Planning, Designing, and Implementing

of Enhanced Network Infrastructure for Datacentric


Corporation through Network Simulation Facility

STI college Global city

In partial fulfillment of requirement in Data and

Communication for the degree of BSIT

Submitted by:

Bugarin, Mark Redel

Dizon, Precika

Fuentes, Lloyd Cedrick

Revilla, Venus

Villasin, Philip Kyle

Submitted to:

Ravina, Dave John


DATACENTRIC CORPORATION

1.1 Company Profile

DATACENTRIC Corp. has been established as a leading information provider in the field of
sports. They provide live sports data commentary for Basketball, Football, Volleyball, Handball,
and other sports. The company is a subsidiary hub of Sportradar Group which is a global
company and the world’s leading supplier of sports and betting-related that provides complete
and precise data for all types of popular sports. The company’s goal is to remain as a fast-
growing production hub of the Sportsradar Group and to guarantee the quick delivery and
accurate services to the media and the gaming industry.

Datacentric Corp. was established in 2012, and is located in Bonifacio Global City, Taguig city,
Philippines. The company is planning to relocate their office in Alabang to be more economical
and cost effective.

Company Departments Structure:

Management:
• Chief Executive Officer
• Branch Manager
• Operations Manager
• Training Manager

Accounting:
• Chief Financial Officer
• Accountants
• Internal Auditors
Administration:
• Service Desk
• Maintenance
• Security
• Company Driver

Human Resources:
• HR Director
• HR Manager
• Recruitment Specialist

IT:
• IT Director
• Senior Network Analyst
• Software Developer
• Network Administrator

Operations:
• Senior Match Operator
• Match Operator
• Post-Match Analysis Operator
• Match Locator Operator

Training:
• Training Manager
• Training Assistant

Other Departments:
• Clinic Department
Problems

STATEMENT OF THE PROBLEM


They are expecting the Internal Support Team to develop the network infrastructure plan.
This will include, but is not limited to:

1. Recommendations on network equipment

- To ensure that all equipment is working properly, the proponents recommend allocating
the company’s resources to purchase new computer equipment for the newly relocated
building. One of the purposes of the new network equipment is to avoid unforeseen
malfunction within the company’s network and equipment. With a new set of equipment,
employees can work efficiently and be more productive. In addition, the main purpose of
recommending new resources is for the company’s long-term success.

2. Recommendations on network cabling

- Technology is developing rapidly. The wiring infrastructure must be according to the


company’s requirement. We take into consideration if the company owns or leases the
building that is why we will go through with the building’s predetermined cabling system.
We recommend Cat6 cable to the company’s network it has a bandwidth capacity of 250
MHz, which can provide you with speeds capable up to 10 Gbps. It is also compatible
with Cat5 and Cat5E cables. "Cat6 cables are mainly used for computer networks that
reach 1000 Mbps, or 1 Gbps data transfer rate.

3. A network wiring plan including:


(a) Physical and Logical cabling layout
(b) A cabling plan for the server room
(c) Layouts of all MDFs and IDFs
PHYSICAL LAYOUT:

1st Floor Departments


• IT Department (Software Development)
• HR Department
• Accounting Department
• Operations Department
• Management
• Training Department
2nd Floor Departments
• IT Department (Network Operations)
• Operations Department
CABLING LAYOUT:
MDF and IDF LAYOUT:

4. An IP addressing scheme for all devices on the network.

NETWORK IP ADDRESS SUBNET MASK DEFAULT GATEWAY


NETWORK A 10.10.10.1
SERVER 1 10.10.9.1 255.0.0.0 10.10.10.1
OPERATION DEPARTMENT 10.10.11.1 255.0.0.0 10.10.10.1
IT (NETWORK OPERATION) 10.10.12.1 255.0.0.0 10.10.10.1
NETWORK B- IT (SOFTWAREDEVT)
NETWORK B 172.20.20.1
IT (SOFTWARDEVT) 172.20.30.1 255.255.0.0 172.20.20.1
OPERATION DEPARTMENT 172.20.41.1 255.255.0.0 172.20.20.1
ACCOUNTING 172.20.42.1 255.255.0.0 172.20.20.1
HR 172.20.43.1 255.255.0.0 172.20.20.1
MANAGEMENT 172.20.44.1 255.255.0.0 172.20.20.1
TRAINING DEPARTMENT 172.20.45.1 255.255.0.0 172.20.20.1

2ND FLOOR SSID: Datacentric HOSTNAME: Datacentric

PASSWORD: P@ssword123! PASSWORD: P@ssword123!

