SCOPE OF WORK:

 10 PCS. 6x8 OPEN KUBO W/ BALDUG, SINK, FIXED KAWAYAN TABLE AND
CHAIRS AND FLOORING
53,000 x 10 PCS = 530,000.00
 5 PCS. 6x12 KUBO W/ ROOM, SLIDING WINDOW, OWN CR, BALDUG, SINK,
KAWAYAN TABLE AND CHAIRS AND FLOORING
100,000 X 5 PCS = 500,000.00
 10 PCS. 6X8 KUBO (DOS AGUA) W/ FLOORING, BALDUG, SINK, KAWAYAN
TABLE AND CHAIRS
42,000 X 10 PCS = 420,000.00
 5 PCS. 20X20 BIG KUBO W/ TERRACE, W/ OWN CR, SINK, 3 KAWAYAN
DOUBLE DECK, KAWAYAN TABLE AND CHAIRS
180,000 X 5 PCS = 900,000.00

FREE:
(10) PCS OPEN TABLE
WITH 3 MONTHS MAINTENANCE (ONCE A MONTH) (DEC-FEB 2023)

LABOR AND MATERIALS COST: P2,350,000.00


START OF PROJECT: PREPARING OF MATERIALS (JULY 23, 2022)
COMPLETION OF PROJECT: 90 CALENDAR DAYS (ON OR BEFORE OCTOBER 30,
2022)
PAYMENT TERMS:
(2ND PROJECT) TOTAL PROJECT: P1,800,000.00

(5) BIG KUBO


W/ VARNISHED
W/ TERRACE, SINK
W/ KAWAYAN TABLE AND CHAIRS
W/ 3 KAWAYAN DOUBLE DESK

P150,000.00 X 5 KUBO = P750,000.00

(5) SMALL KUBO


- FULLY REPAIR

P70,000.00
(5) BIG KUBO
- OWN CR
- A.C ROOM
- SLIDING WINDOW
- SLIDING DOOR
- SINK
- KAWAYAN TABLE AND CHAIRS
- 3 KAWAYAN DOUBLE DESK
- RENOLIUM INSIDE

P180,000 X 5 KUBO = P900,000.00

OPEN KUBO (FRONTAGE / FRONTLINER)


-16X20
- COUNTER AND CABINET
- FLOORING @ COUNTER

P80,000.00

TOTAL PROJECT COST: P1,800.000.00

- TURN OVER ON OR BEFORE: DECEMBER 20, 2022


- INITIAL DEPOSIT: P500,000
- BDO CHECK # 155204
- (DBR ACC)
- DATED: 10/25/2022