BC-4 Bag filter
3. Screen-1 &2
4. Cola feeder- 1B
5. BC-3

Following Equipment AVI Given.


1. BAC-1B,

In Unit No. # 1 bag house area light is not on. So Found that Timer is structed . So Reset it. Now ok.

Shift jobs carried


P&V 4 and 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 80 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Bag house-12-22 back pressure line cleaning done two times
Bag house-12-22 seal pressure line cleaning done two times

Shift jobs carried


In Unit No. # 1 Vessel No.-12 /22 Back Pr. Switch and transmitter impluse line cleaned as per operation
requirement. Also back Pr. Transmitter is showing 1.0 Kg / cm2. Also Pr. Guage is mounted at tapping Point
also showing the 1.0 kg/cm2. So informed to shift Incharge.
In VAM System 02 times bucket to empty.
All the AC MCB to ON Condition.
P&V 4 and 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
BC-5 Tunnel side Extension Board shifted to Electrical workshop area.
Unit No. # 1 Bag House Light to OFF.
BAC-1B AVI is given.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Rubber mat to laid at Repair Supply Box No.-78 . ( DM tank area)
Shift jobs carried
P&V 4 and 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
U-1 Vertical Knocker AB, CD not run, so checked local trial taken and then DCS trial taken, found running healthy.
Bed Ash silo plate valve not open, so power OFF/ON and then trial taken found running healthy.
BH-12/22 seal pressure fault, so pressure switch clean, and then trial run healthy.
C7A/B area 02 hand lamp holder replaced and lamp repaired.
C7A bag filter not run, checked and power OFF/ON then trial run healthy.
Bag house and switchyard area lighting timer stuck up, so reset and trial run healthy..
PI monitor SK3 crusher and total load MW not showing, so restart the system and then after data showing healthy.

Shift jobs carried


P&V-2 running & P&V-4 off due to DT winding temp. low to be observation condition
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
STG Building lift door not open so lift power supply reset now ok
Bag house-12-22 seal pressure line cleaning done two times
Coal feeder AB vertical line Knocker not working, so Dismantle CHECK & found filter damaged so cheange by new one now

Generator-2 Space heater ON & OFF due to maintain Winding temprature


Shift jobs carried
In Unit No. # 1 Vessel No.-11 /21 Back Pr. Switch and transmitter impluse line cleaned as per operation
requirement. Still heavy material deposit in the impluse line. Due to Passing of the NRV. So informed to the
Incharge.
In Unit No. # 1 Vessel No.--12 /22 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is
chocked condition. So cleaned the impluse line. Now ok.

In Unit No. # 1 Vessel No.--11 /21 Fly ash system and Unit No. # 1 APH System S/D to Provided to Maintences Dept.
All the AC MCB to ON Condition.
P&V 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1.Reclaimer
2. Coal Feeder --2C,

At Bed ash silo welding machine proper earthing to done.


BAC-1B AVI is given.
At 22 Mtrs area Transformer is Provided as per operation requirement.
In Unit No. # 2 EOP ON/OFF as per operation requirement.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
BLR-1 APH vessel-02 Dom valve airline, limit, level probe and seal connection done, and air charge, trial run healthy.
BH-12/22 back pressure switch and transmitter cleaning, and trial run healthy.
BH-12 Dom valve airline, limit, level probe and seal connection done, and air charge, trial run healthy.
ETP panel power re-start done.
Following Equipment S/D Clear.
1.Reclaimer
BC-3 area lighting JB and start/stop JB double earthing provided.
BLR-1 S/y side 2nd floor 03 no’s light one circuit tripping, will be checked in day time.
C7A/B area 24v hand lamp repaired.
Shift jobs carried
P&V-2 running & P&V-4 off due to DT winding temp. low to be observation condition
DT-2 temp 79 Deg C, DT-5 temp 81 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
STG Building lift door not open so lift power supply reset now ok
Bag house-12-22 seal pressure line cleaning done two times
Chimney analyser room all Panels cleaning work
BAC-1A Dome not open & close so cylinder hoze pipe dismental & SOV Check manually open 2 -3 times now ok
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
Following Equipment S/D Given.
1.Vibrating Screen-1,
2. Vibrating Screen-2,
3. Coal feeder-1D,

Following Equipment S/D Clear.


1.Coal feeder-2C,
Following Equipment AVI Clear/Given.
1.BED ASH COOLER-1B,
Following Equipment AVI Given.
1.Coal feeder-1D,
VAM floor leakage water bucket full, so drain it.
1C coal bunker level transmitter power reset as per operation requirement.
BH-11/21 High level not showing, and temp showing high, and hopper is actually full, so level probe cleaning, and trial take
running healthy.
Lighting Circuit tripping issue resolved in boiler-1
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.

Instrument compressor-2 not came on load, so checked and found that PLC shows auto loaded but SOV has not making m
one time remove SOV from plunger and again fit it, also PLC output terminal to SOV pressed, then it came in Loading

BH-12/22 back pressure switch and transmitter cleaning, and trial run healthy.
BH-11/21 Level transmitter cleaning, and calibration done

Coal feeder-1D feeder discharge MOV 0912 not operated due to torque limit acted so reset it and open/close limit set

CO value gone voilet, so reset and narmalise it


Following Equipment S/D Clear.
1.Vibrating Screen-1
2. Vibrating screen-2
3. coal feeder-1D
TG-2 enclouser One LED Light checking and made it ON
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
Following Equipment S/D Given.
1.Coal feeder-1D,
2. En-mass Conv-2,
VAM floor leakage water bucket full, so drain it.
Following Equipment AVI Clear.
1.BED ASH COOLER-1B,
Following Equipment AVI Given.
1.En-mass Conv-2, (Local changeover as per Maint requirement.
1A coal bunker level transmitter power reset as per operation requirement.
UPS-1 master fan failure alarm reset.
EOP-2 Power ON and OFF as per operation requirement.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
Coal feeder 1D Outlet MOV not operate so check & found feeder trip on overload & checked fiel side found shaft key dam
new key replaced & open & closed limit set & handover to operation dept.
Bag house 12-22 seal pressure fault so clean impulse line heavy dust so clean now ok
12-22 seal fitting air leakage so change tube fitting & leakage arrested
Bolier-1 22 no;s Domvalve cylinder air leakage so change tube fitting now ok
CO value gone voilet, so reset and narmalise it
Following Equipment S/DClear
1.Coal feeder-1D,
2. En-mass Conv-2,
3. BAC-1B
22 MTR. AREA led Light repaired work
Shift jobs carried

In Unit No. # 1 Coal Feeder -1C Level is not showing correctly at DCS end. So Reset the Power Supply. Now Ok.
In Unit No. # 1 Vessel No.--12 /22 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is chocked co
So cleaned the impluse line. Now ok.
In WTP MCC Room panel Blowerning to done.
In Dosing Room motor cleaning to done.
In WTP hall area All the Inst. Panel and Field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
Following Equipment S/D Given.
1.Coal feeder-1D,
2. En-mass Conv-2,
3. vibrating screen-1
4. bed ash cooler-1B

Coal feeder-1D dischrge MOV rod welding done by mechenicle , its limit setting pending
Following Equipment AVI given
1.BED ASH COOLER-1B,
2. Enmass -2
Following equipments and in Local as per requirement
1. En mass-2
unit-1 bag house vessel 12-22 balancing valve pu tube leakage arested
WTP hall field equipment cleaning done
bag house vessel 12-22 seal pressure line flushing done
cola feeder-1D trial done and found that belt touching load cell and tonage showing 6.6 ton in empty condition, so they de
change the belt again
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
Following Equipment AVI Given
2. Coal Feeder -1D

Coal feeder -1C Clean run proxy bypass as per requirement of Operation SH due to Coal feeder -1B Belt Maint. Job
Coal feeder area 24V light repaired work
SA-1 Fan motor Both sides Greasing work
Coal feeder-1C &1D knocker not working so clean & check manual now working ok
Following Equipment S/D Given.
2. En-mass Conv-2,
3. vibrating screen-1

Bag house 12-22 seal pressure fault so clean impulse line due to heavy dust so clean now ok
IFC Heavy air leakage so checked & found fitting broken condition so change hose pipe & fittting & air leakage arrested
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Coal Crusher-1 stop time feedback showing RUN in dcs and feeder, so breakar replaced from Crusher-2 and hand over for
operation, Coal crusher original breaker checking are pending.
Bed ash cooler-1A dome valve not operate, due to SOV changeover issue, so SOV from 2A bed ash cooler replace in 1A, an
original SOV checking and removing are pending.
GSC motor U-2 cleaning and blowering done.
Boiler-1 area drain MOV, and J valve MOV cleaning and blowering done.
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).

Following Equipment S/D Given.


1.BC-1
2. BC-2
3. Reclamier
4.12-22 DOME SOLENOID Valve

Coal crusher W/M Connetion work for APS Requirement


2 No's Light repaired work
BC-3 not start due to belt slip so check & found field NDE Side pullchord act so reset done now ok
Coal feeder-C&D Knocker PM Work
WTP hall field equipment cleaning done
bag house vessel 12-22 seal pressure line flushing done
Zishu Hozen at Fire Pump ouse area
Shift jobs carried
In Unit No. # 1 Coal Feeder -1D Belt Weight Q is showing 238 Kg/m in controller. Even Belt is empty condit
Checked at field side Found that one Load cell is faulty. So another Load cell is taken in line. Since Mech. Wo
under prrogress. after completing the Mech. work also feeder calibration is done. (Old D02 Value - 1.96 , Ne
Value - 1.85 )
In Unit No. # 1 Vessel No.--21 level is showing High High value. So cleaned and calibrated the level Probe. Now ok.

In Coal Feeder -1C Feeder Temp. Switch Relay removed from Panel Side due to Tripping of Coal feeder. While Temp. is No
All the AC MCB to OFF Condition.
P&V 4 and 2 OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1.BC-1
2. BC-2
3. Reclamier
4.12-22 DOME SOLENOID Valve

Following Equipment AVI Given.


1. Coal Feeder - 1D.

At Coal Feeder -1D grinder Machine 10 Amps Plug To changed.


At BC-7A / 7B area hand lamp to changed.

Shift jobs carried


DT-2 temp 78 Deg C, DT-5 temp 82 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
VAM floor leakage water bucket full, so drain it.
Load Cell weight shift coal feeder to LAB.
1D feeder outlet MOV engaging issue, and manually valve also not operate, as per operation requirement actuator remove
manually limit provided, feeder hand over for operation.
LED light received and put in charging at 4.5 Mtr.
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).

Following Equipment S/D Given & clear.


1.BC-1
2. BC-2
3. BC-5
4.Coal Feeder 1C
5. Screen-1
6. Screen-2

Coal crusher W/M Connetion work for APS Requirement


2 No's Light repaired work
UPS Master fan failure alarm reset done
Coal feeder-C&D Knocker PM Work
Coal Feeder-1D Outlet MOV Shaft key making & MOV Installed open limit set & close limit set U/P
bag house vessel 12-22 seal pressure line flushing done
Crusher-2 Motor both side Lubrication done
BC 7A &7B Area light not ON check & found lighting timer stuckup so reset done now ok

Screen-1 &2 feeder PM Work & Screen-1 Main contactor FIXED & Moving contact found carbonize so repalced by new one
VAM floor leakage water bucket full, so drain it.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 81 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Coal feeder-1C showing feed rate less than set point, so set its basic tare weight set point to 0, then feed rate showing cor
it was running currect during hole shift
Bed ash cooler-1A level sensor checked showing correct, and found that material got stuck in Bed ash cooler, informed to
side
WTP hall motors cleaning done

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
BAC-1A Field side overflow so check level probe clean & calibration now ok
Unit-2 Drain MOV & J valve MOV Cleaning work done
Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.7 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
5/ Distrilled Water topup done

Fire pump house Fire Engine Battery charger supply board Doubel Earthing done
bag house vessel 12-22 seal pressure line flushing done
Power Report Balanced upto 22/10/2022
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
U-1 BH 12/22 back pressure transmitter fitting leakage attend.
WTP hole area equipment cleaning done.
BLR-1 Lift 2nd floor door alignment issue, so power OFF.
Following Equipment S/D Given.
1.EN-mass-2
Roots blower motor and panel cleaning and blowering done.
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Coal feeder-1C not running less than 200 rpm, again trial taken in Local after some time motor became stop frequently on
need to further check from mechanical jaming
Fly ash silo-2 got overload then reset it
Compressor room all equipment cleaning done
VAM area chilled water inlet line water leakage bucket found full so drain it
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.EN-Mass Conv-2
2.Coal Feeder 1C
3.BC-4
4.COAL BUNKER -2D DISCHARGE MOV 02MV0908
5.COAL BUNKER -1C DISCHARGE MOV 01MV0907

Following Equipment S/D Clear.


1.EN-Mass Conv-2 (Local mode change as per Maint team requirement.)
Following Equipment AVI Given.
1.EN-Mass Conv-2
2.Coal Feeder 1C
Bag house-1 light timer replaced.
Boiler-1 &2 Camera cleaning done.
Bed Ash cooler-1A &1B SOV JB Connection tightness done.
Chimney Analyzer room panel cleaning done.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Exhaust fan Panel & STG RSB Panel Cleaning work
Fly ash silo-2 got overload then reset it
Dosing room equipment and panel cleaning and blowering done.
IFC Filter Drain work
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 80 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.EN-Mass Conv-2
2.Coal Feeder 1C
Following Equipment AVI given.
1.EN-Mass Conv-2 (Local mode change as per Maint team requirement.)
Boiler-1 RSB cleaning work at firing floor

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 77 Deg C, DT-5 temp 81 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
U-1 Coal feeder area Blower ELCB replaced.
BC-7A/B area light power OFF, so ON done.
Following Equipment AVI Clear.
1.EN-Mass Conv-2 (Remote mode change as per Maint teamwork completed. .)
Following Equipment AVI Given and clear.
1.Coal Feeder 1C
Following Equipment S/D Clear.
1.EN-Mass Conv-2
2.Coal Feeder 1C
2D Bunker Outlet MOV motor fixing done.
1C Bunker Outlet MOV Close limit set and trial run healthy, Open limit checking pending due to mech. welding broken from
position.(feeder power supply OFF)
1C feeder outlet MOV close limit set and trial run healthy.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
1 no's Emergency LED Light given to Operation dept & return after work
Unit-1 Baghouse vessel 11-21 seal pressure fault showing 4.5 kg check & found SOV not operate so change SOV from Unit-
now ok old SOV kept in Lab
Dosing room equipment and panel cleaning and blowering done.
Following Equipment shutdown Given
1.Coal Feeder 1C outlet Discharge MOV
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
chimny SPM reading shows 150, In CPCB is 27
Chimny analyser o2 showing 12% , so increase by parameter 1-0, and showing now 9.8%
Boiler-1 Lighting time adjust in DCS at 6.15 p.m

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
P&V 2 status checked, found running healthy..
WTP MCC and Motor cleaning & blowering done.
Following Equipment shutdown Given and clear
1.BLR-1 COMMON SEALING PRESSURE VALVE 11-21 VESSEL
BH-11/21 seal check found-21 seal damaged, so mech work all inst. Connection removed and after work completed all con
given and trial run healthy.
BH-12/22 back pressure line flushing done.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 80 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.EN-Mass Conv-1
2.01MV907-1C bunker O/L
3. BC-1
4. soot blower-1

Following Equipment AVI Given


1.En Mass-1 also put in Local as per requirement of CHP person

All coal bunker outlet MOV feeders checked for Relay setting , 1D relay found oversize so replaced it, now all relay is in ran

MOV907 of coal bunker-1C connection removed as per requirement of mechanical maintenance, again reconnect , Now tr
pending
APH-2 air leakage found from fitting, so replaced the nfitting
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 79 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
1C bunker Outlet MOV Close limit set and trial run healthy.
Following Equipment S/D Clear.
1.EN-Mass Conv-1
2.BC-1.
3.Soot blower-1

Following Equipment AVI Clear.


1.EN-Mass Conv-1 (Remote mode change as per Maint teamwork completed. .)
Following Equipment AVI Given and clear.
1.1C Bunker outlet MOV.
2.Soot blower-1
Coal feeder area drill machine plug top replaced.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
1 no's Emergency LED Light given to Operation dept & return after work
Boiler -1 6 no's Drain MOV & J Vlave MOV Cleaning work
Dosing room equipment and panel cleaning and blowering done.
Shift jobs carried
U#1 , Bag house vessel 12-22 seal pressure line flushing done
U#1,Coal bunker outlet MOV 0909,0910,0911,0912 feeders checked , Motor Kw, 0.37 kw, FLC-1.6 Amp, relay range 1.30 to
, and Relay setting at 1.5 amp for, safe operation of MOV
One hand lamp shift from CHP building to work shop.
Green tag check and paste at , Hand breakar and one 230 volt extension board ,near P&v 4.
Compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.COAL FEEDER 1 C
2.RECLAIMER
3. BC-1

Following Equipment AVI Given


1.COAL FEEDER 1 C
MVAR is not run in auto mode. So Put into auto mode by decreased the excitation. Now in auto mode.
DT-2 temp 75.2 Deg C, DT-5 temp 79.4 Deg C , DT-6 temp 72.9 Deg C.
VAM checked physicically, found running healthy..
Shift jobs carried

In Unit No. # 1 Vessel No.--11/21 level is showing High value. So cleaned the level Probe. Now ok.
In Unit No. # 1 Vessel No.--11 /21 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is chocked co
So cleaned the impluse line. Now ok.
ETP Panel Lock to provided and laptop Placed in Inst. Lab almirah.
All the AC MCB to OFF Condition.
P&V 2 is in running Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1.BC-1
2. Reclaimer

Following Equipment AVIClosed.


1. Coal Feeder - 1C.

At Side Stream Filter area Street timer adjusted. ( Old Time- 6.45 PM , new time- 6.15 PM )
At Coal feeder area lighting timer is structed. So Reset it. Now ok.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, BC-4.etc..)
P&V 2 status checked, found running healthy..
Clean run 1D tripped in overload reset and current checked found 1.0 amp balance current taken, and suddenly taking hig
inform to operation for cleaning.
01MV0912 Coal feeder-1D Outlet damper valve close limit act and manually handle its also not close, so as per operation
requirement MOV actuator removed for manually valve close.
Shift jobs carried
In Unit No. # 1 Vessel No.--12 /22 Seal Pr.is not showing at DCS end. So checked and found that Impluse line is chocked co
Also in Guage pr. It is showing 4.0 Kg/cm2.So cleaned the impluse line. Now ok.
In Compressor House all the auto drain valve checked. It is working Normally.
All the AC MCB to OFF Condition.
P&V 2 is in running Condition.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1.BC-2
2. BC-4 Bag Filter ,
3. Coal Crusher No.-1 ,
4. Coal Feeder -2D Discharge MOV

In Mech workshop area grinder Machine cable cut. So Reconnected it. Now ok.
In GSC-1A earthing is in loose condition. So Tightness to done.
In Unit No. # 1 generator Voltage is increased to reduced it. Now ok.

Shift jobs carried


DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
UPS Fan failure alarm reset done
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Baghouse-1 12 no' svessel dome not close given found valve jammed condition so jammed free now ok

In Unit No.#1 Vessel No.-12/22 Conveying is not stop. So Checked at field side Impluse line of Back Pr. Swit
Transmiiter is chocked condition. So Cleaned the Impluse line. Then taken in line. Now it is working Norma

01MV0912 Coal feeder-1D Outlet damper valve both limit act so release both limit & close limit set & valve manually open
Operation requirement
Silo Root Blower Panels & Motors cleaning done
Shift jobs carried

In Unit No. # 1 Coal Feeder O/L MOV not closed from field side. So Dismentating the actuator. Then Valve is
operated. It is free no Jamming at field side. So again mounted at site. Then Operated it. Then Set the open a
Closed Limit Switch at site. While operating the MOV some times Limit is comes in between. So removed it.
Torque is set at site. Then Trial taken. it is working normally. Also handover to Operation Person.

In Unit No. # 1 Coal feeder is not started from DCS end. So checked and found that VFD is in manual. So Put into Remote m
Now it is working normally.
All the AC MCB to OFF Condition.
P&V 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Fire Pump House Battery voltage checked and Found it 13.0 Volts.
In Unit No. # 1 generator Voltage is increased to reduced it. Now ok.
In Unit No. # 2 Lift Ground Floor PB Cover Polythene tape to Provided.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 79 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
At ACW pump house area Street timer adjusted. ( Old Time- 6.15 PM , new time- 6.00 PM )
APH Common valve 8127 limit set as per operation requirement.
U-1 BH 12/22 seal pressure line flushing done.
Bed AS silo plate valve jammed, so tube interchange and jam clear, then after trial run.

Shift jobs carried


DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
UPS Fan failure alarm reset done
Manual Light to OFF ( Fire pump house and Boiler 4th to 7th floor.)
Following Equipment Isolation & AVI Given
1/ Coal Feeder- 1C

Common outle Coveying solenoid valve SOV limit tight by armour now limit bolt Provied & Limit cover tight by bold.

BLR-1 6 no's Drain MOV Cleaning work


Coal feeder-1C Open & close limit set & trial taken
Soot Blower-1 Panels Cleaning work
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.Reclaimer.
2.Bucket Elevator-2
3. Coal Feeder-1C
4.U-1 BH 12/22 inst air valve
5.

Following Equipment AVI Given.


1.Coal Feeder-1C
Following Equipment S/D Clear.
1.Coal Feeder-1C
VAM area chilled water inlet line water leakage bucket found full so drain it
U-1 BH 12/22 Back pressure line flushing done.
U-1 BH 12/22 HH level probe checked as per operation requirement.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 76 Deg C, DT-5 temp 79 Deg C , DT-6 temp 75 Deg C.
Office Ac supply made off .
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D clear


1.Reclaimer.
2.Bucket Elevator-2
3.U-1 BH 12/22 inst air valve

WTP Pump house motors cleaning work


Boiler-1 P Fan IGV Valve checking work Positioner checking work done
BC- 7A & 7B area handlamp repaired work
Coal feeder-1A Level reset done as per requirement of operation dept.
Shift jobs carried
Coal feeder-1A Level is not showing correctly. So Power Reset it. Now Ok.

In VAM System 01 times bucket to empty.


In Chimney analzer area All the Inst. Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
TG-1 Exhust panel Cleaning to done.
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
At 22 mtrs 24 Volts LED to repaired.
In CHP Tool Room , First floor 230 Volts Charger Point damaged . So new required.
Date Shift Engineer Name

01.11.2022 B Ashvin Jadav

Date Shift Engineer Name

01.11.2022 C Sanjay Garg

Date Shift Engineer Name

02.11.2022 A Ashvin Jadav


Date Shift Engineer Name

02.11.2022 B Tarun Gaur

Date Shift Engineer Name

02.11.2022 C Sanjay Garg

Date Shift Engineer Name

03.11.2022 A Gajendra Pandya


03.11.2022 A Gajendra Pandya

Date Shift Engineer Name

03.11.2022 B Tarun Gaur

Date Shift Engineer Name

03.11.2022 C Ashvin Jadav

Date Shift Engineer Name


04.11.2022 A Tarun Gaur

Date Shift Engineer Name

04.11.2022 B Sanjay Garg

Date Shift Engineer Name

04.11.2022 C Ashvin Jadav


04.11.2022 C Ashvin Jadav

Date Shift Engineer Name

05.11.2022 A Tarun Gaur

Date Shift Engineer Name

05.11.2022 B Sanjay Garg


Date Shift Engineer Name

05.11.2022 C Amit kumar singh

Date Shift Engineer Name

06.11.2022 B Ashvin Jadav

Date Shift Engineer Name

06.11.2022 C Tarun Gaur

Date Shift Engineer Name


07.11.2022 A Ashvin Jadav

Date Shift Engineer Name

07.11.2022 B Tarun Gaur

Date Shift Engineer Name

07.11.2022 C Sanjay Garg


07.11.2022 C Sanjay Garg

Date Shift Engineer Name

08.11.2022 A Gajendra Pandya

Date Shift Engineer Name

08.11.2022 B Amit kumar singh

Date Shift Engineer Name

08.11.2022 C Sanjay Garg


08.11.2022 C Sanjay Garg

Date Shift Engineer Name

08.11.2022 A Gajendra Pandya

Date Shift Engineer Name

09.11.2022 C Sanjay Garg

Date Shift Engineer Name


09.11.2022 A Amit kumar singh

Date Shift Engineer Name

10.11.2022 B Tarun Gaur

Date Shift Engineer Name


10.11.2022 C Ashvin Jadav

Date Shift Engineer Name

11.11.2022 A Tarun Gaur

Date Shift Engineer Name

11.11.2022 B Sanjay Garg


11.11.2022 B Sanjay Garg

Date Shift Engineer Name

11.11.2022 C Ashvin Jadav

Date Shift Engineer Name

12.11.2022 A Tarun Gaur


12.11.2022 A Tarun Gaur

Date Shift Engineer Name

12.11.2022 B Sanjay Garg

Date Shift Engineer Name

12.11.2022 C Amit kumar singh


Date Shift Engineer Name

13.11.2022 A Sanjay Garg

Date Shift Engineer Name

13.11.2022 B Ashvin Jadav

Date Shift Engineer Name

13.11.2022 C Tarun Gaur

Date Shift Engineer Name


14.11.2022 A Sanjay Garg

Date Shift Engineer Name

14.11.2022 B Ashvin Jadav

Date Shift Engineer Name

14.11.2022 C Tarun Gaur


Date Shift Engineer Name

15.11.2022 A Amit kumar singh

Date Shift Engineer Name

15.11.2022 B Ashvin Jadav

Date Shift Engineer Name

15.11.2022 C Sanjay Garg


15.11.2022 C Sanjay Garg

Date Shift Engineer Name

16.11.2022 A Ashvin Jadav

Date Shift Engineer Name

16.11.2022 B Tarun Gaur


Date Shift Engineer Name

16.11.2022 C Sanjay Garg

Date Shift Engineer Name

17.11.2022 A Tarun Gaur


Date Shift Engineer Name

17.11.2022 C Ashvin Jadav

Date Shift Engineer Name

18.11.2022 A Tarun Gaur

Date Shift Engineer Name


18.11.2022 B Sanjay Garg

Date Shift Engineer Name

18.11.2022 C Ashvin Jadav

Date Shift Engineer Name


19.11.2022 B Sanjay Garg

Date Shift Engineer Name

20.11.2022 B Ashvin Jadav

Date Shift Engineer Name

20.11.2022 C Tarun Gaur

Date Shift Engineer Name


21.11.2022 A Sanjay Garg

Date Shift Engineer Name

21.11.2022 B Ashvin Jadav

Date Shift Engineer Name

21.11.2022 C Tarun Gaur


21.11.2022 C Tarun Gaur

Date Shift Engineer Name

22.11.2022 A Ashvin Jadav

Date Shift Engineer Name


22.11.2022 B Amit kumar singh

Date Shift Engineer Name

22.11.2022 C Sanjay Garg

Date Shift Engineer Name

23.11.2022 A Ashvin Jadav


23.11.2022 A Ashvin Jadav

Date Shift Engineer Name

23.11.2022 B Amit kumar singh

Date Shift Engineer Name

23.11.2022 C Sanjay Garg

Date Shift Engineer Name


24.11.2022 A Tarun Gaur

Date Shift Engineer Name

24.11.2022 B Amit kumar singh

Date Shift Engineer Name


24.11.2022 C Sanjay Garg

Date Shift Engineer Name

25.11.2022 A Tarun Gaur

Date Shift Engineer Name

25.11.2022 C Amit kumar singh


Date Shift Engineer Name

26.11.2022 A Tarun Gaur

Date Shift Engineer Name

26.11.2022 B Sanjay Garg

Date Shift Engineer Name

26.11.2022 C Amit kumar singh


26.11.2022 C Amit kumar singh

Date Shift Engineer Name

27.11.2022 A Sanjay Garg

Date Shift Engineer Name

27.11.2022 B Tarun Gaur

Date Shift Engineer Name

27.11.2022 C Ashvin Jadav

Date Shift Engineer Name


28.11.2022 B Ashvin Jadav

Date Shift Engineer Name

29.11.2022 C Sanjay Garg

Date Shift Engineer Name

29.11.2022 B Ashvin Jadav


Date Shift Engineer Name

29.11.2022 C Sanjay Garg

Date Shift Engineer Name

30.11.2022 B Ashvin Jadav

Date Shift Engineer Name

30.11.2022 C Sanjay Garg


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
DSLC TG-1 Base load set point 12500 kw verify.
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
DSLC TG-1 Base load set point 12500 kw verify.
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
DSLC TG-1 Base load set point 11800 kw as per running load
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 11800 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 1000 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12500 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12500 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12500 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12500 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 1500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12000 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12000 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point changed 12500 kw for manual stop.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12000 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12000 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Gen voltage goes to 11.30 to 11.60 between 20:30 to 21:00 hrs., so reduce tap voltage from tap
position 7 to tap position 5
VAM area chilled water inlet line water leakage bucket found full so drain it
C7-AB area light MCB OFF condition so ON done.
ACW pump house are lighting timer stuck up, so reset done.
Extension board removed near P & V 4 area.

BAC-1B WATER LINE sov not operate, so checked and found jammed, so inform to operation.

P&V 2 water overflow, so Valve close done..


Shift jobs carried
In Compressor House all the auto drain valve checked. It is working Normally.
In VAM System 01 times bucket to empty.
In WTP hall area All the Inst. Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At Unit No.# 1 Carbon Black area Light ON as per operation requirement.
At WTP Furnace oven earthing is open so reconnected it. Now ok.
In Unit No. # 1 generator Voltage is increased . Now ok.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
VAM area chilled water inlet line water leakage bucket found full so drain it

Following Equipment S/D Given.


1.BC-7B
2.En-Mass-1
3.En-Mass-2
4.CT Fan-1

Crusher house tool room 1-phase domestic 6.0A socket replaced for walkie talkie charging work.
Following Equipment AVI Given. (Also Changed from Remote to Local as per maint team
requirement)
1.En-Mass-1
2.En-Mass-2
EOP-2 Power ON and OFF as per operation requirement.
Coal feeder-1B controller replaced with 2B for trial purpose, and again normalized with original.

Chimney analyzer calibration work under progress by G shift team.


Main transformer-1 TAP position changed from TAP 7 to 9 due to grid voltage goes to down up to
126.0 KV.
ACC-1 area extension board provided to mech team.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Switchyard GT-1 main oil tank silica gel found Pink Condition so replaced by Fresh silica gel

VAM area chilled water inlet line water leakage bucket found full so drain it

Following Equipment S/D clear


1.BC-7B
2.En-Mass-1
3.En-Mass-2

CHP DCS Panel -94 no Earthing wire broken condition so reconnect it


VAM ARea Chiller Pump JB Rubber mat laying work
BAC-1B Fied Panel Rubber Mat Laying work
P&V 2 water overflow, so Valve close done..
Shift jobs carried
In Chimney analyzer Room is very hot. Found that AC is OFF Condition. So ON the AC. Now Ok.