4 LAPTOPS,4 MOBILE PHONES – NO MAC ADDRESS FILTERING


5. A cost projection for the implementation of the network, including:
(a) Equipment purchase costs
(b) Cabling and testing costs
(c) Equipment installation costs
(d) Training and support costs

1.2 Objectives
Specific Objectives
• To design the physical and logical layouts for network infrastructure of the new Datacentric
Corporation bldg.
• To construct a simulation facility to represent Datacentric Corporation.
• To deploy the proposed structured cabling design.
• To design and implement cabling facility.
• Acquisition of Devices & Applications.
• To identify and acquire the necessary Network Devices & Equipments.
o Budget
o Device
o Application

1.3 Objectives

Logical Configuration of proposed network


• Codes per router
• Up and running configurations of logical network

Router>ena
Router#config t
router(config)#hostname Datacentric
Datacentric(config)#ena password P@ssword123!
Datacentric (config)#exit

Datacentric > ena


Password: P@ssword123!
Datacentric# config t
Datacentric (config)#int fa0/0
Datacentric (config-if)#ip add 10.10.11.1 255.0.0.0
Datacentric (config-if)#no shut
Datacentric (config-if)#exit
Datacentric (config)#exit
Computer Set:
Image Name Brand/Description Price
Processor Intel Core i7-11700K Processor (16M P 17,214.08
Cache, up to 5.00 GHz)

Motherboard MIS Z390-A PRO Supports 9th / 8th P 8,999


Gen Intel® Core™ / Pentium®
Celeron® processors for LGA 1151
socket
Ram/Memory HyperX FURY Desktop RAM memory P 4,590
16GB DDR4 DIMM 288-pin internal
memory
Video Card Asus GeForce GTX 1050 Ti OC Strix P 8,000
4GB GDDR5 PC
HHD Western Digital Blue P 4,291.46
More storage space for a bargain price
Interface: SATA 6Gbps | Capacity: 3TB
– 4TB | Cache: 64MB | RPM: 5,400
rpm

SSD Samsung 980 500GB NVME M.2 2280 P 3,699.00


Internal Solid-State Drive (MZ-
V8V500BW) with Up to 3,100MB/s
Seq. read and 2,600MB/s Seq. write
Keyboard and ORIGINAL Logitech MK220 P 1,091.55
Mouse WIRELESS COMBO MK220 USB
Wireless Mouse + Keyboard
Power supply FSP HYPER-K HP700S 700W 80+ P 2,500
APFC Non-Modular Power Supply
Black

Case ECLIPSE P300 TEMPERED GLASS P 3,750

Surge protector Alpha Pro 650Va/ 3 NEMA Power P 1,980


Socket (Output), 1 bypass socket
(NEMA)

Operating Windows 10 Professional 32/64-bit P 1,880


System Product Key For 1 PC, Lifetime

Monitor AOC E1670SWU LED Monitor 15.6" P 3,500

Total:
P 61,495.09
Computer Set Cost by Departments:
Department Quantity Total Cost
Operations Department x 140 P 8,609,312.6
IT Department x4 P 245,980.36
HR Department x2 P 122,990.18
Accounting Department x3 P 184,485.27
Management Department x2 P 122,990.18
Training Department x8 P 491,960.72
Network Department x3 P 184,485.27
Others x8 P 491,960.72
Reserve x 30 P 1,844,852.7
Total PC: 200 P 12,299,018.00
Total PC 200 and Computer Set Total Cost: P 12, 299,018.00
Router
Brand / Image Description Price Shop Name
Archer AX50 Supports Wi-Fi 6 (802.11ax), the P 5,100 PC Express
Archer AX50 AX3000 Wireless
Dual-Band Gigabit Router from TP-
Link is engineered to deliver dual-
band network speeds of up to 3
Gb/s with a range of up to 2000
square feet. Your devices can utilize
up to 2402 Mb/s speeds on the 5
GHz band and up to 574 Mb/s on
the 2.4 GHz band.

