NR
aT
V cerRTIFICATE TUV
a
‘Management System as per
EN ISO 9001 : 2015
In acaranca wih TOV AUSTRIA procedures, i ary crag hat
PIPELINK CONSTRUCTION (PRIVATE) LIMITED
‘341, Main National Highway, Opposite Pakistan Stee! Mills Chowk, Pipri
KARACHI, PAKISTAN,
‘ops 2 Custy Mangement Stemi ine with above Standard forthe folowing Sea
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING
‘SERVICES (PIPELINES, PROCESS PLANTS, PETROCHEMICAL, POWER AND
IL AND GAS SECTOR).
cerita RopseaignN: 2000180001550 ole ur 202-0404
Lahore, 2018.04.08
“This conticaton was undue in scorsance with TOV AUSTRIA aun and ceiston
Scena
@ si]
i
i
|
|TUV
AUSTRIA
Management System as per
‘OHSAS 18001 : 2007
In coerdance wth TOV AUSTRIA proses, thea tied ht
PIPELINK CONSTRUCTION (PRIVATE) LIMITED
‘341, Main National Highway, Opposite Pakistan Stee! Mills Chowk, Pipri
KARACHI, PAKISTAN,
‘vps an Occupation Heat & Safely Mangement yam nine withthe above Stand for the
‘Siowng eae
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING
‘SERVICES (PIPELINES, PROCESS PLANTS, PETROCHEMICAL, POWER AND
OIL AND GAS SECTOR).
EA Scape Riek ctogny 28/8
cereateRepsatin No 0151190001802 Vat ut 202-0941"
“Tris coiason wae canted in seordance wth TOV AUSTRIA aug ad etn
cadies ad set repr stvellance sus
ONC
ea
|WY certiricate TYY
Management System as per
EN ISO 14001 : 2015
In acooranoe wih TV AUSTRIA rosedies, tis aay crag
PIPELINK CONSTRUCTION (PRIVATE) LIMITED.
‘341, Main National Highway, Opposite Pakistan Stee! Mills Chowk, Plpri
KARACHI, PAKISTAN
-Aepilie an Ener! Management Ste nog wh te above Slate flovna Scope
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING
‘SERVICES (PIPELINES, PROCESS PLANTS, PETROCHEMICAL, POWER AND
OIL AND GAS SECTOR).
joatin No: 2005119001600 at ut 2022.08.06
Lao, 2018.08.08
fe
“This cortcaton was sanductedn accordance wh TOV AUSTRIA ang ad etn
pocedzes ands! requ stance eu
a
i
i
b