Introduction to Software Engineering

 The Evolving Role Of Software


 Software
 The Changing Nature Of Software
 Legacy Software

Process Models:

 The Waterfall Model


 Incremental Process Models
 Evolutionary Process Models
 Specialized Process Models.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

THE EVOLVING ROLE OF A SOFTWARE

What is Software Engineering?

The term software engineering is the product of two words, software, and engineering.

The software is a collection of integrated programs.

Software subsists of carefully-organized instructions and code written by developers on


any of various particular computer languages.

Computer programs and related documentation such as requirements, design models and
user manuals.

Engineering is the application of scientific and practical knowledge to invent, design,


build, maintain, and improve frameworks, processes, etc.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Software Engineering is an engineering branch related to the evolution of software


product using well-defined scientific principles, techniques, and procedures. The result of
software engineering is an effective and reliable software product.

THE EVOLVING ROLE OF SOFTWARE

Today, software takes on a dual role. It is a product and, at the same time, the vehicle for
delivering a product. As a product, it delivers the computing potential embodied by
computer hardware or, more broadly, a network of computers that are accessible by local
hardware. Whether it resides within a cellular phone or operates inside a mainframe
computer, software is an information transformer—producing, managing, acquiring,
modifying, displaying, or transmitting information that can be as simple as a single bit or as
complex as a multimedia presentation.

As the vehicle used to deliver the product, software acts as the basis for the control of the
computer (operating systems), the communication of information (networks), and the
creation and control of other programs (software tools and environments). Software
delivers the most important product of our time—information.

Software transforms personal data (e.g., an individual’s financial transactions) so that the
data can be more useful in a local context; it manages business information to enhance
competitiveness; it provides a gateway to worldwide information networks (e.g., Internet)
and provides the means for acquiring information in all of its forms.

The role of computer software has undergone significant change over a time span of little
more than 50 years. Dramatic improvements in hardware performance, profound changes
in computing architectures, vast increases in memory and storage capacity, and a wide
variety of exotic input and output options have all precipitated more sophisticated and
complex computer-based systems. The lone programmer of an earlier era has been
replaced by a team of software specialists, each focusing on one part of the technology
required to deliver a complex application.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Changing Nature of Software:

The nature of software has changed a lot over the years.

1. System software: Infrastructure software come under this category like compilers,
operating systems, editors, drivers, etc. Basically system software is a collection of
programs to provide service to other programs.

2. Real time software: These software are used to monitor, control and analyze real world
events as they occur. An example may be software required for weather forecasting. Such
software will gather and process the status of temperature, humidity and other
environmental parameters to forcast the weather.

3. Embedded software: This type of software is placed in “Read-Only- Memory (ROM)”of


the product and control the various functions of the product. The product could be an
aircraft, automobile, security system, signalling system, control unit of power plants, etc. he
embedded software handles hardware components and is also termed as intelligent
software .

4. Business software : This is the largest application area. The software designed to
process business applications is called business software. Business software could be
payroll, file monitoring system, employee management, account management. It may also
be a data warehousing tool which helps us to take decisions based on available data.
Management information system, enterprise resource planning (ERP) and such other
software are popular examples of business software.

5. Personal computer software: The software used in personal computers are covered in
this category. Examples are word processors, computer graphics, multimedia and
animating tools, database management, computer games etc. This is a very upcoming area
and many big organisations are concentrating their effort here due to large customer base.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

6. Artificial intelligence software: Artificial Intelligence software makes use of non


numerical algorithms to solve complex problems that are not amenable to computation or
straight forward analysis. Examples are expert systems, artificial neural network,signal
processing software etc.

7. Web based software: The software related to web applications come under this
category. Examples are CGI, HTML, Java, Perl, DHTML etc.

LEGACY SOFTWARE:

Legacy software is software that has been around a long time and still fulfills a business
need. It is mission critical and tied to a particular version of an operating system or
hardware model (vendor lock-in) that has gone end-of-life. Generally the lifespan of the
hardware is shorter than that of the software.

PROCESS MODELS:

Software Processes is a coherent set of activities for specifying, designing, implementing


and testing software systems. A software process model is an abstract representation of a
process that presents a description of a process from some particular perspective. There
are many different software processes but all involve:
 Specification – defining what the system should do;
 Design and implementation – defining the organization of the system and
implementing the system;
 Validation – checking that it does what the customer wants;
 Evolution – changing the system in response to changing customer needs.

Types of Software Process Model


Software processes, methodologies and frameworks range from specific prescriptive
steps that can be used directly by an organization in day-to-day work, to flexible
frameworks that an organization uses to generate a custom set of steps tailored to the
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

needs of a specific project or group. In some cases a “sponsor” or “maintenance”


organization distributes an official set of documents that describe the process.
Software Process and Software Development Lifecycle Model
One of the basic notions of the software development process is SDLC models which
stands for Software Development Life Cycle models. There are many development life
cycle models that have been developed in order to achieve different required objectives.
The models specify the various stages of the process and the order in which they are
carried out. The most used, popular and important SDLC models are given below:
 Waterfall model
 V model
 Incremental model
 RAD model
 Agile model
 Iterative model
 Spiral model
 Prototype model

Waterfall Model
The waterfall model is a breakdown of project activities into linear sequential phases,
where each phase depends on the deliverables of the previous one and corresponds to a
specialisation of tasks. The approach is typical for certain areas of engineering design.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

V Model
The V-model represents a development process that may be considered an extension of
the waterfall model and is an example of the more general V-model. Instead of moving
down in a linear way, the process steps are bent upwards after the coding phase, to form
the typical V shape. The V-Model demonstrates the relationships between each phase of
the development life cycle and its associated phase of testing. The horizontal and vertical
axes represent time or project completeness (left-to-right) and level of abstraction
(coarsest-grain abstraction uppermost), respectively.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Incremental model
The incremental build model is a method of software development where the model is
designed, implemented and tested incrementally (a little more is added each time) until
the product is finished. It involves both development and maintenance. The product is
defined as finished when it satisfies all of its requirements. Each iteration passes through
the requirements, design, coding and testing phases. And each subsequent release of the
system adds function to the previous release until all designed functionally has been
implemented. This model combines the elements of the waterfall model with the iterative
philosophy of prototyping.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Iterative Model
An iterative life cycle model does not attempt to start with a full specification of
requirements by first focusing on an initial, simplified set user features, which then
progressively gains more complexity and a broader set of features until the targeted
system is complete. When adopting the iterative approach, the philosophy of incremental
development will also often be used liberally and interchangeably.
In other words, the iterative approach begins by specifying and implementing just part of
the software, which can then be reviewed and prioritized in order to identify further
requirements. This iterative process is then repeated by delivering a new version of the
software for each iteration. In a light-weight iterative project the code may represent the
major source of documentation of the system; however, in a critical iterative project a
formal software specification may also be required.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

RAD model
Rapid application development was a response to plan-driven waterfall processes,
developed in the 1970s and 1980s, such as the Structured Systems Analysis and Design
Method (SSADM). Rapid application development (RAD) is often referred as the adaptive
software development. RAD is an incremental prototyping approach to software
development that end users can produce better feedback when examining a live system,
as opposed to working strictly with documentation. It puts less emphasis on planning and
more emphasis on an adaptive process.
RAD may resulted in a lower level of rejection when the application is placed into
production, but this success most often comes at the expense of a dramatic overruns in
project costs and schedule. RAD approach is especially well suited for developing
software that is driven by user interface requirements. Thus, some GUI builders are often
called rapid application development tools.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Spiral model
The spiral model, first described by Barry Boehm in 1986, is a risk-driven software
development process model which was introduced for dealing with the shortcomings in
the traditional waterfall model. A spiral model looks like a spiral with many loops. The
exact number of loops of the spiral is unknown and can vary from project to project. This
model supports risk handling, and the project is delivered in loops. Each loop of the spiral
is called a Phase of the software development process.
The initial phase of the spiral model in the early stages of Waterfall Life Cycle that is
needed to develop a software product. The exact number of phases needed to develop the
product can be varied by the project manager depending upon the project risks. As the
project manager dynamically determines the number of phases, so the project manager
has an important role to develop a product using a spiral model.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Evolutionary Process Models

 Evolutionary models are iterative type models.


 They allow to develop more complete versions of the software.
Following are the evolutionary process models.

1. The prototyping model


2. The spiral model
3. Concurrent development model

1. The Prototyping model


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Prototype is defined as first or preliminary form using which other forms are
copied or derived.
 Prototype model is a set of general objectives for software.
 It does not identify the requirements like detailed input, output.
 It is software working model of limited functionality.
 In this model, working programs are quickly produced.

The different phases of Prototyping model are:

1. Communication
In this phase, developer and customer meet and discuss the overall objectives of the
software.

2. Quick design
 Quick design is implemented when requirements are known.
 It includes only the important aspects like input and output format of the software.
 It focuses on those aspects which are visible to the user rather than the detailed
plan.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It helps to construct a prototype.


3. Modeling quick design
 This phase gives the clear idea about the development of software because the
software is now built.
 It allows the developer to better understand the exact requirements.
4. Constructionof prototype
The prototype is evaluated by the customer itself.

5. Deployment, delivery, feedback


 If the user is not satisfied with current prototype then it refines according to the
requirements of the user.
 The process of refining the prototype is repeated until all the requirements of users
are met.
 When the users are satisfied with the developed prototype then the system is
developed on the basis of final prototype.
Advantages of Prototyping Model
 Prototype model need not know the detailed input, output, processes, adaptability
of operating system and full machine interaction.
 In the development process of this model users are actively involved.
 The development process is the best platform to understand the system by the user.
 Errors are detected much earlier.
 Gives quick user feedback for better solutions.
 It identifies the missing functionality easily. It also identifies the confusing or
difficult functions.
Disadvantages of Prototyping Model:
 The client involvement is more and it is not always considered by the developer.
 It is a slow process because it takes more time for development.
 Many changes can disturb the rhythm of the development team.
 It is a thrown away prototype when the users are confused with it.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

2. The Spiral model

 Spiral model is a risk driven process model.