Specifications:
Model Archer AX50
Full Name Archer AX3000 Dual Band Gigabit Wi-Fi 6 Router
Dimensions 10.2 x 5.3 x 1.5 in (260.2 x 135.0 x 38.6 mm)
Weight 1.24 lbs. (.56 kg)
Wi-Fi Technology Dual-band Wi-Fi 6 (802.1 lax) AX3000
5GHz Wi-Fi Specs 5GHz AX: 2x2 20/40/80/1 60 MHz, up to 2.4 Gbps
2,4GHz Wi-Fi Specs 2.4GHz AX: 2x2 20/40 MHz up to 574 Mbps
Backward Compatibility 802.llaIb/g/n/ac Wi-Fi
Wireless Security 64/128-bit WEP, WP.4JWPA2, WPA-PSK’WPA2-PSK
Mobile App TP-Link Tether
Web User Interface Yes
Bridge Mode No
AP Mode Yes
USB Port One USB 3.2 Gen 1 (USB 3.0) port
Regular Network Ports Four Gigabit LAN port ports, one Gigabit WAN port
Link Aggregation Yes (LAN 2+ LAN 3)
Multi-Gig Port None
Estimated Cost:
Department Quantity Total Cost
1st Floor x5 P 25,500
2nd Floor x5 P 25,500
Reserve x3 P 15,300
Total: 13 P 66,300

Switch
Brand / Image Description Price Shop Name
TL-SG1024D 24-Port Gigabit The TL-SG1024D Gigabit Ethernet P 6,900 PC Express
Desktop/Rackmount Switch Switch provides you with a high-
(Black) performance, low-cost, easy-to-use,
seamless and standard upgrade to
improve old network to 1000Mbps
network. All 24 ports support auto
MDI/MDIX, no need to worry about
the cable type, simply plug and play.

Specifications:
Features TL-SG1024D
Standards and Protocols IEEE 802.3i, IEEE 802.3u, IEEE 802.3ab , IEEE 802.3x
Interface 24 10/100/1000Mbps RJ45 Ports (Auto Negotiation/Auto
MDI/MDIX
Network Media 10BASE-T: UTP category 3, 4, 5 cable (maximum 100m)
100BASE-TX/1000BASE-T: UTP category 5, 5e or above
cable (maximum 100m)
Fan Quantity Fanless
Physical Security Lock No
Power Supply 100-240VAC, 50/60Hz
Power Consumption Maximum: 13.1W (220V/50Hz)
Dimensions ( W x D x H ) 11.6*7.1*1.7 in. (294*180*44 mm)
Switching Capacity 48Gbps
Packet Forwarding Rate 35.7Mpps
MAC Address Table 8K
Jumbo Frame 10KB
Green Technology Yes
Transfer Method Store-and-Forward
Certification FCC, CE, RoHS
Package Contents 24-Port Gigabit Desktop/Rackmount Switch
Innovative energy-efficient technology saves power consumption
Supports MAC address self-learning, Auto MDI/MDIX and Auto negotiation
Plug & play design
Power Cord
Estimated Costs:
Department Quantity Total Cost
1st Floor x5 P 34,500
2nd Floor x5 P 34,500
Reserve x3 P 20,700
Total: 13 P 89,700

Printer
Brand / Image Price Shop Name
Brother HL-L3270CDW Laser Printer .P15,000 PC Express

Basic Specification:

FUNCTIONS PRINTER TYPE


Print Color LED Printer
PRODUCT DIMENSIONS (WIDTH X DEPTH X PRINT SPEED
HEIGHT)
439 mm x 461 mm x 252 mm Up to 24/25 ppm (A4/LTR)
PAPER SIZE MAXIMUM PAPER CAPACITY
A4, Letter, A5, A5(Long Edge), A6, Executive, Max. 250 sheets (80 gsm)
Legal, Folio, Mexico Legal, India Legal

