COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
ENGINE R
ROOM 05-Mar-16 06-Apr-16 68 12-Mar-16 A 05-Jul-16

MARINE SWITCHBOARD
SW 17-Mar-16 10 18-Mar-16 A 05-May-16
7630-ER Marine Switchboard M 17-Mar-16 10 18-Mar-16 A 05-May-16
SEA/FRESH WATER COOLING SYSTEM 05-May-16 29 18-Apr-16 A 30-May-16
5320 Sea Water Cooling System (Marine -Misc) includes Pumps and Distribution Pipe M 22-May-16 8 18-Apr-16 A 30-May-16
6720 Fresh Water Cooling System (Engine Room) M 05-May-16 8 18-Apr-16 A 11-May-16
AIR SYSTEM
SYSTE 08-Mar-16 14 08-Apr-16 A 19-May-16
5665 Marine Air Compressor Includes Air Receiver, Pipework and Instrumentation (E/R) M 08-Mar-16 5 08-Apr-16 A 08-May-16
5685 Air Dryer (E/R) M 05-May-16 5 06-May-16 10-May-16
5670 Emergency Air Compressor includes Receiver, Pipework and Instrumentation (E/R) M 08-Apr-16 5 13-May-16 17-May-16
5660 Utility Air System Distribution (E/R) M 11-May-16 5 15-May-16 19-May-16
5675 Instrument Air System Distribution (E/R) M 11-May-16 5 15-May-16 19-May-16
MGO SYSTEM
SYST 10-May-16 32 18-Apr-16 A 14-Jun-16
6252 MGO Service System to G/E includes G/E Booster pump, G/E Circulating pump, Service Tank, S M 10-May-16 10 18-Apr-16 A 20-May-16
6254 MGO Tansfer Pump System includes MDO Storage tanks, Distribution Pipe and Instrumentation M 25-May-16 20 28-Apr-16 A 14-Jun-16
6270 Lube Oil System, Fill, Transfer pump, purifier pipework and instrumentation M 27-May-16 5 28-May-16 01-Jun-16

ENGINE RO
ROOM UTILITIES 15-Mar-16 06-Apr-16 50 13-Apr-16 A 18-Jun-16
5122 HVAC in Purifier Room M 06-Apr-16 06-Apr-16 3 13-Apr-16 A 04-May-16
5121 HVAC in Steering Gear M 15-Mar-16 3 25-Apr-16 A 27-Apr-16 A
5131 Packaged HVAC unit in Engine Control Room M 10-May-16 3 28-Apr-16 A 11-May-16
9420 Engine Room Sea Chest (A/B) High and Low M 20-Apr-16 2 05-May-16 06-May-16
9410 Engine Room Quick Closing Valve Including Emergency air Bottle, Pipework and Instrumentation M 10-May-16 6 15-May-16 20-May-16
5120 HVAC in Engine Room and Workshop M 21-May-16 3 22-May-16 24-May-16
9310 Bilge System (Engine Room) including Oily Water Separator, Pump and Tanks M 20-Apr-16 8 23-May-16 30-May-16
5450 Potable Fresh Water Service System to Engine Room including Fresh Water Tank (S), Hydropho M 13-May-16 8 23-May-16 30-May-16
5453 Service Water System to Accommodation M 10-May-16 10 23-May-16 01-Jun-16
9860 Sewage Treatment Plant Skid includes Holding Tank, Tr eatment Pump, Dischar ge Overboar d an M 14-May-16 5 02-Jun-16 06-Jun-16
9630 Engine Room Gantry Crane M 15-Jun-16 3 16-Jun-16 18-Jun-16
AUXILIARY GENERATOR RUNNING & NORMAL POWER SUPPLIES 05-Mar-16 06-Apr-16 66 12-Mar-16 A 05-Jul-16
7254 Normal Lighting & Small Power – E/R M 05-Mar-16 10 12-Mar-16 A 19-May-16
7230 Normal Lighting & Small Power include Transformer Engine Rm. Marine (100V) M 04-Apr-16 5 08-Apr-16 A 05-May-16
7123 Auxiliary Diesel Generator C M 05-May-16 7 18-Apr-16 A 10-May-16
7121 Auxiliary Diesel Generator A M 09-May-16 7 18-Apr-16 A 16-May-16
7240 Normal Lighting & Small Power include Tranformer Engine Rm. Marine and Accommodation (220 M 06-Apr-16 06-Apr-16 10 18-Apr-16 A 21-Apr-16 A
7670 Distribution Board 100V / 220V (Normal) - Engine Room / Pump Room / ECC M 20-Apr-16 5 10-May-16 14-May-16
7675 Distribution Board 440 V (Normal) - Marine M 10-May-16 7 11-May-16 17-May-16
7255 Normal Lighting & Small Power - Pump Room M 12-May-16 10 13-May-16 22-May-16
7251 Normal Lighting & Small Power – Helideck M 15-May-16 5 16-May-16 20-May-16
7253 Normal Lighting & Small Power – Aft Area M 15-May-16 5 16-May-16 20-May-16
7330 Marine 24V DC Battery / Charger / Distribution M 15-May-16 4 16-May-16 19-May-16
7660 Distribution Board (Normal) - Main Deck, Fwd & Misc Space M 15-May-16 5 16-May-16 20-May-16
7250 Normal Lighting & Small Power – Main Deck (Mid Area) M 15-Jun-16 10 16-Jun-16 25-Jun-16
7252 Normal Lighting & Small Power – Fwd Area M 15-Jun-16 5 01-Jul-16* 05-Jul-16
EMERGENC GENERATOR RUNNING & EMERGENCY POWER SUPPLIES
EMERGENCY 20-Apr-16 38 19-May-16 25-Jun-16
7885 Emergency Lighting includes DB - Engine Room M 10-May-16 10 19-May-16 28-May-16
7805 Emergency Switchboard & Main Emergency Distribution Board M 18-May-16 14 19-May-16 01-Jun-16
7830 Emergency Lighting and Small Power Distribution Board (Engine Room and Accommodation inclu M 06-May-16 5 19-May-16 23-May-16
7840 Emergency Lighting and Small Power Distribution Board E/R and Accommodation includes Trans M 15-May-16 5 19-May-16 23-May-16
7886 Emergency Lighting - Pump Room M 20-Apr-16 10 19-May-16 28-May-16
5130 HVAC in Emergency Generator Room M 15-May-16 3 20-May-16 22-May-16
7710 Emergency Power Generation (Emergency Generator) M 28-May-16 14 29-May-16 11-Jun-16
7881 Emergency Lighting - Helideck M 30-May-16 5 31-May-16 04-Jun-16
7883 Emergency Lighting - Aft Area M 30-May-16 10 31-May-16 09-Jun-16
7882 Emergency Lighting - Fwd Area M 15-Jun-16 10 16-Jun-16 25-Jun-16
BOILERS 20-Apr-16 32 16-Apr-16 A 22-Jun-16
5730 Steam Service 16 Bar M 30-Apr-16 6 12-Jun-16 17-Jun-16
5731 Steam Service 9.5 Bar M 21-Apr-16 6 12-Jun-16 17-Jun-16
5732 Steam Service 4.5 Bar M 21-Apr-16 6 12-Jun-16 17-Jun-16
5760 Steam Condensate System includes COPT Condenser, Condensate Pump,Air Ejector, Exhaust S M 13-May-16 5 13-Jun-16 17-Jun-16
5775 Boiler Blow Down System M 10-Jun-16 2 16-Jun-16 17-Jun-16
5780 Steam Vent Pipe From Relief Valves on Steam Ranges M 20-Apr-16 2 16-Jun-16 17-Jun-16
5770 Steam Drain System includes Drain Cooler, Cascade, pipework and instrumentation M 17-Jun-16 5 18-Jun-16 22-Jun-16
ENGINE R
ROOM BOILER FIRING 11-May-16 13 16-Apr-16 A 03-Jun-16
5741 Feed Water System includes pumps, feed filter tank, Make-Up Valve and Instrumentation M 27-May-16 6 16-Apr-16 A 02-Jun-16
5710 Engine Room Boiler including Control Panel, Cabling, Oil Atomizing / Fuel Gas Skid, Fan and Inst M 11-May-16 7 28-May-16 03-Jun-16
DECK BOILER
BOI FIRING 10-May-16 7 11-Jun-16 17-Jun-16
5720 Deck Boiler Iincluding Control Panel, Cabling, Oil Atomizing / Fuel Gas Skid, Fan and Instrumenta M 10-May-16 7 11-Jun-16 17-Jun-16
5740 New Feed Water Booster Pump Supply for Top Side SRU, Boiler includes Pipe Work and Instrum M 10-Jun-16 6 11-Jun-16 16-Jun-16
AREA ACCEPTANCE
ACCE 12-May-16 48 18-May-16 04-Jul-16
9034 ECR M 12-May-16 1 18-May-16 18-May-16
9740 Marine Workshop M 30-May-16 4 31-May-16 03-Jun-16
9026 Emergency Generator Room M 26-May-16 1 11-Jun-16 11-Jun-16
9024 Engine Room M 15-Jun-16 1 26-Jun-16 26-Jun-16
9025 Pump Room M 15-Jun-16 1 26-Jun-16 26-Jun-16
9032 Misc. Room M 16-May-16 1 26-Jun-16 26-Jun-16
9028 Aft Area , Poop Deck M 31-May-16 1 04-Jul-16 04-Jul-16