 It is used for generating the software projects.
 In spiral model, an alternate solution is provided if the risk is found in the risk
analysis, then alternate solutions are suggested and implemented.
 It is a combination of prototype and sequential model or waterfall model.
 In one iteration all activities are done, for large project's the output is small.
The framework activities of the spiral model are as shown in the following figure.

NOTE: The description of the phases of the spiral model is same as that of the process
model.

Advantages of Spiral Model


 It reduces high amount of risk.
 It is good for large and critical projects.
 It gives strong approval and documentation control.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 In spiral model, the software is produced early in the life cycle process.
Disadvantages of Spiral Model
 It can be costly to develop a software model.
 It is not used for small projects.

The concurrent development model

 The concurrent development model is called as concurrent model.


 The communication activity has completed in the first iteration and exits in the
awaiting changes state.
 The modeling activity completed its initial communication and then go to the
underdevelopment state.
 If the customer specifies the change in the requirement, then the modeling activity
moves from the under development state into the awaiting change state.
 The concurrent process model activities moving from one state to another state.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Advantages of the concurrent development model


 This model is applicable to all types of software development processes.
 It is easy for understanding and use.
 It gives immediate feedback from testing.
 It provides an accurate picture of the current state of a project.
Disadvantages of the concurrent development model
 It needs better communication between the team members. This may not be
achieved all the time.
 It requires to remember the status of the different activities.

SPECIALIZED PROCESS MODELS


Special process models take many features from one or more conventional models.
However these special models tend to be applied when a narrowly defined software
engineering approach is chosen.
Types in Specialized process models:
1. Component based development (Promotes reusable components)
2. The formal methods model (Mathematical formal methods are backbone here)
3. Aspect oriented software development (Uses crosscutting technology)

COMPONENT BASED DEVELOPMENT

What is a Component?

A component is a modular, portable, replaceable, and reusable set of well-defined


functionality that encapsulates its implementation and exporting it as a higher-level
interface.

A component is a software object, intended to interact with other components,


encapsulating certain functionality or a set of functionalities. It has an obviously defined
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

interface and conforms to a recommended behavior common to all components within an


architecture.

A software component can be defined as a unit of composition with a contractually


specified interface and explicit context dependencies only. That is, a software component
can be deployed independently and is subject to composition by third parties.

Views of a Component

A component can have three different views − object-oriented view, conventional view,
and process-related view.

Object-oriented view

A component is viewed as a set of one or more cooperating classes. Each problem domain
class (analysis) and infrastructure class (design) are explained to identify all attributes
and operations that apply to its implementation. It also involves defining the interfaces
that enable classes to communicate and cooperate.

Conventional view

It is viewed as a functional element or a module of a program that integrates the


processing logic, the internal data structures that are required to implement the
processing logic and an interface that enables the component to be invoked and data to be
passed to it.

Process-related view

In this view, instead of creating each component from scratch, the system is building from
existing components maintained in a library. As the software architecture is formulated,
components are selected from the library and used to populate the architecture.

 A user interface (UI) component includes grids, buttons referred as controls, and
utility components expose a specific subset of functions used in other components.

 Other common types of components are those that are resource intensive, not
frequently accessed, and must be activated using the just-in-time (JIT) approach.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Many components are invisible which are distributed in enterprise business


applications and internet web applications such as Enterprise JavaBean (EJB), .NET
components, and CORBA components.

Characteristics of Components

 Reusability − Components are usually designed to be reused in different situations


in different applications. However, some components may be designed for a
specific task.

 Replaceable − Components may be freely substituted with other similar


components.

 Not context specific − Components are designed to operate in different


environments and contexts.

 Extensible − A component can be extended from existing components to provide


new behavior.

 Encapsulated − A A component depicts the interfaces, which allow the caller to use
its functionality, and do not expose details of the internal processes or any internal
variables or state.

 Independent − Components are designed to have minimal dependencies on other


components.

FORMAL METHODS MODEL


The formal methods model is concerned with the application of a mathematical
technique to design and implement the software. This model lays the foundation for
developing a complex system and supporting the program development. The formal
methods used during the development process provide a mechanism for eliminating
problems, which are difficult to overcome using other software process models. The
software engineer creates formal specifications for this model. These methods
minimize specification errors and this result in fewer errors when the user begins
using the system.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Table Advantages and Disadvantages of Formal Methods Model

Advantages Disadvantages

 Discovers ambiguity, incompleteness,  Time consuming and expensive.


and inconsistency in the software.  Difficult to use this model as a
 Offers defect-free software. communication mechanism for non
 Incrementally grows in effective technical personnel.
solution after each iteration.  Extensive training is required since
 This model does not involve high only few developers have the essential
complexity rate. knowledge to implement this model.
 Formal specification language
semantics verify self-consistency.

ASPECT ORIENTED SOFTWARE DEVELOPMENT


Aspect-oriented software development (AOSD) is a software programming solution
built to address modularity deficiencies of traditional software development
approaches such as structural, procedural and object-oriented programming
methods. It is an approach that is designed to complement the conventional designs
rather than replace them.
Features Of Aspect-Oriented Software Development

* AOSD focuses on core areas of identification and investigation, specification and


representation of concerns that can present crosscutting concerns
* AOSD gives complementary benefits and can be used along with other coding
standards.
* AOSD ensures better modularization mechanisms of program designs, thereby reducing
software design, and maintenance and development costs.
* AOSD is a better way to handle localization of concerns that are cross-cutting because
concerns are compressed into various modules.
* AOSD makes available software coding methods and tools to support modularization at
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

the source code stage.


* AOSD ensures improved and smaller size of code as a result of addressing the cross-
cutting issues
* AOSD encourages the reuse of code created by the modularization technique.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

UNIT II

Requirements Engineering:

 Requirements Engineering Tasks


 Initiating the Requirements Engineering Process
 Eliciting Requirements
 Developing Use-Cases.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

INTRODUCTION

The software requirements are description of features and functionalities of the target
system. Requirements convey the expectations of users from the software product. The
requirements can be obvious or hidden, known or unknown, expected or unexpected from
client’s point of view.

Requirement Engineering

The process to gather the software requirements from client, analyze and document them
is known as requirement engineering.

The goal of requirement engineering is to develop and maintain sophisticated and


descriptive ‘System Requirements Specification’ document.

Requirement Engineering Process

It is a four step process, which includes –

 Feasibility Study

 Requirement Gathering

 Software Requirement Specification

 Software Requirement Validation

Let us see the process briefly –


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Feasibility study

When the client approaches the organization for getting the desired product developed, it
comes up with rough idea about what all functions the software must perform and which
all features are expected from the software.

Referencing to this information, the analysts does a detailed study about whether the
desired system and its functionality are feasible to develop.

This feasibility study is focused towards goal of the organization. This study analyzes
whether the software product can be practically materialized in terms of implementation,
contribution of project to organization, cost constraints and as per values and objectives of
the organization. It explores technical aspects of the project and product such as usability,
maintainability, productivity and integration ability.

The output of this phase should be a feasibility study report that should contain adequate
comments and recommendations for management about whether or not the project
should be undertaken.

Requirement Gathering

If the feasibility report is positive towards undertaking the project, next phase starts with
gathering requirements from the user. Analysts and engineers communicate with the
client and end-users to know their ideas on what the software should provide and which
features they want the software to include.

Software Requirement Specification

SRS is a document created by system analyst after the requirements are collected from
various stakeholders.

SRS defines how the intended software will interact with hardware, external interfaces,
speed of operation, response time of system, portability of software across various
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

platforms, maintainability, speed of recovery after crashing, Security, Quality, Limitations


etc.

The requirements received from client are written in natural language. It is the
responsibility of system analyst to document the requirements in technical language so
that they can be comprehended and useful by the software development team.

SRS should come up with following features:

 User Requirements are expressed in natural language.

 Technical requirements are expressed in structured language, which is used inside


the organization.

 Design description should be written in Pseudo code.

 Format of Forms and GUI screen prints.

 Conditional and mathematical notations for DFDs etc.

Software Requirement Validation

After requirement specifications are developed, the requirements mentioned in this


document are validated. User might ask for illegal, impractical solution or experts may
interpret the requirements incorrectly. This results in huge increase in cost if not nipped
in the bud. Requirements can be checked against following conditions -

 If they can be practically implemented

 If they are valid and as per functionality and domain of software

 If there are any ambiguities

 If they are complete

 If they can be demonstrated


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Requirement Elicitation Process

Requirement elicitation process can be depicted using the folloiwng diagram:

 Requirements gathering - The developers discuss with the client and end users
and know their expectations from the software.

 Organizing Requirements - The developers prioritize and arrange the


requirements in order of importance, urgency and convenience.

 Negotiation & discussion - If requirements are ambiguous or there are some


conflicts in requirements of various stakeholders, if they are, it is then negotiated
and discussed with stakeholders. Requirements may then be prioritized and
reasonably compromised.

The requirements come from various stakeholders. To remove the ambiguity and
conflicts, they are discussed for clarity and correctness. Unrealistic requirements
are compromised reasonably.

 Documentation - All formal & informal, functional and non-functional


requirements are documented and made available for next phase processing.

Requirement Elicitation Techniques

Requirements Elicitation is the process to find out the requirements for an intended
software system by communicating with client, end users, system users and others who
have a stake in the software system development.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

There are various ways to discover requirements

Interviews

Interviews are strong medium to collect requirements. Organization may conduct several
types of interviews such as:

 Structured (closed) interviews, where every single information to gather is decided


in advance, they follow pattern and matter of discussion firmly.

 Non-structured (open) interviews, where information to gather is not decided in


advance, more flexible and less biased.

 Oral interviews

 Written interviews

 One-to-one interviews which are held between two persons across the table.

