You are on page 1of 219

Tanggal/bulan Unit Hm awal Hm akhir Jumlah

7/27/2022 DT 18 5447.50 5454.50 7.0


DT 16 7275.0 7281.0 6.0
8/2/2022 Ex.47 (Luigong) 1379.0 1382.2 3.2
8/2/2022 DT 01/Algouzan 13:00 22:00 9 jam
DT 02/Algouzan 13:00 22:00 9 jam
8/3/2022 DT 01/Algouzan 16:00 18:00 2 jam
DT 02/Algouzan 16:00 18:00 2 jam
Ex.47 (Luigong) 1382.2 1387.5 5.3
8/4/2022 Ex.47 (Luigong) 1387.5 1396.6 9.1
DT 01/Algouzan 9:00 16:00 7 Jam
DT 02/Algouzan 9:00 20:00 11 jam
8/18/2022 Hyundai 340 33.5 39.5 6.0
8/19/2022 Hyundai 340 39.5 47.7 8.2
8/20/2022 Hyundai 340 47.7 54.9 10.2
8/22/2022 Hyundai 340 55.6 61.4 5.8
8/23/2022 Hyundai 340 61.4 68.4 7.0
8/24/2022 Hyundai 340 68.4
8/25/2022
Ket,Pkerjaan
Houling diponton/Bloro
Houling diponton/Bloro
General
Houling di amos/8 ret
Houling di amos/9 ret
Barging
Barging
Barging
Barging
Barging/32 ret
Barging/87 ret
Melipat ob pak jay
Melipat ob pak jay
Melipat ob Erovin
Melipat ob Erovin
Melipat ob Erovin
HASIL RITASE DRIVER DT PERTANGGAL
PERIODE BULAN 06 JULI S/D 06 AGUSTUS 2022 12 JULI S/D 20 AGUSTUS 2022

Tanggal pit Al- ritase pit


No Nama driver Pit e3
Pit 1b
Pit 2b10wAlgzIndAmos
3b 2 nama
no driver jumlah ritase
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 e3 1b 2b 10w Algz Ind Ams 3b Al-2
1 Budi harianto _ _ _ _ _ 5 4 _ _ _ _ 2 2 18 _ _ _ _ _ _ 4 _ 1 harianto
Budi 20 12 29 22 3 86 ret
2 Derryanto _ _ _ _ _ 8 _ _ _ _ _ 1 2 19 _ _ _ _ 4 _ 4 _ 2 19 3
Derryanto 22 51 41 6 142 ret
3 syukur _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 _ _ _ 3Syukur15 1 14 1 30 63 ret
4 Teguh joko yuwono _ _ _ _ _ _ 8 2 2 1 _ 11 3 _ _ _ _ _ _ _ _ 4Hendra 5 8 13 ret
5 Wandi _ _ _ _ _ 7 _ 7 3 2 _ _ 10 2 _ _ _ _ 6 3 1 18 5Wandi21 8 27 15 68 1 138 ret
6 M.Ikrar haqqi _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 9 _ 4 9 6
M.Ikrar 17 5
haqqi 18 51 1 92 ret
Jumlah

KET: pit e3 10w amos


pit 1b algozan pit 3b 9 PIT KM
pit 2b ind Al-2 Off E3 3.3
Pit 1b 2.6
Pit 2b 3.6
Pit 3 b 4.9
10 w 2.2
06 juli s/d 20 juli Algozan 6.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Pit E5(AMS
1 Budi harianto _ _ _ _ _ 5 4 _ _ _ _ 2 2 18 _ _ _ _ _ _ 4 _ Al-2 4.8
2 Derryanto _ _ _ _ _ 8 _ _ _ _ _ 1 2 19 _ _ _ _ 4 _ 4 _ Ind 0.6
3 syukur _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 _ _ _
4 Teguh joko yuwono _ _ _ _ _ _ 8 2 2 1 _ 11 3 _ _ _ _ _ _ _ _
5 Wandi _ _ _ _ _ 7 _ 7 3 2 _ _ 10 2 _ _ _ _ 6 3 1 18
6 M.Ikrar haqqi _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 9 _ 4 9

20 juli s/d 20 agustus


21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Budi harianto _ _ _ _ _ _ _ 3 _ _ _ 2 9 _ 2 6 _ _ _ 2 8 _ 5 3 8 _ 3 _ _ _ _ _ _ _ _ _ _
2 Derryanto 3 3 _ _ 6 _ _ 3 _ 20 3 9 _ 2 6 5 _ _ 18 9 _ 4 3 8 _ 2 _ _ _ _ _ _ _ _ _ _
3 syukur 1 _ _ _ _ _ _ _ _ _ 1 _ _ _ 5 6 _ _ 18 9 _ 4 2 7 _ 4 _ _ _ _ _ _ _ _ _ _
4 Hendra _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 _ _ 2 1 _ 3 _ _ _ 4 _ _ 1 1 1 2 _
5 Wandi 11 2 5 3 2 1 1 _ _ _ _ _ _ _ 6 8 6 13 4 7 _ _ 2 2 5 3 _ _ _ 5 1 _ 3 _ 1 3 _
6 M.Ikrar haqqi 9 3 4 6 1 1 1 _ _ _ _ _ _ 5 8 6 13 4 7 _ _ 2 1 6 4 _ _ _ 5 2 _ 6 _ 1 1 2

21 Agustus s/d 20 September 2022


Nama Driver 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Budi harianto _ 2 1 4 2 3 _ _ _ 7 _ 6 _ _ _ _ _ _ 2 _ _ _ _ 4 _ _ _ _ _ _ _ _
2 Derryanto 2 2 4 3 _ _ 2 1 4 9 _ _ _ _ 3 _ _ _ _ 4 _ 4 2 8 1 10 _ 4 _ _ _ _
3 syukur 1 _ 3 3 3 2 2 2 3 _ _ _ _ _ 5 _ _ _ _ 4 _ 3 2 7 _ 4 _ 3 _ _ _ _
4 Hendra 1 _ _ _ _ _ _ _ 6 _ _ 5 2 _ 2 3 _ _ 5 _ _ _ _ 4 _ 2 _ 2 _ 1 2 _
5 Wandi _ _ 4 _ _ _ _ _ 7 _ _ _ 1 2 _ 1 4 1 6 _ _ _ _ 4 _ 4 _ 2 _ _ 2 _
6 M.Ikrar haqqi _ _ 3 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 _ 2 _ _ _ _
7 A.Syahril.Z _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 _ 7 _ _ _ _ _ _
8 Rahman nudin.A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 _ _ _ _

21 September s/d 20 oktober 2022


Nama Driver 21 22 25 26 27 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Budi harianto _ 2 1 4 2 3 _ _ _ 7 _ 6 _ _ _ _ _ _ 2 _ _ _ _ 4 _ _ _ _ _ _ _ _
2 Derryanto 2 2 4 3 _ _ 2 1 4 9 _ _ _ _ 3 _ _ _ _ 4 _ 4 2 8 1 10 _ 4 _ _ _ _
3 syukur 1 _ 3 3 3 2 2 2 3 _ _ _ _ _ 5 _ _ _ _ 4 _ 3 2 7 _ 4 _ 3 _ _ _ _
4 Hendra 1 _ _ _ _ _ _ _ 6 _ _ 5 2 _ 2 3 _ _ 5 _ _ _ _ 4 _ 2 _ 2 _ 1 2 _
5 Wandi _ _ 4 _ _ _ _ _ 7 _ _ _ 1 2 _ 1 4 1 6 _ _ _ _ 4 _ 4 _ 2 _ _ 2 _
6 M.Ikrar haqqi _ _ 3 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 _ 2 _ _ _ _
7 A.Syahril.Z _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 _ 7 _ _ _ _ _ _
8 Rahman nudin.A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 _ _ _ _
JUMLAH RP
Rp.6.600
Rp.5.200
Rp.7.200
Rp.9.800
Rp.4.400
Rp.12.000

Rp.9600
Rp.1.200
HITUNGAN RITASE/KM HITUNGAN RITASE/KM
PERIODE 06 JULI S/D 20 JULI 2022 PERIODE 06 JULI S/D 20 JULI 2022
Budi harianto Derryanto
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
9 _ _ _ 4 _ 18 4 _ 7 _ _ _ 8 _
59,400 _ _ _ 28,800 _ 21,600 _ 46,200 _ _ _ 57,600 _

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 20 JULI S/D 20 AGUSTUS 2022 PERIODE 20 JULI S/D 20 AGUSTUS 2022
Budi harianto Derryanto
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
11 8 11 10 3 12 3 14

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 202
Budi harianto Derryanto
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
9 5 17 16 20

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S/D 20 OKTOBER 202
Budi harianto Derryanto
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
N RITASE/KM HITUNGAN RITASE/KM HITUNGAN RI
I S/D 20 JULI 2022 PERIODE 06 JULI S/D 20 JULI 2022 PERIODE 06 JULI S/
ryanto Syukur Wand
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan
19 4 _ 4 _ _ _ _ _ _ _ _ 17 _ _
22,800 _ 26,400 _ _ _ _ _ _ _ _ _ _

N RITASE/KM HITUNGAN RITASE/KM HITUNGAN RI


/D 20 AGUSTUS 2022 PERIODE 20 JULI S/D 20 AGUSTUS 2022 PERIODE 20 JULI S/D 2
ryanto Syukur Wand
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan
40 11 6 11 1 14 1 12 13 3

N RITASE/KM HITUNGAN RITASE/KM HITUNGAN RI


S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D
ryanto Syukur Wand
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan
26 16 17 14 13 7

N RITASE/KM HITUNGAN RITASE/KM HITUNGAN RI


ER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S
ryanto Syukur Wand
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan
HITUNGAN RITASE/KM HITUNGAN RITASE/KM
PERIODE 06 JULI S/D 20 JULI 2022 PERIODE 06 JULI S/D 20 JULI 2022
Wandi M.Ikrar haqqi
pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
2 9 _ 10 21 13 9
10,400 64,800 _ 12,000 85,800

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 20 JULI S/D 20 AGUSTUS 2022 PERIODE 20 JULI S/D 20 AGUSTUS 2022
Wandi M.Ikrar haqqi
pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
6 19 5 32 1 12 8 5 23 6 28 1

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


ERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022
Wandi M.Ikrar haqqi
pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
4 14 2 3 3

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


ERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022
Wandi M.Ikrar haqqi
pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
HITUNGAN RITASE/KM
PERIODE 06 JULI S/D 20 JULI 2022
Teguh joko yuwono
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
11 2 3 11
72,600 10,400 21,600 13,200

HITUNGAN RITASE/KM
PERIODE 20 JULI S/D 20 AGUSTUS 2022
Hendra
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
7 1 6 8

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022
Hendra A.Syahril.Z
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
12 5 18 7

HITUNGAN RITASE/KM HITUNGAN RITASE/KM


PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022
Hendra A.Syahril.Z
pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b
PIT
E3
Pit 1b
Pit 2b
Pit 3 b
10 w
Algozan
Pit E5(AMS
Al-2
Ind

N RITASE/KM HITUNGAN RITASE/KM


S/D 20 SEPTEMBER 2022 PERIODE 21 AGUSTUS S/D 20 SEPTEMBER 2022
ahril.Z Rahman nudin.A
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
7 3

N RITASE/KM HITUNGAN RITASE/KM


ER S/D 20 OKTOBER 2022 PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022
ahril.Z Rahman nudin.A
ind 1/2 pit e5-1/2 al-2 pit e3 10w algozan pit 1b pit 2b pit 3b ind 1/2 pit e5-1/2 al-2
KM JUMLAH RP
3.3 Rp.6.600
2.6 Rp.5.200
3.6 Rp.7.200
4.9 Rp.9.800
2.2 Rp.4.400
6.0 Rp.12.000

4.8 Rp.9600
0.6 Rp.1.200
STOCK BATU BARA BORNEO EMAS HITAM
BATU BARA MASUK KE STOCKFILE
PERIODE 06 JULI - 06 AGUSTUS 2022
Extra MN Jonggon
Tgl/Bulan Batu sisa Alghozan Pit e3(MN) Pit 10w(MN) Pit 1(DMS) Pit 2(DMS) Pit 3(DMS) Ponton(IND) Ponton(Bloro) Pit e5-1(amos) Pit e5-2(amos) Pit e5-3(amos) Room Al-2
AMOS AMOS

7/6/2022 2000+-mt 1.324,228 mt 109,800 mt 661,380 mt 153,570 mt 449,300 mt _ _ _ _ _ _ _ _ _

7/7/2022 2000+-mt 1.324,228 mt 414,650 mt 661,380 mt 153,570 mt 449,300 mt _ _ _ _ _ _ _ _ _

7/8/2022 2000+-mt 1.324,228 mt 526,520 mt 661,380 mt 331,320 mt 449,300 mt _ _ _ _ _ _ _ _ _

7/9/2022 2000+-mt 1.324,228 mt 547,770 mt 661,380 mt 331,320 mt 449,300 mt _ _ _ _ _ _ _ _ _

7/11/2022 2000+-mt 1.324,228 mt 604,020 mt 661,380 mt 331,320 mt 449,300 mt _ _ _ _ _ _ _ _ _

7/12/2022 2000+-mt 1.324,228 mt 671,830 mt 661,380 mt 331,320 mt 449,300 mt _ 267,330 mt _ _ _ _ _ _ _

7/13/2022 2000+-mt 1.324,228 mt 671,830 mt 661,380 mt 331,320 mt 781,170 mt _ 843,830 mt _ _ _ _ _ _ _

7/19/2022 2000+-mt 1.324,228 mt 1.021,010 mt 661,380 mt 331,320 mt 1.089,614 mt _ 843,830 mt _ 36,250 mt _ _ _ _ _

7/20/2022 2000+-mt 1.324,228 mt 1.095,570 mt 661,380 mt 331,320 mt 1.103,584 mt 57,380 mt 843,830 mt _ 522,89 mt _ _ _ _

7/21/2022 2000+-mt 1.324,228 mt 1.188,94 mt 661,380 mt 458,51 mt 1.217,164 mt 57,380 mt 843,830 mt _ 522,89 mt 318,000 mt _ _ _ _

7/22/2022 2000+-mt 1.324,228 mt 1.188,94 mt 661,380 mt 668,95 mt 1.418,254 mt 57,380 mt 843,830 mt _ 522,89 mt 318,000 mt _ _ _ _

7/23/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,254 mt 57,380 mt 843,830 mt _ 522,89 mt 327,34 mt _ _ _ 295,61 mt

7/24/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,254 mt 57,380 mt 843,830 mt _ 522,89 mt 329,61 mt _ _ _ 360,55 mt

7/25/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt _ 522,89 mt 360,57 mt _ 11,62 mt _ 360,55 mt

7/26/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt _ 522,89 mt 360,57 mt _ 13,86 mt 12,816 mt 360,55 mt

7/27/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 712,940 mt 522,89 mt 360,57 mt _ 13,86 mt 22,336 mt 360,55 mt

7/28/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 767,44 mt 522,89 mt 360,57 mt _ 13,86 mt 22,336 mt 360,55 mt

7/29/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 360,57 mt _ 13,86 mt 22,336 mt 402,36 mt

8/1/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 360,57 mt _ 13,86 mt 28,536 mt 402,36 mt

8/2/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 611,31 mt 107,170 mt 13,86 mt 28,536 mt 402,36 mt

8/4/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 611,31 mt 107,170 mt 13,86 mt 30,126 mt 402,36 mt

8/5/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.418,25 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 611,31 mt 553,51 mt 13,86 mt 30,126 mt 402,36 mt

8/6/2022 2000+-mt 1.324,228 mt 1.239,26 mt 661,380 mt 711,93 mt 1.975,822 mt 57,38 mt 843,830 mt 996,15 mt 522,89 mt 611,31 mt 554,7 mt 13,86 mt 30,126 mt 402,36 mt
Jumlah batu masuk/perhari Total

Sift.1(pit.e3=75,940) (pit.1b=153,570) (pit.2b=24,850)


4.698,278 mt
Sift.2(pit.2b=251,450)

Sift.1(pit.e3=304,850) 5.003,128 mt

Sift.1(pit.e3=111,870) (pit.1b=177,750) 5.292,748 mt

Sift.1(pit.e3=21,250) 5.313,998 mt

Sift.1(pit.e3=56,250) 5.370,248 mt

Sift.1(pit.e3=67.810) Sift.2(Ponton(IND)=267,330) 5.705,388 mt

Sift.1(Ponton(IND)=576,500) (pit 2b=107,060)


6.613,810 mt
Sift.2(pit.2b=174,810)
Sift.1(pit.e3=226,380) (pit 2b=132,590) (pit.e5-1,amos=36,250)
7.307,632 mt
Sift.2(pit.e3=122,800) (pit.2b=175,854)
Sift.1(pit.e3=74,560) (pit.e5-1=358,860) (pit.2b=13,970)
7.940,182 mt
Sift.2(pit.e5-1=127,780) (pit.3b=57,380)
Sift.1(pit e5-2=318,000) (pit e3=93,370)
8.592,322 mt
Sift.2(pit 1b=127,190) (pit 2b=113,580)

Sift.1(pit 1 b=210,440) (pit 2b=201,090) 9.003,852 mt

Sift.1(pit e3=50,320) (pit 1b=50,980) (Al-2=83,960) (extra MN=7,530)


9.410,102 mt
Sift.2(extra MN=1,810) (Al-2=211,650)

Sift.1(pit e5-2=2,270) (Al-2=64,940) 9.477,312 mt

Sift.1(pit e5-2=42,580) 9.511,888 mt

Sift.1(extra MN=2,250)
9.526,944 mt
Sift.2(Jonggon=12,816)

Sift.1(Bloro(Bll)=712,940) (Jonggon=9,520) 10.249,404 mt

Sift.1(Bloro(Bll)=54,500) 10.303,904 mt

Sift.1(Bloro(Bll)=228,710) (Al-2=41,810) 10.574,424 mt

Sift.2(Jonggon=6,200) 10.580,624 mt

Sift.1(Pit e5-2=250,740)
10.938,534 mt
Sift.2(Pit e5-3=107,170)

Sift.1(jonggon=1,590) 10.940,124 mt

Sift.1(Pit e5-3=198,300+1,900)
11.386,464 mt
Sift.2(Pit e5-3=246,140)
Sift.1(Pit 2b=291,102) (pit e5-3=1,190)
11.945,226 mt
Sift.2(Pit 2b=266,470)
STOCK BATU BAR
BATU BARA M
PERIODE 21 SEP

Tgl/Bulan/TahunPit E3(MN) Pit(DMS) Pit M.kaman (IND)Pit E5-1 (AMS) E5-4 (MN) Extra (MN)W1dg (IST) E5-1 (MJ)

9/21/2022 2290.5 1830.5 493.45 132.67 _ 113.09 2810.8 _

9/22/2022 2583.1 1928 493.45 132.67 1153.83 125.08 2979.2 _

9/23/2022 2780.1 2446.1 493.45 132.67 1153.83 139.99 3350 _

9/24/2022 2791.6 2484 493.45 132.67 1153.83 141.62 3503.5 _

9/25/2022 2791.6 2484 493.45 132.67 1153.83 141.62 3503.5 _

9/26/2022 971.55 1964 493.45 132.67 1153.83 147.2 2175.8 _

9/27/2022 971.55 2020.8 493.45 132.67 1153.83 147.2 2175.8 _

9/28/2022 971.55 2134.1 493.45 132.67 1153.83 147.2 2854.7 _

9/29/2022 971.55 2134.1 493.45 132.67 1153.83 147.2 2854.7 _

9/30/2022 1205.8 2134.1 493.45 132.67 1153.83 147.2 2854.7 _

10/1/2022 1374.1 2134.1 493.45 132.67 1153.83 149.33 3382.1 _

10/2/2022 1374.1 2134.1 493.45 132.67 1153.83 149.33 3382.1 _

10/3/2022 1374.1 2134.1 493.45 132.67 1153.83 149.33 3793.5 _

10/4/2022 _ 2225.5 493.45 _ _ _ 1281.2 _

10/5/2022 _ 2235 493.45 _ _ _ 1281.2 _

10/6/2022 _ 2235 493.45 _ _ _ 1281.2 _

10/7/2022 34.51 2235 493.45 _ _ _ 1281.2 _

10/8/2022 109.17 2235 493.45 _ _ 4.54 1281.2 _

10/9/2022 109.17 2235 493.45 _ _ 4.54 1281.2 _

10/10/2022 109.17 2319.6 493.45 _ _ 4.54 1488.3 _

10/11/2022 181.99 2319.6 493.45 _ _ 7.95 1505.9 _

10/12/2022 271.71 2319.6 493.45 _ _ 13.15 1505.9 _


10/13/2022 300.51 2319.6 493.45 _ _ 13.15 1505.9 _

10/14/2022 335.02 2319.6 493.45 _ _ 18.56 1505.9 _

10/15/2022 335.02 2476.15 493.45 _ _ 22.37 1712.44 _

10/16/2022 473.04 2587.5 493.45 _ _ 22.37 1827.37 _

10/17/2022 473.04 2587.5 493.45 _ _ 23.38 2570.74 _

10/18/2022 500.00 190.94 493.45 _ _ 10.952 _ _

10/19/2022 500.00 190.94 493.45 _ _ 10.952 _ _

10/20/2022 500.00 190.94 493.45 _ _ 10.952 _ _


STOCK BATU BARA BORNEO EMAS HITAM
BATU BARA MASUK KE STOCKFILE
PERIODE 21 SEPTEMBER - 20 OKTOBER

E5-2 (MJ) E5-3A (MJ) E5-3 (MJ) E5-4 (MJ) E5-5 (MJ)

627.23 159.5 513.37 1313.3 943.81

1256.1 159.5 513.37 1313.3 943.81

2062.2 _ _ 1632.84 _

2102.8 _ _ 1632.84 _

2102.8 _ _ 1632.84 _

1402.8 _ _ 1632.84 _

1477.8 _ _ 1632.84 _

2260.3 _ _ 1632.84 _

2260.3 _ _ 1632.84 _

2534.8 _ _ 1632.84 _

2534.8 _ _ 1632.84 _

2534.8 _ _ 1632.84 _

2534.8 _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _

_ _ _ 1632.84 _
445.49 _ _ 1632.84 _

557.72 _ _ 1632.84 _

746.22 _ _ 1632.84 _

1686.9 _ _ 1632.84 _

1686.9 _ _ 1632.84 _

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _
Batu Bara Masuk perhari Total

Sift 1 {E3=55,58} {ExtraMn=10,27} {W1dg=245,91} {E5-2=29,34} = 304,01


11,228.1
Sift 2 {E5-2=597,89} = 597,89
Sift 1 {E3=292,58} {Dms=97,5} {ExtraMn=11,99} {W1dg=168,39} = 570,46
12,542.8
Sift 2 {E5-2=628,83} = 628,83
Sift 1 {E3=151,75} {Dms=304,15} {ExtraMn=9,68} {W1dg=264,45} = 730,03
14,191.11
Sift 2 {E5-2=547,46} = 547,46

Sift 1 {E3=11,24} {Dms=37,9} {ExtraMn=1,63} {W1dg=153,54} {E5-2=40,61} =244,92 14,436.21

_ 14,436.21

Sift 1 {ExtraMn=5,58} {W1dg=42,3} = 47,88 9,504.09

Sift 1 {Dms=56,76} {E5-2=74,96} = 131,72 9,635.81

Sift 1 {Dms=113,3} {W1dg=678,88} {E5-2=782,57} = 1.574,75 11,210.6

_ 11,210.6

Sift 1 {E3=234,24} {W1dg=363,71} {E5-2=274,46} = 872,41


11,179
Sift 2 {W1dg=213,33} = 213,33

Sift 1 {E3=168,27} {ExtraMn=2,13} {W1dg=527,45} = 697,85 12,417.1

_ 12,417.1

Sift 1 {W1dg=411,36} = 411,36 12,828.5

_ 5,632.86

Sift 1 {Dms=9,53} = 9,53 5,642.39

_ 5,642.39

Sift 1 {E3=34,51} = 34,51 5,676.9

Sift 1 {E3=74,66} {ExtraMn=1,07} = 75,73


5,756.2
Sift 2 {ExtraMn=3,47} = 3,47

_ 5,756.2

Sift 1 {Dms=84,63} {W1dg=207,03} = 291,66 6,047.90

Sift 1 {E3=72,82} {W1dg=17,69} = 90,51


6,141.73
Sift 2 {ExtraMn=3,41} = 3,41

Sift 2 {E3=89,72} {ExtraMn=5,2} = 94,92 6,236.7


Sift 1 {E3=28,800} = 28,800
6710.94
Sift 2 {E5-2=445,490} = 445,490
Sift 1 {Extramn=5,410} {E3=34,510} = 39,92
6863.09
Sift 2 {E5-2=557,720} = 557,720
Sift 1 {ExtraMn=3,810} = 3,810
7418.49
Sift 2 {E5-2=168,500} {W1DGl01=202,540} {8B=156,550} = 527,59
Sift 1 {E3=57,940} {E5-2=298,880} {8B=111,350} = 467,17
8723.47
Sift 2 {W1DGL=102,930} {E5-2=641,800} {E3=80,080} =823,81
Sift 1 {W1DGL=408,640} {ExtraMn=1.010} {W1DGL01=196,980} = 606,63
9467.85
Sift 2 {W1DGL01=139,750} =139,750

Sift 2 {3B=190,940} = 190,940 1195.242

_ 1195.242

_ 1195.242
STOCK BATU BARA BORNEO EMAS HITAM
BATU BARA MASUK KE STOCKFILE
PERIODE 21 OKTOBER - 20 NOVEMBER

Tgl/Bulan/Tahun Sisa Stock Pit E3(MN) Pit(DMS)


Pit M.kaman (IND)
Pit E5-1 (AMS)E5-4 (MN) Extra (MN) W1dg (IST)

10/21/2022 500.000 _ 190.94 493.35 _ _ 10.952 _

10/22/2022 500.000 _ 190.94 493.35 _ _ 10.952 _

10/23/2022 500.000 _ 295.29 493.35 _ _ 10.952 _

10/24/2022 199.000 301.000 295.29 493.35 _ _ 10.952 _

10/25/2022 199.000 301.000 295.29 493.35 _ _ 10.952 _

10/26/2022 199.000 301.000 295.29 493.35 _ _ 10.952 _

10/27/2022 199.000 554.813 492.86 493.35 _ _ 10.952 142.500

10/28/2022 199.000 554.813 492.86 493.35 _ _ 10.952 142.500

10/29/2022 199.000 554.813 519.41 493.35 _ _ 10.952 142.500

10/30/2022 199.000 554.813 561.3 493.35 _ _ 10.952 473.100

10/31/2022 199.000 586.103 561.3 493.35 _ _ 10.952 643.050

11/1/2022 199.000 586.103 575.6 493.35 _ _ 10.952 734.100

11/2/2022 199.000 586.103 575.6 493.35 _ _ 10.952 734.100

10/3/2022 199.000 586.103 575.6 493.35 _ _ 10.952 1457.190

11/4/2022 199.000 613.293 575.6 493.35 _ _ 10.952 1457.190

11/5/2022 199.000 657.723 575.6 493.35 _ _ 10.952 1457.190

11/6/2022 199.000 657.723 575.6 493.35 _ _ 10.952 1457.190

10/7/2022 199.000 791.593 575.6 493.35 _ _ 10.952 1457.190

11/8/2022 199.000 791.593 773.06 493.35 _ _ 10.952 1457.190

11/9/2022 199.000 791.593 842.77 493.35 _ _ 10.952 1457.190


11/10/2022 199.000 791.593 870.98 493.35 _ _ 10.952 1457.190

11/11/2022 199.000 791.593 870.98 493.35 _ _ 10.952 1457.190

11/12/2022 199.000 926.823 870.98 493.35 _ _ 10.952 1457.190

11/13/2022 199.000 926.823 870.98 493.35 _ _ 10.952 1457.190

11/14/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/15/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/16/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/17/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/18/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/19/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190

11/20/2022 199.000 1000.973 870.98 493.35 _ _ 10.952 1457.190


MAS HITAM
OCKFILE
OVEMBER

W1dg (MN) E5-1 (MJ) E5-2 (MJ) E5-3 (MJ) E5-4 (MJ) E5-5 (MJ)

_ _ _ _ _ _

_ _ _ _ _ _

_ _ _ _ _ _

_ _ _ _ _ _

_ _ 233.8 _ _ _

_ _ 1510.62 _ _ _

_ _ 1793.3 _ _ _

_ _ 1793.3 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

_ _ 1945.14 _ _ _

165.51 _ 1945.14 _ _ _

295.400 _ 1945.14 _ _ _

450.110 _ 1945.14 _ _ _
505.540 _ 1945.14 _ _ _

532.270 _ 1945.14 _ _ _

532.270 _ 2138.74 _ _ _

532.270 _ 3152.65 _ _ _

532.270 _ 3168.56 _ _ _

532.270 _ 3168.56 _ _ _

532.270 _ 3236 _ _ _

532.270 _ 3236 _ _ _

532.270 _ 3236 _ _ _

532.270 _ 3939.08 _ _ _

532.270 _ 4279.932 _ _ _
Batu Bara Masuk perhari Total

1,195.242

1,195.242

Sift 1 {DMS=43,750} = 43,750


1,299.592
Sift 2 {DMS=60,600} = 60,600

1,299.592

Sift 1 {E5-2Mj=215,040} = 215,040


1,533.392
Sift 2 {E5-2MJ=18,760} = 18,760
Sift 1 (E5-2MJ=301,430} = 301,430
2,810.21
Sift 2 {E5-2MJ=975,39} = 975,39
Sift 1 {E3=115,983} {3B=28,960} {E5-2MJ=282,680} =427,623
3,686.775
Sift 2 {E3=137,830} {3B=168,610} {W1DGL=142,500} =448,94

3,686.775

Sift 1 {E5-2MJ=151,840} = 151,840


3,865.165
Sift 2 {E5-2MJ=32,120} {3B=26,550} = 58,67
Sift 1 {3B=41,890} {W1DGl=241,560} = 283,45
4,237.655
Sift 2 {W1DGL=89,040} = 89,040
Sift 1 {E3=21,870} = 21,870
4,438.895
Sift 2 {E3=9,420} {W1DGL=169,950} = 179,37
Sift 1 {3B=14,300} {W1DGL=91,050} = 105,35
4,544.245

4,544.245

5,267.335

5,294.525
Sift 2 {E3=27,190} = 27,190
Sift 1 {E3=35,020} = 35,020
5,338.955
Sift 2 {E3=9,410}= 9,410

5,338.955

Sift 1 {E3=122,130} = 122,130


5,638.335
Sift 2 {E3=11,740 } {WEST MN=165,510}
Sift 1 {2 UTARA=77,930} = 77,930
5,965.685
Sift 2 {2 UTARA=119,530} {WEST MN=129,890} = 249,42
Sift 1 {2 UTARA=28,040} {WEST MN=114,710} = 142,75
6,190.105
Sift 2 {2 UTARA KIRI=41,670} {WEST MN=40,000} = 81,67
Sift 1 {2 UTARA=28,210} {WEST MN=55,430} = 83,64
6,273.745

6,300.475
Sift 2 {WEST MN=26,730} = 26,730
Sift 1 {E5-2MJ=92,330} = 92,330
6629.305
Sift 2 {E3=135,230} {E5-2MJ=101,270} = 236,5
Sift 1 {E5-2MJ=505,900} = 505,900
7643.215
Sift 2 {E5-2MJ=508,010} = 508,010
Sift 1 {E3=74,150} {E5-2MJ=15,910} = 90,06
7733.275

7733.275

7800.715
Sift 2 {E5-2MJ=67,440} = 67,440

7800.715

7800.715

Sift 1 {E5-2MJ=17,390} = 17,390


8503.795
Sift 2 {E5-2MJ=685,69} = 685,69
Sift 1 {E5-2MJ=310,402} = 310,402
8844.647
Sift 2 {E5-2MJ=30,450} = 30,450
STOC
BA
PER

Tgl/Bulan/Tahun Sisa Stock Pit E3(MN) Pit(DMS) Pit M.kaman (IND)

Monday, November 21, 2022 199.000 1000.973 870.98 493.35

Tuesday, November 22, 2022 199.000 1000.973 870.98 493.35

Wednesday, November 23, 2022 180.552 608.773 81.08 493.35

Thursday, November 24, 2022 180.552 608.773 81.08 493.35

Saturday, November 26, 2022 180.552 608.773 81.08 493.35

Sunday, November 27, 2022 180.552 608.773 81.08 493.35

Monday, November 28, 2022 180.552 608.773 81.08 493.35

Tuesday, November 29, 2022 180.552 608.773 81.08 493.35

Wednesday, November 30, 2022 180.552 608.773 81.08 493.35

01 Desember 2022 180.552 608.773 247.06 493.35

02 Desember 2022 180.552 608.773 809.910 493.35

3 Desember 2022 180.552 608.773 1392.660 493.35

4 Desember 2022 180.552 608.773 2271.560 493.35

5 Desember 2022 180.552 608.773 2871.220 493.35

6 Desember 2022 180.552 608.773 3596.040 493.35

7 Desember 2022 180.552 608.773 3713.150 493.35

8 Desember 2022 180.552 608.773 3730.680 493.35

9 Desember 2022 180.552 608.773 3730.680 493.35

10 Desember 2022 180.552 608.773 3730.680 493.35

11 Desember 2022 180.552 608.773 3730.680 493.35

12 Desember 2022 180.552 608.773 3730.680 493.35

13 Desember 2022 180.552 608.773 3730.680 493.35


14 Desember 2022 180.552 608.773 3730.680 493.35

15 Desember 2022 180.552 608.773 3730.680 493.35

16 Desember 2022 180.552 608.773 3995.480 493.35

17 Desember 2022 180.552 608.773 4250.490 493.35

18 Desember 2022 180.552 608.773 4250.490 493.35

19 Desember 2022 180.552 608.773 4250.490 493.35

20 Desember 2022 180.552 608.773 4250.490 493.35


STOCK BATU BARA BORNEO EMAS HITAM
BATU BARA MASUK KE STOCKFILE
PERIODE 21 NOVEMBER - 20 DESEMBER

Pit E5-1 (AMS) E5-4 (MN) Extra (MN) West/south (MN/MJ) W1dg (IST) W1dg (MN)

_ _ 10.952 1457.190 532.27

_ _ 10.952 1457.190 532.27

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _

_ _ _ _ _

_ _ 1.660 _ _

_ _ 8.400 _ _

_ _ 10.250 _ 106.140

_ _ 16.110 _ 140.150

_ _ 16.110 _ 140.150

_ _ 19.700 _ 140.150

_ _ 19.700 52.420 _ 239.020

_ _ 19.700 145.960 _ 239.020

_ _ 19.700 556.070 _ 239.020

_ _ 19.700 556.070 _ 239.020

_ _ 19.700 556.070 _ 239.020

_ _ 25.280 734.360 _ 239.020

_ _ 25.280 734.360 _ 239.020


_ _ 25.280 734.360 _ 239.020

_ _ 30.820 767.180 _ 239.020

_ _ 30.820 1379.220 _ 239.020

_ _ 30.820 1379.220 _ 239.020

_ _ 30.820 1379.220 _ 239.020

_ _ 30.820 1379.220 _ 239.020

_ _ 30.820 1466.210 _ 239.020


E5-1 (MJ) E5-2 (MJ) E5-3 (MJ) E5-4 (MJ) E5-5 (MJ)

_ 4279.932 _ _ _

_ 4279.932 _ _ _

_ 557.832 _ _ _

_ 557.832 _ _ _

_ 557.832 _ _ _

_ 557.832 _ _ _

_ 1379.012 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _
_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 _ _ _

_ 1801.812 132.500 683.223 _

_ 1801.812 132.500 1816.563 _

_ 1801.812 132.500 1952.383 _

_ 1801.812 132.500 2207.633 _


Batu Bara Masuk perhari Total

8,844.647

8,844.647

1,921.587

1,921.587

1,921.587

1,921.587

Shift 1 {E5-2MJ=121,710} = 121,710


2,742.767
Shift 2 {E5-2MJ=699,470} = 699,470

3,165.567
Shift 2 {E5-2MJ=422,800} = 422,800

3,165.567

3,333.207
Shift 2 {2UTARA=165,980} {ExtraMN=1,660} = 167,64
Shift 1{2UTARA=310,150} = 310,150
3,902.797
Shift 2 {2UTARA=252,700} {ExtraMN=6,740} = 259,44
Shift 1 {2UTARA=157,460} = 157,460
4,593.537
Shift 2 {WEST MN=106,140} {Extra MN=1,850} {2UTARA=425,290} = 533,28
Shift 1 {2UTARA=270,520} {WEST MN=34,010} = 304,53
5,512.307
Shift 2 {STOCK ROOM=608,380} { Extra MN=5,860} = 614,24
Shift 1 {STOCKROOM(AG)=235,020} {STOCKROOM(AG,1)=298,010} = 533,03
6,111.967
Shift 2 {STOCKROOM(AG,1)=66,630} = 66,630
Shift 1 {3B=93,270} {2UTARA=272,240} = 365,51
6,840.377
Shift 2 {3B=359,310} = 359,310
Shift 1 {West MN=98,870} {Extra MN=32,720} {2UTARA=117,110} = 248,700
7,108.777

Shift 1 {2UTARA=17,350} {Extra MN=51,500} = 68,85


7,219.847
Shift 2 {Extra MN=42,040} = 42,040
Shift 1 {West MN=318,160} = 318,160
7,629.957
Shift 2 {West MN=111,650} = 111,650

7,629.957

7,629.957

Shift 1 {West/SouthMJ=178,290} {ExtraMN=5,580} = 183,87


7,813.827

7,813.827
7813.827

Shift 1 {WestMJ=17,760} {WestMN=15,060} {ExtraMN=5,540} = 38,86


7852.187

Shift 1 {WestSouthMN=373,680} = 373,680


8729.027
Shift 2 {WestSouthMN=68,990} {WestSouthMJ=169,370} {3B=264,800} = 503,16

9799.760
Shift 2 {E5-4MJ=683,223} {D.AG(DMS)=255,01} {E5-3MJ=132,500} = 1.070,773

10933.100
Shift 2 {E5-4MJ=1.070,733} = 1.070,733

11068.920
Shift 2 {E5-4MJ=135,820} = 135,820
Shift 1 {E5-4MJ=255,250} = 255,250
11411.160
Shift 2 {West/SouthMJ=86,990}
STOCK BATU BAR
BATU BARA MA
PERIODE 21 DES

Tgl/Bulan/Tahun Sisa Stock Scrub Pit E3(MN) Pit(DMS) Pit M.kaman (IND)