ENGINE ROOM
R - OTHER SUBSYSTEMS 20-Apr-16 111 25-Apr-16 A 13-Aug-16

4420 Engine Room Alarm Monitoring System including ECR Console M 30 25-Apr-16 A 06-Jun-16
9430 Stern Tube and Seal System M 20-Apr-16 6 06-May-16 11-May-16
9440 Main and Emergency Steering Gear System includes Pipework and Instrumentation M 20-Apr-16 6 06-May-16 11-May-16

Date Revision Checked Approved


Rev. 1 Baseline KEPPEL SHIPYARD LIMITED 05-May-16 PRELIM BISHWA PRADEEP
Remaining Work
FPSO LEASE CONTRACT FOR MADURA STRAIT BD FIELD DEVELOPMENT
Critical Remaining Work
Rev. 1 Baseline Milestone
Current Milestone ARMADA MADURA FPSO
Page 1 of 7
Actual Work
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
5510 Marine Growth Prevention System (E/R ) M 30-Apr-16 4 11-May-16 14-May-16
9450 Main Engine including Local and Remote Bridge Control M 20-Apr-16 6 20-May-16 25-May-16
5520 Marine Growth Prevention System (Fwd) M 20-May-16 4 21-May-16 24-May-16
4514 F&G Detection System in Engine Room M 20-May-16 6 25-May-16 30-May-16
9510 Cathodic Protection and Corrosion Prevention M 20-Apr-16 6 27-May-16 01-Jun-16
4130 PAGA Speaker and Cablin g - Engine Room M 07-May-16 4 30-May-16 02-Jun-16
6230 MGO Purification System includes Distribution Pipe and Instrumentation M 11-May-16 8 31-May-16 07-Jun-16
5490 Fresh Water Generator ( RO Package Unit) System M 14-May-16 10 31-May-16 09-Jun-16
9320 Bilge Well Fwd/ Aft Engine Room includes Clean Drain Tank M 30-May-16 8 31-May-16 07-Jun-16
9470 Drain & Scupper System (Engine Room) M 31-May-16 6 01-Jun-16 06-Jun-16
9311 Sludge System including pump and tank M 20-Apr-16 8 02-Jun-16 09-Jun-16
5210 Oily Water Separator includes Pump, pipework and instrumentation M 20-May-16 8 07-Jun-16* 14-Jun-16
6255 MGO Over Flow System includes Sludge Tank, Over Flow Tank, Vent Pipe and Instrumentation M 25-May-16 8 15-Jun-16 22-Jun-16
6260 MGO Drain and Sludge Tank System includes Vent and Instrumentation M 25-May-16 8 23-Jun-16 30-Jun-16
7411 Intrinsic / Instrument Earth (Marine) M 14-Jul-16 30 15-Jul-16* 13-Aug-16
7421 Normal / Dirty Earth (Marine) M 14-Jul-16 30 15-Jul-16* 13-Aug-16