 Group interviews which are held between groups of participants. They help to
uncover any missing requirement as numerous people are involved.

Surveys

Organization may conduct surveys among various stakeholders by querying about their
expectation and requirements from the upcoming system.

Questionnaires

A document with pre-defined set of objective questions and respective options is handed
over to all stakeholders to answer, which are collected and compiled.

A shortcoming of this technique is, if an option for some issue is not mentioned in the
questionnaire, the issue might be left unattended.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Task analysis

Team of engineers and developers may analyze the operation for which the new system is
required. If the client already has some software to perform certain operation, it is studied
and requirements of proposed system are collected.

Domain Analysis

Every software falls into some domain category. The expert people in the domain can be a
great help to analyze general and specific requirements.

Brainstorming

An informal debate is held among various stakeholders and all their inputs are recorded
for further requirements analysis.

Prototyping

Prototyping is building user interface without adding detail functionality for user to
interpret the features of intended software product. It helps giving better idea of
requirements. If there is no software installed at client’s end for developer’s reference and
the client is not aware of its own requirements, the developer creates a prototype based
on initially mentioned requirements. The prototype is shown to the client and the
feedback is noted. The client feedback serves as an input for requirement gathering.

Observation

Team of experts visit the client’s organization or workplace. They observe the actual
working of the existing installed systems. They observe the workflow at client’s end and
how execution problems are dealt. The team itself draws some conclusions which aid to
form requirements expected from the software.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Software Requirements Characteristics

Gathering software requirements is the foundation of the entire software development


project. Hence they must be clear, correct and well-defined.

A complete Software Requirement Specifications must be:

 Clear

 Correct

 Consistent

 Coherent

 Comprehensible

 Modifiable

 Verifiable

 Prioritized

 Unambiguous

 Traceable

 Credible source

Software Requirements

We should try to understand what sort of requirements may arise in the requirement
elicitation phase and what kinds of requirements are expected from the software system.

Broadly software requirements should be categorized in two categories:

Functional Requirements

Requirements, which are related to functional aspect of software fall into this category.

They define functions and functionality within and from the software system.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Examples -

 Search option given to user to search from various invoices.

 User should be able to mail any report to management.

 Users can be divided into groups and groups can be given separate rights.

 Should comply business rules and administrative functions.

 Software is developed keeping downward compatibility intact.

Non-Functional Requirements

Requirements, which are not related to functional aspect of software, fall into this
category. They are implicit or expected characteristics of software, which users make
assumption of.

Non-functional requirements include -

 Security

 Logging

 Storage

 Configuration

 Performance

 Cost

 Interoperability

 Flexibility

 Disaster recovery

 Accessibility

Requirements are categorized logically as

 Must Have : Software cannot be said operational without them.

 Should have : Enhancing the functionality of software.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Could have : Software can still properly function with these requirements.

 Wish list : These requirements do not map to any objectives of software.

While developing software, ‘Must have’ must be implemented, ‘Should have’ is a matter of
debate with stakeholders and negation, whereas ‘could have’ and ‘wish list’ can be kept for
software updates.

User Interface requirements

UI is an important part of any software or hardware or hybrid system. A software is


widely accepted if it is -

 easy to operate

 quick in response

 effectively handling operational errors

 providing simple yet consistent user interface

User acceptance majorly depends upon how user can use the software. UI is the only way
for users to perceive the system. A well performing software system must also be
equipped with attractive, clear, consistent and responsive user interface. Otherwise the
functionalities of software system can not be used in convenient way. A system is said be
good if it provides means to use it efficiently. User interface requirements are briefly
mentioned below -

 Content presentation

 Easy Navigation

 Simple interface

 Responsive

 Consistent UI elements

 Feedback mechanism

 Default settings
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Purposeful layout

 Strategical use of color and texture.

 Provide help information

 User centric approach

 Group based view settings.

Software System Analyst

System analyst in an IT organization is a person, who analyzes the requirement of


proposed system and ensures that requirements are conceived and documented properly
& correctly. Role of an analyst starts during Software Analysis Phase of SDLC. It is the
responsibility of analyst to make sure that the developed software meets the
requirements of the client.

System Analysts have the following responsibilities:

 Analyzing and understanding requirements of intended software

 Understanding how the project will contribute in the organization objectives

 Identify sources of requirement

 Validation of requirement

 Develop and implement requirement management plan

 Documentation of business, technical, process and product requirements

 Coordination with clients to prioritize requirements and remove and ambiguity

 Finalizing acceptance criteria with client and other stakeholders

Software Metrics and Measures

Software Measures can be understood as a process of quantifying and symbolizing various


attributes and aspects of software.

Software Metrics provide measures for various aspects of software process and software
product.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Software measures are fundamental requirement of software engineering. They not only
help to control the software development process but also aid to keep quality of ultimate
product excellent.

According to Tom DeMarco, a (Software Engineer), “You cannot control what you cannot
measure.” By his saying, it is very clear how important software measures are.

Let us see some software metrics:

 Size Metrics - LOC (Lines of Code), mostly calculated in thousands of delivered


source code lines, denoted as KLOC.

Function Point Count is measure of the functionality provided by the software.


Function Point count defines the size of functional aspect of software.

 Complexity Metrics - McCabe’s Cyclomatic complexity quantifies the upper bound


of the number of independent paths in a program, which is perceived as complexity
of the program or its modules. It is represented in terms of graph theory concepts
by using control flow graph.

 Quality Metrics - Defects, their types and causes, consequence, intensity of severity
and their implications define the quality of product.

The number of defects found in development process and number of defects


reported by the client after the product is installed or delivered at client-end,
define quality of product.

 Process Metrics - In various phases of SDLC, the methods and tools used, the
company standards and the performance of development are software process
metrics.

 Resource Metrics - Effort, time and various resources used, represents metrics for
resource measurement.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

DEVELOPING USE – CASES

Before we start working on any project, it is very important that we are very clear on what
we want to do and how do we want to do. In my last Blog, I discussed on how to write a good
SRS for your project and what is the advantage we get out of that. In this Blog, I’ll discuss Use
Cases and their advantage in our projects.
What are Use Cases?
In software and systems engineering, a use case is a list of actions or event steps, typically
defining the interactions between a role (known in the Unified Modeling Language as
an actor) and a system, to achieve a goal. The actor can be a human, an external system, or
time. In systems engineering, use cases are used at a higher level than within software
engineering, often representing missions or stakeholder goals. Another way to look at it is a
use case describes a way in which a real-world actor interacts with the system. In a system
use case you include high-level implementation decisions. System use cases can be written in
both an informal manner and a formal manner.
What is the importance of Use Cases?
Use cases have been used extensively over the past few decades. The advantages of Use cases
includes:

 The list of goal names provides the shortest summary of what the system will offer
 It gives an overview of the roles of each and every component in the system. It will
help us in defining the role of users, administrators etc.
 It helps us in extensively defining the user’s need and exploring it as to how it will
work.
 It provides solutions and answers to many questions that might pop up if we start a
project unplanned.
How to plan use case?
Following example will illustrate on how to plan use cases:

Use Case: What is the main objective of this use case. For eg. Adding a software component,
adding certain functionality etc.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Primary Actor: Who will have the access to this use case. In the above examples,
administrators will have the access.
Scope: Scope of the use case
Level: At what level the implementation of the use case be.
Flow: What will be the flow of the functionality that needs to be there. More precisely, the
work flow of the use case.
Use Case Diagram
Below is a sample use case diagram which I have prepared for reference purpose for a
sample project (much like Facebook). It would help us to understand the role of various
actors in our project. Various actors in the below use case diagram are: User and System.
The main use cases are in the system and the diagram illustrates on how the actors interact
with the use cases.For eg. During Sign Up, only users need to interact with the use case and
not the system whereas when it comes to categorizing posts, only system would be required.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Unit III
Estimation

1. Observation of Estimation
2. The Project Planning Process
3. Software scope and feasibility
4. Resources
5. Software Project Estimation
6. Decomposition Techniques
7. Empirical estimation model
8. Estimation for object oriented projects
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Estimation
 Estimation is the process of finding an estimate, or
approximation, which is a value that can be used for some
purpose even if input data may be incomplete, uncertain, or
unstable.
 Estimation determines how much money, effort, resources, and
time it will take to build a specific system or product.
Estimation is based on −
Past Data/Past Experience
Available Documents/Knowledge
Assumptions
Identified Risks
The four basic steps in Software Project Estimation are −
 Estimate the size of the development product.
 Estimate the effort in person-months or person-hours.
 Estimate the schedule in calendar months.
 Estimate the project cost in agreed currency.

1. Observations of Estimation
 Estimation need not be a one-time task in a project
 It can take place during −
Acquiring a Project.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Planning the Project.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Execution of the Project as the need arises.


 Project scope must be understood before the estimation
process begins.
 It will be helpful to have historical Project Data.
 Project metrics can provide a historical perspective and
valuable input for generation of quantitative estimates.
 Planning requires technical managers and the software team to
make an initial commitment as it leads to responsibility and
accountability.
 Past experience can aid greatly.
 Use at least two estimation techniques to arrive at the
estimates and reconcile the resulting values.
 Refer Decomposition Techniques in the next section to learn
about reconciling estimates.
 Plans should be iterative and allow adjustments as time passes
and more details are known.