DISPLAY MEMORY CAPACITY


2.7" TFT color touchscreen LCD 256 MB
WEIGHT WINDOWS® OPERATING SYSTEM
18.5 kg Windows® Server 2008, Server 2008 R2, 7
SP1, 8, 8.1, Server 2012, Server 2012 R2, 10,
Server 2016
MAC OPERATING SYSTEM LINUX OPERATING SYSTEM
Mac OS v10.11.6/10.12.x/10.13.x CUPS, LPD/LPRng (x86/x64 environment)
Estimated Costs:
Department Quantity Total Cost
1st Floor x3 P 45,000
2nd Floor x3 P 45,000
Reserve x2 P 30,000
Total: 8 P 120,000

CCTV
Brand / Image Price Shop Name
ABUS Network Outdoor Wifi IR CCTV Camera, 1920 x .P 13,500 PC Express
1080 pixels Resolution, IP66

Specification:
Attribute Value
Indoor/Outdoor Outdoor
Analogue/Network Network
Resolution 1920 x 1080 pixels
Maximum Resolution 1920 x 1080pixels
Sensor Size 2MP
IR Yes
Wireless Yes
IP Rating IP66
Sensor Type 1/2.7in CMOS
Focal Length 4mm
Height 190 mm
Width 105mm

Estimated Costs:
Department Quantity Total Cost
1st Floor x 14 P 189,000
2nd Floor x 11 P 148,500
Reserve x5 P 67,500
Total: 30 P 405,000
Name / Image Description Price
Belden CAT 6 Cable Belden 7814A Cat 6 Cable UTP P 7,500
Unshielded AWG24 Grey Data LAN
Cable Cat6 305 meters 1000 feet
CAT 6 Cable, 4 Pair, 24 AWG, Solid
Bare Copper Conductor, U/UTP, PO
Insulation, PVC Jacket, Indoor
Suitable Applications: Premise
Horizontal Cable, Gigabit Ethernet,
100BaseTX, 100BaseVG ANYLAN,
155ATM, 622ATM, NTSC/PAL
Component or Composite Video,
AES/EBU, Digital
Video, RS-422, 250MHz Category 6
Crimping Tool The mouth of the press-pliers is P 250
made of
magnetic steel, which is hard and
durable
Portable style with perfect shape
Suited for network cable with RJ45
CAT5,
CAT6 & CAT7 Connector and ADSL
Cable with
RJ11 Connector
RJ45 S100PCS RJ45 Connectors Modular P 400
Plug Clear Plastic
Easy to DIY Ethernet Cable When
You Need
Universal Type RJ45 Ends for Cat6
Connector Cat5E Connector Cat5
Connector
UTP 8P8C UTP Solid RJ45 Crimp
Connector Crystal Suit for General
RJ45 Crimp Tool
50 Micron Gold Plating Connectors
Made for Lan Cable Connectors
Achieve Better Data Transmitting
Network Equipment Costs:
Equipment Quantity Total Cost
Belden x4 P30,000
Crimping Tool x 30 P7,500
RJ45 x8 P3,200
Total P40,700

Network Equipment Total Costs: P40, 700


Equipment Installation Costs
*Third party included

Manpower No. Total Salary


Installer x 40 Persons P700,000 (whole duration of work)

Training and Support Costs


*Third party included

Manpower No. Total Salary


Trainee / Support x 40 Persons P700,000 (whole duration of work)

Summary of the Overall Costing:


Description Total Cost
Computer Set P 12,299,018.00
Router P 66,300
Switch P 89,700
Printer P 120,000
CCTV P 405,000
Total Cost for the equipment P 12,980,018

Description Total Cost


Equipment Purchase Cost P 12,980,018
Network Cabling Cost P 40,700
Equipment Installation Cost P 700,000
Trainee / Support Cost P 700,000
Total Cost for the equipment P 14,420,718

The total estimated cost of P 14,420,718 for the overall Network Infrastructure
Plan.
1.4 Logical Configuration of proposed network
• Codes per router
• Up and running configurations of logical Network

1.5 Installation, Configuration and Deployment of the following servers:


- Active Directory
- Domain Name
- File Server
- Web Server
-

Windows 10 OS and Windows 2008 Server Logical Connection:


Setting up Windows Server 2008
Requirements for setting up Windows Server:

• Virtual Box Software (VMware Workstation, Oracle Virtual Box).


