diameter lubang berat tanah tertahan berat komulatif persentase tanah


no.mesh bukaan (mm) saringan(gr) tanah tertahan(gr) tertahan(%)
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
4 4.75 54 54
10 2 141 195
30 0.6 560.7 755.7
40 0.425 163.3 919
60 0.25 279.3 1198.3
80 0.18 409.3 1607.6
100 0.15 81.1 1688.7
140 0.106 114.8 1803.5
200 0.075 180.4 1983.9

pan 72.9 2056.8

D 10 8.1
D30 5.8
D60 3.5

CU(kk) 0.43
CG 1.19
persentase tanah
KURVA DISTRIBUSI UKUR
lolos(%)
100
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
90.52
90
63.26
55.32
80
41.74
21.84
70
17.90
12.32 % TANAH LOLOS
D 60 60
3.54
50

40

30
D 30

20

10
D 10

0
10 5,8 1
8,1 3,5
UKURAN BUTI
A DISTRIBUSI UKURAN BUTIR

dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

0.1 0.01

UKURAN BUTIR (mm)


dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
No sampel Kadar Air (W)
1 70.5 KADAR A
2 64.6
3 63.8
80
4 47.5 70
60

% KADAR AIR
50
40
30
20
10
0
1
2

NOMOR SA
KADAR AIR

2
3
4

NOMOR SAMPEL
NO SAMPEL KADAR AIRDERAJAT POROSITASANGKA PORI
A 30 35 40 45
B 20 45 50 55
C 30 55 60 65 70
D 40 60 65 70
60

50

40

Axis Title
30

20

10

0
1 2 3
Axis Title
KADAR AIR
DERAJAT

2 3 4
Axis Title
NOMOR
NO DATA SAT RUMUS
A B
1 TINGGI RING CM 5.1 4.6
2 DIAMETER RING CM 4.126 4.126
VOLUME TANAH(V) CM 68.2 61.5
BERAT RING (W1) 75.8 68
BERAT TANAH ASLI+RING(W2) gr 186.9 157.1
BERAT TANAH ASLI (Wn) gr 111.1 89.1
BERAT ISI TANAH ASLI gr/cm 1.63 1.45
BERAT TANAH KERING+RING(W3) gr 152.8 123.5
BERAT TANAH KERING (Wd) gr 77 55.5
BERAT ISI TANAH KERING gr/cm 1.13 0.90
BERAT AIR (Ww) gr 34.1 33.6
KADAR AIR (W) % 44.3 60.5
BERAT JENIS 2.65 2.65
VOLUME TANAG KERING cm 29.06 20.94
VOLUME PORI cm 39.1 40.5
DERAJAT KEJENUHAN % 87.2 82.9
POROSITAS % 57.4 65.9
ANGKA PORI % 134.6 193.5
BERAT ISI TANAH ASLI RATA-RATA gr/cm 1.52
BERAT ISI TANAH KERING RATA-RATA gr/cm 0.95
KADAR AIR RATA-RATA % 61.5
DERAJAT KEJENUHAN RATA-RATA % 89.5
POROSITAS TANAH RATA-RATA % 64.1
ANGKA PORI RATA-RATA % 182.2
NOMOR
C D NOMOR SAMPEL A B
4.5 5.6 KADAR AIR 44.3 60.5
4.17 4.18 DERAJAT KEJENUHAN 87.2 82.9
61.4 76.8 POROSITAS 57.4 65.9
67.2 75.8 ANGKA PORI 134.6 193.5
164 186.7
96.8 110.9
1.58 1.44 KURVA BERAT ISI TANAH
125 139.6
250.0
57.8 63.8
0.94 0.83
39 47.1 200.0
67.5 73.8
PERSENTASE

2.65 2.65
150.0
21.81 24.08
39.6 52.7
98.4 89.3 100.0
64.5 68.7
181.6 219.0
50.0
1.52
0.95
61.5 0.0
A B C D
89.5
64.1 NOMOR SAMPEL
182.2
C D
67.5 73.8
98.4 89.3
64.5 68.7
181.6 219.0