2. Project Planning Process


 Once a project is found to be possible, computer code project
managers undertake project designing.
 Project designing is undertaken and completed even before
any development activity starts.
 Project designing consists of subsequent essential activities:
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Estimating the subsequent attributes of the project:

Project size:
What’s going to be downside quality in terms of the trouble and time
needed to develop the product?
Cost:
What proportion is it reaching to value to develop the project?
Duration:
However long is it reaching to want complete development?
Effort:
What proportion effort would be required?
 The effectiveness of the following designing activities relies on
the accuracy of those estimations.
 planning force and alternative resources
 workers organization and staffing plans
 Risk identification, analysis, and abatement designing
 Miscellaneous arranges like quality assurance plan,
configuration, management arrange, etc.
 Precedence ordering among project planning activities:
 The different project connected estimates done by a project
manager have already been mentioned.
 The below diagram shows the order during which vital project
coming up with activities is also undertaken.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It may be simply discovered that size estimation is that the 1st


activity.
 It’s conjointly the foremost basic parameter supported that all
alternative coming up with activities square measure
dispensed, alternative estimations like the estimation of effort,
cost, resource, and project length also are vital elements of the
project coming up with.
Sliding Window Planning:
 Project designing needs utmost care and a spotlight since
commitment to unrealistic time and resource estimates end in
schedule slippage.
 Schedule delays will cause client discontent and adversely have
an effect on team morale.
 It will even cause project failure.
 However, project designing could be a terribly difficult activity.
particularly for giant comes, it’s pretty much troublesome to
create correct plans.
 A region of this issue is thanks to the actual fact that the
correct parameters, the scope of the project, project workers,
etc.
 might amendment throughout the span of the project. So as to
beat this drawback, generally project managers undertake
project designing little by little.
 Designing a project over a variety of stages protects managers
from creating huge commitments too early.
 This method of staggered designing is thought of as window
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

designing. Within the window technique, beginning with


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

associate initial set up, the project is planned additional


accurately in sequential development stages.
 At the beginning of a project, project managers have
incomplete information concerning the main points of the
project.
 Their info base step by step improves because the project
progresses through completely different phases.
 When the completion of each section, the project managers
will set up every ulterior section additional accurately and with
increasing levels of confidence.
3. Software scope and feasibility

 The purpose of feasibility study is not to solve the problem, but


to determine whether the problem is worth solving.
 The feasibility study concentrates on the following area.
 Operational Feasibility
 Technical Feasibility
 Economic Feasibility
 Operational Feasibility
 Operational feasibility study tests the operational scope of the
software to be developed. The proposed software must have
high operational feasibility. The usability will be high.
Technical Feasibility
 The technical feasibility study compares the level of technology
available in the software development firm and the level of
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

technology required for the development of the product.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Here the level of technology consists of the programming


language, the hardware resources, Other software tools etc.
Economic Feasibility
 The economic feasibility study evaluate the cost of the
software development against the ultimate income or benefits
gets from the developed system.
 There must be scopes for profit after the successful Completion
of the project.
 Planning provides a road map for the software development
process.
 Objective of Software Project Planning
 Software Scope
 Resources
 Objective of Software Project Planning
 The objective of software project planning is to provide a
frame work that enables the manager to make reasonable
estimates of resources, cost and schedule.
 Software Scope
 The first activity in software project planning is the
determination of software scope.
 A software project scope must be unambiguous and
understandable at the management and technical levels.
 The software scope means the actual operation that is going to
carried out by the software and its plus points and limitations.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Resources
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 The second task of software planning is the estimation of


resources required.
 Each resource is specified with the following characteristic.
Resource descriptions, details of availability, when it is
required, how long it is required.
 Human Resource
 Hardware Resource
 Software Resource
 People are the primary software development resource. The
planner evaluate the scope and select the appropriate people
for appropriate positions.
4. Resources

 Resources are people, equipment, places, money or anything


else a project needs to be executed.
 As a result, resources must be allocated for each activity on the
to-do list.
 Before you can assign resources to the project, however, you
need to know their availability.
 Some resources need to be scheduled in advance and may only
be available at certain times or times – for example, a meeting
room or a rented office.
 It is therefore essential to know this before you can finish
programming a project.
Resource estimation
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

The objective of the resource estimate is to allocate the necessary


resources to each activity on the list.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

There are five tools and techniques for estimating activity resources:
The judgement of experts:
this means involving experts who have already performed this type
of work before and obtaining opinions on what resources are
needed.
Alternative analysis:
This means considering different options on how to allocate
resources.
This includes changing the number of resources and the type of
resources used.
Many times, there is more than one way to perform a task, and
alternative analysis helps you decide between different possibilities.
Published estimation data:
something that project managers in many industries use to
understand how many resources they need for a specific project.
These are based on articles, research and studies that collect,
analyze and publish data from other people and organizations’
projects.
Project management software: these often feature functions
designed to help project managers estimate resource needs and
constraints and find the best combination for the project in question.
The bottom-up estimate: this means splitting complex tasks into
simpler tasks and processing the resources needed for each small
step.
The need or cost of the resources of the individual tasks is then
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

added together to obtain a total estimate.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

The smaller and more detailed the task, the greater the accuracy of
this technique
Estimation of activities’ duration
 Once you have finished estimating resources per activity, you
have everything you need to understand how long it will take
to complete each activity.
 Estimating the duration of a task means starting with
information about that specific task and then working with the
project team to develop a time estimate.
 Most of the time you will start with a rough estimate and then
refine it.
 When you talk about estimating project time, you may have
already heard of effort.
 If you’re interested in learning more about it, you can check
this article about effort and duration.
 Here are the five tools and techniques to create more accurate
durability estimates:
 The evaluation of the experts that will come from the members
of the project team who are familiar with the work that needs
to be done.
 The equivalent estimate, i.e. when looking at similar activities
from previous projects and how much time they took.
 Parametric Estimation, i.e. linking the project data into a
formula that provides an estimation.
 The three-point estimate, i.e. when three numbers come up: a
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

realistic estimate that is more likely to occur, an optimistic


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

estimate that represents the best scenario and a pessimistic


estimate that represents the worst scenario.
 The final estimate is the weighted average of the three.
 The Back-up Analysis, i.e. adding extra time to the program
(called emergency reserve or buffer) to take account of
additional risk.
 Activity duration estimates are a quantitative measure usually
expressed in hours, weeks, days or months.
 Another thing to keep in mind when estimating activity
duration is to determine the effort required.
 Duration is the amount of time an activity takes, while effort is
the total number of people-hours required.
 If, for example, two people work a total of 6 hours (3 hours one
and 3 hours the other) to complete an activity, the duration is
six hours. However, if these two people worked the whole time
(simultaneously, for 6 hours), the duration would be 12 hours.
 Project planning and critical roadmap
 The project program must be approved and signed by the
stakeholders and functional managers.
 This ensures that everyone is familiar with the program,
including dates and resource commitments.
 In addition, (written) confirmation will be required that
resources will be available as indicated in the planning.
 Once approved, the program will become the baseline for the
rest of the project.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 The progress of the project and the completion of activities will


be monitored compared to project planning to determine if the
project is running as planned.
 A delay in any of the activities in the critical roadmap will delay
the entire project.
 project resources
 Resource equalization
 Resource equalization is used to examine and resolve the
unequal use of resources, usually related to people or
equipment, over time.

 During the execution of project planning, the project manager


will attempt to plan certain activities simultaneously.

 As the project progresses, however, there are situations where


more resources – such as equipment or people – may be
needed than are available and planned.

 The project manager will attempt to schedule certain tasks at


the same time as the project is progressing.

 When using project software, resource equalization can take


place automatically, allowing the software to calculate delays
and automatically update tasks.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 The project manager offers several tools for the development


of good quantitative information, based on numbers and
measurements, such as project schedules, financial and budget
reports, risk analysis and objective monitoring.

 This quantitative information is essential to understand the


current status and trends of a project.
 Likewise important is the development of qualitative
information, such as judgement made by team members.
 In conclusion, regardless of project size or budget, estimating
activities can be a challenging task.
 To create a feasible budget, the project manager needs to know
their team, results, activities, and processes in detail.
 In addition, he or she should feel comfortable asking the
correct questions to stakeholders.
5. Software Project Estimation
 Estimation is the process of finding an estimate, or
approximation, which is a value that can be used for some
purpose even if input data may be incomplete, uncertain, or
unstable.
 Estimation determines how much money, effort, resources, and
time it will take to build a specific system or product.
Estimation is based on −
Past Data/Past Experience
Available Documents/Knowledge
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Assumptions
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Identified Risks
The four basic steps in Software Project Estimation are −
 Estimate the size of the development product.
 Estimate the effort in person-months or person-hours.
 Estimate the schedule in calendar months.
 Estimate the project cost in agreed currency.

6. Decomposition Techniques
 General Project Estimation Approach
 The Project Estimation Approach that is widely used is
Decomposition Technique.
 Decomposition techniques take a divide and conquer approach.
Size, Effort and Cost estimation are performed in a stepwise
manner by breaking down a Project into major Functions or
related Software Engineering Activities.
 Step 1 − Understand the scope of the software to be built.
 Step 2 − Generate an estimate of the software size.
 Start with the statement of scope.
 Decompose the software into functions that can each be
estimated individually.
 Calculate the size of each function.
 Derive effort and cost estimates by applying the size values to
your baseline productivity metrics.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Combine function estimates to produce an overall estimate for


the entire project.
 Step 3 − Generate an estimate of the effort and cost. You can
arrive at the effort and cost estimates by breaking down a
project into related software engineering activities
 Identify the sequence of activities that need to be performed
for the project to be completed.
 Divide activities into tasks that can be measured.
 Estimate the effort (in person hours/days) required to
complete each task.
 Combine effort estimates of tasks of activity to produce an
estimate for the activity.
 Obtain cost units (i.e., cost/unit effort) for each activity from
the database.
 Compute the total effort and cost for each activity.
 Combine effort and cost estimates for each activity to produce
an overall effort and cost estimate for the entire project.