• .iso file of Windows Server 2008 R2

1. Open the virtual box and click “New”.

2. Name your OS and click “Next”.


3. Setup your desired Memory Size for this instance I went for 2048mb and click “Next”.
4. Select the “Create a Virtual hard disk now”.
5. Select the “VDI (VirtualBox Disk Image)” and click “Next”.
6. Select the “Dynamically Allocated” and click “Next”.
7. Setup your desired File location and size for this instance I went for 20gb storage.
8. After that, select your created OS and click “Start” button.
9. It will prompt you to another window and select the folder icon and select your .iso file.
and click “Start”.

10. After that it will prompt you to another window where you will setup your Windows Server
OS
11. Select your preferred language and click “Next” and click “Install Now”.
12. After that Just click “Next” for the product key activation and select “No”
13. Select “Windows Server 2008 Standard (Full Installation)”. And click the check box
below and click “Next”.
14. Click the check box saying, “I accept the license terms” and click “Next”.
15. Select the “Custom (Advanced)” Installation.
16. Select the “Disk 0 Unallocated Space” and click “Next”.
17. After that the Installation will take place about 10-15 minutes.
20. After the installation is complete it will prompt you to another window and it will ask you
to change password.

21. Set your desired password and click the next icon and click “ok”.
22. The installation of Windows Server is complete.
Setting up Windows 10 Operating System
Requirements for setting up Windows 10 Operating System:
- Virtual Box Software (VMware Workstation, Oracle Virtual Box).
- Iso file of Windows 10 OS

1) Open the virtual box and click “New”.

2) Name your OS and click “Next”.


3) Setup your desired Memory Size for this instance I went for 2048mb and click “Next”.
4) Select the “Create a Virtual hard disk now”.
5) Select the “VDI (VirtualBox Disk Image)” and click “Next”.
6) Select the “Dynamically Allocated” and click “Next”.
7) Setup your desired File location and size for this instance I went for 20gb storage.
8) After that, select your created OS and click “Start” button.
9) It will prompt you to another window and select the folder icon and select your .iso file. and
click “Start”.

10) After that it will prompt you to another window where you will setup your Windows Server
OS.
11) Select your preferred language and click “Next” and click “Install Now”.
12) Click the check box saying, “I accept the license terms” and click “Next”.
13) Select the “Custom (Advanced)” Installation.
14) Select the “Disk 0 Unallocated Space” and click “Next”.
15) After that the Installation will take place about 20-30 minutes
16) After that it will prompt you to another window and select your region and click “Next”.
17) Click “Skip”
18) Select “Setup for personal use” and click “Next”.
19) Provide your Microsoft Account for the creation of account.

20) After that you will be asked to setup a PIN select “Create PIN” setup your desired PIN and
click “ok”.
21) Click “Accept" and choose “Next” until the product claiming window.
22) Select “No, thanks”.
23) After that installation once again takes place, this will take up to several minutes.
24) The installation of Windows 10 OS is complete.
Active Directory Configuration:
1. Go to the start button, type “run” and click it.
2. In the run window type “dcpromo” and hit Enter.

3. Click “Next” until the deployment configuration and select “create a new domain in the
forest” and click “Next”.

4. After that, name your desired domain name and click “Next”.
5. Select your forest functional level to “Windows 2000” and click “Next”.
6. Select your domain functional level to “Windows 2000 Native” and click “Next”.
7. In the next window click “Next” and select “Yes”.
8. A warning window will appear afterwards just select “Yes” and click “Next”.
9. After that, you will be asked to add a password to your Administrator account and click
“Next”.

10. In the summary window click “Next” and the installation will take place this process takes
a few minutes.
11. After that, click “Finish” and you will be asked to restart your PC select “Restart now”.
12. After that, you will notice that the username of the PC changed it will be (Domain
name/Administrator), type your assigned password earlier and click the next icon.
13. Installation of domain is now complete.