PUMP ROOM
RO 20-Apr-16 55 05-May-16 28-Jun-16
9422 Pump Room Sea Chest A/B M 20-Apr-16 2 05-May-16 06-May-16
4515 F&G Detection System in Pump Room M 15-May-16 6 25-May-16 30-May-16
4140 PAGA Speaker and Cablin g - Pump Room M 10-May-16 4 30-May-16 02-Jun-16
4229 LAN / PABX System (Engine Room / Pump Room) M 10-May-16 12 31-May-16 11-Jun-16
5123 HVAC in Pump Room M 15-Jun-16 3 16-Jun-16 18-Jun-16
5310-PR Sea Water Lift Pump and Driver Includes Sea Water Suction Manifold (Fwd/Pump Room), Pipew M 20-Apr-16 10 19-Jun-16 28-Jun-16

ACCOMMO
ACCOMMODATION HABITATION 20-Apr-16 23-Apr-16 42 05-May-16 A 16-Jun-16

PIPING SYSTEM
SY 20-Apr-16 25 15-May-16 08-Jun-16
5661 Utility Air System A 20-Apr-16 5 15-May-16 19-May-16
5460 Domestic Hot Water System to Accommodation includes Calorifier Skid System, Pipe Work and M 12-May-16 8 31-May-16 07-Jun-16
5451 Potable Drinking Water System to Accommodation including Drinking Water Tank (P), Hydrophor A 13-May-16 8 31-May-16 07-Jun-16
9861 Grey Water System Accommodation, Galley and Provision Chamber A 14-May-16 3 02-Jun-16 04-Jun-16
9862 Black Water Accommodation and Clinic Hospital A 14-May-16 3 02-Jun-16 04-Jun-16
9870 Drain & Scupper System (Accommodation Area) A 15-May-16 2 07-Jun-16 08-Jun-16
ELECTRICA & INSTRUMENTATION
ELECTRICAL 25-Apr-16 36 06-May-16 10-Jun-16

POWER DISTRIBUTION
D 30-Apr-16 17 06-May-16 22-May-16
7680 Distribution Board 240V (Normal) - Accommodation A 30-Apr-16 7 06-May-16 12-May-16
7320 220V AC UPS Sub DB & 24 VD DC UPS DB (Accommodation) A 12-May-16 10 13-May-16 22-May-16
INSTRUME
INSTRUMENT SYSTEM 25-Apr-16 15 25-May-16 08-Jun-16
4505 F&G System Cabinets,Power Supplies and Control Network A 25-Apr-16 7 25-May-16 31-May-16
4513 F&G Detection System In Accommodation A 18-May-16 6 25-May-16 30-May-16
4512 Addressable Fire Detection System Marine Loop (Main Deck,E/R&PR) A 12-May-16 10 25-May-16 03-Jun-16
4510 Addressable Fire Detection Panel (AFDS) & Control Network A 25-Apr-16 5 30-May-16 03-Jun-16
4511 Addressable Fire Detection System Accommodation Loop A 18-May-16 10 30-May-16 08-Jun-16
PUBLIC AD
ADDRESS & GE NERAL ALARM SYSTEM 18-May-16 12 30-May-16 10-Jun-16
4110 PAGA Sys tem Cabinet & PAGA Multicore Cable, JB's & Access Panel A 18-May-16 12 30-May-16 10-Jun-16
BY DECK/ LOCATION
L 20-Apr-16 23-Apr-16 42 05-May-16 A 16-Jun-16

