You are on page 1of 1

.400 3.600 .400 3.600 .400 3.600 .400 3.600 .400 3.600 .400 3.

600
.800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800 C-160 CLIMBING PLATFORM
HT20 - 3.60m HT20 - 3.60m HT20 - 3.60m HT20 - 3.60m HT20 - 3.60m HT20 - 3.60m
HT20 - 3.60m
m 06.3 - 02TH m 06.3 - 02TH HT20 - 3.60m m 06.3 - 02TH HT20 - 3.60m m 06.3 - 02TH HT20 - 3.60m m 06.3 - 02TH HT20 - 3.60m m 06. 3 - 02TH HT20 - 3.60m m54. 2 - 02TH
1.200 1.502 2.000 1.498 1.502
2.000 1.498
2.000 1.502 2.000 1.498 1.502
2.000 1.498
2.000 1.502 2.000 1.498 1.502
2.000 1.498
2.000 1.502 2.000 1.498 1.502
2.000 .800
REINFORCEMENT
(BY CLIENT)

HT20 - 3.60m
PROP
MF BEAM

HT20 - 3.60m
18 THK PLY
(BY CLIENT)

HT20 - 3.60m
m54.2 - 0 2TH
HT20 - 3.60m
HT20 - 3.60m
1.200
.750 1.502 2.000 1.498 2.000
1.502 2.000
1.498 1.502 2.000 1.498 2.000
1.502 2.000
1.498 1.502 2.000 1.498 2.000
1.502 2.000
1.498 1.502 2.000 1.498 2.000
1.502 .800
.748

HT20 - 3.60m
HT20 - 3.60m
m 06.3 - 02TH HT20 - 3.60m m0 6. 3 - 02TH HT20 - 3.60m m06.3 - 0 2TH HT20 - 3.60m m 06.3 - 02TH HT20 - 3.60m m0 6. 3 - 0 2TH HT20 - 3.60m m06.3 - 02TH HT20 - 2.45m
m 06.3 - 02TH m0 6. 3 - 02TH m06.3 - 0 2TH m 06.3 - 02TH m0 6. 3 - 0 2TH m06.3 - 02TH
.800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800 .800 2.000 .800
.400 3.600 .400 3.600 .400 3.600 .400 3.600 .400 3.600 .400 3.600
PLAN VIEW (C 160 & PROP SPACING)
REFERENCE DRAWINGS CLIENT : J. Kumar Infraprojects Pvt. Ltd. General Consultant (GC) : Detailed Design Consultant : Contractor :
(DDC, ARCHITECTURAL, MEP) MUMBAI METRO RAIL CORPORATION LTD.
PROJECT :Mumbai Metro Project NaMTTRI Building, Plot No. R-13, 'E'- Block,
Vidyanagari Station OMIKRON KAPPA - PSP - INDUS CONSULTRANS JV Bandra Kurla Complex, Bandra (East), Mumbai
A JOINT VENTURE OF 400051.
REF. 8IN198C2.4-5
OMIKRON KAPPA CONSULTING S. A (GREECE), PSP CONSULTING ENGINEERS GMBH Drawing Title :
NOTIFICATION : (GERMANY) & INDUS CONSULTRANS PVT. LTD. (INDIA)
ARCHITECTURAL DESIGN - FOUNTAINHEAD
VIDYANAGRI STATION
A B C MEP DESIGN – INTERCONTINENTAL CONSULTANTS & TECHNOCRATS PVT LTD.
Project Title :
ROOF LEVEL SLAB
As noted in the DSR No. _________________ MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ)
dated ________ CONTRACT UGC-05 FORMWORK ARRANGEMENT ROOF LEVEL SLAB
FORMWORK SOLUTIONS
www.alsina.com A : Objection. A complete resubmission is required. DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AT JKIL-CRTG JV
B : No Objection with comments. DHARAVI, B.K.C., VIDYANAGRI AND SANTACRUZ & MID VENTILATION Rev. Drg. Status
Drawing No. :
TERMS & CONDITIONS C : Notice of No objection. SHAFT AT AGREEPADA HUTMENT AND ASSOCIATED TUNNELS UGC05-SHT-SVN-8000-005
Generic drawing. Valid only after approval of general contractor's project manager/safety director.
Discipline Contractor Address :
Prior to start, application and safety guides will be provided by Alsina Forms co. If not, please Assessor Engineer Designed : Checked : Approved :
contact your sales rep. immediately. Leader P-Preliminary, D-Definitive, C-Construction Reference, W-Working Drawing, B-As Built
Rev. Date Drawn Description Designed Checked Approved Alsina Forms will not be held responsible for improper equipment use since Alsina Forms is only a Scale : Drawn : Date :
supplier. CAD File Name : A1

You might also like