In VAM System 01 times bucket to empty.


Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In ACW area Light ON ( ELCB-ON ) as per operation requirement.
At Bike Stand Lighting Timer OFF timer increased from 5.30 AM to 6.30 AM.
In Unit No. # 1 generator Voltage is increased . Now ok.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
VAM area chilled water inlet line water leakage bucket found full so drain it
Following Equipment S/D Given.
1.BC1
2.BC2
BC-1 spare feeder checking work
Bag house -12-22 conveying time reduced , so check the Pressure swich line and flushing it

cilynder shifting work from chimny analyser room


earthing strip shfting work from china office to pump house for earthing pit welding
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 77 Deg C, DT-5 temp 80 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
Generator -2 Space heater ON & Off for winding temprature maintain
Following Equipment S/D Given.
1 / Baghouse-1 Vessel-11
VAM area chilled water inlet line water leakage bucket found full so drain it
Following Equipment S/D clear
1.BC-1
2.BC-2

4.5 mtr. Near MOT Lighting JB found open condition so packing by packing tape
Switcyard lighting timer ON Time adjstment done
Boiler-1 Pfan IGV Positioner reinstalation , air leakage tube changed , Fitting found Broken so
change trial taken from CCR found OK
Boiler-1 11-21 seal pressure fault checked in field found in tube heavy dust so check & found 11
no's vessel seal leakagee so inform to shift incharge
Sox factor changed in CPCB PC 0.54 to 0.6 due to high stack
BAS suit not up & down so check & found Overlaod realy act so reset now OK
Shift jobs carried
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
ACC-2 area Repair supply box-69, MLDB and power JB cleaning and blowering done.
BC-7A belt not run from DCS, so checked and found emergency stop from field, so release and trial taken found running he
compressor house area charging light given and removed for Maint. Work.
Bag house 11-21 back pressure transmitter line flushing done, as per operation requirement.
Inst. Air Comp-2 not getting Loading after 00:00 Hrs., so checked and found Loading/Unloading
SOV not functioning proper, so replaced the same with new one, and trial running healthy.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 77 Deg C, DT-5 temp 81 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
Coal feeder AB vertical line Knocker not working, so Dismantle CHECK & found filter damaged so
cheange by new one now ok
Coal Feeder AB Knocker Protection Sheet coverded Provided

Following Equipment S/D Given.


1Crusher-1
2Crusher-2
3. Screen-1
4. Screen-2
5. Bucket Elevator-2
6. Soot Blower-2 (Closed)

Following Equipment AVI Given. (Also Changed from Remote to Local as per maint team
requirement)
1.Bucket Elevator-2

Bucket Elevator-2 Put on Local mode as per Mech. Mait. Team requirement ( Mr. Mahendra Singh)

CT Fan-2 &3 Motors Both Sides Greasing done


Green tag Provided 2 no's Extension Board at Mech . Dept
Shift jobs carried

In Unit No. # 1 Coal feeder --1C Pneumatics valve is not operating from DCS end. So checked at
field side found that Inst. Air valve is in closed condition. So Open the Valve . Then hose pipe
damaged. So replaced the hose pipe from Unit No. # 2 pneumatics valve. Then Trial taken. Valve is
jammed condition. So Informed to Shift incharge.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
In BC-7A Belt is not started from DCS end. So checked at feeder side ON delay timer
relay is faulty. So replaced the relay. Now Ok.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1Crusher-1
2Crusher-2
3. Screen-1
4. Screen-2
5. Bucket Elevator-2

Following Equipment AVI Closed. (Also Changed from Local to Remote ) .


1.Bucket Elevator-2

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
WTP area motor cleaning and blowering done.
24v hand lamp repaired at C7A area.
Dosing room panel and field equipment cleaning and blowering done.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 77 Deg C, DT-5 temp 81 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
BAS Level found Faulty so level probe clean & calibration now ok
CHP Tools Room Faulty supply socket Replaced by new socket

Following Equipment S/D Given.


1Crusher-1
2Crusher-2
3. BC-7A
4. BC-7B
5. BC-1
6. Reclamier

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities
carried out-
1/ Battery Voltage check- 12.7 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Bag house -1 11-21 veseel Level H-H 11 no's veseel level probe clean & calibration done & 21 no's
found material inside
Green tag Provided RSB-69 at Fly ash silo area
Shift jobs carried

In Unit No. # 1 Vessel No.--11 /21 back pr. Switch and Transmitter is not showing at DCS end. So
checked and found that Impluse line is chocked condition. So cleaned the impluse line. Now ok.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
EN - mass No. -1 is tripped due to Overload. So as per shift incharge requirement O/L
is reset and Put into Local mode.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1Crusher-1
2Crusher-2
3. BC-7A
4. BC-7B
5. BC-1
6. Reclamier

In Unit No. # 1 Coal Feeder -1A , 1B , 1C and 1D Load cell Purging to done.
In Fire Pump Battery Voltage checked it is showing 12.9 Voltage.

Shift jobs carried


Bag house 11-21 back pressure not showing in ccr so check in field, back pr. And transmitter line cleaning done.

Coal feeder 1C checked as ccr informed it not run while, at panel it take 2.4 amp at 4.4 Hz, in field
motor with gearbox running normal but belt not move due to shaft free. Motor temprature also
normal.
Coal feeder 1 C outlet MOV require to close fully as it stop at 80 % so check it with operator find its
lever running too hard due to jam ,so inform to ccr .
HP & LP Dosing room motors cleaning & blowering work
Chimney NOX lavel show at 312mg/Nm3 so its check and factor reduce till
256mg/Nm3 lavel.(2.1 TO 1.7)
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
DT-2 temp 78.1 Deg C, DT-5 temp 78.9 Deg C , DT-6 temp 74.5 Deg C.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Gen voltage goes to 11.60 ,so reduce tap voltage from tap position 7 to tap position 5
CHP Bucket elevator floor all equipment cleaning and blowering done.
Following Equipment S/D And AVI Cleared.
1. En-Mass-1 (Also Changeover from Local to remote)
Nox value changed in DCS and Analyzer PC, as per Nox value goes above 300.

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 75 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
GSC-1A &1B Motors cleaning work
Manual Light to OFF ( Boiler 4th to 7th floor etc.)
Chimney analyse room Panels cleaning work
Following Equipment S/D & AVI Given
1/ Coal Feeder-1D
24v hand lamp repaired at C7A area.
RG-1 0 mtr. All MOV & Control valve cleaning work
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 82 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Chimney analyzer Probe purging air cylinder Pu tube leakage, so replaced and now healthy.

Following Equipment S/D Given.


1.BC-7B,
2.Bucket Elevator-1,
3.Bucket Elevator-2,
4.BC-1 (02 times),
5.Reclaimer,

Following Equipment AVI Close and S/D Clear.


1.Coal feeder-1D (AVI and S/D Clear).
2.CT fan -1 S/D clear.
Boiler-2 Sox Purging air cylinder Pu tube leakage, so valve isolate.
ETP data not showing, so power reset, and now showing healthy.
Boiler-1 Hydra step leakage found, so marking done and inform to CCR.
BC-1 Pull cord maintenance work under progress by G shift team.
BC-4 area 24v LED top replaced.
Boiler-1 welding machine earthing LUG replaced.
CHP air blower filter cleaning done.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Coal Crusher-1 RTD head & Base bolt found damaged condition so Proper adjusment & Packing by
Packing tape
Boiler-1 switchyard side hydrastep found leakage so marking done

Following Equipment S/D Clear.


1.BC-7B,
2.Bucket Elevator-1,
3.Bucket Elevator-2,
4.BC-1 (02 times),
5.Reclaimer,

Following Equipment S/D Given.


1.Boiler-2 Euipments (Permit Renew)
Bucket Elevator-2 Put on Local to Remote mode
Shift jobs carried
In Unit No. # 1 Boiler Drain MOV Cleaning to done.
IFC Filter Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At Unit No.# 1 Carbon Black area Light ON as per operation requirement.
At BC-7A / 7B area 24 Volts hand lamp to Provided.
In Unit No. # 1 RSB-18 ELCB checking to done.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 83 Deg C , DT-6 temp 76 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.BC-7A,
2.BC-6
3.BC-1
4.Magnetic saparetor BC6

Following Equipment S/D Clear.


1BC-1

Boiler-1 drum hydrastep thermostate elctrod changed


Lift door button packing done
Shift jobs carried
Chimney analyzer ,check its drain pump not work properly so its exchange with Boiler #1 , SOX
analyzer.Now work ok.
Hydrastep leakage arresting done by tight it Nut.
Area light timer change from DCS.
AFR unit visit done with plant CHP electrician and TPP electrician.
Coal feeder area RSB Panel Green Tag Updated done
Office Ac supply made OFF.
Boiler-1 switchyard side hydrastep found leakage so marking done
Following Equipment S/D Clear.
1.BC-7A,
2.BC-6
3.Magnetic saparetor BC6
DT-2 temp 80 Deg C, DT-5 temp 83 Deg C , DT-6 temp 78 Deg C.
P&V 2 status checked, found running healthy..
Shift jobs carried
In Unit No. # 1 Coal feeder -1A pneumatics valve is not closed from DCS. So checked and found
that SOV Supply is OFF. So ON the supply. Then giving the Closed command Valve is closed only 5
to 10 %. Due to Jamming. So Informed to shift operator.
Chimney analyser room AC to ON.
In Compressor House all the auto drain valve checked. It is working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At Unit No.# 1 Carbon Black area Light ON as per operation requirement.
In Unit No. # 1 generator Voltage is increased . Now ok.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 78 Deg C, DT-5 temp 82 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.En mass-2
2.Bucket Elevator-2
3.Reclaimer
crusher building open JB made closed
EOP-2 Power ON and OFF as per operation requirement.
Coal bunker unit 1 level transmitter cleaning done

Bag house-1 , vessel-11 dome valve air tube found damaged , so cut and reconnect the tube

Shift jobs carried


In Unit No. # 1 at 00.53 AM Furnace Pr. Low Pressure Switch acted ( 01PIAZ1101 and 1102 .) While
Furnace Pr. Reading around -1052/-1074/-1071 pa. also all the feeder Tripped. So reset the MFT it.
Then Started it in auto mode.

In Solar reading Hospital (EM-2) reading is not showing in Online. So Informed to Mr. amit. He is
updated the sheet. So upload in the SAP.

In Unit No. # 1 Vessel No.-12 /22 back pr. Switch and Transmitter is not showing at DCS end. So
checked and found that Impluse line is chocked condition. So cleaned the impluse line. Also Heavy
material from impluse line. So informed to Shift operator.

We have received Phone from Qualitity Control Person that in AFR Cutting machine gate is not
closed from Push button. So our electrical operator goes to AFR. He told me that MCC room is in
locked condition. So informed to MPSS Person he give the key of MCC Room. Then as per written
paper on PLC Panel directly Picked up the Contractor. Then Closed the gate. Now AFR is in running
condition.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Unit No. # 1 Coal feeder area JB Coverning to done.
In Unit No. # 1 generator Voltage is decreased . Now ok.
In Chemical dosing room Motor cleaning to done.

Shift jobs carried


U.PS #1 andU.P.S. #2, master and slave panel both show 1-Rectifier fault alarm and battery
discharge alarm, so inform to Pramod sti sir UPS#1, rest by him, UPS #2, alarm continue.
Bag house 12-22 seal presure line flushing two times.
Office Ac supply made ON.
One plug top change of grinder at mechanical work shop.
Boiler 1, near bed ash cooler are , welding macine not work doe to connection loose ,so tight it.
EOP-2 Power ON and OFF as per operation requirement.

Following Equipment S/D Given.


1.BC-4,
2.Reclaimer,
3.Coal crusher-2,
4.Bed ash silo dry unloading,
5.Coal feeder 1D,

Following Equipment AVI given.


1.Coal feeder 1D,
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 83.4 Deg C , DT-6 temp 77.8 Deg C.
Lift telephone check working ok.
Shift jobs carried
Chimney Aviation light not glowing so check & found Lighting timer stuckup now timer reset done
now ok
1 no's 24 V Emergenecy handover to Operation dept at Coal feeder area
old spare tansformer shifting from Reclamier cabin to Mech W/S
Clean Run Motor 1C Conection remove & Connection done after work & motor Double Earthing
done

Boiler-1 all hubbing device checked found open condition so closed & Packing done
Office Ac supply made OFF.
Following Equipment S/D Given.
1.Coal Feeder -1C

Following Equipment AVI given.


1.Coal feeder 1D,
Following Equipment S/D Given.
1.BC-4,
2.Reclaimer,
3.Coal crusher-2,

DT-2 temp 77 Deg C, DT-5 temp 83 Deg C , DT-6 temp 74 Deg C.


7A Belt pullcord rope metal welding broken so rope new metal to fixed done
7A & 7B one lighting cable shift to inst. Lab
1A Level transmittor open condition so proper covered it
In Coal Feeder -1C Feeder Temp. Switch Relay removed from Panel Side due to Tripping of Coal
feeder. While Temp. is Normal.
Shift jobs carried
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
Boiler-1 drain MOV, J valve MOV cleaning and blowering done.
BH-12 level high, so checked and found actual level high, so inform to operation.
AFR press machine door close issue, so manual operation done, and trial run healthy.
U-1 GSC motor cleaning and blowering done.

Shift jobs carried

U.PS #1 andU.P.S. #2, master and slave panel both show 1-Rectifier fault alarm and battery
discharge alarm, so inform to Pramod sti sir UPS#1, rest by him, UPS #2, alarm continue.
1 no's 24 V Transformer shifted to Electrical W/S
Office Ac supply made ON.
Coal feeder-1C trip so check & found proxy not rotataing found Proxy shaft damaged so inform to CCR
Jishu Hozen at HSD Tank Area
Boiler-1 Desuperheater inlet isolation valve 3210 not operate boh DCS & Manual so checking
work U/P

Following Equipment S/D Given.


1.BC-1,
2.BC-2
3.Coal crusher-1,
4.BC-7A &7B
,

RSB-8 near spare cable indentified & open insulation PVC Tap applied & cable dressing doen &
Rubber mat laying at RSB-8 Panel
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 83.4 Deg C , DT-6 temp 77.8 Deg C.
Lift telephone check working ok.
Shift jobs carried

In Unit No. # 1 DSH O/L MOV ( 01MV3210 ) is not operating from DCS end. Also manually as well
as DCS is not operating at site. Also Both the Limit switch is showing at DCS end. So changed the
MOV from Unit No. # 2 DSH O/L MOV. Then Trial taken. Still it is not operating from DCS end as
well as Manually. So changed the BUSH between actuator and Valve. Then Manually Trial taken. It
is working Normally. Also Set the opened and Closed Limit switch. Then Trial taken from DCS end.
It is working Normally.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
BC-7A belt not run from DCS, so checked and found Guard Limit switch is not acted at
site. For Cleaning Purpose Guard is opened. So Guard limit switch is Properly closed at
site. Then Trial taken. It is working Normally.
In Bed ash silo shoute is not up and down from Local EPB. So checked and found that
Up switch is in auto mode. At panel end. So put into Local mode. Then trial taken. It is
working Normally.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1.BC-1,
2.BC-2
3.Coal crusher-1,
4.BC-7A &7B
,

In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.


In CHP all the EPB released from field side.

Shift jobs carried


DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
Dosing room panel and field equipment cleaning and blowering done.
BH-12 level high, so checked and found actual level high, so inform to operation.
C7-AB area light MCB OFF condition so ON done.
C7-AB area 24v light provided.

Shift jobs carried


TG-1 turbine trip on low vaccum at 10.20 am & again synchronised at 11.20 am

Crusher Building 0 mtr. W/M not working so check & found Power cable wire open in plug top so
reconnect & on/off switch supply found loose tightness done & Handover to CHP Team

Office Ac supply made ON.

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities
carried out-
1/ Battery Voltage check- 13.7 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

Jishu Hozen at Fire Pump House area


WTP Bombcalorimeter O2 cylinder pressure gauge pu tube leakage observed so pu tube leakage
arrested
Following Equipment S/D Given.
1.BC-1,
2.BC-4
3.Screen-1
4.Screen-2
5. BAC-1A

Bed ash silo pneumatic valve cylinder fitting air leakage arrested
P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 83.4 Deg C , DT-6 temp 77.8 Deg C.
ACC-1C Breaker trip on overcurrent so reset done now supply healthy
Shift jobs carried
In Bed ash silo air leakage from PU Tube of main SOV. So cut the PU Tube and reconnected it.
Now Ok.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
In Chimney analyzer all the Panels Cleaning and Blowerning to done.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1.BC-1,
2.BC-4
3.Screen-1
4.Screen-2
5. BAC-1A

In Unit No. # 1 Generator Earth alarm is showing at Mimic panel. So checked at Generator
Protection Panel Rotor Voltage (+ side ) - 6 Volts. And Rotor Voltage (- side )- 66 Volts.

In BAC-1A AVI is given and Panel Remote to Local Provided as per maintences dept.
In ACC fan -1C and 1F VFD seperated. Now running in separate mode as per
requirement.
in AFR Hydraulic filter machine connection to changed as per requirement.
In Silo area Emergency Light to Provided.
In MVAR Put into Remote mode by raise the excitation. Now Ok.
Shift jobs carried
In Unit No. # 1 Generator Earth alarm be normal at 11.30pmas Generator Protection Panel Rotor
Voltage (+ side ) - 23 Volts. And Rotor Voltage (- side )- 26 Volts at 13.5 MW load at TG.

Bag house 12-22 seal presure line flushing done as it goes faulty.
Coal bunker-1C Level transmitter reset done as per requirement of operation dept.
At 4.5 meter all instrument equipment cleaning done.
1 no's Emergency LED Light given to Operation dept & return after work
compressor house auto drain valve manually checked found healthy.
DT-2 temp 79 Deg C, DT-5 temp 80 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP

Shift jobs carried


In Bed ash Silo RAV is tripped due to O/L. Due to jamming purpose. Mech. Work is
underprogress.
In MVAR Put into Remote mode by raise the excitation. Now Ok.
In Fly ash system Vessel No.-11level probe is contionuous showing High at DCS end.
So Cleaned and calibrated the Level Probe. Now ok.
In Silo area welding machine Plug top wire is reconnected. Now Ok.
P&V 2 status checked, found running healthy.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
In Bed ash silo Plate valve is not operating due to jamming purpose. So 2 to 3 times
manually operated. Now Ok.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 80 Deg C, DT-5 temp 79 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
CCR desk Mic sound issue, so cleaning and then running normal.
AFR HMI work done with G shift person.
HPP VFD panel packing done by tape.
C7-AB area 24v hand lamp repaired.
C7-AB area motor JB cleaning and blowering done.
Shift jobs carried
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Soot Blower -1 Panel cleaning work
Crusher house W/M green tag expire now updated
Coal feeder-1D not start from DCS so check in Field Panel found Clean run stop push button
stuckup so release now feeder healthy &running
CCR CHP Walkie Talkie not working so repair & Battery replaced checked working
T-1 0 mtr all Instruments equipments cleaning work
Baghouse -1 11-21 seal pressure pu tube pinch air leakage so cut & rejoint now leakage arrested

Shift jobs carried


In Unit No.# 1 Coal Feeder -1D is started in Local mode also Panel Put into Local mode
as per operation requirement.
In Unit No. # 1 Master UPS fan failure alarm is showing So reset it. Now Ok.
In CHP BC-7A belt is not started in DCS . So checked and found that In Local it is also
not started. So checked at field side guard limit is not properly cut. So Adjusted it.
Then it is started then tripped due to O/L. Also due to Jamming condition. So informed
to Shift Incharge.

Following Equipment S/D Given.


1.BC-2,
2.BC-7A
3.BC-7B
4. EN Mass No.-2

P&V 2 status checked, found running healthy.


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
EN - mass No. -2 Put into Local mode as per Maintences requirement.
At CHP BC-7A area Hand Lamp to Provided.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 71 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.BC-2,
2.BC-7A
3.BC-7B
4. EN Mass No.-2 (Also Changeover from Local to remote) AVI Closed.

C7-AB belt guard limit checked as per operation requirement, found healthy.
ETP data not showing, so power reset, and now showing healthy.
BC-2 Pull cord maint work done.
BC-7A area 24v lamp replaced and LED plug top replaced.
Shift jobs carried
DT-2 temp 78 Deg C, DT-5 temp 81 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Chimney Aviation light not glowing so check & found Lighting timer stuckup now timer reset done
now ok
GSC-1A &1B Motors cleaning work
WTP Hall Field Instrumentation cleaning work
Chimney Analyser room Panels & JB's cleaning work
Shift jobs carried
AFR area equipments, observation taken and isolation provide, with , Hemant sharma
sir.
Bag house , 21 no. vessale show H lavel alarm , so its probe cleaning done, now ok

Coal feeder 1-D, outlet MOV, close limit setting increse 90% from 80% after discuss
with Mr. Tarun mandawat.

Following Equipment S/D Given.


1.BC-6,
2.BC-1
3.BC-2
4. Reclaimer

Shut down cancelled of BC-2, belt conveyour.


CCR, AHU, found in manual mode ,os its change to auto mode.
All the Manual Light to OFF Condition.
WTP, PC, Convertor and one Adapter change as signal not available thair.Now ok.
CCR, inform that coal feeder 1-D, not run in remote mode, so check and found its mode
not change in controllor so change it and start.
Generator#1, kv reduce from 11.45 kv to 11.10 kv by tap changer.
P&V 2 status checked, found running healthy.

E.O.P. on of U#2, for one hour on requirement of operation dept. and power off done.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 71 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.BC-6,
2.BC-1,
3.Reclaimer,
4.GRABBER SUPPLY (AFR),
5.New AFR Shredder (AFR),

T1 tower area abnormality attend, Cable dressing and Earthing lead connection work.
Media converter checked at WTP MCC.
Walkie talkie checked at CCR.

Shift jobs carried


In AFR Main cutting machine is not On. So checked and found that In HMI safety switch b10 , b13
ball valve fault is showing on display. So Reset the HMI Power supply and b10 ball Valve Closed
limit is adhusted. Then Trial taken. It is working normally.
From 2 to 4 AM , 1.5 MW Power purchased.
In Compressor House all the auto drain valve checked. It is working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is decreased . Now ok.
In Chemical dosing room Motor cleaning to done.
At 22 Mtrs Light ON as per operation requirement.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 82 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Workshop grinder machine green tag provided.
Following Equipment S/D Given.
1.BC-1,
2.Vibrating Screen-1,

Following Equipment S/D Clear.


1.Coal feeder-1D (AVI and S/D Clear).
2.BLR-1 DE-SUPER HEATING I/L MAIN (MOV),
3.BLR-2 DE-SUPER HEATING I/L MAIN (MOV)

MPHB lift Power OFF/ON for mat laying work, and Charging light provided for the work..

TG-1 manual stop at 13:00 Hrs. and reading not down in log book for the same.
Bed ash silo level transmitter cleaning work done.
UPS-2 Slave rectifier alarm due to voltage tolerance, reset the same.
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 71 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.Coal Feeder-1A
2.Coal Feeder-1B
3.Coal Feeder 1C
4.Coal Feeder-1D
5.CEP-1B
6. CEP -1B Discharge MOV
7. Coal feeder-1A Pneumatic air isolation
8.Coal feeder-1C Pneumatic air isolation
9.Coal feeder-1D Pneumatic air isolation

Following Equipment S/D Clear


1.BC-1,
2.Vibrating Screen-1,
CEP -1B Motor Connection open , Earthing & Space heater connection open
ACC-1 Area W/M not working check & found Plug top yellow phase open so recoonect now ok &
W/M Green tag updated done

CEP-1B Discharge MOV Connection removed , Gauge removed & vibration switch removed

All new Pneumatic valve all SOV removed & shift in lab

Coal feeder -1A 1B 1C & 1D Air valve isolation & SOV Hose pipe removed & shift in inst. Lab

Shift jobs carried


VAM System is stopped.Also Chilled water pump and Condensate Booster Pump is OFF. Also
Manual Air isolation valve is in closed condition.
At CCR and 4.5 Mtrs VAM AHU to stop.
At Turbine CCP panel No.-2 Back side TB Connection tightness to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At CEP Unit No. # 1 area grinder Top to changed.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 79 Deg C, DT-5 temp 82 Deg C , DT-6 temp 78 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
WTP Cbale celler Exhaust fan Panel Rubber mat provided

Following Equipment S/D Given.


1.BC-1,
2.Vibrating Screen-1,
3. BC-2
4. BC-4
5. CEP-1A
6.P Fan 1 bypass MOV
7.Coal Feeder-1D
8. MOV-CT-3
9. MOV CT-2
10. CT-3
11. CT-2

ACC-1 3 NO'S GRINDER Green tag updated done


CT Fan & WTP Tank shower Power JB Nomiclature Pasting done

P Fan-1 Bypass MOV 01MV0914 Cable connector rempoving work for Mech. Maint. Requirement

DCS-1 Panels cleaning & Blowering work


P&V-2 Frequency reduced 40 Hz to 35 Hz
Zishu Hozen at Switchyard area
Shift jobs carried
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
Drain MOV cleaning and blowering done.
DCS-1 Panels cleaning & Blowering work
Coal feeder area grinder machine TOP connection given
Shift jobs carried
P&V 2 status checked, found running healthy..
DT-2 temp 73 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Unit-1 & 2 PCC AHF Panel supply OFF due to low demand

Following Equipment S/D Given.


1.BC-3,
2.BC-5
3. BC-2
4. BC-7
5. BC-7B
6.STG Building Cable celler exhaust fan
7.Bolier-1 Desuperheater valve

Following Equipment S/D Clear


1.BC-2,
2.BC-4
3. Screen-1
4. CEP-1A
5. Coal feder-1B

TG-1 Enclousre Exhaust fan OFF

Mech W/S Grinder not working so check & found cable open inplug top so recconect now ok

CEP-1 Area grinder Plug top 20 amp replaced by 10 amp.


AVR-1 Pf ON indication lamp found faulty so replaced by new now healthy
Boiler-1 APH vessel -1 2 nos old pu tube replaced by new one & dressing done
Boiler-1 isolation valve fitting air leakage so air leakage arrested
Shift jobs carried
As per requirement JOP -2 Start Pr. Switch setting changed from 3.0 kg/cm2 to 6.0 Kg/cm2 . Also In
Main fire Pump No.-1 set 4.0 Kg/cm2. Then after normalized to set Pr. Also informed to shift
incharge.
In Unit No. # 1 P-fan Bypass MOV ( 01MV0914) not opened fully. After completing the Mech.work
MOV is mounted. But MOV is manually is not operated. MOV to be change from Unit No. # 2. This
work is pending.

At Coal Feeder - 1D For New Pneumatics valve Open and Close Limit switch
connection to done. For Main Line connectionto SOV welding / Fitting / Hose Pipe are
required.
At Coal Feeder - 1A For New Pneumatics valve Open and Close Limit switch
connection to done. For Main Line connectionto SOV welding / Fitting / Hose Pipe are
required.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1.BC-3,
2.BC-5
3.BC-7A
4.BC-7B
5.STG Building Cable celler exhaust fan

EOP-1 Power OFF as per operation requirement.

At Unit No.# 1 2 nd floor welding machine is not ON. Found that supply is not available
in RSB . So checked at feeder side. 02 Nos fuse is blown. So replaced it. Now Ok.

Shift jobs carried


DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 77 Deg C.
P&V 2 status checked, found running healthy..
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
CEP-1 area temporary connection TOP connection done.
EOP-1 Power ON/ OFF as per operation requirement.

Shift jobs carried


At Coal Feeder - 1C For New Pneumatics valve Open and Close Limit switch and SOV
connection to done. For air Main Line connectionto to done.
All the Coal feeder Pneumatics valve main air line connected. Only Trial is Pending .
At 8.30 PM Grid Voltage increased to 138 Volts. Our 11 KV side Voltage is increased to
11.94 Volts. Also all the UPS Showing alarm . Mains is out of tolerance.So decreased
the OLTC tapping from 12 to 6. Now ok.
In Unit No. # 1 P-fan Bypass MOV ( 01MV0914) not opened fully. MOV to be change from Unit No.
# 2. Trial taken . It is working Normally.
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared.


1.BC-4,
2.BC-6
3.BC-7A
4.BC-7B
5.CT-2,
6. CT-3
7. 12MV4302,
8. 12MV4303,
9. 01MV3210 ,
10. Barring Gear Unit No. #1,

Unit No. # 1 Furnace side LED Light to Repaired. Also mech. Grinder machine Cable to
provided.
At 4.5 meter mech. Welding machine connection to done.

Shift jobs carried


P&V 2 status checked, found running healthy..
DT-2 temp 78 Deg C, DT-5 temp 80 Deg C , DT-6 temp 71 Deg C.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
CEP-1B Discharge MOV Connection done.
VAM System taken in line.
ACC-1B flow switch re-connection done.
CEP-1B motor connection done, and megger value taken found 150 mega ohms.
BFP and 4.5 Mtr AC off, and 4.5 Mtr and BFP room, CCR AHU taken in line.
TG-1 Synchronized at 18:00 and 20:10 Hrs.
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT tempratue low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
BFP-2 Motor VFD to DOL Changeover done

Clean Run 1C motor trip & Main MCB trip so check & found Megger & resisitance ok but after start
Clean run gear box rotate due to loose support & motor touch with Coal Feeder motor shaft

Coal feeder-1A Bunker leve found faulty power reset done


CEP 1B Dischager line NRV PG Installation but valve closed condition
Shift jobs carried
Unit No. # 1 Vessel No.-12/22 Seal Pr. Is showing fault at DCS end. So Cleaned the
Impluse line. Now Ok.
In CHP , Crusher No.-2 Tripped due to high current two times. Then it is started it. It is
running normally.
In VAM System water is overflow at VAM. So at 22 mtrs water filling valve is
throwtten at site.

Following Equipment S/D Given.


1.BC6,
2.Coal Crusher No.-1C,

P&V 2 and 4 status checked, found OFF Condition.


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
Coal Feeder -1C is AVI to given.
In Unit No. # 1 gererator rotot brush voltage alarm is showing in minic as well as
protection panel.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

GSC-1A PMT not come in DCS, so checked and found O/L tripped, reset it and trial taken found
taking higher amps (>30 amps) and tripped in overload, checked and found megger values are 0
ohms with respect to ground, so spare motor trial taken and shifted to location, and inform to
Maint and operation team, and as per message motor replacement will be done on tomorrow by
Maint team.