UPPER DECK
DE 20-Apr-16 23-Apr-16 30 06-May-16 04-Jun-16
5690 Breathing Air System including Air Receiver, Distribution Pipe and Instrumentation M 20-Apr-16 5 06-May-16 10-May-16
4220 BAB LAN / PABX System (Upper Deck) A 17-May-16 8 19-May-16 26-May-16
5126 HVAC in Foam Room M 15-May-16 3 20-May-16 22-May-16
5128 HVAC in Air Compressor Room T 20-Apr-16 3 20-May-16 22-May-16
7241 Normal Lighting & Small Power Accommodation (Main Deck) A 20-May-16 6 21-May-16 26-May-16
7872 Emergency Lighting Accommodation (Main Deck & A Deck) A 20-May-16 6 21-May-16 26-May-16
5111 HVAC Ac commodation (Upper deck ) A 15-May-16 3 23-May-16 25-May-16
4120 PAGA Speaker and Cablin g - Accommodation (Upper Deck) A 15-May-16 4 30-May-16 02-Jun-16
5135 Packaged HVAC Units Laboratory A 15-May-16 3 02-Jun-16 04-Jun-16
5117 Ducting HVAC Acc ommodation includes Insula tion Equip ments - Upper deck A 20-Apr-16 3 02-Jun-16 04-Jun-16
5127 HVAC in Nitrogen Generator Room M 30-Apr-16 1 02-Jun-16* 02-Jun-16
COLD STORAGE
ST 20-Apr-16 23-Apr-16 13 23-May-16 04-Jun-16
9850 Provision Refrigeration System Including Provision Compresors, Piping, Starter Panel & Instrume A 10-May-16 2 23-May-16 24-May-16
9851 Refrigeration / Freezer / Dry Provision [Vegetable & Dairy Room] A 23-Apr-16 2 31-May-16 01-Jun-16
9852 Refrigeration / Freezer / Dry Provision [Meat Room] A 23-Apr-16 2 31-May-16 01-Jun-16
9853 Refrigeration / Freezer / Dry Provision [Fish Room] A 23-Apr-16 2 31-May-16 01-Jun-16
9854 Refrigeration / Freezer / Dry Provision [Dry Provision Room] A 23-Apr-16 2 31-May-16 01-Jun-16
5132 HVAC in Provision Refrigeration Room A 20-Apr-16 3 02-Jun-16 04-Jun-16
A DECK 10-May-16 18 05-May-16 A 02-Jun-16
7242 Normal Lighting & Small Power Accommodation (A Deck) A 20-May-16 6 05-May-16 A 21-May-16
4221 LAN / PABX System (A Deck) A 12-May-16 12 19-May-16 30-May-16
5112 HVAC Ac commodation (A deck) A 10-May-16 3 23-May-16 25-May-16
4121 PAGA Speaker and Cablin g - Accommodation (A Deck) A 17-May-16 4 30-May-16 02-Jun-16
GALLEY & MESS ROOM 06-May-16 7 11-May-16 17-May-16
7681 440V Galley Distribution Board A 10-May-16 2 11-May-16 12-May-16
7685 220V Galley Distribution Board A 06-May-16 2 11-May-16 12-May-16
9880 Compactor A 15-May-16 2 16-May-16 17-May-16
CCR / TELECOM
TEL ROOM / COMMUNICATION ROOM 15-May-16 12 19-May-16 30-May-16
7873 Electronic Room DB A 15-May-16 6 19-May-16 24-May-16
4240 Client PABX / LAN / Microwave System A 27-May-16 3 28-May-16 30-May-16
B DECK 30-Apr-16 29 13-May-16 10-Jun-16
7243 Normal Lighting & Small Power Accommodation (B Deck) A 12-May-16 6 13-May-16 18-May-16
5110 Main HVAC Accommodation Condenser and AHU B A 15-May-16 24 16-May-16 08-Jun-16
7682 440V Laundry Distribution Board A 15-May-16 2 16-May-16* 17-May-16
5105 Main HVAC Accommodation Condenser and AHU A include Control Panel A 15-May-16 24 16-May-16 08-Jun-16
4222 LAN / PABX System (B Deck) A 12-May-16 12 19-May-16 30-May-16
5113 HVAC Ac commodation (B deck) A 10-May-16 3 23-May-16 25-May-16
7874 Emergency Lighting Accommodation (B Deck & C Deck) A 15-May-16 6 24-May-16 29-May-16
4122 PAGA Speaker and Cablin g - Accommodation (B Deck) A 30-Apr-16 4 30-May-16 02-Jun-16
9820 Laundry Equipment A 14-May-16 3 08-Jun-16 10-Jun-16
C DECK 30-Apr-16 18 05-May-16 A 02-Jun-16
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
7244 Normal Lighting & Small Power Accommodation (C Deck) A 15-May-16 6 05-May-16 A 21-May-16
4223 LAN / PABX System (C Deck) A 10-May-16 12 19-May-16 30-May-16
5114 HVAC Ac commodation (C deck) A 09-May-16 3 23-May-16 25-May-16
4123 PAGA Speaker and Cablin g - Accommodation (C Deck) A 30-Apr-16 4 30-May-16 02-Jun-16
D DECK 05-May-16 21 13-May-16 02-Jun-16
7245 Normal Lighting & Small Power Accommodation (D Deck) A 12-May-16 6 13-May-16 18-May-16
4224 LAN / PABX System (D Deck) A 10-May-16 12 19-May-16 30-May-16
7876 Emergency Lighting Accommodation (D Deck & Nav Deck) A 16-May-16 6 19-May-16 24-May-16
5115 HVAC Ac commodation (D deck) A 09-May-16 3 23-May-16 25-May-16
4124 PAGA Speaker and Cablin g - Accommodation (D Deck) A 05-May-16 4 30-May-16 02-Jun-16
NAVIGATIO DECK
NAVIGATION 15-May-16 15 19-May-16 02-Jun-16
7246 Normal Lighting & Small Power Accommodation (Nav Deck) A 18-May-16 6 19-May-16 24-May-16
4227 LAN / PABX System (Nav Deck) A 17-May-16 12 19-May-16 30-May-16
5116 HVAC Ac commodation (Nav deck ) A 15-May-16 3 23-May-16 25-May-16
4125 PAGA Speaker and Cablin g - Accommodation (Nav Deck) A 18-May-16 4 30-May-16 02-Jun-16
AREA ACCEPTANCE
ACC 21-Apr-16 12 05-Jun-16 16-Jun-16
9830 Cold Storage Rooms Acceptance A 13-May-16 2 05-Jun-16 06-Jun-16
9810 Galley & Mess Room Incl. Wet Chemical A 12-May-16 3 08-Jun-16 10-Jun-16
9840 Cabin/Room Acceptance - Main Deck A 01-May-16 2 09-Jun-16 10-Jun-16
9841 Cabin/Room Acceptance - A Deck A 28-Apr-16 2 09-Jun-16 10-Jun-16
9842 Cabin/Room Acceptance - B Deck A 28-Apr-16 2 09-Jun-16 10-Jun-16
9843 Cabin/Room Acceptance - C Deck A 28-Apr-16 2 09-Jun-16 10-Jun-16
9844 Cabin/Room Acceptance - D Deck A 28-Apr-16 2 09-Jun-16 10-Jun-16
9845 Cabin/Room Acceptance - Navigation Deck A 28-Apr-16 2 09-Jun-16 10-Jun-16
9033 CCR A 21-Apr-16 1 16-Jun-16 16-Jun-16

ACCOMMO
ACCOMMODATION - OTHER AREAS/ SYSTEMS 20-Apr-16 90 15-May-16 12-Aug-16

EXTERNAL 20-May-16 13 21-May-16 02-Jun-16


7247 Normal Lighting & Small Power Accommodation (External) A 20-May-16 10 21-May-16 30-May-16
7870 Emergency Lighting (Accommodation) (External) A 20-May-16 10 24-May-16 02-Jun-16
POWER DISTRIBUTION
DIS 20-Apr-16 90 15-May-16 12-Aug-16
4415 PCS Interface Instruments & Integration Cables including First Junction Box A 20-Apr-16 90 15-May-16* 12-Aug-16
TELECOMM
TELECOMMUNICATION SYSTEM 27-Apr-16 37 20-May-16 25-Jun-16