Connecting Windows 10 OS to the domain:


1. First Go to the “This pc” window then click the right side of the mouse and select
“Properties”.
2. After that, go to the “Change settings” text.

3. In the “Computer name” tab select the “Change” text below.


4. After that, select the domain check box and type in your domain name then click “ok”
5. You will be asked to type your Username and Password.
6. A pop up will show indicating you have connected to the domain.

7. After that, you will be asked to restart your PC to complete the connection select
“Restart now”.
Deployment of users in the Active Directory:
1. Go to start and search for “Active Directory Users and Computers” and click it.

2. After that, click the “+” icon of your domain name and go to “Users”.
3. In adding group in the domain click the right side of your mouse and select “New”>”
Group”.
4. Adding of groups in the domain is successful.

5. After that, right click in the blank side of the window and select “New”>” Users”.

6. Input the required fields to create a user after that click “Next”.
7. You will be then asked to setup a password for the user and check the “User must
change password at next login” and click “Next”.
8. Click “Finish”
9. After that right click on the (IT Department) and click “Properties”
10. Select the “Members” tab and click “Add”.
11. Type in your created user and click “Check name” and click “ok”.

12. Click “Apply” then click “ok”.

Departments and Users in Active Directory:


ACCOUNTING DEPARTMENT
HR DEPARTMENT

IT DEPARTMENT (NETWORK OPERATIONS)


IT DEPARTMENT (SOFTWARE DEVELOPMENT)

MANAGEMENT
OPERATIONS DEPARTMENT FLOOR 1

OPERATIONS DEPARTMENT FLOOR 2


TRAINING DEPARTMENT

ACCESSING THE USER ACCOUNT IN WINDOWS 10 OS:


1. In the windows login click “Other users”
2. Input your domain user account and click the next icon.
3. You will be asked to change the password of your account click “ok”.

4. Joining of client into domain successful.


SETTING UP FILE SERVER:
1. Go to computer and go to Local Disk C: create a folder named “File Sever”.
2. Inside the File Server folder create folders of your department inside of which users are
included.

3. Set their permissions to full control, go to the users right click their folder and click
“properties”
4. Select the sharing tab and click the “Advanced sharing” button.
5. Check the “Share this folder” box and select “Permissions” button.
6. Click the “Remove” button to remove everyone then click “Add” and add your account
name and then check all the allow boxes to access full control.

7. Click “Apply” then click “ok”.


8. After that go to “Share” button in the folder’s properties and click “Change sharing
permission”.
9. The permission level must be Co-owner then click “Share”.
10. Folder shared successfully.

Mapping Network Drive:


1. Go to “This PC” and then click “Map Network Drive”.
2. After that, assign your desired drive and then type the IP of your server and then the
name of your folder in the file server.

3. File server configured successfully.


SETTING UP WEB SERVER:
1. Go to start button and search for “Server manager”.

2. Click the Roles in the category tab and select the “Add roles” text.

3. After that, click “Next” and then check the “Web Server (IIS)” box and then click “Next”.
4. select your desired Role services and click “Next” and then click “Install”.
5. After the installation click “close”.
6. Web Server successfully configured.
1.6 Recommendations and Summary

The network proposal identifies and describes information such as computer specifications,
server components, cable layouts, routers and switches, and applications that will keep the
business running for a long time. We also want to specify that the topology used exclusively in
this project is a tree topology. This will also ensure the stability of the network throughout the
company's operations. Some equipment may be a bit expensive, but the network operations
department ensures that the equipment will provide efficient and productive operations. In other
words, it will be a good investment for the common interests of the company.

1.7 Curriculum Vitae


Mark Redel Bugarin
64 A Sampaguita St. Pasay City
markmark.mrb@gmail.com
0975-0583-616

OBJECTIVE
To apply for any position where I can fully utilize my skills, capabilities and become a value
addition to the company.