Airline leakage arrest near Bag house-1


Following Equipment S/D Clear.
1.BC-6,
2.Coal feeder-1C,(AVI also clear)

Shift jobs carried


DT-2 temp 74 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT tempratue low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
ACW pump house are lighting timer stuck up, so reset done.
STG Building Exhaust Panel Cleaning & Blowering work
Baghouse 1 12 no' s vessel level not showing so check in filed found material not in vessel so
inform to CCR Desk
Monthly Power Report Balanced upto 20/11/2022
Chimney Analyser room Panels & JB's cleaning work
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Given.
1.SHREDDER FEED BELT,

Following Equipment S/D Given.


1.GSC-1A,
2.01MV0909, COAL FEEDER-1A DISCHARGE MOV,
3.COAL FEEDER-1A,
4.COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE,
5.BC-1,
6.BC-4,
7.Coal Crusher-2,
8.COAL FEEDER-2A,
9.COAL FEEDER-2B,
10.COAL FEEDER-2C,
11.COAL FEEDER-2D,
12.Boiler-2 Group LOTO(ID,PA,SA,J valve, Soot blower Coal feeder A,B,C,D etc.),
13.SHREDDER FEED BELT,
14.VC/NEW AFR MCC/GRABBER/3F4 SHREDDER FEED BELT,

Following Equipment S/D Clear.


1.01MV0909, COAL FEEDER-1A DISCHARGE MOV,
2.COAL FEEDER-1A,
3.COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE,
EOP-2 Power ON and OFF as per operation requirement.
VAM area lighting timer OFF time change from 06:00 to 06:45 Hrs.
AFR High mast tower lighting JB area vegetation removing done.
STG building lift 2F fault reset, and trial run healthy.
AFR area lighting manually OFF.
TG-2 enclosure light OFF, so ON done as per operation requirement.
Reclaimer travelling fault, so checked and cable drum limit rese, and trial run healthy.
BH-12-22 seal pressure fault, so pressure switch cleaning done.

BFP-3 12DPI3205 value showing zero, so checked and valve open and now showing healthy.

Bed ash silo level transmitter cleaning work done.


Deaerator LL1 level showing, so connection removed and work under progress.
Shift jobs carried
MOV 01MV2302, feeder found in overload so, its done healthy.then check with
operation team and operate manually too, to get close limit.
MOV 01MV0922, feeder found in isolate position thgen check feeder and its fuse
provide and taken in circuit.
Coal crusher-2 , Current not show in ccr , so check feeder found its convetor supply off
, so on it.

Following Equipment S/D Remove.


1.BC4,
2.Coal Crusher No.-2,
3.BC-1
4.GSC-1A

Following Equipment AVI Provide and Remove.


1.Coal feeder-2C,
2.Coal feeder-2D,
3. SHREDDER FEED BELT

24 Volt light shift coal feeder to workshop and one from mechanical workshop.

GSC 1A Motor connection done and direction trail taken.


AFR area light on done from SFU and timer ON/ OFF time change done.
Deareator lavel switch check and release as its contact get stuck. Now ok.
one led light provide at BAC 1A and return after work.
01MV3210, close limit setting done.
Chimny , aviation light found in off condition , due to nmcb trip, so on it.
Shift jobs carried
In Unit No. # 1 firing floor area local indicator is not showing the data. So checked and found that
Supply is OFF. So ON the supply. Now ok.
In WTP hall area All the Inst. Panel Cleaning and Blowerning to done.
In Compressor House all the auto drain valve checked. It is working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In WTP Pump house room Motor cleaning to done.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
EOP-2 Power ON and OFF as per operation requirement.
Following Equipment S/D Given.
1.COAL FEEDER-1B,
2.COAL FEEDER-1B DISCHARGE PANUMATIC PLATV VALVE,
3.Coal Crusher-2,
4.Vibrating Screen-1,
5.Vibrating Screen-2,

Following Equipment S/D Clear.


1.COAL FEEDER-1B,
2.COAL FEEDER-1B DISCHARGE PANUMATIC PLATV VALVE,
Boiler-1 both flame sensor remove, and put in inst. Lab
BH-12-22 seal pressure line flushing done.

Shift jobs carried

Reclaimer travelling fault, so checked and cable drum limit actuated frequently so its
limit slight adjust and observe for 30 minute ,reclaimer work ok .

05 Nos of faulty ELCB remove and packed with packing tapeof following area
1-Boiler-1 4.5mtr, near instrument protection panel Boiler-2 side.
2-Boiler-1 near Bed material filling motor.
Fan failure alarm show at UPS, while fan running ok, so its reset .
Following Equipment S/D Remove.
1.Vibrating screen -1,
2.Coal Crusher No.-2,
3.Vibrating screen -2

AFR , shed inside light timer, time found wrong so change from 9 p.m. to 7 p.m and on
time set at 05.30 pm and off time at 07.00 am
BH-11/21 ,H-H showing, so level probe cleaning, and trial taken found running healthy.
AFR area both tower light on done from SFU .
One welding machine connection open at near marketing office.
132 Kv tr-1, Sf6 breaker gas pr. Check at field found ok in green zone.
DT-2 temp 77.1 Deg C, DT-5 temp 78.2 Deg C , DT-6 temp 73.4 Deg C.
Shift jobs carried
In Unit No. # 1 Vessel No.-12 /22 seal Pr. Impluse line is cleaned.
In CHP Coal Bunker -1A Plough discharge is not operating . So O/L Reset. Now Ok.
In Chimney analyser room All the Inst. Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In Unit No. # 1 Boiler Third floor RSB-09 Rubber mat to laid.
In Unit No. # 1 Boiler fourth floor RSB-13 02 Nos three phase faulty ELCB open and kept
in electrical workshop area.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.

Boiler-1 RSB-21 Near Soot blower-1 1 no's 3 phase ELCB power cable found burnt condition so
cable removed fr om another faulty ELCB & ready now ok & trippping healthy

Following Equipment S/D Given.


1.COAL FEEDER-1D,
2.Coal Crusher-1

Following Equipment AVI GAIVEN


1CEP-1B
2.CEP-1B MOV
3. Coal feeder-1D(closed)
Boiler-1 RSB Panel -8 ,18 , 19 , 21, 22 Faulty ELCB removing work & shifted to Electrical W/S
BH-12-22 seal Seal pressure line flushing done.
VAM PLC Panel Packing by Packing tape
Boiler-2 area cable tray cleaning work
Shift jobs carried
CEP 1B , direction trail taken in presence on operation , and maintanance team.

During start of CEP 1B get trip due to instataneous fault at 1.9 amp in relay while it setting at 1.8,
so setting increse to 2.0 amp. Then it start normal, take 40 amp. And 22.6 Kw no any abnormal
sound, or heating observed , cooling fan and earthing ok.(37 kw. FLA-63 amp, 1440 rpm)

CEP 1-B , outlet MOV-01MV2902, close and open limit setting done in presence of
Rakesh sir and Pramod sir,and trail taken it work ok.
Following Equipment S/D Remove.
1.Shredder at AFR,
2.Coal Crusher No.-1,
3.CEP- 1B

Following Equipment AVI provide.


1.CEP -1B
2.CEP 1B outlet MOV 01MV2902,

01 Nos of faulty ELCB remove and packed with packing tape.


During next start of CEP 1B at 8.30 pm it get trip due to same instataneous fault at 2.46 amp in
relay while it setting at 2.0 , so setting increse to 2.50 amp. After discuss with Hemant sir. Then
start normal running 40 amp balanced in three phase.

One no. of plug top change at 4.5 meter of grinder with 10 amp. In place 20 amp.

Coal feeder 2B motor, tacho mounting done.


DT-2 temp 76.5 Deg C, DT-5 temp 77.4 Deg C , DT-6 temp 72.9 Deg C.
Shift jobs carried
In CCR AHU Comes in manual mode. So put into the auto mode. Now Ok.
In WTP HPP VFD Cleaning and Blowerning to done.
In WTP Hall area All the Inst. Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In CHP , BC-7A / 7B floor 24 Volts hand lamo to changed.
In Unit No. # 1 generator Voltage is Increased . Now ok.
In Unit No. # 1 Boiler RSB-10 and 11 04 Nos three phase / Single Phase faulty ELCB open and kept
in electrical workshop area.

Shift jobs carried


DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
ACC-1 RSB- 61 Faulty ELCB Removing work

Following Equipment S/D Given.


1.COAL FEEDER-1C,
2.Coal Feeder-1C Pneumatic valve
3.BC-7A ,BC-7B
4. LDB-5302-A
5. Coal Feeder-2D
6.Reclamier
7. BC-1

Following Equipment AVI GAIVEN


1LDB-5302-A
Reclamier Bucket wheel motor trip due to overload & during start found zerk so motor meggering
& resistance checked found ok Bucket wheel manually operate by operator trial taken found
running normally take r- 12 amp , y- 13 amp. , b-12amp
BH-12-22 seal Seal pressure line flushing done.
Zishu Hozen at T-1 Tower area
Shift jobs carried
U#1, Bag house 12-22 back pressure transmitter cover provide.
U#1, Boiler 03 no of MOV cleaning done of J valve.
In Unit No. # 1 Boiler RSB-14, 15 and 16 total 03 Nos three phase / Single Phase faulty ELCB open
and kept in electrical workshop area.
Chimney aviation light not glowing so check & found its mcb in off condition so on it.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
One led light provide to operation team at BAC 1A , area and return also
All, module status checked ,ok.and VAM checked working ok.
DT-2 temp 74.6 Deg C, DT-5 temp 75.4 Deg C , DT-6 temp 71.9 Deg C.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 743Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
FWS PA Checked work normally

Following Equipment S/D Given.


1BC-4
2.BC-6
3. New AFR Shedder

Boiler-1 area Faulty ELCB removi ng work


CEP-1B Motor double Earthing done
CEP-1B Discharge MOV Power & Control cable proper dressing done
Crusher Building ground floor PA CCR call checking work working normally
Shift jobs carried
In BC-4 tall end Belt sway switch handle loose condition. So tightness the handle.Also
checked it is working Normally.
from Unit No. # 2 Vibrator removal and handover to AFR person.
All the AC MCB to OFF Condition.
Since Grid Voltage Decreased to 128 Volts. Our 11 KV side Voltage is increased .Now
Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1BC-4
2.BC-6
3. New AFR Shedder

In CHP , BC-7A / 7B floor 01 Nos hand lamo to provided to CHP Person.


At WTP , Pump House area motor cleaning to done.

Shift jobs carried


In Unit No. # 1 Boiler RSB-08,total 02 Nos three phase / Single Phase faulty ELCB open and kept in
electrical workshop area.
CEP 1B, breaker mode change to local mode , due to leakage in pipeline valve.
In Unit No. # 1 Vessel No.-12 /22 seal Pr. Impluse line is cleaned.
CCR, wireless system two no check as its not work properly.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
APFC, goes out from auto mode three time due to low p.f , so it put in auto mode by,
change excitation current .
Boiler 1, drain MOV cleaning done..
DT-2 temp 75.6 Deg C, DT-5 temp 75.6 Deg C , DT-6 temp 73.8 Deg C.
Shift jobs carried
Unit No. # 1 Vessel No.-12/22 Dome PU Tube dressing to done. Now Ok.
In Unit No. # 1 Coal Bunker -1A level is not showing correctly. So Reset the Power
supply. Now Ok.

Unit No. # 1 Vessel No.-11-21 and 12/22 Back pr. Transmitter GI Cover is Provided.
In Unit No. # 1 Zero mtrs Turbine side Inst. Cleaning to done.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.
For Fire Person in WTP drill machine Plug Top to changed.
In Unit No. # 2 Boiler Side RSB No.- 39/40/44 , 03 Nos faulty ELCB removed and Kept
at Electrical workshop room.

Shift jobs carried


BH-12-22 seal Seal pressure line flushing done.
Baghouse -1 Vibrator DOL Startor in front Rubber mat laying done
All the AC MCB to OFF Condition.
Boiler-2 Firing floor area Instrument cleaning done
P&V 2 and 4 status checked, found OFF Condition .
Mist fan system-1 Power panel ruuber mat laying done
All the Manual Light to ON Condition.
4.5 mtr. W/M & 24 LED connection done
Boiler-2 RSB -46 Panel 2 no's faulty ELCB Removed

Shift jobs carried


DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
RSB-65 at ACC-2 faulty ELCB removed.
TG-1 ground floor all MOV and control valve cleaning done.
Chimney analyzer room , panel, desk, JB all equipment cleaning done.
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
BC-1 Pull cord rope double clip maintenance done.
Compressor house IFC SOV fitting damage, replaced the same.
Following Equipment S/D and AVI Clear.
1.BC-6,
Reclaimer boom belt pull cord wire rope double-clip work done.
ELCB removing work in different location like Bed ash silo, T1, T3 tower etc.
9.5 Mtr walkway gallery UPS room side, Tube light new road replaced.
Shift jobs carried
In MVAR Put into Remote mode by raise the excitation. Now Ok.

In AFR , Fire alarm is showing in all the Fire hooter. ( Alarm-0001 waterflow active , AFR SS Building
IO RM JB-20 SMPS Power fail .) For Reset it. Panel Silences Button pressed in Local Panel.

In BAC-1A and 1B Inst. Panel Cleaning and Blowerning to done.


In Unit No. # 1 APH Inst. JB , All the Inst. Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.

In BC-5 RSB-89 02 Nos Single Phase faulty ELCB open and kept in electrical workshop area.

Shift jobs carried


DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
AFR fire alarm reset, and its feeder power supply OFF.
Fire line trial work done in AFR

Following Equipment S/D Clear.


1.BC-1,
2.BC-4,
3.FIRE WATER PUMP-2 (MOTOR DRIVED),
4.COAL FEEDER-1B,
5.COAL FEEDER-1B DISCHARGE MOV,

Fire water pump-2 tripped in overload 02 times IC=7.95A and IA=6.42A, reset and megger taken
found 500mega Ohms, so suspected numerical relay replaced from Inst. Air comp-3 feeder. All
connection done, relay setting work and trial work are pending.
BC-1 tail end lighting switch (domestic) removed and JB provided.
Shift jobs carried
In MVAR Put into Remote mode by raise the excitation. Now Ok.
In Unit No. # 1 Vessel No.- 12/ 22 Back pr. Switch and Transmitter Impluse line cleaned as per
operation requirement.
In BAC-1A and 1B Inst. Panel connection tightness to done.
In BAC-1B Inst. Panel SOV air leakage arrested.
In Chimney analyzer All the Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 oil centrifuse Panel Rubber mat to laid.
In Cable celler Light is ON. So OFF the light.

Shift jobs carried


DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Grabber not run in AFR, checked and found AUTO/manual switch on manual, so put on AUTO and
trial taken found running healthy.
Vibrating Screen floor light not ON, so checked and found switch OFF, so ON done.

Following Equipment S/D Clear.


1.BC-1,
2.BC-7A,
3.Shradder AFR,
4.Grabber AFR,
5.AFR Discharge belt.

Clean run-1A tripped in overload , reset it.


03 nos Walkie-talkie repaired in CCR
Shift jobs carried
In CHP Line No. # 2 is tripped. So checked and found that In Bucket elevator No.-2 ZSS Proxy is not
showing at DCS end. So at field side found that ZSS proxy cable is damaged condition. So
reconnected it. Then Trial taken. It is working Normally.
In Compressor House all the auto drain valve checked. It is working Normally.
In WTP Hall area All the Panel / field Inst. Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 Coal Feeder -1A Clean run motor O/L reset as per operation requirement.
In CHP Vibrating screen No.-2 feeder checked. It is working normally.
taken found running healthy.
eaning done.
Date Shift Engineer Name

01.12.2022 C Ashvin Jadav

Date Shift Engineer Name

02.12.2022 B Sanjay Garg

Date Shift Engineer Name

03.12.2022 B Sanjay Garg


03.12.2022 B Sanjay Garg

Date Shift Engineer Name

04.12.2022 A Ashvin Jadav

Date Shift Engineer Name

04.12.2022 B Sanjay Garg

Date Shift Engineer Name


05.12.2022 A Sanjay Garg

Date Shift Engineer Name

05.12.2022 B Amit kumar singh

Date Shift Engineer Name

05.12.2022 C Tarun Gaur

Date Shift Engineer Name


06.12.2022 A Sanjay Garg

Date Shift Engineer Name

06.12.2022 C Tarun Gaur

Date Shift Engineer Name

07.12.2022 A Sanjay Garg

Date Shift Engineer Name


07.12.2022 B Amit kumar singh

Date Shift Engineer Name

07.12.2022 C Ashvin Jadav

Date Shift Engineer Name

08.12.2022 A Tarun Gaur

Date Shift Engineer Name


08.12.2022 B Amit kumar singh

Date Shift Engineer Name

08.12.2022 C Ashvin Jadav

Date Shift Engineer Name

09.12.2022 C Ashvin Jadav

Date Shift Engineer Name

10.12.2022 B Sanjay Garg


10.12.2022 B Sanjay Garg

Date Shift Engineer Name

10.12.2022 C Amit kumar singh

Date Shift Engineer Name

11.12.2022 A Sanjay Garg

Date Shift Engineer Name

11.12.2022 B Ashvin Jadav


Date Shift Engineer Name

11.12.2022 C Amit kumar singh

Date Shift Engineer Name

12.12.2022 A Sanjay Garg

Date Shift Engineer Name

12.12.2022 C Amit kumar singh

Date Shift Engineer Name

13.12.2022 A Ashvin Jadav


13.12.2022 A Ashvin Jadav

Date Shift Engineer Name

13.12.2022 B Tarun Gaur

Date Shift Engineer Name

13.12.2022 C Sanjay Garg

Date Shift Engineer Name

14.12.2022 C Sanjay Garg

Date Shift Engineer Name

15.12.2022 A Tarun Gaur


15.12.2022 A Tarun Gaur

Date Shift Engineer Name

15.12.2022 B Amit kumar singh

Date Shift Engineer Name

15.12.2022 C Ashvin Jadav

Date Shift Engineer Name

16.12.2022 A Amit kumar singh


Date Shift Engineer Name

16.12.2022 B Sanjay Garg

Date Shift Engineer Name

16.12.2022 C Ashvin Jadav

Date Shift Engineer Name

17.12.2022 A Amit kumar singh


Date Shift Engineer Name

17.12.2022 B Sanjay Garg

Date Shift Engineer Name

17.12.2022 C Tarun Gaur

Date Shift Engineer Name

18.12.2022 A Sanjay Garg


18.12.2022 A Sanjay Garg

Date Shift Engineer Name

18.12.2022 C Amit kumar singh

Date Shift Engineer Name

19.12.2022 A Sanjay Garg

Date Shift Engineer Name

19.12.2022 B Ashvin Jadav


19.12.2022 B Ashvin Jadav

Date Shift Engineer Name

19.12.2022 C Amit kumar singh

Date Shift Engineer Name

20.12.2022 A Gajendra Pandya

Date Shift Engineer Name

20.12.2022 B Ashvin Jadav

Date Shift Engineer Name


21.12.2022 C Sanjay Garg

Date Shift Engineer Name

21.12.2022 A Ashvin Jadav

Date Shift Engineer Name

22.12.2022 C Sanjay Garg


22.12.2022 C Sanjay Garg

Date Shift Engineer Name

22.12.2022 A Tarun Gaur

Date Shift Engineer Name

22.12.2022 B Amit kumar singh

Date Shift Engineer Name


22.12.2022 C Ashvin Jadav

Date Shift Engineer Name

23.12.2022 A Amit kumar singh

Date Shift Engineer Name

23.12.2022 B Sanjay Garg


Date Shift Engineer Name

23.12.2022 C Ashvin Jadav

Date Shift Engineer Name

24.12.2022 A Amit kumar singh

Date Shift Engineer Name

24.12.2022 B Sanjay Garg

Date Shift Engineer Name


24.12.2022 C Tarun Gaur

Date Shift Engineer Name

25.12.2022 B Ashvin Jadav

Date Shift Engineer Name

25.12.2022 C Amit kumar singh

Date Shift Engineer Name


26.12.2022 A Tarun Gaur

Date Shift Engineer Name

26.12.2022 B Ashvin Jadav

Date Shift Engineer Name

26.12.2022 C Amit kumar singh


Date Shift Engineer Name

27.12.2022 A Ashvin Jadav

Date Shift Engineer Name

27.12.2022 B Tarun Gaur

Date Shift Engineer Name

28.12.2022 A Ashvin Jadav


28.12.2022 A Ashvin Jadav

Date Shift Engineer Name

28.12.2022 B Tarun Gaur

Date Shift Engineer Name

29.12.2022 C Sanjay Garg

Date Shift Engineer Name


29.12.2022 A Gajendra Pandya

Date Shift Engineer Name

29.12.2022 B Amit kumar singh

Date Shift Engineer Name

29.12.2022 C Sanjay Garg


Date Shift Engineer Name

31.12.2022 A Amit kumar singh

Date Shift Engineer Name

31.12.2022 B Sanjay Garg

Date Shift Engineer Name

31.12.2022 C Tarun Gaur

Date Shift Engineer Name

01.01.2023 B Tarun Gaur


01.01.2023 B Tarun Gaur
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal
UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
Dosing room panel and equipment cleaning and blowering done.
Boiler-1 drain MOV and J valve MOV cleaning done.
BLR-1 Bag house 11-21 and 12-22 back pressure transmitter cover proper fixing done.
Shift jobs carried
In Unit No. # 2 Bag House Top air leakage from PU Tube of header SOV. So cut the PU Tube. Now Ok.

In CHP Incomer AFR Breaker is tripped due to ground fault. So Reset the supply. Then ON the Breaker. Now Ok.

In AFR , MCC side ram gate is not closed from push Button. So checked at site found that in PLC alarm is showing.
(1018- Disturbance bolt ram bottom-B3/B4. ). Found that Chip is not inserted in Limit switch. So cleaned the Chip then
inserted. Then Reset the alarm. Then manually Pick up the contractor ( K87 ) also pressed the Local push button. Then
Closed the ram gate. Also chip inserted in upper side limit switch. Do not open /close the gate.

Since Grid Voltage Incresaed to 138 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1Coal Crusher No.-1
2.Grabber supply
3. New AFR Shedder
4. new AFR Discharge Belt.

In AFR Side Tower light is not ON. So checked and found that Pole inside
ELCB is OFF. So ON the ELCB. Now Ok.
In AFR single Phase extension board connection to done.

Shift jobs carried


Sticker Pasted at BC-6 chute level Proxy and DP transmitter at site.
Since Grid Voltage Incresaed to 137 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1Coal Crusher No.-2
2.BC-7B,
3. BC-1,

In Unit No. # 2 all the S/D boiler related cleared.But Feeder / Breaker is not charged as per shift incharge requirement.

In AFR Shedder feed chain conveyor Permit to given also AVI to given. Also closed the Permit.
At Unit No. # 1 ACC zero mtrs RSB feeder side one fuse blown. So Replaced it. Now ok.
At Earth Pit no.-EP-57 green tag to Provided.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.COAL FEEDER-2A,
2.COAL FEEDER-2B,
3.COAL FEEDER-2C,
4.COAL FEEDER-2D,

Boiler-1 RSB 1,7,11,14,15,17,19 and 21 Green tag provided.


P& V 2 water valve proper close, due to water leakage.
Fly Ash Silo plate valve SOV air leakage attend.

Shift jobs carried


As per shift incharge requirement PU Tube and Pressure guage is removed at Unit No. # 1 Carbon
unloading system.
In Compressor House all the auto drain valve checked. It is working Normally.
Since Grid Voltage Incresaed to 138 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In Unit No. # 1 ACC Zero mtrs RSB rubber mat to laid.
In Unit No. # 2 ACC Zero mtrs RSB rubber mat to laid.
At Screen floor area tempoary Light reconnection to done.

Shift jobs carried


Sticker Pasted at BFP spare JB and 4.5 Mtrs Inst. JB at site.
In Unit No. # 2 EOP ON / OFF as per operation requirement.
In Unit No. # 1 02FCV2907 showing 40 % Control valve. When command is 0% at DCS end. So at site air
pressure is adjusted in air filter regulator. Now Ok.
In Unit No. # 1 Coal Feeder -1A Pneumatics main air line air leakage found. So Fitting tightness to done. Mow no air
leakage at site.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.

Following Equipment S/D given and Cleared.


1 Coal Feeder -1A ,
2. Coal Feeder -1A Pneumatics Valve,

Following Equipment S/D given.


1. BC-1 ,

Shift jobs carried


HP dosing pump no.-3, pressure guage marking done.
Crusher building 0 meter, light timer JB marking done.
Boiler no#1, baghouse 12-22, back pressure transmmiter cleaning done.
Following Equipment S/D Cleared.
1 BC-1,

All the Manual Light to ON Condition.


Total 04 no. board displayed at P&V acc side and 02 no. at boiler side.
One 24 volt light provide at BC-7A
HSD area light circuit checked.
Generator-1 , generating voltage maintain at 11 kv as it varis 10.65kv to 11.4 kv, by OLTC.
One extension board shift from SWAS room to workshop.

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
BAS level malfunctioning so level transmittor cleaning & power reset done now ok
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor etc.)
BAC-1A & 1B Field Panel & Level probe cleaning work done
STG-0 mtr. All MOV & Control valve cleaning work done
WTP Pump House Motors Cleaning work done
Shift jobs carried
In Fly ash silo No. # 1 Pneumatics valve air isolation to provided to maintences Dept.
In WTP hall area some cable is in hanging condition. So Proper dressing to done.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Increased by OLTC . Now ok.

Following Equipment S/D given.


1 BC-7A,
2. BC-7B,
3. BC-4 ,
4. CEP-1B ,

In WTP Single Phase ELCB to changed.


In WTP Chemical store room New LED Tubelight to Provided.
In WTP Tank area ( RSB-78 ) single Phase faulty ELCB removed and Kept in workshop area.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Cruhser-1 11 KV Breaker meter error found so power supply OFF now OK
ACW- Pump house Lighting Timer stuckup reset done
Coal feeder area Lighting MCB ON AS per Requirement on Operation dept.
Unit-2 P Fan Bypass MOV Connector Packing done
Unit-2 Telephone JB Packing & Dressing done
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
In Unit No. # 1 APH System Vessel No.-12/22 Seal Pr. Is showing fault at DCS. So checked at field side
Impluse line is in chocked condition. So Cleaned the impluse line. Now ok.
Coal feeder -1D Pneumatics valve air isolation is provided. Also AVI to given.
In Unit No. # 1 APH System Vessel No.-12/22 Main Air Valve is not closed. So checked at site and found
that Main air PU Tube opened from fitting side. So work is under progress.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now ok.

Following Equipment S/D given .


1 BC-4 ,
2. BC-5,
3. BC-7B ,
4. Coal Feeder - 1D ,

AVI to given Coal Feeder -1D feeder.


In Mech. Workshop grinder machine green tag to provided.
In RSB Green tag to Provided.
Shift jobs carried
U#1, bag house 12-22 air isolation valve new fitting and tube provide and leakage arrest.
All deluge station emergency switch and guage checking done.
Chinmney analyser room SOX, and NOX, value check with pramod sati sir, its pump, ok and no any
leakage found . So, its sampling unit cleaning done at chimney floor by air, then SOX value increse till
112 ppm, but again its down to 30ppm, inform to pramod sti sir as at alalyzer room all connection are
ok.

Following Equipment S/D clear .


1 BC-4 ,
2. BC-5,
3. BC-7B ,
4. Coal Feeder - 1D ,

All the Manual Light to ON Condition.


Total 04 no. board displayed at car parking and CHP side.
AVI cancelled of coal feeder 1D.
Boiler-1 drain MOV and J valve MOV cleaning done.
Physical observation taken of audit point in field.
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 69 Deg C.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Coal feeder-1D Pneumatic valve LOTO removed.
Bag House 12-22 seal pressure line flushing done.
WTP hall area instrument cleaning and blowering done.
Soot blower panel cleaning and blowering done.
P&V 4 Panel cleaning and blowering done.
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given
1.BC-1
2.BC-4

Mech W/S Portable tools Tested & Green Tag Updated done
CHP Maint. Portable tools Tested & Green Tag Updated done
T-1 Tower Bag Filter Panel Double Earthing done
BC-1 Fire Deludge station Pressure Gauge Replacement done
Chimney Analyser sample tube cleaning , Chiller Pump maint & Drain Pump maint. Done & All damaged tube replaced
done
Shift jobs carried
AFR shredder gate not get close so its close from panel after clearing jam.
Bed ash silo lavel switch cleaning and reset done ,as its lavel varying at ccr. now ok.
Bag house 12-22 seal pressure line flushing done.
Following Equipment S/D clear .
1 BC-4 ,
2. BC-1,
BC-1, BC-2 and Boiler-1 &2, area sticker pasting done.
Total 05 no. board displayed at 132 KV TR, WTP and CHP MCC side.
Bag house vessal no. 12 lavel probe cleaning done, as it show High at DCS.
Generator-1 , generating voltage maintain at 11 kv as it varis 10.65kv to 11.4 kv, by OLTC.
Physical observation taken of audit point in field.
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 69 Deg C.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Homing device boiler 1 (all 40 no’s) cleaning and sealing by tape done.
Boiler-2 soot blower panel cleaning done.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Green tag provided: RSB-62,2 and 27. LDB-7,31,13,14,16,9 and 3. Single phase power socket at CHP MCC room, DCS-1,
INST lab, and Bike parking area.
Cleaning and Blowering to J valve MOV, and Drain MOV at Boiler-1
Shift jobs carried
In Unit No. # 1 APH System Vessel No.-12/22 Seal Pr. Is showing fault at DCS. So checked at field side
Impluse line is in chocked condition. So Cleaned the impluse line. Now ok.
In Compressor House all the auto drain valve checked. It is working Normally.
Since Grid Voltage Incresaed to 135 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D clear .
1 BC-7A ,
2. BC-7B,
In SSF , mechanical welding machine is not ON. Found that wire in plug top is damaged condition. So reconnected it.
Now Ok.
At RSB green tag to provided.
In Unit No. # 1 Rotor brush voltage alarm is showing at Panel.

Shift jobs carried


WTP , DCS panel cleaning and blowering done.
Bag house vessal no. 12 lavel probe cleaning done, as it show High at DCS.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
One no. of chargeble light provide at coal feeder 1D and return.
compressor house auto drain valve manually checked found healthy.
CHP area RSB no. 82, rubber mate laying done
Shift jobs carried
In Side Stream Filter No.# 1 All the actuator DCS Marking to done.
In Side Stream Filter No.# 2 All the actuator DCS Marking to done.
In Side Stream Filter root Blower No.# 1and 2 DCS Marking to done.
In chimneey analyzer Spare cylinder shifted to WTP DCS Inst. Room.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Increased by OLTC . Now ok.
Following Equipment S/D given .
1 CEP-1B ,
2.AFR Shreeder Power Supply,

In RSB Green tag to Provided.


