CL
300
LL
SSL 52.060 RWO
FA
SSL 52.400 SSL 52.310
230
230
230
SSL 52.210 SSL 52.110 SSL 52.010
4200 (COLUMN)
LINE OF HTH L00
FA
LL UNDERSIDE OF HTH BEAM SSL 52.400
PED. PAVING WALKWAY CANOPY STEEL SUPPORT COLUMNS SLAB ABOVE
OVER RL 55.600 PBO CL CL CL CL
SSL 52.040 3050 5000 2150 2850 5000 2350 1:70
SSL 50.950 1:1 LL
5 FA 230 FFL 52.000
1:
3750
FFL 52.930
1:
FFL 52.100
22
CL
CL
CL
CL
22
DP DP SSL 51.920
1595
1595
1595
PE SSL 51.850
1595
LP
VERTICAL D. FFL/ TOH 52.380 SSL 52.020 RWO
80
80
80
230
RA
CLEARANCE MP
UP
110
110
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
SSL 52.470
110
4650
30.55
0
N FFL 52.380
130
0
TOW 53.450 FFL/ TOK 52.540
25
300WX150H CONC. KERB
6050
1:6
30
1:3 LINE OF OSD TANK
20
2560 3490 1050 1970 6540 640 DASHED LINES INDICATE 650
5
52.
52.
ED CANOPY OVER RETAINING WALL BELOW
SHOWN DASHED
FFL
FFL
BOL
FFL 52.230 FFL 52.400 FFL 52.380 FFL 52.300 FFL 52.200 FFL 52.100 SW GRANTED PIT, RLs
FFL 51.955 110 80
2.10
FFL/ SSL 52.095 1 :1 TOW 51.445 FFL 52.950
3 TOW 51.830 TOW 51.890 TOW 51.870 TOW 51.790 TOW 51.690 TOW 51.595 BOL
FFL 5
SSL 51.840
3860
3860
1:74
TOW 51.440
110
LINE OF OSD TANK MIN 400 RC SW
BOL
260
RETAINING WALLS
FFL 52.400 BELOW SHOWN DASHED BOL
O 1 :1 500
590
SSL 52.290 00 LP LP LP
1500
TOW 51.890 HOB RL'S TO BE PAVING TO VEHICLE DRIVEWAY AND FFL 52.915
150MM ABOVE SSL PARKING 80MM+30MM BEDDING
CL
FFL/ SSL 52.095 SSL 51.807
3290
BOL
TOW 51.405
2700
PLANTER
30
TOP OF PLANTER RL TO BE
52.
LP 100MM ABOVE TOP OF KERB DASHED LINE OF OSD TANK BELOW FFL 51.900
4980 1070 1440 3800 4500 1140
F FL
SSL 51.829
110 BOL
FFL 51.900
FFL 52.387 FFL 52.305 FFL 52.205 FFL 52.110 FFL 52.005 FFL 52.910
SSL 52.277 PBO 52 .00 260 PBO SSL 51.791 110 80
SSL 52.195 SSL 52.095 SSL 52.000 FFL SSL 51.895 SSL 51.800
TOW 51.877 TOW 51.795 TOW 51.695 TOW 51.600 TOW 51.495 TOW 51.400
TOW 53.650 300 300 4600
TOK 52.550 BOL
.20
BOL
CONFIGURATION.