EDUCATION

TERTIARY
STI College Global City Global City, Taguig
City
2018-Present

SECONDARY
Bankal Highschool Makati City
2011-2015

PRIMARY
Tipas Elementary School
2005-2011 Tipas, Taguig City

PERSONAL INFORMATAION

Birth Date : May 3, 1996


Birthplace : Pasay City
Age : 24
Religion : Roman Catholic
Precila P. Dizon
210 James St. Prk 1A Sanalugta New Lower Bicutan Taguig City

dizonprecila@gmail.com

09297946231

EDUCATIONAL BACKGROUND
Level Inclusive Dates Name of school/ Institution
Tertiary 2018 – Present STI Global City
Vocational/Technical 2016 – 2018 Centerville Academy Inc.
High School 2011 – 2016 Signal Village National High School
Elementary 2006 – 2011 EM’S Signal Village Elementary School

PROFESSIONAL OR VOLUNTEER EXPERIENCE


Nature of Experience/ Name and Address of Company or
Inclusive Dates
Job Title Organization
June/July 2018 Taguig SPES (20 days) Hagonoy Health Center C.P. Tinga
Taguig City

SKILLS
SKILLS Level of Competency Date Acquired
Computer Hardware Basic
Knowledge in Java Basic
Knowledge in C# Basic

TRAININGS, SEMINARS, OR WORKSHOPS ATTENDED


Inclusive Dates Title of Training, Seminar, or Workshop
May 2021 Emerging Trends in Information Technology: Data Science
Fundamentals
May 2021 Emerging Trends in Information Technology: CCTV Basics and Common
Monitoring Software
October 2019 ENIGMA a Computer Engineering Convintion: Cyber Security
October 2019 ENIGMA a Computer Engineering Convintion: Software Development
October 2019 ENIGMA a Computer Engineering Convintion: Adruino Workshop
October 2019 ENIGMA a Computer Engineering Convintion: College Corporate
March 2019 NSTP 2 Program Seminar Awareness in Dengue and Leptospirosis
July 2018 Promotional Event on Food Gardeng
Lloyd Cedrick Fuentes
15-b General Luna St. Signal Village Taguig City
0906-3210-398
Lloydcedrick29@yahoo.com

OBJECTIVE
To familiarize in the workplace and acquire through observationsknowledge,
and skills and competencies
simulations.

EDUCATION

TERTIARY
STI College Global City Global City, Taguig
City
2018-Present

SECONDARY
Signal Village National Highschool Signal, Taguig City
2015-2018

PRIMARY
Kapitan Jose Cardones Memorial Elementary School Taguig City

2001-2007

PERSONAL INFORMATAION

Birth Date : May 16, 2000


Birthplace : Taguig City
Age : 20
Religion : Roman Catholic
Citizenship : Filipino

PERSONAL SKILLS
Attentive
Cheerful
Knowledge in Programming and designing website.
Fast Learner
Curriculum Vitae

Venus Revilla
☏0935-051-7212 ✉rjdbadua@gmail.com

Personal Data
Birthdate: April 11, 2000
Gender: Female
Religion: Catholic
Height: 157 cm.
Weight: 52 kg.
Address: Torrijos, Marinduque
Civil Status: Single
Nationality: Filipino

Educational Background
Year School/Institution Level Program
2013 – 2016 Maranlig National High School High School
2016 – 2018 Torrijos Senior High School Senior High STEM
2018 – present STI College Global City College BSIT

Awards, Extra Curricular Activities and Academic Achievements


2016-2018 Member of Stage Group

Skills and Abilities


▪ Fluent in English and Filipino
▪ Can make quick and accurate decisions
▪ Team player
▪ Logical and analytical skills
Phillip Kyle J. Villasin
Milkweed street barangay Rizal Makati city

pkylevillasin@gmail.com

09658174648

EDUCATIONAL BACKGROUND

Level Inclusive Dates Name of school/ Institution

Tertiary 2018 - 2021 STI College Global City

High School 2011-2015 Benigno “Ninoy” Aquino High School

Elementary 2005-2011 Pateros Catholic School

SKILLS Level of Competency

Computer Hardware Average

Computer Software Average

Knowledge in Java Average

Knowledge in C# Average

TRAININGS, SEMINARS, OR WORKSHOPS ATTENDED

Inclusive Dates Title of Training, Seminar, or Workshop

October 2019 ENGMA ‘Software Development’

October 2019 ENIGMA ‘Cyber Security’

October 2019 ENIGMA ‘Database Management’

You might also like