RADIO SYSTEM
SY 20-May-16 6 01-Jun-16 06-Jun-16
4233 UHF Radio System A 27-May-16 5 01-Jun-16 05-Jun-16
4234 VHF Radio System A 20-May-16 5 01-Jun-16 05-Jun-16
4235 BAB Fleet Broadband A 20-May-16 6 01-Jun-16 06-Jun-16
4239 NDB / VHF AM A 27-May-16 4 01-Jun-16 04-Jun-16
METEORO
METEOROLOGICAL SYSTEM 20-May-16 6 06-Jun-16 11-Jun-16
4237 Meteorological System A 20-May-16 6 06-Jun-16 11-Jun-16
NAVIGATIO AIDS SYSTEM
NAVIGATION 27-Apr-16 14 20-May-16 02-Jun-16
8925 Echo Sounder A 27-Apr-16 4 20-May-16 23-May-16
8930 Speed Log (DELETED) A 4 20-May-16 23-May-16
8940 Navigation Lights (existing) A 20-May-16 6 21-May-16 26-May-16
8910 Navigation Lights A 27-May-16 6 28-May-16 02-Jun-16
8920 U Lights and Fog Horn A 27-May-16 2 28-May-16 29-May-16
ENTERTAI
ENTERTAINMENT SYSTEM 18-May-16 14 12-Jun-16 25-Jun-16
4310 Entertainment System / Gyro A 18-May-16 14 12-Jun-16 25-Jun-16
SECURITY SYSTEM 20-May-16 46 01-Jun-16 16-Jul-16
4231 Radar / Racon System A 20-May-16 5 01-Jun-16 05-Jun-16
4232 GMDSS System / SSAS / GPS System A 20-May-16 6 06-Jun-16 11-Jun-16
8610 Closed Circuit Television System (CCTV) A 15-Jul-16 20 27-Jun-16 16-Jul-16
SAFETY 21-May-16 6 22-May-16 27-May-16
8410 Portable Fire Fighting Equipment A 21-May-16 6 22-May-16 27-May-16
AREA ACCEPTANCE
ACCE 26-Apr-16 33 03-Jun-16 05-Jul-16
9027 Accommodation Exterior and Top W/H A 26-Apr-16 1 03-Jun-16 03-Jun-16
9710 Laboratory A 30-Jul-16 5 01-Jul-16 05-Jul-16

MAIN DECK
DEC 20-Apr-16 24 15-Jun-16 08-Jul-16

5124 HVAC in Main Deck M 14-Jun-16 3 15-Jun-16 17-Jun-16


7880 Emergency Lighting - Main Deck (Mid Area) M 15-Jun-16 10 16-Jun-16 25-Jun-16
9890 Accommodation Ladder include Winches Actuator M 20-Apr-16 8 30-Jun-16 07-Jul-16
9029 Main Deck M 16-Jun-16 1 08-Jul-16 08-Jul-16

FWD MAC
MACHINERY ROOM 20-Apr-16 62 05-May-16 05-Jul-16

9421 Sea Chest Forward Ship Pump Room A/B M 20-Apr-16 2 05-May-16 06-May-16
4560 F&G Detection System Main Deck and Bosun Store M 30-May-16 7 01-Jun-16 07-Jun-16
9315 Bilge and Ballast pump includes pipe work and instruments M 20-Apr-16 5 02-Jun-16 06-Jun-16
4160 PAGA Speaker and Cablin g - Fwd Area M 30-May-16 4 11-Jun-16 14-Jun-16
5125 HVAC in Forward- Bosun Store M 15-Jun-16 3 16-Jun-16 18-Jun-16
5310-FWD Sea Water Lift Pump and Driver Includes Sea Water Suction Manifold (Fwd/Pump Room), Pipew M 20-Apr-16 10 19-Jun-16 28-Jun-16
9321 Bilge System includes Eductor and Piping (Forecastle & Bow Void Space) M 30-May-16 2 25-Jun-16 26-Jun-16
9030 Fwd Area-includes Bosun Store M 16-Jun-16 1 05-Jul-16 05-Jul-16

CARGO & OFFLOADING 20-Apr-16 67 11-May-16 16-Jul-16

PRE-REQUISITE
PRE-REQU 20-Apr-16 45 19-May-16 02-Jul-16
5340 Sea Water Cooling System (Cargo System) with COPT Condenser Circulating pump and Distribu M 15-May-16 4 19-May-16 22-May-16
6259 MDO Boiler Service System includes Ignition,Supply Pumps,Pipework and Instrumentation M 20-Apr-16 8 23-May-16 30-May-16
5360 Sea Water Distribution to IG Scrubber of Inert Gas System includes pump, suction and discharg M 22-May-16 6 02-Jun-16 07-Jun-16
2510 Inert Gas System includes Fan, Scrubber, Pipework and Instrumentation M 15-May-16 15 18-Jun-16 02-Jul-16
2520 Inert Gas Main Header includes Deck Seal, Pipe Distribution and Tank Vent Header M 15-May-16 4 29-Jun-16 02-Jul-16
COMMISSIOINNG
COMMISSI 30-Apr-16 67 11-May-16 16-Jul-16
5810 Remote Cargo / Ballast Valve Hydraulic System including Solenoid, Actuators, Control Panels ,Pip M 10-May-16 40 11-May-16 19-Jun-16
2130 Cargo Oil System (Suction & Distribution Pipes) M 26-May-16 8 27-May-16 03-Jun-16
2310 Tank Gauging System including Draft System & Hi Hi Level M 15-Jun-16 30 16-Jun-16 15-Jul-16
2110 Cargo Oil Pump and Turbine M 30-Apr-16 17 23-Jun-16 09-Jul-16
2120 Cargo Stripping System (Stripping Pump, Eductor and Distribution Pipes) includes Offspec Oil Pu M 30-May-16 10 23-Jun-16 02-Jul-16
2610 Offloading System (Offloading Hose, ESD Valve) M 30-May-16 20 23-Jun-16 12-Jul-16
2410 Tank Steam Heating System M 30-May-16 10 23-Jun-16 02-Jul-16
2810 Condensate Metering Skid Pipework and Instrumentation M 18-May-16 15 25-Jun-16 09-Jul-16
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
2210 Cargo Oil Washing System Including Pumps And Distribution Pipe M 30-May-16 10 07-Jul-16 16-Jul-16
21 - CARG
CARGO STORAGE TANK 06-May-16 28 19-Jun-16 16-Jul-16
2154 Slop Oil Tank (Port) M 21-May-16 4 19-Jun-16 22-Jun-16
2155 Slop Oil Tank (Stbd) M 21-May-16 4 19-Jun-16 22-Jun-16
2140 Cargo Oil Tank #1P M 28-Jun-16 4 13-Jul-16 16-Jul-16
2141 Cargo Oil Tank # 1S M 05-Jul-16 4 13-Jul-16 16-Jul-16
2142 Cargo Oil Tank # 2P M 28-Jun-16 4 13-Jul-16 16-Jul-16
2143 Cargo Oil Tank # 2S M 29-Jun-16 4 13-Jul-16 16-Jul-16
2144 Cargo Oil Tank # 3P M 29-Jun-16 4 13-Jul-16 16-Jul-16
2146 Cargo Oil Tank # 4P M 29-Jun-16 4 13-Jul-16 16-Jul-16
2147 Cargo Oil Tank # 4S M 29-Jun-16 4 13-Jul-16 16-Jul-16
2148 Cargo Oil Tank # 5P M 30-May-16 4 13-Jul-16 16-Jul-16
2149 Cargo Oil Tank # 5S M 14-Jun-16 4 13-Jul-16 16-Jul-16
2150 Cargo Oil Tank # 6P M 06-May-16 4 13-Jul-16 16-Jul-16
2151 Cargo Oil Tank # 6S M 06-May-16 4 13-Jul-16 16-Jul-16
2152 Off Spec Oil Condensate Tank (Port ) M 25-May-16 4 13-Jul-16 16-Jul-16
2153 Off Spec Oil Condensate Tank (Stbd ) M 29-Jun-16 4 13-Jul-16 16-Jul-16