In Earthing Pit Sticker to Pasted.
Due to Low PF MVAR running in Manual mode.
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.Shradder AFR,
Fly Ash Silo plate valve not operate, so power reset and trial run found healthy.
Bed ash silo level 10 Mtr. Showing, so power off sensor cleaning and found healthy.
Field equipment sticker pasting done.
Chimney analyzer panel equipment earthing done, Sox-1 and 2 panel earthing are pending.
AFR and DG area equipment double earthing done.
BC-1 belt power JB double earthing done.
AFR new 230 V LED provided.
Boiler-1 and 2 RSB ELCB removed.
Shift jobs carried
Chimney analyser SOX panel , chillar ,pump earthing done.
U#1, CO analyser all scrap remove and outside cylinde shift to chimney analyser room.
U#2, CO analyser room all scrap remove and outside cylinder shift.
WTP RSB green tag checked of all RSB.
Generator-1 , generating voltage maintain at 11 kv by OLTC.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
U#1, Baghouse-12-22 seal Seal pressure line flushing done.
Shift jobs carried
In chimneey analyzer Spare cylinder shifted to WTP DCS Inst. Room.
In Fire Pump House area m-seal is provided in hole in fan cover of motor.
MVAR Put into auto mode.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Increased by OLTC . Since grid voltage is 128 KV.Now ok.
Following Equipment S/D Cleared.
1 CEP-1B ,

Following Equipment S/D given .


1 BC-1 ,
2. BC-4 ,

Shift jobs carried


Power JB lock checked and close of ACC area, chimney area .
Coal bunkar 1-D lavel sensor check and reset on requirment of contol room.
Lighting JB hole pack done with packing tape at ID fan- 2.
CHP DCS panel blowering done.
HSD area light circuit on.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 69 Deg C.
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Boiler-1 lift in fault, so reset and trial run found healthy.
Boiler-1 area sticker pasting work done.

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Chimney , Coal Feeder & P Fan Area Power JB & RSB Panel Electrical Rubber Mat Laying done
Bunker Outlet 1D MOV Limit assmenbly Box Fixed & Packing by packing tape
BC-3 Belt slip Proxy JB Doubel Earthing work done
Field equipment sticker pasting done.
Coal Feeders , Boiler & CT Fan area Supply socket Cap Protection done
AFR and DG area equipment double earthing done.
AFR High mask light not ON so & found Contactor not Hold & clean & tightness done now Light glowing
Shift jobs carried
In BAC-1A and 1B Inst. Panel Connection to done.
In Compressor House all the auto drain valve checked. It is working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
Report is not send due to CD is in full condition.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In Unit No. # 2 TG Floor , 4.5 Mtrs Light , BFP zer mtrs and Routh Blower silo area Light to ON Condition.

Shift jobs carried


In Unit No. # 1 Vessel No.-12/22 Seal Pr. Is showing fault at DCS. So checked at field side Impluse line is
in chocked condition. So Cleaned the impluse line. Now ok.
In Unit No. # 1 Baghouse Vessel No.-11-21 level probe checked and Cleaned the Probe. Now Ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In HP-LP dosing Room Motor and Panel Cleaning to done.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
CHP Area Instrument JB's sticker Pasting work
Boiler-1 area sticker pasting work done.
WTP Acid tank area W/M connection done & W/M Double Earthing done
TPP arae RSB Panel opening hole Packing by Packing Tape
Boiler Ligting time reschdule ON 17.30 Pm & OFF 06.45 Am
Watch tower nearby Temple Lighting timer reset & taken in line
Shift jobs carried
Boiler #1, seal pressure fault, so check and pressure switch cleaning done .now,ok
AFR tower light current taken, R/Y/B/N 4.1/6.8/2.3/7.1 amp.
Boiler#1, baghouse 22 no. vibrator hanging condition , so proper nut bolt provide and tightness done.
Solar component auto day*/ night switch for light circuit trail taken it, start at 5.50 p.m.
BC6, tail end two no. RSB remove and kept at workshop.
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
HODs office computer and mic system shifted to lab.
Office Ac supply made OFF.
Manual Light to ON of CHP ,22 mtr, and Tgfloor, chimney.
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
TG-1 ground floor MOV and control valve cleaning done.
Chimney Analyzer room panel and JB cleaning done.
Boiler-1 bag house 12-22 seal pressure line disconnected, so re-connect the same.
Shift jobs carried
Solar component auto day/ night switch for light circuit trail taken it, stop at 6.58 a.m.
Frequency meter display remove check and shift to lab.
Following Equipment S/D given .
1 BC-7A ,
2. BC-7B,
3. Coal cusher-1 ,

Boiler 2, two faulty ELCB remove.


BAC 1B, showing lavel H, so its check and probe cleaning done.

Boiler #2, bag house 12-22 seal pressure faulty so check with Mr ketul , found air leakage from NRV at tapping point
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
WTP, DCS module BRC300 ,81M get faulty at 1.3 pm , so reset it. room tempreture was ok
WTP , LCF valve leakage so mechanical job continue,so air fitting remove, water tube remove, and limit switch
connector remove and limit switch kept at DCS room.
Shift jobs carried
In Chimney analyzer room Instrument Panel Cleaning and Blowerning to done.
In Chimney analyzer O2 is showing 14 % . So all the PU tube connection tightness to done. Now ok.
Since Grid Voltage Incresaed to 135 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D clear .
1 BC-7A ,
2. BC-7B,
3. Coal Crusher No.-1 ,
In Coal Feeder -1C Clean run Motor tripped due to O/l. So reset it. Now Ok.
In HSD tank area and acid tank area in WTP Light ON .
At cooling Tower area welding machine connection to done.

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Bed Ash cooler 1A and 1B panel, level probe JB and transmitter cleaning done.
Bag house 12-22 back pressure fault, so checked and found transmitter line heavy jammed, so flushing and clear the
jammed and running healthy.
Bag house 12 level not showing, so calibration and cleaning done and material not found inside, so inform to CCR.

Shift jobs carried

AFR , shed fire alarm at 07.30 amand 0830 am due todiper cutting dust , so reset it. And inform to fire deptt.
WTP valve assembly fixing work on progress.

Following Equipment S/D Clear.


1.BC-1,
2.BC-4,
3.BC-2,
4.SHREDDER APOWER SUPPLY- 02 TIMES,
5.AFR DISCHARGE, 6.SHREDEER FEED
CHAIN

Green tag provide on single phase extension board.


BAC 1B, not showing lavel, so its check and probe cleaning done.
compressor house auto drain valve manually checked found healthy.
DT-2 temp 78 Deg C, DT-5 temp 79 Deg C , DT-6 temp 69 Deg C.
U#1, generator voltage varies between 10.65 kv to 11.40 kv so its maintain at 11 kv by
changing tap changer.
Coal bunkaer 1B, lavel not show at CCR, so its reset one time .now ok.

Shift jobs carried


In BAC-1B Level Probe is not working properly. So cleaned and Calibrated the level probe. Now Ok.

In Compressor House Service air compressor No.-3 EPB Pressed at site. So as per shift incharge EPB is
released and Put into auto mode.
In CHP Control Room outside door is opened. So packing tape to Provided.
Since Grid Voltage Incresaed to 135 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Clear.


1.BC-1,
2.BC-4,
3.BC-2,
4.SHREDDER APOWER SUPPLY- 02 TIMES,
5.AFR DISCHARGE, 6.SHREDEER FEED
CHAIN

In Coal Feeder -1C Clean run Motor tripped due to O/l. So reset it. Now Ok.
MVAR Put into auto mode.
In WTP , RSB-78 Dummy to provided in three phase socket.

Shift jobs carried


DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
HP & LP Dosing Room Motors , Pressure Gauge & Panels cleaning work
CEP 1A & CEP 1B Pressure gauge ,MOV , Vibration switch cleaning work done,
APH 1 no's Vessel Pressure gauge sticker pasting done
ACC-1 all 6 no's ACC Motors both Side Greasing done
Turbine-1 steam temp. tripping bypass as per requirement of operation dept. after normalize turbine Temprature
tripping taken inline
ACC-1E lube oil motor Earthing damaged lug repalced by new one
Shift jobs carried
In AFR HMI Connection JB Coverning to done.
At WTP hall area all the field inst. And Panel Cleaning and Blowerning to done.
MVAR Put into auto mode.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Increased by OLTC . Now Ok.
Following Equipment S/D given .
1 BAC-1A ,
2. AFR Coveyor Belt ,

AVI is given to AFR Conveyor Belt and Loto key kept at AFR Loto box.
At Marpholine Tank earthing to done.
At 4.5 mtrs Unit No. # 2 side ON/OFF switch packing to done.
Shift jobs carried
TG2, all MOV,control valve,Tx JB, all equipment cleanig done.
Boiler 1, 2, TG building lift telephone checked.
GSC motor 1A,1B cleaning done.
generator-1 , generating voltage maintain at 11 kv by OLTC.
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Shift jobs carried

In Unit No. # 2 Vessel No.- 12/22 Seal pr. Fault is showing at DCS end. So checked and found that SOV is
not working properly. So changed the SOV. Also Trial taken. Now it is working normally.

In Unit No. # 2 Vessel No.- 12/22 Back Pr. Switch and Transmitter impluse line cleaned as per shift
incharge requirement.
In Unit No.# 1 APH , Vessel No.- 12/22 and 11/21 Field Inst. And SOV JB cleaning and Blowerning to
done.
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now Ok.
Following Equipment S/D given .
1 BC-4 ,
2. CEP-1B ,

In Unit No. # 2 EOP Power ON/OFF as per shift incharge requirement.


In Inst. Lab extension board to provided.
In Switchyard Lighting JB earthing tightness to done.
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1 BC-4,
2.J valve 2B, (S/D given and clear)
Generator Transformer-2 made ON and again OFF.
New Lighting timer cable laying, connection given and trial run found healthy.
Single phase extension board provided at lighting work and shifting to workshop.
24v LED provided at Coal feeder unit-2 side.
Shift jobs carried
U#2, baghouse 12-22 seal pressure faulty, so line cleaning done.
In Compressor House all the auto drain valve checked. It is working Normally.
Coal feeder area Lighting MCB Onand OFF done as per Requirement on Operation dept.
generator-1 , generating voltage maintain at 11 kv by OLTC.
DT-2 temp 77 Deg C, DT-5 temp 76.4 Deg C , DT-6 temp 70.2 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Shift jobs carried
Green circle Point: CHP MCC feeder handle and indicating Lamp provided
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition. Day Night Light auto control OFF the Light at 7.06 a.m
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now Ok.

Following Equipment S/D given .


1 BC-7A
2. BC-7B
3. Hoist Compressor House
4. Silo Roots Blower-1

In Unit No. # 2 EOP Power ON/OFF as per shift incharge requirement.


In Switchyard Lighting JB earthing tightness to done.
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1BC-7A
2.BC-7B
3.Silo Roots Blower-1
Pump house area cable dressing work done.
CO analyzer sample line flushing done.
Coal Feeder-1C Temp relay bypassed, and again taken in line after work completed.
Earthing lead prepared and provide in workshop.
Shift jobs carried
In Unit No. # 1 Vessel No.- 12/22 Back Pr. Switch and Transmitter impluse line cleaned as per shift
incharge requirement.
In Inst Shift PC showing disk error also auomatics repair is showing on Display. Also Restart 2 to 3
times. Still it is showing same error. So Electrical PC (364) is connected.
In Chimney analyzer PC it is showing internet not connected in PC. So modem and PC is restart. Still it is
showing Internet not connected.
In Compressor House all the auto drain valve checked. It is working Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In CHP MCC Room Light to OFF .

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Boiler-1 Bag house 12-22 level high, and probe clean and found trial run healthy.
HP heater control valve 3304 not operate, so aur exhaust and trial run found healthy.

Following Equipment S/D given .


1 Shredder Feed Chain Conveyor -02 PTW (Key-100, T042),
2. AFR Shredder Power Supply -02 PTW (Key-T029, 81),
3. AFR Discharge Belt -02 PTW (Key-045, T090),
4. Fly ash silo Root blower- 2 MCC (Key-31),
5. RECLAIMER (Key-099),
6. BC-1 Key-T093,

De-watering pump in crusher house megger value taken found healthy.


Bed ash cooler area 24v light provided.
Shift jobs carried
In Unit No. # 1 Vessel No.- 11/21 Seal Pr. Switch impluse line cleaned as per shift incharge
requirement.
In AFR when running the Plant then inside the rotor heavy sound is observed. Then open the gate found
that rotor knife and other parts damaged condition. Also RAM gate is closed by manually pressing the
Contractor.
In Unit No. # 1 and 2 Boiler Lift Telephone is checked it is working normally.
In Chimney analyzer room Instrument Panel Cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In HP-LP dosing Room Motor and Panel Cleaning to done.

Shift jobs carried


DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Following Motors Greasing Done
1/ J valve-1A
2/ CEP-1A
3/ ACW-2
1 phase extension board given at BAC-2A ( Vishwakarma Sir)

Following Equipment S/D given .


1 Shredder Feed Chain Conveyor
2. AFR Shredder Power Supply
3. AFR Discharge Belt
4. Crusher-2
5. RECLAIMER

ACW Pump House Motors & Power JB Cleaning work


Zishu Hozen at Switchyard arae
Shift jobs carried
AFR, shredder door not close in remote after maintanance job so close at manually.
Coal feeder 1C get off at 2.30 pm and motor tempreture at 60C, so check with maintanance team and after cleaning
belt its again start.
Reclaimer bucket not move , so check and found motor running but bucket not rotate , so its jam cleaning done and
rotate manually two round then it start normaly.
Coal feeder 1C , motor rpm checked with operation and maintanance team from 0 Hz TO 10 Hz referance without gear
box it running ok.
One no of light provide at BAC 1A for maintanance job.

Following Equipment S/D clear .


1 Shredder Feed Chain Conveyor
2. AFR Shredder Power Supply
3. AFR Discharge Belt
4. Crusher-2
5. RECLAIMER

DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shut down provide of SV 8131 and close after job.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Boiler-1 Bag House 12-22 Conveying and seal pressure closing issue, so checked and found seal pressure switch not
proper working, so replaced with unit-2, by the help from Mr. Tarun.M and trial run found healthy.

Boiler-1 bag House 12-22 level not showing, probe calibration done and then after running normal.
Bed ash cooler area temporary light Power OFF.
Shift jobs carried
Boiler #2,Bag house 12 Lavel show H , so probe cleaning done and actual material in it , inform to control room.

Bag filtar 22 , one vibrator foundation bolt missing so , new bolt provide and other bolt tight done.
Control room telephone box repaired as it continue ringing.
one no. of light shift from BAC 1A to Coal feeder 1D maintanance job.
WTP, feedback limit set of valave.
Following equipment avi provide and close.
1/ Coal feeder 1D
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Following Equipment S/D given .


1. BC1 & BC2 & BC4
2. VIBRATING SCREEN 1 & 2
3. RECLAIMER
4. COAL FEEDER 1D

DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.


APFC , maintain as it go out from auto mode due to p.f. BELOW 0.83 AND ABOVE 0.96 .
Shift jobs carried

In Unit No. # 1 Fly ash Vessel No.-12 Hooper HH level Probe not showing at DCS end. Found that supply
is not healthy. So new cable is laid from near Supply MCB. Also calibrated the level probe. Now ok.

In Unit No. # 2 Coal feeder -2D pneumatics valve Hose pipe fitting tightness done. Also closed the
Since Grid Voltage Incresaed to 135 Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC1 & BC2 & BC4
2. VIBRATING SCREEN 1 & 2
3. RECLAIMER

In Unit No. # 1 Boiler filling Pump S/D given and cleared.


In Unit No.# 1 BAC Side extension board to provided.
In Chipping Machine plug Top wire is reconnected.
At WTP tank area 24 Volts LED Light and Transformer connection to done.
Shift jobs carried
DT-2 temp 79 Deg C, DT-5 temp 78 Deg C , DT-6 temp 70 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Boiler-1 drain MOV and J valve MOV cleaning done.
Bag house 12-22 Level HH showing, so probe cleaning and trial taken, found running healthy.
Coal feeder area temporary light provided and connection given.
Shift jobs carried
Coal crusher 2, breaker operation check in test position, ON/OFF ok, as CCR inform it not start in one click. IN service
position not check pleace cheak during start of group in next shift.
AFR, shredder door not close in remote after maintanance job so close at manually.
Coal feeder 2D pnumatic valve air line close due to air leakage.
one no. of 24 volt light repaired at 22 mtr.
Coal bunkar 1C lavel probe check and reset as it show faulty at ccr
APFC , maintain as it go out from auto mode due to p.f. BELOW 0.83 AND ABOVE 0.96 .
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Following Equipment S/D given .


1. BC1
2. VIBRATING SCREEN 1
3. BC 7A
4. BC 7B

DT-2 temp 78 Deg C, DT-5 temp 77.1 Deg C , DT-6 temp 74.5 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
In CHP Coal Crusher No.-2 Tripped 02 times due to current interlock. ( 25 amps with 10 sec time
dealy. ) After third time it is started normally.
ETP Power Reset due to network problem.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC1
2. VIBRATING SCREEN 1
3. BC 7A
4. BC 7B

In maintences office RSB-98 Door lock tightness to done.


At Bike Parking JB Hole packing to done.

Shift jobs carried


DT-2 temp 79 Deg C, DT-5 temp 77 Deg C , DT-6 temp 69 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Boiler-1 0 mtr. 6 no's Drain MOV Cleaning work
Chimney Analyser Rooms Panels Instrument JB 's & PC's Cleaning work done
Root Blower Room Motors & Panels Cleaning work

Shift jobs carried


DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.BC-3,
2.Coal Crusher -2 ,
AFR Shredder fault, so power OFF/ON and trial run found healthy.
PI pc restart two times automatically, so programme on both time.
Silo-1 top 12-22 diverting valve not opearate, so checked and found running but its jammed , so infor to operation for
jam clear.
Boiler-1 drain MOV and J valve MOV cleaning done.
Shift jobs carried
Boiler-1 Bag house 12-22 level show H, so its probe clean and found trial run healthy.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
AFR breaker trip from PCC, so charge it and one control fuse change of control tr. Of MCC2
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
DT-2 temp 76.8 Deg C, DT-5 temp 71.3 Deg C , DT-6 temp 67.4 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
Jockey Pump-2 low pressure switch limit change 6 kg to 3 kg
P&V 2 and 4 status checked, found OFF Condition.
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 1 generator Voltage is Decreased by OLTC . Now Ok.

Following Equipment S/D given .


1 BC-1
2. Reclamier
3. BAC-1B
4. CEP-1B
5. BC-4
6. AFR Shedder M/C Supply
7. Magetic Seperator Supply (AFR)
8. Shedder feede chain conveyor(AFR)
9. AFR Dischage(AFR)
10. Grabber supply(AFR)

Following euipment AVI Given


1/ BAC-1B
2/ shedder feed chain conveyor(AFR)

AFR Magnetic seperator motor connection removed ( DE- R-Y-B-NDE) As per requirement mr. Rakesh Patil

AFR gate is closed by pickup the contractor.

BAC-1B level shows H-H so check & found level probe not inposition so adjustment done now level ok
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.BC-3,
2.Coal Crusher -2 ,

Shift jobs carried


Coal bunker 1D outlet mov not run , so check feeder found its contol fuse faulty so change it and start.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
One no of LED light provide at coal feeder 1D cleaning job.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
CCR AHU found in manual mode so put in auto mode.
DT-2 temp 76.8 Deg C, DT-5 temp 71.3 Deg C , DT-6 temp 67.4 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI given .
1 EN-MASS CONVEYOR-2 (Key-T045), (Remote to Local changeover done)
Following Equipment AVI Given & Close .
1.BED ASH COOLER-1B (Key-T047),

Following Equipment S/D given .


1 EN-MASS CONVEYOR-2 (Key-T045),
2. BC-4 (Key-T093),
3. BC-1 (Key-T042),
4. BELT CONVEYOR-7B (BC-7B) (Key-T055),
5. COAL FEEDER-1B (Key-T073), (Clean run Motor connection removed from DE side R,Y,B)

EOP-2 Power ON and OFF as per operation requirement.


Bag house 12-22 seal pressure line flushing,back pressure switch, and transmitter cleaning done.
Shift jobs carried
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear


1 EN-MASS CONVEYOR-2 (Key-T045),
2. BC-4 (Key-T093),
3. BC-1 (Key-T042),
4. BELT CONVEYOR-7B (BC-7B) (Key-T055),
5. COAL FEEDER-1B (Key-T073), (Clean run Motor connection removed from DE side R,Y,B)

CEP-1B motor Connection open ( DE-R-B-G-NDE)


Clean Run 1B Motor Connection done & Motor Double Earthing done
BAC-1B level shows H-H so check & found level probe not inposition so adjustment done now level ok
Monthly Power Report Balanced upto 26/12/2022
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI given .
1 EN-MASS CONVEYOR-1 (Key-045), (Remote to Local changeover done)
Reclaimer De-watering pump connection removed in PTW , details are R,Y, B from NDE side.
Following Equipment S/D given .
1 EN-MASS CONVEYOR-1 (Key-045),
2. BC-4 (Key-102),
3. BC-1 (Key-T093),
4. RECLAIMER (Key-T042),
5. Oil Supply Pump,
6. Unit-1 Soot blower power,

EOP-2 Power ON and OFF as per operation requirement.

Shift jobs carried


DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear


1 EN-MASS CONVEYOR-1
2. BC-4
3. BC-1
4. Reclamier

Generator-2 Space Heater OFF due to winding temprature within limit


Crusher-1 Motor Both sides Greasing done
Reclimer Water spray motor Connection done after complete work

Reclamier Boom belt ZSS porxy switch welding joint found broken condition now welding done & proxy taken line

BC-1 Guard limit inspection work


Unit-1 Battry Bank individual Battery voltage cheked ( 54 no's)
Shift jobs carried

In Inst. Compressor No.-2 Loading / Unloding switch churting sound observed in Plunger. So wire
connection in SOV Coil tightness to done. Then connected it. Then ok. At 5.00 AM again compressor is
not loaded. So again tightness to done. Then loaded. Loading and unloading switch may be check.

In compressor all the auto drain valve checked and working normally.
At TG zro mtrs all the field inst. Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Decreased . Now ok.
At 22 mtrs Light to OFF.
In Unit No. # 1 GSC -1A , 1B motor cleaning to done.
At Compressor house charging light to provided.

Shift jobs carried


DT-2 temp 75 Deg C, DT-5 temp 76 Deg C , DT-6 temp 75 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Instrument compressor-2 loading solenoid connector found loose , so tight it with wire, changeover of compressor not
received from operation team, so solenoid connector will be changed in B shift.

Following Equipment AVI given .


1 Bed ash cooler-1A
Reclaimer De-watering pump connection removed in PTW , details are R,Y, B from NDE side.
Following Equipment S/D given .
1 BC-1
2. Reclaimer
3. Bed ash cooler-1A

Shift jobs carried


BAC 1 B, lavel probe check and cleaning done, as lavel not show at ccr.
Instrument air commpressure No. 1 ,taken in line for changing SOV coil OF IAC 2, and after check trail taken and taken
in line.now ok.
IAF, air leakage arrest as its PU pipe found open , so connect it.
CPCB, pc dongle check its working ok.
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear
1. BC-1
2. Reclamier
3. CEP -1B
DT-2 temp 77 Deg C, DT-5 temp 77 Deg C , DT-6 temp 76 Deg C.
Motor connection done of CEP 1B, AS ptw close by maintanance dept.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
APFC, mode change to auto as it automatically chahe in manual mode due to power factor limit
Shift jobs carried

In AFR Shedder is frequently tripped on Pressure Switch -B17 filter. So inform to Katara . Then cleaned
the oil filter. Also inform to tarun Mandawat. He comes at site. Then cleaned the Pressure switch and
hole. Then it is started 1 to 2 times. Then pressure is build. Also shedder is in running condition.

In AFR Cooling Tower Pump is not ON. So checked and Found that feeder is in OFF condition. So ON the
feeder. Now Ok.
In AFR Magnetic seperator AVI is given . But feeder Supply is not ON condition.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Decreased . Now ok.
Shift jobs carried
Bed ash silo pnumatic valve not work, so check and found its pu pipe bend so its change.
One no of hand lampprovide at T1 tower to mr. om prakash garg for maintanance
Coal bunkar 1 C lavel not show at ccr shor its probe clean and reset . Now ok.
Bag house 12 lavel probe cleaning and calibration done.
EOP-2 Power ON and OFF as per operation requirement.
Following Equipment shutdown cancelled .
1 shredder machine
Office Ac supply made ON.
Following Equipment S/D given .
1 BC-1
2. BC 2
DT-2 temp 75 Deg C, DT-5 temp 76 Deg C , DT-6 temp 75 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
In Compressor house Lighting timer JB earthing tightness to done.
In IFC Moisture drain to done.
Since Grid Voltage Incresaed to 138KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC1
2. BC-2,
In Reclaimer side Boom Belt Motor EPB NC Contact to changed. Now Ok.
In Unit No.# 1 master UPS Fan failure alarm to Reset.

Shift jobs carried


DT-2 temp 75 Deg C, DT-5 temp 76 Deg C , DT-6 temp 75 Deg C.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
One no of LED light provide at coal feeder 1D cleaning job.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report not send to all concerns due to CD issue
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
WTP Pump House Motor Cleaning work
ACC-2 Area Lights OFF
Monthly Power Report Balanced upto 31/12/2022
Shift jobs carried
In Compressor house Lighting timer JB earthing tightness to done.
In IFC Moisture drain to done.
Since Grid Voltage Incresaed to 138KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
Unit-1 Battry Bank individual Battery voltage cheked ( 54 no's) tota dc voltage=121.7
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC-4
2. HSD Pump-1
Soot Blower-2 Panels cleaning & Blowering done
Unit-1 6 no's drain MOV Cleaning done
Unit-1 3 no's J Valve MOV Cleaning done

Bag house-1 12-22 Back Pressure transmittor cover found open condition so proper covering done
U
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

01.01.2023 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
Following check list prepared
02.01.2023 A Tarun Gaur

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal.

02.01.2023 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
02.01.02023 C Amit kumar singh VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

03.01.2023 A Gajendra Pandya


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


03.01.2023 B Tarun Gaur

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

04.01.2023 B Amit kumar singh


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

RNRP all nodes found Normal.


04.01.2023 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
04.01.2023 C Sanjay Garg

VAM log digital log book filled.


Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
05.01.2023 B Amit kumar singh

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
05.01.2023 C Ashvin Jadav UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.

06.01.2023 A Amit kumar singh RNRP all nodes found Normal except SPC004.
06.01.2023 A Amit kumar singh
Shift instrument digital log book filled
UPS log digital log book filled.
Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

06.01.2023 B Sanjay Garg

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.

07.01.2023 A Amit kumar singh

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

07.01.2023 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

07.01.2023 C Ashvin Jadav


UPS log digital log book filled.
VAM log digital log book filled.
07.01.2023 C Ashvin Jadav
Following check list prepared

a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

08.01.2023 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

08.01.2023 B Tarun Gaur

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
08.01.2023 C Amit kumar singh
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

09.01.2023 A Sanjay Garg UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
09.01.2023 C Amit kumar singh
09.01.2023 C Amit kumar singh
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
10.01.2023 A Ashvin Jadav

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


10.01.2023 B Tarun Gaur

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal
RNRP all nodes found Normal.
10.01.2023 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

11.01.2023 A Ashvin Jadav

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

11.01.2023 B Amit kumar singh


11.01.2023 B Amit kumar singh

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running
normal

11.01.2023 C Sanjay Garg


RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared

12.01.2023 A Amit kumar singh


12.01.2023 A Amit kumar singh

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
12.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

13.01.2023 A Amit kumar singh


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
13.01.2023 A Amit kumar singh

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

13.01.2023 B Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

13.01.2023 C Ashvin Jadav


UPS log digital log book filled.
13.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
14.01.2023 A Gajendra Pandya

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

14.01.2023 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
14.01.2023 C Tarun Gaur VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

15.01.2023 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
15.01.2023 B Ashvin Jadav
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

16.01.2023 A Gajendra Pandya


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

16.01.2023 B Ashvin Jadav

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


16.01.2023 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

17.01.2023 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

17.01.2023 B Tarun Gaur

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

17.01.2023 C Sanjay Garg

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
18.01.2023 A Ashvin Jadav
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


18.01.2023 B Amit kumar singh UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running


normal

18.01.2023 C Sanjay Garg

RNRP all nodes found Normal.


18.01.2023 C Sanjay Garg

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

19.01.2023 A Tarun Gaur

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.

18.01.2023 B Amit kumar singh


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
19.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

20.01.2023 A Amit kumar singh

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal
RNRP all nodes found Normal.

20.01.2023 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

21.01.2023 A Tarun Gaur

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

21.01.2023 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

21.01.2023 C Amit kumar singh UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

22.01.2023 A Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
22.01.2023 B Ashvin Jadav
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
22.01.2023 C Amit kumar singh
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

23.01.2023 A Sanjay Garg

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

23.01.2023 B Ashvin Jadav


23.01.2023 B Ashvin Jadav
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
23.01.2023 C Amit kumar singh VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

24.01.2023 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.


24.01.2023 B Tarun Gaur

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


24.01.2023 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

25.01.2023 A Ashvin Jadav


25.01.2023 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

25.01.2023 B Amit kumar singh


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

RNRP all nodes found Normal.


25.01.2023 C Sanjay Garg
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
26.01.2023 B Amit kumar singh UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
26.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

27.01.2023 A Amit kumar singh

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

27.01.2023 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
27.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

28.01.2023 A Amit kumar singh

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

28.01.2023 B Sanjay Garg

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
28.01.2023 C Ashvin Jadav VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs

shift round taken drives running normal

29.01.2023 A Sanjay Garg RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

29.01.2023 B Ashvin Jadav UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
29.01.2023 B Ashvin Jadav

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
29.01.2023 C Amit kumar singh

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


shift round taken drives running normal

RNRP all nodes found Normal.

30.01.2023 A Sanjay Garg


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

30.01.2023 B Ashvin Jadav


UPS log digital log book filled.
VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
30.01.2023 C Amit kumar singh UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Date Shift Engineer Name Regular jobs


Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

31.01.2023 A Ashvin Jadav

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Date Shift Engineer Name Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


31.01.2023 B Tarun Gaur

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist


Date Shift Engineer Name Regular jobs
Shift round taken found drives running
normal

31.01.2023 C Sanjay Garg


RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried

In AFR Road side gate is not closed . So Conractor Pick up. Then Gate is closed.
In BAC-1B Water valve actuator is not opened. At site PU Tube is in opened condition. So
reconnected it. Then operate from CCR. Then valve is in jammed condition. So inform to shift
incharge.
At WTP area all the SOV panel , RO , UF System all the Pressure Guage cleaning to done.
P&V 2 and 4 status checked, found OFF Condition .

online CPCB and ETP website is not opened .