21 Desember 2022 _ _ 2059.995 463.350

22 Desember 2022 _ _ 2059.995 463.350

23 Desember 2022 _ _ 2059.995 463.350

24 Desember 2022 _ _ 2059.995 463.350

25 Desember 2022 _ _ 2059.995 463.350

26 Desember 2022 _ _ 2059.995 463.350

27 Desember 2022 _ _ 2059.995 463.350

28 Desember 2022 _ _ 2591.445 463.350

29 Desember 2022 _ _ 2591.445 463.350

30 Desember 2022 _ _ 2591.445 463.350

31 Januari 2022 _ _ 2591.445 463.350

01 Januari 2023 _ _ 2591.445 463.350

02 Januari 2023 _ _ 2591.445 463.350

03 Januari 2023 _ _ 2591.445 463.350

04 Januari 2023 _ _ 3306.815 463.350

05 Januari 2023 _ _ 3608.335 463.350

06 Januari 2023 _ _ 3608.335 463.350

07 Januari 2023 _ _ 3608.335 463.350

08 Januari 2023 _ _ 3608.335 463.350

09 Januari 2023 _ _ 3608.335 463.350

10 Januari 2023 _ _ 3608.335 463.350


10 Januari 2023 _ _ 3608.335 463.350

11 Januari 2023 _ _ 3608.335 463.350

12 Januari 2023 _ _ 4074.555 463.350

13 Januari 2023 _ _ 4074.555 463.350

14 Januari 2023 _ _ 4074.555 463.350

15 Januari 2023 _ _ 4074.555 463.350

16 Januari 2023 _ _ 4074.555 463.350

17 Januari 2023 _ _ 4074.555 463.350


STOCK BATU BARA BORNEO EMAS HITAM
BATU BARA MASUK KE STOCKFILE
PERIODE 21 DESEMBER - 20 JANUARI

Extra (MN) West (MN) West(MJ) E5 (MJ)

_ _ _ 886.695

_ _ 131.150 886.695

_ _ 131.150 1054.805

_ 84.790 176.170 1054.805

_ 84.790 176.170 1054.805

_ 138.120 176.170 2570.765

_ 138.120 176.170 2570.765

_ 138.120 176.170 3072.325

_ 278.260 176.170 3132.355

_ 324.490 176.170 3132.355

_ 324.490 348.640 3132.355

_ 324.490 348.640 3132.355

_ 425.160 348.640 3132.355

_ 425.160 438.460 3132.355

_ 563.090 521.710 3132.355

3.380 628.250 640.980 3132.355

6.860 628.250 640.980 4337.885

11.940 628.250 757.090 4821.925

11.940 628.250 757.090 4821.925

15.290 628.250 877.550 5292.685

15.290 769.350 877.550 5292.685


15.290 769.350 877.550 5292.685

22.140 769.350 877.550 5292.685

26.400 769.350 877.550 5292.685

29.930 769.350 877.550 6423.565

29.930 769.350 877.550 6423.565

29.930 769.350 877.550 6423.565

29.930 1006.680 877.550 6798.105

35.630 1053.700 877.550 6798.105


Batu Bara Masuk perhari Total

Shift 1 <WestMN=318,160> = 318,160


3,410.040

3,541.190
Shift 2 <WestMJ=131,150> = 131,150

3,709.300
Shift 2 <E5-4MJ=168,110> = 168,110

3,839.110
Shift 2 <WestMN=84,790> <WestMJ=45,020> = 129,810

3,839.110

Shift 1 <WestMN=53,330> <E5-4MJ=726,120> = 781,450


5,408.400
Shift 2 <E5-4MJ=789,840> = 789,840

5,408.400

Shift 1 <2UtaraDMS=221,010> = 221,010


6,441.410
Shift 2 <2UtaraDMS=310,440> <E5-5MJ=501,560> = 812,000
Shift 1 <E5-5MJ=60,030> <WestMN=140,140> = 200,170
6,641.580

Shift 1 <WestMN=46,230> = 46,230


6,687.810

Shift 1 <WestMJ=172,470> = 172,470


6,860.280

6,860.280

Shift 1 <WestMN=100,670> = 100,670


6,960.950

7,050.770
Shift 2 <WestMJ=89,820> = 89,820
Shift 1 <WestMJ=83,250> <WestMN=137,930> <Pit D.DMS=38,570> = 259,750
7,987.320
Shift 2 <Pit D.DMS=672,800> = 672,800
Shift 1 <Pit D.DMS=301,520> <WestMJ=119,270> = 420,790
8,476.650
Shift 2 <ExtraWestMN=3,380> <WestMN=65,160> = 68,540
Shift 1 <E5-5MJ=252,980> = 252,980
9,685.660
Shift 2 <E5-5MJ=952,550> <ExtraWestMN=3,480> = 956,030
Shift 1 <westMJ=116,110> = 116,110
10,290.890
Shift 2 <ExtraAmos=3,220> <E5-5MJ=484,040> <Extrawest=1,860> = 489,120

10,290.890

Shift 1 <E5-5MJ=238,320> <WestMJ=120,460> = 358,780


10,885.460
Shift 2 <E5-5MJ=232,440> <ExtraMJ=3,350> = 235,790

11,026.560
11,026.560
Shift 2 <WestMN=141,100> = 141,100
Shift 1 <ExtraMJ=3,420> <ExtraWestMN=3,430> = 6,850
11,033.410

Shift 1 <2UtaraDMS=466,220> <ExtraMJ=4,260> = 470,480


11503.890

Shift 1 <ExtraWestMN=3,530> <E5-4MJ=395,410> = 398,940


12638.300
Shift 2 <E5-4MJ=735,470> = 735,470

12638.300

12638.300

Shift 1 <E5-4MJ=122,240> = 112,240


13250.170
Shift 1 <E5-4MJ=262,300> <WestMN=237,330> = 499,630
Shift 1 <WestMN=47,020> <ExtraMJ=5,700> = 52,720
13302.890
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN JUNI S/D JULI 2022(Budi harianto)

Tgl/Bulan Kode unit SPL Hm awal Hm akhir Jumlah jam Keterangan pekerjaan
7/6/2022 DT.205 6 jam 25482.7 25496.0 13.3 Houling coal,pit e3,pit 1b,pit 2b/SPL
7/7/2022 _ _ _ _ _ Stanbay ready/Sift 2
7/8/2022 DT.205 _ _ _ _ Stanbay ready/Sift 2
7/9/2022 _ _ _ _ _ Off
7/10/2022 _ _ _ _ _ Off/Idul Adha
7/11/2022 DT.205 _ 25510.0 25512.5 2.5 Houling coal di e3
7/12/2022 DT.205 _ 25512.5 25513.6 1.1 Houling cool di e3
7/13/2022 DT.205 _ 25517.1 25525.4 8.3 Houling coal di ponton
7/14/2022 _ _ _ _ _ Stanbay ready/Sift 1
7/15/2022 _ _ _ _ _ Stanbay ready/Sift 1
7/16/2022 _ _ _ _ _ Stanbay ready/Sift 1
7/17/2022 _ _ _ _ _ Off
7/18/2022 _ _ _ _ _ Stanbay/Sift 2
7/19/2022 _ _ _ _ _ Stanbay/Sift 2
7/20/2022 DT.205 _ 25547.6 25550.0 2.4 Houling di pit e5-1
TOTAL 27,6 jam
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN JULI S/D AGUSTUS 2022(Dwiwanto)

Jumlah
Tgl/Bulan Kode unit SPL Hm awal Hm akhir Keterangan pekerjaan
jam
7/21/2022 Hyundai _ 374.8 382.0 7.2 Cleanning,getting/loading di e3
7/22/2022 Hyundai 1 jam 382.0 390.8 8.8 Sidecast/cleanning/SPL
7/23/2022 Hyundai 390.8 395.9 5.1 Loading/Breakdown
7/24/2022 EX.201 3 jam 22202 22205 3.0 Crushing coal/SPL
7/25/2022 _ _ _ _ _ Stanbay
7/26/2022 Hyundai _ 395.9 403.7 7.8 Cleanning coal
7/27/2022 Hyundai 5 jam 403.7 415.0 11.3 Travel dri e3 ke jetty/loading ponton/SPL
7/28/2022 Hyundai _ 415.0 419.2 4.2 Loading ponton
7/29/2022 Hyundai _ 419.2 425.1 5.9 Loading ponton/perapian stockfile
7/30/2022 _ _ _ _ _ Off/1 Muharam
7/31/2022 Hyundai 5 jam 13:00 17:00 4 jam 375/SPL
01/08/2022 Hyundai 2 jam 425.1 432.9 7.8 perapian distockfile dan persiapan barging/SPL
02/08/2022 Hyundai 5 jam 432.9 442.8 9.9 General dan melambungkan coal/SPL
03/08/2022 Hyundai 4 jam 442.8 452.3 9.5 Barging,/SPL
04/08/2022 Hyundai 8 jam 452.3 465.9 13.6 Barging,/SPL
05/08/2022 Hyundai 6 jam 465.9 478.2 12.3 Merapikan dan melambungkan batu/SPL
06/08/2022 Hyundai 3 jam 478.2 487.2 9.0 Sidecast dpit e3/SPL
07/08/2022 Hyundai 11 jam 487.2 498.4 11.2 Sidecast dpit e3/SPL
08/08/2022 Hyundai 3 jam 498.4 507.0 8.6 Sidecast dpit e3/SPL
09/08/2022 Hyundai 3 jam 507.0 515.7 8.7 Loading di pit e3
10/08/2022 Hyundai 2 jam 515.7 519.7 4.0 Servis/perbaikn telkit DT/SPL
11/08/2022 Hyundai 6 jam 519.7 532.8 13.1 Sidecast,cleanning,Getting/SPL
12/08/2022 Hyundai 7 jam 532.8 544.9 12.1 Loading,travel ke jetty dan loading ponton/SPL
13/08/2022 Hyundai _ 544.9 547.9 3.0 Sidecast
Hyundai 15 jam 547.9 553.9 6.0 Sidecast/SPL
14/08/2022
SANY.02 5 jam 660.2 665.2 5.0 Loading ponton/SPL
15/08/2022 Hyundai 1 jam 553.9 562.0 8.1 Sidecast/SPL
16/08/2022 Hyundai 3 jam 562.0 570.2 8.2 Loading di pit e3/SPL
17/08/2022 Hyundai 8 jam 570.2 576.2 6.0 Sidecast dan Cleanning,Loading di pit e3/SPL
18/08/2022 Hyundai 1 jam 576.2 582.5 6.3 Sidecast,cleanning/SPL
19/08/2022 Hyundai 2 jam 582.5 588.4 5.9 Cleanning,Loading/SPL
20/08/2022 Hyundai 1 jam 588.4 594.8 6.4 Cleanning,Loading/SPL
TOTAL 110 jam 232.0
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 AGUSTUS S/D 20 SEPTEMBER 2022(A.Mubaid)
(OPERATOR DOZER)
Jumlah
Hari/Tgl/Bulan Kode unit SPL Hm awal Hm akhir Keterangan pekerjaan
jam
Minggu,21/08/22 _ _ _ _ _ Off
Senin,22/08/22 DZ.004 3 jam 20791.0 20798.8 7.7 Dozing jln houling/SPL
Selasa,23/08/22 DZ.004 5 jam 20798.7 20807.7 9.0 Dozing distockfile,dozing jln amos/SPL
Rabu,24/08/22 DZ.004 1 jam 20812.7 20820.7 8.0 Dozing distockfile,jln amos/SPL
Kamis,25/08/22 DZ.004 _ 20820.7 20828.7 8.0 Dozing batu di stockfile
Jum"at,26/08/22 DZ.004 8 jam 20828.7 20839.7 11.0 Dozing batu di stockfile/SPL
Sabtu,27/08/22 Bomax 106 _ 439 443 4.0 Memadatkan stockfile dan jln amos
Minggu,28/08/22 _ _ _ _ _ Off
Senin,29/08/22 DZ.004 4 jam 20843.7 20850.7 7.0 Dozing batu di stockfile dan perbaikan jln Houling/Spl
Selasa,30/08/22 DZ.004 _ 20850.7 20857.7 7.0 Melambungkan dan merapikan coal/skrap jln houling
Rabu,31/08/22 DZ.004 8 jam 20857.7 20867.8 10.1 Merapikan jln houling/SPL
Kamis,01/09/22 _ _ _ _ _ Stanbay sift 2
Jum"at,02/09/22 _ _ _ _ _ Stanbay sift 2
Sabtu,03/09/22 DZ.004 2 jam 20876.8 20884.8 8.0 Merapikan stockfile dan jalan houling/Spl
Minggu,04/09/22 DZ.004 4 jam 20884.8 20888.8 4.0 Dozing distockfile dan jln houling/SPL
Senin,05/09/22 _ _ _ _ _ Stanbay sift 2/Breakdown
Selasa,06/09/22 _ _ _ _ _ Stanbay sift 2/Breakdown
Rabu,07/09/22 EX.201 2 jam 22440 22449 9.0 Crushing coal dan merapikan stockfile/SPL
Kamis.08/09/22 Bomax 106 2 jam 498 507 9.0 Memadatkan areal stockfile dan jln Houling
Jum'at,09/09/22 _ _ _ _ _ Stanbay sift 2/Breakdown
Sabtu,10/09/22 Bomax 106 1 jam 511 519 8.0 Memadatkan areal stockfile dan jln Houling/Spl
Minggu,11/09/22 Bomax 106 3 jam 519 522 3.0 Memadatkan arel jln houling/Spl
Senin,12/09/22 Bomax 106 2 jam 522 528 6.0 Memadatkan jln houling pit 10w sampe ke pit amos/Spl
Selasa,13/09/22 DZ.004 _ _ _ _ Stanbay shif 1/Breakdown
Rabu,14/09/22 EX.201 _ 22493 22495 2.0 Perbaikan stock file mengalirkan air yg tergenang
Kamis,15/09/22 Hyundai 134 1 jam 25.8 33.8 8.0 Mentenen Areal stock fail dan jln houling ke pit amos/Spl
Jumat,16/09/22 Hyundai 134 33.8 42.2 8.4 Mentence area stockfile
Sabtu,17/09/22 Hyundai 135 4 jam 10.9 18.1 7.2 Trevel dan perbaikan jalan/spl
Minggu,18/09/22 Hyundai 134 10 jam 16.9 24.6 7.7 Perbaikan jalan houling area west hyundai 136
Senin,19/09/22 Hyundai 136 _ 60.9 68.8 7.9 General
Selasa,20/09/22 Hyundai 134 _ 68.8 70.8 2.0 General
TOTAL
60 jam 161.1
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (A.MUBAID
(OPERATOR DOZER)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu,21/09/22 Hyundai 134 _ 79.6 85.5 5.9
Kamis,22/09/22 Hyundai 134 _ 91.2 98.3 7.1
Jumat,23/09/22 Hyundai 134 _ 102.6 109.6 7.0
Sabtu,24/09/22 _ _ _ _ _
Minggu,25/09/22 Hyundai 134 14.0 38.5 50.2 11.7 Loading
Senin,26/09/22 Hyundai 340 4.0 50.2 56.9 6.7
Selasa,27/09/22 Hyundai 134 _ 139.7 146.7 7.0
Rabu,28/09/22 _ _ _ _ _
Kamis,29/09/22 Hyundai 134 149.8 151.8 2.0
Jumat,30/09/22
Sabtu,01/10/22 Hyundai 134 _ 158.8 165.0 6.2
Minggu,02/10/22 _ _ _ _ _
Senin,03/10/22 Hyundai 134 7.0 165.0 177.5 12.5
Selasa,04/10/22 Hyundai 134 7.0 177.5 187.9 10.4
Rabu,05/10/22 _ _ _ _ _
Kamis,06/10/22 _ _ _ _ _
Jumat,07/10/22 Hyundai 134 _ 195.0 201.1 6.1
Sabtu,08/10/22 Hyundai 134 7.0 207.1 215.1 8.0
Minggu,09/10/22 _ _ _ _ _
Senin,10/10/22 Hyundai 134 _ 215.1 219.3 4.2
Selasa,11/10/22 Hyundai 134 _ 225.3 231.0 5.7
Rabu,12/10/22 DZ 004 _ 21057.8 21063.8 6.0
Kamis,13/10/22 DZ 004 _ 21069.8 21076.8 7.0
Jumat,14/10/22 DZ 004 4.0 21083.8 21093.8 10.0
Sabtu,15/10/22 DZ 004 7.0 21093.8 21106.8 13.0
minggu,16/10/22 Hyundai 340 14.0 95.3 108.3 13.0
Senin,17/10/22 Hyundai 340 _ 108.3 112.3 4.0
Selasa,18/10/22 _ _ _ _ _
Rabu,19/10/22 _ _ _ _ _
kamis,20/10/22 DZ 004 7.0 21122.8 21128.8 6.0

TOTAL 71.0 159.3

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (BUDI HARIAN
(OPERATOR ALLU CRUS (ECXA)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam
Bomax 106 _ 584 586 2.0
Rabu,21/09/22
Allu EX 201 _ 22535 22539 4.0
Kamis,22/09/22 EX 201 _ 22543 22550 7.0 C
Jumat,23/09/22 Bomax 106 _ 600 607 7.0
Sabtu,24/09/22 _ _ _ _ _
Minggu,25/09/22 DT Sper/12 14.0 7:00 23:00 14.0
Senin,26/09/22 DT 12 _ 7:00 15:00 7.0
Selasa,27/09/22 _ _ _ _ _
Rabu,28/09/22 Allu EX 201 _ 22550 22556 6.0
Kamis,29/09/22 Allu EX 201 _ 22569 22576 7.0
Jumat,30/09/22 Allu EX 201 _ 22576 22583 7.0
Sabtu,01/10/22 Allu EX 201 1.0 22590 22598 8.0
Minggu,02/10/22 _ _ _ _ _
Senin,03/10/22 Allu EX 201 _ 22610 22617 7.0
Selasa,04/10/22 Allu EX 201 _ 22624 22631 7.0
Rabu,05/10/22 _ _ _ _ _
Kamis,06/10/22 _ _ _ _ _
Hyundai 340 _ 84.7 86.1 1.4 Mel
Jumat,07/10/22
Allu EX 201 _ 22640 22645 5.0 Crush
Sabtu,08/10/22 Allu EX 201 7.0 22650 22654 4.0
Minggu,09/10/22 _ _ _ _ _
Senin,10/10/22 _ _ _ _ _
Selasa,11/10/22 Allu EX 201 _ 22657 22664 7.0
Rabu,12/10/22 Allu EX 201 _ 22669 22676 7.0
Kamis,13/10/22 Allu EX 201 _ 22683 22690 7.0
Jumat,14/10/22 Allu EX 201 _ 22697 22702 5.0
Allu EX 201 _ 22702 22709 7.0
Sabtu,15/10/22
DT 101 7.0 15:00 23:00 7.0
minggu,16/10/22 Allu EX 201 8.0 22721 22729 8.0
Senin,17/10/22 Allu EX 201 _ 22736 22739 3.0
Selasa,18/10/22 Allu EX 201 _ 22739 22746 7.0
Rabu,19/10/22 _ _ _ _ _
kamis,20/10/22 _ _ _ _ _

TOTAL 37 151

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (WANDI)
(DRIVER DT.103
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu,21/09/22 DT 103 _ 15:00 23:00 7.0 Houling
Kamis,22/09/22 DT 103 _ 15:00 17:00 2.0
Jumat,23/09/22 DT 103 _ 15:00 23:00 7.0
Sabtu,24/09/22 _ _ _ _ _
Minggu,25/09/22 DT 103 7.0 7:00 15:00 7.0
Senin,26/09/22 DT 103 _ 7:00 12:00 5.0
Selasa,27/09/22 DT 103 _ 7:00 15:00 7.0
Rabu,28/09/22 _ _ _ _ _
Kamis,29/09/22 _ _ _ _ _
Jumat,30/09/22 DT 103 _ 7:00 15:00 7.0 Angkut O
Sabtu,01/10/22 DT 103 _ 7:00 15:00 7.0 Angkut OB
Minggu,02/10/22 _ _ _ _ _
Senin,03/10/22 DT 103 _ 15:00 23:00 7.0
Selasa,04/10/22 DT 103 _ 15:00 23:00 7.0
Rabu,05/10/22 DT 103 _ 16:00 21:00 4.0
Kamis,06/10/22 _ _ _ _ _
Jumat,07/10/22 DT 103 _ 15:00 23:00 7.0 A
Sabtu,08/10/22 DT 103 7.0 15:00 23:00 7.0 Angkut O
Minggu,09/10/22 _ _ _ _ _
Senin,10/10/22 _ _ _ _ _
Selasa,11/10/22 DT 103 _ 7:00 15:00 7.0
Rabu,12/10/22 _ _ _ _ _
Kamis,13/10/22 DT 103 _ 7:00 15:00 7.0
Jumat,14/10/22 DT 103 _ 7:00 15:00 7.0 Angkut O
Sabtu,15/10/22 DT 103 _ 7:00 15:00 7.0
minggu,16/10/22 DT 101/103 14.0 7:00 23:00 14.0
Senin,17/10/22 DT 103 _ 15:00 23:00 3.0
Selasa,18/10/22 _ _ _ _ _
Rabu,19/10/22 _ _ _ _ _
kamis,20/10/22 DT 103 _ 15:00 23:00 7.0 A

TOTAL 28 133.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (AGUS SUYON
(OPERATOR EXCA)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu,21/09/22 EX 134 _ 70.8 79.6 8.8
Kamis,22/09/22 Hyundai 134 _ 85.5 91.2 5.7
Jumat,23/09/22 Hyundai 134 _ 98.3 102.6 4.3 Perbaikan
Sabtu,24/09/22 Hyundai 134 _ 109.6 114 4.4
Minggu,25/09/22 Hyundai 134 14.0 114 125.1 11.1
Senin,26/09/22 Hyundai 134 4.0 125.1 132.7 7.6
Selasa,27/09/22 Hyundai 134 _ 132.7 139.7 7.0
Rabu,28/09/22 EX 134 _ 146.7 149.8 3.1
Kamis,29/09/22 _ _ _ _ _
Jumat,30/09/22 134 _ 151.8 158.8 7.0
Sabtu,01/10/22 Loader 220 _ 14.5 19.5 5.0
Minggu,02/10/22 _ _ _ _ _
Senin,03/10/22 Loader 220 7.0 19.5 33.5 14.0
Selasa,04/10/22 Loader 220 _ 36.4 42.4 6.0
Rabu,05/10/22 Hyundai 134 _ 188.0 192.0 4.0
Kamis,06/10/22 _ _ _ _ _
Jumat,07/10/22 Hyundai 134 _ 192.0 195.0 3.0
Sabtu,08/10/22 Hyundai 134 7.0 201.1 207.1 6.0
Minggu,09/10/22 _ _ _ _ _
Senin,10/10/22 Hyundai 134 _ 219.3 225.3 6.0
Selasa,11/10/22 Hyundai 134 _ 231.0 234.0 3.0
Rabu,12/10/22 Hyundai 134 _ 234.0 241.7 7.7
Hyundai 134 _ 241.7 248.7 7.0
Kamis,13/10/22
Loader 220 _ 74.9 78.6 3.7
Jumat,14/10/22 Hyundai 134 4.0 248.7 258.7 10.0 Gener
Sabtu,15/10/22 Hyundai 134 7.0 258.7 269.7 11.0
minggu,16/10/22 Hyundai 134 14.0 269.7 282.0 12.3
Senin,17/10/22 Hyundai 134 _ 282.0 289.0 7.0
Selasa,18/10/22 _ _ _ _ _
Rabu,19/10/22 Hyundai 134 _ 289.0 290.0 1.0
kamis,20/10/22 Hyundai 134 7.0 290.0 298.5 8.5

TOTAL 64 174
ARYAWAN
OBER 2022 (A.MUBAID)

Keterangan Pekerjaan Hari/Tgl/Bulan

General Rabu,21/09/22
General Kamis,22/09/22
General Jumat,23/09/22
Stand By Sabtu,24/09/22
Loading coal lanjut dozen coal di stockfile Minggu,25/09/22
Loading coal / Barging Senin,26/09/22
_ Selasa,27/09/22
Stand By Rabu,28/09/22
Melambungkan Coal Kamis,29/09/22
Jumat,30/09/22
General Sabtu,01/10/22
Off Minggu,02/10/22
Barjing Senin,03/10/22
Barjing Selasa,04/10/22
Stand By Rabu,05/10/22
Stand By Kamis,06/10/22
General Jumat,07/10/22
General Sabtu,08/10/22
Off Minggu,09/10/22
General Senin,10/10/22
General Selasa,11/10/22
Mentenen Jalan Rabu,12/10/22
Mentenen Jalan Houling Kamis,13/10/22
Mentenen Jalan Jumat,14/10/22
Mentenen StockFile Sabtu,15/10/22
Loading Barjing minggu,16/10/22
Senin,17/10/22
Stand By Selasa,18/10/22
Stand By Rabu,19/10/22
OB/Mentenen Jalan kamis,20/10/22

TOTAL

ARYAWAN
R 2022 (BUDI HARIANTO)
XA)

Keterangan Pekerjaan Hari/Tgl/Bulan

Merapikan stockfile Rabu,21/09/22


Crushing E3+E5-2 MJ Kamis,22/09/22
Crushing coal pit 2B dan 10W Jumat,23/09/22
_ Sabtu,24/09/22
Stand By
Minggu,25/09/22
Loading Coal
Barging Senin,26/09/22
Stand By Selasa,27/09/22
Crushing Coal sper DT 25 Rabu,28/09/22
Crushing Coal Kamis,29/09/22
Crushing Coal Jumat,30/09/22
Crushing Coal Sabtu,01/10/22
Off Minggu,02/10/22
Crushing Coal Barjing Senin,03/10/22
Crushing Coal Selasa,04/10/22
Stand By Rabu,05/10/22
Stand By Kamis,06/10/22
Melambungkan Coal Batu Mansur Jumat,07/10/22
Crushing E3 Dan Melambungfkan Batu Sabtu,08/10/22
Perapian StockFile Minggu,09/10/22
Off Senin,10/10/22
Stand By Selasa,11/10/22
Crushing Coal Rabu,12/10/22
Crushing Coal Kamis,13/10/22
Crushing Coal Jumat,14/10/22
Crushing Coal Sabtu,15/10/22
Crushing Coal minggu,16/10/22
Barjing Senin,17/10/22
Crushing Coal Barjing Selasa,18/10/22
Crushing Coal Rabu,19/10/22
Crushing Coal kamis,20/10/22
Stand By
TOTAL
Stand By

ARYAWAN
TOBER 2022 (WANDI)

Hari/Tgl/Bulan
Hari/Tgl/Bulan
Keterangan Pekerjaan
Rabu,21/09/22
Houling coal E3 Dan Houling coal pit amos Kamis,22/09/22
Houling coal 10W/Hujan Jumat,23/09/22
Houling coal pit amos/E3 Sabtu,24/09/22
Stand By Shift 2 Minggu,25/09/22
Barging Senin,26/09/22
Barging Selasa,27/09/22
Angkut OB timbun jalan Rabu,28/09/22
Stand By Shift 1 Kamis,29/09/22
Stand By Shift 1 Jumat,30/09/22
Angkut OB Timbun jalan dan Houling Coal E3 Sabtu,01/10/22
Angkut OB Timbun Jalan Lanjut Houling Coal E3 Minggu,02/10/22
Off Senin,03/10/22
Barjing Selasa,04/10/22
Barjing Rabu,05/10/22
Angkut OB Kamis,06/10/22
Stand By Shift 2 Jumat,07/10/22
Angkut OB Houling coal E3 Sabtu,08/10/22
Angkut OB dan Laminating Jalan Houling E3 Minggu,09/10/22
Off Senin,10/10/22
Stand By Shift 1 Selasa,11/10/22
Houling coal E3 Rabu,12/10/22
Stand By Shift 1 Kamis,13/10/22
Houling E3 Jumat,14/10/22
Angkut Ob timbun Jalan Dan Houling Coal E3 Sabtu,15/10/22
OB Dan Barjing minggu,16/10/22
Barjing Senin,17/10/22
Houling West 10 Selasa,18/10/22
Stand By Shift 2 Rabu,19/10/22
Stand By Shift 2 kamis,20/10/22
Angkut OB Laminating Jalan

TOTAL

ARYAWAN
ER 2022 (AGUS SUYONO)

Hari/Tgl/Bulan
Keterangan Pekerjaan
Rabu,21/09/22
Melambungkan coal Kamis,22/09/22
Melambungkan Batu Bara Jumat,23/09/22
Perbaikan jalan dan melambungkan batu bara Sabtu,24/09/22
General Minggu,25/09/22
Loading coal Senin,26/09/22
Barjing Selasa,27/09/22
General Rabu,28/09/22
General Kamis,29/09/22
Stand By Jumat,30/09/22
lambungkan coal / General Sabtu,01/10/22
Lambung Coal Minggu,02/10/22
Off Senin,03/10/22
Barjing Selasa,04/10/22
Barjing Rabu,05/10/22
Melambungkan Coal Kamis,06/10/22
Stand By Jumat,07/10/22
General Sabtu,08/10/22
General Bikin Tanggul Minggu,09/10/22
Off Senin,10/10/22
General Selasa,11/10/22
Pelebaran Tanggul Rabu,12/10/22
Merapikan Jalan Coal
Kamis,13/10/22
Perbaikan StockFile
Lambung Batu Jumat,14/10/22
General Perbaikan Jalan Dan Tanggul
Sabtu,15/10/22
Barjing
Barjing minggu,16/10/22
Barjing Senin,17/10/22
Stand By Selasa,18/10/22
General Rabu,19/10/22
OB/General Jalan Houling kamis,20/10/22

TOTAL
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (ASPIANTO)
(OPERATOR ALLU CRUSHING(EXCA)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan
Jam
Rabu,21/09/22 EX 201 _ 22529 22535 6.0 Crushin
Kamis,22/09/22 EX 201 _ 22539 22543 4.0 Crushin
Jumat,23/09/22 EX 201 _ 22550 22556 6.0 Crushin
Sabtu,24/09/22 _ _ _ _ _ Stand
Minggu,25/09/22 DT 25 7.0 15:00 23:00 7.0 Bargin
Senin,26/09/22 _ _ _ _ _ Stand
Selasa,27/09/22 Bomax 106 _ 626 630 4.0 Memadatkan
Rabu,28/09/22 EX 201 _ 22562 22569 7.0 Crushin
Kamis,29/09/22 _ _ _ _ _ Stand
Jumat,30/09/22 EX 201 _ 22583 22590 7.0 Crushing C
Sabtu,01/10/22 EX 201 _ 22598 22605 7.0 Crushin
Minggu,02/10/22 _ _ _ _ _ Of
Senin,03/10/22 EX 201 _ 22605 22610 5.0 Crushin
Selasa,04/10/22 EX 201 _ 22617 22624 7.0 Crushin
Rabu,05/10/22 EX 201 _ 22631 22637 6.0 Crushin
Kamis,06/10/22 _ _ _ _ _ Stand
Jumat,07/10/22 EX 201 _ 22637 22640 3.0 Crushin
Sabtu,08/10/22 EX 201 7.0 22645 22650 5.0 Crushin
Minggu,09/10/22 _ _ _ _ _ Of
Senin,10/10/22 EX 201 _ 22654 22657 3.0 Crushin
Selasa,11/10/22 EX 201 _ 22664 22669 5.0 Crushin
Rabu,12/10/22 EX 201 _ 22676 22683 7.0 Crushin
Kamis,13/10/22 EX 201 _ 22690 22697 7.0
Jumat,14/10/22 _ _ _ _ _ Stand
Sabtu,15/10/22 EX 201 _ 22709 22714 5.0 Crushin
minggu,16/10/22 EX 201 7.0 22714 22721 7.0 Crushin
Senin,17/10/22 EX 201 _ 22729 22736 7.0 Crushin
Selasa,18/10/22 _ _ _ _ _ Stand
Rabu,19/10/22 _ _ _ _ _ Stand
kamis,20/10/22 EX 201 _ 22746 22753 7.0 Crushin

TOTAL 21 122

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (DERRYANTO)
(DRIVER DT.103)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan
Jam
Rabu,21/09/22 DT 103 _ 7:00 15:00 6.0 Houling
Kamis,22/09/22 DT 103 _ 7:00 15:00 5.0 Houling pit E3 lan
Jumat,23/09/22 DT 102 _ 7:00 15:00 5.0 Houling pit w-10
Sabtu,24/09/22 DT 103 _ 7:00 12:00 4.0 Houling p
DT 25 7.0 7:00 15:00 7.0 Barg
Minggu,25/09/22
DT 103 7.0 15:00 23:00 7.0 Barg
Senin,26/09/22 _ _ _ _ _ Stand By
Selasa,27/09/22 DT 103 _ 15:00 23:00 7.0 Laminat
Rabu,28/09/22 _ _ _ _ _ Stand By
Kamis,29/09/22 _ _ _ _ _ Stand By
Jumat,30/09/22 DT 103 _ 15:00 23:00 7.0 Houing pit E3/W
Sabtu,01/10/22 DT 103 _ 15:00 23:00 6.0 Houling Pit E
Minggu,02/10/22 _ _ _ _ _ Of
Senin,03/10/22 DT 103 _ 8:00 15:00 6.0 Barji
Selasa,04/10/22 DT 103 _ 7:00 15:00 7.0 Barji
Rabu,05/10/22 DT 103 _ 9:00 15:00 5.0 Laminating Jalan Sim
Kamis,06/10/22 _ _ _ _ _ Stand By
Jumat,07/10/22 _ _ _ _ _ Stand By
Sabtu,08/10/22 DT 103 7.0 8:00 15:00 6.0 Houling Pit E
Minggu,09/10/22 _ _ _ _ _ Of
Senin,10/10/22 DT 103 _ 15:00 23:00 7.0 Houling p
Selasa,11/10/22 DT 103 _ 15:00 20:00 5.0 Persiapan Ho
Rabu,12/10/22 DT 103 _ 15:00 21:00 5.0 Houling
Kamis,13/10/22 DT 103 _ 15:00 23:00 7.0 Houling Pit a
Jumat,14/10/22 _ _ _ _ _ Stand By
Sabtu,15/10/22 DT 103 _ 15:00 23:00 7.0 Barji
minggu,16/10/22 DT 103 7.0 7:00 15:00 7.0 Barji
Senin,17/10/22 DT 103 _ 7:00 15:00 7.0 Houling Da
Selasa,18/10/22 _ _ _ _ _ Stand By
Rabu,19/10/22 _ _ _ _ _ Stand By
kamis,20/10/22 DT 103 _ 7:00 15:00 7.0 Angku

TOTAL 28 130

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (M.IKRAR HAQQI)
(DRIVER DT.101)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan
Jam
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan
Jam
Rabu,21/09/22 DT 101 _ 15:00 23:00 7.0 Houling E3 lanjut
Kamis,22/09/22 DT 101 _ 15:00 17:00 2.0 Houling
Jumat,23/09/22 DT 101 _ 15:00 23:00 7.0 Houling E3 lanjut
Sabtu,24/09/22 _ _ _ _ _ Stand By
Minggu,25/09/22 DT 101 7.0 7:00 15:00 7.0 Barg
Senin,26/09/22 DT 101 _ 7:00 12:00 5.0 Barg
Selasa,27/09/22 DT 101 _ 7:00 15:00 7.0 Houling di 10
Rabu,28/09/22 _ _ _ _ _ Stand By
Kamis,29/09/22 _ _ _ _ _ Stand By
Jumat,30/09/22 DT 101 _ 7:00 15:00 7.0 Houling E3 da
Sabtu,01/10/22 DT 101 _ 7:00 15:00 7.0 Angkut OB Lanju
Minggu,02/10/22 _ _ _ _ _ Of
Senin,03/10/22 DT 101 _ 7:00 15:00 6.0 Barg
Selasa,04/10/22 DT 101 _ 15:00 23:00 7.0 Barjing To T
Rabu,05/10/22 DT 101 _ 16:00 21:00 4.0 Angkut OB L
Kamis,06/10/22 _ _ _ _ _ Stand By
Jumat,07/10/22 DT 101 _ 15:00 23:00 7.0 Houling C
Sabtu,08/10/22 DT 101 7.0 15:00 23:00 7.0 Angkut OB dan Lamina
Minggu,09/10/22 _ _ _ _ _ Of
Senin,10/10/22 _ _ _ _ _ Stand By
Selasa,11/10/22 DT 101 _ 7:00 15:00 7.0 Houling W1
Rabu,12/10/22 _ _ _ _ _ Stand By
Kamis,13/10/22 DT 101 _ 7:00 15:00 7.0 Houlin
Jumat,14/10/22 DT 101 _ 7:00 15:00 7.0 Angkut OB Laminating Ja
Sabtu,15/10/22 DT 101 _ 7:00 15:00 7.0 OB Dan B
minggu,16/10/22 DT 101 7.0 15:00 23:00 7.0 Barjing To T
Senin,17/10/22 _ _ _ _ _ Stand By
Selasa,18/10/22 _ _ _ _ _ Stand By
Rabu,19/10/22 _ _ _ _ _ Stand By
kamis,20/10/22 _ _ _ _ _ Stand By

TOTAL 21 115.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (ROMI GUNAWAN)
(OPERATOR LOADER)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan
Jam
Rabu,21/09/22 Compact 106 _ 577 584 7.0 Compact memad
Kamis,22/09/22 Bomax 106 _ 586 593 7.0 Mentenan
Jumat,23/09/22 Bomax 106 _ 593 600 7.0 Perbaikan ja
Sabtu,24/09/22 Bomax 106 _ 607 611 4.0 Perbaikan jalan sam
Minggu,25/09/22 Bomax 106 14.0 611 625 14.0 Maintenace
Senin,26/09/22 _ _ _ _ _ Stand
Selasa,27/09/22 Bomax 106 _ 625 626 1.0 Maintenace jal
Rabu,28/09/22 Bomax 106 _ 630 636 6.0 Maintenance
Kamis,29/09/22 _ _ _ _ _ Stand
Jumat,30/09/22 Bomax 106 _ 636 643 7.0 Maintenance St
Sabtu,01/10/22 Bomax 106 _ 643 650 7.0 Maintenance St
Minggu,02/10/22 _ _ _ _ _ Of
Senin,03/10/22 Bomax 106 _ 650 657 7.0 Memadataka
Selasa,04/10/22 Bomax 106 _ 657 662 5.0 Memadataka
Rabu,05/10/22 Loader 220 _ 48.2 50.5 2.3
Kamis,06/10/22 _ _ _ _ _ Stand
Jumat,07/10/22 _ _ _ _ _ Stand
Sabtu,08/10/22 Loader 220 7.0 50.5 53.0 2.5 Perapian S
Minggu,09/10/22 _ _ _ _ _ Of
Senin,10/10/22 Loader 220 _ 53.0 58.3 5.3 Merapikan Stock
Selasa,11/10/22 Loader 220 _ 58.3 63.9 5.6 Maintenance
Rabu,12/10/22 Loader 220 7.0 63.3 71.7 7.8 Merapikan StockFile Da
Loader 220 _ 71.7 74.9 3.2 Mentenen S
Kamis,13/10/22

Jumat,14/10/22 Loader 220 4.0 78.6 85.4 6.8 Merapikan


Loader 220 _ 89.8 93.2 3.4 Mentenance
Sabtu,15/10/22
Bomax 106 7.0 66.2 66.9 7.0 Merapikan Ja
minggu,16/10/22 Bomax 106 7.0 669 674 5.0 Perbaikan jal
Senin,17/10/22 Loader 220 4.0 104.2 109.7 5.5 Barjing/Melamb
Selasa,18/10/22 Loader 220 7.0 109.7 115.4 5.7 Merapikan Stockfile Dan
Rabu,19/10/22 _ _ _ _ _ Stand
kamis,20/10/22 Loader 220 _ 115.4 122.1 6.7 Memindahkan Batu

