You are on page 1of 2

SOP No. 4.

015

Title of SOP: Positive Pressure Monitoring

Original: Yes __ No __ Revision: Yes __ No __ Revision No.: _________


===============================================================
Related SOPs:

4.015.1 Cleanroom Positive Pressure Monitoring


4.015.2 Anteroom Positive Pressure Monitoring

Responsibility:

The pharmacist-in-charge is responsible for this procedure.

Purpose:

The purpose of this standard operating procedure is to ensure that the positive pressure is
working properly to facilitate the air exchanges needed.

Equipment/Supplies Required:

 Magnahelic gauge
 Positive Pressure Monitoring Log

Procedure:

The positive pressure will be checked and logged daily on the Positive Pressure Monitoring Log.

===============================================================
Approved by _______________________________________ Date _____________
Implemented by_____________________________________ Date_____________
Page 1 of 2
______________________________________________________________________________
Positive Pressure Monitoring Log

Cleanroom Anteroom
Magnahelic Pressure Magnahelic Pressure
Date Okay Okay Signature
Yes No Yes No

===============================================================
Approved by _______________________________________ Date _____________
Implemented by_____________________________________ Date_____________
Page 2 of 2

You might also like