All the Manual Light to OFF Condition.


Following Equipment S/D Cleared.
1. BC-4

In AFR side , Fire alarm is showing . So Reset it and Silence it.

Shift jobs carried


WTP UF#2 Device inlet valve air leakage arrested

Bag House-1 12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done
CCR AHU found in manual mode so put in auto mode.
Fire alarm reset at AFR Shed
EOP-2 Power ON and OFF as per operation requirement.
Office Ac supply made ON.

Following Equipment S/D given .


1 BC-1
2. BC 4
3/ BC-4
4/ Reclamier

DT-2 temp 75 Deg C, DT-5 temp 76 Deg C , DT-6 temp 75 Deg C.


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried

In Reclaimer Water Spray Pump is not started from Push button. So checked and found that PB ON
Contact is not working Condition. So replaced the PB contact . Then Trial taken it is working
condition. Also motor takes 6.5 Amps current.
In BAC-1B Water valve actuator PU Tube is opened. So New fitting to provided. Now Ok.
Since Grid Voltage Incresaed to 138KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared.
1. BC1
2. BC-2,
3.BC-4,
4. Reclaimer.

Fire alarm reset at AFR Shed


BC-6 S/D to provided also cleared.

Shift jobs carried


CEP 1B motor cover found missing so , cover it properly.
Boiler-1 drain MOV and J valve MOV cleaning done.
Bed ash silo level 10 Mtr. Showing, so power off sensor cleaning and found healthy.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
CCR AHU found in manual mode so put in auto mode.
DT-2 temp 76.8 Deg C, DT-5 temp 71.3 Deg C , DT-6 temp 67.4 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
Bed Ash cooler-1B water valve air tube fititng replaced and tral taken found OK
Fly ash silo-1 bag filer not running in auto, so checked and found that its relay malfunctioning , so relay setting
slightly changed, now it is running in auto normally

Following Equipment S/D given .


1 BC-2
2. BC 6
3/ BC-7A
4/BC-7B
5 Vibrating screen-2

all manual lightas made OFF

Office Ac supply made ON.

DT-2 temp 73 Deg C, DT-5 temp 72 Deg C , DT-6 temp 72 Deg C.


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D clear .


1 BC-2
2. BC 6
3/ BC-7A
4/BC-7B
5 Vibrating screen-2

WTP ETP Data found hang condition so power supply reset now ok

Bag House-1 12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done
Electrical Rubber mat laying Hoist SFU Compressor house
Car Parking Lighting JB Earthing found loose condition so tightness done
Security T-2 Tower lighting timer adjsutment done
Shift jobs carried
BAC 1A, back pressure transmitter check with operation team , found heavy leakage from conveyinf line. So
mainatanance team job done.
In Unit No. # 1 generator Voltage is Increased by OLTC . Since grid voltage is 128 KV.Now ok.
Shredder machine door not close from field so close it from feeder.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
Office Ac supply made OFF.

Following Equipment S/D clear .


1 BC-2, BC-4, BC6
2. SHREDDER,FEED BELT
3. BOILER DRAINAGE PUMP 1&2
4. RECLAIMER
5. COAL FEEDER 1C & 2C

Shut down provide for Boiler drainage pump 1&2.


Extension board disconnect and tower light on of AFR area.
DT-2 temp 77.2 Deg C, DT-5 temp 76.1 Deg C , DT-6 temp 72.4 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Coal feeder area light found not glowing ,due to mcb in trip condition , so on it.
Shift jobs carried
In Unit No. # 1 Turbine Module Panel No.- 16M , Bottom side Secondary BRC Comes in fault. LED
No.- 1 ,4 and 5. But at DCS it is showing Ok Condition. So Reset it. Now ok.
In Compressor all the auto drain valve checked and working normally.
In Chimney analyzer all the panel cleaning and Blowerning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
One Light put into charging mode.

Shift jobs carried


AFR, shredder door not get close of mcc side , so check at feeder and push button and contact cleaning done. Now
ok.
AFR, tower light on at 5.40 pm so its time increse to 6.15 pm
Fire alarm at 4.30 pm at AFR so, check with supervisor found all are ok. Its die to cutting material dust, so reset it.

Coal bunker 1D , outlet MOV not work, due to its motor get free from actuator it take only 1.3 amp balanced. So
close it manually and inform to pramod sati sir and tarun it will take tommrow in maintanance.

AVI provide foe coal feeder 1 D and normalize.

Following Equipment S/D clear .


1 BC-1
2. BC2
3. BC7
4. COAL CRUSHER 1
5. COAL FEEDER 1D

In Unit No. # 1 generator Voltage is Increased by OLTC . Since grid voltage is 128 KV.Now ok.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.
DT-2 temp 77.5 Deg C, DT-5 temp 75.1 Deg C , DT-6 temp 73.4 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Coal feeder 1 D , pnumatic valve air isolation done.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)

WTP Raw water pump cleaning and blowering done.


Shift jobs carried
Coal bunker 1D , outlet MOV connection open and MOV remove and shift to workshop.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.

Following Equipment S/D given .


1. BC 4 & BC7B
2. BAC 1A
3. RECLAIMER
4. Coa bunker 1D outlet MOV0908
5 Coal crusher 1
One damaged24 volt light repaired and hand over to maintanance team.
one extension board connect at AFR tower light and green tag provide on it elcb.

Civil dept, mixture machine faulty power cable isolate , reconnect,and new JB connection and trail dobe.

all manual lightas made OFF


DT-2 temp 73.5Deg C, DT-5 temp 72.9 Deg C , DT-6 temp 72.2 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried
In AFR side, Both the Tower Light is not ON. So checked and found that MCB is in OFF Condition. So
ON the MCB. Now ok.
Ply ash silo No.-2 plate Valve is not operating. So manually direct air given from SOV. Now ok.

Since Grid Voltage Incresaed to 138KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared .
1. BC 4 & BC7B
2. BAC 1A
3. RECLAIMER
4. Coal crusher 1

Following Equipment S/D Given.


1.COAL FEEDER-2D DISCHARGE MOV, 02MV0912,
2. BLR-2_IGN-1,
3. UNIT-2 SOOT BLOWER POWER-1,
4.COAL FEEDER-2C DISCHARGE MOV 02MV0911.
5. COAL FEEDER-2A DISCHARGE MOV 02MV0909,
6. SA FAN-2 LT MOTOR / 02AN0903,
7. P FAN-2,
8. J-VALVE-2A (VVFD)
9. PA FAN-2
10. ID FAN-2,
11. J-VALVE FAN-2A (DOL),
12. COAL FEEDER-2B DISCHARGE MOV 02MV0910.
13. BOILER-2 IGNITOR-2,

In AFR fire alarm is Reset.


At BC-7A / 7B hand lamp to changed.
At workshop extension board Plug top to changed.
At 22 mtrs extension board provided to Operation Person.
Shift jobs carried
Coal bunker 1D ,get stop due to tempretureat 50 C , so its transmitter setting check found ok. Then its restart.
ACC fan 1 C , get off , then check at feeder found its feedback contact malfunction , so loop provide at terminal,
dcs 15-B-T4-3&4.

Following Equipment S/D given .


1. BC 4 & BC71 & V/S 2 & ENMASS 1
2. SOOT BLOWER 1
3. SHREDDER, ,
4. FEED BELT
5 DISCHARGE BELT

EOP of U#2, ON and OFF as per requirement of CCR.


AFR, tower light manually ON due to its not taken in auto mode.
BC4 , bag filter open close cylinde pu pipe change due to damge condition.
all manual lightas made OFF
DT-2 temp 74.5Deg C, DT-5 temp 73.4 Deg C , DT-6 temp 72.9 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Shift jobs carried

In AFR side, Sheeder is not ON. So checked and found that T32 fault at HMI station. So checked
supply is Ok. But During clearing the S/D belt discharge feeder control supply is not ON. Also EPB is
pressed condition. So ON the MCB and EPB is released. Then fault is not showing in HMI station. Also
shedder is in OK Condition.
Ply ash silo No.-2 plate Valve is not operating. So checked and found that Both the limit switch is
showing at Panel end. So released the closed limit switch. Now ok.

Since Grid Voltage Incresaed to 138KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

In AFR side Sheeder motor light is not ON. Found that MCB is not ON. So ON the MCB. Now ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Following Equipment S/D Cleared .
1. BC 4 & BC71 & V/S 2 & ENMASS 1
2. SOOT BLOWER 1
3. SHREDDER, ,
4. FEED BELT
5 DISCHARGE BELT

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
In Unit No. # 1 Coal Bunker Level Transmitter -1A is not showing correctly at DCS end. So Power
Reset and Cleaned the level Probe. Now Ok.
Drain pot motor of unit-2 fan cover hole sealing with m seal.
WTP area equipment cleaning and blowering done.
WTP high pressure pump vfd cleaning done.
Shift jobs carried

In Chimney analyzer Main Chimney Sample line heat trace Temp. is not showing in Temp. Controller.
So checked and found that RTD element is removed from RTD. So reconnected the RTD element.
Now it is showing normally.
In Compressor all the auto drain valve checked and working normally.
In Unit No.# 1 , vessel No.-11/21 Back Pr. Transmitter impluse line chocked condition. So cleaned
the impluse line. Now ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given
1. BC-5

In AFR side Both the Tower light is manually OFF from MCB / SFU side.
In Unit No. # 1 Power factor is showing 0.8 at DCS. For improving the Power factor infrom to MPSS
Person. Presently MVAR running in Remote mode.

Shift jobs carried


DT-2 temp 78 Deg C, DT-5 temp 77 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D clear .
1 BC-5

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

AFR tower light not ON checked & found SFU OFF Condition so ON now OK
1 No's Handlamp provided at BC-7A & 7B Area
Baghouse -1 vessel no 12 level not shown so Level clean & calibration done now Level OK
Chimney Analyser room Panels cleaning work done
Shift jobs carried
Bag House-1 12 lavel probe check and cleaning done on requirement of ccr.
APH, transmitter, pr. Switch, vessel limit cleaning done.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
One no of led light shift from 22 meter to 4 floor and connect.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
APH panel, all sov, connector tightness and cleaning done.
Shift jobs carried

In Unit No. # 1 Carbon Unloading System Inst. Manual isolation is opened due to cleaning the BAC
bend chocking work as per shift incharge requiremnt. After completion of work also installed the
valve.
In Unit no. # 1 MVAR is not run into auto mode. So SP increased from 0.3 to 1.0 . Now ok.
In AFR side Both the Tower light is manually OFF from MCB / SFU side.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given


1. AFR Shredder Machine ,
2. VS-2 ,
3. Reclaimer ,
4. BC-6 ,
5. 02MV0906 ,

Following Equipment S/D Cleared.


1. AFR Shredder Machine ,

At WTP area all the SOV panel , RO , UF System all the Pressure Guage cleaning to done.

Shift jobs carried


UPS, master-1, fan failure alarm observed , so check found fan working ok so reset it.
Lift Ir sensor not work properly so its verticle sensor adjustment done, and operation check
Back side - EOT JB, MPDB JB, tephone JB , AC supply JB cleaning done.
Exhaust fan of TG building cleaning done.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
24 volt portable light put on charge.
Shift jobs carried
DT-2 temp 76 Deg C, DT-5 temp 77 Deg C , DT-6 temp 74 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI given .
1 BC-6, (Remote to Local changeover done)
BC-6 not start from LCS, so checked and found Start/Stop push button interchanged and wiring changed, and trial
run found healthy.

Following Equipment S/D given .


1 Coal feeder-2A,
2. BC-4,
3. BC-1 ,
4. RECLAIMER ,
5. Bag filter Screen floor,

Grass cutting machine in middle gate green tag provided.


AFR high must blower light SFU, and MCB OFF.
Shift jobs carried
DT-2 temp 80 Deg C, DT-5 temp 78 Deg C , DT-6 temp 76 Deg C.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D clear .


1 Coal feeder-2A,
2. BC-4,
3. BC-1 ,
4. RECLAIMER ,
5. Bag filter Screen floor,

1 no's 24 V Transformer handover to opeartion dept at 22 mtr. area


Screen floor Bag filter start & frequent stop check in fireld manual operation done Bag filter running normally but
RAV Motor trip due to O/L so inform to Operation dept. further checking
AFR Civil tempaory lights ON
FAS-2 pneumatic valve limit switch damaged & deallocation so proper fixing & dressing work trial taken both
manual & auto working normally & Guard also fixing work done
OFFICE AC OFF
Shift jobs carried
In Unit No. # 1 Coal Bunker Level Transmitter -1A is not showing correctly at DCS end. So Power
Reset and Cleaned the level Probe. Now Ok.
In Solar Online Reading Cinema Hall ( EM-1) is not showing. So daily Per day reading is written in
the sheet. To be check.
At 4.5 Mtrs Lighting ON/OFF switch Packing to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 generator Voltage is Increased . Now ok.
In Dosing Room , Motor Cleaning to done.

Shift jobs carried


Zishu Hozen done at crusher building.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase, AFR area etc. ).
compressor house auto drain valve manually checked found healthy.
MPHB 22 Mtr LED not run, so checked and found TOP cable connection loose, so tightness done, and trial run
healthy.
Following Equipment S/D Clear.
1 CEP-1A,

Following Equipment S/D given .


1 CEP-1A,
2. BC-4,
3. BC-6 ,
4. RECLAIMER ,
5. Bucket Elevator-2,
6. Bucket Elevator-1,
7. Coal Crusher-1 ,
8. COAL CRUSHER BUILDING LDB ,

CEP-1B gauge glass fitting provided as per Maint requirement.

Shift jobs carried


Screen floor bag filter RAV not run , so check found it relay in overload conditon . So reset it and start , it take 1.3
amp balance and relay setting at 1.5 amp.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
Two new 24 volt hand lamp prepared at workshop.
Grid high alarm set at 20.9 MW, with 30 mitute interlock.
Following Equipment S/D provide. .
1 .Bag filter Screen floor ,
2. BOILER 1, ELEVATOR WITH RAV.
Following Equipment S/D clear .
1 . BUCKET ELEVATOR 1 &2,
2. BC-1 & BC ,4 BC 6.
3. COAL CRUSHER-1 ,
4. RECLAIMER ,
5. Bag filter Screen floor,

Bag house 12-22 air line shutdown provide an dcancelled too.


CEP 1B, suction line DP switch, drain line leakage found , so arrested.
CEP 1B, discharge line pressure guage install..
AFR, high mast light on done .

Shift jobs carried


As Per Shift Incharge requirement , IFC Set Point is checked it is 48 PSI, Also IFC is working
Normally.

In Unit No. # 1 Fly ash Vessel No.-21 LHH is showing at DCS end. While LH is not showing at DCS end.
So ON / OFF the Vibrator. So material deposit on level Probe fall on the vessel. Now Ok.

At 22 mtrs Light ON as per Operation Person requirement.


In Unit No. # 2 Boiler No.- 2 Light OFF from 4th to 7th Floor.
Coal Feeder -1D Clean run tripped due to O/L. So reset it. Now Ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 1 GSC-1A and 1B motor cleaning to done.

Shift jobs carried


Lime stone UPS connection remove.
CPCB, braodband cable connection.
ETP, panel power reset due to data not proper.
AFR high mast tower light off, from tower.
Crusher building light not glow ,due to timer by pass , so take it in line.
Coal bunker 1D outlet MOV , motor winding resistance taken at 11.6 ohm in all phase
Following Equipment AVI p[rovoide.
1 Coal feeder 1D,
Following Equipment S/D given .
1 BC-1,
2. BC-4,
3. BAG FILTAR SCREEN ,
4. OIL PUMP-2 ,
5. COAL FEEDER-1D,
6. COAL BUNKER 1D OUTLET MOV 01MV0908 ,

Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Shift jobs carried


Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
Two new 24 volt hand lamp prepared at workshop.
Following Equipment S/D provide. .
1 .Bag filter Screen floor ,
2. BOILER 1, ELEVATOR WITH RAV.

Following Equipment S/D CLEAR .


1 BC-1,
2. BC-4,
3. BAG FILTAR SCREEN ,

AFR High mask lighting ckt. Taken in line & Civil tempaory supply removing work
BAC-1B 1no's Extension board , 1no's 24 V transformer given to Mr. Mahto
BC-7A &7B Handlamp repaired work
BC-5 not started so check & found Emergency push button act so release now Belt Healthy
Grid failure due toundervoltage at 16.00 pm & again synchronised at 16.12 pm
BAC-1B Extra air line puppet valve air charge & taken in line trial taken by conveying cycle now ok
IFC Filter moisture drain
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
WTP area equipment cleaning and blowering done.
GSC-1A and 1B motor cleaning and blowering done.
Bed ash cooler-1B area 24v hand lamp replaced.

Shift jobs carried


Shredder machine not get off at starting of shift, so its power on / off done one time and start normal.

Bag house 11 lavel probe cleaning done as per requirement of ccr..


APH , seal air pressure show faulty ar ccr so , impulse line flushing done found heavy dust.
Coal feeder 1A, pnumatic hose pipe air leakage , so hose pipe change new.
One no of industrial top replacement done of 10 amp to 20 amp.
Boiler are light get off at 07.17 am due to dust at sensor, so clean it.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low

Following Equipment S/D given .


1 VIBRATING SCREEN-1,
2. BC-5,
3. ROOT BLOWER ASH SILO ,
4. SHREDDER SUPPLY,
5. FEEDING BELT,
6. DISCHARGE BELT ,

Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Shift jobs carried

In Unit No. # 1 Vessel No. -1 Seal Pr. Showing fault. So S/D Given to Mech. Dept. When Open the
Dome Valve found that Dome Valve crack condition. So Mech. Dept Changed the Dome valve also
Limit Switch mounted at site. Also all the PU Tube Connection to done. Also Line is in Jammed
condition. also Dome valve Trial is pending condition.
AFR Side Fire Alarm to Reset.
Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D given .


1 02MV0907
2. Unit No. # 1 APH System ,

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Following Equipment S/D Cleared .


1 VIBRATING SCREEN-1,
2. BC-5,
3. Unit No. # 1 APH System ,
4. SHREDDER SUPPLY,
5. FEEDING BELT,
6. DISCHARGE BELT ,

BC-7A &7B Handlamp to provided.


Bed ash silo welding machine Plug To changed and green tag to Provided.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Drain MOV and J valve MOV cleaning and blowering done.
Dosing room panel and field equipment cleaning and blowering done,
Pa fan-2 motor cleaning and blowering done.

Shift jobs carried


Portable tools checking work
Temporary supply given for PC at assembly point

P&V 2 status checked, found OFF Condition due to ambient & DT temperature low

Following Equipment S/D given .


1 Coal crusher-1
2. BC-5,
3. Screen floor bag filter
4. Gabber supply

Shift jobs carried


In Unit No. #1 MVAR is not run into auto mode. So Raise the excitation command. Then put into auto
mode. Now Ok.
In Screw Conveyor No.-2A ON/OFF as per Mr. Vishal requirement.
In BAC-2B level Probe is showing high / not high at DCS End. So cleaned and Calibrated the level
Probe. Now Under observation.

In CHP Crusher Building Light is not ON. Found that Lighting timer structed. So Reset it. Now Ok.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Cleared.


1 Coal crusher-1
2. BC-5,
3. Screen floor bag filter

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
CCR AHU found in manual mode so put in auto mode.
Chimney Analyser room Panels cleaning work done
Boiler-1 drain MOV and J valve MOV cleaning done.
ACC-1 0 mtr area light now glowing check & found MCB OFF so ON it
Shift jobs carried
In Fly ash Silo No. # 2 Fork level Switch is Contionuous showing at site. So Cleaned the level Switch.
Now Ok.
In Unit No.# 1 , vessel No.-12/22 Seal pr. impluse line chocked condition. So cleaned the impluse
line. Now ok.
In Compressor all the auto drain valve checked and working normally.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given
1.Crusher Floor Bag Filter Fan ,
2. Crusher Floor Bag Filter RAV ,

In Unit No. # 2 EOP ON/OFF as per Operation requirement.


Crusher building light ON as per operation requirement.

Shift jobs carried


Soot Blower -2 Panel Cleaning and blowering done.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.Crusher RAV,
2.Crusher Bag filter,
Boiler-2 Firing floor instrument cleaning done.
Boiler-2 Burner floor instrument cleaning done.
Shift jobs carried

In Fly ash Silo No. # 2 Fork level Switch is Contionuous showing at site. So Remove it and reduce the
sensitivity in Lab ,still showing NC, so need to replace with New sensor switch, also need to check
silo-2 conveying system stop in timer mode of 20 min
Bed ash cooler level sensor checked found OK
In Compressor all the auto drain valve checked and working normally.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given


1.BC7A
2. BC7B
3 Reclaimer
4 BC5
6 CEP-1B
7 MOV2902
8 vibrating screen-1
9 Crusher floor bag filter
10 RAV crusher Floor

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.BC7A
2. BC7B
3 Reclaimer
4 BC5
6 CEP-1B
7 MOV2902
8 vibrating screen-1
9 Crusher floor bag filter
10 RAV crusher Floor

Following Equipment AVI Given and Clear.


1. CEP-1B,
2. MOV2902,
C7-AB area 24v light provided.
Bag house-1 vessel 12-22 vibrator rubber mat laying done.

Shift jobs carried


In Compressor all the auto drain valve checked and working normally.
In Boiler No. # 1 APH SOV JB , Field Inst. Cleaning to done.
In CHP, BC-4 , T-1 and T-2 Lighting Timer Set to 6 to 10 PM.
At AFR Fire alarm is Reset.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
BC-1 Motor and JB Cleaning to done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.Vibrating screen-1,
2.Vibrating screen-2,
3.BC-6,
4.01MOV2902,
5.CEP-1B,
6.BLR-1 APH-1 INSTRUMENT AIR INTAKE VALVE,
7.BAG FILTER FAN CRUSHER FLOOR,
8.BAG FILTER RAV CRUSHER FLOOR,
9. BAG FILTER BC-4 FLOOR,
10. FLY ASH SILO-2 DRY UNLOADING,

Bag House 12-22 seal pressure fault, pressure switch cleaning and taken in line.
Boiler-1 APH Airline isolation, airline, limit switch and pressure gauge removed for Maint, work.
Zishu Hozen done at crusher building.
Green tag provided at T1 tower welding machine.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Clear.


1.Vibrating screen-1,
2.Vibrating screen-2,
3.BC-6,
4.01MOV2902,
5.CEP-1B,
6.BLR-1 APH-1 INSTRUMENT AIR INTAKE VALVE,
7.BAG FILTER FAN CRUSHER FLOOR,
8.BAG FILTER RAV CRUSHER FLOOR,
9. BAG FILTER BC-4 FLOOR,
10. FLY ASH SILO-2 DRY UNLOADING,

FAS-2New fork switch installation done & trial taken


BC-7A &7B lights not ON check & found Timer stuckup & so reset now OK
BC-7A Bag filter motor fan cover found loose condition so tightness done
Shift jobs carried

In Boiler No. # 1 Lift one Contractor Person Trapped inside the Lift. Then Reset the Supply. Display
is showing O Fault. Also Manual Lever Key is not available. So Informed to Hement Sharma. In this
Locker one extra key is Present. Then Open the gate at zero mtrs. Then found that Lift in between
floor No. -1 and 2. As per Hement sharma Instruction Top side Lift Panel Manual select. Also in roller
side limit switch acted. So removed it Then Lift comes in 2nd Floor. Then Opened the door also
Person got outside the Lift. Also in Lift emergency switch is acted.

In BAC-1A and 1B SOV JB Connection tightness to done.


In CHP, BC-3 , BC-4 ,T-1 and T-2 Light , Coal Shed Light to OFF.
In WTP hall area field Inst. Cleaning to done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
HP and LP Dosing Motor Cleaning to done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.01MOV2902,
2.CEP-1B,
3.BAG FILTER FAN CRUSHER FLOOR,
4.BAG FILTER RAV CRUSHER FLOOR,
5.Vibrating screen-1,

Following Equipment S/D Clear.


1.01MOV2902,
2.CEP-1B,
Bag house 12-22 seal pressure fault, so line flushing done.
Bag house 12-22 back pressure transmitter, and switch cleaning done.
Crusher Building back side 3 phase welding machine earthing provided.
Zishu Hozen done at crusher building.
Shift jobs carried
Bag house 22 no. vessel check with operation and maintanance team, found back air presseure in transmitter.
After checking found its stunner chocked , so cleaned and fixed. After that that pipeline cleaning job continue by
operation team.
Mixture machine connection open from both end at AFR.
BC1, Show pull card during start group ,so check with Pramod sir and provide loop at 93-7A-TB2-3/4. please check
pulchord in field next shift and find it after remove link.
Fire water pump house, switch yard, ACC2 side road light timer time increse to 6.30 pm in place 6.00 pm

Following Equipment S/D Clear.


1.FLY ASH SILO2- DRY UNLOADING PNUMATIC VALVE,
2.BAG FILTER FAN CRUSHER FLOOR,
3.BAG FILTER RAV CRUSHER FLOOR,
4.Vibrating screen-1,

P& V 2, water pump stoped as water full.


Fly ash silo 2, dry unloading pnumatic valve provide shutdown to mechanical, and after job, limit adjustment done, and trail ta

Shift jobs carried

As Per previous Shiff BC-1 PCS is in Bypassed condition. So removed the Loop from DCS DI PCS wire.
Then 02 to 03 Times Reset the PCS Controller Supply. Also in Controller no PCS acted indication is
showing in display. Controller is showing healthy condition. Also DCS there is no PCS Indication.
Also Checked at field side at PCS-08 Number Heavely restrusted condition. it is not showing
Incoming as well as as O/L Supply. So this PCS may be replace. Presently this PCS Cover is Open
Condition.

In CHP, BC-3 , BC-4 ,T-1 and T-2 Light , Coal Shed Light to OFF.
In Unit No. # 1 Vessel No. -12/22 , Seal Pr. Showing fault. So Cleaned the Impluse line. Also changed
the SOV. Now Ok.
In Unit No. # 1 Vessel No. -12/22 , Back pr. Switch and Transmitter Cleaned the Impluse line as per
operation requirement.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In Unit No. # 2 Soot Blower Panel Connection tightness and Cleaning to done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
Generator-2 Space Heater current checked R- 10.5 amp , Y-10.8 amp. , B- 10.7 amp.

Following Equipment S/D Given.


1.T-1 Tower Bag Filter
2BAC-1B
3.BAG FILTER FAN CRUSHER FLOOR,
4.BAG FILTER RAV CRUSHER FLOOR,

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1240 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work
5/ Distrilled water add on 1, 3& 5th no's cell
6/ Battery Status- Green

Bag house 12-22 seal pressure fault, so line flushing done.


BC-1 Pullchord cleaning by CRC & trial taken found ok
BC-7A &7B Handlamp repaired work
Zishu Hozen done atTG-0 mtr.
Shift jobs carried
Bag house 21, H lavel probe check and found material in it and HH lavel probe check found no material. calibration
done of both lavel probe.
Camera of TG1, check, its signal cable, power cable and re-connection done, now ok.
Bag house 11, H lavel probe supply missing and HH lavel probe check and calibration done.
Bed ash silo lavel show suddenly increse 5.5 mtr to 10 mtr at ccr , so its probe cleaning done from silo top at 8.30
pm, now ok.

Following Equipment S/D Clear.


1.T-1 Tower Bag Filter
2BAC-1B
3.BAG FILTER FAN CRUSHER FLOOR,
4.BAG FILTER RAV CRUSHER FLOOR,
APH 1 dome limit get faulty so, check and found its due to loose bolt of limit switch, so tight it and confirm from
ccr .now ok.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Boiler-1 Bed thermocouple JB cleaning and Sealing done.
Ignitor control panel, flame detector burner panel and 08 nos SOV Cleaning done.
Silo roots blower and panel cleaning and blowering done.

Shift jobs carried


Bag house 11-21, H lavel probe check and probe cleaning done on requirement of ccr.
Bag house 11 no, lavel switch supply found off from CHP dcs , so ON it. Now ok
Bag house 22 no. valve and air connection open as it on maintanance and marking done.
Grid frequency meter display checked with pramod sati sir ,found its power supply card faulty , so remove it for
maintanance.

Following Equipment S/D Clear.


1.COAL FEEDER 1C PNUMATIC VALVE
2.COAL FEEDER IC,
3.BC-7B,
4.BAG FILTER 7A-7B,
5.RECLAIMER,
6.BAG FILTER ( BC4)
7.COAL FEEDER 2 B
8.SHREDDER FEED BELT,
9. SHREDDER DISCHARGE BELT,
10. SHREDDER SUPPLY,

Boiler area light not off at time so its lux sencor check and cleaning done but then also light not off so its off from
mcb, and later mcb on done.
Scrap yard side light timer found, time at 10.00 am , so it change to actual time.
Assembly point loud Speaker maintanance done.
Supply provide for safety van for, safety program at car parking, and one plug top also provide and remove.

Shift jobs carried


In Unit No. #1 MVAR is not run into auto mode. So Raise the excitation command. Then put into auto
mode. Now Ok.
In Unit No. # 2 Fly ash system Vessel No.- 12/22 , service air main intake valve Open , Close limit
assembly , PU Tube are connected and Trial taken it is working normally.
In CHP DCS Room HP-LP alarm is showing. So reset it. Now Ok.
When Clearing the S/D of AFR, Starting hooter is not ON. Since belt is running condition and Due to
dust we can not check the hooter.

Since Grid Voltage Incresaed to 134KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Clear.


1.COAL FEEDER 1C PNUMATIC VALVE
2.COAL FEEDER IC,
3.BC-7B,
4.BAG FILTER 7A-7B,
5.RECLAIMER,
6.BAG FILTER ( BC4)
7.SHREDDER FEED BELT,
8. SHREDDER DISCHARGE BELT,
9. SHREDDER SUPPLY,

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At BC-7A / 7B hand lamp to changed. Also 24 Volts Transformer TOP to changed.
In Root Blower No.-2 is not started from DCS. So checked and found that O/L. So Reset it. Now ok.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
1 no's handlamp repaired work
24 V transformer Plug top replacement work
1 no's LED plug top replacement work

Following Equipment S/D Clear.


