Location ofthe Contact
Funding Souren DSWD KALAHI CIDSS PAMANA IP. COD
Republic oft Philippines
Provine of Souh Cotabato
‘Municipality of Lake Sebu
‘arangay Hanoon,
‘CONSTRUCTION OF LUNTT 2 STOREY TRIBAL HOUSE (CONFLICT SETTLEMENT CENTER)
Barangey Hancon Lake Sebu, South Cotabato
ITEMIZED COST REVISION
ign Approved Cont ‘ACTUAL CHANGES NEW VARIATION
Remarks
sunt | untcont | oy | routcou | oy | vot | unitcoat | otaicont vt | unwcost | totcost |
vee ve] ene) | |e wanna soa
* on senses = ma
[own sora one = cr ac = ‘ar a
bonancmco = ven] va] eos ve] ame co
5 perenne a cr a en Ta ase
} parece = ra] a ee Teme
fe fcr come 7 za v=] sea] a] = | ama eal nr
epee = wal n| ee) meee ze Tra ae
— . wenn] se asl we ame
= an] Te waa] oz ror)
. = = vara vans v0
“ea “emia aeDIRECT COST TOTAL Trae 1757038
cone Pet = wasn
Ast 5 nana
& ‘ana
‘200 ana]
& ers] 75000
o earn 6900800 |
& roa000| 1500000 |
aanal- | F nae): | g waa
18.00 6231070 | 1500 6331.7 | Aditoal tem of Work
extra work total
‘SUMMARY:
Propared by: Checked and Reviewed by: Orgttopoed at PHP. 41.245,980.00
Crk, fost Pa 12690000
‘ can ron. = Fi 309
Tecnlea Feltatr al Ergon
Needy
wi v
Aoproved By:on) aimee 17579838
& eap038|
= ‘992009
or Ea
e ers 675000 a
eee a ont eore 6,008.00 am]
a 3 ya Fes) @ oe000| 75,000.00 exam]
(NoIRECT COST TOTAL amar nrzeia0| asa
[EXTRA WORK No.4
sr. [Pive cna 1500 6331070] 1500) 6:31.07 | Acitonal tem of Work
SUMMARY:
Prepared by (Checked ard Reviewod by: tyra pane con PHP
Ca peed ote io anges oe
eed Ard Cot
ae wees PHP
Technical Facitator
Approved By: