You are on page 1of 1

12.000 D3 6.

000 D3
0.320
3.680
0.320
4.000 W1
4.000
3.000 3.000

0.980 2.050
0.800 Keys

1.100

1.500

1.500
2.200 2.200 2.200 1.250

D1

2.180
Fluorescent
Lamp

D3 D3 D3 D3

1.200
SLOPE

Fluorescent Lamp

5.000
Fluorescent

0.200

3.500
Lamp

1.000
2.000

RAMP
W1

8.000
2.500 Fluorescent
Lamp

2.000

2.000
Fan Switch

1.300
2.723

D1
1.500

Inlet from Control Board


3-phase

Fluorescent
Lamp Ceilling Fan
1.500

H.L.W H.L.W H.L.W H.L.W

1.500 1.500 1.500 1.500 Control Board 3-phase


Receiving Area RAMP
Electrical Plan
Toilets Outlet from Control Board
GSPublisherEngine 0.4.100.100

3.000
Electrical5.000Plan Intlet from Control Board
GSPublisherEngine 0.4.100.100

1.000
Inlet from Control Board
D1 2.400 Fluorescent
Lamp
2.400
Switch
3-phase
1.400

D2 W1

2.200
Outlet from Control Board Ceilling Fan
3-phase
Control Board
Socket
3.000

1.300 1.500 3-phase


Fluorescent

7.000

7.000
Fluorescent
Lamp Lamp

W1

2.200
1.400

Ceilling Fan

W1
Fluorescent

1.400
Lamp

Gaurd 5.000

Office and Meeting Hall


Electrical Plan Electrical Plan

Drawing Name Drawing Scale GSPublisherEngine 0.4.100.100


Modified by
Electrical Plan 1:100 FISH LANDING SITE
12
4.100.100

UNIDO Fisheries Project entitled LOCATION : TEREKAKE STATE


Drawing Status upgrading the Fishery Sector in Checked by
Architectural Drawings South Sudan

GSPublisherEngine 0.3.100.100