DATOS DE ENTRADA =

Costo fijo A ($/orden) = 35000 35000 35000 35000 35000 35000


Demanda D_i(u) = 80.00 60.00 180.00 80.00 0.00 0.00
Costo de mantener ($/u*sem) = 115

VARIABLES X_ij Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6


Sem. 1 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 2 0.00 0.00 0.00 0.00 0.00
Sem. 3 0.00 0.00 0.00 0.00
Sem. 4 0.00 0.00 0.00
Sem. 5 0.00 0.00
Sem. 6 0.00
Sem. 7
Sem. 8
Sem. 9
Sem. 10
Sem. 11
Sem. 12
TOTAL = 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6
Variables binarias Y_i = 1 0 0 0 1 0
Demanda pendiente = 1140 1060 1000 820 740 740
Producto = 1140 0 0 0 740 0
CTR = 377550.00
35000 35000 35000 35000 35000 35000
180.00 130.00 10.00 110.00 80.00 230.00

Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12 TOTAL


0.00 0.00 0.00 0.00 0.00 0.00 400.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
180.00 130.00 0.00 0.00 0.00 0.00 310.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
10.00 110.00 80.00 230.00 430.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00
180.00 130.00 10.00 110.00 80.00 230.00 1140.00
Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12
0 0 1 0 0 0 0
740 560 430 420 310 230
0 0 430 0 0 0
DATOS DE ENTRADA =

Costo fijo A ($/orden) = 35000 35000 35000 35000 35000 35000


Demanda D_i(u) = 80.00 60.00 180.00 80.00 0.00 0.00
Costo de mantener ($/u*sem) = 115

VARIABLES X_ij Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6


Sem. 1 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 2 0.00 0.00 0.00 0.00 0.00
Sem. 3 0.00 0.00 0.00 0.00
Sem. 4 0.00 0.00 0.00
Sem. 5 0.00 0.00
Sem. 6 0.00
Sem. 7
Sem. 8
Sem. 9
Sem. 10
Sem. 11
Sem. 12
TOTAL = 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6
Variables binarias Y_i = 1 0 0 0 0 0
Demanda pendiente = 1140 1060 1000 820 740 740
Producto = 1140 0 0 0 0 0
CTR = 242350.00
35000 35000 35000 35000 35000 35000
180.00 130.00 10.00 110.00 80.00 230.00

Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12 TOTAL


0.00 0.00 0.00 0.00 0.00 0.00 400.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
180.00 130.00 10.00 0.00 0.00 0.00 320.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
110.00 80.00 190.00
230.00 230.00
180.00 130.00 10.00 0.00 110.00 310.00 1140.00
Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12
1 0 0 0 1 1
740 560 430 420 420 310
740 0 0 0 420 310
DATOS DE ENTRADA =

Costo fijo A ($/orden) = 35000 35000 35000 35000 35000 35000


Demanda D_i(u) = 80.00 60.00 180.00 80.00 0.00 0.00
Costo de mantener ($/u*sem) = 115

VARIABLES X_ij Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6


Sem. 1 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 2 0.00 0.00 0.00 0.00 0.00
Sem. 3 0.00 0.00 0.00 0.00
Sem. 4 0.00 0.00 0.00
Sem. 5 0.00 0.00
Sem. 6 0.00
Sem. 7
Sem. 8
Sem. 9
Sem. 10
Sem. 11
Sem. 12
TOTAL = 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6
Variables binarias Y_i = 1 0 0 0 0 0
Demanda pendiente = 1140 1060 1000 820 740 740
Producto = 1140 0 0 0 0 0
CTR = 845750.00
35000 35000 35000 35000 35000 35000
180.00 130.00 10.00 110.00 80.00 230.00

Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12 TOTAL


180.00 130.00 10.00 110.00 80.00 230.00 1140.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00
180.00 130.00 10.00 110.00 80.00 230.00 1140.00
Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12
0 0 0 0 0 0 0
740 560 430 420 310 230
0 0 0 0 0 0
DATOS DE ENTRADA =

Costo fijo A ($/orden) = 35000 35000 35000 35000 35000 35000


Demanda D_i(u) = 80.00 60.00 180.00 80.00 0.00 0.00
Costo de mantener ($/u*sem) = 115

VARIABLES X_ij Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6


Sem. 1 80.00 0.00 0.00 0.00 0.00 0.00
Sem. 2 60.00 0.00 0.00 0.00 0.00
Sem. 3 180.00 0.00 0.00 0.00
Sem. 4 80.00 0.00 0.00
Sem. 5 0.00 0.00
Sem. 6 0.00
Sem. 7
Sem. 8
Sem. 9
Sem. 10
Sem. 11
Sem. 12
TOTAL = 80.00 60.00 180.00 80.00 0.00 0.00
Sem. 1 Sem. 2 Sem. 3 Sem. 4 Sem. 5 Sem. 6
Variables binarias Y_i = 1 1 1 1 0 0
Demanda pendiente = 1140 1060 1000 820 740 740
Producto = 1140 1060 1000 820 0 0
CTR = 350000.00
35000 35000 35000 35000 35000 35000
180.00 130.00 10.00 110.00 80.00 230.00

Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12 TOTAL


0.00 0.00 0.00 0.00 0.00 0.00 80.00
0.00 0.00 0.00 0.00 0.00 0.00 60.00
0.00 0.00 0.00 0.00 0.00 0.00 180.00
0.00 0.00 0.00 0.00 0.00 0.00 80.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
180.00 0.00 0.00 0.00 0.00 0.00 180.00
130.00 0.00 0.00 0.00 0.00 130.00
10.00 0.00 0.00 0.00 10.00
110.00 0.00 0.00 110.00
80.00 0.00 80.00
230.00 230.00
180.00 130.00 10.00 110.00 80.00 230.00 1140.00
Sem. 7 Sem. 8 Sem. 9 Sem. 10 Sem. 11 Sem. 12
1 1 1 1 1 1 0
740 560 430 420 310 230
740 560 430 420 310 230