 Step 4 − Reconcile estimates: Compare the resulting values


from Step 3 to those obtained from Step 2. If both sets of
estimates agree, then your numbers are highly reliable.
Otherwise, if widely divergent estimates occur conduct further
investigation concerning whether −
 The scope of the project is not adequately understood or has
been misinterpreted.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 The function and/or activity breakdown is not accurate.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Historical data used for the estimation techniques is


inappropriate for the application, or obsolete, or has been
misapplied.
 Step 5 − Determine the cause of divergence and then reconcile
the estimates.
7. Empricial estimation model

 Cost Estimation Models in Software Engineering


 Cost estimation simply means a technique that is used to find
out the cost estimates.
 The cost estimate is the financial spend that is done on the
efforts to develop and test software in Software Engineering.
 Cost estimation models are some mathematical algorithms or
parametric equations that are used to estimate the cost of a
product or a project.
 Various techniques or models are available for cost estimation,
also known as Cost Estimation Models as shown below :
Empirical Estimation Technique –
 Empirical estimation is a technique or model in which
empirically derived formulas are used for predicting the data
that are a required and essential part of the software project
planning step.
 These techniques are usually based on the data that is collected
previously from a project and also based on some guesses,
prior experience with the development of similar types of
projects, and assumptions.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It uses the size of the software to estimate the effort.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 In this technique, an educated guess of project parameters is


made.
 Hence, these models are based on common sense. However, as
there are many activities involved in empirical estimation
techniques, this technique is formalized.
 For example Delphi technique and Expert Judgement technique.

8. Estimation for object oriented projects

 The Object-Oriented Project Size Estimation (Oopsize)


technique uses the initial estimates of B1 and B2 to predict
how much time is required to design, code and test an object.
 The objects can be described in a Rational Rose class model, for
instance.
 In the class model, the analyst defines object names, object
attributes, object methods and parameters to object methods.
Oopsize operates against the information in the Class model,
calculates the Point values for each object in the model, and
plugs the Point values into the predictive equation to
determine an estimated amount of time for each object’s
creation.

 Determining the Point Values for a Set of Objects


 Point calculations are best illustrated by example. Consider the
set of object definitions written in Java.
Point values for the objects are formulated as follows:
a) For MyObject1
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

1. Points for MyObject1 are set equal to 0.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

2. The name MyObject1 is parsed. MyObject1 contains two unique


tokens: My and Object1. Therefore, Points = Points + 2, or 2 total
points.
3. MyObject1 has 3 attributes. Each attribute contains 1 unique
token. Therefore, Points = Points + 3, or 5. Each Attribute has a type
(i.e., String). Therefore, Points = Points + 3, or 8.
4. MyObject1 contains a method: Method11. Method11 contains 1
unique token. Therefore, Points = Points + 1, or 9.
5. Method11 has two arguments: Parm11 and Parm12. Therefore,
Points = Points + 2, or 11. Each argument has a type. Therefore,
Points = Points + 2, or 13.
6. MyObject1 contains a method: Method12. Method12 contains 1
unique token. Therefore, Points = Points + 1 or 14. Note that no
points are awarded for the return value of Method12.
b) For MyObject2
1. Points for MyObject2 are set equal to 0.
2. The name MyObject2 is parsed. MyObject2 contains 1 unique
token: Object2. ("My" was used previously in MyObject1). Therefore,
Points = Points + 1, or 1.
3. MyObject2 contains Attribute21. It has a type (i.e. int). Therefore,
Points = Points + 2, or 3.
4. MyObject2 contains Method21. Method21 contains 1 unique
token. Therefore, Points = Points + 1, or 4.
5. Method21 has 1 argument: Arg1 has a type (i.e. float). Therefore,
Points = Points + 2, or 6.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Total points for MyObject1 and MyObject2 are 14 and 6,


respectively.
 Then, substituting the Points values into the predictive
equation on page 34, the number of days to design, code and
test
 MyObject1 is 5.15 and the number of days to produce
MyObject2 is 2.20.
 The total number of days for the entire project is 7.35
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

UNIT IV

1. Testing Strategies for Conventional software


2. Validation Testing
3. System Testing
4. Testing Tactics –Software Testing Fundamentals
5. White-box Testing
6. Basis Path Testing
7. Control Structure Testing
8. Black-box Testing
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

TEST STRATEGIES FOR CONVENTIONAL SOFTWARE

 There are many strategies that can be used to test software.


 At one extreme, you can wait until the system is fully constructed and then conduct tests on the overall
system in hopes of finding errors.
 This approach simply does not work. It will result in buggy software.
 At the other extreme, you could conduct tests on a daily basis, whenever any part of the system is
constructed.
 This approach, although less appealing to many, can be very effective.
 A testing strategy that is chosen by most software teams falls between the two extremes.
 It takes an incremental view of testing,
 Beginning with the testing of individual program units,
 Moving to tests designed to facilitate the integration of the units,
 Culminating with tests that exercise the constructed system.

Unit Test :
 Unit testing focuses verification effort on the smallest unit of software design—the software component
or module.
 The unit test focuses on the internal processing logic and data structures within the boundaries of a
component.
 This type of testing can be conducted in parallel for multiple components.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Unit tests are illustrated schematically in previous Figure.


 The module interface is tested to ensure that information properly flows into and out
of the program unit under test.
 Local data structures are examined to ensure that data stored temporarily maintains
its integrity during all steps in an algorithm’s execution.
 All independent paths through the control structure are exercised to ensure that all
statements in a module have been executed at least once.
 Boundary conditions are tested to ensure that the module operates properly at
boundaries established to limit or restrict processing.
 Finally, all error-handling paths are tested
 Good design anticipates error conditions and establishes error-handling paths to
reroute or cleanly terminate processing when an error does occur.
 Unit testing is simplified when a component with high cohesion is designed.

Integration Testing :
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Different Integration Testing Strategies


 Top-down testing
 Bottom-up testing
 Regression Testing
 Smoke Testing

Top-down testing

Top-down integration testing is an incremental approach to construction of the software


architecture.

 Modules are integrated by moving downward through the control hierarchy, beginning
with the main control module (main program).
 Modules subordinate (and ultimately subordinate) to the main control module are
incorporated into the structure in either a depth-first or breadth-first manner.

Integration Testing
The integration process is performed in a series of five steps

1. The main control module is used as a test driver and stubs are substituted for all
components directly subordinate to the main control module.

2. Depending on the integration approach selected (i.e., depth or breadth first), subordinate
stubs are replaced one at a time with actual components.

3. Tests are conducted as each component is integrated.


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

4. On completion of each set of tests, another stub is replaced with the real component.

5. Regression testing (discussed later in this section) may be conducted to ensure that new
errors have not been introduced.

The process continues from step 2 until the entire program structure is built.

VALIDATION TESTING
The process of evaluating software during the development process or at the end of the
development process to determine whether it satisfies specified business requirements.
Validation Testing ensures that the product actually meets the client's needs. It can also be
defined as to demonstrate that the product fulfills its intended use when deployed on
appropriate environment.
It answers to the question, Are we building the right product?

Validation Testing - Workflow:


Validation testing can be best demonstrated using V-Model. The Software/product under test
is evaluated during this type of testing.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Verification:
Verification is the process of checking that a software achieves its goal without any bugs. It is
the process to ensure whether the product that is developed is right or not. It verifies whether
the developed product fulfills the requirements that we have.

Verification is Static Testing.


Activities involved in verification:
1. Inspections
2. Reviews
3. Walkthroughs
4. Desk-checking

Verification Validation

The process just checks the design, code and It should evaluate the entire product including the code.
program.

Reviews, walkthroughs, inspections, and Functional and non functional methods of testing are involved .
desk- checking involved. In depth check of the product is done.

It checks the software with specification. It checks if the software meets the user needs.

ALPHA AND BETA TESTING

 Alpha Testing is performed by the Testers within the organization whereas Beta
Testing is performed by the end users.
 Alpha Testing is performed at Developer's site whereas Beta Testing is performed at
Client's location.
 Reliability and Security testing are not performed in-depth in Alpha Testing while
Reliability, Security and Robustness are checked during Beta Testing.
 Alpha Testing involves both Whitebox and Blackbox testing whereas Beta Testing
mainly involves Blackbox testing.
 Alpha Testing requires testing environment while Beta Testing doesn't require testing
environment.
 Alpha Testing requires long execution cycle whereas Beta Testing requires only few
weeks of execution.
 Critical issues and bugs are addressed and fixed immediately in Alpha Testing
whereas issues and bugs are collected from the end users and further implemented in
Beta Testing
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

SYSTEM TESTING
System Testing is a type of software testing that is performed on a complete integrated system
to evaluate the compliance of the system with the corresponding requirements.
In system testing, integration testing passed components are taken as input. The goal of
integration testing is to detect any irregularity between the units that are integrated together.
System testing detects defects within both the integrated units and the whole system. The result
of system testing is the observed behavior of a component or a system when it is tested.
System Testing is carried out on the whole system in the context of either system requirement
specifications or functional requirement specifications or in the context of both. System testing
tests the design and behavior of the system and also the expectations of the customer. It is
performed to test the system beyond the bounds mentioned in the software requirements
specification (SRS).

System Testing is basically performed by a testing team that is independent of the development
team that helps to test the quality of the system impartial. It has both functional and non-
functional testing.
System Testing is a black-box testing. It is actually a series of different tests whose primary
purpose is to fully exercise the computer based system.

System Testing Process:


System Testing is performed in the following steps:
 Test Environment Setup:
Create testing environment for the better quality testing.
 Create Test Case:
Generate test case for the testing process.
 Create Test Data:
Generate the data that is to be tested.
 Execute Test Case:
After the generation of the test case and the test data, test cases are executed.
 Defect Reporting:
Defects in the system are detected.
 Regression Testing:
It is carried out to test the side effects of the testing process.
 Log Defects:
Defects are fixed in this step.
 Retest:
If the test is not successful then again test is performed.

Types of System testing:


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Recovery Testing

Recovery Testing is software testing technique which verifies software's ability to recover
from failures like software/hardware crashes, network failures etc. The purpose of Recovery
Testing is to determine whether software operations can be continued after disaster or
integrity loss. Recovery testing involves reverting back software to the point where integrity
was known and reprocessing transactions to the failure point.