1.Coal Feeder-1B
2.Coal feeder -1B Pneumatic air isolation
3.Bag filter -BC-4
4.BAG FILTER 7A-7B,
5.BFP-2
6.P Fan-2

Lube-oil pump 2F not start so check & found ON timer relay faulty replaced by new one now ok

Lube-oil pump 2B not start so check & found ON timer relay faulty & RELAY base Damaged checking work U/P

ACC & ACW pump house area PA phone checking work


CEP-1A new spare VFD Installation work
Monthly Power Report Balanced upto 20/01/2023
Zishu hozen at TG Building area
Shift jobs carried
In Unit No. #1 MVAR is not run into auto mode. So Raise the excitation command. Then put into auto
mode. Now Ok.

In AFR, Starting hooter is not ON. So Removed the hooter. So checked and found that carbon Brush is
damaged condition. New is required. Presently hooter available in Inst. Lab.

In AFR fire alarm is Reset.

In ACC fan -2B Lub. Oil System Feeder side Relay Base Unit is damaged condition. So new base unit
Mounted in feeder and trial taken . It is working Normally. At DCS side current is not showing .

Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Clear.


1.Coal Feeder-1B
2.Coal feeder -1B Pneumatic air isolation
3.Bag filter -BC-4
4.BAG FILTER 7A-7B,
5.BFP-2
6.P Fan-2

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
P-fan -2 AVI is given. Also AVI and S/D to Provided.
In Drain Pot Pump No.-2A Sound observed. So fan Cover tightness to done. Still sound at site. So Informed to
Hement Sharma.

In Unit No. # 2 ACC side lighting timer structed. So reset it. Also Main MCB OFF as per shift incharge
requirement.

Shift jobs carried

Bag House ,12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done .
Coal bunker 1C, lavel show faulty , so its lavel probe cleaning done and reset.
Chimney aviation light not glowing , so check and found its outgoing mcb in off condition so, on it.
Ground mounted solar power display moniter reading not show at ccr , then talk to MPSS, thare also reading faulty
due to signal cable terminal loose at MPSS , so its tight done. Now display working ok.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
At 7.57 AM , Grid island ( 20.88 MW to 0.0 MW ) and TG # 1 Load reduced from 16.32 MW to 7.35
MW due to Voltage dip. And Synchnonised at 12.13 PM. 00
In IAC No. # 2 Tripped due to VFD Fault , ( Fault -5 , DC UNDER VOLTAGE ) , So Reset it. Now Ok.
AFR Breaker is tripped. So Reset the power Supply. Now Ok.

At 10.59 AM Generator Frequency is increased to 51.48 HZ suddenly. After some time it comes to Normal Value.

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 2 EOP ON/OFF as per Operation requirement.

Shift jobs carried


Soot Blower -2 Panel Cleaning and blowering done.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given and Clear.
1.Bag filter BC-7A &7B,

BC-6 Motor cleaning done.


BC-6 area 24v hand lamp provided.
TG-1 area 0 meter control valve and Mov cleaning done.

Shift jobs carried


at 5.30 am ,Bag House ,22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing
done , but found continue material flow from tube . So dome vlave close one time observed abnormal sound from
dome.inform to ccr
CCR AHU found in manual mode so put in auto mode.
In Chimney analyzer all the panel window , calibration JB, cyclinder cleaning and Blowerning to
done.
BAC 1A and 1 B, panel and lavel probe JB cleaning done..
IFC Filter moisture drain.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Shift jobs carried

Due to PRDS Leakage arresting Job , MOV S/D to Provided also VAM System working in Unloading
Condition. Also at 4.5 Mtrs and BFP MV Drive room AC to started from Cooling Purpose.
In Unit No. # 1 Vessel No.-12/22 Conveying Cut at 25 Sec. So Checked and found that Back pressure
switch , Back pressure transmittor , Impluse line is heavily chocked condition. So Cleaned the
Impluse Line. Also Air filter chocked condition. So direct connection to done. Then Trial taken it is
working Normally.
In Bed ash Silo Level is showing 10 Mtrs. So Reset it. Now Ok.
In Dosing Room ,Hydrazine Pump Level Switch Power Reset. Now Ok.

In Ultrafiltration Solenoid Box Power OFF and Valve Limit switch connection removed as Per Mech. Requirement.

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1. BC-6,
2. BC-7A / 7B bag Filter ,
3. T-2 Tower Bag Filter,
4. 12MV2305,
5. 01MV2312 ,
6. P. & V. No.-4 ,
7. CEP-1B ,

Coal feeder area lighting Timer taken in line.


Crusher Building welding machine double earthing to done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment AVI Given and Clear.
1. 12MV2305,
2. 01MV2312 ,
Following Equipment S/D Clear.
1. BC-6,
2. BC-7A / 7B bag Filter ,
3. T-2 Tower Bag Filter,
4. 12MV2305,
5. 01MV2312 ,
6. CEP-1B ,

CEP-1B taken in line through DOL mode in new VFD panel.


VAM taken in line after PRDS work completed and AC OFF and water valve close.

In Ultrafiltration Solenoid Box Power ON and Valve Limit switch connection done as after Mech. Work completed.

Shift jobs carried


CHP DCS, ash system 91M BRC card change to primary from secondary.
CHP DCS, room AC show HP/LP alarm so, its reset one time.
One no of hand light provide st 22 mtr for coal bunker poking job.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
MOV and control valve cleaning done at TG 1, O mtr.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.

Shift jobs carried


Zishu Hozen done at MPHB 0.0 Mtr. Area.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.COAL FEEDER-1A DISCHARGE MOV, 01MV0909,
5.COAL FEEDER-1A,
6.COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE,
7.Coal Crusher-1,
8.BC-1,

AFR Hooter installation done, trial are pending due to plant shutdown.
EOP-2 Power ON and OFF as per operation requirement.
Bed ash silo RAV tripped in overload, reset it.
Bag house 12-22 back pressure transmitter, and switch cleaning done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
CEP-1A Discharge MOV gland leakage arrested done

Following Equipment S/D Clear


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.COAL FEEDER-1A DISCHARGE MOV, 01MV0909,
5.COAL FEEDER-1A,
6.COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE,
7.Coal Crusher-1,
8.BC-1,

AFR Dischagre belt hooter not ON checked hooter by other supply source working normally Power supply need to
be check.

BC-7B Bag filter not ON checked & found Power contactor stcukup SO Supply reset done now running normally

Coal feeder-1A Clean run motor fan cover found loose condition tightness done
Monthly Power Report Balanced upto 23/01/2023
WTP Furnace earthing lug found damaged condition so replaced by new one
Shift jobs carried
In Bed ash Silo Level is showing 10 Mtrs. So Reset it. Also packing to done. Now Ok.

In Compressor all the auto drain valve checked and working normally.
At zero mtrs cable celler light is ON. So OFF the Light. Now Ok.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP

Shift jobs carried


Zishu Hozen done at ACW area.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-1 (02 PTW),
2.BC-2,
3.BAG FILTER BC-7A&7B,
4.BAG FILTER T2 TOWER,
5.BC-4,

EOP-2 Power ON and OFF as per operation requirement.


230v Top replaced in workshop.
Bag house -11 level high, so probe checked and found material so inform to operation.
Bag house-12-22 back pressure pressure switch frequently cleaning required.
Crusher house tool room walkie talkie charger socket connection tightness done.
Shift jobs carried
Bag house 11, HH lavel probe check as it show at ccr , found actualyy material in it , so confirm to ccr.
Bag house 22, no. bach pressure switch, and transmitter switch line cleaning done, as a lot of dust blow out from
pu pipe line.
AVI, Provide of bag house 12-22 air line isolation remove and done as AVI close.
Shut down close of bag house 12-22 as ,permit close by maintaanace deptt.
CCR AHU found in manual mode so put in auto mode.

Following Equipment S/D Clear.


1.BC-1 (02 PTW),
2.BC-2,
3.BAG FILTER BC-7A&7B,
4.BAG FILTER T2 TOWER,
5.BC-4,

Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).


Generator 1 voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies 126.2kv to 134.9
kv.
Republic day program preparation done.
BAC 1A and 1 B, panel and lavel probe JB cleaning done..
Shift jobs carried
In Bed ash Silo Level is showing 10 Mtrs. Also it is Hang Condition. So Reset the 24 Volts Supply and Cleaned the
Level Probe. Now it is showing Normally.
In Bed ash Cooler -1A and 1B SOV JB Connection tightness and Cleaning to done.
Lift Telephone checked all are working normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Chemical Room Motor Cleaning to done.
Shift jobs carried
Bag house 12-22 lavel probe check on requirement of ccr, found actual material in it. So inform to ccr.
UPS, lights , fan , and other accessories remove from tractor, except heavy , welded structure, and kept at
workshop and instrument lab.
AFR, supervisor inform that light not glow at cooling tower , so check found its mcb in trip condition , so reset it.
One no of hand lamp provide at coal feeder for cleaning job.
CCR AHU found in manual mode so put in auto mode.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.
Compressor house, auto drain valve manually checked found ok.
Dosing room panel and field equipment cleaning and blowering done,

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Coal crusher Unite-1 error reset.
Drain pot Motor of Unit-1 and 2 cleaning done.
Bag House-12-22 temp checked and inform to ccr as per requirement.

Shift jobs carried


Soot Blower -15 no. limit not work , so checked and find field side phase wire OPEN . SO, CONNET IT PROPER AND
START.
Fly ash silo 01 no selector switch found in broken condition, so its replace with new selector switch.
Coal feeder area and 22 mtr light ON and OFF as per requirement of CCR.
Solar panel , with structiure remove from tractor , and shifting done.

Following Equipment S/D Given.


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.CEP 1A,
5.CEP MOV 01MV2901,
6.BC1,
7.BC7A,

Following Equipment S/D Close .


1.CEP 1A MOV01,MV2901,
2.CEP 1A
CCR AHU found in manual mode so put in auto mode.
MVAR show negative reading, -1.88 at 1.30 pm , so check and found APFC out from auto mode, due to generator
p.f. limit so put it in auto again by changing excitation.
Shift jobs carried

In CHP, Bucket elevator No.-1 is Tripped due to Overload. At site found that bucket elevator is in
jammed condition. So Put into Local and DOL mode then it is started for 2 to 4 minutes. After
normalized it again put into Auto and VFD mode. Now ok.
In Chimney analyzer PC internet not connected is showing. So Reset the modem and connection
tightness to done. Still it is showing interent not connected.
In CHP , Bucket elevator No.-1 ZSS Proxy checked . It is working Normally.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Closed.


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.BC1,
5.BC7A,

Following Equipment S/D Given .


1.AFR Grabber Stsrter Supply ,
2. Unit No. # 1 Centrifuse Oil ,
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
BC-1 AVI is given. Also AVI and S/D to Cleared.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Dosing room panel and field equipment cleaning done.
Pump house motor cleaning by cloth.
Bed ash cooler-1A Back pressure transmitter replaced from 2A as per operation requirement.

Shift jobs carried


U#1, Desuperheter, 01TCV3203 valve show hunting at , dcs , so check at field found its, positioner not work proper,
so one spare positioner arrange and fix , then trail taken , calibration done,and check at DCS , with pramod sir.
Now ok.
Grid AND tpp MW display goes off, so check found its one single pole mcd trip, then its supply check with
multimeter found ok , then reset it.
One no of RSB, ponit found damage at coal feeder area , so its change with new.
one noo hand lamp provide at 22 mtr area.

Following Equipment S/D Given.


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.BC1,
5.BC7A,
6.VS1,
7.COAL CRUSHER 2,

one no of GE sheet shigt for P&V job.

Shift jobs carried


In CHP , Vibrating Screen Floor area Bag Filter checked. It is working on DP base. When DP is high
then it is started from DCS. Now Ok.
In CHP , Crusher Floor area Bag Filter checked. In Controller DP is not showing. So changed the PU
Tube. Now it is showing DP in the controller. Also manual Purging is given. Then SOV is operated.
Also in auto condition also checked. It is working Normally.
one Nos Positioner mounted in Unit No. # 2 Desuperheater station.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D cleared.


1.Shredder Feed Chain Conveyor,
2.AFR Discharge Belt,
3.AFR Shredder Power Supply,
4.BC1,
5.BC7A,
6.VS1,
7.COAL CRUSHER 2,

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
U# 1 Centrifuse Pump AVI is given. Also AVI and S/D to Cleared.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Dosing room panel and field equipment cleaning done.
Dosing Room Motors & Panels cleaning done
Bed ash cooler-1A Back pressure transmitter line flushing done
Boiler-1 Lift Out of service power supply reset but not start , lift between 0 & 2 nd floor
Shift jobs carried

In Unit No. # 1 Bed ash Cooler -1A Back Pr. Transmitter /Switch Impluse line Cleaned as per
Operation requirement. Also Conveying given the Back Pr. Is showing 0.94 Kg/cm2. And Conveying
cut at 0.8 Kg/cm2. Also No Material inside the vessel. So inform to Shift Incharge.

In Unit No. # 1 Bed ash Cooler -1A Level Probe is not working Properly. ( Malfunctions ). So
Calibrated it then installed at site. Also Material is overflow but level High is not showing at DCS end.
So Replaced the level Probe from Unit No. # 2 BAC. And calibrated the level Probe. Now Ok.

In Unit No. # 1 Bed ash Cooler -1A Back Pr. Switch Setting value decreased from 0.8 to 0.6 Kg/cm2
as per Shift Incharge requirement. Also Normal to previous value as per shift incharge requirement.
In Bed ash Silo Level is showing 10 Mtrs. So Reset it. Now Ok.
At 22 mtrs Light OFF.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
GSC-1A and 1B motor cleaning and blowering done.
BC-7A area Lamp to changed.
In Reclaimer Area JB Polythene Coverning to done.
In BC-1 PCS 09 nos is showing in Controller. So PCS Reset at Site. And Controller is not showing on display. But DCS
it is showing. So Bypassed the PCS. Short link to provided at 93-7A-TB2-3/4. Pl Check.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given and Clear.
1. BC-1,
BC-1 Pull Cord maintenance done.
Reclaimer boom belt tripping report from CCR, checked and found running healthy.
BC-3 and T3 tower light manually ON Timmer bypassed.
Street light towards china yard road power OFF, due to cable found punctured near C5 hopper

Shift jobs carried


Grid isolate at 11.00 p.m. at, that time instrument compressror 2 , J valve 1A , and coal feeder 1C, get faulty, so all
done reset and given clearance to start. All are start normally.
Kiln 1 2 3, start at 11.30 p.m. and total load 21.2 MW, at 00.40 am.

Grid power clearance at 4.45 a.m. so. TPP base load put at 20600 Kw as running load 20.65 MW ,Then grid and TPP
volatge match and give clearance to synchronise and it synchronise normaly, But it get again island within minute.

Grid power again resume to from mpss at 5.05 a.m. so, again voltage match and give clearance to MPSS to
synchronise, they trying 3-4 time and finaly it get synchronise at 5.19 am.
BAC cooler 1A pressure transmiiter check as per requirement of ccr in presence of operation team, found its
working ok.
DSLC TG-1 base load set at 12500 KW after normalize plant.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
All Energy meter manual reading taken for Power Report.
Shift jobs carried

In CCR , Shift Inchrge PC is in hanged condition. So Restart the PC. Now Ok.
In Unit No. # 2 BAC-2B , Back pr. Transmitter installed at site.
In Unit No. # 1 Vessel No.-12/22 Back pressure switch , Back pressure transmittor , Impluse line is
cleaned as per Shift Incharge requirement.
In CHP, Hooter Light to OFF Condition.
In CHP , T-1 , T-2, and T-3 Lighting Timer taken in line.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1.BC-1,
2.VS-2,
3. Oil Centrifuse Pump no.-1,
4. J-valve Fan-2A

Following Equipment S/D Cleared.


1. P.& V. No.-4
2. Coal Feeder -2C MOV,

At Oil Centrifuse Pump -1 Charging Light to provided.


Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Clear.
1.BC-1,
2.VS-2,
3. Oil Centrifuge Pump no.-1,

Following Equipment AVI given and Clear.


1. Oil Centrifuge Pump no.-1,
BC-3 and T3 tower light manually ON Timmer bypassed.
Bed ash cooler area 24v light provided.
Bag house-12 vessel level high, level probe cleaning done.
Bed ash silo level 10 Mtr. Showing, so power off sensor cleaning and found healthy.
Shift jobs carried
Voltage dip observed at 2.48 a.m , plant running normal.
Bag house 22, no. back pressure switch, and transmitter switch line cleaning done, found a lot of dust blow out
from transmitter pipe line.
Bag house no -11 lavel probe cleaning done as per requirement of ccr..
One damaged 24 volt light repaired and hand over for coal feeder job..
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
External dvd driver not work proprly so, power report prapare manually.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
All Energy meter manual reading taken for Power Report.
Shift jobs carried
Zishu Hozen done at Switchyard area.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.BC-1 (02 PTW),
2.Reclaimer,
3.FLY ASH SILO-2 DRY UNLOADING,
4.VIBRATING SCREEN-1,
5.EN-MASS CONVEYOR-1,
6..BC-4,

EOP-2 Power ON and OFF as per operation requirement.


24v hand lamp replaced at C7-AB area.
Assembly point area plug top replaced.
Fly ash silo-2 dry unloading plate valve Limit connection removed as per Maint requirement.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D clear.


1.BC-1 (02 PTW),
2.Reclaimer,
3.VIBRATING SCREEN-1,
4.EN-MASS CONVEYOR-1,
5.BC-4,

AFR Hooter not work so check & found Control MCB Trip when Hooter ON , check hooter physically found Carbon
brush base insulation damaged & touch body when Hooter ON now tempraory insulation provided & Hooter trial
takedn found working normally
Assembly Point Plug top changed domestic to industrial
Limestone fabrication yard 24 V Charging light provided for Mech. Maint. Work
BC-1 Pull Cord maintenance done & taken in line.
Fly ash silo-2 Limit assembly fixed
Monthy Power Report Balanced upto 30/01/2023
BC-7A Bag filter purging not start check & found transmittor tube damaged condition & replace by new one now
ok
Shift jobs carried
In Bed ash Silo Level is showing 10 Mtrs. Also it is Hang Condition. So Reset the 24 Volts Supply and Cleaned the
Level Probe. Now it is showing Normally.
In Generator Carbon Brush alarm is showing in Generator Protection Panel. Also it comes auto Reset
. It is showing frequently.
In Unit No. # 1 Master UPS fan failure alarm is showing in display. Also it comes auto Reset . It is
showing frequently.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
Fly ash Silo No.-2 Shutdown to cleared.
.
ment done, and trail taken with operation and maintanance team.
Date Shift Engineer Name

01.02.2023 A Ashvin Jadav

Date Shift Engineer Name

01.02.2023 B Amit kumar singh

Date Shift Engineer Name

01.02.2023 C Sanjay Garg


01.02.2023 C Sanjay Garg

Date Shift Engineer Name

02.02.2023 A Ashvin Jadav

Date Shift Engineer Name

02.02.2023 B Amit kumar singh


Date Shift Engineer Name

02.02.2023 C Ashvin Jadav

Date Shift Engineer Name

03.02.2023 A Ashvin Jadav

Date Shift Engineer Name

03.02.2023 B Sanjay Garg


03.02.2023 B Sanjay Garg

Date Shift Engineer Name

03.02.2023 C Amit kumar singh

Date Shift Engineer Name

04.02.2023 A Tarun Gaur


04.02.2023 A Tarun Gaur

Date Shift Engineer Name

04.02.2023 B Sanjay Garg


Date Shift Engineer Name

04.02.2023 C Amit kumar singh

Date Shift Engineer Name

05.02.2023 A Sanjay Garg

Date Shift Engineer Name

05.02.2023 C Amit kumar singh


05.02.2023 C Amit kumar singh

Date Shift Engineer Name

06.02.2023 A Sanjay Garg

Date Shift Engineer Name

06.02.2023 B Ashvin Jadav


06.02.2023 B Ashvin Jadav

Date Shift Engineer Name

06.02.2023 C Amit kumar singh

Date Shift Engineer Name

07.02.2023 A Ashvin Jadav


Date Shift Engineer Name

07.02.2023 B Tarun Gaur

Date Shift Engineer Name

07.02.2023 C Sanjay Garg


Date Shift Engineer Name

08.02.2023 A Ashvin Jadav

Date Shift Engineer Name

08.02.2023 B Amit kumar singh

Date Shift Engineer Name

08.02.2023 C Sanjay Garg


08.02.2023 C Sanjay Garg

Date Shift Engineer Name

09.02.2023 A Tarun Gaur

Date Shift Engineer Name

09.02.2023 B Amit kumar singh


Date Shift Engineer Name

10.02.2023 A Tarun Gaur

Date Shift Engineer Name

10.02.2023 B Sanjay Garg


10.02.2023 B Sanjay Garg

Date Shift Engineer Name

10.02.2023 C Ashvin Jadav

Date Shift Engineer Name

11.02.2023 B Sanjay Garg


11.02.2023 B Sanjay Garg

Date Shift Engineer Name

11.02.2023 C Tarun Gaur

Date Shift Engineer Name


12.02.2023 A Sanjay Garg

Date Shift Engineer Name

12.02.2023 B Ashvin Jadav

Date Shift Engineer Name

12.02.2023 C Amit kumar singh


12.02.2023 C Amit kumar singh

Date Shift Engineer Name

13.02.2023 A Sanjay Garg

Date Shift Engineer Name

13.02.2023 B Tarun Gaur


13.02.2023 B Tarun Gaur

Date Shift Engineer Name

13.02.2023 C Amit kumar singh

Date Shift Engineer Name


14.02.2023 A Tarun Gaur

Date Shift Engineer Name

14.02.2023 C Sanjay Garg

Date Shift Engineer Name

15.02.2023 A Amit kumar singh


15.02.2023 A Amit kumar singh

Date Shift Engineer Name

15.02.2023 B Sanjay Garg

Date Shift Engineer Name

15.02.2023 C Tarun Gaur


15.02.2023 C Tarun Gaur

Date Shift Engineer Name

16.02.2023 A Gajendra Pandya

Date Shift Engineer Name

16.02.2023 B Amit kumar singh


Date Shift Engineer Name

16.02.2023 C Tarun Gaur

Date Shift Engineer Name

17.02.2023 A Gajendra Pandya

Date Shift Engineer Name


17.02.2023 B Amit kumar singh

Date Shift Engineer Name

17.02.2023 C Tarun Gaur

Date Shift Engineer Name

18.02.2023 A Amit kumar singh


18.02.2023 A Amit kumar singh

Date Shift Engineer Name

18.02.2023 B Sanjay Garg


Date Shift Engineer Name

19.02.2023 A Sanjay Garg

Date Shift Engineer Name

19.02.2023 B Tarun Gaur

Date Shift Engineer Name


19.02.2023 C Amit kumar singh

Date Shift Engineer Name

20.02.2023 B Ashvin Jadav

Date Shift Engineer Name

20.02.2023 C Amit kumar singh

Date Shift Engineer Name


21.02.2023 A Ashvin Jadav

Date Shift Engineer Name

21.02.2023 C Amit kumar singh

Date Shift Engineer Name

22.02.2023 A Hemant Sharma


22.02.2023 A Hemant Sharma

Date Shift Engineer Name

22.02.2023 B Tarun Gaur

Date Shift Engineer Name

23.02.2023 A Tarun Gaur

Date Shift Engineer Name


23.02.2023 B Amit kumar singh

Date Shift Engineer Name

23.02.2023 C Ashvin Jadav

Date Shift Engineer Name

24.02.2023 A Amit kumar singh


24.02.2023 A Amit kumar singh

Date Shift Engineer Name

24.02.2023 B Sanjay Garg

Date Shift Engineer Name

24.02.2023 C Ashvin Jadav

Date Shift Engineer Name


24.02.2023 A Amit kumar singh

Date Shift Engineer Name

25.02.2023 B Sanjay Garg

Date Shift Engineer Name

25.02.2023 C Tarun Gaur


25.02.2023 C Tarun Gaur

Date Shift Engineer Name

26.02.2023 A Sanjay Garg

Date Shift Engineer Name

26.02.2023 B Ashvin Jadav

Date Shift Engineer Name

26.02.2023 C Amit kumar singh


26.02.2023 C Amit kumar singh

Date Shift Engineer Name

27.02.2023 A Sanjay Garg

Date Shift Engineer Name

27.02.2023 B Ashvin Jadav


Date Shift Engineer Name

27.02.2023 C Amit kumar singh

Date Shift Engineer Name

28.02.2023 A Ashvin Jadav

Date Shift Engineer Name

27.02.2023 A Sanjay Garg


27.02.2023 A Sanjay Garg
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal


DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal


RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal except SPC004.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.

a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist

c) Elect. Shift checklist


Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
b) Elect. Shift checklist

Regular jobs

Shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
b) Elect. Shift checklist

Regular jobs
Shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

a) Generator-1 / 2 checklist
b) Elect. Shift checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken drives running normal
RNRP all nodes found Normal.

UPS Check List filled.

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal .

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal .


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.


UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Shift jobs carried
Zishu Hozen done at Boiler-1 area.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-7A,
2.Reclaimer,
3.BC-7B,
4.VIBRATING SCREEN-1,
5.EN-MASS CONVEYOR-2,
EOP-2 Power ON and OFF as per operation requirement.
Shift PC-212 send to IT for maintenance work.
Carbon black unloading system air leakage attends and new fitting provided.
Boiler-1 ground floor and firing floor abnormality attend.
Plug top replaced in workshop girder machine.
Shift jobs carried
TG building, lift IR sensor, new location installation done, and checked found ok.

BC-4, bag filter monometer, DP transmitter PU tube found damage condition so change it.

Bag House-1 12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done ,
found a lot of ndust in it.
One no of welding machine connection done at AFR area.
Following Equipment S/D clear.
1.BC-7A & 7B,
2.Reclaimer,
3.VIBRATING SCREEN-1,
4.EN-MASS CONVEYOR-2,

Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
One 2 amp industrial socket change at AFR.
Boiler area light not on at its time , so checked by Trun mandawat and rectified on DCS.
compressor house auto drain valve manually checked found healthy.
Shift jobs carried
IN MVAR Comes out from auto . Then again give the raise excitation command. Then again put into auto
mode. Now Ok.

In Unit No. # 1 Bag House Vessel No.- 11/21 and 12/22 Transmitter Cover to provided.

In Bed ash Silo Level is showing 10 Mtrs. Also it is Hang Condition. So Reset the 24 Volts Supply and Cleaned
the Level Probe. Now it is showing Normally.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
J- Valve Fan -2A Shutdown to cleared.
At 22 Mtrs Light ON as per operation requirement.
At WTP hall area field Inst. Cleaning to done.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-1
2.Screen-2
3.BC-4
4.Grabber M/C
5.EN-MASS CONVEYOR-2,
6. BAC-1B Air isolation
Boiler-1 BAC-1B Filed panel Insulated Rubber mat laying owkr
Following Equipment AVI Given& clear
1/BAC-1B
AFR Area Extension board given & 1 phase connection given( Mr.Katara)
CEP-1B Spare rubber mat shifting to Electrical W/S
Boiler-1 ground floor and firing floor abnormality attend.
CEP-1B Discharge MOV Gland hole sealing by M Seal
Shift jobs carried
Bed ash silo lavel show 10 meter , while empty , so transmitter cleaning done, and its power also reset. Now
show 2.5 mtr , confirm from ccr.
CHP dcs BRC 91 no. changr from secondary to primary.
Fan failure alarm at UPS, 1, master , so check found working ok, so alarm reset.
CHP, dcs room AC, show, HP/LP alarm ,so reset it, and start AC.
Following Equipment S/D clear.
1.BC-1,
2.BC-4,
3.VIBRATING SCREEN-1,
4.EN-MASS CONVEYOR-2,

One no. of light provide with transformer and light top connection tightness done, for cleaning job.
En mass 1 conveyor get trip , at starting of CHP group, due to jam so feeder check and reset , then it start
normally.
Lift 1, no. push button packing job done .
ACC 1, side stair switch and socket packing done with packing tape.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
GSC 2A and 2B Motor cleaning done.
ACW area light not ON, so checked and found timer stuck up, so reset done.
VAM floor equipment cleaning done.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-1
2.Coal Feeder-2A

Bag House-1 Dome limit cover blot found loose conditionso tightness done
Bag House-2 vessel-2 seal pressure pu tube pu tube found damaged condition so replaced by new
one
ACC-1 6 no's Motors , Lube oil Motors & Power JB Cleaning work
Rubber mat Laying at RSB-62
Shift jobs carried

In Fly Ash Silo No. # 1 Wet Unloading System Panel Checked Found that 03 Nos ON / OFF
Switch Button is not working condition. So Changed the switch. Also 02 Nos O/L relay is not Ok.
Changed the Relay from Bed ash silo Panel. Also Mounted and wiring to done. Since mixer and
RAV is in jammed condition. So Trial is Pending condition.
In Bed ash Silo Level is showing 10 Mtrs. Also it is Hang Condition. So Reset the 24 Volts Supply and Cleaned
the Level Probe. Now it is showing Normally.
IFC Compressor House Set Point Increased from 55 to 57 PSI. As per shift Incharge
requirement. Again Normal to 55 PSI as per shift incharge requirement.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D cleared.


1.Grabber Starter Supply,
2.BC-1,
Following Equipment S/D Given.
1. Fly ash silo # 1 Wet Unloading System.

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At 22 Mtrs Light ON as per operation requirement.

Shift jobs carried

Bag House ,11 no. Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done .
Coal bunker 1A, lavel show faulty , so its lavel probe cleaning done and reset.
BAC 1A, lavel probe check , with operation team and its cleaning done.
APH 1 dome limit get faulty so, check and found its due to loose bolt of limit switch, so tight it .

All Energy meter manual reading taken for Power Report.


Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Coal feeder area hand lamp not glowing ,due to its cable wire open from industrial top , so connect
it.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.BC-1
2.BC-4
3. Enmass-2
4. Screen 1&2
5. Wet unloading FAS-1
6. Wet unloading FAS-2.
7. Wet Unloading BAS

IFC Compressor House Set Point Increased from 55 to 57 PSI. As per shift Incharge
requirement. Again Normal to 55 PSI as per shift incharge requirement.
CHP Room Socket supply not coming check & found Phase supply missiing so check & rectified now
ok

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13.9 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1200 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

ID-1 Motors both Sides Lubrication work


BAC-1A Puppet Valve tube changed work
BAC-1A Puppet Valve fitting arrangement done
ID-1 Motors Bearing temprature bypass due to motor greasing purpose
TG-1 Inlet pressure tripping bypass done due to pressure low 67 kg/cm2 as per requirement shift
incharge now after normal pressure tripping taken in line
Scrap yard Lighting Timer reset & adjustment done
Shift jobs carried

As Per Mr. Vishal Sharma When giving the same command to BAC-1A and 1B , Then BAC-1A at
VFD display it is showing 22 HZ. While the BAC-1B it is showing 11 HZ. Then Checked the DCS
SP signal isolator. Found that O/P Current is showing 0.0 Amps. So changed the Isolator from
Unit No. # 2 Screw Conveyor -2A. Then Trial taken. Now it is running Normally.
In Unit No. # 1 Bag House Vessel No.- 11 DP is not showing at DCS end. So checked and found that Manual I/L
isolation valve is in closed condition.So Opened the Valve. Now Ok.
In Fly Ash Silo No. # 1 Wet Unloading System Gate valve isolation removed.
Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Cleared.