TOTAL 57 138
N
2 (ASPIANTO)

Keterangan Pekerjaan Hari/Tgl/Bulan

Crushing coal Rabu,21/09/22


Crushing coal Kamis,22/09/22
Crushing coal Jumat,23/09/22
Stand By Sabtu,24/09/22
Barging/DT Minggu,25/09/22
StandBy Senin,26/09/22
Memadatkan stockfile Selasa,27/09/22
Crushing Coal Rabu,28/09/22
StandBy Kamis,29/09/22
Crushing Coal atas Jumat,30/09/22
Crushing Coal Sabtu,01/10/22
Off Minggu,02/10/22
Crushing Coal Senin,03/10/22
Crushing Coal Selasa,04/10/22
Crushing Coal Rabu,05/10/22
Stand By Kamis,06/10/22
Crushing Coal Jumat,07/10/22
Crushing Coal Sabtu,08/10/22
Off Minggu,09/10/22
Crushing Coal Senin,10/10/22
Crushing Coal Selasa,11/10/22
Crushing Coal Rabu,12/10/22
Kamis,13/10/22
Stand By Jumat,14/10/22
Crushing Coal Sabtu,15/10/22
Crushing Coal minggu,16/10/22
Crushing Coal Senin,17/10/22
Stand By Selasa,18/10/22
Stand By Rabu,19/10/22
Crushing Coal kamis,20/10/22

TOTAL

N
(DERRYANTO)
Keterangan Pekerjaan Hari/Tgl/Bulan

Houling pit E3 Rabu,21/09/22


Houling pit E3 lanjut pit E5-2 MJ Kamis,22/09/22
Houling pit w-10 sampai pit E3 Jumat,23/09/22
Houling pit E3-OB Sabtu,24/09/22
Barging Minggu,25/09/22
Barging Senin,26/09/22
Stand By Shift 2 Selasa,27/09/22
Laminating OB Rabu,28/09/22
Stand By Shift 2 Kamis,29/09/22
Stand By Shift 2 Jumat,30/09/22
Houing pit E3/W10 angkut OB Sabtu,01/10/22
Houling Pit E3 Dan OB Minggu,02/10/22
Off Senin,03/10/22
Barjing Selasa,04/10/22
Barjing Rabu,05/10/22
Laminating Jalan Simpang 3 Batu Dinding Kamis,06/10/22
Stand By Shift 1 Jumat,07/10/22
Stand By Shift 1 Sabtu,08/10/22
Houling Pit E3 Dan OB Minggu,09/10/22
Off Senin,10/10/22
Houling pit W10 Selasa,11/10/22
Persiapan Houling Pit E3 Rabu,12/10/22
Houling pit E3 Kamis,13/10/22
Houling Pit amos E5-2 Jumat,14/10/22
Stand By Shift 2 Sabtu,15/10/22
Barjing minggu,16/10/22
Barjing
Senin,17/10/22
Houling Dan Barjing
Stand By Shift 1 Selasa,18/10/22
Stand By Shift 1 Rabu,19/10/22
Angkut OB kamis,20/10/22

TOTAL

N
M.IKRAR HAQQI)

Keterangan Pekerjaan
Keterangan Pekerjaan
Hari/Tgl/Bulan
Houling E3 lanjut Houling E5-2 MJ
Houling di w10 Rabu,21/09/22
Houling E3 lanjut Houling E5-2 MJ Kamis,22/09/22
Stand By Shift 2 Jumat,23/09/22
Barging Sabtu,24/09/22
Barging Minggu,25/09/22
Houling di 10w mansur Senin,26/09/22
Stand By Shift 1 Selasa,27/09/22
Stand By Shift 1 Rabu,28/09/22
Houling E3 dan angkut OB Kamis,29/09/22
Angkut OB Lanjut Houling Di E3 Jumat,30/09/22
Off Sabtu,01/10/22
Barging Minggu,02/10/22
Barjing To Tongkang Senin,03/10/22
Angkut OB Laminating Selasa,04/10/22
Stand By Shift 2 Rabu,05/10/22
Houling Coal E3 Kamis,06/10/22
Angkut OB dan Laminating jalan Houling E3 Jumat,07/10/22
Off Sabtu,08/10/22
Stand By Shift 1 Minggu,09/10/22
Houling W10 Dan E3 Senin,10/10/22
Stand By Shift 1 Selasa,11/10/22
Houling E3 Rabu,12/10/22
Angkut OB Laminating Jalan Dan Houling Coal E3 Kamis,13/10/22
OB Dan Barjing Jumat,14/10/22
Barjing To Tongkang Sabtu,15/10/22
Stand By Shift 2 minggu,16/10/22
Stand By Shift 2 Senin,17/10/22
Stand By Shift 2 Selasa,18/10/22
Stand By Shift 2 Rabu,19/10/22
kamis,20/10/22

TOTAL

N
ROMI GUNAWAN)

Keterangan Pekerjaan
Hari/Tgl/Bulan
Compact memadatkan stockfile
Mentenance Jalan Jumat,14/10/22
Perbaikan jalan houling Sabtu,15/10/22
Perbaikan jalan samping Work Shop minggu,16/10/22
Maintenace stock file Senin,17/10/22
Stand By Selasa,18/10/22
Maintenace jalan workshop Rabu,19/10/22
Maintenance Stockfile kamis,20/10/22
Stand By
Maintenance Stockfile Jalan
TOTAL
Maintenance StockFile Jalan
Off
Memadatakan StockFile
Memadatakan StockFile

Stand By
Stand By
Perapian StockFile
Off
Merapikan StockFile Batu Bara
Maintenance stockFile
Merapikan StockFile Dan Menjaga Dumpingan
Mentenen StockFile

Merapikan StockFile
Mentenance Fiul/Stock
Merapikan Jalan Houling
Perbaikan jalan Houling
Barjing/Melambungkan Coal
Merapikan Stockfile Dan Melambungkan Coal
Stand By
Memindahkan Batu Bara Di StockFile
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (DWIWANTO)
(OPERATOR EXCA(HYUNDAI)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keteranga
Jam
Rabu,21/09/22 Hyundai _ 848.5 856.8 8.3 Load
Kamis,22/09/22 Hyundai _ 856.8 865.7 8.9 Side
Jumat,23/09/22 Hyundai _ 865.7 875.7 10.0 Cleanning
Sabtu,24/09/22 Hyundai _ 875.7 885.7 10.0 Loading clea
Minggu,25/09/22 Hyundai 136 _ 24.6 38.4 13.8 Loading D
Senin,26/09/22 Hyundai 136 _ 38.4 47.7 9.3 Barging
Selasa,27/09/22 Hyundai 136 _ 47.7 56.2 8.5 Gen
Rabu,28/09/22 Hyundai _ 885.7 894.6 8.9 Side
Kamis,29/09/22 Hyundai _ 894.6 906.3 11.7 Sidecast
Jumat,30/09/22 Hyundai _ 906.3 920.3 14.0 Getting Lo
Sabtu,01/10/22 Hyundai _ 920.3 925.1 4.8 Getting L
Minggu,02/10/22 _ _ _ _ _ O
Senin,03/10/22 Hyundai 340 _ 56.9 73.7 16.8 loading
Selasa,04/10/22 Hyundai 340 _ 73.7 84.7 11.0 Loading
Rabu,05/10/22 _ _ _ _ _ Stan
Kamis,06/10/22 Hyundai _ 925.1 933.3 8.2 Crushing Cl
Jumat,07/10/22 Hyundai _ 933.3 938.6 5.3 Cleannin
Sabtu,08/10/22 Hyundai _ 938.6 947.9 9.3 Clean
Minggu,09/10/22 _ _ _ _ _ O
Senin,10/10/22 Hyundai _ 947.9 955.5 7.6 Cleanning G
Selasa,11/10/22 Hyundai _ 955.5 958.5 3.0 Getting load
Rabu,12/10/22 Hyundai _ 958.5 961.6 3.1 Getting loa
Kamis,13/10/22 Hyundai _ 961.6 965.6 4.0 Getting L
Jumat,14/10/22 _ _ _ _ _ Stan
Sabtu,15/10/22 Hyundai 340 _ 86.1 95.3 9.2 Loading Po
minggu,16/10/22 Hyundai _ 965.6 972.6 7.0 Load
Senin,17/10/22 _ _ _ _ _ Stan
Selasa,18/10/22 _ _ _ _ _ Stan
Rabu,19/10/22 Hyundai _ 972.6 981.8 9.2 Cleann
kamis,20/10/22 _ _ _ _ _ Stan

TOTAL 0 202

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (SYUKUR)
(DRIVER DT.101)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keteranga
Jam
Rabu,21/09/22 DT 101 _ 7:00 15:00 6.0 Houlin
Kamis,22/09/22 DT 101 _ 7:00 15:00 6.0 Houling pit E3
Jumat,23/09/22 DT 101 _ 7:00 15:00 6.0 Houling d
Sabtu,24/09/22 DT 101 _ 7:00 12:00 4.0 O
Minggu,25/09/22 DT 101 7.0 15:00 23:00 7.0 Bar
Senin,26/09/22 DT 101 _ 15:00 23:00 7.0 OB dan Peni
Selasa,27/09/22 _ _ _ _ _ Stand B
Rabu,28/09/22 _ _ _ _ _ Stand B
Kamis,29/09/22 _ _ _ _ _ Stand B
Jumat,30/09/22 DT 101 _ 15:00 23:00 7.0 Houling pit E
Sabtu,01/10/22 DT 101 _ 15:00 21:00 5.0 Houling Pit E3
Minggu,02/10/22 _ _ _ _ _ O
Senin,03/10/22 DT 101 _ 15:00 23:00 7.0 Bar
Selasa,04/10/22 DT 101 _ 7:00 15:00 7.0 Barjin
Rabu,05/10/22 DT 101 _ 9:00 15:00 5.0 Laminat
Kamis,06/10/22 _ _ _ _ _ Stand B
Jumat,07/10/22 _ _ _ _ _ Stand B
Sabtu,08/10/22 DT 101 7.0 8:00 15:00 6.0 Houling Coal Pit
Minggu,09/10/22 _ _ _ _ _ O
Senin,10/10/22 DT 101 _ 15:00 18:00 2.0 Houling P
Selasa,11/10/22 DT 101 _ 15:00 22:00 6.0 Houl
Rabu,12/10/22 DT 101 _ 15:00 21:00 5.0 Houlin
Kamis,13/10/22 DT 101 _ 15:00 22:00 6.0 Houling
Jumat,14/10/22 DT 101 _ 15:00 23:00 7.0 Bar
Sabtu,15/10/22 _ _ _ _ _ Stand B
minggu,16/10/22 DT 101 14.0 7:00 15:00 7.0 Houling Pit E
DT 101 _ 7:00 15:00 7.0 Houling pit Man
Senin,17/10/22
DT 25 3.0 15:00 23:00 7.0 Houling P
Selasa,18/10/22 _ _ _ _ _ Stand B
Rabu,19/10/22 _ _ _ _ _ Stand B
kamis,20/10/22 DT 25 _ 15:00 23:00 7.0 Angkut OB/La

TOTAL 31 127

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (HENDRA)
(DRIVER DT.102)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keteranga
Jam
Rabu,21/09/22 DT 102 _ 15:00 23:00 7.0 Houling E5 d
Kamis,22/09/22 DT 102 _ 15:00 17:00 2.0 Houling 1
Jumat,23/09/22 DT 102 _ 15:00 23:00 7.0 Houling
Sabtu,24/09/22 _ _ _ _ _ Stand B
Minggu,25/09/22 DT 102 7.0 7:00 15:00 7.0 Bar
Senin,26/09/22 DT 102 _ 7:00 12:00 5.0 Bar
Selasa,27/09/22 _ _ _ _ _ Stand B
Rabu,28/09/22 DT 102 _ 7:00 15:00 7.0 Houlin
Kamis,29/09/22 _ _ _ _ _ Stand B
Jumat,30/09/22 DT 102 _ 7:00 15:00 7.0 Houling
Sabtu,01/10/22 DT 102 _ 7:00 15:00 7.0 Angkut OB
Minggu,02/10/22 _ _ _ _ _ O
Senin,03/10/22 DT 102 _ 15:00 23:00 7.0 Bar
Selasa,04/10/22 DT 102 _ 15:00 23:00 7.0 Bar
Rabu,05/10/22 DT 102 _ 16:00 21:00 4.0 Angkut OB/La
Kamis,06/10/22 _ _ _ _ _ Stand B
Jumat,07/10/22 DT 102 _ 15:00 23:00 7.0 Angk
Sabtu,08/10/22 DT 102 7.0 15:00 23:00 7.0 Angkut OB dan Mente
Minggu,09/10/22 _ _ _ _ _ O
Senin,10/10/22 _ _ _ _ _ Stand B
Selasa,11/10/22 DT 102 _ 7:00 15:00 7.0 Houl
Rabu,12/10/22 _ _ _ _ _ Stand B
Kamis,13/10/22 DT 102 _ 7:00 15:00 7.0 Houl
Jumat,14/10/22 DT 102 _ 7:00 15:00 7.0 Laminating jalan Ho
Sabtu,15/10/22 DT 102 _ 7:00 15:00 7.0 Bar
minggu,16/10/22 DT 102 14.0 15:00 23:00 14.0 Bar
Senin,17/10/22 DT 102 _ 15:00 23:00 3.0 Houling
Selasa,18/10/22 _ _ _ _ _ Stand B
Rabu,19/10/22 _ _ _ _ _ Stand B
kamis,20/10/22 DT 102 _ 15:00 23:00 7.0 Laminat

TOTAL 28 133.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (MUH.RISKI.ADITIA)
(OPERATOR LOADER)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keteranga
Jam
Jumat,14/10/22 Loader 220 _ 85.4 89.8 4.4 Perapian StockFile Da
Sabtu,15/10/22 Loader 220 _ 93.2 95.7 2.5 Barjing Perap
minggu,16/10/22 Loader 220 14.0 95.7 104.2 8.5 Barjing Perap
Senin,17/10/22 Tanpa Ke
Selasa,18/10/22 Tanpa Ke
Rabu,19/10/22 Tanpa Ke
kamis,20/10/22 Tanpa Ke

TOTAL 14 15.4
(DWIWANTO)

Keterangan Pekerjaan Hari/Tgl/Bulan

Loading E3 Rabu,21/09/22
Sidecast Kamis,22/09/22
Cleanning Loading E3 Jumat,23/09/22
Loading cleanning getting Sabtu,24/09/22
Loading DT Barging Minggu,25/09/22
Barging ponton Senin,26/09/22
General Selasa,27/09/22
Sidecast Rabu,28/09/22
Sidecast Cleanning Kamis,29/09/22
Getting Loading Coal Jumat,30/09/22
Getting Loading E3 Sabtu,01/10/22
Off Minggu,02/10/22
loading Barjing Senin,03/10/22
Loading Barjing Selasa,04/10/22
Stand By Rabu,05/10/22
Crushing Cleanning Coal Kamis,06/10/22
Cleanning Coal E3 Jumat,07/10/22
Cleanning E3 Sabtu,08/10/22
Off Minggu,09/10/22
Cleanning Getting Coal Senin,10/10/22
Getting loading coal Di E3 Selasa,11/10/22
Getting loading coal E3 Rabu,12/10/22
Getting Loading E3 Kamis,13/10/22
Stand By Jumat,14/10/22
Loading Ponton Barjing Sabtu,15/10/22
Loading E3 minggu,16/10/22
Stand By Senin,17/10/22
Stand By Selasa,18/10/22
Cleanning Coal Rabu,19/10/22
Stand By kamis,20/10/22

TOTAL

2 (SYUKUR)
Keterangan Pekerjaan Hari/Tgl/Bulan

Houling Pit E3 Rabu,21/09/22


Houling pit E3 sampai amos Kamis,22/09/22
Houling di pit w-10 Jumat,23/09/22
OB Sabtu,24/09/22
Barjing Minggu,25/09/22
OB dan Penimbunan jalan Senin,26/09/22
Stand By Shift 2 Selasa,27/09/22
Stand By Shift 2 Rabu,28/09/22
Stand By Shift 2 Kamis,29/09/22
Houling pit E3/Angkut Ob Jumat,30/09/22
Houling Pit E3 dan Angkut OB Sabtu,01/10/22
Off Minggu,02/10/22
Barjing Senin,03/10/22
Barjing Coal Selasa,04/10/22
Laminating Jalan Rabu,05/10/22
Stand By Shift 1 Kamis,06/10/22
Stand By Shift 1 Jumat,07/10/22
Houling Coal Pit E3 Dan Angkut OB Sabtu,08/10/22
Off Minggu,09/10/22
Houling Pit Mansur Senin,10/10/22
Houling E3 Selasa,11/10/22
Houling Pit E3 Rabu,12/10/22
Houling Pit Amos Kamis,13/10/22
Barjing Jumat,14/10/22
Stand By Shift 2 Sabtu,15/10/22
Houling Pit E3 dan Barjing minggu,16/10/22
Houling pit Mansur dan Barjing Senin,17/10/22
Houling Pit Mansur Selasa,18/10/22
Stand By Shift 1 Rabu,19/10/22
Stand By Shift 1 kamis,20/10/22
Angkut OB/Laminating Jalan

TOTAL

2 (HENDRA)

Hari/Tgl/Bulan
Hari/Tgl/Bulan
Keterangan Pekerjaan
Rabu,21/09/22
Houling E5 dan Houling E3 Kamis,22/09/22
Houling 10W/Hujan Jumat,23/09/22
Houling E3 dan E5 Sabtu,24/09/22
Stand By Shift 2 Minggu,25/09/22
Barging Senin,26/09/22
Barging Selasa,27/09/22
Stand By Shift 1 Rabu,28/09/22
Houling W10 Kamis,29/09/22
Stand By Shift 1 Jumat,30/09/22
Houling E3 dan E5 Sabtu,01/10/22
Angkut OB/Houling E3 Minggu,02/10/22
Off Senin,03/10/22
Barjing Selasa,04/10/22
Barjing Rabu,05/10/22
Angkut OB/Laminating Jalan Kamis,06/10/22
Stand By Shift 2 Jumat,07/10/22
Angkut OB Sabtu,08/10/22
Angkut OB dan Mentenen Jalan Houling E3 Minggu,09/10/22
Off Senin,10/10/22
Stand By Shift 1 Selasa,11/10/22
Houling E3 Rabu,12/10/22
Stand By Shift 1 Kamis,13/10/22
Houling E3 Jumat,14/10/22
Laminating jalan Houling Dan Houling E3 Sabtu,15/10/22
Barjing minggu,16/10/22
Barjing Senin,17/10/22
Houling West 10 Selasa,18/10/22
Stand By Shift 2 Rabu,19/10/22
Stand By Shift 2 kamis,20/10/22
Laminating jalan

TOTAL

UH.RISKI.ADITIA)

Keterangan Pekerjaan
Perapian StockFile Dan Menjaga Dampingan
Barjing Perapian StockFile
Barjing Perapian StockFile
Tanpa Keterangan
Tanpa Keterangan
Tanpa Keterangan
Tanpa Keterangan
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (HERDIANSYAH)
(OPERATOR DOZER)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pe
Jam
Rabu,21/09/22 DZ 004 _ 20889.8 20894.8 5.0 Dozing stoc
Kamis,22/09/22 DZ 004 _ 20901.8 20908.8 7.0 Perbaikan stockfile dan dozing coal
Jumat,23/09/22 DZ 004 _ 20911.8 20917.8 6.0 Dozing stoc
Sabtu,24/09/22 DZ 004 _ 20924.8 20928.8 4.0 Dozing stockfile dan pe
Minggu,25/09/22 DZ 004 7.0 20935.8 20942.8 7.0 Barging
Senin,26/09/22 DZ 004 _ 20947.8 20951.8 4.0 Dozing/Barg
Selasa,27/09/22 DZ 004 _ 20954.8 20961.8 7.0 Laminating jalan E3-
Rabu,28/09/22 _ _ _ _ _ Stand By
Kamis,29/09/22 _ _ _ _ _ Stand By
Jumat,30/09/22 DZ 004 _ 20978.8 20985.8 7.0 Laminating jalan E
Sabtu,01/10/22 DZ 004 _ 20991.8 20997.8 6.0 Laminating Jalan
Minggu,02/10/22 _ _ _ _ _ Off
Senin,03/10/22 DZ 004 _ 20997.8 21003.8 6.0 Dozing Batu B
Selasa,04/10/22 DZ 004 _ 21010.8 21017.8 7.0 Dozing Bar
Rabu,05/10/22 DZ 004 _ 21017.8 21023.8 6.0 Laminating Jalan Ara
Kamis,06/10/22 _ _ _ _ _ StandBy
Jumat,07/10/22 _ _ _ _ _ StandBy
Sabtu,08/10/22 DZ 004 7.0 21026.8 21032.8 6.0 Laminating Jalan
Minggu,09/10/22 _ _ _ _ _ Off
Senin,10/10/22 DZ 004 _ 21045.8 21048.8 3.0 Menrut Jalan Houling
Selasa,11/10/22 DZ 004 _ 21054.8 21057.8 3.0 Dozing Jalan Houli
Rabu,12/10/22 DZ 004 _ 21063.8 21069.8 6.0 Menrut Jalan Houling
Kamis,13/10/22 DZ 004 _ 21076.8 21083.8 7.0 Dozing Jalan Dan
Jumat,14/10/22 _ _ _ _ _ StandBy
Sabtu,15/10/22 _ _ _ _ _ StandBy
minggu,16/10/22 DZ 004 7.0 21106.8 21113.8 7.0 Barjing Do
Senin,17/10/22 _ _ _ _ _ StandBy
Selasa,18/10/22 _ _ _ _ _ StandBy
Rabu,19/10/22 _ _ _ _ _ StandBy
kamis,20/10/22 DZ 004 2.0 21113.8 21122.8 9.0 Menrut Jalan Ara

TOTAL 23 113

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (A.SYAHRIL.Z)
(OPERATOR BOMAX)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pe
Jam
Rabu,21/09/22 DZ 004 _ 20894.8 20901.8 7.0 Dozer coal di s
Kamis,22/09/22 DZ 004 _ 20908.8 20911.8 3.0 Dozeng coal st
Jumat,23/09/22 DZ 004 _ 20917.8 20924.8 7.0 Dosen coal dan dosen
Sabtu,24/09/22 _ _ _ _ _ StandBy
Minggu,25/09/22 DZ 004 7.0 20928.8 20935.8 7.0 Dosen coal di s
Senin,26/09/22 DZ 004 _ 20942.8 20947.8 5.0 Dosen coal di s
Selasa,27/09/22 DZ 004 _ 20951.8 20954.8 3.0 Perbaikan Jalan Hou
Rabu,28/09/22 DZ 004 _ 20961.8 20968.8 7.0 Perbaikan Jalan Hou
Kamis,29/09/22 DZ 004 _ 20968.8 20972.8 4.0 Geret jalan Houliin
Jumat,30/09/22 DZ 004 _ 20972.8 20978.8 6.0 Perbaikan jalan Hou
Sabtu,01/10/22 DZ 004 _ 20984.8 20991.8 6.0 Mentenen Jalan H
Minggu,02/10/22 _ _ _ _ _ Off
Senin,03/10/22 DZ 004 _ 21003.8 21010.8 7.0 Doseng Coal B
Selasa,04/10/22 Loader 220 _ 42.4 48.2 5.8 Loading Ke Hopp
Rabu,05/10/22 DZ 004 _ 21023.8 21026.8 3.0 Geret jalan Houliin
Kamis,06/10/22 _ _ _ _ _ StandBy
Jumat,07/10/22 _ _ _ _ _ StandBy
Sabtu,08/10/22 DZ 004 7.0 21031.8 21039.8 7.0 Mentenen Jalan H
Minggu,09/10/22 _ _ _ _ _ Off
Senin,10/10/22 DZ 004 1.0 21039.8 21045.8 6.0 Geret jalan Houliin
Selasa,11/10/22 DZ 004 21048.8 21054.8 6.0 Doseng Jalan a
Rabu,12/10/22 _ _ _ _ _ Izin Saki
Kamis,13/10/22 _ _ _ _ _ Izin Saki
Jumat,14/10/22 _ _ _ _ _ Izin Saki
Sabtu,15/10/22 _ _ _ _ _ Izin Saki
minggu,16/10/22 _ _ _ _ _ Off
Senin,17/10/22 _ _ _ _ _ Izin Saki
Selasa,18/10/22 _ _ _ _ _ Izin Saki
Rabu,19/10/22 _ _ _ _ _ Izin Saki
kamis,20/10/22 _ _ _ _ _ Izin Saki

TOTAL 15 89.5

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 SEPTEMBER S/D 20 OKTOBER 2022 (RAHMAN NUDIN.A)
(DRIVER DT.102)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pe
Jam
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pe
Jam
Rabu,21/09/22 DT 102 _ 7:00 15:00 6.0 Angkut O
Kamis,22/09/22 DT 102 _ 8:00 10:00 2.0 Angkut O
Jumat,23/09/22 DT 102 _ 7:00 15:00 6.0 Houling di pit E3
Sabtu,24/09/22 DT 102 _ 7:00 12:00 5.0 Angkut OB /
Minggu,25/09/22 DT 102 7.0 15:00 23:00 7.0 Barjing
Senin,26/09/22 DT 102 _ 15:00 23:00 7.0 Angkut O
Selasa,27/09/22 _ _ _ _ _ Stand By Sh
Rabu,28/09/22 _ _ _ _ _ Stand By Sh
Kamis,29/09/22 _ _ _ _ _ Stand By Sh
Jumat,30/09/22 DT 102 _ 15:00 23:00 7.0 Angkut O
Sabtu,01/10/22 DT 102 _ 15:00 21:00 5.0 Houling Di E3 dan
Minggu,02/10/22 _ _ _ _ _ Off
Senin,03/10/22 DT 102 _ 8:00 15:00 6.0 Barjing
Selasa,04/10/22 DT 102 _ 7:00 15:00 7.0 Barjing
Rabu,05/10/22 DT 102 _ 9:00 15:00 5.0 Angkut O
Kamis,06/10/22 _ _ _ _ _ Stand By Sh
Jumat,07/10/22 _ _ _ _ _ Stand By Sh
Sabtu,08/10/22 DT 102 7.0 8:00 15:00 6.0 Houling E3 da
Minggu,09/10/22 _ _ _ _ _ Off
Senin,10/10/22 DT 102 _ 15:00 21:00 5.0 Houling W
Selasa,11/10/22 DT 102 _ 15:00 18:00 3.0 Persiapan Houli
Rabu,12/10/22 DT 102 _ 15:00 22:00 6.0 Angkut OB Dan H
Kamis,13/10/22 DT 102 _ 15:00 23:00 7.0 Houling Pit A
Jumat,14/10/22 DT 102 _ 15:00 23:00 7.0 Barjing
Sabtu,15/10/22 _ _ _ _ _ Stand By Sh
minggu,16/10/22 DT 102 7.0 7:00 15:00 7.0 Barjing
Senin,17/10/22 DT 102 _ 7:00 15:00 7.0 Barjing Dan Houling
Selasa,18/10/22 _ _ _ _ _ Stand By Sh
Rabu,19/10/22 _ _ _ _ _ Stand By Sh
kamis,20/10/22 DT 102 _ 7:00 15:00 7.0 Angkut O

TOTAL 21 118.0
AN ABSENSI KARYAWAN TIMBAN
(HERDIANSYAH) PERIODE 21 SEPTEMBER S/D 20 OKTOBE
(OPERATOR TIMBANGAN

Keterangan Pekerjaan No Hari/Tanggal/Bulan

Dozing stockfile 1 Rabu,21/09/22


an stockfile dan dozing coal lanjut menrut arah jln amos 2 Kamis,22/09/22
Dozing stockfile 3 Jumat,23/09/22
Dozing stockfile dan perapian stockfile 4 Sabtu,24/09/22
Barging 5 Minggu,25/09/22
Dozing/Barging 6 Senin,26/09/22
Laminating jalan E3-W10 Mansyur 7 Selasa,27/09/22
Stand By 8 Rabu,28/09/22
Stand By 9 Kamis,29/09/22
Laminating jalan E3 Houling 10 Jumat,30/09/22
Laminating Jalan E3 Houling 11 Sabtu,01/10/22
Off 12 Minggu,02/10/22
Dozing Batu Barjing 13 Senin,03/10/22
Dozing Barjing 14 Selasa,04/10/22
Laminating Jalan Arah Kampung E3 15 Rabu,05/10/22
StandBy 16 Kamis,06/10/22
StandBy 17 Jumat,07/10/22
Laminating Jalan Houling 18 Sabtu,08/10/22
Off 19 Minggu,09/10/22
Menrut Jalan Houling Dan StockFile 20 Senin,10/10/22
Dozing Jalan Houling Arah E3 21 Selasa,11/10/22
Menrut Jalan Houling Dan StockFile 22 Rabu,12/10/22
Dozing Jalan Dan StockFile 23 Kamis,13/10/22
StandBy 24 Jumat,14/10/22
StandBy 25 Sabtu,15/10/22
Barjing Dozer 26 Minggu,16/10/22
StandBy 27 Senin,17/10/22
StandBy 28 Selasa,18/10/22
StandBy 29 Rabu,19/10/22
Menrut Jalan Arah Amous 30 Kamis,20/10/22
31

TOTAL

AN
2 (A.SYAHRIL.Z)
Keterangan Pekerjaan

Dozer coal di stockfile


Dozeng coal stockfile
Dosen coal dan dosen OB pit amos
StandBy
Dosen coal di stockfile
Dosen coal di stockfile
Perbaikan Jalan Houling Pit 10W
Perbaikan Jalan Houling Pit 10W
Geret jalan Houliing arah E3
Perbaikan jalan Houling Arah E3
Mentenen Jalan Houling E3
Off
Doseng Coal Barjing
Loading Ke Hopper Barjing
Geret jalan Houliing arah E3
StandBy
StandBy
Mentenen Jalan Houling E3
Off
Geret jalan Houliing arah E3
Doseng Jalan arah E3
Izin Sakit
Izin Sakit
Izin Sakit
Izin Sakit
Off
Izin Sakit
Izin Sakit
Izin Sakit
Izin Sakit

AN
RAHMAN NUDIN.A)

Keterangan Pekerjaan
Keterangan Pekerjaan

Angkut OB
Angkut OB
Houling di pit E3 dan W10
Angkut OB / hujan
Barjing
Angkut OB
Stand By Shift 2
Stand By Shift 2
Stand By Shift 2
Angkut OB
Houling Di E3 dan Angkut OB
Off
Barjing
Barjing
Angkut OB
Stand By Shift 1
Stand By Shift 1
Houling E3 dan OB
Off
Houling W10
Persiapan Houling Di E3
Angkut OB Dan Houling E3
Houling Pit Amos
Barjing
Stand By Shift 2
Barjing
Barjing Dan Houling Pit Mansur
Stand By Shift 1
Stand By Shift 1
Angkut OB
NSI KARYAWAN TIMBANGAN ABSENSI KARYAWAN TIMBANGAN
TEMBER S/D 20 OKTOBER 2022(Erlangga) PERIODE 21 SEPTEMBER S/D 20 OKTOBER 2022(Adiannur)
OPERATOR TIMBANGAN) (OPERATOR TIMBANGAN)
Jam Jam
Jam Hadir SPL No Hari/Tanggal/Bulan Jam Hadir
Pulang Pulang
15:00 23:00 1 Rabu,21/09/22 7:00 15:00
15:00 23:00 2 Kamis,22/09/22 7:00 15:00
15:00 23:00 3 Jumat,23/09/22 7:00 15:00
15:00 23:00 4 Sabtu,24/09/22 7:00 15:00
7:00 15:00 7.0 5 Minggu,25/09/22 15:00 23:00
7:00 15:00 _ 6 Senin,26/09/22 15:00 23:00
7:00 15:00 _ 7 Selasa,27/09/22 15:00 23:00
7:00 15:00 _ 8 Rabu,28/09/22 15:00 23:00
7:00 15:00 _ 9 Kamis,29/09/22 15:00 23:00
7:00 15:00 _ 10 Jumat,30/09/22 15:00 23:00
7:00 15:00 _ 11 Sabtu,01/10/22 15:00 23:00
_ 12 Minggu,02/10/22
15:00 23:00 _ 13 Senin,03/10/22 7:00 15:00
15:00 23:00 _ 14 Selasa,04/10/22 7:00 15:00
15:00 23:00 _ 15 Rabu,05/10/22 7:00 15:00
15:00 23:00 _ 16 Kamis,06/10/22 7:00 15:00
15:00 23:00 _ 17 Jumat,07/10/22 7:00 15:00
15:00 23:00 7.0 18 Sabtu,08/10/22 7:00 15:00
_ 19 Minggu,09/10/22
7:00 15:00 _ 20 Senin,10/10/22 15:00 23:00
7:00 15:00 _ 21 Selasa,11/10/22 15:00 23:00
7:00 15:00 _ 22 Rabu,12/10/22 15:00 23:00
7:00 15:00 _ 23 Kamis,13/10/22 15:00 23:00
7:00 15:00 _ 24 Jumat,14/10/22 15:00 23:00
7:00 15:00 7.0 25 Sabtu,15/10/22 7:00 23:00
7:00 23:00 14.0 26 Minggu,16/10/22 7:00 23:00
7:00 18:00 3.0 27 Senin,17/10/22 15:00 18:00
15:00 23:00 _ 28 Selasa,18/10/22 7:00 15:00
15:00 23:00 _ 29 Rabu,19/10/22 7:00 15:00
15:00 23:00 _ 30 Kamis,20/10/22 7:00 15:00
31

38.0 TOTAL
ANGAN
ER 2022(Adiannur)
N)

SPL

1.0
_
_
_
7.0
_
_
_
_
_
_
_
_
_
_
_
_
7.0
_
_
_
_
_
_
7.0
14.0
3.0
_
_
_

39.0
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (A.MUBAID)
(FOREMAN SVP)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerj
Jam

Minggu/30/10/2022 Hyundai 134 _ 391.7 395.1 3.4 General


Sabtu/05/11/2022 Hyundai 134 _ 457.2 459.7 2.5 General
Kamis/10/11/2022 Hyundai 99 _ 2010.9 2012.9 2.0 General Loading dan
Hyundai 99 _ 2012.9 2017.9 5.0 General
Jumat/11/11/2022
Hyundai 134 _ 499.1 504.5 5.4 General
Sabtu/12/11/2022 Hyundai 134 _ 511.6 515.0 3.4 General / Perapian D
Minggu/13/11/2022 Hyundai 134 _ 521.0 526.7 5.7 General
Senin/14/11/2022 Hyundai 134 _ 533.7 537.1 3.4 General
Selasa/15/11/2022 Hyundai 134 _ 537.1 544.4 7.3 General Perapian Sto
Kamis/17/11/2022 Hyundai 134 _ 555.0 558.2 3.2 General
Jumat/18/11/2022 Hyundai 134 _ 561.1 563.0 1.9 General
Minggu/20/11/2022 Hyundai 134 _ 575.1 580.0 4.9 Barjing Tongkan

TOTAL 0.0 48.1

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (BUDI HARIANTO)
(OPERATOR ALLU CRUSHING (ECXA)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerj
Jam
Jumat/21/10/2022 DZ 004 _ 21137.8 21139.8 2.0 Mentenen Jalan
Sabtu/22/10/2022 _ _ _ _ Stand By
Minggu/23/10/2022 Allu EX 201 7.0 22756 22763 7.0 Crushing Coal
Senin/24/10/2022 _ _ _ _ Stand By
Selasa/25/10/2022 Allu EX 201 _ 22775 22782 7.0 Crushing Coal Dan Tr
Rabu/26/10/2022 Allu EX 201 1.0 22785 22793 8.0 Crushing Coal
Kamis/27/10/2022 Allu EX 201 1.0 22800 22808 8.0 Crushing Coal
Jumat/28/10/2022 _ _ _ _ StandBy
Sabtu/29/10/2022 Allu EX 201 _ 22815 22822 7.0 Crushing Coal
Minggu/30/10/2022 Allu EX 201 7.0 22836 22843 7.0 Crushing Coal 10
Senin/31/10/2022 Allu EX 201 _ 22850 22857 7.0 Crushing Coal E
Selasa/01/11/2022 Allu EX 201 _ 22864 22871 7.0 Crushing Coal Man
Rabu/02/11/2022 Hyundai 134 _ 422.6 427.9 5.3 OB lumpur StockF
Kamis/03/11/2022 Allu EX 201 _ 22882 22886 4.0 Crushing Coal Man
Hyundai 134 _ 445.9 450.0 4.1 General Dan Houling A
Jumat/04/11/2022
Bomax 106 _ 728.0 731.0 3.0 Memadatkan Jalan Houling
Sabtu/05/11/2022 Allu EX 201 _ 22886 22893 7.0 Crushing Coal Mansur
Minggu/06/11/2022 _ _ _ _ _ Off
Senin/07/11/2022 Bomax 106 _ 742 747 5.0 Memadatakan Jalan Houling Amos Da
Selasa/08/11/2022 Allu EX 201 _ 22901 22908 7.0 Crushing Coal
Rabu/09/11/2022 Allu EX 201 _ 22915 22922 7.0 Crushing Coal Mansur D
Kamis/10/11/2022 Allu EX 201 _ 22927 22934 7.0 Crushing Coal Man
Jumat/11/11/2022 Allu EX 201 _ 22934 22939 5.0 Crushing Coal Man
Sabtu/12/11/2022 Allu EX 201 _ 22939 22946 7.0 Crushing Coal Mansur D
Minggu/13/11/2022 Allu EX 201 7.0 22953 22960 7.0 Crushing Coal Am
Senin/14/11/2022 Allu EX 201 _ 22967 22974 7.0 StandBy
Selasa/15/11/2022 Allu EX 201 _ 22974 22979 5.0 Crushing Coal
Rabu/16/11/2022 Allu EX 201 _ 22979 22983 4.0 Crushing Coal Am
Kamis/17/11/2022 _ _ _ _ StandBy
Jumat/18/11/2022 DT Baru _ 15:00 18:00 3.0 Mobilisasi Dt Ba
Sabtu/19/11/2022 Allu Ex 201 1.0 22986 22994 8.0 Crushing Coal Am
Minggu/20/11/2022 Allu EX 201 7.0 22994 23001 7.0 Crushing Coal

TOTAL 31.0 162.4

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (WANDI)
(DRIVER DT.103)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerj
Jam

