Professional Documents
Culture Documents
F-02
SHAFT FOR
SHAFT ENT-2
WOODEN
FINISH
5255 X 7425 600
STARTING
FLOORING ALUMINUM TRANSITION
AS/APP. GOOD FOR CONSTRUCTION
600
SHAFT FOR MRI
POINT
F-02
QUENCH PIPE
600
FLOORING 75 MM HIGH ANODIZED
FLOORING ALUMINIUM SKIRTING
ENT ROOMS, DIRECTOR'S ROOM, 3. Written Dimensions to be followed.
F-02 STARTING VERTIGO, AUDIOMETRY
POINT
WOODEN PRIVATE LIFT 50 MM HIGH SKIRTING 4. Contractor should read/check all
1200 DIRECTOR'S ROOM
FINISH 2400 X 1500 MATCHING WITH WOODEN the drawings before starting the
VINYL 1200 FLOORING
construction work.
75 MM HIGH COVED VINYL
VERTIGO
600
LV. SHAFT
*NOTE- NO SKIRTING ON AREAS WITH WALL TILES Architect.
MGPS F-06
SHAFT 6. The Drawing is the copyright of the
GRANITE
Architect and must not be used for
UP
FRESH AIR DUCT
FLOORING W-2000
SHAFT FOR
F-07
PROPOSED RAIDENT HOSPITAL AT GREATER
CARPET RECEPTION / NOIDA, U.P
ROLL BILLING COUNTER
F-07 NICHE
CARPET
ROLL
ELEC.
F-01 F-01 ardent architects
TILE TILE where imagination leads to creativity
F-06
STARTING
POINT
GRANITE
F-05 F-01 FLOORING
600
TILE
TILE
FLOORING
FLOORING
F-06
GRANITE DN F-01 ATRIUM
FLOORING TILE 7770 X 7770
MALE TOILET
UP FLOORING
2475 X 3670
600
F-05
STARTING
TILE POINT
FLOORING
600
F-05 F-05
TILE
TILE
FLOORING
FLOORING W-2000 PUBLIC
T-300
FEMALE TOILET R-153/143 LIFT
FHC
F-06
3740 X 2415
GRANITE
FLOORING
F-05
TILE
FLOORING FLOORING LAYOUT
(FIRST FLOOR)