1.BC-1
2.BC-4
3. Enmass-2
4. Screen 1&2
5. Wet unloading FAS-1

In BC-1 Tail end side belt switch roller to Provided.


P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At 22 Mtrs LED Light and Transformer Provided as per operation requirement.
At BAS wet unloading System RAV Motor cable connection removed as per mech. Person requirement.

ID-1 Motors Bearing temprature Tripping taken in line.

Shift jobs carried


ACC fan 1 D, some abnormal sound observed from NDE side while no any heating , so greasing done at DE/
NDE point 5 punch each.abnormal sound reduce.
BAC 1 B, check as ccr inform that , purging not running , in 2- 3 trail found all operation of dome, valve, back
pressure transmitter , are ok.
Aviotin light of chimany found in , off condioton , due to its mcb get trip , so on it.
Bag house 22, H lavel probe check and found material in it , so inform to ccr.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
Shift jobs carried
IFC Compressor House Set Point Decreased from 57 to 55 PSI. As per shift Incharge
requirement.
In Fly ash Silo No. # 1 Plate Valve main air leakage arresting work to done.
CCR Desk Boiler PC mouse to Provided.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
In Unit No. # 2 EOP ON/OFF as per Operation requirement.

Following Equipment S/D Given.


1.BE-1
2.EN Mass -1
3. Coal crusher No.-1,

At CHP Building Air Blower Filter Cleaning to done.


At Fire Pump House Lighting timer structed. So Reset it.

Shift jobs carried


ACC fan1 D, physical observation taken found running ok.
Soot Blower -1,Panel Cleaning and blowering done.
CCR, ahu running in manual mode at temp 27 C, so its put on auto mode.
Bag house area, light near by paas valave not glow, while all mcb in on condition.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
Shift jobs carried
Shift Incharge PC Trend is not Showing. So Restart the PC. Now Ok.
In Unit No. # 1 Fly ash System -11 Nos. Veseel Popet Valve and Purging Valve Isolation Provided
to Operation Person.
In Compressor House all the auto drain valve is checked and working normally.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Silo area Light ON as per Shift Incharge requirement.

Following Equipment S/D Given.


1.BC-1,
2.BC-2 ,
3. Coal crusher No.-2,
4. EN mass No.-2,
5. U#1 Vessel No.-11 Popet Valve ,
6. U#1 Vessel No.-11 Purging valve SOV ,

At Crusher Building area All the light , Hydraulic panel cleaning to done.
BC-4 Motor Cleaning to done.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D clear.
1.BC-1,
2.BC-2 ,
3. Coal crusher No.-2,
4. EN mass No.-2,
5. U#1 Vessel No.-11 Popet Valve ,
6. U#1 Vessel No.-11 Purging valve SOV ,
Boiler-1 lift in fault, so reset and trial run found healthy.
Bag house-11 DP not showing, so transmitter manifold 01DPI1201 valve open, so close done and
trial run healthy.

Shift jobs carried


Bag house 12-22, H lavel show at dcs , so check with operation team found material in it , so probe cleaning
done and inform to ccr.
Coal bunkar 1B , lavel sensor check and reset as per requirement of ccr, and cleaning done.
TG-1 ground floor area control valve and MOV cleaning done.
Boiler-1 APH vessel -1 , airline leakage arresting done.
All Energy meter manual reading taken for Power Report.
Environment and Plant performance report send to all concerns.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
In Chimney analyser room All the Inst. Panel Cleaning and Blowerning done.
Shift jobs carried
Zishu Hozen done at Reclimer area.
Office Ac supply made OFF.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.BAG HOUSE-1 POPET VALVE CHAMBER-22, (Key no-560) (Tube, Coil connector removed),
2.BAG HOUSE-1Header actuator valve-22, (Key no-47)
3.BED ASH COOLER-1A,
4.Shredder Feed Chain Conveyor,
5.AFR Discharge Belt,
6.AFR Shredder Power Supply,
7.BC-1 (02 PTW),
8.BC-2,
9.Reclaimer (02 PTW),
10.EN-MASS CONVEYOR-2,
11.EN-MASS CONVEYOR-2,
12.EN-MASS CONVEYOR-1,

Every night Environment report Do Not Send to Concerns, till further instruction as per message.
AFR hooter trial with external supply, found running but sometimes stall, so removed from position
for repairing at LAB.
Bag House-12 level probe checking done and cleaning done.
Crusher area grinder machine green tag provided.
22 mtr area lighting MCB off from 9.5 mtr. LDB
Shift jobs carried
compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low

Following Equipment S/D Clear


1.BAG HOUSE-1 POPET VALVE CHAMBER-22, (Key no-560) (Tube, Coil connector removed),
2.BAG HOUSE-1Header actuator valve-22, (Key no-47)
3.BED ASH COOLER-1A,
4.Shredder Feed Chain Conveyor,
5.AFR Discharge Belt,
6.AFR Shredder Power Supply,
7.BC-1 (02 PTW),
8.BC-2,
9.Reclaimer (02 PTW),
10.EN-MASS CONVEYOR-2,
11.EN-MASS CONVEYOR-2,
12.EN-MASS CONVEYOR-1,

BC-2 BSS handle found stuck in belt , so release & tightness done
WTP RO Back side pressure line valve cheanged & pressure gauge installed trial taken found ok

BAG House-1 poppet valve 22 no's chamber fitting installation & sov connector mount & air isolaion
valve air leakage arrested
BAC-1B Dome limit changed & poppet valve air leakage arrested done
Fire Engine Battery 6 no's cell Distrilled water top up done
Shift jobs carried

In Unit No. # 1 BAC-1B Dome valve is not Operated. So Manually it is operated . Then Ok. After some time
again it is not operated. Then found that open O/P of SOV not given the air. So Changed the SOV from Unit
No. # 2 BAC. Then checked and found that Dome valve is operated only 90 %. So Inform to shift incharge.
then Changed the Power Cylinder of dome valve. Now it is working Normally.

In Unit No. # 2 BAC-2B Dome Valve Close limit switch is installed.


In Chimney analyser room All the Inst. Panel Cleaning and Blowerning done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In BAC-1B 24 Volts Hand lamp replaced 02 times.
At BAC near 24 Volts Transformer netural Point loose. So tightness to done.
Shift jobs carried
Zishu Hozen done at Compressor house area.
Office Ac supply made OFF.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-1,
2.BC-2,
3.Reclaimer,
4.Bed ash cooler-1A Air valve Isolate(Key-597)
Bed ash silo plate valve not operate, so power reset and trial taken found running healthy.
Bag house 11 level probe high, so calibration done.
24v hand lamp and transformer shifted to workshop.
Green tag provided at pantry equipment’s.
Following Equipment S/D Clear.
1.Bed ash cooler-1A Air valve Isolate(Key-597)
Shift jobs carried
Fly ash silo No.-2 plate Valve is not operating. So manually direct air given from SOV. Now ok.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.
Bag House-1, 12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done
found a lot of dust in it.
At 22 Mtr LED not run, so checked and found TOP cable connection loose, so connect it proprly.

Following Equipment S/D Clear.


1.BC1
2.BC4
3.RECLAIMER

Grid Mvar at 4.35 , while all parameter are ok at TPP, so contact, MPSS, then he inform that , HT capacitor
bank on maintanance, and it power on at 05.00 pm , then Mvar at 0.24.
compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).

Shift jobs carried


In Unit No. # 1 Generator Carbon Brush alarm is showing frequently in protection panel.

In Compressor House all the auto drain valve is checked and working normally.
In WTP hall room All the Inst. Panel Cleaning and Blowerning done.
Electrical Report is generated.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At 22 mtrs Light to OFF.
In Boiler No. -1 4th to 7th Floor Light to OFF Condition.

Shift jobs carried


Zishu Hozen done at Boiler-2 0 mtr. area.
Office Ac supply made OFF.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1.BC-6,
2.Boiler-1&2 Drainage pump
3.Reclaimer,
4.BAC-1B Dome valve
5. Bag House-1 Poppet valve
6. Bag House-1 Purging Valve
7. Coal Feeder-1C
8. Coal feeder-1C Pnaumatic valve

Following Equipment S/D clear.


1.BAC-1B Dome valve
2. Bag House-1 Poppet valve
3. Bag House-1 Purging Valve
Crusher-2 Motor Both side Greasing done
Hand air Blower Repaired done
Bag House -2 22 no's vessel H-H Level probe installaion
BAC-1B Dome valve close limit adjstment work done & pressure Gauge mount done
Shift jobs carried
Coal feeder 1C, checked with operation team found heavy jam.
Coal feeder 1C , pnumatic valve air isolation provide.
Coal feeder 1 A,1B,1C,1D khokar vibrtor, heavy dust , so its cleaning done.
At 22 Mtr LED not run, so checked and found TOP cable connection loose, so connect it proprly.
Following Equipment S/D Clear.
1.BC1
2.COAL FEEDER 1C
3.RECLAIMER
AVI Provide to Coal feeder 1C and after job isolate it.
light provide for coal feeder 1C checking and cleaning , and load cell job.
Power supply stiker provide on light jb at bag house top floor.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).
Shift jobs carried
Zishu Hozen done at Silo area.
Office Ac supply made OFF.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1.BC-1,
2.Bucket Elevator-2
3.Reclaimer,
4. Bag House-1 Poppet valve
5. Bag House-1 Purging Valve

Following Equipment AVI Given & Put on Local mode


1Bucket Elevator-2

Following Wok Done at Mixer Silo-2 wet system Field Panels & Motors
1/ Panel cleaning done
2/ RAV Motor megger & resistance checked & Power cable connect both Motor & MCB Side
3/ Mixer motor Megger & resistance checked & Power cable connect both motor & MCB Side
4/ Panel to Motors continuity checked found ok both RAV & Mixer motor

CEP-1A CV2907 not operate so check & found air isolate so release air now operate normally

APH 1 Vessel level probe glanding done

Monthly Power Report Balanced upto 09/02/2023


Shift jobs carried
In Unit No. # 1 Vessel No.-11 Level Probe High is showing at DCS end. So cleaned the level
Probe. Now Ok.
IN MVAR Comes out from auto . Then again give the raise excitation command. Then again put into auto
mode. Now Ok.
Since Unit No. # 1 Baghouse No.- 21 is in shutdown condition. Also frequently DP Alarm is showing. As per
shift incharge requirement , Alarm setting to done from 0.2 to 0.0 (S3 Vaule. ) ( PCU-3, Module-2, Block No.-
5936)
Bucket Elevator No.-2 AVI and Permit to closed.
Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
Following Equipment S/D Given.
1.BC-1,
2.Bucket Elevator-2
3.Reclaimer,

In Unit No. # 2 ACC Side Light to ON Condition.


P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At Unit No. # 1 Coal Feeder area Hand lamp connection removed. So reconnected it. Now ok.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Soot Blower -1,Panel Cleaning and blowering done.
Bag house 11-21 back pressure switch, transmitter cleaning done.
VAM floor equipment cleaning done.
MPHB Lift Power OFF, due to sensor fault.
Shift jobs carried
In Unit No. # 1 BAC-1B Conveying Valve Air fitting is damaged condition. So changed the fitting.
Now Ok.
In Chimney analyser PC data is not showing. So Restart the PC. Now Ok.
Since Unit No. # 1 Baghouse No.- 21 is in shutdown is cleared, Alarm setting to done from 0.0 to 0.2 (S3
Vaule. ) ( PCU-3, Module-2, Block No.-5936)
Bucket Elevator No.-2 AVI and Permit to closed.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
Following Equipment S/D Given.

1.Bucket Elevator-2
2.Reclaimer,
3. IBD pump ,

In Unit No. # 2 ACC Side Light to ON Condition.


P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
Bucket Elevator No.-2 AVI and Permit to closed. Also Put into Remote and VFD Mode.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Soot Blower -1,Panel Cleaning and blowering done.
Chimney Analyser Room Panels , JB & Instruments Cleaning work
Following Euipment Shutdown Given & clear
1/ Shedder Chain Conveyor
2/ AFR Discharge Belt
3/ Shedder Power Supply
APH -1 Transmittor , JB'S Pressure Gauge , Dome limit & Panels cleaning work

Unit-1 &2 Drain Pot Motors Cleaning work


Shift jobs carried
In AFR Shredder is Tripped on B17 fault. This fault is automatics Reset. Again it is Started. After
some times it is again Tripped. This will done again and again. This is due to Filter chocking
condition. Then Mech. Person Cleaned the Filter. Then 02 to 03 Times it is tripped. Then it is
running Normally.

In AFR Shredder Radiator Fan is not started when shredder is in ON Condition. This Fan is ON
when Oil temp. is increased to 55 degree. At 50 Degree this pump is automatics stopped.
Bucket Elevator No.-2 Tripped overcurrent in VFD due to jamming condition. So Reset it as per
Shift incharge requirement.
During the shift 02 times AFR Breaker is Tripped. So Reset the Breaker. Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Fly ash silo No.-1 plate Valve S/D is given and Air tube removed condition.

Following Equipment S/D Given.


1Fly ash Silo No. # 1 Plate Valve,
2. Bucket Elevator No.-2,

Bucket Elevator No.-2 running in AVI mode.

Bucket Elevator No.-2 Put into Local and DOL Mode as per shift incharge requirement.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D clear.
1.Fly ash Silo No. # 1 Plate Valve,
2.Bucket Elevator No.-2,
3.FLY ASH SILO-1 WET UNLOADING,
Bucket elevator-2 Local/Remote and DOL/VFD change over done.
Compressor house lighting timer set from 18:15 to 18:30 hrs.
ACC-2 Lighting timer stuck up, so reset done.
BC-3 motor minor sound, so greasing done.
Fly ash silo-1 limit switch connect, as maint work completed.
Shift jobs carried
Coal bunker 1B, lavel show faulty , so its lavel probe cleaning done and reset.
TG, 0 mtr all mov and control valve cleaning done.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
CHP DCS, room , ac not work proper and show, HP/LP alarm, so reset it and start.
CEP 1A,1B mov, vibration switch, and all equipment cleaning done.

Shift jobs carried


In Unit No. # 2 ACC fan Vibration -2E is voilet at DCS end. So checked and found that DCS wire
TB is in loose condition. So tightness done. Now Ok.
In Unit No. # 1 Desuper Heater Control Valve 01TCV3203 Calibration done as per operation
requirement.

In Unit No. # 1 BAC-1B Level Probe Changed from Unit No. # 2 BAC as per Tarun requirement.
RO Booster Pump No.-2 Fan Cover and Earthing tightness to done.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

Following Equipment S/D Given.


1BC-1,
2. Bucket Elevator No.-2,
3. RO Booster Pump No.-1,
4. VS-1,
5. VS-2,
6. Coal Feeder -2B ,

Bucket Elevator No.-2 running in AVI mode.

Bucket Elevator No.-2 Put into Local and DOL Mode as per maintences Person requirement.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D Clear
1BC-1,
2. Bucket Elevator No.-2,
3. RO Booster Pump No.-1,
4. VS-1,
5. VS-2,

Following Equipment S/D Given


1BFP-1
2. BFP-1elevator-2
Bucket Bypass MOVLocal/Remote and DOL/VFD change over done.
3. BFP-1 Main MOV
4. BFP-1 Lube oil pump

WTP SWAS Room sample checking work with sachin tyagi


Bag House-1 22 vessel poppet valve not open so given command 2 to 3 times now ok
BC-7A & 7B Area handlamp repaired done

Bag House -1 11 no vessel level not show so level probe clean & calibration now level healthy

Shift jobs carried


BAC 1B, lavel not show, so lavel probe cleaning and calibration done.
Drain pot pump 1A, NRV line pr. Guage glass marking sticker provide, and glass cover screw tight
done.
AFR supervisor inform that , shredder machine stop woking , so check and found AFR alresdy in
renning condition.
UPS 1, fan failure alarm observed , while fan ruunuing well , so reset it.
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.

Shift jobs carried


P&V 2 and 4 status checked, found OFF Condition .
OFFICE
FollowingACEquipment
ON S/D Given.
1Reclamier
All the Manual Light to OFF Condition.
2. Bucket Elevator No.-2,
3. BC-5
4. ACC-1E
5.Lube oil 1E
Following Equipment S/D AVI Given
1ACC-1E
2. Lube oil 1E
3. ID-2
4. PA-2
5.J Valve 2b
6. J Valve2A

Bucket Elevator No.-2 running in AVI mode.

Bucket Elevator No.-2 Put into Local and DOL Mode as per maintences Person requirement.
ACC1E Lube oil flow low so check in field found oil not comes from gear box so inform to shift
incharge
BAC-1B Dome not opearated so check in field found Dome Jaamed condition so inform to CCR
Operator
APH-1 intine valve open feedback not comes so limits adjustment work now ok
Lube oil 1E Motor connection open & connection done after work completed
ID-2 , PA-2 & J Valve 2A & 2B Motors meggering done found satisfactory value
ACC-2D Flow sitch remove & again installed for ACC-1E Trial Purpose
Shift jobs carried
In BC-1 Belt PCS Controller Power Reset and Bypass Loop removed. Now PCS is showing healthy condition at
DCS end.
MVAR is not running in auto mode. So Increased the excitation. Then Put into auto mode. Now
Ok.
Since CD is not Open in PC . So Manual reading fed into the EMS report.
All other Report is not sent Because CD is not open.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
At WTP Motor Cleaning to done.

Shift jobs carried


BFP-1, Total 05 no. pressure guage remove, 03 no. RTD remove, and 02 no. vibration sensor
probe remove and ket at Almirah no. 13, at instrument lab.

Following Equipment S/D Given.


1. BC1
2. Bucket Elevator No.-2,
3. BOILER 1, POPPET VALVE AIR ISOLATION
4. BOILER 1, POPPET VALVE SOV ISOLATION
Following Equipment S/D AVI Given
1. Bucket elevator no. 2

Bucket Elevator No.-2 running in AVI mode so put in local mode.


U#2, EOP Power ON/ off done as per requirement of control room.
Bed ash silo RAV motor not run , due to overload operated , so reset it.
BFP1, outlet MOV, feeder maintanance deptt lock provide as per loto.
CCR, ahu found in manual mode at start of shift so, its change in auto mode.

Shift jobs carried

In Bed ash Silo RAV is tripped due to O/L. So Reset it. Again it is started then tripped due to O/L.
Due to Jamming condition. So Informed to shift incharge. After clearing the jamming it is
running normally.
In Workshop welding machine three Phase Plug Top is in damaged condition. So Replaced with new one.
Now Ok.
At 22 Mtrs Light ON as per operation requirement. Also Put into Auto and VFD Mode.
Bucket Elevator No.-2 AVI and Permit to closed.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Cleared.

1.Bucket Elevator-2
2. BC-1 ,

In Unit No. # 2 ACC Side Light to ON Condition.


P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In CHP AC is tripped due to HP/LP alarm. So Reset it. Now Ok.

Shift jobs carried


Dosing room Motors & Panels cleaning work

MVAR is not running in auto mode. So Increased the excitation. Then Put into auto mode. Now
Ok.
Since CD is not Open in PC . So Manual reading fed into the EMS report.
All other Report is not sent Because CD is not open.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
WTP Hall E&I Equipment cleaning work
compressor house auto drain valve manually checked found healthy.
Coal feeder area hand lamp not glowing ,due to its cable wire open from industrial top , so connect it.

Monthly Power Report Balanced upto 14/02/2023

Shift jobs carried


Electrical Work shop 5S done

Following Equipment S/D Given.


1. BC1
2. Bucket Elevator No.-2,
3. Reclaimer
4. Vibrating screen-1

Following Equipment S/D AVI Given


1. Bucket elevator no. 2

Bucket Elevator No.-2 running in AVI mode so put in local mode.


BC-1 pull cord act , so checked and rectify it
TG building EOT push button checked for small hook found OK

Shift jobs carried

One current transducor remove from limestone building, and fix at Drain pot 2A feeder, after
power off, but then also ,its current not show, then its output connection change , and its start
show current.
BC1, belt pull chord maintanance done, and BC4, also show , pullchord at ccr then check at field and pull
chord operate 2-3 time now ok.
Bucket elevator in local mode , so its change to auto mode and DOL to VFD mode.
Following Equipment S/D remove.
1. BOILER 1, POPPET VALVE AIR ISOLATION
2. BOILER 1, POPPET VALVE SOV ISOLATION
Following Equipment S/D remove.
1. BC1
2. Bucket Elevator No.-2,
3. Reclaimer
4. Vibrating screen-1
Bag house 22 , no DP not show at ccr, then its linecleaning flushing done, now ok.
One welding machine check at 0 mtr as it not work due to MCB IN off position , so ON it.
Bag house 22, no. SOV air leakage arrest done.

Shift jobs carried


Dosing room Motors & Panels cleaning work

MVAR is not running in auto mode. So Increased the excitation. Then Put into auto mode. Now
Ok.
Since CD is not Open in PC . So Manual reading fed into the EMS report.
All other Report is not sent Because CD is not open.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
VAM floor equipment cleaning done.
compressor house auto drain valve manually checked found healthy.
Boiler-1 0 mtr RSB-1 &2 Damaged 3 phase Top connection removed
GSC Blower 1A &1 B Motor cleaning work done
Workshop MV VFD Drive Room AHU found ON condition now OFF

Shift jobs carried


Electrical Work shop 5S done
Following Equipment S/D Given.
1. BC1
2. BC2
3. Bucket Elevator-2
4. Vibrating screen-1
5. vessel-22 poppet valve
6. vessel-22 purjing air valve
Following Equipment S/D AVI Given
1. Bucket elevator no. 2

Bucket Elevator No.-2 running in AVI mode so put in local mode.


Bag House-1, vessel-22 conveying problem, workunder progress
22 no Poppet valve air rubes removed on requirement of operation deptt.
bag house-1 vessel-22 level sensor of high/HH both checked and calibrated
Two nos welding machine checked in mechanical workshop

Shift jobs carried


Bag house 22, no. DP transmitter line flushing done and puppet valve and purging valve air
isolation clear.
Bag house 21 no. HH, lavel probe remove and installation done.
One no of hand lamp provide at 22 mtr, to maintanance team
Following Equipment S/D remove.
1. BOILER 1, POPPET VALVE AIR ISOLATION
2. BOILER 1, POPPET VALVE SOV ISOLATION

Following Equipment S/D Given.


1. BC1
2. BC2
3. Bucket Elevator-2
4. AFR FEEDING BELT
5. AFR DISCHARGE BELT
6. AFR SHREDDER SUPPLY
Bucket elevator-2 Local to Remote and DOL to VFD change over done.
One welding machine check bed ash silo found its power cable heated and mcb trip condition so, cable
remove and next machine connection done.
Bag house, 11 21 12 22 alarm set for no purge since 2 hour in dcs.

Shift jobs carried


Monthly Power Report Balanced upto 16/02/2023

MVAR is not running in auto mode. So Increased the excitation. Then Put into auto mode. Now
Ok.
Boiler-1 6 no's drain MOV Cleaning done
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
APC & Plant Performance Report send to concernred Person
compressor house auto drain valve manually checked found healthy.
Bag house-1 E&I Equipment cleaning work done
GSC Blower 2A &2 B Motor cleaning work done
Coal crusher-1 HT Panel meters error found Power supply reset now OK

Shift jobs carried


Coal feeder 2 B Main motor connection done and double earthing provide to motor.
CHP building RSB check , as it observed burning smell, after power off ,found all elcb, mcb
connection ok ,so all connection tight done. In welding machine top found its core melt , so
reconnect again properly.
At mechanical work shop one welding machine new power cable provide 4 sqmm copper, 4 mtr
and connection done.
Following Equipment S/D AVI Given
1. Bucket elevator no. 2 Two times
Following Equipment S/D Given.
1. BC3
2. BC4
3. Bucket Elevator-2
4. SOOT BLOWER 1

BAC 1B, puppet valve isolate and , hose pipe dummy, as per requirement of mr. vijay mahato
ccr.
Bucket Elevator No.-2 running in AVI mode so put in local mode.
One hand lamp provide at coal bunker 22 mtr, to attender.
SWAS room , super heated water sample, not show , so check panel ,it show out of failed
sample, so reset it, now ok.

Drum water sample also not show, found inlet water line heavy leakage, so leakage arrested. Now ok.

Deareator sample not show, due to flow very low, so its repaired by WTP Team, so after increse it work ok.
Bag hoiuse 11-21 transmitter value not show, so check and PU Tube line found heavy dust, so flushing done,
now ok.
Bag house 12-22,transmitter value not show , so check and found its supply in off condition , so its cable
tracking job continue.
Shift jobs carried
In Fly ash Conveying pr. Is Violet at DCS end. So Connector side Cable Tightness to done. Now
Ok.
In Bed ash cooler -1B Dome valve is in jammed condition. So 2 to 3 times manually Operated. Now Ok.

Bucket Elevator No.-2 AVI and Permit to closed. Also Put into Remote and VFD Mode.
Since Grid Voltage Incresaed to 136KV Volts. Our 11 KV side Voltage is decreased .Now Ok.

Following Equipment S/D Cleared.

1.Bucket Elevator-2
2. BC-3 ,
3. BC-4 ,
4. Soot Blower No.-1,

Coal feeder -2C Clean run motor connection to done. Also Earthing lug to Provided.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
IN MVAR Comes out from auto . Then again give the raise excitation command. Then again put into
auto mode. Now Ok.

Shift jobs carried


In Unit No.# 1 Coal Bunker Level Transmitter -1A level is not showing correctly at DCS end. So
Reset the Power Supply. Now Ok.
In CCR Lift door open and close at No. # 3 , So adjust the sensor. Now Ok.
In APH O/L Conveying SOV Limit switch Cable gland Tightness to done.
In Bed ash Silo RAV is tripped due to O/L. So Reset it. Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1 BC-4,

In BFP-1 Lub oil Motor PMT is showing at DCS end. So all the fuse removed from Lub. Oil Local
Panel. Still it is showing PMT at DCS end.

Shift jobs carried


Drain Pot Pump 1A & 1B Motors cleaning work
Unwanted Lights OFF at Boilers area
One no of hand lamp provide at 22 mtr, to maintanance team
Following Equipment S/D clear
1. BC-4

CCR AHU found in Local mode now put on auto Mode


Unit-1 coal bunker Level transmittor cleaning done
IFC Filter drain work done

Shift jobs carried


Bed ash silo lavel show at 10 mtr , so check at field , its lavel probe cleaning done, now it show at 4.08 mtr.
Bag house 22, no. HH lavel transmitter cleaning and calibration done, as prequirement by, ccr.

CCR, ahu found in manual mode so its change to auto mode.


Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
APC & Plant Performance Report send to concernred Person
APH -1 Transmittor , JB'S Pressure Gauge , Dome limit & Panels cleaning done.
Soot Blower -1,Panel Cleaning and blowering done.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D clear.
1.Coal crusher No.-2,
2. Vibrating Svcreen-2 ,
3. Shredder Feed Chain Conveyor,
4. AFR Discharge Belt,
5. AFR Shredder Power Supply ,
Following Equipment AVI clear.
1.Vibrating Svcreen-2 ,
24v LED provided at screen floor.
Bag house 12-22 back pressure line flushing done.

Shift jobs carried


Fly ash silo No.-2 plate Valve is not operating. So manually direct air given from SOV. Now ok.
UPS 1, MASTER, fan failure alarm observed , while fan ruunuing well , so reset it.

Bag House-1, 12-22 Back pressure switch , Back pressure transmittor , seal pressure switch line flushing done.
At 22 Mtr LED not run, so checked and found TOP cable connection loose, so connect it proprly.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
APC & Plant Performance Report send to concernred Person
APFC , goes out from auto mode so its put in auto mode by changing excitation.
CCR, ahu found in manual mode at start of shift so, its change in auto mode.

Shift jobs carried


Zishu Hozen done at CHP and Silo area.
Office Ac supply made OFF.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. Shredder Feed Chain Conveyor (Key T008),
2. AFR Discharge Belt (Key T082),
3. AFR Shredder Power Supply (Key T105),
4. BC-6,
5. BC-1,
6. Bucket Elevator-1,
7. Vibrating Screen-2,

Following Equipment AVI Given.


1. Bucket Elevator-1, (Change over Remote/Local and VFD/DOL)
Following Equipment S/D Clear.
1. Shredder Feed Chain Conveyor (Key T008),
2. AFR Discharge Belt (Key T082),
3. AFR Shredder Power Supply (Key T105),
24v hand lamp made ready and put in shift ALMIRAH.
Silo Start/stop push button replaced.
Silo plate valve ON/OFF checked with level found running healthy, and under observation.
Shift jobs carried
In Unit No. # 1 Coal Bunker Level Transmitter -1A is not showing correctly at DCS end. So
Power Reset and Cleaned the level Probe. Now Ok.
In Unit No. # 1 Coal Bunker Level Transmitter -1A is not showing correctly at DCS end. So
Power Reset and Cleaned the level Probe. Now Ok.
In BAC-1B Water valve actuator PU Tube leakage arresting done. Now Ok.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
APC & Plant Performance Report send to concernred Person
At WTP area all the SOV panel , RO , UF System all the Pressure Guage cleaning to done.

Shift jobs carried


Drain Pot Pump 1A & 1B Motors cleaning work
One no of hand lamp provide at 22 mtr, to maintanance team
Following Equipment S/D clear
1. BC-4
CCR AHU found in Local mode now put on auto Mode
Unit-1 coal bunker Level transmittor cleaning done
IFC Filter drain work done
Shift jobs carried
Office Ac supply made OFF.
Manual Light to ON ( MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D CLEAR
1. Screen-1
2.ACC-1E
3. Lube oil-1E

Following Equipment AVI Given & Clear.


1. Bucket Elevator-1, (Change over Remote/Local and VFD/DOL)
2/ ACC-1E
3/ Lube oil 1E
ACC-1E Lube oil flow switch installation & trial work

BAS Pneumatic valve not close so check & found Valveseal passing issue so inform to shift incharge

Rclamier Cabin PLC Panel Cleaning work


ACC -2A to 2 F & ACC-1D Motor both sides Lubrication work done
10 kg grease received from Oil room
ACC-1E Lube oil pump motor & earthing connection done
Monthly Power Report Balanced upto 21/02/2023
Shift jobs carried
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. Reclamier
2. BC-2
3. BAC-1A(Clear)
4. BC-6,
5. BC-1,
6. Crusher-1

WTP Pump house MB Feed Pump-1 motor double earthing & fan cover tightness done
SA-1 Fan motors both sides Lubrication done
Bag House-1 all E&I Euipments cleaning done
APH-1 All E&I Euipments cleaning done
Revised EMS Power report send to concern
Shift jobs carried
Coal Bunker Level Transmitter -1A is not showing correctly at DCS end. So Power Reset and Cleaned the
level Probe. Now Ok.
Bag House 21 lavel probe check and cleaning done on requirement of ccr.
APH , seal air pressure show faulty ar ccr so , impulse line flushing done found heavy dust. Now ok
Bed ash silo, pnumatic valve air tube connection done.