BERAT ISI TANAH

KADAR AIR
DERAJAT KEJENUHAN
POROSITAS
ANGKA PORI

C D

AMPEL
no sampel
data
no 10 tumbukan 30 tumbukan
1 tinggi mould 17.78 17.78
2 diameter mould 15.24 15.24
3 volume tanah= volume mould 3241.68900048 3241.68900048
4 berat mould 6710 6850
5 berat tanah asli+ muold 9370 9970
6 berat tanah asli 2660 3120
7 berat isi tanah asli 0.820559899362996 0.962461235343063

data 10 tumbukan
no A T
1 berat cawan (w1) 41 42
2 berat tanah asli + cawan(w2) 114 130
3 berat tanah asli (WN) 73 88
4 berat tanah kering+ cawan 96.24 107.65
5 berat tanah kering (wd) 55.24 65.65
6 berat air(ww) 17.76 22.35
7 kadar air(w) 0.321506154960174 0.34044173648134
8 berat isi tanah kering 0.620927792339889 0.612156334013417

k 28
lb 10.3 10 tumbukan
beban penetrasi= pembacaan arloji ukur beban
pembacaan arloji ukur beban kN lb
8 224 82.4
12 336 123.6
18 504 185.4
22 616 226.6
26 728 267.8
33 924 339.9
40 1120 412
49 1372 504.7
57 1596 587.1
63 1764 648.9
65 tumbukan
17.78
15.24
3241.68900048
6730
10400
3670
1.13212587619

no sampel
30 tumbukan
B A T B
40 41 38 42
111 120 131 127
71 79 93 85
93.12 99.73 107.49 105.61
53.12 58.73 69.49 63.61
17.88 20.27 23.51 21.39
0.33659638554 0.345138770645326 0.338322060728162 0.336267882408426
0.6139174909 0.71551073862909 0.719155174666553 2.29872911775149

30 tumbukan
beban penetrasi=pembacaan arloji ukur x k
pembacaan arloji ukur beban
kN lb
16 448 164.8
33 924 339.9
62 1736 638.6
79 2212 813.7
91 2548 937.3
104 2912 1071.2
116 3248 1194.8
130 3640 1339
142 3976 1462.6
155 4340 1596.5
65 tumbukan
A T B
41 42 41
122 130 128
81 88 87
101.91 107.95 106.48
60.91 65.95 65.48
20.09 22.05 21.52
0.329830898046298 0.33434420015163 0.328649969456322
0.851330705168636 0.848451153802853 0.852087383595888

65 tumbukan
beban penetrasi=pembacaan arloji ukur x k
pembacaan arloji ukur beban
kN
2 56
4 112
6 168
10 280
22 616
82 2296
133 3724
193 5404
pembacaan arloji ukur x k
lb
20.6
41.2
61.8
103
226.6
844.6
1369.9
1987.9
NO SEMPEL
NO DATA
1 2 3
1 TINGGI MOULD 11.54 11.54 11.54
2 DIAMETER MOULD 10.28 10.28 10.28
3 VOLUME TANAH=VOLUME MOULD 957.3 957.3 957.3
4 BERAT MOULD (Wm) 3100 3100 3100
5 BERAT TANAH ASLI+MOULD (Wm1) 4180 4190 4210
6 BERAT TANAH ASLI (W) 1080 1090 1110
7 BERAT ISI TANAH ASLI 1.1281 1.1386 1.1595

NO DATA 1 2 3
1 BERAT CAWAN (W1) 45.2 40.7 40.1
2 BERAT TANAH ASLI +CAWAN(W2) 119.7 108.9 103.7
3 BERAT TANAH ASLI (Wn) 74.5 68.2 63.6
4 BERAT TANAH KERING + CAWAN (W3) 110 99.3 94.7
5 BERAT TANAH KERING (Wd) 64.8 58.6 54.6
6 BERAT AIR (Ww) 9.7 9.6 9
7 KADAR AIR(W) 0.15 0.16 0.16
8 BERAT ISI TANAH KERING 0.98125 0.97831 0.99540

1 0.15 0.98125
2 0.16 0.97831
3 0.16 0.99540
4 0.21 0.99309
MPEL
4
11.54 pemadatan standar
10.28 1.00000
957.3
0.99500
3100
4250 0.99000
1150
0.98500
1.2013
0.98000

0.97500
4
42 0.97000
104.9
62.9 0.96500
0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22
94
52
10.9
0.21
0.99309