Professional Documents
Culture Documents
600
265 170 165
Musholla
175
+15
R.Apoteker Pantry B
300
±0,00 ±0,00
B
KM/WC
125
-5
R.Niaga
±0,00
800
800
A A
-15
-30
600
C
DENAH
Skala 1:50
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
Baja Ringan
105
+405 20°
+360
R.Niaga ±0
±0
-20
-40
Sloof Sloof
Urugan
-90 Pondasi A Pondasi A
600
POTONGAN A-A
Skala 1:50
+510
Atap Spandeks
Baja Ringan
105
+405 20°
50 500 50
+360
Talang Beton
D1 D2
Musholla +15
R.Apoteker ±0 Pantry ±0
±0
-20
600
POTONGAN B-B
Skala 1:50
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
+360
+250
-20
-90
±0
Balok Ring
Sloof
Balok Latei
Pondasi A
Talang Beton
Baja Ringan
R.Niaga ±330
800
R.Niaga ±0
Plafon +330
Pantry ±0
Musholla +15
Pondasi A
300
Balok Ring
Sloof
POTONGAN C-C
Skala 1:50
+510
+360
-20
-90
±0
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
TAMPAK SELATAN
Skala 1:75
TAMPAK UTARA
Skala 1:75
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
175
B
300
125
265
1.100
265
800
A A
270
600
C
PONDASI
Skala 1:50
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022
KP KP KP
175
300
KP
Balok Ring
125
KP KP
KP Balok Ring KP
265
1.100
KP KP
265
800
KP KP
270
K-30/30 K-30/30
600
BALOK DAN KOLOM
Skala 1:50
F4
Project Location : Drawing Status : Date :
SUMBERJO, KEDIRI SHOP DRAWING 14/08/2022