BALLAST 15-May-16 68 16-May-16 22-Jul-16

9211 Ballast Pump (Motor Driven) M 15-May-16 10 16-May-16 25-May-16


9270 Ballast Water Tanks #6C M 15-May-16 2 16-May-16 17-May-16
9220 Ballast Water Distribution Pipes Includes Ballast Stripping Eductor M 30-May-16 2 31-May-16 01-Jun-16
9250 Aft Peak Ballast Tank M 15-May-16 2 02-Jun-16 03-Jun-16
9262 Ballast Water Tanks #2P M 08-Jun-16 2 09-Jun-16 10-Jun-16
9263 Ballast Water Tanks #2S M 10-Jun-16 2 11-Jun-16 12-Jun-16
9260 Ballast Water Tanks #1P M 12-Jun-16 2 13-Jun-16 14-Jun-16
9261 Ballast Water Tanks #1S M 13-Jun-16 2 14-Jun-16 15-Jun-16
9268 Ballast Water Tanks #5P M 14-Jun-16 2 15-Jun-16 16-Jun-16
9269 Ballast Water Tanks #5S M 15-Jun-16 2 16-Jun-16 17-Jun-16
9266 Ballast Water Tanks #4P M 28-Jun-16 2 29-Jun-16 30-Jun-16
9264 Ballast Water Tanks #3P M 30-Jun-16 2 01-Jul-16 02-Jul-16
9265 Ballast Water Tanks #3S M 03-Jul-16 2 04-Jul-16 05-Jul-16
9267 Ballast Water Tanks #4S M 20-Jul-16 2 21-Jul-16 22-Jul-16
E-HOUSE 20-Feb-16 22-Mar-16 100 16-Mar-16 A 17-Jul-16

5170 Packaged HVAC Units HVAC (E-House) T 22-Mar-16 7 16-Mar-16 A 21-Apr-16 A


4548 F&G Detection System Module 65 T 7 16-Mar-16 A 10-May-16
7860 Emergency Lighting Module 65 includes DB T 5 27-Mar-16 A 08-May-16
8380 Inergen System E-House T 6 27-Mar-16 A 21-Apr-16 A
7220 Normal Lighting & Small Power Module 65 includes DB T 5 29-Mar-16 A 09-Apr-16 A
7310-M65 220V AC UPS System A/B including Charger, Inverter, Bypass, Batteries, DB & DB (Topside) T 22-Mar-16 7 08-Apr-16 A 04-May-16
7610 LV Switchboard T 20-Feb-16 14 05-May-16 18-May-16
7620-M65 LV Essential Switchboard T 22-Mar-16 13 05-May-16 17-May-16
4810 Emergency Shutdown System Cabinets, Power Supplies and Control Network T 21-Apr-16 30 06-May-16 04-Jun-16
4815 ESD Interface Instruments & Integration Cables including First Junction Box and Emergency Pus T 20-Apr-16 70 06-May-16 14-Jul-16
4410 PCS System Cabinets,Power Supplies and Control Network A 13-May-16 60 14-May-16 12-Jul-16
4530 F&G Detection System E-House (Addressable) Module 65 T 08-Apr-16 10 25-May-16 03-Jun-16
7510 MV Switchboard T 22-Mar-16 20 30-May-16 18-Jun-16
7550 6.6KV Transformer 4 T 10-May-16 3 19-Jun-16 21-Jun-16
7520 6.6KV Transformer 1 T 22-Mar-16 3 22-Jun-16 24-Jun-16
7560 PMS System T 10-May-16 25 23-Jun-16 17-Jul-16
7530 6.6KV Transformer 2 T 22-Mar-16 3 25-Jun-16 27-Jun-16
7540 6.6KV Transformer 3 T 22-Mar-16 3 28-Jun-16 30-Jun-16