Following Equipment LOTO Remove.


1. Reclamier
2. BC-2
3. BAC-1A(Clear)
4. BC-6,
5. BC-1,
6. Crusher-1

Following Equipment LOTO provide and remove.


1.Bed ash silo dry unloading RAV ,
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
Drain MOV and J valve MOV cleaning and blowering done.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase, Bag house top etc. ).

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
VAM floor equipment cleaning done.
Roots blower panel and motor cleaning done.

Shift jobs carried


ACC fan 1 A . Show flow low alarm at dcs , so check and flow switch cleaning done, and observed
foam farmation in lube oil so cleaning done and inform to ccr. Now ok.
U#2, bed all thermocouple, mv continuity and , mv check , found one pair no continuity so, replace
with spare contact.

Coal feeder 2B, main motor connection done, earthing done. Direction trail not taken now.

Following Equipment S/D Given.


1. SA FAN 2
2. BC-4
3. BC -6
ACC fan 1 E and 1 F, lube oil motor, double earthing done.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
APFC , goes out from auto mode so its put in auto mode by changing excitation.

Shift jobs carried

Since Due to Increasing Load , SA Fan-1 Motor DE Side Temp. is Increased to 77 degree. Also
Greasing done on dated:- 23/02/2023. Also one Extra cooling Fan Provided at site. Also
Tripping Value is 90 Degree.
Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
In Unit No. # 1 UPS Master Showing Fan fault alarm at Panel Display. Also automatics Reset.
In Chimney analyzer Boiler No. # 1 SOX analyzer Heat Trace line Temp. is showing 250 degree
in controller. So Connection tightness to done. Now Ok.
Following Equipment S/D Cleared.
1. SA FAN 2
2. BC-4
3. BC -6
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
SA fan-1 Motor DE side temp goes to 50 deg C, air stopped and under observation.
Bag house 11-21 and 12-22 back pressure line flushing done.
Boiler-1 drain MOV and J valve mov cleaning done.

Shift jobs carried


Safan tempretureat 65C, at 12.30 p.m. so cooling fan on for 15 minute and stop, now at 59C

One extension board provide at T1 tower for maintanace team and green tag also provide.
UPS, master-1, fan failure alarm observed , so check found fan working ok so reset it.
Following Equipment LOTO Remove.
1. Reclamier
2. BC-4
3. BAG FILTER BC-4
4. BC-7A,
5. BC-7B,
6. FLY ASH SILO -1, PNUMATIC PLATE VALVE
7. J-VALVE 2B

Following Equipment LOTO remove.


1. BAG FILTER BC-4 ,
Generator voltage maintanin at 11 kv, by oltc as it change frequntly as grid voltage varies.
In Unit No. #1 MVAR is not run into auto mode. So Raise the excitation command. Then put into
auto mode. Now Ok.
Greasing job done at J Valve 2 B.

Shift jobs carried


In Compressor House all the auto drain valve is checked and working normally.
In Unit No. # 1 SA Fan Motor DE Temp. is increased to 66 Degree. So Cooling fan is started.Now it is showing
58 Degree.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
In Unit No. # 1 UPS Master Showing Fan fault alarm at Panel Display. Also automatics Reset.

Following Equipment S/D Cleared.


1. Reclamier
2. BC-4
3. BC-7A,
4. BC-7B,
5. FLY ASH SILO -1, PNUMATIC PLATE VALVE
6. J-VALVE 2B
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
At BC-7A and 7B Area New Hand Lamp to Provided.
In Compressor House Repair supply Box rubber mat to Laid.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area, 22 mtr etc.)
UPS-1 Fan failure alarm reset done
Boiler-2 P fan hoist cable dressing done
TG 0 mtr. All E&I Euipments cleaning done
SA-1 Fan motor cooling fan supply OFF
Shift jobs carried

In Unit No. # 2 Furnace O/L Temp. ( 02TI1101) is showing Voilet at DCS end. So checked at field
side one pair is out. So DCS wire is connected to Spare Pair. Now it is showing at DCS end.

Since SA Fan -1 Motor DE Side Temp. is Normal condition. So Cooling Fan is in stop condition.
In Chimney analyzer PC Interent not connected due to network down condition.

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.

In Fire Pump House area Battery Voltage is checked. It is 12 Volts and is in charging condition.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
C7AB area 24v hand lamp replaced.
WTP pump house motor cleaning done.
UPS-1 Fan failure alarm reset done
Bed ash silo area air leakage attend.
BC-1 pull cord act , so checked 41 no pull cord reset, and rectify it

Shift jobs carried


AFR, main breaker 1000A, get trip due to overload, jam at shredder machine, breaker not on in
service position while on in test position so , spare breaker 1000A, from spare feeder 00PCC5305-B,
use ant start supply of AFR.
After on supply all feeder checked of AFR, found normal, so start, complete AFR system.
UPS#1, Master show fan failure alarm, while fan running , so reset it.
Solar Power Report Upload in SAP
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
SAfan tempretureat 67C, at 11.30 p.m. so cooling fan on for 01 hour and stop, now at 56C.
Ignitor panel, burner 1A and 1B panel flame sensor detector panel cleaning done.
BAC, 1A and 1B panel and lavel probe JB cleaning done.
Shift jobs carried
In BC-7A and 7B area , Bag filter DP Transmitter -1A and 1D one PU Tube is open condition. So
reconnected it. Now Ok.
Since SA Fan -1 Motor DE Side Temp. is Normal condition. So Cooling Fan is in stop condition.
( Present Temp.- 55 Degree.)

In CHP Crusher House Building Screen Floor area Bag House DP manometer taken in line.
In Unit No. # 2 EOP ON/OFF as per Operation requirement.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. Reclaimer ,
2. BC-6 ,
3. BAC-1B ,
Following Equipment S/D Cleared.
1. BAC-1B ,

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D Clear.
1. Reclaimer ,
2. BC-6 ,
3. Coal feeder 2A(02 PTW) ,
Reclaimer area welding machine connection provided.
Fly ash silo-1and 2 unloading system bag filter mano meter checked and taken in line.

Bed ash silo unloading system mano meter PU tube fitting damaged, so replaced and taken in line.

Fly ash silo 1and 2 loading system bag filter mano meter broken PU tube rplaced and mano meter
water top up and taken in line
Bed ash silo loading bag filter mano meter water top up done.
Shift jobs carried
Bag House -1, 11 no vessel level not show so level probe clean & calibration now level healthy
22 mtr. Lights on as per requirement of CCR.
IN MVAR Comes out from auto . Then again give the raise excitation command. Then again put into
auto mode. Now Ok.
Solar Power Report Upload in SAP
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
SAfan tempretureat 68C, at 10.30 p.m. so cooling fan on for 01 hour and stop, now at 57C.
Silo roots blower and panel cleaning and blowering done.
U#1, APH, vessel no. 1, lavel probe gland packing done.
Chimny analyzer room, all panel fitting tightness done.
Shift jobs carried
Zishu Hozen done at Coal feeder and Deaerator area.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BLR-1 APH-1 VESSEL-2 DOME INSTUMENT AIR (Key 76),
2. UNIT-1 OIL PURIFIER,
3. EN-MASS CONVEYOR-1,
4. VIBRATING SCREEN-1,
5. EN-MASS CONVEYOR-2,
6. VIBRATING SCREEN-2,
7. Reclaimer,

Coal feeder floor pressure gauge marking done.


Boiler -1 truck unloading system actuator not open, checked and found air valve close, so open done
ad trial run healthy.

Shift jobs carried


In BC-7A and 7B area , Bag filter DP Transmitter -1A and 1D one PU Tube is open condition. So
reconnected it. Now Ok.
Since SA Fan -1 Motor DE Side Temp. is Normal condition. So Cooling Fan is in stop condition.
( Present Temp.- 55 Degree.)

In CHP Crusher House Building Screen Floor area Bag House DP manometer taken in line.
In Unit No. # 2 EOP ON/OFF as per Operation requirement.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. Reclaimer ,
2. BC-6 ,
3. BAC-1B ,
Following Equipment S/D Cleared.
1. BAC-1B ,
Date Shift Engineer Name

01.03.2023 A Ashvin Jadav

Date Shift Engineer Name

01.03.2023 B Amit kumar singh

Date Shift Engineer Name

01.03.2023 C Sanjay Garg


01.03.2023 C Sanjay Garg

Date Shift Engineer Name

02.03.2023 A Tarun Gaur

Date Shift Engineer Name

02.03.2023 B Amit kumar singh


02.03.2023 B Amit kumar singh

Date Shift Engineer Name

02.03.2023 C Ashvin Jadav

Date Shift Engineer Name

03.03.2023 A Amit kumar singh


03.03.2023 A Amit kumar singh

Date Shift Engineer Name

03.03.2023 B Sanjay Garg

Date Shift Engineer Name

03.03.2023 C Ashvin Jadav


Date Shift Engineer Name

04.03.2023 A Amit kumar singh

Date Shift Engineer Name

04.03.2023 B Sanjay Garg


Date Shift Engineer Name

04.03.2023 C Tarun Gaur

Date Shift Engineer Name

05.03.2023 A Sanjay Garg

Date Shift Engineer Name


05.03.2023 B Ashvin Jadav

Date Shift Engineer Name

05.03.2023 C Amit kumar singh

Date Shift Engineer Name

06.03.2023 A Sanjay Garg


06.03.2023 A Sanjay Garg

Date Shift Engineer Name

06.03.2023 B Ashvin Jadav

Date Shift Engineer Name

06.03.2023 C Amit kumar singh


06.03.2023 C Amit kumar singh

Date Shift Engineer Name

07.03.2023 B Tarun Gaur

Date Shift Engineer Name

07.03.2023 C Sanjay Garg

Date Shift Engineer Name


08.03.2023 A Tarun Gaur

Date Shift Engineer Name

08.03.2023 B Amit kumar singh

Date Shift Engineer Name

08.03.2023 C Sanjay Garg


08.03.2023 C Sanjay Garg

Date Shift Engineer Name

09.03.2023 A Tarun Gaur

Date Shift Engineer Name

09.03.2023 B Amit kumar singh


09.03.2023 B Amit kumar singh

Date Shift Engineer Name

09.03.2023 C Ashvin Jadav

Date Shift Engineer Name

10.03.2023 A Amit kumar singh


10.03.2023 A Amit kumar singh
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal .

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal .
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal.

Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
b) Generator-2  checklist

Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist
b) Generator-2  checklist
Regular jobs
shift round taken drives running normal

RNRP all nodes found Normal.

UPS Check List filled.


Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.
a) Generator-1 / 2 checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist

c) Elect. Shift checklist

b) Generator-2  checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.

Shift instrument digital log book filled


UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.


Following check list prepared
a) Generator-1  checklist
b) Generator-2  checklist

c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.


RNRP all nodes found Normal.
Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled

UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist

b) Generator-2  checklist

c) Elect. Shift checklist


Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal.

Shift instrument digital log book filled

UPS log digital log book filled.


VAM log digital log book filled.

Following check list prepared


a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Regular jobs
Shift round taken found drives running normal
DSLC TG-1 Base load set point 12500 kw verify.
RNRP all nodes found Normal except SPC004.
Shift instrument digital log book filled
UPS log digital log book filled.
VAM log digital log book filled.
Following check list prepared
a) Generator-1  checklist
c) Elect. Shift checklist

Regular jobs

Shift round taken found drives running normal

DSLC TG-1 Base load set point 12500 kw verify.

RNRP all nodes found Normal.


Shift instrument digital log book filled
UPS log digital log book filled.

VAM log digital log book filled.

Following check list prepared

a) Generator-1  checklist
b) Generator-2  checklist
c) Elect. Shift checklist
Shift jobs carried
Zishu Hozen done at Boiler-2 area.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1. Grabber Starter Supply (Key T096),
2. COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE (Key-47),
3. COAL FEEDER-1A,
4. MAGNETIC SEPERATOR T1,
5. BC-1,
BFP-2 Changeover from DOL to VFD as per operation requirement.
Following Equipment S/D Clear.
1. COAL FEEDER-1A DISCHARGE PANUMATIC PLATV VALVE (Key-47),
2. COAL FEEDER-1A,
Welding Machine and Grinder Machine TOP provided and green tag provided.

Shift jobs carried


BFP spare ,pump, guage and lavle fitting remove and kept at instrument lab.
BFP- 3, motor bearing, oil replacement done and BFP 3, MVVFD power on from breaker.
Coal feeder 2D main motor, connection done after fixing motor.
Boiler #2, ground floor, weldning machine, connection, green tag provide and 3 phase top
replacement done.
Following Equipment LOTO Clear.
1.BFP-3 ,
2. BC-1 ,
3. MAGNETIC SEPRATOR ,
Following Equipment LOTO Provide.
1.BFP-3 ,
One 24 volt LED light with transformer provide at BFP-3, job.

Bed ash silo unloading system mano meter PU tube fitting damaged, so replaced and taken in line.

Coal shed trolly drive, VCS loto provide, lock no. TOO8,
Bed ash silo pnumatic valve not getting cloce, so check and found its pnumatic, valve air pu tube
bend. So damage pu tube cut and reconnect.
Shift jobs carried
In CCR Lift At Floor No.-3 door is not opened from PB. Then adjust the sensor. Now Ok.

At Coal Feeder area 24 Volts hand lamp to changed.


In UPS Unit No.-1 master UPS Fan alarm is showing on the display. Also Reset it.
In Unit No.# 1 APH area Cable Tray GI Sheet cover is removed. So Proper covered to provided.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP

Shift jobs carried


Zishu Hozen done at CHP Crusher Building
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-6
2.Bucket Elevator-2(CHP)
3. BC-2
4. Reclamier
5. Enmass Conveyor- ( Boiler-2)
6. Bucket Elevtaor ( Boiler-2)
7. BC-5

Enmass Conveyor Boiler-2 Coal feeder Motor & Earthing connection removed
Boiler-2 Bed Material Rav Motor connection & Earthing open as per requirement of Mech. Maint .
Dept.
BC-1 tail End Power JB found open condition now lock it
APH -1 Pressure switch & Pressure line transmittor line flushing done , APH -1 Back pressure
Transmittor base found damaged condition now proper fitting done
Thrussior Motor Power Cable laying work from Motor to BC-5 Power JB
Shift jobs carried

APH -1 , SOV 8127, Commen outlet conveying valve , open limt faulty, so change its limt now ok

Boiler 2, furnace pressure transmitter , six no. cleaning and flushing done.
Boiler 2 DPT 1104, transmitter heavy choked , its work under progress
CCR, turbine desk, telephone lead change due to voice not clear.
Following Equipment LOTO Clear.
1. BC-6 & BC5
2.Bucket Elevator-2(CHP)
3. BC-2
4. Reclamier
5. AFR FEED CHAIN
6. AFR DISCHARGE BELT
7. SHREDDER MACHINE

Following Equipment LOTO Provide.


1. BC5
2. BAC 1 A
3. AFR FEED CHAIN
4. AFR DISCHARGE BELT
5. SHREDDER MACHINE
AVI provide to BC5 belt for connection of cutter machine.
U#1, MOT, lavel guage working checked with operation team .
ACC 2, area lights ON on requirment of operation team.
BC 5, feeder , one fuse change ,of 80 amp.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
P & V 2 and 4 panel and motor cleaning and blowering done.
WTP pump house field equipment cleaning and blowering done.

Shift jobs carried


BFP -1, Motor connection open, DE R/Y/B # U/V/W NDE and cable insulate properly.
BFP -1, space heater connection open , motor side T1-red & T2- yellow.
BFP-2 , change over taken from VFD mode to DOL mode as per instruction of shift incharge.

EOT#2 , power on done as per requirement of operation team at 08.00 am and power off done.

Following Equipment S/D Given.


1. BC-5
2. VIBRATING SCREEN-2
3. BC-1 ( TWO TIME)
4. Reclamier
AVI provide of BC1 to hemant sir.
UPS, Master-1, fan failure alarm reset at 08.00 am.
U#2, J valve, inlet/ outlet static pressure transmitter impulse line flushing done.
CEP 1A and 1B, and drain pot pump area all equipment cleaning done.

Shift jobs carried


In CCR Lift At Floor No.-3 door is not opened from PB. Then adjust the sensor. Now Ok.

In BC-1 Belt Running F/B is not showing at DCS end. So Informed to Pandaya Ji Then Changed the Relay .Still it
is not showing at DCS end. So Running F/B at DCS end 93-9A-TB4-1/2 Loop to Provided. To be check.

In BC-1 Belt PCS Indication is showing at DCS end. So Power Supply Reset of Controller. Now Ok.

In Unit No. # 1 Coal Feeder -1D level is not showing at DCS end. So Reset the power Supply. Now Ok.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
In Unit No. # 1 UPS Master Showing Fan fault alarm at Panel Display. Also automatics Reset.

Following Equipment S/D Cleared.


1. BC-5
2. VIBRATING SCREEN-2
3. BC-1 ( TWO TIME)
4. Reclamier
5. Coal Feeder - 2B ,

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In Unit No. # 2 Furnace area 230 Volts extension is Provided. Also Collected it.

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Vam Floor panel cleaning and blowering done.
Unit-1 Soot blower panel cleaning done.
Shift jobs carried

U#1, Nox value checked with Mr. tarun , by portable analyser found its readimng normal actual.

In BC-1 Belt Running F/B is not showing at DCS end. So Informed to Pandaya Ji Then Changed the Relay .Still it
is not showing at DCS end. So Running F/B at DCS end 93-9A-TB4-1/2 Loop to Provided. To be check.

BC1, Feeder taken in maintanance and check found it control connector, male/ female clip broken ,
so its replace with spare.
BAC 1B, poppet valve taken in circuit, as it dummy previously and connection done.
Following Equipment S/D Given.
1. RECLAIMER
2. VIBRATING SCREEN-2
3. BC-1
One no. of extension board(woden) prapered for , temple , programe.
Solar Power display not show at dcs, while network ok, contact to M+, team and they will come in B
shift with dongle to check it.
U#2, J valve, inlet/ outlet static pressure transmitter impulse line flushing done.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage varies.

Shift jobs carried


In CCR Lift At Floor No.-3 door is not opened from PB. Then adjust the sensor. Still it is not opened the gate.
To be check.

In Unit No. # 1 BAC-1B Conveying Pr. High is not showing at DCS end. So checked at field side found that hose
pipe is heavily is in chocked condition. So cleaned the hose pipe. Then taken in line. Now Ok.

In Unit No. # 1 BAC-1B bypass popette valve is not operating at DCS end. So Checked at site and found that
open and close hose pipe is reversed connected. So corrected it. Now it is working Normally.

In Unit No. # 1 BAC-1B Dome Valve is manually operated. It is Jammed condition. So Informed to shift
incharge.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
In Unit No. # 1 UPS Master Showing Fan fault alarm at Panel Display. Also automatics Reset.
Following Equipment S/D Cleared.
1. RECLAIMER
2. VIBRATING SCREEN-2
3. BC-1
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to ON Condition.
In BFP # 1 Area new 24 Volts Light to Provided as per Mech. Person.
In BFP # 1 motor Terminal Box dummy hole packing to done.
Shift jobs carried
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Root Blower Room Motors & Panels cleaning work
1 no's 24 V LED Given to Mech Maint team at BAC-1B
Crusher-1 Energy Meter Display Error so Power Supply reset now OK
Bag House-1 11-21 Seal Pressure fault so line flushing done now ok
BAC-1B Found Jammed Condition so as per requirement operation dept Extra air line removed now
back pressure healthy
Shift jobs carried
In Unit No. # 1 Coal Feeder -1D AVI is given. Also Motor Direction is reversed from VFD Side.
( Parameter No.-1003). Also Back to Forward direction. Also OFF the MCB.

In Unit No. # 1 Coal Feeder -1D Bunker O/L is not closed from DCS end. So checked at feeder
side Loto Lock condition. Also feeder is in outside condition. So Informed to Mr. Tarun. Then
Insert the New MOV feeder. Then Trial taken found that Open command is Ok. But closed
command is not going to MOV side. So MOV is manually closed at Site. To be check. During the
Manually closed condition. Valve is heavily Jammed condition.So Informed to Shift Incharge.

Boiler No.-2 Lift Power OFF due to C fault. As Per shift incharge there is no Person inside. Also
Informed to shift incharge and hement Sharma. When Power OFF still it is showing C Fault.

P&V 2 and 4 status checked, found OFF Condition .


online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. Coal Feeder -1D ,
2. Coal Feeder -1D Pneumatics Valve.,

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
Following Equipment S/D Clear.
1. Coal Feeder -1D ,
2. Coal Feeder -1D Pneumatics Valve.,
Coal feeder 1D Bunker outlet MOV Open Limit set as per operation requirement.
BFP-1 area welding machine connection done.

Shift jobs carried


U#1, Bag house 21, H lavel probe check with operation team and found material in it , so inform to
ccr.
Chimney analyser room 03 panel , front and back window, PC desk JB, cylinder all equipment
cleaning done.
SA fan 1, bearing temprature observed found normal within limit.
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Plant performance report send to all concerns.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Aviotin light of chimany found in , off condioton , due to its mcb get trip , so on it.
CCR, AHU running in manual mode at temp 26 C, so its put on auto mode.
Shift jobs carried
In CCR Lift At Floor No.-3 door is not opened from PB. Then Removed the Sensor. Now Under observations.

In Fly ash silo No. # 1 ,2 and Bed ash silo Level Transmitter Power Reset and Cleaned the level
Probe. Also Phyiscally checked with operation team. It is working normally.
In CHP EN mass No.-1 PMT is not showing at DCS end. So checked at feeder side Tripped due to
O/L. So Reset it. Now Ok.
P&V 2 and 4 status checked, found OFF Condition .
online CPCB and ETP website is not opened .
All the Manual Light to OFF Condition.
Following Equipment S/D Given.
1. AFR Shedder Feed Chain Belt ,
2. AFR Disch. Belt ,
3. AFR Shreeder ,
4. ACC Fan -1A ,
5. ACC Fan -1A Lub. Oil ,
6. EN Mass No.- 1/2 ,
7. Vib. Screen No.-1/2,

At BC-7A / 7B area 24 Volts hand lamp to changed.

Shift jobs carried


compressor house auto drain valve manually checked found healthy.
Office Ac supply made OFF.
Manual Light to ON ( Coal shed, Bunker floor MPHB staircase etc. ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low

Following Equipment S/D Clear.


1. EN-MASS CONVEYOR-2,
2. EN-MASS CONVEYOR-1,
3. VIBRATING SCREEN-1,
4. VIBRATING SCREEN-2,
5. ACC FAN-1A LUBE OIL PUMP,
6. ACC FAN-1A,
7. Shredder Feed Chain Conveyor,
8. AFR Discharge Belt,
9. AFR Shredder Power Supply,

Following Equipment AVI Given & Clear.


1. ACC FAN-1A LUBE OIL PUMP,
VAM tripped in HTG vapour temp high, reset and taken in line.
Grinder M/c green tag provided at BFP area.
LED provided at bed ash cooler area.

Shift jobs carried


VAM, booster pump water leakage observed at stating of shift, so taken observation with shift
incharge and maintanance team and decide to take maintanance in morning shift.
BAC 1A and 1 B panel cleaning done, and lavel probe cleaning done.
LP / HP dosing panel and morpholine, dosing panel all pressure guage cleaning done.
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
Plant performance report send to all concerns.
UPS, Master-1, fan failure alarm reset at 11.00 pm.
Generator voltage maintanin at 11 kv, by oltc as it change frequntly due to grid voltage
varies.

Shift jobs carried


BAC Cylinder tube found damaged condition so repaired done
Office Ac supply made OFF.
Manual Light to ON ( MPHB staircase ).
P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
BC-7A & 7B Bag Filter Panels cleaning done

Fire Pump House Fire Engine Battery & Charger Maintence & Following activities carried out-
1/ Battery Voltage check- 13 Vdc
2/ 6 no's Cell Water Specific Gravity Checked & Found - Min- 1200 & Max-1300
3/ Battery Charger Cleaning & Terminal Tightness done
4/ Battery Terminal & Body Cleaning work

BFP-1 area welding machine sparking observed so check RCBO & Plug top side found neutral cable
heated condition so cut heated parts both sides & connect done now working normally & Earthing
also connect done
compressor house auto drain valve manually checked found healthy.

Shift jobs carried


In Boiler No. # 1 and CCR Lift Telephone checked. It is working Normally.

In CHP MCC Door hole Packing to done.


In UPS Unit No.-1 master UPS Fan alarm is showing on the display. Also Reset it.
In Unit No. # 1 Coal Crusher Reading meter Power reset. Now Ok.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP

Shift jobs carried


Zishu Hozen done at Compressor House
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.
Following Equipment S/D Given.
1. BC-7A
2.BC-7B

Bag House-1 21 no's vessel dome valve air leakage arrested done
Bag House-1 11-21 & 12-22 back pressure transmittor Proper covering done
BFP-1 Area Supply Board plug top replaced done
1 no's charging light handover to Mr. Nikhil Pandya in place of Old charging LED
Boiler -2 Lift not working & so check & found safety Ckt. Out so Lift top cabin Panels Terminals
tightness done & Door adjustment done now lift healthy condition
Shift jobs carried

CT fan 2, not start at field after command from DCS, check at field no supply in incomming mccb, so
check at vfd panel found incoming voltage 415 v , but no outgoning power ,vfd reset but then not
start, so check at dcs found its AND gate create problem, so its programing again download and
install. then after command from DCS its start normally.

At fly ash silo plate valve airleakage, so fitting replacement done.


Near BFP-1, one welding machine green tag provide.
Near coal belt 7A and & 7B one handlamp repaired as require by operation team.
At, 4.5 meter,total 5 no. air leakage arresting and cleaning done.
Following Equipment LOTO Given.
1. BC-7A
2.BC-7B
11-21 12-22 JB cleaning and blowering done.
compressor house auto drain valve manually checked found healthy.

Shift jobs carried


In Boiler No. # 2 Lift Telephone checked. It is working Normally.

Since Grid Voltage Incresaed to 135KV Volts. Our 11 KV side Voltage is decreased .Now Ok.
In UPS Unit No.-1 master UPS Fan alarm is showing on the display. Also Reset it.
In Compressor House all the auto drain valve checked. It is working Normally.
In Fly ash silo No. # 1Top Bag Filter Fan is Continuously ON even Off Command from DCS end.
To be check.
EMS Report is generated in the System and mail to all the concered person.
DG Report is uploaded in SAP System.
Solar Power Report Upload in SAP
In WTP MB Feed O/L Pump No. # 1 Double earthing to done.
In WTP area Motor Cleaning to done.

Shift jobs carried


Zishu Hozen done at Compressor House
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).
compressor house auto drain valve manually checked found healthy.

Following Equipment S/D Given.


1. BC-7A
2.BC-7B
3. Screen-1
4. Screen-2
5. ACW-2( S/D Clear)
6.BFP-2

Fly Ash silo-1 Bag Filter continue ON Not stop by dcs command & field manual switch so check &
found Power Contactor Add ON Block faulty & rusted with Contactor so replaced by ADD ON &
Contactor now Bag Filter fan healthy takes 3.4 amp.
Bag House-1 11-21 back pressure checking with Shift incharge

Bolier-2 lift comes in C fault check & found lift below 0 mtr. To be check tomorrow with AMC Person

Fly ash silo-2 Field Panel Bag filter Power Contactor removed & connect in Fly ash silo-1& FAS-2
Power contactor to be reconnect tomorrow( FAS-2 Filed Bag filter Panel MCB OFF)
WTP Area ETP Data updating work U/P
In Unit No. # 2 EOP ON/OFF as per Operation requirement.
Fly Ash silo-1 Bag Filter continue ON Not stop by dcs command & field manual switch so check & found
Power Contactor Add ON Block faulty & rusted with Contactor so replaced by ADD ON & Contactor now Bag
Filter fan healthy takes 3.4 amp.
Chimney Top SPM Leakage arresting work with G Shift team
Shift jobs carried

Reclaimer , limit switch, found only one bolt, so fix it properly tight and one extra bolt provide.

Boiler 2, zero meter damaged cable cut and new cable connect for maintanance team.
One welding machine industrial top change,double earthing done, and check then green tag
provide.
New, solar roof top area observation, cable estimation, safety precoution, feeder identification done,
with fourth partner solar.
U#2, furnace area 24 volt light one top change of 20 amp.
Following Equipment LOTO Given.
1. BC-7A
2.BC-7B
3. Screen-1
4. Screen-2
5. ACW-2( S/D Clear)
6.BFP-2
7. BAC 2A & 2B

Shift jobs carried


P&V 2 status checked, found OFF Condition due to ambient & DT temperature low
All Energy meter manual reading taken for Power Report.
DG Aux. report upload in SAP
Solar Power Report Upload in SAP
compressor house auto drain valve manually checked found healthy.
Manual Light to OFF ( Fire pump house, Boiler 4th to 7th floor, HSD area etc.)
Boiler-2 area welding Machine power OFF done.
GSC Motor 1A and 1B Motor cleaning done.
SAP ID VCPP008 password reset by MPSS, New password is April@2023
WTP area field instrument cleaning done.
Shift jobs carried
U#2, Shutdown job, two welding machine repaired, both machine power cable remove and fresh
cable provide, due to damage condition, and its top change, and both machine double earthing
provide and green tag provide.
U#2, Bed thermocouple element no. 14, 15,18, removed. No. 20 heavy jam so, removing job
continue.
Bag house 22, no. lavel high show at ccr, so probe cleaning and calibration done.
UPS, Master-1, fan failure alarm reset at 11.00 am.
Following Equipment LOTO Given.
1. BC-7A
2.BC-7B
3. COAL FEEDER 2B
4. RECLAIMER
5. COAL CRUSHER 1
6. BFP-1 7. AFR
FEED CHAIN 8. AFR
DISCHARGE BELT 9. SHREDDER
MACHINE

CCR, AHU running in manual mode at temp 27.6 C, so its put on auto mode now at 26.2C
BFP1, and U#2, shut down job observation taken , found one welding machine power cable damage
so its change with spare cable.
Office Ac supply made ON.
Manual Light to OFF ( Coal shed, Bunker floor MPHB staircase etc. ).