You are on page 1of 25
The figures in the margin indicate full for the questions. PART - A Marks — 25 Answer all the questions. ; 1. Multiple choice questions : (Choose the correct answer). : (i) The insulation in a is provided to prevent (a) Current leakage (by Electric shock (c) Both (a) and (b) above Scanned with CamScanner ) That of supply } (c) Infinite (d) None of the above (iv) The main objectives of the foundations are @) to support the weight of the machine (b) to maintain the alignment of the machine (©) to provide firm for the machine s22(d) All of the above Scanned with CamScanner "(c) type of foundation (d) All of the above (vi) Shims are used (a) to align the final position of i (bY to adjust the gap between the motor foundation i (c) under the tooth of motor to raise the: (d) None of the above 5 (vii) A fuse element should have (a) low melting point ©) high melting point (c) very high melting point i (d) All-of the above Scanned with CamScanner ‘ (@) Alll of the above. (@&) For three phase : UP anore (@) vo earthing ie sonereu nm (b) one earthing is required tC) two earthings are required (d) None of the above (x) Earth resistance is kept low (b) by increasing the; electrodes * _ (¢) by inc! (4) All of the above Scanned with CamScanner , ii) The machinery must be kept 0+¢) moisture, humidity, and dirt, re Gili) Hex saw is ot ied for cutting, fi) The electric ‘power can bel ameatae Seen ue ‘ she Av) Three phase energy conductor has a terminals. (vi) In case of electrical plants, the buckets are filled with ¢+ °”* instead of water. (vii) Carbon tetrachloride extinguisher is used to extinguish the fire of tyre iG ar is (viii) Proper precautions can av" the accidents, — hod (ix) The basic function of a circuit breaker is to a oi Lee Pireosatiaslod ‘of electrical energy voltages is more economical. i iii) Pin type insulators are used upto 33 kV. y(iv) Drying out of the motor is not ne 4 before using. +(v) Megger is used for detection of earth leakage A current. ~ =~ ae PART -B Marks — 45 : Answer any three questions. 15x3=45 — 4. (a) Define maintenance. a (b) Give the classification of maintenance. 4 (c) Explain the methods of preventive maintenance and breakdown maintenance. 34356 (d) State the causes of prea, 4 63 Discuss the electrical test to be performed — before commissioning an et machine. Scanned with CamScanner ke oy With a neat diagram des resistance is measured. , - Ea. @ “What do you = shock ? What are aS as Q the tests to be performed in Jectrical. installation. : (b) Describe domestic e¢! 8. Write short notes on any three : (a) . Fire extinguisher is (6) Streamline purifier « i _ (©) Megger _@) Maintenance schedule of transmission. Scanned with CamScanner / (0) NJ DM “Full Marks Pass Marks = 28 4 Time — Three hours The figures in the margin in icate ‘fi for the questio ; Answer any five questions. 1. (a) Define the following : (i) Preventive maintenance ~ (ii) Scheduled maintenance (iii) Overhaul. (b) State the advantages of preventive mainte- nance. Ss 2. (a) Explain any five possible faults, their causes and remedies of D.C motors. (b) State and briefly explain the common in a transformer. Scanned with CamScanner - (b) Give the Rvfintenanis Biches of t for different rating of transformer. 4. @) Define earthing. Why it is important 2 242-4 (b) Explain a method of measurement of} ‘earth’ resistance. 12 (c) Giving complete specifications, draw @ figure for pipe earthing or plate earthing. 5 5. (a) What is a fire extinguisher ? Which type is suitable for electrical fire and why ? 4 (b) Describe a method of giving artificial respiration to a person who is a victim of electric shock. 5 (c) What are the precautions to be taken against _ electric shock ? ; 5 6. @ Tabulate the maintenance schedule for oil bk 5 circuit pia ee or air circuit breaker. Mee deeailne(2) 2 " soanned with CamScanner Bec: i: (a) Machine foundation for electrical installa (b) Polarisation Index (c) Maintenance schedule of induction motor : (d) Fire extinguishers. call Scanned with CamScanner Time — Three hours The figures in the margin indicate full for the questions. Answer any five questions. (a) Define electrical maintenance. Why it is 44 a. v necessary ? 4 om “ (b) Give the classification of maintenance. 4 (c) What is preventive maintenance ? aa (d) What do you mean by tools and tackles ? maintenance tools. State at least six possible faults, their causes | motors. 10549 am) Explain any five and remedies of AC. (b) Describe @ method of resistance. a measuring earth Scanned with CamScanner treatmént of transformer oil you ae eS ; ACG) What is earthing ? Why it is necessary? 4 ag ) Enumerate the factors that affect earth ah resistance. . 5 (©) Draw with complete specification the method of pipe earthing. a w 5. (a) Give the fnaintenance schedule of SF, circuit breaker. a (b) What do you mean by electric shock ? What Sy are the effects of electric shock 2 2+3=5 (c} Define polarization index 2 A 6 Describe in details about the foundation of "electrical machines. 14 26fELGO4N RIM @) pS Scanned with CamScanner e {iv) Testing of wire system (s) Air circuit breaker maintenance, — Scanned with CamScanner The figures in the margin indicate full marks for the equestions. : Answer any five questions. 1. (a) Write down the advantages of preventive © maintenance. 5 (b) Discuss the factors to be considered at the time of installation of transformer. 