Material) NOTES 1 These Rates are only labour rate(No Material & Machinery included). 2 Contractor's profit and labour costs etc are included. 3 No Tax included in our rates. 4 Payment will be made as per actual executed quantities 5 Electricity & water is respensbilty of clinte. 3000 Psi Concrete Rate Breakdown Per C.M Sr# Description Qty Rate Cost Accumulative Remarks 1 Cement 320 17.4 5568 5568 2 Crush 28 60 1680 7248 3 Sand 17.6 34 598.4 7846.4 4 Admixer 3.1 75 232.5 8078.9 7 Water 190 0.37 70.3 8149.2 8 Profit+ Over Head 1 12% 977.904 9127.104 9127.104