Jumat/21/10/2022 DT 103 _ 15:00 23:00 7.0 Angkut OB Laminatin


Sabtu/22/10/2022 _ _ _ _ StandBy Shift 2
Minggu/23/10/2022 DT 103 7.0 7:00 15:00 7.0 Angkut OB Laminatin
Senin/24/10/2022 _ _ _ _ StandBy Shift 1
Selasa/25/10/2022 DT 57 _ 7:00 15:00 Evakuasi
7.0 DT 3 Unit Di Simpang 3 Batu Dinding Dan
Rabu/26/10/2022 DT 103 _ 9:00 15:00 5.0 Angkut OB
Kamis/27/10/2022 DT 103 _ 7:00 15:00 7.0 Angkut OB Timbun Jalan Houling Da
Jumat/28/10/2022 _ _ _ _ StandBy Shift 1
Sabtu/29/10/2022 DT 103 _ 9:00 15:00 5.0 Angkut OB Laminatin
Minggu/30/10/2022 DT 103 7.0 15:00 23:00 7.0 OB timbun Jalan Houling Dan Ho
Senin/31/10/2022 DT 103 _ 15:00 23:00 7.0 Houling Coal 10W Dan Angkut OB
Selasa/01/11/2022 _ _ _ _ StandBy Shift 2
Rabu/02/11/2022 DT 103 _ 15:00 23:00 7.0 Angkut Lumpur Area S
Kamis/03/11/2022 DT 103 _ 15:00 23:00 6.0 Angkut OB Laminating Jalan Dan
Jumat/04/11/2022 DT 103 _ 15:00 23:00 7.0 Angkut OB Timbun Jalan Dan H
Sabtu/05/11/2022 DT 103 _ 15:00 23:00 7.0 Angkut OB Laminatin
Minggu/06/11/2022 _ _ _ _ Off
Senin/07/11/2022 DT 103 _ 7:00 15:00 5.0 Angkut OB Dan Houling
Selasa/08/11/2022 DT 103 _ 7:00 15:00 7.0 Angkut OB Laminatin
Rabu/09/11/2022 DT 103 _ 7:00 15:00 7.0 Angkut OB Timbun Jalan Dan H
Kamis/10/11/2022 DT 103 _ 9:00 15:00 5.0 Houling Coal 10
Jumaat/11/11/2022 _ _ _ _ StandBy Shift 1
Sabtu/12/11/2022 _ _ _ _ StandBy Shift 1
Minggu/13/11/2022 _ _ _ _ Off
Senin/14/11/2022 _ _ _ _ StandBy Shift 2
Selasa/15/11/2022 _ _ _ _ StandBy Shift 2
Rabu/16/11/2022 _ _ _ _ StandBy Shift 2
Kamis/17/11/2022 _ _ _ _ StandBy Shift 2
Jumat/18/11/2022 _ _ _ _ StandBy Shift 2
Sabtu/19/11/2022 Bomax 106 _ 754 761 7.0 Barjing Pemadatan Jalan
Minggu/20/11/2022 DT 103 7.0 7:00 15:00 7.0 Angkut Lumpur Area StockFi

TOTAL 21.0 117.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (AGUS SUYONO)
(OPERATOR EXCA)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerj
Jam

Jumat/21/10/2022 Hyundai 134 3.0 298.5 302.8 4.3 General/Perbaikan J


Sabtu/22/10/2022 Hyundai 134 1.0 302.8 307.4 4.6 General/Perbaikan Ta
Minggu/23/10/2022 Hyundai 134 14.0 307.4 317.7 10.3 General/Perbaikan J
Senin/24/10/2022 Hyundai 134 _ 323.1 330.2 7.1 Perbaikan Jalan
Selasa/25/10/2022 Hyundai 134 _ 337.9 341.4 3.5 General Perbaikan J
Rabu/26/10/2022 Hyundai 134 _ 347.7 354.7 7.0 General Perbaikan J
Kamis/27/10/2022 Hyundai 134 _ 361.0 368.1 7.1 General Perbaikan J
Jumat/28/10/2022 Hyundai 134 _ 372.0 374.1 2.1 General
Sabtu/29/10/2022 Hyundai 134 _ 379.1 386.1 7.0 General Loading O
Minggu/30/10/2022 _ _ _ _ Off
Senin/31/10/2022 Hyundai 134 4.0 395.1 405.3 10.2 General Perbaikan Jalan Kampung M
Selasa/01/11/2022 Hyundai 134 4.0 405.3 415.6 10.3 General Perbaikan Jalan
Rabu/02/11/2022 Hyundai 134 _ 415.6 422.6 7.0 General Loading O
Kamis/03/11/2022 Hyundai 134 6.0 427.9 440.9 13.0 Loading Coal Mansur L
Jumat/04/11/2022 Hyundai 134 _ 440.9 445.9 5.0 Loading OB
Sabtu/05/11/2022 Hyundai 134 _ 450.0 457.2 7.2 General Lambung Lumpur D
Minggu/06/11/2022 _ _ _ _ Off
Senin/07/11/2022 Hyundai 134 1.0 466.4 472.4 6.0 General Perapian Ta
Selasa/08/11/2022 Hyundai 134 _ 479.8 486.8 7.0 General Perapian Di
Rabu/09/11/2022 Hyundai 134 _ 493.4 495.4 2.0 General Perbantuan Pasang
Kamis/10/11/2022 _ _ _ _ StandBy
Jumat/11/11/2022 Hyundai 134 _ 504.5 511.6 7.1 General perbaikan di
Sabtu/12/11/2022 Hyundai 134 _ 515.0 521.0 6.0 General Perbaikan Dispo
Minggu/13/11/2022 _ _ _ _ Off
Senin/14/11/2022 Hyundai 134 _ 526.7 533.7 7.0 General Perapian Dispo
Selasa/15/11/2022 _ _ _ _ StandBy
Rabu/16/11/2022 _ _ _ _ StandBy
Kamis/17/11/2022 Hyundai 134 3.0 544.4 555.0 10.6 General Bikin Gorong" D
Jumat/18/11/2022 Hyundai 134 _ 558.2 561.1 2.9 General Pembersihan
Sabtu/19/11/2022 Hyundai 134 7.0 563.0 575.1 12.1 General Perbaikan Ta
Minggu/20/11/2020 Hyundai 134 7.0 580.0 585.1 5.1 Barjing

TOTAL 50.0 171.5

*NOTE*
WARNA WARNA TULISAN KETERANGAN
HITAM STANDBY
HITAM LEMBUR HARI KERJA
PUTIH OFF
MERAH LEMBUR HARI LIBUR KERJA/TANGGAL MERAH
HITAM IZIN SAKIT
HITAM IZIN JIKA ADA KEPERLUAN/URUSAN
KARYAWAN LAPO
MBER 2022 (A.MUBAID) PERIODE BULA
(O

Keterangan Pekerjaan Hari/Tgl/Bulan Kode Unit


#VALUE!
General Jumat/21/10/2022 EX Allu 201
General Sabtu/22/10/2022 _
General Loading dan Getting Minggu/23/10/2022 EX Allu 201
General Senin/24/10/2022 EX Allu 201
General Selasa/25/10/2022 EX Allu 201
General / Perapian Disposal Rabu/26/10/2022 EX Allu 201
General Kamis/27/10/2022 EX Allu 201
General Jumat/28/10/2022 _
General Perapian StockFile Sabtu/29/10/2022 EX Allu 201
General Minggu/30/10/2022 EX Allu 201
General Senin/31/10/2022 EX Allu 201
Barjing Tongkang Selasa/01/11/2022 EX Allu 201
Rabu/02/11/2022 EX Allu 201
Kamis/03/11/2022 EX Allu 201
Sabtu/05/11/2022 Bomax 106
Minggu/06/11/2022 _
Senin/07/11/2022 EX Allu 201
Selasa/08/11/2022 EX Allu 201
Rabu/09/11/2022 EX Allu 201
Kamis/10/11/2022 _
Jumat/11/11/2022 _
Sabtu/12/11/2022 EX Allu 201
Minggu/13/11/2022 _
Senin/14/11/2022 EX Allu 201
Selasa/15/11/2022 _
Rabu/16/11/2022 _
Kamis/17/11/2022 _
Jumat/18/11/2022 _
Sabtu/19/11/2022 EX Allu 201
Minggu/20/11/2022 EX Allu 201

TOTAL

KARYAWAN LAPO
ER 2022 (BUDI HARIANTO) PERIODE BULAN
G (ECXA)

Keterangan Pekerjaan Hari/Tgl/Bulan Kode Unit

Mentenen Jalan Jumat/21/10/2022 DT 103


Stand By Sabtu/22/10/2022 _
Crushing Coal Minggu/23/10/2022 DT 103
Stand By Senin/24/10/2022 DT 103
Crushing Coal Dan Travel DT Selasa/25/10/2022 _
Crushing Coal Rabu/26/10/2022 DT 103
Crushing Coal Kamis/27/10/2022 DT 103
StandBy Jumat/28/10/2022 _
Crushing Coal Sabtu/29/10/2022 DT 103
Crushing Coal 10w Minggu/30/10/2022 DT 103
Crushing Coal E3 Senin/31/10/2022 Bomax 106
Crushing Coal Mansur Selasa/01/11/2022 DT 103
OB lumpur StockFile Rabu/02/11/2022 DT 103
Crushing Coal Mansur Kamis/03/11/2022 DT 103
General Dan Houling Arah E3 Jumat/04/11/2022 DT 103
Memadatkan Jalan Houling Arah Mansur Sabtu/05/11/2022 DT 103
Crushing Coal Mansur Dan E3 Minggu/06/11/2022 _
Off Senin/07/11/2022 DT 103
Memadatakan Jalan Houling Amos Dan Workshop ,StockFile Selasa/08/11/2022 DT 103
Crushing Coal Rabu/09/11/2022 _
Crushing Coal Mansur Dan Dimas Kamis/10/11/2022 _
Crushing Coal Mansur Jumaat/11/11/2022 _
Crushing Coal Mansur Sabtu/12/11/2022 DT 103
Crushing Coal Mansur Dan Tamrin Minggu/13/11/2022 _
Crushing Coal Amos Senin/14/11/2022 DT 103
StandBy Selasa/15/11/2022 _
Crushing Coal Rabu/16/11/2022 _
Crushing Coal Amos Kamis/17/11/2022 _
StandBy Jumat/18/11/2022 _
Mobilisasi Dt Baru Sabtu/19/11/2022 Dt 103
Crushing Coal Amos Minggu/20/11/2022 Bomax 106
Crushing Coal
TOTAL

LAPO
KARYAWAN PERIODE BULAN 2
EMBER 2022 (WANDI)

Hari/Tgl/Bulan Kode Unit


Keterangan Pekerjaan
Jumat/21/10/2022 DT 101
Angkut OB Laminating Jalan Sabtu/22/10/2022 _
StandBy Shift 2 Minggu/23/10/2022 DT 101
Angkut OB Laminating Jalan Senin/24/10/2022 _
StandBy Shift 1 Selasa/25/10/2022 DT 101
T 3 Unit Di Simpang 3 Batu Dinding Dan Angkut OB Perbaikan Jalan Houling Rabu/26/10/2022 DT 101
Angkut OB Kamis/27/10/2022 DT 101
Angkut OB Timbun Jalan Houling Dan Houling Coal Pit E3 Jumat/28/10/2022 _
StandBy Shift 1 Bomax
Sabtu/29/10/2022
Sabtu/29/10/2022
Angkut OB Laminating Jalan DT 101
OB timbun Jalan Houling Dan Houling Coal Pit w10 Minggu/30/10/2022 DT 101
Houling Coal 10W Dan Angkut OB Laminating Jalan Senin/31/10/2022 DT 101
StandBy Shift 2 Selasa/01/11/2022 DT 101
Angkut Lumpur Area StockFile Rabu/02/11/2022 DT 101
Angkut OB Laminating Jalan Dan Houling Coal 10W Kamis/03/11/2022 DT 101
Angkut OB Timbun Jalan Dan Houling Coal 10W Jumat/04/11/2022 Bomax 106
Angkut OB Laminating Jalan Sabtu/05/11/2022 DT 101
Off Minggu/06/11/2022 _
Angkut OB Dan Houling Coal E3 Senin/07/11/2022 DT 101
Angkut OB Laminating Jalan Selasa/08/11/2022 DT 101
Angkut OB Timbun Jalan Dan Houling Coal 10W Rabu/09/11/2022 DT 101
Houling Coal 10w Kamis/10/11/2022 DT 101
StandBy Shift 1 Jumaat/11/11/2022 _
StandBy Shift 1 Sabtu/12/11/2022 _
Off Minggu/13/11/2022 _
StandBy Shift 2 Senin/14/11/2022 _
StandBy Shift 2 Selasa/15/11/2022 _
StandBy Shift 2 Rabu/16/11/2022 _
StandBy Shift 2 Kamis/17/11/2022 _
StandBy Shift 2 Jumat/18/11/2022 _
Barjing Pemadatan Jalan Houling Sabtu/19/11/2022 DT 101
Angkut Lumpur Area StockFile Dan Barjing Minggu/20/11/2022 DT 101

TOTAL

LAPO
KARYAWAN PERIODE BULAN 21
BER 2022 (AGUS SUYONO)

Hari/Tgl/Bulan Kode Unit


Keterangan Pekerjaan
Jumat/21/10/2022 Loader 220
General/Perbaikan Jalan Sabtu/22/10/2022 _
General/Perbaikan Tanggul Minggu/23/10/2022 Loader 220
General/Perbaikan Jalan Senin/24/10/2022 Loader 220
Perbaikan Jalan Selasa/25/10/2022 Loader 220
General Perbaikan Jalan Rabu/26/10/2022 Loader 220
General Perbaikan Jalan Kamis/27/10/2022 _
General Perbaikan Jalan Jumat/28/10/2022 _
General Sabtu/29/10/2022 _
General Loading OB Minggu/30/10/2022 Loader 220
Off Senin/31/10/2022 Loader 220
General Perbaikan Jalan Kampung Meratakan Batu Coral Selasa/01/11/2022 Loader 220
General Perbaikan Jalan Kampung Rabu/02/11/2022 Loader 220
General Loading OB 98.0 Kamis/03/11/2022 Loader 220
Loading Coal Mansur LongShift Jumat/04/11/2022 Loader 220
Loading OB Sabtu/05/11/2022 Loader 220
General Lambung Lumpur Di Disposal luwi Minggu/06/11/2022 _
Off Senin/07/11/2022 Loader 220
General Perapian Tanggul Selasa/08/11/2022 Loader 220
General Perapian Disposal Rabu/09/11/2022 Loader 220
General Perbantuan Pasang Treck Dozer Kamis/10/11/2022 Loader 220
StandBy Jumat/11/11/2022 _
General perbaikan disposal Sabtu/12/11/2022 Loader 220
General Perbaikan Disposal Amos Minggu/13/11/2022 Loader 220
Off Senin/14/11/2022 Loader 220
General Perapian Disposal Amos Selasa/15/11/2022 _
StandBy Rabu/16/11/2022 Loader 220
StandBy Kamis/17/11/2022 _
General Bikin Gorong" Di Pit Amos Jumat/18/11/2022 _
General Pembersihan Truck Sabtu/19/11/2022 Loader 220
General Perbaikan Tanggul Minggu/20/11/2022 Loader 220
Barjing

TOTAL

JA

NGGAL MERAH

N/URUSAN
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (ASPIANTO)
(OPERATOR ALLU CRUSHING(EXCA)
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

_ 22753 22756 3.0 Merapikan StockFile


_ _ _ StandBy
7.0 22763 22770 7.0 Crushing Coal
_ 22770 22775 5.0 Crushing Coal Dan Perapian StockFile
_ 22782 22785 3.0 Crushing Coal
_ 22793 22800 7.0 Crushing Coal
_ 22808 22815 7.0 Crushing Coal
_ _ _ StandBy
_ 22822 22829 7.0 Crushing Coal
7.0 22829 22836 7.0 Crushing Coal
_ 22843 22850 7.0 Crushing Coal
_ 22857 22864 7.0 Crushing Coal
_ 22871 22874 3.0 Crushing Coal
1.0 22874 22882 8.0 Crushing Coal
_ 731 738 7.0 Bomax Jalan
_ _ _ Off
1.0 22893 22901 8.0 Crushing Coal
_ 22908 22915 7.0 Crushing Coal
_ 22922 22927 5.0 Crushing Coal
_ _ _ StandBy
_ _ _ StandBy
_ 22946 22953 7.0 Crushing Coal
_ _ _ Off
_ 22960 22967 7.0 Crushing Coal
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
_ 22983 22986 3.0 Crushing Coal
7.0 23001 23008 7.0 Crushing Coal

23 122.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (DERRYANTO)
(DRIVER DT.103)
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

_ 7:00 15:00 7.0 Angkut OB


_ _ _ StandBy Shift 1
7.0 15:00 21:00 6.0 Houling Pit 3B
_ 15:00 23:00 7.0 Angkut OB
_ _ _ StandBy Shift 2
_ 15:00 23:00 7.0 Angkut OB
_ 15:00 23:00 7.0 Houling Pit E3 Dan Mansur
_ _ _ StandBy Shift 2
_ 15:00 23:00 7.0 Angkut OB
7.0 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
4.0 683 690 7.0 Memadatkan Jalan Kampung
_ 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
_ 7:00 15:00 7.0 Loading Lumpur StockFile
1.0 7:00 15:00 7.0 Holing Pit Mansur
_ 7:00 15:00 6.0 Angkut OB Houling Pit E3
_ 7:00 15:00 7.0 Angkut OB Houling E3
_ _ _ Off
1 15:00 23:00 7.0 Angkut OB/ Houling w10
_ 15:00 23:00 5.0 Angkut OB Dan Houling W10
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ 15:00 23:00 7.0 Houling Pit E3
_ _ _ Off
_ 7:00 15:00 7.0 Houling Pit E3 Dan Angkut OB W10
_ _ _ StandBy Shift 1
_ _ _ StandBy Shift1
_ _ _ StandBy Shift 1
_ _ _ StandBy Shift 1
_ 7:00 11:00 4.0 Angkut OB
7.0 15:00 23:00 4.0 Memadatkan stockFile

27.0 123.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (M.IKRAR HAQQI)
(DRIVER DT.101)
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam
_ 15:00 23:00 7.0 Angkut OB Perbaikan Jalan
_ _ _ StandBy Shift 2
7.0 7:00 15:00 7.0 Angkut OB/Laminating Jalan
_ _ _ StandBy Shift 1
_ 7:00 15:00 7.0 Angkut OB,Timbun Jalan Dan Houling Pit Amos
_ 9:00 15:00 5.0 Angkut OB Laminating Jalan
_ 7:00 15:00 7.0 Angkut OB Laminating Jalan Dan Houling Pit E3
_ _ _ StandBy Shift 1
_ 674 676 2.0 Perapian Area Timbangan
_ 9:00 15:00 5.0 Angkut OB
7.0 15:00 23:00 7.0 Houling 10W Dan Angkut OB
_ 15:00 23:00 7.0 Houling E3 Angkut OB Dan Houling Pit Mansur
_ 15:00 23:00 5.0 Angkut OB / Sisanya StandBy 2 Jam
_ 15:00 23:00 7.0 Angkut Lumpr Di StockFile Dan Angkut OB
_ 15:00 23:00 6.0 Houling Pit Mansur Dan Angkut OB Laminating Jalan
_ 731 735 4.0 Laminating Jalan Houling
_ 15:00 23:00 7.0 Angkut OB Laminating Jalan supaya Jalan Tidak Licin
_ _ _ Off
_ 7:00 15:00 5.0 Houling Pit E3 Dan Angkut OB
_ 7:00 15:00 7.0 Angkut OB Laminating Jalan
_ 7:00 15:00 7.0 Angkut OB Lanjut Houling Di West 10
_ 7:00 15:00 5.0 Angkut OB Di E3 Dan Houling Di Pit West
_ _ _ StandBy Shift 1
_ _ _ StandBy Shift 1
_ _ _ Off
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ _ _ StandBy Shift 2
_ 15:00 23:00 7.0 Barjing To Tongkang
7.0 7:00 15:00 7.0 Barjing To Tongkang Dan Angkut Lumpur StockFile

21.0 121.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (ROMY GUNAWAN)
(OPERATOR LOADER)
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam
_ 126.7 129.9 3.2 Perapihan Dan Memindahkan Batu
_ _ _ StandBy
7.0 129.9 134.6 4.7 Menjaga Dampingan StockFile
_ 138.1 140.0 1.9 Merapikan StockFile Dan Menjaga Dampingan
_ 146.4 152.0 5.6 Menjaga Dampingan StockFile
1.0 154.1 157.4 3.3 Menjaga Dampingan StockFile
_ _ _ StandBy
_ _ _ StandBy
_ _ _ Izin
7.0 172.5 174.0 1.5 Melambungkan Batu Bara StockFile
_ 176.0 183.3 7.3 Perbaikan Dan Merapikan StockFile
_ 187.7 190.0 2.3 Merapikan Batu Bara
_ 704 707 3.0 Memadatkan Area StockFile
_ 202.8 208.4 5.6 Memindahkan Batu Bara Menjaga Dampingan DT
_ 210.9 214.4 3.5 Merapikan StockFile Dan Memindahkan Batu Bara
_ 218.3 223.4 5.1 Mengampar OB Jalan Melayani Exca/Allu
_ _ _ Off
_ 223.4 229.8 6.4 Melambungkan Batu Bara Dan Mentenance StockFile
_ 236.1 243.1 7.0 Mengampar OB Dan Laminating Jalan
_ 248.2 251.2 3.0 Merapikan StockFile
_ 253.3 259.4 6.1 Merapikan StockFile Coal
_ _ _ StandBy
_ 259.4 260.9 1.5 Merapikan StockFile
7.0 266.1 273.3 7.2 Merapikan Dumpingan Dt/StockFile
_ 280.3 286.4 6.1 StandBy
_ _ _ StandBy
_ 286.4 293.4 7.0 Merapikan Area StockFile Batu Bara
_ _ _ StandBy
_ _ _ StandBy
1.0 305.4 313.4 8.0 Barjing/Menjaga Dampingan
7.0 313.4 320.4 7.0 Barjing

30.0 106.3
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (DWIWANT
(OPERATOR EXCA(HYUNDAI)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam

Jumat/21/10/2022 _ _ _ _
Sabtu/22/10/2022 _ _ _ _
Minggu/23/10/2022 _ _ _ _
Senin/24/10/2022 Hyundai _ 981.8 989.2 7.4
Selasa/25/10/2022 Hyundai 340 _ 353.5 358.0 4.5
Rabu/26/10/2022 Hyundai 340 _ 358.0 366.5 8.5
Kamis/27/10/2022 Hyundai 340 _ 366.5 371.6 5.1
Jumat/28/10/2022 Hyundai 112 _ 1000.5 1008.9 8.4
Sabtu/29/10/2022 Hyundai _ 1008.9 1016.8 7.9
Minggu/30/10/2022 Hyundai _ 1016.8 1025.8 9.0
Senin/31/10/2022 _ _ _ _
Selasa/01/11/2022 Hyundai _ 1025.8 1037.7 11.9
Rabu/02/11/2022 _ _ _ _
Kamis/03/11/2022 _ _ _ _
Jumat/04/11/2022 Hyundai _ 1037.7 1051.9 14.2
Sabtu/05/11/2022 Hyundai _ 1051.9 1061.9 10.0
Minggu/06/11/2022 _ _ _ _
Senin/07/11/2022 Hyundai _ 1061.9 1068.4 6.5
Selasa/08/11/2022 Hyundai _ 1068.4 1076.4 8.0
Rabu/09/11/2022 Hyundai _ 1076.4 1082.5 6.1
Kamis/10/11/2022 Hyundai _ 1082.5 1086.6 4.1
Jumat/11/11/2022 Hyundai _ 1086.6 1094.1 7.5
Sabtu/12/11/2022 Hyundai _ 1094.1 1104.7 10.6
Minggu/13/11/2022 _ _ _ _
Senin/14/11/2022 _ _ _ _
Selasa/15/11/2022 Hyundai _ 1112.3 1116.7 4.4
Hyundai _ 1104.7 1112.3 7.6
Rabu/16/11/2022
Hyundai _ 1116.7 1125.4 8.7
Kamis/17/11/2022 Hyundai _ 1125.4 1135.8 10.4
Jumat/18/11/2022 Hyundai 131 _ 528.4 534.3 5.9
Sabtu/19/11/2022 Hyundai _ 534.3 542.8 8.5
Minggu/20/11/2022 Hyundai 131 7.0 542.8 553.8 11.0

TOTAL 7.0 186

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (SYUKUR
(DRIVER DT.101)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam

Jumat/21/10/2022 DT 25 _ 7:00 15:00 7.0


Sabtu/22/10/2022 _ _ _ _
Minggu/23/10/2022 DT 105/25 7.0 7:00 15:00 7.0
Senin/24/10/2022 DT 25 _ _ _
Selasa/25/10/2022 DT 55 _ 7:00 15:00 7.0
Rabu/26/10/2022 DT 25/105 _ 9:00 15:00 5.0
Kamis/27/10/2022 DT 25/105 _ 7:00 15:00 7.0
Jumat/28/10/2022 _ _ _ _
Bomax 106 7.0 676 683 7.0
Sabtu/29/10/2022
DT 25 _ 9:00 15:00 5.0
Minggu/30/10/2022 DT 25 7.0 15:00 23:00 7.0
Senin/31/10/2022 DT 25 _ 15:00 23:00 7.0
Selasa/01/11/2022 DT 25 _ 15:00 21:00 5.0
Rabu/02/11/2022 DT 25 _ 15:00 23:00 7.0
Kamis/03/11/2022 Bomax 106 _ 718 722 4.0
Jumat/04/11/2022 DT 25 _ 15:00 23:00 7.0
Sabtu/05/11/2022 DT 25 _ 15:00 23:00 7.0
Minggu/06/11/2022 _ _ _ _
Senin/07/11/2022 DT 25 _ 9:00 15:00 5.0
Selasa/08/11/2022 DT 25 _ 7:00 15:00 7.0
Rabu/09/11/2022 DT 25 _ 7:00 15:00 7.0
Kamis/10/11/2022 _ _ _ _
Jumaat/11/11/2022 _ _ _ _
Sabtu/12/11/2022 _ _ _ _
Minggu/13/11/2022 _ _ _ _
Senin/14/11/2022 _ _ _ _
Selasa/15/11/2022 _ _ _ _
Rabu/16/11/2022 _ _ _ _
Kamis/17/11/2022 _ _ _ _
Jumat/18/11/2022 _ _ _ _
Sabtu/19/11/2022 DT 25 _ 15:00 23:00 7.0
Minggu/20/11/2022 DT 25 7.0 7:00 15:00 7.0

TOTAL 28.0 122.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (HENDRA
(DRIVER DT.102)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam

Jumat/21/10/2022 DT 102 _ 15:00 23:00 7.0


Sabtu/22/10/2022 _ _ _ _
Minggu/23/10/2022 DT 102 7.0 7:00 15:00 7.0
Senin/24/10/2022 _ _ _ _
Selasa/25/10/2022 DT 102 _ 7:00 15:00 7.0
Rabu/26/10/2022 DT 102 _ 9:00 15:00 5.0
Kamis/27/10/2022 DT 102 _ 7:00 15:00 7.0
Jumat/28/10/2022 _ _ _ _
Sabtu/29/10/2022 DT 102 _ 9:00 15:00 5.0
Minggu/30/10/2022 DT 102 7.0 15:00 23:00 7.0
Senin/31/10/2022 DT 102 _ 15:00 20:00 3.0
Selasa/01/11/2022 Bomax 106 _ 697 702 5.0
Rabu/02/11/2022 Bomax 106 _ 707 710 3.0
Kamis/03/11/2022 DT 108 _ 15:00 23:00 6.0
Jumat/04/11/2022 DT 108 _ 15:00 23:00 7.0
Sabtu/05/11/2022 DT 108 _ 15:00 23:00 7.0
Minggu/06/11/2022 _ _ _ _
Senin/07/11/2022 DT 108 _ 7:00 15:00 5.0
Selasa/08/11/2022 DT 108 _ 7:00 15:00 3.0
Rabu/09/11/2022 _ _ _ _
Kamis/10/11/2022 DT 25 _ 7:00 15:00 5.0
Jumaat/11/11/2022 _ _ _ _
Sabtu/12/11/2022 _ _ _ _
Minggu/13/11/2022 _ _ _ _
Senin/14/11/2022 _ _ _ _
Selasa/15/11/2022 _ _ _ _
Rabu/16/11/2022 _ _ _ _
Kamis/17/11/2022 _ _ _ _
Jumat/18/11/2022 DT Baru _ 15:00 18:00 3.0
Sabtu/19/11/2022 DT 108 _ 15:00 23:00 7.0
Minggu/20/11/2022 DT 108/107 7.0 7:00 15:00 7.0

TOTAL 21.0 106.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (HAIRIL)
(OPERATOR LOADER)
Jumlah
Hari/Tgl/Bulan Kode Unit spl Hm Awal Hm Akhir
Jam
Jumat/21/10/2022 Loader 220 _ 122.1 126.7 4.6
Sabtu/22/10/2022 _ _ _ _
Minggu/23/10/2022 Loader 220 7.0 134.6 138.1 3.5
Senin/24/10/2022 Loader 220 _ 140.0 146.3 6.3
Selasa/25/10/2022 Loader 220 _ 152.0 154.1 2.1
Rabu/26/10/2022 Hyundai 134 _ 989.2 994.0 4.8
Kamis/27/10/2022 Loader 220 _ 157.4 159.9 2.5
Jumat/28/10/2022 _ _ _ _
Sabtu/29/10/2022 Loader 220 2.0 159.9 166.9 7.0
Minggu/30/10/2022 Loader 220 7.0 166.9 172.5 5.6
Senin/31/10/2022 Loader 220 _ 174.0 176.0 2.0
Selasa/01/11/2022 Loader 220 _ 183.3 187.7 4.4
Rabu/02/11/2022 Loader 220 _ 190.0 196.1 6.1
Kamis/03/11/2022 Loader 220 1.0 196.1 202.8 6.7
Jumat/04/11/2022 Loader 220 _ 208.4 210.9 2.5
Sabtu/05/11/2022 Loader 220 _ 214.4 218.3 3.9
Minggu/06/11/2022 _ _ _ _
Senin/07/11/2022 Loader 220 1.0 229.8 236.1 6.3
Selasa/08/11/2022 Loader 220 _ 243.1 248.2 5.1
Rabu/09/11/2022 Loader 220 _ 251.2 253.3 2.1
Kamis/10/11/2022 _ _ _ _
Jumat/11/11/2022 _ _ _ _
Sabtu/12/11/2022 Loader 220 _ 260.9 266.1 5.2
Minggu/13/11/2022 _ _ _ _
Senin/14/11/2022 Loader 220 _ 273.3 280.3 7.0
Selasa/15/11/2022 _ _ _ _
Rabu/16/11/2022 _ _ _ _
Kamis/17/11/2022 _ _ _ _
Jumat/18/11/2022 Loader 220 _ 293.4 298.4 5.0
Sabtu/19/11/2022 Loader 220 _ 298.4 305.4 7.0
Minggu/20/11/2022 Loader 220 7.0 320.4 325.4 5.0

TOTAL 25.0 104.7


HARIAN KARYAWAN
20 NOVEMBER 2022 (DWIWANTO) PERIOD
CA(HYUNDAI)

Keterangan Pekerjaan Hari/Tgl/Bulan

StandBy Jumat/21/10/2022
StandBy Sabtu/22/10/2022
StandBy Minggu/23/10/2022
General Senin/24/10/2022
Sidecast Selasa/25/10/2022
Sidecast Rabu/26/10/2022
Sidecast Kamis/27/10/2022
Sidecast Jumat/28/10/2022
Sidecast Sabtu/29/10/2022
Sidecast Minggu/30/10/2022
StandBy Senin/31/10/2022
Sidecast Selasa/01/11/2022
StandBy Rabu/02/11/2022
StandBy Kamis/03/11/2022
Sidecast Jumat/04/11/2022
Sidecast Sabtu/05/11/2022
Off Minggu/06/11/2022
Sidecast Cleanning Loading Senin/07/11/2022
Sidecast Selasa/08/11/2022
Sidecast Rabu/09/11/2022
Sidecast Kamis/10/11/2022
Sidecast Cleanning Jumat/11/11/2022
Cleanning Getting Loading Coal E3 Sabtu/12/11/2022
Off Minggu/13/11/2022
StandBy Senin/14/11/2022
Sidecast Selasa/15/11/2022
Cleanning Getting Loading E3 Rabu/16/11/2022
Sidecast Kamis/17/11/2022
Sidecast Jumat/18/11/2022
General Sabtu/19/11/2022
Barjing Minggu/20/11/2022
Melambungkan Coal Barjing

TOTAL

HARIAN KARYAWAN
D 20 NOVEMBER 2022 (SYUKUR) PERIO
DT.101)

Keterangan Pekerjaan Hari/Tgl/Bulan

OB Laminating Jalan Jumat/21/10/2022


StandBy Shift 1 Sabtu/22/10/2022
OB/Laminating Jalan Houling Dan Houling pit 2B Minggu/23/10/2022
StandBy Shift 1 Senin/24/10/2022
Evakuasi Unit Di Jalan Selasa/25/10/2022
Angkut OB Rabu/26/10/2022
OB Laminating Jalan Dan Houling Pit E3 Kamis/27/10/2022
StandBy Shift 1 Jumat/28/10/2022
Area StockFile Dan Timbangan Sabtu/29/10/2022
OB Laminating Jalan Houling Minggu/30/10/2022
Houling Pit 10W Mansur Senin/31/10/2022
OB Timbun Jalan Houling Dan Houling Pit w10 Selasa/01/11/2022
OB mentenen Jalan Rabu/02/11/2022
Buang Material Lumpur StockFile Kamis/03/11/2022
Pemadatan Area StockFile Dan Tikungan Timbangan Jumat/04/11/2022
Houling Dan OB Sabtu/05/11/2022
OB/Laminating Jalan Houling Minggu/06/11/2022
Off Senin/07/11/2022
Houling E3 Selasa/08/11/2022
Angkut OB Laminating Jalan Rabu/09/11/2022
Angkut OB Dan Houling Pit 10W Kamis/10/11/2022
StandBy Shift 1 Jumat/11/11/2022
StandBy Shift 1 Sabtu/12/11/2022
StandBy Shift 1 Minggu/13/11/2022
Off Senin/14/11/2022
StandBy Shift 2 Selasa/15/11/2022
StandBy Shift 2 Rabu/16/11/2022
StandBy Shift 2 Kamis/17/11/2022
StandBy Shift 2 Jumat/18/11/2022
StandBy Shift 2 Sabtu/19/11/2022
Barjing Minggu/20/11/2022
Barjing Dan Buang Lumpur StockFile
TOTAL

HARIAN KARYAWAN PERIODE


D 20 NOVEMBER 2022 (HENDRA)
DT.102)
Hari/Tgl/Bulan
Keterangan Pekerjaan
Jumat/21/10/2022
Laminating Jalan Houling Sabtu/22/10/2022
StandBy Shift 2 Minggu/23/10/2022
Laminating Jalan Houling/OB Senin/24/10/2022
StandBy Shift 1 Selasa/25/10/2022
Angkut OB Dan Timbun Jalan Rabu/26/10/2022
Angkut OB Laminating Jalan Kamis/27/10/2022
Houling Pit E3 Jumat/28/10/2022
StandBy Shift 1 Sabtu/29/10/2022
OB Laminating Jalan Houling Minggu/30/10/2022
Houling w10 OB/Jalan Houling Senin/31/10/2022
Angkut OB Di E3 Kendala Insiden Selasa/01/11/2022
Pemadatan Area StockFile Dan WorkShop Rabu/02/11/2022
Pemadatan Area StockFile Dan Jalan Houling Kamis/03/11/2022
Houling Pit 10W Mansur Jumat/04/11/2022
Houling E3 OB/laminating Jalan Dan Houling pit 10W Sabtu/05/11/2022
OB/Laminating Jalan Houling Minggu/06/11/2022
Off Senin/07/11/2022
OB Laminating Jalan Dan Houling E3 Selasa/08/11/2022
Laminating StockFile Rabu/09/11/2022
StandBy Shift 1 Kamis/10/11/2022
OB E3 Houling W10 Jumaat/11/11/2022
StandBy Shift 1 Sabtu/12/11/2022
StandBy Shift 1 Minggu/13/11/2022
Off Senin/14/11/2022
StandBy Shift 2 Selasa/15/11/2022
StandBy Shift 2 Rabu/16/11/2022
StandBy Shift 2 Kamis/17/11/2022
StandBy Shift 2 Jumat/18/11/2022
Mobilisasi DT Baru/Tunggu Scrub Jalan Sabtu/19/11/2022
Barjing Minggu/20/11/2022
OB Lumpur Dan Barjing

TOTAL

HARIAN KARYAWAN
/D 20 NOVEMBER 2022 (HAIRIL) PERIODE
R LOADER)

Keterangan Pekerjaan Hari/Tgl/Bulan

Memindahkan BatuBara Jumat/21/10/2022


StandBy Sabtu/22/10/2022
Perapihan StockFile Minggu/23/10/2022
Menjaga Dampingan Senin/24/10/2022
Jaga Dampingan Selasa/25/10/2022
Perbaikan Tanggul Dan Jalan Houling Rabu/26/10/2022
Merapikan Dampingan Kamis/27/10/2022
StandBy Jumat/28/10/2022
Jaga Dampingan Dan Perapian StockFile Sabtu/29/10/2022
Jaga Dampingan Minggu/30/10/2022
Jaga Dampingan Senin/31/10/2022
Jaga Dampingan Selasa/01/11/2022
Perapian Dan Loading Lumpur StockFile Rabu/02/11/2022
Jaga Dampingan Kamis/03/11/2022
Merapikan Dan Membuang Lumpur Jumat/04/11/2022
Jaga Dampingan Sabtu/05/11/2022
Off Minggu/06/11/2022
Jaga Dampingan Senin/07/11/2022
Jaga Dampingan Selasa/08/11/2022
Jaga Dampingan Rabu/09/11/2022
StandBy Kamis/10/11/2022
StandBy Jumat/11/11/2022
Jaga Dampingan Sabtu/12/11/2022
Off Minggu/13/11/2022
Jaga Dampingan Senin/14/11/2022
StandBy Selasa/15/11/2022
StandBy Rabu/16/11/2022
StandBy Kamis/17/11/2022
Merapikan StockFile Jumat/18/11/2022
Merapikan StockFile Persiapan Loading Sabtu/19/11/2022
Jaga Dampingan Minggu/10/11/2022

TOTAL
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (HERDIANSYAH)
(OPERATOR DZ.004)
Jumlah
Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

DZ 004 3.0 21128.8 21132.8 9.0 Perbaikan Jalan Arah E3


_ _ _ _ StandBy
DZ 004 7.0 21144.8 21150.8 6.0 Mentenen Jalan Houling Arah Amos
DZ 004 _ 21152.8 21159.8 7.0 Mentenen Jalan Houling
DZ 004 _ 21166.8 21169.8 3.0 Mentenen Jalan Houling
DZ 004 _ 21175.8 21182.8 7.0 Dozing Dan laminating StockFile
DZ 004 _ 21189.8 21196.8 7.0 Menrut Jalan E3 Dan Dozing StockFile
_ _ _ _ StandBy
_ _ _ _ StandBy
DZ 004 7.0 21209.8 21216.8 7.0 Perbaikan Dan Laminating Jalan Arah Pit Mansur
DZ 004 1.0 21221.8 21227.8 6.0 Menrut Jalan Arah E3
DZ 004 _ 21234.8 21241.8 7.0 Menrut Jalan Jetty,Amous Dan StockFile
DZ 004 _ 21244.8 21251.8 7.0 Dozing Lumpur
DZ 004 1.0 21258.8 21266.8 8.0 Menrut Jalan Houiling Arah Mansur Dan Laminating Jalan Arah Amos
DZ 004 _ 21270.8 21276.8 6.0 Buat Jalan Baru E3
DZ 004 _ 21280.8 21285.8 5.0 Dozing Jalan arah Amous
_ _ _ _ Off
DZ 004 1.0 21287.8 21292.8 5.0 Dozing Disposal Amous
_ _ _ _ StandBy
_ _ _ _ StandBy
_ _ _ _ StandBy
DZ 004 _ 21299.8 21306.8 7.0 Buat jalan Houling Amos
DZ 004 _ 21311.8 21318.8 7.0 Dozing Disposal Amos Dan Menrut Jalan Arah E3
_ _ _ _ Off
DZ 004 _ 21325.8 21332.8 7.0 Dozing Disposal Amos
_ _ _ _ StandBy
DZ 004 _ 21339.8 21342.8 3.0 Dozing Lumpur Disposal Amos
DZ 004 _ 21348.8 21355.8 7.0 Dozing Di Jalan Amos Dan Pemasangan Gorong Gorong
DZ 004 _ 21355.8 21361.8 6.0 Laminating Jalan Houling Amos
DZ 004 _ 21363.8 21370.8 7.0 Laminating Jalan Houling Amos
DZ 004 7.0 21384.8 21388.8 4.0 Dozing Jalan Dan Laminating Arah Amos

