You are on page 1of 1

C AXIS PARALLEL TO

CANTILEVER ARM
SITE LOCATION

45°
B D

PROPERTY LINE

5780 AXIS PARALLEL 8-51 DIA. ANCHOR


TO CURB BOLTS ON 700
A BOLT CIRCLE

5900
DIAMETER (BCD)

U
NI
P EM

V
PROPOSED

ER
CONCRETE PILE

SI
BINA

TY
C

C
R
45°

ES
10 THICK x790 DIA. 8-54 DIA. HOLES

HWY

C
ASSEMBLY PLATE ON 700 BCD

EN
T
B D
R3
05

R3
CL CL A

95
OF OF
SIGN PLATE & LANE PILE AND SHAFT

10120
C
2590 7530
N PILE CONSTRUCTION NOTES:
400 L EA
C
12-25M VERT. BARS 7 5 O V ER 1. REINFORCING STEEL
BRACKET I.D. (TYP.) DODECAGONAL ARM C
-CSA G30.18 GR. 400W
500 A/F TO 200 A/F -VERTICAL BARS FULL LENGTH OF PILE
-HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A767
B D
B1

B2

B3

B4

2. ANCHOR BOLT
1219 DIA. CONCRETE -ASTM F1554 GR.55 (380 MPa)
PILE FOUNDATION -8-51 DIA. ANCHOR BOLTS 2.0m LONG
20M TIES - EACH BOLT C/W 4 NUTS AND 2 PLATE WASHERS (SEE PLATE WASHER DETAIL FOR MK. 14)

ARM
4380x2170

OF
CL
SIGN PANEL 8-51 DIA. ANCHOR BOLTS - TOP 300 THREADED UNC CLASS 2A
2000 LONG C/W 4 NUTS & 2 - BOTTOM 100 THREADED UNC CLASS 2A
A
WASHERS - HOT DIP GALVANIZED FULL LENGTH, IN ACCORDANCE WITH ASTM A153 CLASS C

38 PROJECTION ABOVE
- B.C.D. = BOLT CIRCLE DIAMETER TO CENTRE OF BOLT GROUP

TOP NUT (MINIMUM)


DODECAGONAL

240 BOLT PROJECTION


92

- ANCHOR BOLTS SHALL BE ALIGNED WITH TEMPORARY STEEL TEMPLATES. PLACEMENT


SHAFT 500 A/F
°

OF ANCHOR BOLTS AND CONCRETE WITHOUT THE TEMPLATES WILL NOT BE PERMITTED.

ABOVE PILE
- CONTRACTOR SHALL REMOVE THE TOP ANCHOR BOLT SETTING TEMPLATE, NUTS AND
FORM, FOLLOWING A MINIMUM 24 HOUR CONCRETE CURING PERIOD.
CL - FOLLOWING INSTALLATION OF THE STEEL STRUCTURE, TIGHTEN THE LOWER LEVELING
OF ANCHOR BOLT ASSEMBLY TEMPLATE
(10 THICK) TO BE REMOVED PRIOR TO NUTS AND UPPER ANCHOR NUTS TO A SNUG-TIGHT CONDITION, FOLLOWED BY 31 NUT
CONC. PILE ROTATION (+20°/-0°) OF THE UPPER ANCHOR NUTS.
ERECTION OF THE SIGN STRUCTURE

5963
- ANCHOR BOLTS SHALL BE TIGHTENED USING A STAR PATTERN TIGHTENING SEQUENCE.
5300 MIN.

TOP OF PILE 25 CHAMFER (TYP.)


1
EL. 232.900
GROUND SURFACE 5 8
TOP OF GROUND
EL. 232.825 3 4
8-51 DIA. ANCHOR

75
BOLTS ON 700 BCD
7 6
TOP OF ROADWAY 2

15M TIES @ 200 O.C. FULL 3. FORM TOP OF PILE WITH A TUBULAR FORM (SONOTUBE):
2% LENGTH OF ANCHOR BOLTS -1m FOR DRILLED SHAFTS
-1.5m FOR HYDRO-EXCAVATED SHAFTS
±75

3350 3500 5780


75

4. CONCRETE MIX DESIGN


9000 PILE LENGTH

LANE LANE
1219 DIA. CONCRETE PILE
NOTE: FOUNDATION PROPORTIONING OF FINE AGGREGATE, COARSE AGGREGATE, CEMENT, WATER, AND AIR
ELEVATIONS SHOWN ARE APPROXIMATE. ENTRAINING AGENT SHALL BE SUCH AS YIELD CONCRETE HAVING THE REQUIRED STRENGTH
1219 DIA. CONCRETE 12-25M VERTICAL BARS AND WORKABILITY AS FOLLOWS:
CONTRACTOR SHALL VERIFY ALL
ELEVATIONS PRIOR TO INSTALLATION OF PILE FOUNDATION 8-51 DIA. GALV. ANCHOR BOLTS i) CLASS OF EXPOSURE: S-1, C-1
CONCRETE PILE FOUNDATION. C/W 4 NUTS & 2 PLATE WASHERS ii) MINIMUM COMPRESSIVE STRENGTH AT 56 DAYS = 35 MPa
(SEE DETAIL) iii) MAXIMUM WATER/CEMENT RATIO = 0.40
ANCHOR BOLT ASSEMBLY iv) AIR CONTENT: CATEGORY 2 PER TABLE 4 OF CSA A23.1-14 (4-7%)
TEMPLATE (10 THICK) v) CEMENT IN ACCORDANCE WITH CSA A23.1-14
CL
1
2"- 18F STAINLESS STEEL RODENT SCREEN OF
FASTENED WITH SELF- TAPPING WARNING:
PILE AND SHAFT
SCREWS. SEE SPECIFICATION FOR DETAILS. 20M TIES @ 300 O.C. BELOW
IF POWER EQUIPMENT OR EXPLOSIVES ARE TO BE USED FOR EXCAVATION ON
ANCHOR BOLTS
THIS PROJECT THE CONTRACTOR MUST:
MAX
C:\USERS\CAMERONKJ\ONEDRIVE - AECOM\DESKTOP\WORK\60648764 SIGN\60648764 CS-01.DWG

38

#8-21" LONG SS SELF-TAPPING SCREW C/W 75 CLEAR COVER ON TIES


1. NOTIFY THE GAS COMPANY OF THE PROPOSED LOCATION OF EXCAVATION.
SS WASHER AT 200 O/C, FULL
2. TAKE PRECAUTION TO AVOID DAMAGE TO GAS COMPANY INSTALLATIONS
CIRCUMFERENCE OF BASE PLATE
SEE PROVINCIAL REGULATION 210/72 FOR DETAILS
#8-5/8" LONG SS SELF-TAPPING SCREW C/W 3. OBTAIN EXCAVATION PERMITS PRIOR TO CONSTRUCTION.
SS NUT, 2 FLAT SS WASHERS, 1% 1%
AND SS LOCK WASHER AT BOTTOM
OF RODENT SCREEN SPLICE LAP
MAX
38

CC FT 2022 REGIONAL STREET RENEWAL PROGRAM S-797-22-01


UNIVERSITY CRESCENT FROM
KC EBL THATCHER DRIVE TO PEMBINA HIGHWAY 10 11
Certificate of Authorization
AECOM Canada Ltd. AS S797 NB UNIVERSITY CR NORTH OF WEDGEWOOD DR
NOTED
OVERHEAD SIGN SUPPORT STRUCTURE
No. 4671 Date:_____________
CS-01 PLAN, SECTION AND DETAILS
2022-05-26