PAKISTAN PETROLEUM LIMITED

TRANSMITTAL

GPF-IV Upgrade Project Date: 19th July -2019


GS GPF-IV Project Phase 2 Transmittal No. PJ-0983-TR-001

Attention: Mr. Shams Ashraf Job No. PJ-0983


Manager Engineering

Transmittal herewith is Original(s) Print(s) Reproducible(s) (CDs-ROM)

Preliminary For Review Issued For Tender


Per your request Approved as Noted Issued for Construction
For Information Revised as Noted For Procurement

(Discipline: PROCESS)
S.NO
DRAWING / DOCUMENT NO. DOCUMENT TITLE REV. STATUS
.
1 1003-00-000-D06-001-01 Sht. 1 of 3 Standard Symbol Legend & Line Designations 0 IFC
2 1003-00-000-D06-001-01 Sht. 2 of 3 Standard Symbol Legend & Line Designations 0 IFC
3 1003-00-000-D06-001-01 Sht. 3 of 3 Standard Symbol Legend & Line Designations 0 IFC
4 1003-20-000-D06-001-01 Sht. 1 of 7 Pig Receiver RE-02 And Production Manifold 0 IFC
5 PID-3001 Plant Inlet Air Cooler GPF-IV Phase II 0 IFC
6 1003-20-000-D06-001-02 Sht. 2 of 7 Inlet Separator 0 IFC
7 1003-20-000-DO6-001-04 Sht. 4 of 7 Raw Gas Metering 0 IFC
8 1003-20-000-DO6-001-05 Sht. 5 of 7 Raw Gas Cooler 0 IFC
9 PJ-0983-PID-9000 Gas/Gas Exchangers 0 IFC
10 PJ-0983-PID-9001 Gas Chiller Unit 0 IFC
11 PJ-0983-PID-9200 UOP Filter Coalescer 0 IFC
12 PJ-0983-PID-9201 UOP Pretreatment Skid 0 IFC
13 PJ-0983-PID-9202 UOP Membrane Banks 0 IFC
14 1003-20-000-D06-001-03 Sht. 3A of 7 Raw Gas K.O Vessel And Raw Gas Distribution 0 IFC
15 1003-20-000-D06-001-03 Sht. 3B of 7 Raw Gas K.O Vessel And Raw Gas Distribution 0 IFC
16 1003-23-000-D06-002-01 Sht. 1 of 5 Hydrocarbon & Water Dew point Control Unit 0 IFC
17 1003-23-000-D06-002-03 Sht. 3 of 5 Hydrocarbon Water Dew point Control Unit 0 IFC
18 1003-30-000-D06-001-01 Sht. 1 of 3 Condensate Degasser 0 IFC
19 PID-9301 Stabilizer Inlet Flash Separator 0 IFC
20 PID-9302 Stabilizer Skid 0 IFC
21 PID-3501 Condensate Storage tanks 0 IFC
22 1003-40-000-D06-001-01 Produced Water Handling System 0 IFC
23 1003-40-000-D06-002-01 Waste Water Treatment Package 0 IFC
S.NO DRAWING / DOCUMENT NO. DOCUMENT TITLE REV. STATUS

1
.
24 PID-9400 Oily Water Treatment Package 0 IFC
25 1003-55-000-D06-001-02 Sht. 1 of 2 Instrument Air System 0 IFC
26 1003-55-000-D06-001-03 Sht. 2 of 2 Instrument Air System 0 IFC
27 1003-57-000-D06-001-01 Sht. 1 of 2 Heat Medium Unit Train-1 0 IFC
28 1003-57-000-D06-001-02-5 Sht. 2 of 2 Heat Medium Unit Train-1 0 IFC
29 1003-58-000-D06-001-01 Sht. 1 of 2 Heat Medium Unit Train-2 0 IFC
30 1003-58-000-D06-001-01 Sht. 2 of 2 Heat Medium Unit Train-2 0 IFC
31 1003-59-000-D06-001-01 Heat Medium Distribution Header 0 IFC
32 1003-60-000-D06-002-01 Sht. 1 of 2 Fuel Gas System 0 IFC
33 1003-60-000-D06-002-02 Sht. 2 of 2 Fuel Gas System 0 IFC
34 1003-61-000-D06-001-01 Sht. 1 of 2 Flare System 0 IFC
35 1003-61-000-D06-001-02 Sht. 2 of 2 Flare System 0 IFC
36 1003-63-000-D06-001-01 Closed Drain Header 0 IFC
37 1003-66-000-D06-001-01 Diesel System 0 IFC
38 1003-68-000-D06-001-01 Test Separator 0 IFC
39 32618-110-06-DR-004 Cold Separator 0 IFC
40 32618-110-06-DR-005 Refrigeration Accumulator 0 IFC
41 32618-118-06-DR-002 Glycol Pumps & Filtration 0 IFC
42 32618-118-06-DR-003 Glycol Still 0 IFC
43 32618-132-06-DR-002 HP Flare Header 0 IFC
44 32618-138-06-DR-002 Closed Drain Header 0 IFC
45 32618-147-06-DR-002 Inert Gas System 0 IFC
46 1003-21-000-D06-002-01 Sheet 1 of 9 Amine Sweetening Unit Train-1 0 IFC
47 1003-22-000-D06-002-01 Sheet 1 of 9 Amine Sweetening Unit Train-2 0 IFC
48 PJ-0231-004-IMA-6002-22-0 Restriction Orifice Plates 0 IFC
49 PJ-0231-91-DS-1701-0 Foam Water Monitor 0 IFC
50 PJ-0231-91-DS-1702-0 Foam Water Monitor & Hydrant 0 IFC
51 PJ-0231-91-DS-1703-0 Fire Hose Box for Hydrant 0 IFC
General Specifications for Fire Water & Safety
52 - - -
System - PPL
53 PJ-0231-91-DS-1704-0 Datasheet For Flame Arrestor 0 IFC

Arshad Ghaffar
Project Manager
PPL