TOTAL 27.0 138.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (RUSDI YANI)
(DRIVER DT 101)
Jumlah
Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

DT 101 _ 7:00 15:00 7.0 Angkut OB


_ _ _ _ StandBy Shift 1
DT 101 7.0 15:00 21:00 6.0 Houling Pit 3B
DT 101 _ 15:00 23:00 7.0 Angkut OB
_ _ _ _ StandBy Shift 2
DT 101 _ 15:00 23:00 7.0 Angkut OB
DT 101 _ 15:00 23:00 7.0 Houling Pit E3 Dan Mansur
_ _ _ _ StandBy
DT 101 _ 15:00 23:00 7.0 Angkut OB
DT 101 7.0 7:00 15:00 7.0 Houling Pit Mansur Dan angkut OB E3
DT 101 _ 13:00 15:00 2.0 Houling E3
DT 101 _ 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
DT 101 _ 7:00 15:00 7.0 Angkut Lumpur Di StockFile
DT 101 1.0 7:00 15:00 8.0 Holing Pit Mansur
DT 101 _ 7:00 15:00 6.0 Angkut OB E3 Houling
DT 101 _ 7:00 15:00 7.0 Angkut OB Houling E3
_ _ _ _ Off
DT 101 1.0 15:00 23:00 7.0 Houling E3 Dan Angkut OB E3
DT 101 _ 15:00 23:00 5.0 Angkut OB Dan Houling Di W10
DT 101 _ 15:00 17:00 2.0 Houling Pit Mansur
_ _ _ _ StandBy
DT 101 _ 15:00 18:00 3.0 Houling Pit Mansur
DT 101 _ 15:00 23:00 7.0 Houling Pit E3
_ _ _ _ Off
DT 101 _ 7:00 15:00 7.0 Houling Pit E3 Dan Angkut Ob Pit W10
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
DT 101 _ 7:00 15:00 7.0 Angkut OB
DT 101 7.0 15:00 23:00 4.0 Angkut Ob

TOTAL 23.0 127.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (RAHMAN NUDIN.A)
(DRIVER DT.102)
Jumlah
Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

DT 102 _ 7:00 15:00 7.0 Angkut OB


_ _ _ _ StandBy Shift 1
DT 102 7.0 15:00 21:00 6.0 Houling Pit 3B Dan Angkut OB
DT 102 _ 15:00 23:00 7.0 Angkut OB
_ _ _ _ StandBy Shift 2
DT 102 _ 15:00 23:00 7.0 Angkut OB
DT 102 _ 15:00 23:00 7.0 Houling Pit E3 Dan Mansur
_ _ _ _ StandBy Shift 2
DT 102 _ 15:00 23:00 7.0 Angkut OB
DT 102 7.0 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
DT 102 _ 13:00 15:00 2.0 Houling E3
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
DT 108 1.0 11:00 15:00 4.0 Holing Pit Mansur
DT 108 _ 7:00 15:00 6.0 Angkut OB
DT 108 _ 7:00 15:00 7.0 Angkut OB
_ _ _ _ Off
DT 108/107 1.0 15:00 23:00 7.0 Angkut OB/Houling w10
_ _ _ _ StandBy Shift 2
DT 103 _ 15:00 17:00 2.0 Houling Di West (MN)
_ _ _ _ StandBy Shift 2
_ _ _ _ StandBy Shift 2
_ _ _ _ StandBy Shift 2
_ _ _ _ Off
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
DT 108/107 _ 7:00 15:00 7.0 Angkut OB
DT 108/107 7.0 15:00 23:00 4.0 Angkut Ob

TOTAL 23.0 87.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (FERRY BACTHIAR)
(DRIVER DT.25/105)
Jumlah
Kode Unit spl Hm Awal Hm Akhir Keterangan Pekerjaan
Jam

DT 25 1.0 15:00 23:00 7.0 Laminating Jalan Houling


_ _ _ _ StandBy Shift 2
DT 25 7.0 15:00 21:00 5.0 Angkut OB
DT 25 _ 15:00 19:00 4.0 Angkut OB
_ _ _ _ StandBy Shift 2
DT 25 _ 15:00 23:00 7.0 Laminating Jalan Angkut OB
DT 25 _ 15:00 23:00 7.0 Houling Pit E3 Dan Mansur
_ _ _ _ StandBy Shift 2
DT 25 _ 15:00 23:00 7.0 Laminating Jalan Angkut OB
DT 25 7.0 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
DT 25 _ 13:00 15:00 2.0 Laminating Jalan Dan Angkut OB
DT 25 _ 7:00 15:00 7.0 Angkut OB Dan Houling Pit Mansur
DT 25 _ 7:00 15:00 7.0 Loading Lumpur StockFile
DT 25 _ 7:00 12:00 5.0 Holing Mansur
DT 25 _ 7:00 15:00 7.0 Laminating Jalan Angkut OB
DT 25/105 _ 7:00 15:00 7.0 Laminating Jalan Angkut OB Ke StockFile
_ _ _ _ Off
DT 25/105 1.0 15:00 23:00 7.0 Angkut OB Houling w10
DT 25/105 _ 15:00 23:00 5.0 Houling w10
DT 25/105 _ 15:00 17:00 2.0 Houling West
_ _ _ _ StandBy
_ _ _ _ StandBy Shift 2
DT 25/105 _ 15:00 23:00 7.0 Houling E3
_ _ _ _ Off
DT 25/105 _ 7:00 15:00 7.0 Houling E3 Dan Angkut OB West
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift 1
_ _ _ _ StandBy Shift1
_ _ _ _ StandBy Shift 1
DT 25/105 _ 7:00 15:00 7.0 Angkut OB
DT 25/105 7.0 15:00 23:00 4.0 Barjing

TOTAL 23.0 118.0


ABSENSI KARYAWAN TIMBANGAN
NSYAH) PERIODE 21 OKTOBER S/D 20 NOVEMBER 2022(Erlangga)
(OPERATOR TIMBANGAN)

terangan Pekerjaan No Hari/Tanggal/Bulan Jam Hadir Jam Pulang

baikan Jalan Arah E3 1 Jumat/21/10/2022 15:00 23:00


StandBy 2 Sabtu/22/10/2022 15:00 23:00
Jalan Houling Arah Amos 3 Minggu/23/10/2022 7:00 15:00
ntenen Jalan Houling 4 Senin/24/10/2022 7:00 15:00
ntenen Jalan Houling 5 Selasa/25/10/2022 7:00 15:00
Dan laminating StockFile 6 Rabu/26/10/2022 7:00 15:00
an E3 Dan Dozing StockFile 7 Kamis/27/10/2022 7:00 15:00
StandBy 8 Jumat/28/10/2022 7:00 15:00
StandBy 9 Sabtu/29/10/2022 7:00 15:00
Laminating Jalan Arah Pit Mansur 10 Minggu/30/10/2022 Off Off
enrut Jalan Arah E3 11 Senin/31/10/2022 15:00 23:00
an Jetty,Amous Dan StockFile 12 Selasa/01/11/2022 15:00 23:00
Dozing Lumpur 13 Rabu/02/11/2022 15:00 23:00
h Mansur Dan Laminating Jalan Arah Amos 14 Kamis/03/11/2022 15:00 23:00
uat Jalan Baru E3 15 Jumat/04/11/2022 15:00 23:00
ng Jalan arah Amous 16 Sabtu/05/11/2022 15:00 23:00
Off 17 Minggu/06/11/2022 Off Off
zing Disposal Amous 18 Senin/07/11/2022 7:00 15:00
StandBy 19 Selasa/08/11/2022 7:00 15:00
StandBy 20 Rabu/09/11/2022 7:00 15:00
StandBy 21 Kamis/10/11/2022 7:00 15:00
t jalan Houling Amos 22 Jumat/11/11/2022 7:00 15:00
Amos Dan Menrut Jalan Arah E3 23 Sabtu/12/11/2022 7:00 15:00
Off 24 Minggu/13/11/2022 15:00 23:00
ozing Disposal Amos 25 Senin/14/11/2022 15:00 23:00
StandBy 26 Selasa/15/11/2022 15:00 23:00
Lumpur Disposal Amos 27 Rabu/16/11/2022 15:00 23:00
mos Dan Pemasangan Gorong Gorong 28 Kamis/17/11/2022 15:00 23:00
ting Jalan Houling Amos 29 Jumat/18/11/2022 15:00 23:00
ting Jalan Houling Amos 30 Sabtu/19/11/2022 15:00 23:00
n Dan Laminating Arah Amos 31
32

TOTAL

YANI)

terangan Pekerjaan

Angkut OB
StandBy Shift 1
Houling Pit 3B
Angkut OB
StandBy Shift 2
Angkut OB
ng Pit E3 Dan Mansur
StandBy
Angkut OB
t Mansur Dan angkut OB E3
Houling E3
B Dan Houling Pit Mansur
ut Lumpur Di StockFile
Holing Pit Mansur
gkut OB E3 Houling
gkut OB Houling E3
Off
g E3 Dan Angkut OB E3
OB Dan Houling Di W10
Houling Pit Mansur
StandBy
Houling Pit Mansur
Houling Pit E3
Off
t E3 Dan Angkut Ob Pit W10
StandBy Shift 1
StandBy Shift 1
StandBy Shift 1
StandBy Shift 1
Angkut OB
Angkut Ob

LAPORAN
NUDIN.A) PERIODE BULAN 21 O

terangan Pekerjaan Hari/Tgl/Bulan Kode Unit

Angkut OB Jumat/21/10/2022 _
StandBy Shift 1 Sabtu/22/10/2022 _
g Pit 3B Dan Angkut OB Minggu/23/10/2022 DZ 004
Angkut OB Senin/24/10/2022 DZ 004
StandBy Shift 2 Selasa/25/10/2022 DZ 004
Angkut OB Rabu/26/10/2022 DZ 004
ng Pit E3 Dan Mansur Kamis/27/10/2022 DZ 004
StandBy Shift 2 Jumat/28/10/2022 _
Angkut OB Sabtu/29/10/2022 DZ 004
B Dan Houling Pit Mansur Minggu/30/10/2022 DZ 004
Houling E3 Senin/31/10/2022 DZ 004
StandBy Shift 1 Selasa/01/11/2022 DZ 004
StandBy Shift 1 Rabu/02/11/2022 DZ 004
Holing Pit Mansur Kamis/03/11/2022 DZ 004
Angkut OB Jumat/04/11/2022 DZ 004
Angkut OB Sabtu/05/11/2022 Bomax 106
Off Minggu/06/11/2022 _
gkut OB/Houling w10 Senin/07/11/2022 DZ 004
StandBy Shift 2 Selasa/08/11/2022 Bomax 106
ouling Di West (MN) Rabu/09/11/2022 _
StandBy Shift 2 Kamis/10/11/2022 DZ 004
StandBy Shift 2 Jumat/11/11/2022 DZ 004
StandBy Shift 2 Sabtu/12/11/2022 DZ 004
Off Minggu/13/11/2022 DZ 004
StandBy Shift 1 Senin/14/11/2022 DZ 004
StandBy Shift 1 Selasa/15/11/2022 _
StandBy Shift 1 Rabu/16/11/2022 DZ 004
StandBy Shift 1 Kamis/17/11/2022 _
StandBy Shift 1 Jumat/18/11/2022 DZ 004
Angkut OB Sabtu/19/11/2022 DZ 004
Angkut Ob Minggu/20/11/2022 DZ 004

TOTAL

LAPORAN
CTHIAR) PERIODE BULAN 21 O

terangan Pekerjaan Hari/Tgl/Bulan Kode Unit

inating Jalan Houling Jumat/21/10/2022 _


StandBy Shift 2 Sabtu/22/10/2022 _
Angkut OB Minggu/23/10/2022 _
Angkut OB Senin/24/10/2022 Hyundai 134
StandBy Shift 2 Selasa/25/10/2022 Hyundai 134
nating Jalan Angkut OB Rabu/26/10/2022 Hyundai 134
ng Pit E3 Dan Mansur Kamis/27/10/2022 Hyundai 134
StandBy Shift 2 Jumat/28/10/2022 Hyundai 134
nating Jalan Angkut OB Sabtu/29/10/2022 Hyundai 134
B Dan Houling Pit Mansur Minggu/30/10/2022 Hyundai 134
ing Jalan Dan Angkut OB Senin/31/10/2022 _
B Dan Houling Pit Mansur Selasa/01/11/2022 Bomax 106
ing Lumpur StockFile Rabu/02/11/2022 Bomax 106
Holing Mansur Kamis/03/11/2022 Bomax 106
nating Jalan Angkut OB Jumat/04/11/2022 Bomax 106
Jalan Angkut OB Ke StockFile Sabtu/05/11/2022 _
Off Minggu/06/11/2022 _
gkut OB Houling w10 Senin/07/11/2022 Hyundai 134
Houling w10 Selasa/08/11/2022 Hyundai 134
Houling West Rabu/09/11/2022 Hyundai 134
StandBy Kamis/10/11/2022 Hyundai 134
StandBy Shift 2 Jumat/11/11/2022 _
Houling E3 Sabtu/12/11/2022 _
Off Minggu/13/11/2022 _
E3 Dan Angkut OB West Senin/14/11/2022 _
StandBy Shift 1 Selasa/15/11/2022 _
StandBy Shift 1 Rabu/16/11/2022 _
StandBy Shift1 Kamis/17/11/2022 _
StandBy Shift 1 Jumat/18/11/2022 _
Angkut OB Sabtu/19/11/2022 _
Barjing Minggu/20/11/2022 Bomax 106

TOTAL
ANGAN ABSENSI KARYAWAN TIMBANGAN
BER 2022(Erlangga) PERIODE 21 OKTOBER S/D 20 NOVEMBER 2022(Adiannur)
AN) (OPERATOR TIMBANGAN)

SPL No Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL

1 Jumat/21/10/2022 7:00 15:00


2 Sabtu/22/10/2022 7:00 15:00
7.0 3 Minggu/23/10/2022 15:00 23:00 7.0
4 Senin/24/10/2022 15:00 23:00
5 Selasa/25/10/2022 15:00 23:00
1.0 6 Rabu/26/10/2022 15:00 23:00
7 Kamis/27/10/2022 15:00 23:00
8 Jumat/28/10/2022 15:00 23:00
9 Sabtu/29/10/2022 15:00 23:00
10 Minggu/30/10/2022 7:00 23:00 14.0
11 Senin/31/10/2022 7:00 15:00
12 Selasa/01/11/2022 7:00 15:00
13 Rabu/02/11/2022 7:00 15:00
14 Kamis/03/11/2022 7:00 15:00 1.0
15 Jumat/04/11/2022 7:00 15:00
16 Sabtu/05/11/2022 7:00 15:00
17 Minggu/06/11/2022 Off Off
18 Senin/07/11/2022 15:00 23:00 1.0
19 Selasa/08/11/2022 15:00 23:00
20 Rabu/09/11/2022 15:00 23:00
21 Kamis/10/11/2022 15:00 18:00
22 Jumat/11/11/2022 15:00 19:00
23 Sabtu/12/11/2022 15:00 23:00
7.0 24 Minggu/13/11/2022 Off Off
25 Senin/14/11/2022 7:00 15:00
26 Selasa/15/11/2022 7:00 15:00
27 Rabu/16/11/2022 7:00 15:00
28 Kamis/17/11/2022 7:00 15:00
29 Jumat/18/11/2022 7:00 15:00
1.0 30 Sabtu/19/11/2022 7:00 15:00
31
32

16.0 TOTAL 23.0


LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (A.Syahril.Z)
(OPERATOR DZ.004)

spl Hm Awal Hm Akhir Jumlah Jam Keterangan Pekerjaan

_ _ _ StandBy
_ _ _ StandBy Hujan
7.0 21137.8 21144.8 7.0 Dozing Jalan Houling Arah Amos Dan StockFile
_ 21149.8 21152.8 3.0 Dozing Jalan Houling Arah Pit Mansur
_ 21159.8 21166.8 7.0 Dozing Jalan Houling Pit Mansur Dan Pit Amos
_ 21169.8 21175.8 6.0 Dozing Jalan Houling Pit Amos
1.0 21182.8 21189.8 7.0 Dozing Jalan Houling Pit Mansur
_ _ _ StandBy
7.0 21196.8 21209.8 13.0 Dozing Jalan Houling Arah Mansur/Long Shift
7.0 21216.8 21221.8 5.0 Dozing Jalan Houling Arah Mansur
_ 21227.8 21234.8 7.0 Dozing Jalan Houling Arah Mansur
_ 21241.8 21244.8 3.0 Dozing Jalan Houling Arah StockFile
_ 21251.8 21258.8 7.0 Dozing Jalan Dan Dozing Lumpur
_ 21266.8 21270.8 4.0 Dozing Jalan Houling Arah Amos
_ 21276.8 21280.8 4.0 Dozing Jalan Houling Arah Amos
_ 738 742 4.0 Memadatkan Jalan Houling Arah 10W
_ _ _ Off
_ 21285.8 21287.8 2.0 Dozing Lumpur Disposal Amos
_ 747 754 7.0 Memadatkan Jalan arah Mansur
_ _ _ StandBy
_ 21292.8 21296.8 4.0 Dozing Lumpur Di Disposal Amos
_ 21296.8 21299.8 3.0 Dozing Lumpur Di Disposal Amos
_ 21306.8 21311.8 5.0 Dozing Lumpur Di Disposal Amos
7.0 21318.8 21325.8 7.0 Dozing Lumpur Di Disposal Amos
_ 21332.8 21339.8 7.0 Dozing Lumpur Disposal Amos
_ _ _ StandBy
_ 21342.8 21348.8 6.0 Dozing Jalan Houling Amos
_ _ _ StandBy
_ 21361.8 21363.8 2.0 Dozing Jalan Mobilisasi Dt Baru
_ 21370.8 21377.8 7.0 Dozing Jalan Houling Amos
7.0 21377.8 21384.8 7.0 Dozing Lumpur Dan Jalan Houling Amos

36.0 134.0

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 OKTOBER S/D 20 NOVEMBER 2022 (MUKMIN)
(OPERATOR EXCA)

spl Hm Awal Hm Akhir Jumlah Jam Keterangan Pekerjaan

_ _ _ _
_ _ _ _
_ _ _ _
_ 317.7 323.1 5.40000000000003 General
_ 330.2 337.9 7.7 General
_ 341.4 347.7 6.3 General
_ 354.7 361.0 6.3 General Perbaikan Jalan Houling
_ 368.1 372.0 3.9 General
_ 374.1 379.1 5.0 General Arah E3
7.0 386.1 391.7 5.6 General
_ _ _ StandBy
_ 690 697 7.0 Pemadatan area StockFile Dan Jalan Kampung
_ 697 704 7.0 Memadatkan Jalan Houling
1.0 710 718 8.0 Memadatkan Jalan Houling Dan StockFile
_ 722 728 6.0 Memadatkan Jalan StockFile
_ _ _ Izin Sakit
_ _ _ Off
_ 459.7 466.4 6.7 General
_ 472.4 479.8 7.40000000000003 Membuang Lumpur Di Disposal Amos
_ 486.8 493.4 6.6 General Arah E3 Lanjut Membuang Lumpur Di Disposal Amos
_ 495.4 499.1 3.7 Membuang Lumpur Di Disposal Amos
_ _ _ StandBy
_ _ _ StandBy
_ _ _ Off
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
_ _ _ StandBy
7.0 761 768 7.0 Memadatkan Areal StockFile

15 99.6
ABSENSI KARYAWAN DUMPMAN
PERIODE 21 OKTOBER S/D 20 NOVEMBER 2022(BAKRAM)
(OPERATOR TIMBANGAN)

No Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL

1 Jumat/21/10/2022 15:00 23:00


2 Sabtu/22/10/2022 15:00 23:00
3 Minggu/23/10/2022 7:00 15:00 7.0
4 Senin/24/10/2022 15:00 23:00
5 Selasa/25/10/2022 7:00 15:00
6 Rabu/26/10/2022 7:00 15:00
7 Kamis/27/10/2022 7:00 15:00
8 Jumat/28/10/2022 7:00 15:00
9 Sabtu/29/10/2022 7:00 15:00
10 Minggu/30/10/2022 7:00 15:00 7.0
11 Senin/31/10/2022 15:00 23:00
12 Selasa/01/11/2022 15:00 23:00
13 Rabu/02/11/2022 15:00 23:00
14 Kamis/03/11/2022 15:00 23:00
15 Jumat/04/11/2022 15:00 23:00
16 Sabtu/05/11/2022 15:00 23:00
17 Minggu/06/11/2022 Off Off
18 Senin/07/11/2022 7:00 15:00
19 Selasa/08/11/2022 7:00 15:00
20 Rabu/09/11/2022 7:00 15:00
21 Kamis/10/11/2022 7:00 15:00
22 Jumat/11/11/2022 7:00 15:00
23 Sabtu/12/11/2022 7:00 15:00
24 Minggu/13/11/2022 15:00 23:00 7.0
25 Senin/14/11/2022 15:00 23:00
26 Selasa/15/11/2022 15:00 23:00
27 Rabu/16/11/2022 15:00 23:00
28 Kamis/17/11/2022 15:00 23:00
29 Jumat/18/11/2022 15:00 23:00
30 Sabtu/19/11/2022 15:00 23:00
31
32

TOTAL 21.0
eterangan Pekerjaan

StandBy
StandBy Hujan
Houling Arah Amos Dan StockFile
an Houling Arah Pit Mansur
Houling Pit Mansur Dan Pit Amos
Jalan Houling Pit Amos
Jalan Houling Pit Mansur
StandBy
Houling Arah Mansur/Long Shift
alan Houling Arah Mansur
alan Houling Arah Mansur
lan Houling Arah StockFile
Jalan Dan Dozing Lumpur
Jalan Houling Arah Amos
Jalan Houling Arah Amos
an Jalan Houling Arah 10W
Off
g Lumpur Disposal Amos
atkan Jalan arah Mansur
StandBy
Lumpur Di Disposal Amos
Lumpur Di Disposal Amos
Lumpur Di Disposal Amos
Lumpur Di Disposal Amos
g Lumpur Disposal Amos
StandBy
ng Jalan Houling Amos
StandBy
Jalan Mobilisasi Dt Baru
ng Jalan Houling Amos
mpur Dan Jalan Houling Amos

eterangan Pekerjaan

_
_
_
General
General
General
Perbaikan Jalan Houling
General
General Arah E3
General
StandBy
a StockFile Dan Jalan Kampung
adatkan Jalan Houling
n Jalan Houling Dan StockFile
adatkan Jalan StockFile
Izin Sakit
Off
General
g Lumpur Di Disposal Amos
ut Membuang Lumpur Di Disposal Amos
g Lumpur Di Disposal Amos
StandBy
StandBy
Off
StandBy
StandBy
StandBy
StandBy
StandBy
StandBy
adatkan Areal StockFile
ABSENSI KARYAWAN DUMPMAN
PERIODE 21 OKTOBER S/D 20 NOVEMBER 2022(ARDIANSYAH)
(OPERATOR TIMBANGAN)

No Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL

1 Jumat/21/10/2022 7:00 15:00


2 Sabtu/22/10/2022 7:00 15:00
3 Minggu/23/10/2022 15:00 23:00 7.0
4 Senin/24/10/2022 _ _
5 Selasa/25/10/2022 15:00 23:00
6 Rabu/26/10/2022 15:00 23:00
7 Kamis/27/10/2022 15:00 23:00
8 Jumat/28/10/2022 15:00 23:00
9 Sabtu/29/10/2022 15:00 23:00
10 Minggu/30/10/2022 15:00 23:00 7.0
11 Senin/31/10/2022 7:00 15:00
12 Selasa/01/11/2022 7:00 15:00
13 Rabu/02/11/2022 7:00 15:00
14 Kamis/03/11/2022 7:00 15:00 1.0
15 Jumat/04/11/2022 7:00 15:00
16 Sabtu/05/11/2022 7:00 15:00
17 Minggu/06/11/2022 Off Off
18 Senin/07/11/2022 15:00 23:00 1.0
19 Selasa/08/11/2022 15:00 23:00
20 Rabu/09/11/2022 15:00 23:00
21 Kamis/10/11/2022 15:00 18:00
22 Jumat/11/11/2022 15:00 19:00
23 Sabtu/12/11/2022 15:00 23:00
24 Minggu/13/11/2022 Off Off
25 Senin/14/11/2022 7:00 15:00
26 Selasa/15/11/2022 7:00 15:00
27 Rabu/16/11/2022 7:00 15:00
28 Kamis/17/11/2022 7:00 15:00
29 Jumat/18/11/2022 7:00 15:00
30 Sabtu/19/11/2022 7:00 15:00
31
32

TOTAL 16.0
LAPORAN TIMESHEET HARIAN KAR
PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER
(OPERATOR EXCAVATOR {134
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir Keteran
Jam

Senin/21/11/2022
Selasa/22/11/2022 Pagi Hyundai 134 _ 589.7 595.9 6.2 G
Rabu/23/11/2022 Pagi Hyundai 134 _ 602.2 607.4 5.2 Melay
Kamis/24/11/2022 Pagi Hyundai 134 _ 612.9 615.0 2.1 G
Jumat/25/11/2022 Pagi Hyundai 134 _ 618.6 625.7 7.1 G
Sabtu/26/11/2022 Pagi Hyundai 134 _ 632.3 640.5 8.2 G
Minggu/27/11/2022 _ _ _ _ _ _
Senin/28/11/2022 Malam Hyundai 134 _ 651.8 657.1 5.3 G
Selasa/29/11/2022 Malam _ _ _ _ _ StandBy
Rabu/30/11/2022 Malam Hyundai 134 _ 666.3 672.3 6.0 G
Kamis/01/12/2022 Malam Hyundai 134 _ 679.3 685.3 6.0 G
Jumat/02/12/2022 Malam Hyundai 134 _ 690.8 697.9 7.1 G
Sabtu/03/12/2022 Malam Hyundai 134 _ 705.0 711.2 6.2 G
Minggu/04/12/2022 _ _ _ _ _ _
Senin/05/12/2022 Pagi _ _ _ _ _ StandB
Selasa/06/12/2022 Pagi Hyundai 134 _ 718.7 722.6 3.9 G
Rabu/07/12/2022 Pagi _ _ _ _ _ StandB
Kamis/08/12/2022 Pagi Hyundai 134 _ 734.0 738.1 4.1 G
Jumat/09/12/2022 Pagi Hyundai 136 _ 193.2 4.3
Sabtu/10/12/2022 Pagi Hyundai 134 _ 746.9 750.1 3.2 G
Minggu/11/12/2022 _ _ _ _ _ _
Senin/12/12/2022 Malam Hyundai 134 _ 753.6 761.0 7.4 G
Selasa/13/12/2022 Malam Hyundai 134 _ 764.1 766.4 2.3 Perap
Rabu/14/12/2022 Malam Hyundai 134 _ 771.9 775.7 3.8 General
Kamis/15/12/2022 Malam _ _ _ _ _ StandBy
Jumat/16/12/2022 Malam Hyundai 134 _ 782.1 786.3 4.2 G
Sabtu/17/12/2022 Malam Hyundai 136 5.0 215.3 223.2 7.9 Loa
Minggu/18/12/2022 Pagi/Malam Hyundai 136 14.0 223.2 236.4 13.2 B
Senin/19/12/2022 Pagi/Malam Hyundai 136 7.0 236.4 249.5 13.1 B
Selasa/20/12/2022 Pagi/Malam Hyundai 136 7.0 249.5 257.7 8.2 Bar

TOTAL 33 135

LAPORAN TIMESHEET HARIAN KAR


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBE
(OPERATOR DOZER {004})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir Keteran
Jam

Senin/21/11/2022 Pagi DZ 004 _ 21388.8 21395.8 7.0 Persiapan Jalan Loa


Selasa/22/11/2022 Pagi DZ 004 _ 21395.8 21398.8 3.0 Dozing Jalan Untu
Rabu/23/11/2022 Pagi DZ 004 _ 21405.8 21412.8 7.0 Melayani
Kamis/24/11/2022 Pagi _ _ _ _ _ StandB
Jumat/25/11/2022 Pagi _ _ _ _ _ StandB
Sabtu/26/11/2022 Pagi DZ 004 _ 21425.8 21432.8 7.0 Dozing Ja
Minggu/27/11/2022 _ _ _ _ _ _
Senin/28/11/2022 Malam DZ 004 _ 21443.8 21446.8 3.0 Dozi
Selasa/29/11/2022 Malam _ _ _ _ _ StandBy
Rabu/30/11/2022 Malam _ _ _ _ _ StandBy
Kamis/01/12/2022 Malam _ _ _ _ _ StandBy
Jumat/02/12/2022 Malam DZ 004 _ 21465.3 21475.3 10.0 Dozi
Sabtu/03/12/2022 Malam _ _ _ _ _ StandBy
Minggu/04/12/2022 Pagi DZ 004 _ 21485.3 21494.6 9.3 Dozi
Senin/05/12/2022 Pagi _ _ _ _ _ StandB
Selasa/06/12/2022 Pagi DZ 004 _ 21499.3 21501.6 2.3 Dozing Pit Bar
Rabu/07/12/2022 Pagi _ _ _ _ _ StandB
Kamis/08/12/2022 Pagi _ _ _ _ _ StandB
Jumat/09/12/2022 Pagi _ _ _ _ _ StandB
Sabtu/10/12/2022 Pagi _ _ _ _ _ StandB
Minggu/11/12/2022 _ _ _ _ _ _
Senin/12/12/2022 Malam _ _ _ _ _ StandBy
Selasa/13/12/2022 Malam _ _ _ _ _ StandBy
Rabu/14/12/2022 Malam _ _ _ _ _ StandBy
Kamis/15/12/2022 Malam _ _ _ _ _ StandBy
Jumat/16/12/2022 Malam _ _ _ _ _ StandBy
Sabtu/17/12/2022 Malam _ _ _ _ _ StandBy
Minggu/18/12/2022 Pagi DZ 004 _ 21504.6 21509.8 5.2 Maintenance jala
Senin/19/12/2022 Malam _ _ _ _ _ StandBy
Selasa/20/12/2022 Pagi DZ 004 _ 21511.8 21521.8 10.0 Doz
Rabu/21/12/2022 Pagi _ _ _ _ _ StandB
Kamis/22/12/2022 Pagi DZ 004 _ 21529.3 21538.5 9.2 Dozing
Jumat/23/12/2022 Pagi _ _ _ _ _ StandB
Sabtu/24/12/2022 Pagi DZ 004 _ 21546.8 21551.3 4.5 Dozi
Minggu/25/12/2022 Pagi _ _ _ _ _ StandB
TOTAL 0 77.5

LAPORAN TIMESHEET HARIAN KAR


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMB
(OPERATOR BOMAX {106})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir Keteran
Jam

Senin/21/11/2022 Pagi Bomax 106 _ 772 777 5.0 Memada


Selasa/22/11/2022 Pagi Bomax 106 _ _ _ _ StandB
Rabu/23/11/2022 Pagi Bomax 106 _ 787 790 3.0 Memada
Kamis/24/11/2022 Pagi Bomax 106 _ _ _ _ StandB
Jumat/25/11/2022 Pagi Bomax 106 _ 796 803 7.0 Memadatka
Sabtu/26/11/2022 Pagi Bomax 106 _ 810 817 7.0 Memadatk
Minggu/27/11/2022 _ _ _ _ _ _
Senin/28/11/2022 Pagi Bomax 106 _ 817 824 7.0 Memadatkan Jala
Selasa/29/11/2022 Pagi Bomax 106 _ 829 835 6.0 Memadatkan jala
Rabu/30/11/2022 Pagi _ _ _ _ _ StandB
Kamis/01/12/2022 Pagi Bomax 106 _ 835 841 6.0 Memadatkan J
Jumat/02/12/2022 Pagi Bomax 106 _ 846 854 8.0 Merapikan Jal
Sabtu/03/12/2022 Pagi Bomax 106 _ 861 869 8.0 Memadatkan Stock
Minggu/04/12/2022 _ _ _ _ _ _
Senin/05/12/2022 Pagi _ _ _ _ _ StandB
Selasa/06/12/2022 Pagi Hyundai 136 _ 173.2 179.5 6.3 G
Rabu/07/12/2022 Pagi Hyundai 136 _ 179.5 188.1 8.6 loa
Kamis/08/12/2022 Pagi Hyundai 136 _ 188.1 193.2 5.1 G
Jumat/09/12/2022 Pagi Hyundai 136 _ 879 886 7.0 Memadatkan
Sabtu/10/12/202 Pagi Bomax 106 _ 886 894 8.0 Memadatkan
Minggu/11/12/2022 _ _ _ _ _ _
Senin/12/12/2022 Pagi DT 25 _ 7:00 15:00 7.0 An
Selasa/13/12/2022 Pagi _ _ _ _ _ StandB
Rabu/14/12/2022 Pagi Bomax 106 _ 903 907 4.0 Memada
Kamis/15/12/2022 Pagi Bomax 106 _ 907 915 8.0 StandB
Jumat/16/12/2022 Pagi Bomax 106 _ 915 922 7.0 Memadatkan Jalan
Sabtu/17/12/2022 Pagi Bomax 106 _ 922 928 6.0 Memadatka
Minggu/18/12/2022 Pagi/Malam Bomax 106 14.0 935 949 14.0 Memada
Senin/19/12/2022 Pagi/Malam Bomax 106 7.0 949 963 14.0 Memada
Selasa/20/12/2022 Pagi/Malam Bomax 106 3.0 963 973 10.0 Memada

TOTAL 24 162

LAPORAN TIMESHEET HARIAN KAR


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER
(DRIVER DT {101})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir Keteran
Jam

Senin/21/11/2022 Pagi DT 101 _ 7:00 15:00 7.0 Angkut Lumpur


Selasa/22/11/2022 Pagi _ _ _ _ _ StandB
Rabu/23/11/2022 Pagi DT 101 _ 7:00 15:00 7.0 Barjin
Kamis/24/11/2022 Pagi _ _ _ _ _ StandB
Jumat/25/11/2022 Pagi DT 110 _ 11:00 15:00 3.0 Tav
Sabtu/26/11/2022 Pagi _ _ _ _ _ StandB
Minggu/27/11/2022 _ _ _ _ _ _
Senin/28/11/2022 Malam _ _ _ _ _ StandBy
Selasa/29/11/2022 Malam _ _ _ _ _ StandBy
Rabu/30/11/2022 Malam _ _ _ _ _ StandBy
Kamis/01/12/2022 Malam _ _ _ _ _ StandBy
Jumat/02/12/2022 Malam DT 109 _ 15:00 23:00 7.0 Hauli
Sabtu/03/12/2022 Malam _ _ _ _ _ StandBy
Minggu/04/12/2022 Pagi DT 109 7.0 7:00 15:00 7.0 Hauling
Senin/05/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Hauling
Selasa/06/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Hauling
Rabu/07/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Hauling P
Kamis/08/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Hauling
Jumat/09/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Hauling
Sabtu/10/12/2022 Pagi _ _ _ _ _ StandB
Minggu/11/12/2022 _ _ _ _ _ _
Senin/12/12/2022 Malam DT 23 _ 15:00 23:00 7.0 Angkut OB Angkut Lump
Selasa/13/12/2022 Malam _ _ _ _ _ StandBy
Rabu/14/12/2022 Malam DT 23 _ 15:00 20:00 5.0 Angkut Lum
Kamis/15/12/2022 Malam _ _ _ _ _ StandBy
Jumat/16/12/2022 Malam DT 109 _ 15:00 23:00 7.0 Hauling P
Sabtu/17/12/2022 Malam Bomax 106 _ 928 935 7.0 Pemadatan Jalan D
Minggu/18/12/2022 Pagi DT 109 7.0 7:00 15:00 7.0 Barjing
Senin/19/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Barjing
Selasa/20/12/2022 Pagi DT 109 _ 7:00 15:00 7.0 Barjing

TOTAL 14 113

LAPORAN TIMESHEET HARIAN KAR


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBE
(DRIVER DT {101})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir Keteran
Jam

Senin/21/11/2022 Malam _ _ _ _ _ StandBy


Selasa/22/11/2022 Malam DT 101 _ 15:00 23:00 4.0 B
Rabu/23/11/2022 Malam DT 107 1.0 15:00 23:00 6.0 B
Kamis/24/11/2022 Malam _ _ _ _ _ StandBy
Jumat/25/11/2022 Malam DT 101 _ 15:00 23:00 7.0 An
Sabtu/26/11/2022 Malam _ _ _ _ _ StandBy
Minggu/27/11/2022 _ _ _ _ _ _
Senin/28/11/2022 Pagi _ _ _ _ _ StandB
Selasa/29/11/2022 Pagi _ _ _ _ _ StandB
Rabu/30/11/2022 Pagi _ _ _ _ _ StandB
Kamis/01/12/2022 Pagi _ _ _ _ _ StandB
Jumat/02/12/2022 Pagi DT 107 _ 7:00 15:00 7.0 Angkut OB d
Sabtu/03/12/2022 Pagi DT 107 _ 7:00 15:00 7.0 hauling Pi
Minggu/04/12/2022 Malam DT 107 7.0 15:00 23:00 7.0 Haulin
Senin/05/12/2022 Malam _ _ _ _ _ StandBy
Selasa/06/12/2022 Malam DT 107 _ 15:00 23:00 7.0 Hauling Pit 2 Utara
Rabu/07/12/2022 Malam _ _ _ _ _ StandBy
Kamis/08/12/2022 Malam DT 107 _ 15:00 23:00 7.0 Hauling P
Jumat/09/12/2022 Malam DT 107 _ 15:00 23:00 7.0 Hauling
Sabtu/10/12/2022 Malam DT 25 _ 15:00 23:00 4.0 An
Minggu/11/12/2022 _ _ _ _ _ _
Senin/12/12/2022 Pagi DT 10 _ 7:00 15:00 7.0 Ha
Selasa/13/12/2022 Pagi _ _ _ _ _ StandB
Rabu/14/12/2022 Pagi _ _ _ _ _ StandB
Kamis/15/12/2022 Pagi _ _ _ _ _ StandB
Jumat/16/12/2022 Pagi DT 107 _ 7:00 15:00 7.0 Hauling
Sabtu/17/12/2022 Pagi DT 107 _ 13:00 14:00 1.0 Antar Pak Z
Minggu/18/12/2022 Malam DT 107 7.0 15:00 23:00 7.0 B
Senin/19/12/2022 Malam DT 107 _ 15:00 23:00 7.0 B
Selasa/20/12/2022 Malam DT 107 _ 15:00 23:00 7.0 Barjing Dan H
TOTAL 15 99
ESHEET HARIAN KARYAWAN
BER S/D 20 DESEMBER 2022 (M.AL KURNAIN)
TOR EXCAVATOR {134})