Security Testing
SECURITY TESTING is a type of Software Testing that uncovers vulnerabilities, threats, risks
in a software application and prevents malicious attacks from intruders. The purpose of
Security Tests is to identify all possible loopholes and weaknesses of the software system
which might result in a loss of information, revenue, repute at the hands of the employees or
outsiders of the Organization.

Stress Testing
Stress testing is a software testing activity that determines the robustness of software by
testing beyond the limits of normal operation. Stress testing is particularly important for
"mission critical" software, but is used for all types of software. A most prominent use of stress
testing is to determine the limit, at which the system or software or hardware breaks.

Performance Testing
Performance Testing ensures software applications to perform properly under their expected
workload. It is a testing technique carried out to determine system performance in terms of
sensitivity, reactivity and stability under a particular workload.
Performance Testing is the process of analyzing the quality and capability of a product. It is a
testing method performed to determine the system performance in terms of speed, reliability
and stability under varying workload. Performance testing is also known as Perf Testing.

Performance Testing Attributes:


 Speed:
It determines whether the software product responds rapidly.
 Scalability:
It determines amount of load the software product can handle at a time.
 Stability:
It determines whether the software product is stable in case of varying workloads.
 Reliability:
It determines whether the software product is secure or not.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Objective of Performance Testing:


1. The objective of performance testing is to eliminate performance congestion.
2. It uncovers what is needed to be improved before the product is launched in market.
3. The objective of performance testing is to make software rapid.
4. The objective of performance testing is to make software stable and reliable.

Deployment Testing

Testing a software project before and after deploying it on production is not that difficult.
But too often, major bugs appear on production server after the deployment process. To avoid
situations in which your production environment is threatened by these bugs, you should use a
streamlined deployment and testing flow.Generally speaking, this flow consists of three
phases: pre-deploy, deploy and post-deploy.

SOFTWARE TESTING FUNDAMENTALS


 OPERABILITY

In the context of a software systems, Operability is a measure of how well


a software system works when operating. We say that a software system with
good operability works well and is operable ..... Software with a high level
of operability is easy to deploy, test, and interrogate in the Production environment.

 OBSERVABILITY

Observability: Software tests examine the outputs produced by the software for particular
inputs. .... This implies that software is more testable when the tester has the ability to easily
control the software in order to provide the test inputs.

 CONTROLABILITY

Controllability: As just mentioned, software testing involves examining outputs for given inputs.
This means that the more easily we can provide inputs to the software, the more easily we
can test the software.

 DECOMPOSABILITY

When software can be decomposed into independent modules, these modules can be
tested individually. When an error occurs in an individual module, the error is less likely to
require changes to be made in other modules, or for the tester to even examine multiple
modules.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 SIMPLICITY

Clearly, the simpler the software, the fewer errors it will have, and the easier it will be to
test. There are three forms of simplicity that software can demonstrate: functional
simplicity, in which the software does no more than is needed of it; structural
simplicity, in which the software is decomposed into small, simple units; and code
simplicity, in which the coding standards used be the software team allows for the easy
understanding of the code.

 STABILITY

If changes need to be made to the software, then testing becomes easier if these
changes are always contained within independent modules (via, for instance,
decomposability), meaning that the code that needs to be tested remains small.

 UNDERSTANDABILITY

Clearly, the more the testers understand the software, the easier it is to test. Much of this
relates to good software design, but also to the engineering culture of the developers:
communication between designers, developers and testers whenever changes occur in
the software is important, as is the ability for the testers and developers to easily access
good technical documentation related to the software (such as APIs for the libraries being
used and the software itself).

WHITE -BOX TESTING


White Box Testing is software testing technique in which internal structure, design and
coding of software are tested to verify flow of input-output and to improve design, usability and
security. In white box testing, code is visible to testers so it is also called Clear box testing,
Open box testing, Transparent box testing, Code-based testing and Glass box testing.

It is one of two parts of the Box Testing approach to software testing. Its counterpart,
Blackbox testing, involves testing from an external or end-user type perspective. On the other
hand, Whitebox testing is based on the inner workings of an application and revolves around
internal testing.

White box testing involves the testing of the software code for the following:

 Internal security holes


 Broken or poorly structured paths in the coding processes
 The flow of specific inputs through the code
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Expected output
 The functionality of conditional loops
 Testing of each statement, object, and function on an individual basis
 Path testing is a structural testing method that involves using the source code of a
program in order to find every possible executable path. It helps to determine all faults
lying within a piece of code. This method is designed to execute all or selected path
through a computer program.
 Any software program includes, multiple entry and exit points. Testing each of these
points is a challenging as well as time-consuming. In order to reduce the redundant
tests and to achieve maximum test coverage, basis path testing is used.

BASIS PATH TESTING


 Basis Path Testing in software engineering is a White Box Testing method in which
test cases are defined based on flows or logical paths that can be taken through the
program. The objective of basis path testing is to define the number of independent
paths, so the number of test cases needed can be defined explicitly to maximize test
coverage.

In software engineering, Basis path testing involves execution of all possible blocks in a
program and achieves maximum path coverage with the least number of test cases. It is a
hybrid method of branch testing and path testing methods.

Here we will take a simple example, to get a better idea what is basis path testing include
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

In the above example, we can see there are few conditional statements that is executed
depending on what condition it suffice. Here there are 3 paths or condition that need to be
tested to get the output,

 Path 1: 1,2,3,5,6, 7
 Path 2: 1,2,4,5,6, 7
 Path 3: 1, 6, 7

Steps for Basis Path testing


The basic steps involved in basis path testing include

 Draw a control graph (to determine different program paths)


 Calculate Cyclomatic complexity (metrics to determine the number of independent
paths)
 Find a basis set of paths
 Generate test cases to exercise each path

Advantages of Basic Path Testing


 It helps to reduce the redundant tests
 It focuses attention on program logic
 It helps facilitates analytical versus arbitrary case design
 Test cases which exercise basis set will execute every statement in a program at least
once

CONTROL STRUCTURE TESTING


Control structure testing is used to increase the coverage area by testing various control
structures present in the program. The different types of testing performed under control
structure testing are as follows-
1. Condition Testing
2. Data Flow Testing
3. Loop Testing

1. Condition Testing :
Condition testing is a test cased design method, which ensures that the logical condition and
decision statements are free from errors. The errors present in logical conditions can be
incorrect boolean operators, missing parenthesis in a booleans expression, error in relational
operators, arithmetic expressions, and so on.
The common types of logical conditions that are tested using condition testing are-
1. A relation expression, like E1 op E2 where ‘E1’ and ‘E2’ are arithmetic expressions and
‘OP’ is an operator.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

2. A simple condition like any relational expression preceded by a NOT (~) operator.
For example, (~E1) where ‘E1’ is an arithmetic expression and ‘a’ denotes NOT
operator.
3. A compound condition consists of two or more simple conditions, Boolean operator, and
parenthesis.
For example, (E1 & E2)|(E2 & E3) where E1, E2, E3 denote arithmetic expression and
‘&’ and ‘|’ denote AND or OR operators.

4. A Boolean expression consists of operands and a Boolean operator like ‘AND’, OR,
NOT.
For example, ‘A|B’ is a Boolean expression where ‘A’ and ‘B’ denote operands and |
denotes OR operator.

2. Data Flow Testing :


The data flow test method chooses the test path of a program based on the locations of the
definitions and uses all the variables in the program.
The data flow test approach is depicted as follows suppose each statement in a program is
assigned a unique statement number and that theme function cannot modify its parameters or
global variables.
For example, with S as its statement number.
DEF (S) = {X | Statement S has a definition of X}
USE (S) = {X | Statement S has a use of X}
If statement S is an if loop statement, them its DEF set is empty and its USE set depends on
the state of statement S. The definition of the variable X at statement S is called the line of
statement S’ if the statement is any way from S to statement S’ then there is no other definition
of X.
A definition use (DU) chain of variable X has the form [X, S, S’], where S and S’ denote
statement numbers, X is in DEF(S) and USE(S’), and the definition of X in statement S is line at
statement S’.
A simple data flow test approach requires that each DU chain be covered at least once. This
approach is known as the DU test approach. The DU testing does not ensure coverage of all
branches of a program.
However, a branch is not guaranteed to be covered by DU testing only in rar cases such as
then in which the other construct does not have any certainty of any variable in its later part and
the other part is not present. Data flow testing strategies are appropriate for choosing test paths
of a program containing nested if and loop statements.
3. Loop Testing :
Loop testing is actually a white box testing technique. It specifically focuses on the validity of
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

loop construction.
Following are the types of loops.
1. Simple Loop – The following set of test can be applied to simple loops, where the
maximum allowable number through the loop is n.
1. Skip the entire loop.
2. Traverse the loop only once.
3. Traverse the loop two times.
4. Make p passes through the loop where p<n.
5. Traverse the loop n-1, n, n+1 times.

2. Concatenated Loops – If loops are not dependent on each other, contact loops can be
tested using the approach used in simple loops. if the loops are interdependent, the
steps are followed in nested loops.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

3. Nested Loops – Loops within loops are called as nested loops. when testing nested
loops, the number of tested increases as level nesting increases.
The following steps for testing nested loops are as follows-
1. Start with inner loop. set all other loops to minimum values.
2. Conduct simple loop testing on inner loop.
3. Work outwards.
4. Continue until all loops tested.
4. Unstructured loops – This type of loops should be redesigned, whenever possible, to
reflect the use of unstructured the structured programming constructs.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

BLACK BOX TESTING


Black Box Testing is a software testing method in which the functionalities of software
applications are tested without having knowledge of internal code structure, implementation
details and internal paths. Black Box Testing mainly focuses on input and output of software
applications and it is entirely based on software requirements and specifications. It is also
known as Behavioral Testing.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Types of Black Box Testing


There are many types of Black Box Testing but the following are the prominent ones -

 Functional testing - This black box testing type is related to the functional
requirements of a system; it is done by software testers.
 Non-functional testing - This type of black box testing is not related to testing of
specific functionality, but non-functional requirements such as performance, scalability,
usability.
 Regression testing - Regression Testing is done after code fixes, upgrades or any
other system maintenance to check the new code has not affected the existing code.