GTG 15-May-16 22-Mar-16 111 09-Mar-16 A 12-Jun-16

KHL190 Lifting of Module.70 - Power Generation System 0 09-Mar-16 A


PRE-REQUISITES
PRE-REQU 15-May-16 22-Mar-16 36 18-Mar-16 A 30-May-16
7630-GTG Marine Switchboard M 10 18-Mar-16 A 05-May-16
7310-GTG 220V AC UPS System A/B including Charger, Inverter, Bypass, Batteries, DB & DB (Topside) T 22-Mar-16 7 08-Apr-16 A 04-May-16
7620-GTG LV Essential Switchboard T 22-Mar-16 13 05-May-16 17-May-16
5650-GTG Instrument Air System Distribution (Topside) T 22-May-16 5 23-May-16 27-May-16
6258 MGO Service System for Top Side includes MDO Supply Pump, Filter, Pipe Distribution and Instr M 15-May-16 5 26-May-16 30-May-16
PREPARAT
PREPARATORY WORKS FOR GTG PRE-COMMISSIONING 17 16-Mar-16 A 01-Jun-16
A1570 Space Heater Power Up 5 16-Mar-16 A 28-Mar-16 A
A1590 Clear scaffolding at GTG area 5 18-May-16* 22-May-16
A1600 Load Bank arrangement 5 28-May-16* 01-Jun-16
PRE-COMMISSIONING
PRE-COMM 40 04-May-16 12-Jun-16

7110- GTG A 40 04-May-16 12-Jun-16


A1610 Pre-alignment of GTG A 6 04-May-16* 09-May-16
A1620 Cold Loop Check 6 04-May-16 09-May-16
A1630 Final Alignment 3 23-May-16 25-May-16
A1640 Power Up of Panels & checking control networks 1 25-May-16 25-May-16
A1650 Function Checks and Hot Loop Checks 7 25-May-16 31-May-16
A1670 Auxiliary Equipment Function Checks 1 27-May-16 27-May-16
A1660 Approval of Sample Report from Solar 1 31-May-16 31-May-16
A1680 Cold Cranking 1 31-May-16 31-May-16
A1690 Full Speed No Load Run 1 01-Jun-16 01-Jun-16
A1700 Excitation of GTG 1 01-Jun-16 01-Jun-16
A1710 6.6KV Switchboard Commissioning 2 02-Jun-16 03-Jun-16
A1720 100% Load Test 2 11-Jun-16 12-Jun-16
7111- GTG B 34 10-May-16 12-Jun-16
A1730 Pre-alignment of GTG B 4 10-May-16 13-May-16
A1740 Cold Loop Check 4 10-May-16 13-May-16
A1750 Final Alignment 2 23-May-16 24-May-16
A1760 Power Up of Panels & checking control networks 1 25-May-16 25-May-16
A1770 Function Checks and Hot Loop Checks 6 26-May-16 31-May-16
A1780 Approval of Sample Report from Solar 2 31-May-16 01-Jun-16
A1790 Auxiliary Equipment Function Checks 1 31-May-16 31-May-16
A1800 Cold Cranking 1 01-Jun-16 01-Jun-16
A1810 Full Speed No Load Run 1 02-Jun-16 02-Jun-16
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
A1820 Excitation of GTG 1 02-Jun-16 02-Jun-16
A1830 6.6KV Switchboard Commissioning 2 03-Jun-16 04-Jun-16
A1840 100% Load Test 2 11-Jun-16 12-Jun-16
7112- GTG C 30 14-May-16 12-Jun-16
A1850 Pre-alignment of GTG C 4 14-May-16 17-May-16
A1860 Cold Loop Check 4 14-May-16 17-May-16
A1870 Final Alignment 2 01-Jun-16 02-Jun-16
A1880 Power Up of Panels & checking control networks 1 03-Jun-16 03-Jun-16
A1890 Function Checks and Hot Loop Checks 6 04-Jun-16 09-Jun-16
A1900 Approval of Sample Report from Solar 2 04-Jun-16 05-Jun-16
A1910 Auxiliary Equipment Function Checks 1 06-Jun-16 06-Jun-16
A1920 Cold Cranking 1 07-Jun-16 07-Jun-16
A1930 Full Speed No Load Run 1 08-Jun-16 08-Jun-16
A1940 Excitation of GTG 1 08-Jun-16 08-Jun-16
A1950 6.6KV Switchboard Commissioning 2 09-Jun-16 10-Jun-16
A1960 100% Load Test 2 11-Jun-16 12-Jun-16