2, (a) Why éarthing is necessary ? Draw neat diagram of pipe earthing. pa. om (b) Write down the factors. affecting the earth a 5 4a resistance. a (c) Describe the points to be considered at the time of installation of earthing = Scanned with CamScanner (@) Desétibe the maintenance schedule overhead transmission line. “ae Z ’ (b) Discuss some faults, their causes and. © remedial measures of a dc motor. Tg 5. (a) What-are the tests; 40 be performed after installation of outdoor circuit breaker.? 7 ~~ (b) Drying out of insulation is essential: Why ? - 7 28 (c) What are the tests to be followed in drying out of a motor or a ‘generator ? $ 6. (a) Describe the tests to be performed in’ a domestic electrical installation. 6 (b) Write down the precautions to be taken against electric shock. 4 (c) Discuss the points to be taken into. consideration at the time of treatment of electric shock. i 4 Scanned with CamScanner ne extinguisher - (ii) Centrifugal purifier oe Scanned with CamScanner = (a) What are the che of transformer 2 : : (b) Describe the factors that should be t consideration at the time i transformer. ~ A Write short notes on any three : (a) Pipe earthing. former. for (b) Maintenance schedule of trans different rating of transformer. © (c) Foundation of electrical installation. a (a) Care or treatment of shocks. vai Scanned with CamScanner “The figures in the margin indicate f On for the questions. - PART-A Marks —25 Fill'in the blanks : " 1x10=10 (a) Earthing is the direct connection of all parts of electrical equipment to the general mass of earth. © (b) Common salt is added to soil during earthing to reduce in the insulating oil. heck the in (c) Crackle test is done to ¢ (GC) ie (e) The earth resist “ between is one type of oil purifier. ance of any earthing should _ for better performances. y used for fire 5 cs gas is most commonl (a fighting. ( Scanned with CamScanner @ The insulating material used in the transformer. calculates the safe operating 2. Answer in one sentence each Hl, 5x10=15 (a) What instrument do you use to measure earth resistance ? (6) What will be the minimum distance of the - « earth electrode from the installation for - proper earthing ? a (c) What is the strength of current which results x apainful shock ? (d) Write one effect of electric shock. -(e) What is the effect of dampness, humidity ete. < onthe machines? (f) Define maintenance. — (g) An AC induction motor works with reduced speed. Give one important cause of the fault. at aittad Or i F Scanned with CamScanner sam FAO Answer any, five questions. 3. (a) State the advantages of preventiy " _. maintenance. : (b) Write the preventive maintenance 9 \ transformers. 1 oie What is earthing ? P gl ‘Write down the factors affecting the catia resistance. fe) How earth resistance can be messin : . Describe: » 5 ; (4) What are the precautions to be taken wi : electric shocks ? ) What is fire extinguisher ? Which onl ; “Suitable for electrical fire and why ? Le ISA/EL-604/18q, a ray Tu Scanned with CamScanner The figures in thé margin indicate full n for the questions. . Answer any five questions. 1. (a) What do you mean by “preventive maintenance” ? 74 (b) What are the advantages of preventive maintenance ? Z, causes and remedies 2. State the probable faults, their 14 of A.C induction motors or D.C motors. arthing ? Discuss the different 3. (a) What is © factors that influence the earthing resistance. 6 (b) With a neat diagram, describe how om : resistance is measured. Scanned with CamScanner Per type of of! neat diagram. 5. (a) What are the precautions to be taken © prevent electric shock ? bi (b) Describe the treatment, you would like to give to an electrician who has received a electric shoke. : . j 6. (a) Write in brief about the different tests to be | carried out in a domestic electrical installation. _ / | / q (b) Tabulate the recommended maintenance 4 schedule in the case of induction motor. 7 7. Write short notes on any fwo : 2x7=14 (a) Fire extinguisher (b) Polarise Index (c) Meggar (Insulation testing) (d) Foundation of electrical installation. 69/E1-604/1&M Q) Scanned with CamScanner Pass Marks - 28 Time - Three hous The figures in the margin indicate full marks ” for the questions. Answer ail questions: 1. Fill in the blanks : 1x4=4 | (a) is required to keep an equipment in 4 + good condition. f a | (b) G I. pipe of 40 mm diameter is most commonly. used in domestic. electrical installation for the purpose of dded to soil during earthing — : (c) Common salt is a to reduce ———- ——— gas is most commonly used for fire“), * fighting. (@) ~ [Tumover — Scanned with CamScanner = (iv) Crackle test. 3. @>-Deserite the foundation given to a ven electrical machine. a Write the precautions taken before —a a rotating electrical machine. {c) Describe the procedure of loading and unloading of heavy electrical machine. 4 (a) As a store in-charge, how would you receive a power transformer from a supplier 2? 4 ow hat is earthing ? Why earthing is necessary ? 242=4 yy Write the maximum permissible earth resistance of big substation, medium sub- station, small substation and domestic installation. 4 _ (g) Describe a procedure to reduce earth resistance. 4 Shy Describe the testing procedure of a domestic electrical installation for open circuit fault. 4 8/EI-604/IM (2) Scanned with CamScanner Power transformer (b) Overhead transmission line (c) Oil circuit breaker. a af “Describe trouble shooting of a D.C motor. Or ; Name and describe shortly about fire fig equipments. 7. With diagram explain the construction and worki principle of a stream line oil purifier. Or What are the differeat types of maintenane Describe them. Which one is the best and wh 6+2: Scanned with CamScanner

You might also like