Keterangan Pekerjaan Keterangan Spl

General
Melayani Barjing
General
General
General
Off
General
StandBy Shift Malam
General
General
General
General
Off
StandBy Shift Pagi
General
StandBy Shift Pagi
General

General
Off
General
Perapian StocPile
General Areal StockPile
StandBy Shift Malam
General
Loading OB Loading OB Laminating StockPile
Barjing Barjing
Barjing Barjing
Barjing Batu Loading DT/Barjing

ESHEET HARIAN KARYAWAN


MBER S/D 20 DESEMBER 2022 (M.SYAHRIL.Z)
RATOR DOZER {004})

Keterangan Pekerjaan Keterangan Spl

Persiapan Jalan Loading Ponton Di Stockfile


Dozing Jalan Untuk Mobil Tangki Masuk
Melayani Loading Ponton
StandBy Shift Pagi
StandBy Shift Pagi
Dozing Jalan Hauling w10
Off
Dozing Pit Baru
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Dozing Pit Baru
StandBy Shift Malam
Dozing Pit Baru
StandBy Shift Pagi
Dozing Pit Baru/Hos radiator bocor
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Maintenance jalan Dan Dozing Pit West
StandBy Shift Malam
Dozing West
StandBy Shift Pagi
Dozing Pit West MN
StandBy Shift Pagi
Dozing Pit Baru
StandBy Shift Pagi

ESHEET HARIAN KARYAWAN


EMBER S/D 20 DESEMBER 2022 (MUKMIN)
RATOR BOMAX {106})

Keterangan Pekerjaan Keterangan Spl

Memadatkan StockFile
StandBy Shift Pagi
Memadatkan StockFile
StandBy Shift Pagi
Memadatkan jalan Kampung
Memadatkan Jalan Hauling
Off
Memadatkan Jalan hauling Arah west 10
Memadatkan jalan Hauling Arah 10 W
StandBy Shift Pagi
Memadatkan Jalan Hauling arah E3
Merapikan Jalan Hauling Arah e3
Memadatkan StockFile Lanjut Jalan hauling
Off
StandBy Shift Pagi
General
loading OB
General
Memadatkan Jalan Hauling West
Memadatkan Jalan Hauling West
Off
Angkut OB
StandBy Shift Pagi
Memadatkan StockPile
StandBy Shift Pagi
Memadatkan Jalan Hauling Dan stockPile
Memadatkan Areal StockPile
Memadatkan StockPile Memadatkan stockPile
Memadatkan stockpile Barjing
Memadatkan StockPile Memadatkan StockPile

ESHEET HARIAN KARYAWAN


BER S/D 20 DESEMBER 2022 (M.IKRAR HAQQI)
DRIVER DT {101})

Keterangan Pekerjaan Keterangan Spl

Angkut Lumpur Dan Barjing Tongkang


StandBy Shift Pagi
Barjing Tongkang
StandBy Shift Pagi
Tavel Dt Baru
StandBy Shift Pagi
Off
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Hauling Pit DMS
StandBy Shift Malam
Hauling Pit Algozan Hauling Pit Algozan
Hauling Pit Algozan
Hauling Pit Algozan
Hauling Pit West Di MN
Hauling Pit West MJ
Hauling Pit West MJ
StandBy Shift Pagi
Off
ngkut OB Angkut Lumpur Nimbun Jalan Buang Lumpur
StandBy Shift Malam
Angkut Lumpur Di StockPile
StandBy Shift Malam
Hauling Pit West MJ MN
Pemadatan Jalan Dan StockPile Jadi padat
Barjing to Tongkang Barjing
Barjing To Tongkang
Barjing to Tongkang

ESHEET HARIAN KARYAWAN


MBER S/D 20 DESEMBER 2022 (RUSDI YANI)
DRIVER DT {101})

Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


Barjing
Barjing Barjing
StandBy Shift Malam
Angkut OB
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Angkut OB dari Ponton Algozan
hauling Pit 2 Utara Dimas
Hauling Pit Dimas Hauling
StandBy Shift Malam
Hauling Pit 2 Utara dan houling pit 3b(DMS)
StandBy Shift Malam
Hauling Pit W10 Pit Baru
Hauling Pit Baru W10
Angkut OB
Off
Hauling Pit
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Pit West MN
Antar Pak Zuna Ke Pit Amos
Barjing Barjing
Barjing
Barjing Dan Hauling Pit west MJ
LAPORAN
PERIODE BULAN 21 NO
(OP

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal

Senin/21/11/2022 Malam _ _ _
Selasa/22/11/2022 Malam Hyundai 134 _ 595.9
Rabu/23/11/2022 Malam Hyundai 134 1.0 607.4
Kamis/24/11/2022 Malam Hyundai 134 _ 615.0
Jumat/25/11/2022 Malam Hyundai 134 _ 625.7
Sabtu/26/11/2022 Malam Hyundai 134 _ 640.5
Minggu/27/11/2022 _ _ _ _
Senin/28/11/2022 Pagi Hyundai 134 _ 644.5
Selasa/29/11/2022 Pagi Hyundai 134 _ 657.1
Rabu/30/11/2022 Pagi Hyundai 134 _ 660.2
Kamis/01/12/2022 Pagi Hyundai 134 _ 672.3
Jumat/02/12/2022 Pagi Hyundai 134 _ 685.3
Sabtu/03/12/2022 Pagi Hyundai 134 _ 697.9
Minggu/04/12/2022 Malam Hyundai 134 7.0 711.2
Senin/05/12/2022 Malam _ _ _
Selasa/06/12/2022 Malam Hyundai 134 _ 722.6
Rabu/07/12/2022 Pagi Hyundai 134 _ 728.6
Kamis/08/12/2022 Malam Hyundai 134 _ 738.1
Jumat/09/12/2022 Malam Hyundai 134 _ 740.4
Sabtu/10/12/2022 Malam Hyundai 134 _ 750.1
Minggu/11/12/2022 _ _ _ _
Senin/12/12/2022 Pagi Hyundai 136 _ 206.0
Selasa/13/12/2022 Pagi Hyundai 134 _ 761.0
Rabu/14/12/2022 Pagi Hyundai 134 _ 766.4
Kamis/15/12/2022 Pagi Hyundai 134 _ 775.7
Jumat/16/12/2022 Pagi Hyundai 134 _ 778.1
Sabtu/17/12/2022 Pagi Hyundai 134 3.0 786.3
Minggu/18/12/2022 Pagi/Malam Hyundai 134 14.0 795.8
Senin/19/12/2022 Pagi/Malam Hyundai 134 7.0 805
Selasa/20/12/2022 Pagi/Malam Hyundai 134 7.0 818.4

TOTAL 39

LAPORAN
PERIODE BULAN 21 NO

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal

Senin/21/11/2022 Malam _ _ _
Selasa/22/11/2022 Malam DZ 004 _ 21398.8
Rabu/23/11/2022 Malam DZ 004 1.0 21412.8
Kamis/24/11/2022 _ DZ 004 _ _
Jumat/25/11/2022 Malam DZ 004 _ 21418.8
Sabtu/26/11/2022 Malam DZ 004 _ 21423.8
Minggu/27/11/2022 _ _ _ _
Senin/28/11/2022 Pagi DZ 004 _ 21436.8
Selasa/29/11/2022 Pagi DZ 004 _ 21446.8
Rabu/30/11/2022 Pagi _ _ _
Kamis/01/12/2022 Pagi DZ 004 _ 21455.3
Jumat/02/12/2022 Pagi _ _ _
Sabtu/03/12/2022 Pagi DZ 004 _ 21475.3
Minggu/04/12/2022 Malam _ _ _
Senin/05/12/2022 Malam DZ 004 _ 21494.6
Selasa/06/12/2022 Malam _ _ _
Rabu/07/12/2022 Malam _ _ _
Kamis/08/12/2022 Malam _ _ _
Jumat/09/12/2022 Malam _ _ _
Sabtu/10/12/2022 Malam _ _ _
Minggu/11/12/2022 _ _ _ _
Senin/12/12/2022 Pagi _ _ _
Selasa/13/12/2022 Pagi _ _ _
Rabu/14/12/2022 Pagi _ _ _
Kamis/15/12/2022 Pagi _ _ _
Jumat/16/12/2022 Pagi _ _ _
Sabtu/17/12/2022 Pagi _ _ _
Minggu/18/12/2022 Malam _ _ _
Senin/19/12/2022 Pagi DZ 004 _ 21509.8
Selasa/20/12/2022 Pagi _ _ _
Rabu/21/12/2022 Pagi DZ 004 _ 21521.8
Kamis/22/12/2022 Pagi _ _ _
Jumat/23/12/2022 Pagi DZ 004 _ 21538.5
Sabtu/24/12/2022 Pagi _ _ _
Minggu/25/12/2022 Pagi DZ 004 21551.3
TOTAL 1

LAPORAN
PERIODE BULAN 2

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal

Kamis/01/12/2022 Pagi Grader _ 27.7


Jumat/02/12/2022 Pagi Grader _ 39.4
Sabtu/03/12/2022 Pagi Grader _ 52.6
Minggu/04/12/2022 Malam Grader 7.0 67.7
Senin/05/12/2022 Pagi Grader _ 72.6
Selasa/06/12/2022 Pagi Grader _ 81.3
Rabu/07/12/2022 Pagi Grader _ 92.0
Kamis/08/12/2022 Pagi Grader _ 99.5
Jumat/09/12/2022 Pagi Grader _ 104.3
Sabtu/10/12/1022 Pagi Grader _ 115.2
Minggu/11/12/2022 _ _ _ _
Senin/12/12/2022 Malam Grader _ 126.4
Selasa/13/12/2022 Malam _ _ _
Rabu/14/12/2022 Malam _ _ _
Kamis/15/12/2022 Malam Grader _ 135.8
Jumat/16/12/2022 Malam Grader _ 144.3
Sabtu/17/12/2022 Malam Grader _ 151.2
Minggu/18/12/2022 Pagi Grader 7.0 154.2
Senin/19/12/2022 Pagi Grader _ 167.4
Selasa/20/12/2022 Pagi Grader _ 179.1
TOTAL 14

LAPORAN
PERIODE BULAN 2

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal

Senin/21/11/2022 Pagi DT 103 _ 7:00


Selasa/22/11/2022 Pagi _ _ _
Rabu/23/11/2022 Pagi DT 103 _ 7:00
Kamis/24/11/2022 Pagi _ _ _
Jumat/25/11/2022 Pagi _ _ _
Sabtu/26/11/2022 Pagi Grader _ 4.0
Minggu/27/11/2022 _ _ _ _
Senin/28/11/2022 Malam Grader _ 11.0
Selasa/29/11/2022 Malam _ _ _
Rabu/30/11/2022 Malam _ _ _
Kamis/01/12/2022 Malam _ _ _
Jumat/02/12/2022 Malam DT 108 _ 15:00
Sabtu/03/12/2022 Malam DT 108 _ 15:00
Minggu/04/12/2022 Pagi DT 108 7.0 7:00
Senin/05/12/2022 Pagi DT 108 _ 7:00
Selasa/06/12/2022 Pagi DT 108 _ 7:00
Rabu/07/12/2022 Pagi DT 108 _ 7:00
Kamis/08/12/2022 Pagi DT 108 _ 7:00
Jumat/09/12/2022 Pagi DT 108 _ 7:00
Sabtu/10/12/2022 Pagi _ _ _
Minggu/11/12/2022 _ _ _ _
Senin/12/12/2022 Malam DT 25 _ 15:00
Selasa/13/12/2022 Malam _ _ _
Rabu/14/12/2022 Malam Bomax 106 1.0 907
Kamis/15/12/2022 Malam _ _ _
Jumat/16/12/2022 Malam DT 108 _ 15:00
Sabtu/17/12/2022 Malam _ _ _
Minggu/18/12/2022 Pagi DT 108 7.0 7:00
Senin/19/12/2022 Pagi DT 108 _ 7:00
Selasa/20/12/2022 Pagi DT 108 _ 7:00

TOTAL 15

LAPORAN
PERIODE BULAN 21 N

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal

Senin/21/11/2022 Malam _ _ _
Selasa/22/11/2022 Malam DT 103 _ 15:00
Rabu/23/11/2022 Malam DT 108 1.0 15:00
Kamis/24/11/2022 Malam _ _ _
Jumat/25/11/2022 Malam _ _ _
Sabtu/26/11/2022 Malam _ _ _
Minggu/27/11/2022 _ _ _ _
Senin/28/11/2022 Pagi _ _ _
Selasa/29/11/2022 Pagi _ _ _
Rabu/30/11/2022 Pagi _ _ _
Kamis/01/12/2022 Pagi _ _ _
Jumat/02/12/2022 Pagi _ _ _
Sabtu/03/12/2022 Pagi DT 108 _ 7:00
Minggu/04/12/2022 Malam DT 108 7.0 15:00
Senin/05/12/2022 Malam _ _ _
Selasa/06/12/2022 Malam DT 108 _ 15:00
Rabu/07/12/2022 Malam _ _ _
Kamis/08/12/2022 Malam DT 108 _ 15:00
Jumat/09/12/2022 Malam DT 108 _ 15:00
Sabtu/10/12/2022 Malam _ _ _
Minggu/11/12/2022 _ _ _ _
Senin/12/12/2022 Pagi _ _ _
Selasa/13/12/2022 Pagi _ _ _
Rabu/14/12/2022 Pagi _ _ _
Kamis/15/12/2022 Pagi _ _ _
Jumat/16/12/2022 Pagi DT 108 _ 7:00
Sabtu/17/12/2022 Pagi DT 23 _ 7:00
Minggu/18/12/2022 Malam DT 108 7.0 15:00
Senin/19/12/2022 Malam DT 108 _ 15:00
Selasa/20/12/2022 Malam DT 108 _ 15:00
TOTAL 15

ABSENSI KARYAWAN
PERIODE 21 NOVEMBER S/D 20 DESEMBER 2022(BAKRAM)
(DUMPMAN)

No Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL

1 Senin/21/11/2022 7:00 15:00


2 Selasa/22/11/2022 7:00 15:00
3 Rabu/23/11/2022 7:00 15:00
4 Kamis/24/11/2022 7:00 15:00
5 Jumat/25/11/2022 7:00 15:00
6 Sabtu/26/11/2022 7:00 15:00
7 Minggu/27/11/2022 Off Off _
8 Senin/28/11/2022 15:00 23:00
9 Selasa/29/11/2022 15:00 23:00
10 Rabu/30/11/2022 15:00 23:00
11 Kamis/01/12/2022 15:00 23:00
12 Jumat/02/12/2022 15:00 23:00
13 Sabtu/03/12/2022 15:00 23:00
14 Minggu/04/12/2022 7:00 15:00 7.0
15 Senin/05/12/2022 7:00 15:00
16 Selasa/06/12/2022 7:00 15:00
17 Rabu/07/12/2022 7:00 15:00
18 Kamis/08/12/2022 7:00 15:00
19 Jumat/09/12/2022 7:00 15:00
20 Sabtu/10/12/2022 7:00 15:00
21 Minggu/11/12/2022 Off Off _
22 Senin/12/12/2022 15:00 23:00
23 Selasa/13/12/2022 15:00 23:00
24 Rabu/14/12/2022 15:00 23:00
25 Kamis/15/12/2022 15:00 23:00
26 Jumat/16/12/2022 15:00 23:00
27 Sabtu/17/12/2022 15:00 23:00
28 Minggu/18/12/2022 7:00 15:00 7.0
29 Senin/19/12/2022 7:00 15:00
30 Selasa/20/12/2022 7:00 15:00
31
32

TOTAL
Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Pagi Hyundai 134

TOTAL

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (AGUS SUYONO)
(OPERATOR EXCAVATOR {134})
Jumlah
Hm Akhir Keterangan Pekerjaan
Jam

_ _ StandBy Shift Malam


602.2 6.3 General
612.9 5.5 Barjing
619.2 4.2 General
632.3 6.6 General Perbaikan Jalan
644.5 4.0 General
_ _ Off
651.8 7.3 General
660.2 3.1 StandBy Shift Pagi
666.3 6.1 General
679.3 7.0 General
690.8 5.5 General Perbaikan Jalan WorkShop
705.0 7.1 General Perbaikan Jalan Hauling
718.7 7.5 General
_ _ StandBy Shift Malam
728.6 6.0 Melambungkan coal distockfile
734.0 5.4 Melambungkan Coal / General
740.4 2.3 General / Pelebaran Parit
746.9 6.5 General Perbaikan Tanggul
753.6 3.5 General
_ _ Off
215.3 9.3
764.1 3.1 General
771.9 5.5 General
778.1 2.4 General
782.1 4.0 General OB Laminating StockRoom
795.8 9.5 Barjing / Pembuatan Jalan StockRoom
805.0 9.2 Barjing
818.4 13.4 Barjing
827.5 9.1 Barjing

159.4

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (HERDIANSYAH)
(OPERATOR DOZER {004})
Jumlah
Hm Akhir Keterangan Pekerjaan
Jam

_ _ StandBy Shift Malam


21405.8 7.0 Dozing Jalan Houling Dan Barjing
21418.8 6.0 Dozing StockFile Dan Barjing
_ _ StandBy Shift Malam
21425.8 7.0 Dozing Dan Laminating Jalan Hauling
21436.8 4.0 Evakuasi Dt Ke Pit Baru
_ _ Off
21443.8 7.0 Dozing Disposal Pit Baru
21455.3 8.5 Dozing Disposal Pit Baru
_ _ StandBy Shift Pagi
21465.3 10.0 Dozing Disposal Pit Baru
_ _ StandBy Shift Pagi
21485.3 10.0 Dozing Disposal Dan Buat Jalan Hauling pit Baru
_ _ StandBy Shift Malam
21499.3 4.7 Dozing Jalan Dan Pelebaran Jalan Hauling Arah Simpang Cempaka
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ Off
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Malam
21511.8 2.0 Dozing Lipatan Exca
_ _ StandBy Shift Pagi
21529.3 7.5 Dozing pit Bentur
_ _ StandBy Shift Pagi
21546.8 8.3 Dozing pit Bentur
_ _ StandBy Shift Pagi
21554.3 3.0 Bikin Jalan Baru Masuk Pit Bentur MN
85

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (ABBAS)
(OPERATOR GRADER)
Jumlah
Hm Akhir Keterangan Pekerjaan
Jam

34.4 6.7 Maintenance Jalan Hauling


46.9 7.5 Grit Di Jalan Hauling
57.1 4.5 Grit Jalan Di Tambang
72.6 4.9 Scrup Jalan hauling arah DMS
79.0 6.4 Grit Jalan Hauling
87.6 6.3 Grit Jalan Hauling
99.5 7.5 Scrup Jalan Hauling arah West
102.3 2.8 Mentenen Jalan Hauling Arah West
111.2 6.9 Scrup jalan hauling Arah west
121.2 6.0 Grit Jalan Hauling
_ _ Off
128.9 2.4 Grit jalan Hauling
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
137.7 1.9 Grit Jalan Hauling
147.5 3.2 Mentenen Jalan Hauling
154.2 3.0 Grit Jalan Hauling
161.3 7.1 Grit Jalan Hauling
173.2 5.8 Grit Jalan Hauling
185.9 6.8 Maintenance Jalan Hauling
89.7

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (WANDI)
(DRIVER DT {103})
Jumlah
Hm Akhir Keterangan Pekerjaan
Jam

15:00 7.0 Angkut Lumpur Area StockFile/Barjing


_ _ StandBy Shift Pagi
15:00 7.0 Barjing Tongkang
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
11.0 7.0 Scrap Jalan hauling
_ _ Off
19.2 8.2 Scrap Jalan hauling
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
23:00 7.0 Hauling Coal Pit Algozan
23:00 7.0 Hauling Coal Pit West MN Dan hauling Coal Pit Algozan
15:00 7.0 Hauling Coal Pit West (MN) Dan hauling Coal Pit Algozan (DMS)
15:00 7.0 Hauling Coal Pit Algozan
15:00 7.0 Hauling Coal Pit Algozan
15:00 7.0 Hauling Coal Pit West MJ West Mn
15:00 7.0 Hauling Coal Pit West MJ
15:00 7.0 Hauling Coal Pit New West MJ
_ _ StandBy Shift Pagi
_ _ Off
21:00 5.0 Angkut Lumpur Area StockPile
_ _ StandBy Shift Malam
913 6.0 Memadtakan Jalan Hauling arah west StockPile
_ _ StandBy Shift Malam
23:00 7.0 Hauling Pit west MN MJ
_ _ StandBy Shift Malam
15:00 7.0 Barjing To Tongkang
15:00 7.0 Barjing
15:00 7.0 Barjing To Tongkang

124.2

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (DERI YANTO)
(DRIVER DT {103})
Jumlah
Hm Akhir Keterangan Pekerjaan
Jam

_ _ StandBy Shift Malam


23:00 4.0 Barjing
23:00 6.0 Barjing
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ StandBy Shift Malam
_ _ Off
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
15:00 7.0 Hauling Pit Dimas 2 Utara
23:00 7.0 Hauling Di StockRoom
_ _ StandBy Shift Malam
23:00 7.0 Hauling Pit 2 Utara dan houling pit 3b(DMS)
_ _ StandBy Shift Malam
23:00 7.0 Hauling Pit Baru
23:00 7.0 Hauling Pit Baru
_ _ StandBy Shift Malam
_ _ Off
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
_ _ StandBy Shift Pagi
15:00 7.0 Hauling Pit West MN
15:00 7.0 Angkut OB
23:00 7.0 Barjing
23:00 7.0 Barjing
23:00 7.0 Barjing Dan Hauling Pit West MJ
80

ABSENSI KARYAWAN
PERIODE 21 NOVEMBER S/D 20 DESEMBER
(ADMIN TIMBANGAN)

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

TOTAL
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (A.MUBAID)
(FOREMAN SVP)

spl Hm Awal Hm Akhir Jumlah Jam Keterangan Pekerj

_ 585.1 589.7 4.6 Melayani Barjin

0 4.6

Keterangan Spl Hari/Tgl/Bulan

Senin/21/11/2022
Selasa/22/11/2022
Barjing
Rabu/23/11/2022

Kamis/24/11/2022
Jumat/25/11/2022
Sabtu/26/11/2022
Minggu/27/11/2022
Senin/28/11/2022
Selasa/29/11/2022
Rabu/30/11/2022
Kamis/01/12/2022
Jumat/02/12/2022
General Sabtu/03/12/2022
Minggu/04/12/2022
Senin/05/12/2022
Selasa/06/12/2022
Rabu/07/12/2022
Kamis/08/12/2022
Jumat/09/12/2022
Sabtu/10/12/2022
Minggu/11/12/2022
Senin/12/12/2022
Selasa/13/12/2022
Rabu/14/12/2022
Kamis/15/12/2022
Barjing Jumat/16/12/2022
Barjing Sabtu/17/12/2022
Barjing Minggu/18/12/2022
Loading DT/Barjing Senin/19/12/2022
Selasa/20/12/2022

Keterangan Spl Hari/Tgl/Bulan

Senin/21/11/2022
Selasa/22/11/2022
Barjing Rabu/23/11/2022
Kamis/24/11/2022
Jumat/25/11/2022
Sabtu/26/11/2022
Minggu/27/11/2022
Senin/28/11/2022
Selasa/29/11/2022
Rabu/30/11/2022
Kamis/01/12/2022
Jumat/02/12/2022
Sabtu/03/12/2022
Minggu/04/12/2022
Senin/05/12/2022
Selasa/06/12/2022
Rabu/07/12/2022
Kamis/08/12/2022
Jumat/09/12/2022
Sabtu/10/12/2022
Minggu/11/12/2022
Senin/12/12/2022
Selasa/13/12/2022
Rabu/14/12/2022
Kamis/15/12/2022
Jumat/16/12/2022
Sabtu/17/12/2022
Minggu/18/12/2022
Senin/19/12/2022
Senin/20/12/2022

Keterangan Spl Hari/Tgl/Bulan

Rabu/30/11/2022
Kamis/01/12/2022
Jumat/02/12/2022
Scrup Jalan hauling Sabtu/03/12/2022
Minggu/04/12/2022
Senin/05/12/2022
Selasa/06/12/2022
Rabu/07/12/2022
Kamis/08/12/2022
Jumat/09/12/2022
Sabtu/10/12/2022
Minggu/11/12/2022
Senin/12/12/2022
Selasa/13/12/2022
Rabu/14/12/2022
Kamis/15/12/2022
Jumat/16/12/2022
Grit jalan Sabtu/17/12/2022
Minggu/18/12/2022
Senin/19/12/2022
Selasa/20/12/2022
Keterangan Spl Hari/Tgl/Bulan

Senin/21/11/2022
Selasa/22/11/2022
Rabu/23/11/2022
Kamis/24/11/2022
Jumat/25/11/2022
Sabtu/26/11/2022
Minggu/27/11/2022
Senin/28/11/2022
Selasa/29/11/2022
Rabu/30/11/2022
Kamis/01/12/2022
Jumat/02/12/2022
Sabtu/03/12/2022
Hauling Coal Pit West (MN) Dan hauling Coal Pit Algozan (DMS) Minggu/04/12/2022
Senin/05/12/2022
Selasa/06/12/2022
Rabu/07/12/2022
Kamis/08/12/2022
Jumat/09/12/2022
Sabtu/10/12/2022
Minggu/11/12/2022
Senin/12/12/2022
Selasa/13/12/2022
Rabu/14/12/2022
Kamis/15/12/2022
Jumat/16/12/2022
Sabtu/17/12/2022
Barjing Minggu/18/12/2022
Senin/19/12/2022
Selasa/20/12/2022

Keterangan Spl Hari/Tgl/Bulan

Senin/21/11/2022
Selasa/22/11/2022
Barjing Rabu/23/11/2022
Kamis/24/11/2022
Jumat/25/11/2022
Sabtu/26/11/2022
Minggu/27/11/2022
Senin/28/11/2022
Selasa/29/11/2022
Rabu/30/11/2022
Kamis/01/12/2022
Jumat/02/12/2022
Sabtu/03/12/2022
Hauling Dimas Minggu/04/12/2022
Senin/05/12/2022
Selasa/06/12/2022
Rabu/07/12/2022
Kamis/08/12/2022
Jumat/09/12/2022
Sabtu/10/12/2022
Minggu/11/12/2022

Senin/12/12/2022

Selasa/13/12/2022
Rabu/14/12/2022
Kamis/15/12/2022
Jumat/16/12/2022
Barjing Sabtu/17/12/2022
Minggu/18/12/2022
Senin/19/12/2022
Selasa/20/12/2022
ABSENSI KARYAWAN
PERIODE 21 NOVEMBER S/D 20 DESEMBER 2022(ERLANGGA) PERIODE 21 NOV
(ADMIN TIMBANGAN)

Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL No

Senin/21/11/2022 7:00 15:00 1


Selasa/22/11/2022 7:00 15:00 2
Rabu/23/11/2022 7:00 15:00 3
Kamis/24/11/2022 7:00 15:00 5.0 4
Jumat/25/11/2022 7:00 15:00 5
Sabtu/26/11/2022 7:00 15:00 6
Minggu/27/11/2022 Off Off _ 7
Senin/28/11/2022 15:00 23:00 8
Selasa/29/11/2022 15:00 23:00 9
Rabu/30/11/2022 15:00 23:00 10
Kamis/01/12/2022 15:00 23:00 11
Jumat/02/12/2022 15:00 23:00 12
Sabtu/03/12/2022 15:00 23:00 13
Minggu/04/12/2022 7:00 15:00 7.0 14
Senin/05/12/2022 7:00 15:00 15
Selasa/06/12/2022 7:00 15:00 16
Rabu/07/12/2022 7:00 15:00 17
Kamis/08/12/2022 7:00 15:00 18
Jumat/09/12/2022 7:00 15:00 19
Sabtu/10/12/2022 7:00 15:00 20
Minggu/11/12/2022 Off Off _ 21
Senin/12/12/2022 15:00 23:00 22
Selasa/13/12/2022 15:00 23:00 23
Rabu/14/12/2022 15:00 23:00 24
Kamis/15/12/2022 15:00 23:00 25
Jumat/16/12/2022 15:00 23:00 26
Sabtu/17/12/2022 15:00 23:00 27
Minggu/18/12/2022 7:00 15:00 7.0 28
Senin/19/12/2022 7:00 15:00 29
Selasa/20/12/2022 7:00 15:00 30
31
32

TOTAL TOTAL
*NOTE*
WARNA WARNA TULISAN KETERA
HITAM STAN
HITAM LEMBUR H
PUTIH OF
MERAH LEMBUR HARI LIBUR KE
HITAM IZIN S
HITAM IZIN JIKA ADA KEP
HITAM DRIVER MEMBAWA
WAN
2022 (A.MUBAID)

Keterangan Pekerjaan Keterangan Spl

Melayani Barjing

LAPORAN TIMESHEET HARIAN K


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMB
(OPERATOR EXCA ALLU CRUSH

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir

Senin/21/11/2022 Pagi Allu EX 201 _ 23008 23015


Selasa/22/11/2022 Pagi _ _ _ _
Bomax 106 _ 782 787
Rabu/23/11/2022 Pagi
DT 107 _ 13:00 15:00
Kamis/24/11/2022 Pagi _ _ _ _
Jumat/25/11/2022 Pagi _ _ _ _
Sabtu/26/11/2022 Pagi _ _ _ _
Minggu/27/11/2022 _ _ _ _ _
Senin/28/11/2022 Malam Allu EX 201 _ 23018 23025
Selasa/29/11/2022 Malam Allu EX 201 _ 23030 23037
Rabu/30/11/2022 Malam Allu EX 201 _ 23044 23051
Kamis/01/12/2022 Malam _ _ _ _
Jumat/02/12/2022 Malam Allu EX 201 _ 23064 23071
Sabtu/03/12/2022 Malam Allu EX 201 _ 23078 23085
Minggu/04/12/2022 Pagi Allu EX 201 7.0 23085 23092
Senin/05/12/2022 Pagi Allu EX 201 _ 23099 23106
Selasa/06/12/2022 Pagi Allu EX 201 _ 23106 23113
Rabu/07/12/2022 Pagi Allu EX 201 _ 23120 23127
Kamis/08/12/2022 Pagi Allu EX 201 _ 23120 23127
Jumat/09/12/2022 Pagi Allu EX 201 _ 23134 23141
Sabtu/10/12/2022 Pagi Hyundai 136 _ 197.5 206.0
Minggu/11/12/2022 _ _ _ _ _
Senin/12/12/2022 Malam _ _ _ _
Selasa/13/12/2022 Malam _ _ _ _
Rabu/14/12/2022 Malam _ _ _ _
Kamis/15/12/2022 Malam Allu EX 201 _ 23155 23162
Jumat/16/12/2022 Malam Allu EX 201 _ 23169 23176
Sabtu/17/12/2022 Malam Allu EX 201 _ 23183 23190
Minggu/18/12/2022 Pagi Allu EX 201 8.0 23190 23198
Senin/19/12/2022 Pagi Allu EX 201 _ 23206 23213
Selasa/20/12/2022 Pagi Allu EX 201 _ 23220 23227

TOTAL 15

LAPORAN TIMESHEET HARIAN K


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMB
(OPERATOR LOADER {2

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir

Senin/21/11/2022 Pagi Loader 220 _ 325.4 332.4


Selasa/22/11/2022 Pagi _ _ _ _
Rabu/23/11/2022 Pagi Loader 220 _ 338.7 345.7
Kamis/24/11/2022 Pagi _ _ _ _
Jumat/25/11/2022 Pagi _ _ _ _
Sabtu/26/11/2022 Pagi Loader 220 _ 356.7 363.7
Minggu/27/11/2022 _ _ _ _ _
Senin/28/11/2022 Malam Loader 220 _ 370.7 377.7
Selasa/29/11/2022 Malam _ _ _ _
Rabu/30/11/2022 Malam _ _ _ _
Kamis/01/12/2022 Malam Loader 220 _ 388.7 391.7
Jumat/02/12/2022 Malam Loader 220 _ 398.7 405.7
Sabtu/03/12/2022 Malam Loader 220 _ 412.7 419.7
Minggu/04/12/2022 Pagi Loader 220 7.0 419.7 426.7
Senin/05/12/2022 Pagi Loader 220 _ 433.8 440.8
Selasa/06/12/2022 Pagi Loader 220 _ 440.8 447.8
Rabu/07/12/2022 Pagi _ _ _ _
Kamis/08/12/2022 Pagi Loader 220 _ 460.0 464.0
Jumat/09/12/2022 Pagi _ _ _ _
Sabtu/10/12/2022 Pagi Loader 220 _ 476.6 483.6
Minggu/11/12/2022 _ _ _ _ _
Senin/12/12/2022 Malam Loader 220 _ 490.8 497.8
Selasa/13/12/2022 Malam _ _ _ _
Rabu/14/12/2022 Malam _ _ _ _
Kamis/15/12/2022 Malam Loader 220 _ 502.8 507.8
Jumat/16/12/2022 Malam _ _ _ _
Sabtu/17/12/2022 Malam Loader 220 _ 521.2 528.2
Minggu/18/12/2022 Pagi Loader 220 7.0 528.2 535.2
Senin/19/12/2022 Pagi Loader 220 _ 542.2 549.2
Senin/20/12/2022 Pagi Loader 220 _ 556.2 563.2

TOTAL 14

LAPORAN TIMESHEET HARIAN K


PERIODE BULAN 21 NOVEMBER S/D 20 DESEM
(OPERATOR GRADER

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir

Rabu/30/11/2022 Malam Grader _ 19.2 27.7


Kamis/01/12/2022 Malam Grader _ 34.4 39.4
Jumat/02/12/2022 Malam Grader _ 46.9 52.6
Sabtu/03/12/2022 Malam Grader _ 57.1 63.7
Minggu/04/12/2022 Pagi Grader 7.0 63.7 67.7
Senin/05/12/2022 Malam Grader _ 79.0 81.3
Selasa/06/12/2022 Malam Grader _ 87.6 92.0
Rabu/07/12/2022 Malam _ _ _ _
Kamis/08/12/2022 Malam Grader _ 102.3 104.3
Jumat/09/12/2022 Malam Grader _ 111.2 115.2
Sabtu/10/12/2022 Malam Grader _ 121.2 123.2
Minggu/11/12/2022 _ _ _ _ _
Senin/12/12/2022 Pagi Grader _ 123.2 126.4
Selasa/13/12/2022 Pagi _ _ _ _
Rabu/14/12/2022 Pagi _ _ _ _
Kamis/15/12/2022 Pagi Grader _ 128.8 135.8
Jumat/16/12/2022 Pagi Grader _ 137.7 144.3
Sabtu/17/12/2022 Pagi Grader _ 147.5 151.2
Minggu/18/12/2022 Malam Grader 7.0 161.3 167.4
Senin/19/12/2022 Malam Grader _ 173.2 179.1
Selasa/20/12/2022 Malam Grader _ 185.9 190.9
TOTAL 14

LAPORAN TIMESHEET HARIAN K


PERIODE BULAN 21 NOVEMBER S/D 20 DES
(DRIVER DT {108/107})

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir

Senin/21/11/2022 Pagi DT 108/107 _ 7:00 15:00


Selasa/22/11/2022 Pagi _ _ _ _
Rabu/23/11/2022 Pagi DT 108/107 _ 7:00 15:00
Kamis/24/11/2022 Pagi _ _ _ _
Jumat/25/11/2022 Pagi DT 109 _ 11:00 15:00
Sabtu/26/11/2022 Pagi _ _ _ _
Minggu/27/11/2022 _ _ _ _ _
Senin/28/11/2022 Malam _ _ _ _
Selasa/29/11/2022 Malam _ _ _ _
Rabu/30/11/2022 Malam _ _ _ _
Kamis/01/12/2022 Malam _ _ _ _
Jumat/02/12/2022 Malam _ _ _ _
Sabtu/03/12/2022 Malam DT 010 _ 15:00 23:00
Minggu/04/12/2022 Pagi Bomax 106 7.0 869 876
Senin/05/12/2022 Pagi _ _ _ _
Selasa/06/12/2022 Pagi DT 102/23 _ 7:00 15:00
Rabu/07/12/2022 Pagi DT 23 _ 7:00 15:00
Kamis/08/12/2022 Pagi _ _ _ _
Jumat/09/12/2022 Pagi DT 102/23 _ 7:00 15:00
Sabtu/10/12/2022 Pagi DT 25 _ 7:00 15:00
Minggu/11/12/2022 _ _ _ _ _
Senin/12/12/2022 Malam _ _ _ _
Selasa/13/12/2022 Malam _ _ _ _
Rabu/14/12/2022 Malam _ _ _ _
Kamis/15/12/2022 Malam _ _ _ _
Jumat/16/12/2022 Malam DT 25 _ 15:00 23:00
Sabtu/17/12/2022 Malam DT 23 _ 15:00 20:00
Minggu/18/12/2022 Pagi DT 110 7.0 7:00 15:00
Senin/19/12/2022 Pagi DT 110 _ 7:00 15:00
Selasa/20/12/2022 Pagi DT 110 _ 7:00 15:00

TOTAL 14

LAPORAN TIMESHEET HARIAN K


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBE
(DRIVER DT {108/107})

Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir

Senin/21/11/2022 Malam _ _ _ _
Selasa/22/11/2022 Malam DT 108/107 _ 15:00 23:00
Rabu/23/11/2022 Malam DT 108/107 1.0 15:00 23:00
Kamis/24/11/2022 Malam _ _ _ _
Jumat/25/11/2022 Malam DT 108/107 _ 15:00 23:00
Sabtu/26/11/2022 Malam _ _ _ _
Minggu/27/11/2022 _ _ _ _ _
Senin/28/11/2022 Pagi _ _ _ _
Selasa/29/11/2022 Pagi _ _ _ _
Rabu/30/11/2022 Pagi _ _ _ _
Kamis/01/12/2022 Pagi _ _ _ _
Jumat/02/12/2022 Pagi _ _ _ _
Sabtu/03/12/2022 Pagi DT 110 _ 7:00 15:00
Minggu/04/12/2022 Malam Bomax 106 7.0 876 879
Senin/05/12/2022 Malam _ _ _ _
Selasa/06/12/2022 Malam DT 102/23 _ 15:00 23:00
Rabu/07/12/2022 Malam _ _ _ _
Kamis/08/12/2022 Malam DT 23 _ 15:00 23:00
Jumat/09/12/2022 Malam DT 23 _ 15:00 23:00
Sabtu/10/12/2022 Malam _ _ _ _
Minggu/11/12/2022 _ _ _ _ _
Pagi Bomax 106 _ 894 896
Senin/12/12/2022
Pagi DT 108 _ 7:00 12:00
Selasa/13/12/2022 Pagi _ _ _ _
Rabu/14/12/2022 Pagi _ _ _ _
Kamis/15/12/2022 Pagi DT 108 _ 7:00 11:00
Jumat/16/12/2022 Pagi DT 25 _ 7:00 15:00
Sabtu/17/12/2022 Pagi DT 25 _ 7:00 15:00
Minggu/18/12/2022 Malam DT 110 7.0 15:00 23:00
Senin/19/12/2022 Malam DT 110 _ 15:00 23:00
Selasa/20/12/2022 Malam DT 110 _ 15:00 23:00
TOTAL 15

