You are on page 1of 1

Muhammad Asad engrasad468@gmail.

com
+923131023258
Project Engineer | Industrial Engineer Karachi, Pakistan

To meet the challenges of this competitive era by the zest and enthusiasm inculcated in me.

EXPERIENCES EDUCATION
Project Engineer (Assistant Manager) B.E – Industrial Engineering & Management
Pak Suzuki Motor Company Dawood University of Engineering & Technology, Karachi.
27/03/2018– Present CGPA 3.68
2014 – 2018
Responsibilities:
▪ Design, develop and procure new and existing facilities. SKILLS / EXPERTISE
▪ Technical & cost feasibility study as per project requirements. Project management
▪ Resolving complex technical issues and coming up with fast KAIZEN
efficient solutions.
Risk Assessment
▪ 2D & 3D CAD modeling & Layout development
▪ Overall Project Planning, Risk Assessment and Documentation. CAD
▪ Negotiation & selection of contractors, suppliers & machines MS Office
manufacturers.
▪ Project execution as per qualitative work and safety standards. CERTIFICATIONS / COURSES
▪ Progress monitoring and reporting on daily, weekly and
monthly basis against the planned schedule. Essential Training on AutoCAD 2019
▪ Conduct acceptance tests and trials on equipment, tools and LinkedIn Learning, 2020
jigs procured from suppliers. To improve 2D & 3D CAD Drawings.
▪ Designing & development of assembly jigs & equipment to
accommodate new models or improve existing assembly Data Driven Problem Solving
processes. Creative Swan, 2019
Understanding and utilization of data to deal with
Accomplishments: the problems.
1. Erection of new model facilities including layout
development, equipment ordering, installation and Entrepreneurship for Engineers
commissioning, in collaboration with foreign supervisors. E4E IBA-Karachi, 2017
2. Designing and fabrication of Pneumatic Press Machine, to Six-months certified course, to find the gap in the system
reduce operation time and ensure qualitative work, to and convert it into business prototype.
eliminate manual repetitive pressing operations.
3. Procurement & installation of Poka-Yoke System in Engine SOCIAL ACTIVITIES
Assembly to ensure first time pass production.
4. Installation of Engine Oil and water gallery leak test
Institute of Industrial & System Engineers
Founding member & 1st President of IISE -DUET chapter
equipment.
Affiliated with IISE, USA.
5. Fabrication of Stairs as per Suzuki Engineering Standards.
6. Installation of HVAC System in Engine & Transmission Active Citizenship Program
assembly shop to improve indoor Air quality and work Served the society through a social action project ‘’To clean &
environment. maintain the city’’ Under active citizenship program of British
Council.
Final Year Project (FYP)
Lucky Textile Mills, 17/07/2017-28/11/2018 Declamation Contest
Won two times interdepartmental declamation contest.
▪ Implementation of 5S methodology with FSN and SMV
techniques to improve Warehouse Management.
▪ Categorized different types of fabrics through FSN Analysis.
INTERESTS
Reading, Social welfare, Public Speaking
▪ Significance results were achieved through maximum space
utilization of floor by eliminating dead stock material.
▪ Proposed FIFO based optimum storage system to control
Inventory Management.

Internship
Peoples Steel Mills, 08/08/2016-23/08/2016

▪ Getting familiar with industrial procedures & practical


exposure of preventive and corrective measure practices.
▪ Understanding of steel manufacturing process such as Ingot
casting, Continuous casting, Rolling and Forging.

You might also like