TRASRAM

SLOOF 20/30

LANTAI KERAMIK
±0.00
-0.05 SPESI
-0.15 COR BETON
PASIR URUG
-0.30

TANAH URUG

PONDASI BATU KALI

-1.10
TRASRAM
-1.25 AANSTAMPING
-1.30 PASIR URUG SLOOF 25/30
LANTAI KERAMIK
-1.50 ±0.00
-0.05 SPESI
-1.60 ±0.00
PONDASI TELAPAK -0.15 ±0.05
COR BETON
±0.15
-1.80 -0.30 ±0.20 PASIR URUG
0.20
0.35
0.40
0.90
1.00
TANAH URUG

DETAIL POTONGAN C-C PONDASI BATU KALI


SKALA 1: 20
-1.10
AANSTAMPING
-1.25
-1.30 PASIR URUG
TRASRAM
SLOOF 15/20
-1.50
LANTAI KERAMIK
±0.00 -1.60
±0.05 SPESI
±0.15 PONDASI TELAPAK
COR BETON
-1.80
±0.30 PASIR URUG
0.25
0.35
0.40
0.90
1.00
TANAH URUG

PONDASI BATU KALI


±1.10
DETAIL POTONGAN E-E
SKALA 1: 20
±1.25
AANSTAMPING
±1.30 PASIR URUG

0.15
0.25 DETAIL POTONGAN D-D
0.80 SKALA 1: 20
0.90