Black Box Testing White Box Testing

the main focus of black box testing is on the White Box Testing (Unit Testing) validates
validation of your functional requirements. internal structure and working of your software
code

Black box testing gives abstraction from code and To conduct White Box Testing, knowledge of
focuses on testing effort on the software system underlying programming language is essential.
behavior. Current day software systems use a variety of
programming languages and technologies and its
not possible to know all of them.

Black box testing facilitates testing White box testing does not facilitate testing
communication amongst modules communication amongst modules
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Unit V
METRICS FOR PROCESS AND PROJECTS

1. Metrics in the process and project domain


2. Software measurements
3. Metrics for Software quality
4. Integrating Metrics within the Software Process
5. Engineering of Component Based System(CBSE)
6. The CBSE process
7. Domain engineering
8. CBD
9. Classifying and Retrieving Components
10. Economics of CBSE
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

1. Metrics in the process and project domain


Project managers have a wide variety of metrics to choose from.
We can classify the most commonly used metrics into the following
groups:
Process Metrics
These are metrics that pertain to Process Quality. They are used to
measure the efficiency and effectiveness of various processes.
Project Metrics
These are metrics that relate to Project Quality. They are used to
quantify defects, cost, schedule, productivity and estimation of
various project resources and deliverables.
Product Metrics
These are metrics that pertain to Product Quality. They are used to
measure cost, quality, and the product’s time-to-market.
Organizational Metrics
These metrics measure the impact of organizational economics,
employee satisfaction, communication, and organizational growth
factors of the project.
Software Development Metrics Examples
 These metrics enable management to understand the quality of
the software, the productivity of the development team, code
complexity, customer satisfaction, agile process, and
operational metrics.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 We’ll now take a closer look at the various types of the two
most important categories of metrics – Project Metrics, and
Process Metrics.
 Schedule Variance: Any difference between the scheduled
completion of an activity and the actual completion is known
as Schedule Variance.
 Schedule variance = ((Actual calendar days – Planned calendar
days) + Start variance)/ Planned calendar days x 100.
 Effort Variance: Difference between the planned outlined effort
and the effort required to actually undertake the task is called
Effort variance.
 Effort variance = (Actual Effort – Planned Effort)/ Planned
Effort x 100.
 Size Variance: Difference between the estimated size of the
project and the actual size of the project (normally in KLOC or
FP).
 Size variance = (Actual size – Estimated size)/ Estimated size x
100.
 Requirement Stability Index: Provides visibility to the
magnitude and impact of requirements changes.
 RSI = 1- ((Number of changed + Number of deleted + Number
of added) / Total number of initial requirements) x100.
 Productivity (Project): Is a measure of output from a related
process for a unit of input.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Project Productivity = Actual Project Size / Actual effort


expended in the project.

 Productivity (for test case preparation) = Actual number of test


cases/ Actual effort expended in test case preparation.
 Productivity (for test case execution) = Actual number of test
cases / actual effort expended in testing.
 Productivity (defect detection) = Actual number of defects
(review + testing) / actual effort spent on (review + testing).
 Productivity (defect fixation) = actual no of defects fixed/
actual effort spent on defect fixation.
 Schedule variance for a phase: The deviation between planned
and actual schedules for the phases within a project
 Schedule variance for a phase = (Actual Calendar days for a
phase – Planned calendar days for a phase + Start variance for
a phase)/ (Planned calendar days for a phase) x 100
 Effort variance for a phase: The deviation between a planned
and actual effort for various phases within the project.
 Effort variance for a phase = (Actual effort for a phase – a
planned effort for a phase)/ (planned effort for a phase) x 100.
 Process Metrics:
 Cost of quality: It is a measure of the performance of quality
initiatives in an organization. It’s expressed in monetary terms.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Cost of quality = (review + testing + verification review +


verification testing + QA + configuration management +
measurement + training + rework review + rework testing)/
total effort x 100.

 Cost of poor quality: It is the cost of implementing imperfect


processes and products.

 Cost of poor quality = rework effort/ total effort x 100.

 Defect density: It is the number of defects detected in the


software during development divided by the size of the
software (typically in KLOC or FP)

 Defect density for a project = Total number of defects/ project


size in KLOC or FP

 Review efficiency: defined as the efficiency in harnessing/


detecting review defects in the verification stage.

 Review efficiency = (number of defects caught in review)/ total


number of defects caught) x 100.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Testing Efficiency: Testing efficiency = 1 – ((defects found in


acceptance)/ total number of testing defects) x 100.

 Defect removal efficiency: Quantifies the efficiency with which


defects were detected and prevented from reaching the
customer.

 Defect removal efficiency = (1 – (total defects caught by


customer/ total number of defects)) x 100.

 Residual defect density = (total number of defects found by a


customer)/ (Total number of defects including customer found
defects) x 100.

 Check out our course on Introduction to PMP Certification


Training.
2. Software Measurement
 A measurement is an manifestation of the size, quantity,
amount or dimension of a particular attributes of a product or
process.
 Software measurement is a titrate impute of a characteristic of
a software product or the software process. It is an authority
within software engineering.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Software measurement process is defined and governed by ISO


Standard.

Need of Software Measurement:


Software is measured to:
 Create the quality of the current product or process.
 Anticipate future qualities of the product or process.
 Enhance the quality of a product or process.
 Regulate the state of the project in relation to budget and
schedule.
 Classification of Software Measurement:
There are 2 types of software measurement:
Direct Measurement:
 In direct measurement the product, process or thing is
measured directly using standard scale.
 Indirect Measurement:
 In indirect measurement the quantity or quality to be
measured is measured using related parameter i.e. by use of
reference.
Metrics:
A metrics is a measurement of the level that any impute belongs to a
system product or process.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

There are 4 functions related to software metrics:


Planning
Organizing
Controlling
Improving
Characteristics of software Metrics:
Quantitative:
Metrics must possess quantitative nature.It means metrics can be
expressed in values.
Understandable:
Metric computation should be easily understood ,the method of
computing metric should be clearly defined.
Applicability:
Metrics should be applicable in the initial phases of development of
the software.
Repeatable:
The metric values should be same when measured repeatedly and
consistent in nature.
Economical:
Computation of metric should be economical.
Language Independent:
Metrics should not depend on any programming language.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Classification of Software Metrics:


There are 2 types of software metrics:
Product Metrics:
Product metrics are used to evaluate the state of the product, tracing
risks and undercovering prospective problem areas. The ability of
team to control quality is evaluated.
Process Metrics:
Process metrics pay particular attention on enhancing the long term
process of the team or organisation.
Project Metrics:
Project matrix is describes the project characteristic and execution
process.
Number of software developer
Staffing pattern over the life cycle of software
Cost and schedule
Productivity
3. Metrics for Software quality
 Software quality metrics are a subset of software metrics that
focus on the quality aspects of the product, process, and
project.
 These are more closely associated with process and product
metrics than with project metrics.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Software quality metrics can be further divided into three


categories −
 Product quality metrics
 In-process quality metrics
 Maintenance quality metrics
 Product Quality Metrics
This metrics include the following −
 Mean Time to Failure
 Defect Density
 Customer Problems
 Customer Satisfaction
 Mean Time to Failure
 It is the time between failures. This metric is mostly used with
safety critical systems such as the airline traffic control
systems, avionics, and weapons.
Defect Density
 It measures the defects relative to the software size expressed
as lines of code or function point, etc. i.e., it measures code
quality per unit.
 This metric is used in many commercial software systems.
 Customer Problems
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It measures the problems that customers encounter when


using the product.
 It contains the customer’s perspective towards the problem
space of the software, which includes the non-defect oriented
problems together with the defect problems.
 The problems metric is usually expressed in terms of Problems
per User-Month (PUM)
4. Integrating Metrics Within the Software Process

Arguments for Software Metrics


 Why is it so important to measure the process of software
engineering and the product (software) that it produces?
 The answer is relatively obvious.
 If we do not measure, there no real way of determining
whether we are improving.
 And if we are not improving, we are lost.
 By requesting and evaluating productivity and quality
measures, senior management can establish meaningful goals
for improvement of the software engineering process.
 If the process through which it is developed can be improved, a
direct impact on the bottom line can result.
 But to establish goals for improvement, the current status of
software development must be understood.
 Hence, measurement is used to establish a process baseline
from which improvements can be assessed.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 The day-to-day rigors of software project work leave little time


for strategic thinking.
 Software project managers are concerned with more mundane
(but equally important)
 issues: developing meaningful project estimates, producing
higher-quality systems, getting product out the door on time.
 By using measurement to establish a project baseline, each of
these issues becomes more manageable.
 We have already noted that the baseline serves as a basis for
estimation.
 Additionally, the collection of quality metrics enables an
organization to "tune" its software process to remove the "vital
few" causes of defects that have the greatest impact on
software development.
 At the project and technical levels (in the trenches), software
metrics provide immediate benefit.
 As the software design is completed, most developers would be
anxious to obtain answers to the questions such as
• Which user requirements are most likely to change?
• Which components in this system are most error prone?
• How much testing should be planned for each component?
• How many errors (of specific types) can I expect when
testing commences?
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Establishing a Baseline
 By establishing a metrics baseline, benefits can be obtained at
the process, project, and product (technical) levels. Yet the
information that is collected need not be fundamentally
different.
 The same metrics can serve many masters.
 The metrics baseline consists of data collected from past
software development projects To be an effective aid in
process improvement and/or cost and effort estimation,
 baseline data must have the following attributes:
 data must be reasonably accurate—"guestimates" about past
projects are to be avoided;
 data should be collected for as many projects as possible;
 measures must be consistent, for example, a line of code must
be interpreted consistently across all projects for which data
are collected;
 applications should be similar to work that is to be
estimated—it makes little sense to use a baseline for batch
information systems work to estimate a realtime, embedded
application.
 Metrics Collection, Computation, and Evaluation
 Ideally, data needed to establish a baseline has been collected
in an ongoing manner.
 Sadly, this is rarely the case. Therefore, data collection requires
a historical investigation of past projects to reconstruct
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

required data. Once measures have been collected


(unquestionably the most difficult step), metrics computation
is possible.
 Depending on the breadth of measures collected, metrics can
span a broad range of LOC or FP metrics as well as other
quality- and project-oriented metrics.
 Finally, metrics must be evaluated and applied during
estimation, technical work, project control, and process
improvement.
 Metrics evaluation focuses on the underlying reasons for the
results obtained and produces a set of indicators that guide the
project or process.
5. Component Based Software Engineering (CBSE)

