You are on page 1of 1

5,300 5,300

CL
20° 20°
500 500

1,000

1,000
2,600

2,600
5,000

5,000
1,900 1,900
20° 20°

1,400

1,400
CONDUCTOR CROSSARM
(FOR TOWER TYPE CC4) 30°

1,800

1,800
1,030
1,030 20
°

3,600

3,600
15,000

15,000
5,000

5,000
1,430

1,430
DD 30° INDEX SHEET
1,400

1,400
CL
30°
3,600

3,600
12
13
5,000

5,000
7 8 9 10 11
30° 4 5 6
3
1 2
1,400

1,400
30°

2,400 4,500 4,500 2,400


9,000
9,000 9,000
LEGENDA
36,000

36,000
To Line DDR
0.0
Index Contour, Jembatan
CL 2.5
2.5m Major, 0.5m Minor

Benchmark
Sungai

Control Point Aliran

Jalan Propinsi
Bore Hole
45° Jalan Petani

Saluran
Slackspan 45° SUTT Tower
21,000

21,000
Batas Pemilik Lahan
Slackspan
CR 01 Cross Section Sungai
4,500 4,500 Rumah / Kampung

9,000

To Substation

SKALA
- 6.000 CONDUCTOR CROSSARM - 6.000
(FOR TOWER TYPE DD4/DDR4 AND DD7/DDR7)

- 3.000 - 3.000

± 0.000 ± 0.000 REV. No. KETERANGAN DIGAMBAR DIPERIKSA DISETUJUI


PEMILIK :

PT. ENERGI TOBA PRIMA


ALAMANDA TOWER, Lantai 22D
ENERGI TOBA PRIMA
JL. TB. Simatupang Kav.23-24, Cilandak Barat, Jakarta Selatan
Telp. (021) 29661957, Fax : (021)29661993
+ 3.000 + 3.000
KONSULTAN :

WIRATMAN
POWER
Graha Simatupang Tower II Blok A & D Jl T.B Simatupang Kav. 38, Jakarta 12540
+ 0.000 Phone : +62 021-78840421- , Fax : +62 021-7829337
+ 6.000 + 6.000
PROYEK :
+ 1.000
STUDI PENYAMBUNGAN PLTA KUALU 2x10.5 MW
+ 2.000 Desa Lumban Rau Tengah dan Desa Lumban Rau Utara, Kec. Nassau,
Kabupaten Toba Samosir, Propinsi Sumatra Utara
+ 9.000 10,000 + 3.000 + 9.000 10,000
JUDUL GAMBAR :
+ 4.000
150kV TRANSMISSION LINE
+ 5.000
TOWER TYPE CC4
TOWER TYPE DD4/DDR4 AND DD7/DDR7 TOWERS, STANDARD DESIGN (2/2)
+ 6.000

DIGAMBAR TANGGAL SKALA


LOWEST PANEL OF TOWER AND 0 5 10m DIPERIKSA
LEG EXTENSIONS DISETUJUI REV. NO. NO. LEMBAR
1:100 (A1)
1:200 (A3) GAMBAR NO.

You might also like