ABSENSI KARYAWAN
PERIODE 21 NOVEMBER S/D 20 DESEMBER 2022(ADIANNUR)
(ADMIN TIMBANGAN)

Hari/Tanggal/Bulan Jam Hadir Jam Pulang SPL

Senin/21/11/2022 15:00 23:00


Selasa/22/11/2022 15:00 23:00 2.0
Rabu/23/11/2022 15:00 23:00 1.0
Kamis/24/11/2022 15:00 23:00
Jumat/25/11/2022 15:00 23:00
Sabtu/26/11/2022 15:00 23:00
Minggu/27/11/2022 Off Off _
Senin/28/11/2022 7:00 15:00
Selasa/29/11/2022 7:00 15:00
Rabu/30/11/2022 7:00 15:00
Kamis/01/12/2022 7:00 15:00
Jumat/02/12/2022 7:00 15:00
Sabtu/03/12/2022 7:00 15:00
Minggu/04/12/2022 15:00 23:00 7.0
Senin/05/12/2022 15:00 23:00
Selasa/06/12/2022 15:00 23:00
Rabu/07/12/2022 15:00 23:00
Kamis/08/12/2022 15:00 23:00
Jumat/09/12/2022 15:00 23:00
Sabtu/10/12/2022 15:00 23:00
Minggu/11/12/2022 Off Off _
Senin/12/12/2022 7:00 15:00
Selasa/13/12/2022 7:00 15:00
Rabu/14/12/2022 7:00 15:00
Kamis/15/12/2022 7:00 15:00
Jumat/16/12/2022 7:00 15:00
Sabtu/17/12/2022 7:00 15:00
Minggu/18/12/2022 7:00 23:00 14.0
Senin/19/12/2022 15:00 23:00
Selasa/20/12/2022 15:00 23:00

TOTAL
KETERANGAN
STANDBY
LEMBUR HARI KERJA
OFF
LEMBUR HARI LIBUR KERJA/TANGGAL MERAH
IZIN SAKIT
IZIN JIKA ADA KEPERLUAN/URUSAN
DRIVER MEMBAWA UNIT ALAT BERAT
AN TIMESHEET HARIAN KARYAWAN
OVEMBER S/D 20 DESEMBER 2022 (BUDI HARIANTO)
ATOR EXCA ALLU CRUSHING {201})
Jumlah
Keterangan Pekerjaan Keterangan Spl
Jam

7.0 Crushing Coal Amos


_ StandBy Shift Pagi
5.0 Perapian StockFile
2.0 Melayani Barjing
_ StandBy Shift Pagi
_ StandBy Shift Pagi
_ StandBy Shift Pagi
_ Off
7.0 Crushing Coal Amos
7.0 Crushing Coal Amos
7.0 Crushing Coal
_ StandBy Shift Malam
7.0 Crushing Coal DMS
7.0 Crushing Coal
7.0 Crushing Coal Crushing Coal
7.0 Crushing Coal
7.0 Crushing Coal
7.0 Crushing Coal MN Dan DMS
7.0 Crushing Coal
7.0 Crushing Coal
8.5 Loading OB Laminating Jalan Hauling
_ Off
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
7.0 Crushing Coal
7.0 Crushing Coal
7.0 Crushing Coal
8.0 Crushing Coal Crushing Coal
7.0 Crushing Coal
7.0 Crushing Coal Amos

142.5

AN TIMESHEET HARIAN KARYAWAN


OVEMBER S/D 20 DESEMBER 2022 (ROMI GUNAWAN)
(OPERATOR LOADER {220})
Jumlah
Keterangan Pekerjaan Keterangan Spl
Jam

7.0 Melayani Hoffer Barjing


_ StandBy Shift Pagi
7.0 Melayani Loading Ponton Over
_ StandBy Shift Pagi
_ StandBy Shift Pagi
7.0 Merapikan Area StockFile
_ Off
7.0 Melayani Hauling Batu bara
_ StandBy Shift Malam
_ StandBy Shift Malam
3.0 Merapikan Dampingan
7.0 Melambungkan Coal
7.0 Melambungkan Batu Bara Hauling
7.0 Melayani Hauling Batu bara Melayani Hallu Hauling
7.0 Melayani Hauling Batu bara
7.0 Melayani Hauling Batu bara
_ StandBy Shift Pagi
4.0 Melambungkan Coal Dan Merapikan Dampingan
_ StandBy Shift Pagi
7.0 Melambungkan Coal
_ Off
7.0 Memindahkan Batu Bara stockPile
_ StandBy Shift Malam
_ StandBy Shift Malam
5.0 Memindahkan Batu Bara stockPile
_ StandBy Shift Malam
7.0 Melambungkan BatuBara
7.0 Barjing Loading DT Barjing
7.0 Barjing
7.0 Barjing Loading DT

117

AN TIMESHEET HARIAN KARYAWAN


NOVEMBER S/D 20 DESEMBER 2022 (ASMIANSYAH)
(OPERATOR GRADER)
Jumlah
Keterangan Pekerjaan Keterangan Spl
Jam

8.5 Maintenance Jalan Hauling


5.0 Maintenance Jalan Hauling
5.7 Maintenance Jalan Hauling Pit Dimas
6.6 Maintenance Jalan Pit Baru Dan Dimas
4.0 Maintenance Jalan Hauling Pit Dimas Maintenance Jalan Hauling Pit Dimas
10.4 Mentenen Jalan Hauling Arah Amos
4.4 Maintenance Jalan Hauling Pit Dimas
_ StandBy Shift Malam
2.0 Maintenance Jalan Hauling Ke Pit PJMU arah Barat
4.0 Maintenance jalan Hauling Pit Baru
2.0 Maintenance Jalan Hauling Di Areal Timbangan
_ Off
3.2 Maintenance Jalan Kampung
_ StandBy Shift Pagi
_ StandBy Shift Pagi
7.0 Maintenance Jalan Hauling Arah Barat
6.6 Maintenance Jalan Arah Barat
3.7 Maintenance Jalan StockPile
6.1 Maintenance Jalan Hauling Dan StockPile Maintenance Jalan Dan StockPile
5.9 Maintenance StockPile
5.0 Maintenance Jalan Haulinh Arah Barat Dan stockPile 2
90.1

AN TIMESHEET HARIAN KARYAWAN


21 NOVEMBER S/D 20 DESEMBER 2022 (HENDRA)
(DRIVER DT {108/107})
Jumlah
Keterangan Pekerjaan Keterangan Spl
Jam

7.0 OB Lumpur Di Jetty/Barjing


_ StandBy Shift Pagi
7.0 Melayani Barjing
_ StandBy Shift Pagi
3.0 Travel Dt Baru
_ StandBy Shift Pagi
_ Off
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
7.0 Hauling Pit Dimas
7.0 Memadatkan jalan hauling Compact Jalan hauling
_ StandBy Shift Pagi
7.0 Hauling Coal Pit Algozan
7.0 Angkut OB Laminating Jalan Hauling
_ StandBy Shift Pagi
7.0 OB Lumpur
7.0 Laminating Jalan Hauling
_ Off
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
_ StandBy Shift Malam
7.0 Angkut OB Laminating Jalan Hauling Dan StockPile
4.0 OB Laminating Jalan StockPile
7.0 Barjing Barjing
7.0 Barjing
7.0 Barjing

91

AN TIMESHEET HARIAN KARYAWAN


VEMBER S/D 20 DESEMBER 2022 (RAHMAN NUDIN.A)
(DRIVER DT {108/107})
Jumlah
Keterangan Pekerjaan Keterangan Spl
Jam
_ StandBy Shift Malam
4.0 Barjing
6.0 Barjing Barjing
_ StandBy Shift Malam
7.0 Angkut OB
_ StandBy Shift Malam
_ Off
_ StandBy Shift Pagi
_ StandBy Shift Pagi
_ StandBy Shift Pagi
_ StandBy Shift Pagi
_ StandBy Shift Pagi
7.0 Hauling Dimas
3.0 Memadatkan Jalan hauling Memadatkan Jalan Hauling
_ StandBy Shift Malam
7.0 Hauling Pit 2 Utara dan houling pit 3b(DMS)
_ StandBy Shift Malam
7.0 Angkut OB Lumpur
7.0 Angkut Lumpur OB
_ StandBy Shift Malam
_ Off
2.0 Memdadatkan Jalan Kampung
5.0 Hauling West (MJ)
_ StandBy Shift Pagi
_ StandBy Shift Pagi
4.0 Hauling West
7.0 Angkut OB
7.0 Angkut OB
7.0 Barjing Barjing
7.0 Barjing
7.0 Barjing Dan Hauling Pit west MJ
94

ABSENSI KARYAWAN
PERIODE 21 NOVEMBER S/D 20 DESEMBER 2022(ARDIANSYAH
(DUMPMAN)

No Hari/Tanggal/Bulan Jam Hadir

1 Senin/21/11/2022 15:00
2 Selasa/22/11/2022 15:00
3 Rabu/23/11/2022 15:00
4 Kamis/24/11/2022 15:00
5 Jumat/25/11/2022 15:00
6 Sabtu/26/11/2022 15:00
7 Minggu/27/11/2022 Off
8 Senin/28/11/2022 7:00
9 Selasa/29/11/2022 7:00
10 Rabu/30/11/2022 7:00
11 Kamis/01/12/2022 7:00
12 Jumat/02/12/2022 7:00
13 Sabtu/03/12/2022 7:00
14 Minggu/04/12/2022 15:00
15 Senin/05/12/2022 15:00
16 Selasa/06/12/2022 15:00
17 Rabu/07/12/2022 15:00
18 Kamis/08/12/2022 15:00
19 Jumat/09/12/2022 15:00
20 Sabtu/10/12/2022 15:00
21 Minggu/11/12/2022 Off
22 Senin/12/12/2022 7:00
23 Selasa/13/12/2022 7:00
24 Rabu/14/12/2022 7:00
25 Kamis/15/12/2022 7:00
26 Jumat/16/12/2022 7:00
27 Sabtu/17/12/2022 7:00
28 Minggu/18/12/2022 15:00
29 Senin/19/12/2022 15:00
30 Selasa/20/12/2022 15:00
31
32

TOTAL
LAPOR
PERIODE BULAN
(OP

erangan Spl Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Malam _
Selasa/22/11/2022 Malam Bomax 106
Rabu/23/11/2022 Malam Bomax 106
Kamis/24/11/2022 Malam _
Jumat/25/11/2022 Malam Bomax 106
Sabtu/26/11/2022 Malam _
Minggu/27/11/2022 _ _
Senin/28/11/2022 Pagi Allu EX 201
Selasa/29/11/2022 Pagi Allu EX 201
Rabu/30/11/2022 Pagi Allu EX 201
Kamis/01/12/2022 Pagi Allu EX 201
Jumat/02/12/2022 Pagi Allu EX 201
Sabtu/03/12/2022 Pagi Allu EX 201
Minggu/04/12/2022 Malam Allu EX 201
shing Coal Senin/05/12/2022 Malam _
Selasa/06/12/2022 Malam Allu EX 201
Rabu/07/12/2022 Malam _
Kamis/08/12/2022 Malam Allu EX 201
Jumat/09/12/2022 Malam Allu EX 201
Sabtu/10/12/2022 Malam _
Minggu/11/12/2022 _ _
Senin/12/12/2022 Pagi _
Selasa/13/12/2022 Pagi _
Rabu/14/12/2022 Pagi _
Kamis/15/12/2022 Pagi Allu EX 201
Jumat/16/12/2022 Pagi Allu EX 201
Sabtu/17/12/2022 Pagi Allu EX 201
Minggu/18/12/2022 Malam Allu EX 201
shing Coal Senin/19/12/2022 Malam Allu EX 201
Selasa/20/12/2022 Malam Allu EX 201

TOTAL

LAPOR
PERIODE BULAN

erangan Spl Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Malam _
Selasa/22/11/2022 Malam Loader 220
Rabu/23/11/2022 Malam Loader 220
Kamis/24/11/2022 Malam _
Jumat/25/11/2022 Malam Loader 220
Sabtu/26/11/2022 Malam _
Minggu/27/11/2022 _ _
Senin/28/11/2022 Pagi Loader 220
Selasa/29/11/2022 Pagi _
Rabu/30/11/2022 Pagi Loader 220
Kamis/01/12/2022 Pagi Loader 220
Jumat/02/12/2022 Pagi Loader 220
Sabtu/03/12/2022 Pagi Loader 220
ni Hallu Hauling Minggu/04/12/2022 Malam Loader 220
Senin/05/12/2022 Malam _
Selasa/06/12/2022 Malam Loader 220
Rabu/07/12/2022 Pagi Loader 220
Kamis/08/12/2022 Malam Loader 220
Jumat/09/12/2022 Malam Loader 220
Sabtu/10/12/2022 Malam _
Minggu/11/12/2022 _ _
Senin/12/12/2022 Pagi Loader 220
Selasa/13/12/2022 Pagi _
Rabu/14/12/2022 Pagi _
Kamis/15/12/2022 Pagi Loader 220
Jumat/16/12/2022 Pagi Loader 220
Sabtu/17/12/2022 Pagi Loader 220
Barjing Minggu/18/12/2022 Malam Loader 220
Senin/19/12/2022 Malam Loader 220
Selasa/20/12/2022 Malam Loader 220

TOTAL

LAPOR
PERIODE BULAN 2

erangan Spl Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Pagi Hyundai 131


Selasa/22/11/2022 Pagi Hyundai 131
Rabu/23/11/2022 Pagi Hyundai 131
Kamis/24/11/2022 Pagi Hyundai 131
alan Hauling Pit Dimas Jumat/25/11/2022 Pagi _
Sabtu/26/11/2022 Pagi _
Minggu/27/11/2022 Pagi Hyundai 131
Senin/28/11/2022 Pagi Hyundai 112
Selasa/29/11/2022 Pagi Hyundai 112
Rabu/30/11/2022 Pagi _
Kamis/01/12/2022 Pagi Hyundai 112
Jumat/02/12/2022 Pagi Hyundai 112
Sabtu/03/12/022 Pagi Hyundai 112
Minggu/04/12/2022 Pagi Hyundai 112
Senin/05/12/2022 Pagi _
Selasa/06/12/2022 Pagi Hyundai 112
Rabu/07/12/2022 Pagi Hyundai 112
Kamis/08/12/2022 Pagi Hyundai 112
Jalan Dan StockPile Jumat/09/12/2022 Pagi Hyundai 112
Sabtu/10/12/2022 Pagi Hyundai 340
Minggu/11/12/2022 Pagi Hyundai 112
Senin/12/12/2022 Pagi Hyundai 112
Selasa/13/12/2022 Pagi Hyundai 112
Rabu/14/12/2022 Pagi Hyundai 112
Kamis/15/12/2022 Pagi Hyundai 112
Jumat/16/12/2022 Pagi Hyundai 112
Sabtu/17/12/2022 Pagi Hyundai 112
Minggu/18/12/2022 Pagi Hyundai 112
Senin/19/12/2022 Pagi _
Selasa/20/12/2022 Pagi Hyundai 112
Rabu/21/12/2022 Pagi Hyundai 112
Kamis/22/12/2022 Pagi Hyundai 112
Jumat/23/12/2022 Pagi Hyundai 112
Sabtu/24/12/2022 Pagi Hyundai 112
Minggu/25/12/2022 Pagi Hyundai 112
TOTAL

LAPOR
PERIODE BULAN

erangan Spl Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Pagi DT 25
Selasa/22/11/2022 Pagi _
Rabu/23/11/2022 Pagi DT 25
Kamis/24/11/2022 Pagi _
Jumat/25/11/2022 Pagi _
Sabtu/26/11/2022 Pagi _
Minggu/27/11/2022 _ _
Senin/28/11/2022 Malam Bomax 106
Selasa/29/11/2022 Malam _
Rabu/30/11/2022 Malam _
Kamis/01/12/2022 Malam Bomax 106
Jumat/02/12/2022 Malam Bomax 106
Sabtu/03/12/2022 Malam DT 07
ct Jalan hauling Minggu/04/12/2022 Pagi DT 07
Senin/05/12/2022 Pagi DT 07
Selasa/06/12/2022 Pagi _
Rabu/07/12/2022 Pagi DT 25
Kamis/08/12/2022 Pagi DT 107
Jumat/09/12/2022 Pagi DT 107
Sabtu/10/12/2022 Pagi _
Minggu/11/12/2022 _ _
Senin/12/12/2022 Malam Bomax 106
Selasa/13/12/2022 Malam _
Rabu/14/12/2022 Malam DT 25
Kamis/15/12/2022 Malam _
Jumat/16/12/2022 Malam DT 107
Sabtu/17/12/2022 Malam DT 25
Barjing Minggu/18/12/2022 Pagi DT 107
Senin/19/12/2022 Pagi DT 107
Selasa/20/12/2022 Pagi DT 107

TOTAL

LAPOR
PERIODE BULAN 21 N

erangan Spl Hari/Tgl/Bulan Shift Kode Unit

Senin/21/11/2022 Malam _
Selasa/22/11/2022 Malam DT 25
Barjing Rabu/23/11/2022 Malam DT 25
Kamis/24/11/2022 Malam _
Jumat/25/11/2022 Malam DT 25
Sabtu/26/11/2022 Malam _
Minggu/27/11/2022 _ _
Senin/28/11/2022 Pagi _
Selasa/29/11/2022 Pagi _
Rabu/30/11/2022 Pagi _
Kamis/01/12/2022 Pagi _
Jumat/02/12/2022 Pagi _
Sabtu/03/12/2022 Pagi DT 109
kan Jalan Hauling Minggu/04/12/2022 Malam DT 109
Senin/05/12/2022 Malam _
Selasa/06/12/2022 Malam DT 109
Rabu/07/12/2022 Malam _
Kamis/08/12/2022 Malam DT 109
Jumat/09/12/2022 Malam DT 109/25
Sabtu/10/12/2022 Malam _
Minggu/11/12/2022 _ _
Senin/12/12/2022 Pagi DT 109
Selasa/13/12/2022 Pagi _
Rabu/14/12/2022 Pagi _
Kamis/15/12/2022 Pagi DT 109
Jumat/16/12/2022 Pagi DT 109
Sabtu/17/12/2022 Pagi _
Minggu/18/12/2022 Malam DT 109
Barjing Senin/19/12/2022 Malam DT 109
Selasa/20/12/2022 Malam DT 109
TOTAL

WAN
MBER 2022(ARDIANSYAH)
)

Jam Pulang SPL

23:00
23:00
23:00 1.0
23:00
23:00
23:00
Off
15:00
15:00
15:00
15:00
15:00
15:00
23:00 7.0
23:00
23:00
23:00
23:00
23:00
23:00
Off _
15:00
15:00
15:00
15:00
15:00
15:00
23:00 7.0
23:00
23:00
LAPORAN TIMESHEET HARIAN KARYAWAN
PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (ASPIANTO)
(OPERATOR EX ALLU CRUSHING {201})
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan Keterangan Spl
Jam
_ _ _ _ StandBy Shift Malam
_ 777 782 5.0 Bomax Memadatkan StockFile
1.0 790 796 6.0 Memadatkan StockFile Barjing
_ _ _ _ StandBy Shift Malam
_ 803 810 7.0 Memadatkan StockFile Dan Jalan Hauling
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ 23015 23018 3.0 Crushing Coal Amos
_ 23025 23030 5.0 Crushing Coal
_ 22037 22044 7.0 Crushing Coal
_ 23051 23058 7.0 Crushing Coal
_ 23058 23064 6.0 Crushing Coal
_ 23071 23078 7.0 Crushing Coal
7.0 23092 23099 7.0 Crushing Coal Crushing Coal
_ _ _ _ StandBy Shift Malam
_ 23113 23120 7.0 Crushing Coal
_ _ _ _ StandBy Shift Malam
_ 23127 23134 7.0 Crushing Coal
_ 23141 23148 7.0 Crushing Coal
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ 23148 23155 7.0 Crushing Coal
_ 23162 23169 7.0 Crushing Coal
_ 23176 23183 7.0 Crushing Coal
8.0 23198 23206 8.0 Crushing Coal Crushing Coal
_ 23213 23220 7.0 Crushing Coal
_ 23227 23234 7.0 Crushing Coal

16 124

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (CHAIRIL)
(OPERATOR LOADER {220})
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan Keterangan Spl
Jam

_ _ _ _ StandBy Shift Malam


_ 332.4 338.7 6.3 Blending Coal
1.0 345.7 351.7 6.0 Barjing Belending Barjing
_ _ _ _ StandBy Shift Malam
_ 351.7 356.7 5.0 Merapikan StockFile
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ 363.7 370.7 7.0 Jaga Dumpingan
_ _ _ _ StandBy Shift Pagi
_ 377.7 381.7 4.0 Merapikan Dan Melambungkan Coal
_ 381.1 388.7 7.6 Merapikan StockFile
_ 391.7 398.7 7.0 Jaga Dumpingan
_ 405.7 412.7 7.0 Merapikan StockFile Dan Menjaga Dampingan
7.0 426.7 433.8 7.1 Jaga Dampingan Jaga Dampinga
_ _ _ _ StandBy Shift Malam
_ 447.8 454.8 7.0 Merapikan StockFile Dan Menjaga Dampingan
_ 454.8 460.0 5.2 Merapikan StockFile Menjaga Dampingan
_ 464.0 471.0 7.0 Jaga Dampingan
_ 471.0 476.6 5.6 Merapikan StockPile
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ 483.6 490.8 7.2 Jaga Dampingan Merapikan Dan Melambungkan Coal
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ 497.8 502.8 5.0 Jaga Dampingan Dan Memindahkan BatuBara
7.0 507.8 514.0 6.2 Jaga Dampingan Jaga Dampingan
_ 514.0 521.2 7.2 Jaga Dampingan
7.0 535.2 542.2 7.0 Barjing Barjing
_ 549.2 556.2 7.0 Barjing
_ 563.2 568.2 5.0 Barjing Dan Menjaga Dampingan

22 126.4

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (DWIWANTO)
(OPERATOR EXCAVATOR {131})
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan Keterangan Spl
Jam

_ 553.8 558.3 4.5 Melambungkan Coal Barjing


_ 558.3 563.8 5.5 Melambungkan Coal Barjing
_ 563.8 576.3 12.5 Melambungkan Coal Loading DT
_ 576.3 580.7 4.4 General
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ 580.7 594.2 13.5 Sidecast
_ 1184.0 1192.3 8.3 Sidecast
_ 1192.3 1200.7 8.4 Sidecast/General
_ _ _ _ StandBy Shift Pagi
_ 1200.7 1210.1 9.4 Sidecast/General
_ 1210.1 1220.5 10.4 Sidecast/General
_ 1220.5 1230.9 10.4 Cleanning/Getting general
_ 1230.9 1236.7 5.8 Cleanning/Getting general
_ _ _ _ StandBy Shift Pagi
_ 1236.7 1246.1 9.4 Sidecast/General
_ 1245.1 1257.1 12.0 Getting Wading Coal
_ 1257.1 1264.4 7.3 Cleanning Getting General
_ 1264.4 1273.6 9.2 Sidecast/Cleanning
_ 675.5 678.5 3.0 Sidecast
_ 1271.6 1274.3 2.7 Sidecast
_ 1274.3 1288.3 14.0 Sidecast
_ 1288.3 1300.2 11.9 Sidecast
_ 1300.2 1308.0 7.8 General/Sidecast
_ 1308.0 1316.5 8.5 Getting Loading Coal/General
_ 1316.5 1322.7 6.2 Cleanning/Getting Loading Coal
_ 1322.7 1330.9 8.2 Sidecast
_ 1330.9 1341.6 10.7 Sidecast
_ _ _ _ StandBy Shift Pagi
_ 1341.6 1351.1 9.5 Sidecast
_ 1351.1 1356.6 5.5 Sidecast
_ 1356.6 1364.1 7.5 Sidecast
_ 1364.1 1372.3 8.2 Sidecast
_ 1372.3 1384.3 12.0 Getting Wedding Coal
_ 1384.3 1387.9 3.6 Sidecast/General
0 250.3

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (SYUKUR)
(DRIVER DT {25})
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan Keterangan Spl
Jam

_ 7:00 15:00 7.0 OB/Barjing


_ _ _ _ StandBy Shift Pagi
_ 7:00 15:00 7.0 Barjing keponton
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ Off
_ 824 829 5.0 Perapian area StockFile Dan jalan hauling Amos
_ _ _ _ StandBy Shift Malam
_ _ _ _ StandBy Shift Malam
_ 841 846 5.0 Perapian Jalan Hauling
_ 854 861 7.0 Pemadatan Di Jalan Kampung Dan Jalan Hauling
_ 15:00 23:00 7.0 Hauling Di Pit West MN
7.0 7:00 15:00 7.0 Hauling Pit Dimas Hauling Pit Dim
_ 7:00 15:00 7.0 Hauling Di Dimas
_ _ _ _ StandBy Shift Pagi
_ 7:00 15:00 7.0 Angkut OB
_ 7:00 15:00 7.0 Hauling Pit West MJ
_ 7:00 15:00 7.0 Hauling Pit West MJ
_ _ _ _ StandBy Shift Pagi
_ _ _ _ Off
_ 896 903 7.0 Memadatkan Jalan Kampung
_ _ _ _ StandBy Shift Malam
_ 15:00 20:00 5.0 Angkut Lumpur/OB
_ _ _ _ StandBy Shift Malam
_ 15:00 23:00 7.0 Hauling West MJ Dan MN
_ 15:00 23:00 7.0 Angkut OB
7.0 7:00 15:00 7.0 Barjing Barjing
_ 7:00 15:00 7.0 Barjing
_ 7:00 15:00 7.0 Barjing

14 120

LAPORAN TIMESHEET HARIAN KARYAWAN


PERIODE BULAN 21 NOVEMBER S/D 20 DESEMBER 2022 (FERRY BACTHIAR)
(DRIVER DT {25})
Jumlah
spl Hm Awal Hm Akhir Keterangan Pekerjaan Keterangan Spl
Jam

_ _ _ _ StandBy Shift Malam


_ 15:00 23:00 4.0 Barjing
1.0 15:00 23:00 6.0 Barjing Barjing
_ _ _ _ StandBy Shift Malam
_ 15:00 23:00 7.0 Angkut OB
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
7.0 7:00 23:00 14.0 Hauling Dimas Hauling Pit 2 Utara (
7.0 15:00 23:00 7.0 Hauling Dimas Hauling Dimas
_ _ _ _ StandBy Shift Malam
_ 15:00 23:00 7.0 Hauling Pit 2 Utara dan houling pit 3b(DMS)
_ _ _ _ StandBy Shift Malam
_ 15:00 23:00 7.0 Hauling
_ 15:00 23:00 7.0 Angkut OB Lumpur Dan Hauling Di Pit West
_ _ _ _ StandBy Shift Malam
_ _ _ _ Off
_ 7:00 15:00 7.0 Hauling Pit West
_ _ _ _ StandBy Shift Pagi
_ _ _ _ StandBy Shift Pagi
_ 7:00 11:00 4.0 Hauling West
_ 7:00 15:00 7.0 Hauling Pit West
_ _ _ _ StandBy Shift Pagi
7.0 15:00 23:00 7.0 Barjing Barjing
_ 15:00 23:00 7.0 Barjing
_ 15:00 23:00 7.0 Barjing Dan Hauling Pit west MJ
22 98
Keterangan Spl

Barjing
Crushing Coal

Crushing Coal

Keterangan Spl

Barjing

Jaga Dampingan
Jaga Dampingan

Barjing

Keterangan Spl
Keterangan Spl

Hauling Pit Dimas


Barjing

Keterangan Spl

Barjing

Hauling Pit 2 Utara (DMS)


Hauling Dimas

Barjing
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 20
(OPERATOR EXCAVATOR {134}
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi Hyundai 134 _ 827.5 832.6 5.1
Jumat/23/12/2022 Pagi Hyundai 134 _ 836.9 844.5 7.6
Sabtu/24/12/2022 Pagi Hyundai 134 _ 846.6 853.7 7.1
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam Hyundai 134 _ 864.1 869.3 5.2
Selasa/27/12/2022 Malam Hyundai 134 _ 875.8 879.4 3.6
Rabu/28/12/2022 Malam DT 110 _ 17:00 23:00 5.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam Hyundai 134 _ 905.1 909.1 4.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi Hyundai 134 _ 909.1 913.3 4.2
Selasa/03/01/2023 Pagi Hyundai 134 _ 916.8 921.1 4.3
Rabu/04/01/2023 Pagi _ _ _ _ _
Kamis/05/01/2023 Pagi _ _ _ _ _
Jumat/06/01/2023 Pagi Hyundai 134 _ 938.7 944.0 5.3
Sabtu/07/01/2023 Pagi Hyundai 134 _ 951.1 957.4 6.3
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam Hyundai 134 _ 966.6 970.7 4.1
Selasa/10/01/2023 Malam Hyundai 134 _ 973.7 978.7 5.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam Hyundai 134 _ 989.0 991.4 2.4
Jumat/13/01/2023 Malam Hyundai 134 _ 991.4 995.7 4.3
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi Hyundai 134 _ 995.7 1000.3 4.6
Selasa/17/01/2023 Pagi _ _ _ _ _
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 78.1

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 202
(OPERATOR LOADER {220})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _

Kamis/22/12/2022 Pagi _ _ _ _ _

Jumat/23/12/2022 Pagi _ _ _ _ _

Sabtu/24/12/2022 Pagi _ _ _ _ _

Minggu/25/12/2022 _ _ _ _ _ _

Senin/26/12/2022 Malam Loader 220 _ 592.8 599.8 7.0

Selasa/27/12/2022 Pagi/Malam Loader 220 7.0 599.8 611.8 12.0

Rabu/28/12/2022 Malam Loader 220 _ 618.8 625.8 7.0

Kamis/29/12/2022 Malam _ _ _ _ _

Jumat/30/12/2022 Malam _ _ _ _ _

Sabtu/31/12/2022 Malam _ _ _ _ _

Minggu/01/01/2023 _ _ _ _ _ _

Senin/02/01/2023 Pagi _ _ _ _ _

Selasa/03/01/2023 Pagi _ _ _ _ _

Rabu/04/01/2023 Pagi Loader 220 _ 655.5 662.5 7.0

Kamis/05/01/2023 Pagi Loader 220 _ 669.6 676.6 7.0

Jumat/06/01/2023 Pagi Loader 220 _ 638.5 690.5 7.0

Sabtu/07/01/2023 Pagi Loader 220 _ 697.5 704.5 7.0

Minggu/08/01/2023 _ _ _ _ _ _

Senin/09/01/2023 Malam _ _ _ _ _

Selasa/10/01/2023 Malam Loader 220 _ 715.5 720.5 5.0

Rabu/11/01/2023 Malam _ _ _ _ _

Kamis/12/01/2023 Malam Loader 220 _ 727.5 734.5 7.0

Jumat/13/01/2023 Malam Loader 220 _ 741.5 748.5 7.0

Sabtu/14/01/2023 Malam _ _ _ _ _

Minggu/15/01/2023 _ _ _ _ _ _

Senin/16/01/2023 Pagi Loader 220 _ 7:00 15:00 7.0

Selasa/17/01/2023 Pagi Loader 220 _ 7:00 15:00 7.0

Rabu/18/01/2023 Pagi _ _ _ _ _

Kamis/19/01/2023 Pagi _ _ _ _ _

Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 7 87
TOTAL 7 87

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUAR
(DRIVER DT {101})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi _ _ _ _ _
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam DT 23 _ 15:00 23:00 7.0
Selasa/27/12/2022 Malam _ _ _ _ _
Rabu/28/12/2022 Malam DT 107 _ 15:00 23:00 7.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Selasa/03/01/2023 Pagi _ _ _ _ _
Rabu/04/01/2023 Pagi _ _ _ _ _
Kamis/05/01/2023 Pagi _ _ _ _ _
Jumat/06/01/2023 Pagi _ _ _ _ _
Sabtu/07/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam _ _ _ _ _
Jumat/13/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Selasa/17/01/2023 Pagi _ _ _ _ _
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 49
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI
(DRIVER DT {107})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam DT 107 _ 15:00 23:00 7.0
Jumat/23/12/2022 Malam _ _ _ _ _
sabtu/24/12/2022 Malam DT 107 1.0 15:00 23:00 7.0
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi DT 107 _ 7:00 15:00 7.0
Selasa/27/12/2022 Pagi _ _ _ _ _
Rabu/28/12/2022 Pagi DT 107 _ 7:00 15:00 7.0
Kamis/29/12/2022 Pagi DT 107 _ 7:00 15:00 7.0
Jumat/30/12/2022 Pagi DT 107 _ 7:00 15:00 6.0
Sabtu/31/12/2022 Pagi DT 107 _ 7:00 15:00 7.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam _ _ _ _ _
Selasa/03/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Rabu/04/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Kamis/05/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Jumat/06/01/2023 Malam _ _ _ _ _
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi _ _ _ _ _
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Jumat/13/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam DT 107 _ 15:00 23:00 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 90
HEET HARIAN KARYAWAN
R S/D 20 JANUARI 2022 (M.AL KURNAIN)
R EXCAVATOR {134})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


Loading Lumpur Laminating StockPile
General Jalan Hauling Dan StocPile 2
Perapian Di StockPile 2
Off
General
Melambungkan Coal
Hauling Pit 2 Utara
StandBy Shift Malam
StandBy Shift Malam
General
Off
General
General Jalan Hauling
StandBy Shift Pagi
StandBy Shift Pagi
General
General Jalan Hauling Arah Amos
Off
Melambungkan Coal
General
StandBy Shift Malam
Melambungkan Coal
General
StandBy Shift Malam
Off
Melambungkan Coal Dan Bantu Pengangkatan Timbangan
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi

HEET HARIAN KARYAWAN


R S/D 20 JANUARI 2022 (ROMI GUNAWAN)
OR LOADER {220})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

Off

Melambungkan BatuBara

Melambungkan BatuBara Areal StockPile Memindahkan BatuBara

Melambungkan BatuBara Hauling

StandBy Shift Malam

StandBy Shift Malam

StandBy Shift Malam

Off

StandBy Shift Pagi

StandBy Shift Pagi

Melambungkan BatuBara

Melambungkan BatuBara Melayani Hauling

Merapikan BatuBara

Melambungkan BatuBara Hauling

Off

StandBy Shift Malam

Melambungkan Coal

StandBy Shift Malam

Melambungkan BatuBara

Melambungkan BatuBara Hauling

StandBy Shift Malam

Off

Melambungkan BatuBara Areal StockPile

Melambungkan BatuBara Area StockPile

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi


HEET HARIAN KARYAWAN
MBER S/D 20 JANUARI 2022 (SYUKUR)
VER DT {101})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
Angkut OB
StandBy Shift Malam
Hauling Pit Dimas
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
Hauling West MN
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Hauling west MJ
Off
StandBy Shift Malam
Hauling WestMN
StandBy Shift Malam
StandBy Shift Malam
Hauling Pit Amos
StandBy Shift Malam
Off
Hauling Pit Amos
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
HEET HARIAN KARYAWAN
BER S/D 20 JANUARI 2022 (RUSDI YANI)
VER DT {107})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


Hauling Pit Baru
StandBy Shift Malam
Hauling Pit baru Hauling MN/MJ
Off
Hauling Pit Baru
StandBy Shift Pagi
Hauling Pit Dimas
Hauling Pit Baru
Hauling Pit Baru MN
Hauling Pit Baru MJ
Off
StandBy Shift Malam
Hauling Pit Baru MJ
Hauling pit Dimas Algozan
Hauling Pit Baru MJ
StandBy Shift Malam
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Pit Dimas
Hauling Pit Amos
StandBy Shift Pagi
Off
Hauling Pit Amos
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 20
(OPERATOR EXCAVATOR {134}
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam Hyundai 134 _ 832.6 836.9 4.3
Jumat/23/12/2022 Malam Hyundai 134 _ 844.5 846.6 2.1
Sabtu/24/12/2022 Malam Hyundai 134 1.0 853.7 856.9 3.2
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi Hyundai 134 _ 856.9 864.1 7.2
Selasa/27/12/2022 Pagi Hyundai 134 _ 869.3 875.8 6.5
Rabu/28/12/2022 Pagi Hyundai 134 _ 879.4 886.7 7.3
Kamis/29/12/2022 Pagi Hyundai 134 _ 886.7 892.9 6.2
Jumat/30/12/2022 Pagi Hyundai 134 _ 892.9 897.1 4.2
Sabtu/31/12/2022 Pagi Hyundai 134 _ 897.1 905.1 8.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam Hyundai 134 _ 913.3 916.8 3.5
Selasa/03/01/2023 Malam Hyundai 134 _ 921.1 927.6 6.5
Rabu/04/01/2023 Malam Hyundai 134 _ 927.6 932.7 5.1
Kamis/05/01/2023 Malam Hyundai 134 _ 935.7 938.7 3.0
Jumat/06/01/2023 Malam Hyundai 134 _ 944.0 951.1 7.1
Sabtu/07/01/2023 Malam Hyundai 134 _ 957.4 963.6 6.2
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi Hyundai 134 _ 963.6 966.6 3.0
Selasa/10/01/2023 Pagi Hyundai 134 _ 970.7 973.7 3.0
Rabu/11/01/2023 Pagi Hyundai 134 _ 978.7 981.9 3.2
Kamis/12/01/2023 Pagi Hyundai 134 _ 981.9 989.0 7.1
Jumat/13/01/2023 Pagi _ _ _ _ _
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam Hyundai 134 _ 1000.3 1007.3 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam Hyundai 134 _ 1007.3 1011.3 4.0
Kamis/19/01/2023 Malam Hyundai 134 _ 1011.3 1014.3 3.0
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 110.7

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUAR
(OPERATOR LOADER {220})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _

Kamis/22/12/2022 Malam Loader 220 _ 568.2 575.2 7.0

Jumat/23/12/2022 Malam Loader 220 _ 575.2 578.7 3.5

Sabtu/24/12/2022 Malam Loader 220 1.0 578.7 585.8 7.1

Minggu/25/12/2022 _ _ _ _ _ _

Senin/26/12/2022 Pagi Loader 220 _ 585.8 592.8 7.0

Selasa/27/12/2022 Pagi _ _ _ _ _

Rabu/28/12/2022 Pagi _ _ _ _ _

Kamis/29/12/2022 Pagi Loader 220 _ 625.8 632.8 7.0

Jumat/30/12/2022 Pagi Loader 220 _ 632.8 638.3 5.5

Sabtu/31/12/2022 Pagi Loader 220 _ 638.3 645.3 7.0

Minggu/01/01/2023 _ _ _ _ _ _

Senin/02/01/2023 Malam Loader 220 _ 645.3 648.5 3.2

Selasa/03/12/2022 Malam Loader 220 _ 648.5 655.5 7.0

Rabu/04/01/2023 Malam Loader 220 _ 662.5 669.6 7.1

Kamis/05/01/2023 Malam Loader 220 _ 676.6 683.5 6.9

Jumat/06/01/2023 Malam Loader 220 _ 690.5 697.5 7.0

Sabtu/07/01/2023 Malam Loader 220 _ 704.5 711.5 7.0

Minggu/08/01/2023 _ _ _ _ _ _

Senin/09/01/2023 Pagi Loader 220 _ 711.5 715.5 4.0

Selasa/10/01/2023 Pagi _ _ _ _ _

Rabu/11/01/2023 Pagi _ _ _ _ _

Kamis/12/01/2023 Pagi Loader 220 _ 720.5 727.5 7.0

Jumat/13/01/2023 Pagi Loader 220 _ 734.5 741.5 7.0

Sabtu/14/01/2023 Pagi _ _ _ _ _

Minggu/15/01/2023 _ _ _ _ _ _

Senin/16/01/2023 Malam Loader 220 _ 15:00 23:00 7.0

Selasa/17/01/2023 Malam _ _ _ _ _

Rabu/18/01/2023 Malam _ _ _ _ _

Kamis/19/01/2023 Malam _ _ _ _ _

Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 107.3
TOTAL 1 107.3

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUAR
(DRIVER DT {108})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi _ _ _ _ _
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam Bomax 106 _ 973 980 7.0
Selasa/27/12/2022 Malam _ _ _ _ _
Rabu/28/12/2022 Malam DT 108 _ 15:00 23:00 7.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Selasa/03/01/2023 Pagi _ _ _ _ _
Rabu/04/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Kamis/05/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Jumat/06/01/2023 Pagi _ _ _ _ _
Sabtu/07/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam Bomax 106 _ 1040 1044 4.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam _ _ _ _ _
Jumat/13/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Selasa/17/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 67
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 2
(DRIVER DT {108})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam _ _ _ _ _
Jumat/23/12/2022 Malam _ _ _ _ _
Sabtu/24/12/2022 Malam DT 108 1.0 15:00 23:00 7.0
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi DT 108 _ 7:00 15:00 7.0
Selasa/27/12/2022 Pagi _ _ _ _ _
Rabu/28/12/2022 Pagi DT 108 _ 7:00 15:00 7.0
Kamis/29/12/2022 Pagi DT 108 _ 7:00 15:00 7.0
Jumat/30/12/2022 Pagi DT 108 _ 7:00 15:00 6.0
Sabtu/31/12/2022 Pagi DT 108 _ 7:00 15:00 7.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam _ _ _ _ _
Selasa/03/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Rabu/04/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Kamis/05/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Jumat/06/01/2023 Malam _ _ _ _ _
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi _ _ _ _ _
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Jumat/13/01/2023 Pagi DT 108 _ 7:00 15:00 7.0
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam _ _ _ _ _
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 76
HEET HARIAN KARYAWAN
ER S/D 20 JANUARI 2022 (AGUS SUYONO)
R EXCAVATOR {134})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


General Pembersihan StockRoom
Perbaikan Jalan dan Membuat parit
General Perbaikan Jalan StockRoom General Perbaikan StockRoom
Off
General Perbaikan StockRoom
General Perbaikan StockRoom
Melambungkan BatuBara
General
General
General
Off
General
General
General
General
General
General
Off
General
General
General
General
StandBy Shift Pagi
StandBy Shift Pagi
Off
Melambungkan BatuBara Di StockPile
StandBy Shift Malam
General
General
StandBy Shift Malam

HEET HARIAN KARYAWAN


MBER S/D 20 JANUARI 2022 (CHAIRIL)
OR LOADER {220})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan Jaga Dampingan

Off

Jaga Dampingan

Sakit

StandBy Shift Pagi

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan

Off

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan

Jaga Dampingan

Off

Jaga Dampingan

StandBy Shift Pagi

StandBy Shift Pagi

Jaga Dampingan

Jaga Dampingan

StandBy Shift Pagi

Off

Jaga Dampingan

StandBy Shift Malam

StandBy Shift Malam

StandBy Shift Malam

StandBy Shift Malam


HEET HARIAN KARYAWAN
MBER S/D 20 JANUARI 2022 (WANDI)
VER DT {108})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
Pemadatan Areal StockPile
StandBy Shift Malam
Hauling Di Pit 2 Utara
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
Hauliing Coal Pit West MN
StandBy Shift Pagi
Hauling Coal Pit west MN/MJ
Hauling Coal Dimas
StandBy Shift Pagi
Hauling Pit westMJ
Off
StandBy Shift Malam
Padatkan Jalan Arah West
StandBy Shift Malam
StandBy Shift Malam
Hauling Coql Pit Amos
StandBy Shift Malam
Off
Hauling Pit Amos
Hauling di pit West MN
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
HEET HARIAN KARYAWAN
ER S/D 20 JANUARI 2022 (DERI YANTO)
VER DT {108})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


StandBy Shift Malam
StandBy Shift Malam
Hauling MN/MJ Hauling MN/MJ
Off
Hauling Pit MN
StandBy Shift Pagi
Hauling Pit 2 Utara
Hauling Pit Baru
Hauling Pit Baru
Hauling Pit MJ
Off
StandBy Shift Malam
Hauling Pit MJ
Hauling Pit
Hauling Pit MN
StandBy Shift Malam
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Pit Dimas
Hauling Pit Amos
StandBy Shift Pagi
Off
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 20
(OPERATOR EXCA ALLU CRUSHING
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi _ _ _ _ _
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam Hyundai 136 _ 261.1 266.6 5.5
Selasa/27/12/2022 Malam _ _ _ _ _
Rabu/28/12/2022 Malam Bomax 106 _ 1001 1008 7.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi _ _ _ _ _
Selasa/03/01/2023 Pagi _ _ _ _ _
Rabu/04/01/2023 Pagi _ _ _ _ _
Pagi DT 110 _ 7:00 11:00 4.0
Kamis/05/01/2023
Pagi Hyundai 134 _ 932.7 935.7 3.0
Jumat/06/01/2023 Pagi _ _ _ _ _
Sabtu/07/01/2023 Pagi _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam _ _ _ _ _
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam Bomax 106 _ 1501 1506 5.0
Jumat/13/01/2023 Malam _ _ _ _ _
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi _ _ _ _ _
Selasa/17/01/2023 Pagi _ _ _ _ _
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 24.5

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUA
(OPERATOR GRADER)
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _

Kamis/22/12/2022 Pagi _ _ _ _ _

Jumat/23/12/2022 Pagi _ _ _ _ _

Sabtu/24/12/2022 Pagi _ _ _ _ _

Minggu/25/12/2022 _ _ _ _ _ _

Senin/26/12/2022 Malam Grader _ 207.3 212.3 5.0

Selasa/27/12/2022 Malam Grader _ 216.3 219.3 3.0

Rabu/28/12/2022 Malam Grader _ 226.3 229.3 3.0

Kamis/29/12/2022 Malam _ _ _ _ _

Jumat/30/12/2022 Malam _ _ _ _ _

Sabtu/31/12/2022 Malam _ _ _ _ _

Minggu/01/01/2023 _ _ _ _ _ _

Senin/02/01/2023 Pagi _ _ _ _ _

Selasa/03/01/2023 Pagi _ _ _ _ _

Rabu/04/01/2023 Pagi _ _ _ _ _

Kamis/05/01/2023 Pagi Grader _ 246.4 253.7 7.3

Jumat/06/01/2023 Pagi _ _ _ _ _

Sabtu/07/01/2023 Pagi Grader _ 258.6 264.3 5.7

Minggu/08/01/2023 _ _ _ _ _ _

Senin/09/01/2023 Malam _ _ _ _ _

Selasa/10/01/2023 Malam Grader _ 264.3 266.0 1.7

Rabu/11/01/2023 Malam _ _ _ _ _

Kamis/12/01/2023 Malam _ _ _ _ _

Jumat/13/01/2023 Malam Grader _ 272.3 276.0 3.7

Sabtu/14/01/2023 Malam _ _ _ _ _

Minggu/15/01/2023 _ _ _ _ _ _

Senin/16/01/2023 Pagi Grader _ 276.0 280.0 4.0

Selasa/17/01/2023 Pagi _ _ _ _ _

Rabu/18/01/2023 Pagi _ _ _ _ _

Kamis/19/01/2023 Pagi _ _ _ _ _

Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 33.4
TOTAL 0 33.4

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 202
(DRIVER DT {109})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi _ _ _ _ _
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam _ _ _ _ _
Selasa/27/12/2022 Malam Bomax 106 _ 987 994 7.0
Rabu/28/12/2022 Malam DT 109 _ 15:00 23:00 7.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi DT 109 _ 7:00 15:00 7.0
Selasa/03/01/2023 Pagi _ _ _ _ _
Rabu/04/01/2023 Pagi DT 109 _ 7:00 15:00 7.0
Kamis/05/01/2023 Pagi DT 109 _ 7:00 15:00 7.0
Jumat/06/01/2023 Pagi _ _ _ _ _
Sabtu/07/11/2023 Pagi DT 109 _ 7:00 15:00 7.0
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam _ _ _ _ _
Jumat/13/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi DT 109 7:00 15:00 7.0
Selasa/17/01/2023 Pagi _ _ _ _ _
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 63
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 202
(DRIVER DT {109})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam DT 109 _ 15:00 23:00 7.0
Jumat/23/12/2022 Malam _ _ _ _ _
Sabtu/24/12/2022 Malam DT 109 1.0 15:00 23:00 7.0
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi DT 109 _ 7:00 15:00 7.0
Selasa/27/12/2022 Pagi _ _ _ _ _
Rabu/28/12/2022 Pagi DT 109 _ 7:00 15:00 7.0
Kamis/29/12/2022 Pagi DT 109 _ 7:00 15:00 7.0
Jumat/30/12/2022 Pagi DT 109 _ 7:00 15:00 6.0
Sabtu/31/12/2022 Pagi DT 109 _ 7:00 15:00 7.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam _ _ _ _ _
Selasa/03/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Rabu/04/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Kamis/05/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Jumat/06/01/2023 Malam _ _ _ _ _
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi DT 109 _ 11:00 15:00 4.0
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi DT 109 _ 7:00 15:00 7.0
Jumat/13/01/2023 Pagi DT 109 _ 7:00 15:00 7.0
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam DT 109 _ 15:00 23:00 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 94
HEET HARIAN KARYAWAN
R S/D 20 JANUARI 2022 (BUDI HARIANTO)
CA ALLU CRUSHING {201})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
Loading OB Laminating Jalan Hauling
StandBy Shift Malam
Perapian StockPile 2
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Di Pit Dimas
General
StandBy Shift Pagi
StandBy Shift Pagi
Off
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Mentenen Areal StockPile Dan Jalan Hauling
StandBy Shift Malam
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi

HEET HARIAN KARYAWAN


MBER S/D 20 JANUARI 2022 (ABBAS)
ATOR GRADER)
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

Off

Mentenen Jalan Hauling Arah Amos

Mantenen Jalan Hauling Arah West

Grit Jalan Hauling

StandBy Shift Malam

StandBy Shift Malam

StandBy Shift Malam

Off

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

Mantenen Jalan Hauling

StandBy Shift Pagi

Mentenen Jalan Hauling Arah Amos

Off

StandBy Shift Malam

Grit Jalan Hauling

StandBy Shift Malam

StandBy Shift Malam

Mentenen Jalan Hauling Arah Amos

StandBy Shift Malam

Off

Grit Jalab Hauling

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi

StandBy Shift Pagi


HEET HARIAN KARYAWAN
R S/D 20 JANUARI 2022 (M.IKRAR HAQIQI)
VER DT {109})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
StandBy Shift Malam
Memadatkan Areal StockPile Dan Areal Timbangan
Hauling Pit Dimas
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
Hauling West MN
StandBy Shift Pagi
Hauling Pit West MN/MJ
Hauling Pit Dimas
StandBy Shift Pagi
Hauling Pit WestMJ
Off
StandBy Shift Malam
Hauling Pit WestMN
StandBy Shift Malam
StandBy Shift Malam
Hauling Coal Pit Amos
StandBy Shift Malam
Off
Hauling Pit Amos
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
HEET HARIAN KARYAWAN
S/D 20 JANUARI 2022 (FERRY BACHTIAR)
VER DT {109})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


Hauling Pit West
StandBy Shift Malam
Hauling Pit West Hauling MN/MJ
Off
Hauling MN
StandBy Shift Pagi
Hauling Dimas
Hauling MN
Hauling MN
Hauling MJ
Off
StandBy Shift Malam
Hauling MJ
Hauling Dimas
Hauling MN
StandBy Shift Malam
StandBy Shift Malam
Off
Hauling MJ
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Dimas
Hauling Amos
StandBy Shift Pagi
Off
Hauling MN
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI
(OPERATOR EX ALLU CRUSHING {
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam Allu Ex 201 _ 23234 23241 7.0
Jumat/23/12/2022 Malam Allu Ex 201 _ 23241 23248 7.0
Sabtu/24/12/2022 Malam Allu Ex 201 1.0 23248 23255 7.0
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi Allu Ex 201 _ 23255 23259 4.0
Selasa/27/12/2022 Pagi _ _ _ _ _
Rabu/28/12/2022 Pagi Loader 220 _ 611.8 618.8 7.0
Kamis/29/12/2022 Pagi _ _ _ _ _
Jumat/30/12/2022 Pagi _ _ _ _ _
Sabtu/31/12/2022 Pagi _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam _ _ _ _ _
Selasa/03/01/2023 Malam _ _ _ _ _
Rabu/04/01/2023 Malam _ _ _ _ _
Kamis/05/01/2023 Malam _ _ _ _ _
Jumat/06/01/2023 Malam _ _ _ _ _
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi _ _ _ _ _
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi _ _ _ _ _
Jumat/13/01/2023 Pagi _ _ _ _ _
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam Bomax 106 _ 1063 1070 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 39

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 2
(OPERATOR GRADER)
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _

Kamis/22/12/2022 Malam Grader _ 190.9 194.0 3.1

Jumat/23/12/2022 Malam Grader _ 194.0 196.1 2.1

Sabtu/24/12/2022 Malam Grader 1.0 196.1 201.9 5.8

Minggu/25/12/2022 _ _ _ _ _ _

Senin/26/12/2022 Pagi Grader _ 201.9 207.3 5.4

Selasa/27/12/2022 Pagi Grader _ 212.3 216.3 4.0

Rabu/28/12/2022 Pagi Grader _ 219.3 226.3 7.0

Kamis/29/12/2022 Pagi Grader _ 229.3 233.5 4.2

Jumat/30/12/2022 Pagi _ _ _ _ _

Sabtu/31/12/2022 Pagi Grader _ 233.5 237.5 4.0

Minggu/01/01/2023 _ _ _ _ _ _

Senin/02/01/2023 Malam _ _ _ _ _

Selasa/03/01/2023 Malam Grader _ 237.5 239.5 2.0

Rabu/04/01/2023 Malam Grader _ 239.5 246.4 6.9

Kamis/05/01/2023 Malam Grader _ 253.7 255.1 1.4

Jumat/06/01/2023 Malam Grader _ 255.1 258.6 3.5

Sabtu/07/01/2023 Malam _ _ _ _ _

Minggu/08/01/2023 _ _ _ _ _ _

Senin/09/01/2023 Pagi DT 108 _ 11:00 15:00 4.0

Selasa/10/01/2023 Pagi _ _ _ _ _

Rabu/11/01/2023 Pagi _ _ _ _ _

Kamis/12/01/2023 Pagi Grader 139 _ 266.0 272.3 6.3

Jumat/13/01/2023 Pagi _ _ _ _ _

Sabtu/14/01/2023 Pagi _ _ _ _ _

Minggu/15/01/2023 _ _ _ _ _ _

Senin/16/01/2023 Malam Grader 139 _ 280.0 285.5 5.5

Selasa/17/01/2023 Malam Hyundai 134 _ 1007.3 1010.6 3.3

Rabu/18/01/2023 Malam _ _ _ _ _

Kamis/19/01/2023 Malam _ _ _ _ _

Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 68.5
TOTAL 1 68.5

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 21 DESEMBER S/D 20 JANUAR
(DRIVER DT {110})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi _ _ _ _ _
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Malam Hyundai 136 _ 257.7 261.1 3.4
Selasa/27/12/2022 Malam _ _ _ _ _
Rabu/28/12/2022 Malam DT 110 _ 15:00 17:00 2.0
Kamis/29/12/2022 Malam _ _ _ _ _
Jumat/30/12/2022 Malam _ _ _ _ _
Sabtu/31/12/2022 Malam _ _ _ _ _
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Selasa/03/01/2023 Pagi _ _ _ _ _
Rabu/04/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Kamis/05/01/2023 Pagi DT 110 _ 11:00 15:00 3.0
Jumat/06/01/2023 Pagi _ _ _ _ _
Sabtu/07/01/2023 Pagi _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam DT 110 _ 15:00 23:00 7.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam _ _ _ _ _
Jumat/13/01/2023 Malam DT 110 _ 15:00 23:00 7.0
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Selasa/17/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 50.4
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUARI 202
(DRIVER DT {110})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/21/12/2022 Malam _ _ _ _ _
Kamis/22/12/2022 Malam DT 110 _ 15:00 23:00 7.0
Jumat/23/12/2022 Malam _ _ _ _ _
Sabtu/24/12/2022 Malam DT 110 1.0 15:00 23:00 7.0
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi DT 110 _ 7:00 15:00 7.0
Selasa/27/12/2022 Pagi _ _ _ _ _
Rabu/28/12/2022 Pagi DT 110 _ 7:00 15:00 7.0
Kamis/29/12/2022 Pagi DT 110 _ 7:00 15:00 7.0
Jumat/30/12/2022 Pagi DT 110 _ 7:00 15:00 6.0
Sabtu/31/12/2022 Pagi DT 110 _ 7:00 15:00 7.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam _ _ _ _ _
Selasa/03/01/2023 Malam DT 110 _ 15:00 23:00 7.0
Rabu/04/01/2023 Malam DT 110/108 _ 15:00 23:00 7.0
Kamis/05/01/2023 Malam DT 110 _ 15:00 23:00 7.0
Jumat/06/01/2023 Malam _ _ _ _ _
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi DT 110 _ 11:00 15:00 4.0
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Jumat/13/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam DT 110 _ 15:00 23:00 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 1 94
HEET HARIAN KARYAWAN
BER S/D 20 JANUARI 2022 (ASPIANTO)
X ALLU CRUSHING {201})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


Crushing Coal
StandBy Shift Malam
Crushing Coal Crushing Coal
Off
Crushing Coal
StandBy Shift Pagi
Merapikan StockPile Dan Jaga Dampingan DT
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
Memadatkan StockPile
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam

HEET HARIAN KARYAWAN


ER S/D 20 JANUARI 2022 (ASMIANSYAH)
ATOR GRADER)
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam

Maintenance Jalan Hauling Arah west

Maintenance Jalan hauling Arah Pit Amos

Maintenance Jalan Hauling Arah Barat Maintenance Jalan Hauling Arah Barat

Off

Maintenance Jalan Hauling Pit Amos dan Arah Barat

Maintenance Jalan Hauling Pit Amos Dan StockRoom

Maintenance Jalan Hauling Arah barat,Utara Dan StockRoom 2

Maintenen Jalan Hauling Arah Barat

StandBy Shift Pagi

Maitenen Jalan Hauling Arah Barat

Off

StandBy Shift Malam

Maintenen Jalan Hauling Arah Barat

Maintenen Jalan Hauling Pit Utara

Maintenance Jalan Hauling Arah Barat

Maintenen Jalan Hauling Pit Amos

StandBy Shift Malam

Off

Hauling Coal West/MJ

StandBy Shift Pagi

StandBy Shift Pagi

Mentenen Jalan Hauling Arah Utara

StandBy Shift Pagi

StandBy Shift Pagi

Off

Maintenen Jalan Hauling Arah Barat

Melambungkan Coal Di StockPile

StandBy Shift Malam

StandBy Shift Malam

StandBy Shift Malam


HEET HARIAN KARYAWAN
MBER S/D 20 JANUARI 2022 (HENDRA)
VER DT {110})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
Laminating StockPile Dan Jalan Hauling
StandBy Shift Malam
Hauling Pit 2 Utara
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
Off
Hauling West MN
StandBy Shift Pagi
Hauling MJ Dan MN
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Off
StandBy Shift Malam
Hauling WestMN
StandBy Shift Malam
StandBy Shift Malam
Hauling Pit Amos
StandBy Shift Malam
Off
Hauling Pit Amos
Hauling Pit WestMN
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
HEET HARIAN KARYAWAN
S/D 20 JANUARI 2022 (RAHMAN NUDIN.A)
VER DT {110})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Malam


Hauling Di Pit West
StandBy Shift Malam
Hauling MN/MJ Hauling MN/MJ
Off
Hauling Pit MN
StandBy Shift Pagi
Hauling Dimas
Hauling Pit Baru
Hauling Pit Baru
Hauling
Off
StandBy Shift Malam
Hauling
Hauling Dimas
Hauling
StandBy Shift Malam
StandBy Shift Malam
Off
Hauling Pit Baru
StandBy Shift Pagi
StandBy Shift Pagi
Hauling Pit Dimas
Hauling Pit Amos
StandBy Shift Pagi
Off
Hauling Pit Baru
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 21 DESEMBER S/D 20 JANUAR
(OPERATOR BOMAX {106})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam
Rabu/21/12/2022 Pagi _ _ _ _ _
Kamis/22/12/2022 Pagi DT 25 _ 13:00 15:00 2.0
Jumat/23/12/2022 Pagi _ _ _ _ _
Sabtu/24/12/2022 Pagi _ _ _ _ _
Minggu/25/12/2022 _ _ _ _ _ _
Senin/26/12/2022 Pagi DT 23 _ 7:00 15:00 7.0
Selasa/27/12/2022 Pagi Bomax 106 _ 980 987 7.0
Rabu/28/12/2022 Pagi Bomax 106 _ 994 1001 7.0
Kamis/29/12/2022 Pagi Bomax 106 _ 1008 1015 7.0
Jumat/30/12/2022 Pagi Bomax 106 _ 1015 1021 6.0
Sabtu/31/12/2022 Pagi Bomax 106 _ 1021 1027 6.0
Minggu/01/01/2023 _ _ _ _ _ _
Senin/02/01/2023 Malam Bomax 106 _ 1027 1029 2.0
Selasa/03/01/2023 Malam _ _ _ _ _
Rabu/04/01/2023 Malam Bomax 106 _ 1031 1034 3.0
Kamis/05/01/2023 Malam _ _ _ _ _
Jumat/06/01/2023 Malam Bomax 106 _ 1038 1040 2.0
Sabtu/07/01/2023 Malam _ _ _ _ _
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Pagi _ _ _ _ _
Selasa/10/01/2023 Pagi _ _ _ _ _
Rabu/11/01/2023 Pagi _ _ _ _ _
Kamis/12/01/2023 Pagi Bomax 106 _ 1044 1051 7.0
Jumat/13/01/2023 Pagi Bomax 106 _ 1056 1058 2.0
Sabtu/14/01/2023 Pagi _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Selasa/17/01/2023 Malam _ _ _ _ _
Rabu/18/01/2023 Malam _ _ _ _ _
Kamis/19/01/2023 Malam _ _ _ _ _
Jumat/20/01/2023 Malam _ _ _ _ _

TOTAL 0 65

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 26 DESEMBER S/D 25 JANUARI
(OPERATOR EXCAVATOR {112}
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Senin/26/12/2022 Pagi Hyundai 112 _ 1387.9 1392.3 4.4

Selasa/27/12/2022 Pagi Hyundai 112 _ 1392.3 1400.9 8.6

Rabu/28/12/2022 Pagi Hyundai 112 _ 1400.9 1407.7 6.8

Pagi Hyundai 112 _ 1407.7 1415.6 7.9


Kamis/29/12/2022
Pagi Hyundai 340 _ 807.5 811.1 3.6

Jumat/30/12/2022 Pagi Hyundai 112 _ 1415.6 1424.7 9.1

Sabtu/31/12/2022 Pagi Hyundai 112 _ 1424.7 1431.1 6.4

Minggu/01/01/2023 Pagi Hyundai 112 _ 1431.1 1440.7 9.6

Senin/02/01/2023 Pagi Hyundai 112 _ 1440.7 1445.1 4.4

Selasa/03/01/2023 Pagi Hyundai 112 _ 1445.1 1448.8 3.7

Rabu/04/01/2023 Pagi Hyundai 112 _ 1448.8 1454.5 5.7

Kamis/05/01/2023 Pagi Hyundai 112 _ 1454.5 1465.6 11.1

Jumat/06/01/2023 Pagi Hyundai 112 _ 1465.6 1480.6 15.0

Sabtu/07/01/2023 Pagi Hyundai 112 _ 1480.6 1493.5 12.9

Minggu/08/01/2023 Pagi Hyundai 112 _ 1493.5 1500.2 6.7

Senin/09/01/2023 Pagi Hyundai 112 _ 1500.2 1502.4 2.2

Selasa/10/01/2023 Pagi Hyundai 112 _ 1502.4 1511.3 8.9

Rabu/11/01/2023 Pagi Hyundai 112 _ 1511.3 1521.7 10.4

Hyundai 112 _ 1521.7 1529.8 8.1


Kamis/12/01/2023 Pagi
Hyundai 340 _ 930.0 938.1 8.1

Jumat/13/01/2023 Pagi Hyundai 112 _ 1529.8 1538.1 8.3

Sabtu/14/01/2023 Pagi Hyundai 112 _ 1538.1 1543.3 5.2

Minggu/15/01/2023 Pagi Hyundai 112 _ 1543.3 1549.7 6.4

Senin/16/01/2023 Pagi Hyundai 112 _ 1549.7 1562.3 12.6

Selasa/17/01/2023 Pagi Hyundai 112 _ 1562.3 1566.3 4.0

Rabu/18/01/2023 Pagi Hyundai 112 _ 1566.3 1569.8 3.5

Kamis/19/01/2023 Pagi Hyundai 112 _ 1569.3 1571.1 1.3

Jumat/20/01/2023 Pagi Hyundai 112 _ 1571.1 1580.5 9.4

TOTAL 0 204.3
TOTAL 0 204.3

LAPORAN TIMESHEET HARIAN KARY


PERIODE BULAN 26 DESEMBER S/D 25 JANUARI 20
(OPERATOR DOZER {004})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Selasa/17/01/2023 1 DZ 85 ss _ 9:00 18:00 9.0


Rabu/18/01/2023 1 DZ 85 ss _ 13:00 16:00 3.0
Kamis/19/01/2023 1 DZ 85 ss _ 12:30 15:30 3.0
Jumat/20/01/2023 1 DZ 85 ss _ 7:00 12:00 5.0

TOTAL 0 20
LAPORAN TIMESHEET HARIAN KARY
PERIODE BULAN 26 DESEMBER S/D 25 JANUARI 2022
(OPERATOR DOZER {004})
Jumlah
Hari/Tgl/Bulan Shift Kode Unit spl Hm Awal Hm Akhir
Jam

Rabu/04/01/2023 Pagi Bomax 106 _ 1029 1031 2.0


Kamis/05/01/2023 Pagi DT 107 _ 7:00 15:00 7.0
Jumat/06/01/2023 Pagi Bomax 106 _ 1034 1038 4.0
Sabtu/07/01/2023 Pagi DT 110 _ 7:00 15:00 7.0
Minggu/08/01/2023 _ _ _ _ _ _
Senin/09/01/2023 Malam _ _ _ _ _
Selasa/10/01/2023 Malam DT 108 _ 15:00 23:00 7.0
Rabu/11/01/2023 Malam _ _ _ _ _
Kamis/12/01/2023 Malam _ _ _ _ _
Jumat/13/01/2023 Malam Bomax 106 _ 1058 1065 7.0
Sabtu/14/01/2023 Malam _ _ _ _ _
Minggu/15/01/2023 _ _ _ _ _ _
Senin/16/01/2023 Pagi Bomax 106 _ 1058 1063 5.0
Selasa/17/01/2023 Pagi _ _ _ _ _
Rabu/18/01/2023 Pagi _ _ _ _ _
Kamis/19/01/2023 Pagi _ _ _ _ _
Jumat/20/01/2023 Pagi _ _ _ _ _

TOTAL 0 39
HEET HARIAN KARYAWAN
MBER S/D 20 JANUARI 2022 (MUKMIN)
TOR BOMAX {106})
Keterangan Pekerjaan Keterangan Spl

StandBy Shift Pagi


Angkut Lumpur
StandBy Ready Hujan
StandBy Ready Hujan
Off
Angkut OB
Memadatkan Areal StockPile
Memadatkan StockPile Dan Jalan Hauling Arah West
Memadatkan Jalan hauling
Maintenen StockPile
Memadatkan Jalan Hauling Arah West
Off
Memadatkan Areal StockPile
StandBy Shift Malam
Memdatkan StockPile
StandBy Shift Malam
Memadatkan Areak StockPile Dan Jalan Hauling
StandBy Shift Malam
Off
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
Memadatkan StockPile
Memadatkan Areal StockPile
StandBy Shift Pagi
Off
Hauling Amos/MN
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam
StandBy Shift Malam

HEET HARIAN KARYAWAN


BER S/D 25 JANUARI 2022 (DWIWANTO)
R EXCAVATOR {112})
Keterangan Pekerjaan Keterangan Spl

Cleanning General

Sidecast

General

Cleanning/General

Sidecast

Cleanning/Wedding Coal

Sidecast General

General

General

Sidecast

Cleanning Loading Coal

Cleanning/Gettinng/Loading Coal

Cleanning Getting Coal

Sidecast/Cleanning

Sidecast Cleanning

Sidecast

Sidecast Cleanning/Wedding/Getting Coal

Sidecast

Sidecast

Sidecast

Sidecast

Sidecast

Cleanning Coal

Cleanning/Getting Loading Coal

Cleanning/Getting Loading Coal

Sidecast

Sidecast/Habis Fiul

Sidecast
HEET HARIAN KARYAWAN
ER S/D 25 JANUARI 2022 (HERDIANSYAH)
TOR DOZER {004})
Keterangan Pekerjaan Keterangan Spl

Dozing Pit West


Dozing Pit Baru
Dozing Pit Baru
Dozing Pit Baru
HEET HARIAN KARYAWAN
S/D 25 JANUARI 2022 (AHMAD SYAHRIL.Z)
TOR DOZER {004})
Keterangan Pekerjaan Keterangan Spl

Memadatkan StockPile
Hauling Pit Dimas
Mantenen Jalan Hauling Dan StockPile
Hauling Pit MJ
Off
StandBy Shift Malam
Hauling Di WestMN
StandBy Shift Malam
StandBy Shift Malam
Mentenen Jalan Hauling Arah Amos
StandBy Shift Malam
Off
Memadatkan Jalan Haulin Dan StocPile
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
StandBy Shift Pagi
ABSENSI KARYAWAN
PERIODE 21 DESEMBER S/D 20 JANUARI 2022(ERLANGGA) PERIODE 21 D
(OPERATOR TIMBANGAN) (
Jam Jam
No Hari/Tanggal/Bulan SPL No
Hadir Pulang
1 Rabu/21/12/2022 7:00 15:00 1
2 Kamis/22/12/2022 7:00 15:00 2
3 Jumat/23/12/2022 7:00 15:00 3
4 Sabtu/24/12/2022 7:00 15:00 4
5 Minggu/25/12/2022 Off Off 5
6 Senin/26/12/2022 15:00 23:00 6
7 Selasa/27/12/2022 15:00 23:00 7
8 Rabu/28/12/2022 15:00 23:00 8
9 Kamis/29/12/2022 15:00 23:00 9
10 Jumat/30/12/2022 15:00 23:00 10
11 Sabtu/31/12/2022 15:00 23:00 11
12 Minggu/01/01/2023 Off Off 12
13 Senin/02/01/2023 7:00 15:00 13
14 Selasa/03/01/2023 7:00 15:00 14
15 Rabu/04/01/2023 7:00 15:00 15
16 Kamis/05/01/2023 7:00 15:00 16
17 Jumat/06/01/2023 7:00 15:00 17
18 Sabtu/07/01/2023 7:00 15:00 18
19 Minggu/08/01/2023 Off Off 19
20 Senin/09/01/2023 15:00 23:00 20
21 Selasa/10/01/2023 15:00 23:00 21
22 Rabu/11/01/2023 15:00 23:00 22
23 Kamis/12/01/2023 15:00 23:00 23
24 Jumat/13/01/2023 15:00 23:00 24
25 Sabtu/14/01/2023 15:00 23:00 25
26 Minggu/15/01/2023 Off Off 26
27 Senin/16/01/2023 7:00 15:00 27
28 Selasa/17/01/2023 7:00 15:00 28
29 Rabu/18/01/2023 7:00 15:00 29
30 Kamis/19/01/2023 7:00 15:00 30
31 Jumat/20/01/2023 7:00 15:00 31

TOTAL TOTAL
ABSENSI KARYAWAN
PERIODE 21 DESEMBER S/D 20 JANUARI 2022(BAKRAM) PERIODE 21 DESE
(DUMPMAN)
Jam Jam
No Hari/Tanggal/Bulan SPL No
Hadir Pulang

1 Rabu/21/12/2022 7:00 15:00 1

2 Kamis/22/12/2022 7:00 15:00 2

3 Jumat/23/12/2022 7:00 15:00 3

4 Sabtu/24/12/2022 7:00 15:00 4

5 Minggu/25/12/2022 Off Off 5

6 Senin/26/12/2022 15:00 23:00 6

7 Selasa/27/12/2022 15:00 23:00 7

8 Rabu/28/12/2022 15:00 23:00 8

9 Kamis/29/12/2022 15:00 23:00 9

10 Jumat/30/12/2022 15:00 23:00 10

11 Sabtu/31/12/2022 15:00 23:00 11

12 Minggu/01/01/2023 Off Off 12

13 Senin/02/01/2023 7:00 15:00 13

14 Selasa/03/01/2023 7:00 15:00 14

15 Rabu/04/01/2023 7:00 15:00 15

16 Kamis/05/01/2023 7:00 15:00 16

17 Jumat/06/01/2023 7:00 15:00 17

18 Sabtu/07/01/2023 7:00 15:00 18

19 Minggu/08/01/2023 Off Off 19

20 Senin/09/01/2023 15:00 23:00 20

21 Selasa/10/01/2023 15:00 23:00 21

22 Rabu/11/01/2023 15:00 23:00 22

23 Kamis/12/01/2023 15:00 23:00 23

24 Jumat/13/01/2023 15:00 23:00 24

25 Sabtu/14/01/2023 15:00 23:00 25

26 Minggu/15/01/2023 Off Off 26

27 Senin/16/01/2023 7:00 15:00 27

28 Selasa/17/01/2023 7:00 15:00 28

29 Rabu/18/01/2023 7:00 15:00 29

30 Kamis/19/01/2023 7:00 15:00 30

31 Jumat/20/01/2023 7:00 15:00 31

TOTAL TOTAL
*NOTE*

WARNA WARNA TULISAN KETERANGAN

HITAM STANDBY
HITAM LEMBUR HARI KER
PUTIH OFF
MERAH LEMBUR HARI LIBUR KERJA/TA
HITAM IZIN SAKIT
HITAM IZIN JIKA ADA KEPERLUA
HITAM DRIVER MEMBAWA UNIT ALAT BE
ABSENSI KARYAWAN
PERIODE 21 DESEMBER S/D 20 JANUARI(ADIANNUR)
(OPERATOR TIMBANGAN)
Jam Jam
Hari/Tanggal/Bulan SPL
Hadir Pulang
Rabu/21/12/2022 15:00 23:00
Kamis/22/12/2022 15:00 23:00
Jumat/23/12/2022 15:00 23:00
Sabtu/24/12/2022 15:00 23:00 1.0
Minggu/25/12/2022 Off Off
Senin/26/12/2022 7:00 15:00
Selasa/27/12/2022 7:00 15:00
Rabu/28/12/2022 7:00 15:00
Kamis/29/12/2022 7:00 15:00
Jumat/30/12/2022 7:00 15:00
Sabtu/31/12/2022 7:00 15:00
Minggu/01/01/2023 Off Off
Senin/02/01/2023 15:00 23:00
Selasa/03/01/2023 15:00 23:00
Rabu/04/01/2023 15:00 23:00
Kamis/05/01/2023 15:00 23:00
Jumat/06/01/2023 15:00 23:00
Sabtu/07/01/2023 15:00 23:00
Minggu/08/01/2023 Off Off
Senin/09/01/2023 7:00 15:00
Selasa/10/01/2023 7:00 15:00
Rabu/11/01/2023 7:00 15:00
Kamis/12/01/2023 7:00 15:00
Jumat/13/01/2023 7:00 15:00
Sabtu/14/01/2023 7:00 15:00
Minggu/15/01/2023 Off Off
Senin/16/01/2023 15:00 23:00
Selasa/17/01/2023 15:00 23:00
Rabu/18/01/2023 15:00 23:00
Kamis/19/01/2023 15:00 23:00
Jumat/20/01/2023 15:00 23:00

TOTAL
ABSENSI KARYAWAN
PERIODE 21 DESEMBER S/D 20 JANUARI 2022(ARDIANSYAH)
(DUMPMAN)
Jam Jam
Hari/Tanggal/Bulan SPL
Hadir Pulang

Rabu/21/12/2022 15:00 23:00

Kamis/22/12/2022 15:00 23:00

Jumat/23/12/2022 15:00 23:00

Sabtu/24/12/2022 15:00 23:00 1.0

Minggu/25/12/2022 Off Off

Senin/26/12/2022 7:00 15:00

Selasa/27/12/2022 7:00 15:00

Rabu/28/12/2022 7:00 15:00

Kamis/29/12/2022 7:00 15:00

Jumat/30/12/2022 7:00 15:00

Sabtu/31/12/2022 7:00 15:00

Minggu/01/01/2023 Off Off

Senin/02/01/2023 15:00 23:00

Selasa/03/01/2023 15:00 23:00

Rabu/04/01/2023 15:00 23:00

Kamis/05/01/2023 15:00 23:00

Jumat/06/01/2023 15:00 23:00

Sabtu/07/01/2023 15:00 23:00

Minggu/08/01/2023 Off Off

Senin/09/01/2023 7:00 15:00

Selasa/10/01/2023 7:00 15:00

Rabu/11/01/2023 7:00 15:00

Kamis/12/01/2023 7:00 15:00

Jumat/13/01/2023 7:00 15:00

Sabtu/14/01/2023 7:00 15:00

Minggu/15/01/2023 Off Off

Senin/16/01/2023 15:00 23:00

Selasa/17/01/2023 15:00 23:00

Rabu/18/01/2023 15:00 23:00

Kamis/19/01/2023 15:00 23:00

Jumat/20/01/2023 15:00 23:00

TOTAL
KETERANGAN

STANDBY
LEMBUR HARI KERJA
OFF
HARI LIBUR KERJA/TANGGAL MERAH
IZIN SAKIT
N JIKA ADA KEPERLUAN/URUSAN
MBAWA UNIT ALAT BERAT/SEBALIKNYA