CAPPING BEAM - B5

40Ø
CAPPING BEAM - B5
GROUND LVL.
CAPPING BEAM - B5
GROUND LVL.
G.L.
01 REINFORCEMENT SCHEDULE(SECANT PILE)
2.905 2.905 02

MATERIAL
WALER BEAM REFER
SEPARATE DRAWING FOR

FILL

300
WL - 1 ANCHOR LVL. DETAILS 12Ø 4 NOS LIFTING HOOK
1.705 Ø32 BOTTOM
WELDED TO MAIN 01 16Ø-20 NOS
REINFORCEMENT
WALER - 1 REINFORCEMENT
800 DIA. RCC
(M25) PILE (TYP.) 02 10Ø 140C/C SPIRAL
20Ø 4 NOS STIFFENING RING
AL1

SOIL
800 AT 1.8m c/c

(M10) PILE (TYP.)


SECTION B-B
WL - 2
-1.095 (SCALE 1:25)
01

GRADE - IV ROCK
WALER - 2 ANCHOR / ROCK BOLTS SCHEDULE
AL2
WL - 3 02
-3.095
AL1 2600 C/C 1200 MM FROM G.L ANCHOR 15 M 452 KN 30° 10 5
WALER - 3
RL1
AL2 2600 C/C 4000 MM FROM G.L ANCHOR 12 M 596 KN 30° 8 4

GRADE - III ROCK


WL - 4
-4.595
RL1 ~ RL2 2600 C/C 1500 C/C SN (32 mm Ø) 6M 165/181 KN 20° - -
RL2 WALER - 4
RL3 ~ RL7 2000 C/C 2000 C/C SN (25 mm Ø) 6M < 120 KN 12° - 15° - -
LEDGE LEVEL
-6.095
* FIX LENGTH OF ANCHOR TO BE VERIFIED AS PER ANCHOR TEST RESULT

SOIL / ROCK SIDE

EXCAVATION SIDE
PILE TOE LVL.
-7.095 SHOTCRETE (dS = 100 MM)
WITH 1 LAYER WIRE MESH (150x150x4) IN
GRADE - III ROCK.
REINFORCEMENT SCHEDULE(CAPPING BEAM)
RL3
DRAINAGE HOLE
01
LENGTH
= 6m 02
04 16Ø-6NOS
RL4
Ø32 BOTTOM 05 16Ø-6 NOS
REINFORCEMENT
GRADE - I & II ROCK 06 16Ø-2 NOS FACE BAR
20
800 07 10Ø 300C/C 4LEGGED STIRRUPS
RL5 1
DRAINAGE HOLE
SECTION C-C
LENGTH SHOTCRETE (dS = 75 MM) (SCALE 1:25)
= 6m
WITH 1 LAYER WIRE MESH (150x150x4) IN
GRADE - I TO GRADE - II ROCK.
RL6
MAIN REINFORCEMENT
800

04

(TYP.)
75
RL7

EXCAVATION LVL. EXCAVATION LVL. R50

100
800
-16.99

06

06
-16.99

07
DEVELOPED VIEW OF SECANT PILES

(TYP.)
TYPICAL CROSS SECTION OF SECANT PILES (PRIMARY PILE)

75
WITH ANCHOR - BOLT ARRANGEMENT
(SCALE 1:75) WITH EXCAVATION (BOLTING ARRANGEMENT) 05
(SCALE 1:75) 8mm THK. BUTT WELD

REINFORCEMENT DETAIL
OF CAPPING BEAM - B5 TYPICAL WELDING DETAIL
NOTES :- (VARIES)
(SCALE 1:20) OF LIFTING HOOK
(SCALE 1:5)
* APPROVED VIA DSR NUMBER :
LEGEND: SECTION - A-A (RC PILE) UGC05-GCC-DEC-000092-R03 DATED 28/08/2018
(SCALE 1:30)

COLABA
KEY PLAN SEEPZ
A3
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
REFERENCE DRAWING :-

AL

W - 100
W - 102
W - 104
W - 106
W - 108
W - 110
W - 112
W - 114
W - 116
RL

W - 099
W - 101
W - 103
W - 105
W - 107
W - 109
W - 111
W - 113
W - 115
A

PILE TERMINATION CRITERIA: G

N
·

JKC-CAC-SVN-4206-001 UGC05-GCC-DEC-000092- CONSTRUCTION REFERENCE DRAWING


/ GOOD FOR CONSTRUCTION
REFERENCE DRAWINGS General Consultant (GC) : Detailed Design Consultant : Contractor :
(DDC, ARCHITECTURAL, MEP) MUMBAI METRO RAIL CORPORATION LTD.
VIDYANAGARI STATION SECANT PILE LAYOUT & EXPENDED NaMTTRI Building, Plot No. R-13, 'E'- Block,
UGC05-CAC-SVN-4207-001 ELEVATION VIEW AT (GRID 1 TO 6) & PILE NO. W - 045 TO W - 116 OMIKRON KAPPA - PSP - INDUS CONSULTRANS JV Bandra Kurla Complex, Bandra (East), Mumbai 400051.
A JOINT VENTURE OF
OMIKRON KAPPA CONSULTING S. A (GREECE), PSP CONSULTING ENGINEERS GMBH Drawing Title :
NOTIFICATION : (GERMANY) & INDUS CONSULTRANS PVT. LTD. (INDIA)
ARCHITECTURAL DESIGN - FOUNTAINHEAD
A B C VIDYANAGARI STATION
Project Title :
As noted in the DSR No. _________________
SECANT PILE DETAILS AT GRID 5 TO 6 (PILE NO. W-099
MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ)
dated ________ A3 30-08-2018 A.N REVISED AS PER GC COMMENTS G.G P.M B.M.G
CONTRACT UGC-05 TO W-116) WEST SIDE
A : Objection. A complete resubmission is required. A2 02-07-2018 A.N REVISED AS PER GC COMMENTS G.G P.M B.M.G DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AT
JKIL-CRTG JV
B : No Objection with comments. DHARAVI, B.K.C., VIDYANAGRI AND SANTACRUZ & MID VENTILATION Rev. Drg. Status
A1 19-05-2017 D.D REVISED AS PER LDC COMMENTS G.G P.M B.M.G Drawing No. :
C : Notice of No objection. SHAFT AT AGREEPADA HUTMENT AND ASSOCIATED TUNNELS
Discipline Contractor Address :
UGC05-CAC-SVN-4206-001 A3 C
Assessor Engineer A0 01-05-2017 D.D INITIAL DRAWING G.G P.M B.M.G Designed : G.G Checked : P.M Approved : B.M.G
Leader P-Preliminary, D-Definitive, C-Construction Reference, W-Working Drawing, B-As Built
Rev. Date Drawn Description Designed Checked Approved Scale : AS SHOWN Drawn : D.D Date : 19-05-2017 CAD File Name : UGC05-CAC-SVN-4206-001_A3.DWG A1