You are on page 1of 1

LEGEND:

S.NO SYMBOL TYPE AREA


TILE FLOORING RECEPTION/ WAITING AREA/
F-01 1200 X 600 AS/APP. PHARMACY
WOODEN FINISH VINYL OPD/ CMO/ USG ROOM/
F-02 AS/APP. ATRIUM
F-02 F-02
WOODEN WOODEN F-02 TILE FLOORING TOILETS
F-03 600 X 600 AS/APP.
FINISH FINISH WOODEN
VINYL VINYL FINISH GRANITE FLOORING
OPD-2 VINYL OPD-3 F-04 STAIRCASE
4210 X 2950 AS/APP.
4485 X 2950 USG-1
OPD -1 F-02 3715 X 3920 GRANITE FLOOR JAMB
F-02
3000 X 4265 WOODEN WOODEN AS/APP.
FINISH FINISH
VINYL ALUMINUM TRANSITION
EXHAUST AIR

VINYL
SHAFT FOR

F-02 AS/APP.
SMOKE

F-02 WOODEN
WOODEN FINISH
F-01 BALCONY

1200
FINISH F-01 VINYL
VINYL TILE TILE LEGEND:
FLOORING FLOORING
SHAFT SYMBOL DESCRIPTION AREA

GOOD FOR CONSTRUCTION


SHAFT FOR MRI
QUENCH PIPESHAFT FOR

75 MM HIGH ANODIZED ATRIUM, RECEPTION & WAITING


F-02 ALUMINIUM SKIRTING OPD, CMO ROOM, USG ROOM
SHAFT WOODEN 75 MM HIGH COVED VINYL
FINISH F-02 SKIRTING MATCHING WITH OPD, CMO ROOM, USG ROOM NOTES:-

2800
VINYL WOODEN F-02 VINYL FLOORING
BASEMENT

CMO ROOM
FRESH AIR

SHAFT FINISH USG-2 WOODEN 1. All Dimensions are in MM.


4485 X 2905 VINYL 3025 X 3275
F-02 FINISH *NOTE- NO SKIRTING ON AREAS WITH WALL TILES unless mentioned otherwise.
WOODEN VINYL 2. No Dimensions to be scaled out.
FINISH
F-02 PRIVATE LIFT 3. Written Dimensions to be followed.
VINYL
WOODEN 2400 X 1500
1500 2800 1500 FINISH 4. Contractor should read/check all

935
VINYL the drawings before starting the
1200 NICHE construction work.
5. Any discripancy if observed may be

L.V SHAFT
600

F-01 F-01 F-04 brought to the notice of the


MGPS
F-01
TILE TILE GRANITE
SHAFT FLOORING Architect.
TILE FLOORING FLOORING
UP
FRESH AIR DUCT

FLOORING 6. The Drawing is the copyright of the


SHAFT FOR

SHAFT W-2000 Architect and must not be used for


T-300 other purposes.
R-153/143
PHARMACY RECEPTION AND
3200 X 5535
WAITING AREA PROPOSED RAIDENT HOSPITAL AT GREATER
DN NOIDA, U.P
F-01
F-01 F-01 F-04
UP F-04
TILE TILE GRANITE
TILE FLOORING FLOORING FLOORING
GRANITE DR. HARPREET SINGH KOCHER & DR. RACHANA GAR
FLOORING FLOORING

1200 F-01 NICHE


1200 TILE ELEC.
600

STARTING
POINT FLOORING
600

6570
ardent architects
930

F-02

2370
F-01 F-02
F-01 WOODEN WOODEN where imagination leads to creativity
TILE F-01
600

FLOORING TILE FINISH FINISH


FLOORING TILE VINYL C: 0120-4148204
FLOORING VINYL
1200 EMAIL :projects@ardentarchitects.in
11

A : C-29, FIRST FLOOR, SECTOR-6, NOIDA


10

5845
600

1200
STARTING
600

POINT
600
F-03 F-04
GRANITE
F-01 ATRIUM
TILE TILE
FLOORING FLOORING
F-01 FLOORING (TRIPLE HT.) F-01
MALE TOILET UP TILE WAITING AREA TILE
3670 X 2476 FLOORING 7770 X 7770 FLOORING
600

F-03
TILE STARTING
POINT 1200
FLOORING
600
600

F-04
F-03 GRANITE F-01
TILE FLOORING TILE
FLOORING UP PUBLIC FLOORING
600

FEMALE TOILET 1200


3740 X 2415 LIFT STARTING
POINT

DN
FHC

F-04 W-2000
F-03 T-300
GRANITE R-153/143
TILE FLOORING
FLOORING

FLOORING LAYOUT
(GROUND FLOOR)

You might also like