It is a process that focuses on the design and development of


computer-based systems with the use of reusable software
components.
CBSE Framework Activities
Framework activities of Component Based Software Engineering are
as follows:-
Component Qualification:
This activity ensures that the system architecture define the
requirements of the components for becoming a reusable
component.Reusable components are generally identified through
the traits in their interfaces.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

It means “the services that are given, and the means by which
customers or consumers access these services ” are defined as a part
of the component interface.
Component Adaptation:
This activity ensures that the architecture defines the design
conditions for all component and identifying their modes of
connection.
In some of the cases, existing reusable components may not be
allowed to get used due to the architecture’s design rules and
conditions.
These components should adapt and meet the requirements of the
architecture or refused and replaced by other, more suitable
components.
Component Composition:
This activity ensures that the Architectural style of the system
integrates the software components and form a working system.
By identifying connection and coordination mechanisms of the
system, the architecture describes the composition of the end
product.
Component Update:
This activity ensures the updation of reusable components.
Sometimes, updates are complicated due to inclusion of third party
(the organization that developed the reusable component may be
outside the immediate control of the software engineering
organization accessing the component currently.)
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

6. TheCBSE process
 CBSE processes are software processes that support
component-based software engineering.
 They take into account the possibilities of reuse and the
different process activities involved in developing and using
reusable components.
There are two types of CBSE processes:
 CBSE for reuse is concerned with developing components or
services that will be reused in other applications.
 It usually involves generalizing existing components.
 CBSE with reuse is the process of developing new applications
using existing components and services.
 CBSE for reuse focuses on component and service development.
Components developed for a specific application usually have
to be generalised to make them reusable.
 A component is most likely to be reusable if it associated with a
stable domain abstraction (business object).
 For example, in a hospital stable domain abstractions are
associated with the fundamental purpose - nurses, patients,
treatments, etc.
Component reusability:
 Should reflect stable domain abstractions;
 Should hide state representation;
 Should be as independent as possible;
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Should publish exceptions through the component interface.


 There is a trade-off between reusability and usability. The
more general the interface, the greater the reusability but it is
then more complex and hence less usable.
 To make an existing component reusable:
 Remove application-specific methods.
 Change names to make them general.
 Add methods to broaden coverage.
 Make exception handling consistent.
 Add a configuration interface for component adaptation.
 Integrate required components to reduce dependencies.
 Existing legacy systems that fulfill a useful business function
can be re-packaged as components for reuse.
 This involves writing a wrapper component that implements
provides and requires interfaces then accesses the legacy
system.
 Although costly, this can be much less expensive than
rewriting the legacy system.

7. Domain engineering
 It's also called product line engineering, is the entire process of
reusing domain knowledge in the production of new software
systems.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It is a key concept in systematic software reuse. A key idea in


systematic software reuse is the domain.
 Most organizations work in only a few domains.
 They repeatedly build similar systems within a given domain
with variations to meet different customer needs.
 Rather than building each new system variant from scratch,
significant savings may be achieved by reusing portions of
previous systems in the domain to build new ones.
 The process of identifying domains, bounding them, and
discovering commonalities and variabilities among the systems
in the domain is called domain analysis.
 This information is captured in models that are used in the
domain implementation phase to create artifacts such as
reusable components, a domain-specific language, or
application generators that can be used to build new systems
in the domain.
 8.CBD
 Component-based development techniques consist of non-
conventional development routines, including component
evaluation, component retrieval, etc. It is important that the
CBD is carried out within a middleware infrastructure that
supports the process, for example, Enterprise Java Beans.

 The key goals of CBD are as follows:


Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Save time and money when building large and complex


systems: Developing complex software systems with the help
of off-the-shelf components helps reduce software
development time substantially. Function points or similar
techniques can be used to verify the affordability of the
existing method.

 Enhance the software quality: The component quality is the


key factor behind the enhancement of software quality.

 Detect defects within the systems: The CBD strategy supports


fault detection by testing the components; however, finding the
source of defects is challenging in CBD.
 Some advantages of CBD include:

 Minimized delivery:
 Search in component catalogs
 Recycling of pre-fabricated components

 Improved efficiency:
 Developers concentrate on application development

 Improved quality:
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Component developers can permit additional time to ensure


quality

 Minimized expenditures
 The specific routines of CBD are:

 Component development
 Component publishing
 Component lookup as well as retrieval
 Component analysis
 Component assembly

9. Classifying And Retrieving Components


 Consider a large university library.
 Tens of thousands of books, periodicals, and other information
resources are available for use.
 But to access these resources, a categorization scheme must be
developed.
 To navigate this large volume of information, librarians have
defined a classification scheme that includes a Library of
Congress classification code, keywords, author names, and
other index entries. All enable the user to find the needed
resource quickly and easily.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 Now, consider a large component repository.


 Tens of thousands of reusable software components reside in it.
But how does a software engineer find the one she needs?
 To answer this question, another question arises: How do we
describe software components in unambiguous, classifiable
terms? These are difficult questions, and no definitive answer
has yet been developed.
 In this section we explore current directions that will enable
future software engineers to navigate reuse libraries.
Describing Reusable Components
 A reusable software component can be described in many
ways, but an ideal description encompasses what Tracz has
called the 3C model—concept, content, and context.

 The concept of a software component is “a description of what


the component does” .
 The interface to the component is fully described and the
semantics— represented within the context of pre- and
postconditions—are identified.
 The concept should communicate the intent of the component.
 The content of a component describes how the concept is
realized.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 In essence, the content is information that is hidden from


casual users and need be known only to those who intend to
modify or test the component.

 The context places a reusable software component within its


domain of applicability.
 That is, by specifying conceptual, operational, and
implementation features, the context enables a software
engineer to find the appropriate component to meet
application requirements.

 To be of use in a pragmatic setting, concept, content, and


context must be translated into a concrete specification
scheme.
 Dozens of papers and articles have been written about
classification schemes for reusable software components .
 The methods proposed can be categorized into three major
areas: library and information science methods, artificial
intelligence methods, and hypertext systems.
 The vast majority of work done to date suggests the use of
library science methods for component classification.

 Figure presents a taxonomy of library science indexing


methods. Controlled indexing vocabularies limit the terms or
syntax that can be used to classify an object (component).
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

Uncontrolled indexing vocabularies place no restrictions on


the nature of the description. The majority of classification
schemes
10.Economics of CBSE
 Component-based software engineering has an intuitive appeal.
 In theory, it should provide a software organization with
advantages in quality and timeliness.
 And these should translate into cost savings. But are there hard
data that support our intuition?
 To answer this question we must first understand what
actually can be reused in a software engineering context and
then what the costs associated with reuse really are.
 As a consequence, it is possible to develop a cost/benefit
analysis for component reuse.
 Impact on Quality, Productivity, and Cost
 Considerable evidence from industry case studies indicates
substantial business benefits can be derived from aggressive
software reuse.
 Product quality, development productivity, and overall cost are
all improved.

 Quality. In an ideal setting, a software component that is


developed for reuse would be verified to be correct and would
contain no defects.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 In reality, formal verification is not carried out routinely, and


defects can and do occur. However, with each reuse, defects
are found and eliminated, and a component’s quality improves
as a result. Over time, the component becomes virtually defect
free.

 In a study conducted at Hewlett Packard, Lim [LIM94] reports


that the defect rate for reused code is 0.9 defects per KLOC,
while the rate for newly developed software is 4.1 defects per
KLOC.
 For an application that was composed of 68 percent reused
code, the defect rate was 2.0 defects per KLOC—a 51 percent
improvement from the expected rate, had the application been
developed without reuse.
 Henry and Faller report a 35 percent improvement in quality.
Although anecdotal reports span a reasonably wide spectrum
of quality improvement percentages, it is fair to state that
reuse provides a nontrivial benefit in terms of the quality and
reliability for delivered software.

 Productivity. When reusable components are applied


throughout the software process, less time is spent creating the
plans, models, documents, code, and data that are required to
create a deliverable system.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

 It follows that the same level of functionality is delivered to


the customer with less input effort. Hence, productivity is
improved.
 Although percentage productivity improvement reports are
notoriously difficult to interpret, it appears that 30 to 50
percent reuse can result in productivity improvements in the
25–40 percent range.

 Cost. The net cost savings for reuse are estimated by projecting
the cost of the project if it were developed from scratch, Cs, and
then subtracting the sum of the costs associated with reuse, Cr,
and the actual cost of the software as delivered,
 Cd. Cs can be determined by applying one or more of the
estimation techniques The costs associated with reuse, Cr,
include

• Domain analysis and modeling.


• Domain architecture development.
• Increased documentation to facilitate reuse.
• Support and enhancement of reuse components.
• Royalties and licenses for externally acquired
components.
• Creation or acquisition and operation of a reuse
repository.
Bachelor of Engineering (Computer Science & Engineering)
Course Code: CS107 Course Name: Object Oriented Software Engineering

• Training of personnel in design and construction for


reuse.

 Although costs associated with domain analysis and the


operation of a reuse repository can be substantial, many of the
other costs noted here address issues that are part of good
software engineering practice, whether or not reuse is a
priority.

You might also like