PROCESS 07-Mar-16 22-Mar-16 129 18-Mar-16 A 15-Aug-16

UTILITIES 20-Apr-16 22-Mar-16 99 18-Mar-16 A 16-Jul-16

POWER DISTRIBUTION
D 25-May-16 22-Mar-16 26 18-Mar-16 A 30-May-16
7630-PROC Marine Switchboard M 10 18-Mar-16 A 05-May-16
7620-PROC LV Essential Switchboard T 22-Mar-16 13 05-May-16 17-May-16
7640 Distribution Board (Normal) - Process Area T 25-May-16 5 26-May-16 30-May-16
FRESH / D
DISTILLATE / SERVICE WATER SYSTEM 27-May-16 46 18-Apr-16 A 25-Jun-16
5440 Distillate Fresh Water Generator System (existing & new) includes Pipe Work and Instrument M 27-May-16 8 18-Apr-16 A 04-Jun-16
5452 Service Water System (Topside) T 21-Jun-16 4 22-Jun-16 25-Jun-16
AIR SYSTEM
SYSTE 15-May-16 45 16-May-16 29-Jun-16
5610 Air Compressor A (Tops ide) T 15-May-16 6 16-May-16 21-May-16
5611 Air Compressor B (Topside) T 15-May-16 6 16-May-16 21-May-16
5612 Air Compressor C (Topside) T 15-May-16 6 16-May-16 21-May-16
5615 Air Dryer System (Topside) T 15-May-16 4 16-May-16 19-May-16
5620 Air Receiver Pipework and Instrumentation (Topside) T 15-May-16 5 16-May-16 20-May-16
5650 Instrument Air System Distribution (Topside) T 25-May-16 5 22-May-16 26-May-16
5640 Utility Air System Distribution (Topside) T 24-Jun-16 5 25-Jun-16 29-Jun-16
FUEL GAS SYSTEM 20-Apr-16 6 07-Jul-16 12-Jul-16
6110 Fuel Gas Treatment System pipework and instrumentation T 20-Apr-16 6 07-Jul-16 12-Jul-16
6120 Fuel Gas Distribution System pipework and instrumentation T 15-May-16 6 07-Jul-16 12-Jul-16
HEATING / COOLING MEDIUM SYSTEM 28-May-16 99 09-Apr-16 A 16-Jul-16
6620 Electrical Heat Tracing System T 30 09-Apr-16 A 15-Jul-16
6710 Cooling Medium System Topside including Expansion Vessel, pumps, cooler and distribution netw T 28-May-16 15 02-Jun-16 16-Jun-16
6610 Steam Heating System and Distribution T 30-May-16 29 18-Jun-16 16-Jul-16
INERT SYSTEM
SYS INCLUDING NITROGEN SYSTEM 30-May-16 7 25-Jun-16 01-Jul-16
5910 Nitrogen Generation Skid T 30-May-16 7 25-Jun-16 01-Jul-16
5920 Nitrogen Distribution System T 30-May-16 3 29-Jun-16 01-Jul-16
5930 Nitrogen Bottles and Charging System T 30-May-16 2 30-Jun-16 01-Jul-16
DRAIN SYSTEMS
SYS 30-May-16 22 25-Jun-16 16-Jul-16
6511 Non-Hazardous Open Drain System T 24-Jun-16 6 25-Jun-16 30-Jun-16
6410 Closed Drain Non Amine area Collection Header includes pipework T 30-May-16 5 02-Jul-16 06-Jul-16
6420 Closed Drain Non Amine area Sump vessel, Sump pump pipework and instrumentation T 30-May-16 5 02-Jul-16 06-Jul-16
6510 Hazardous Open Drain System T 24-Jun-16 6 11-Jul-16 16-Jul-16
LIGHTING 05-May-16 22-Mar-16 49 21-Apr-16 A 05-Jul-16

NORMAL LIGHTING
L 05-May-16 22-Mar-16 48 21-Apr-16 A 05-Jul-16
7218 Normal Lighting & Small Power Module 55 includes DB T 5 21-Apr-16 A 21-Jun-16
7213 Normal Lighting & Small Power Module 20 includes DB T 5 28-Apr-16 A 21-May-16
7215 Normal Lighting & Small Power Module 35 includes DB T 5 28-Apr-16 A 31-May-16
7221 Normal Lighting & Small Power Module 70 includes DB T 05-May-16 5 05-May-16 A 07-May-16 A
7222 Normal Lighting & Small Power Module 91 includes DB T 06-May-16 5 05-May-16 A 07-May-16 A
7210 Normal Lighting & Small Power DB including Transformer ( Top Side) T 22-Mar-16 7 19-May-16 25-May-16
7219 Normal Lighting & Small Power Metering Skid includes DB T 06-May-16 5 19-May-16 23-May-16
7211 Normal Lighting & Small Power Module 10 T 01-Jun-16 5 26-May-16 30-May-16
7214 Normal Lighting & Small Power Module 30 includes DB T 15-Jun-16 5 16-Jun-16 20-Jun-16
7212 Normal Lighting & Small Power Module 15 T 24-Jun-16 5 25-Jun-16 29-Jun-16
7216 Normal Lighting & Small Power Module 40 includes DB T 30-Jun-16 5 01-Jul-16 05-Jul-16
7217 Normal Lighting & Small Power Module 45 includes DB T 30-Jun-16 5 01-Jul-16 05-Jul-16
EMERGEN
EMERGENCY LIGHTING 06-May-16 22-Mar-16 49 28-Apr-16 A 05-Jul-16
7853 Emergency Lighting Module 20 includes DB T 5 28-Apr-16 A 09-May-16
7855 Emergency Lighting Module 35 includes DB T 5 28-Apr-16 A 31-May-16
7858 Emergency Lighting Module 55 includes DB T 5 28-Apr-16 A 21-Jun-16
7861 Emergency Lighting Module 70 includes DB T 08-May-16 5 05-May-16 A 22-May-16
7859 Emergency Lighting & Small Power Metering Skid includes DB T 06-May-16 5 18-May-16 22-May-16
7850 Emergency Lighting and Small Power DB including Transformer (Topside) T 22-Mar-16 5 18-May-16 22-May-16
7862 Emergency Lighting Module 91 includes DB T 06-May-16 5 18-May-16 22-May-16
7851 Emergency Lighting Module 10 T 25-May-16 5 23-May-16 27-May-16
7810 Emergency Distribution Board (Process Area) T 25-May-16 5 26-May-16 30-May-16
7854 Emergency Lighting Module 30 includes DB T 15-Jun-16 5 16-Jun-16 20-Jun-16
7852 Emergency Lighting Module 15 T 24-Jun-16 5 25-Jun-16 29-Jun-16
7856 Emergency Lighting Module 40 includes DB T 30-Jun-16 5 01-Jul-16 05-Jul-16
7857 Emergency Lighting Module 45 includes DB T 30-Jun-16 5 01-Jul-16 05-Jul-16
FIRE & GAS 07-Mar-16 88 04-May-16 30-Jul-16
4506 F&G Interface Instruments & Integration Cables including First Junction Box and MAC Push Butt T 25-Apr-16 50 04-May-16 22-Jun-16
4549 F&G Detection System Module 70 T 06-May-16 7 25-May-16 31-May-16
4542 F&G Detection System Module 20 T 16-May-16 6 01-Jun-16 06-Jun-16
4544 F&G Detection System Module 35 T 28-May-16 7 01-Jun-16 07-Jun-16
4550 F&G Detection System Module 91 T 07-Mar-16 3 01-Jun-16 03-Jun-16
4540 F&G Detection System Module 10 T 10-Jun-16 6 04-Jun-16 09-Jun-16
4543 F&G Detection System Module 30 T 15-Jun-16 10 16-Jun-16 25-Jun-16
4547 F&G Detection System Module 55 T 16-Jun-16 8 16-Jun-16 23-Jun-16
4541 F&G Detection System Module 15 T 24-Jun-16 6 25-Jun-16 30-Jun-16
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
4545 F&G Detection System Module 40 T 16-Jul-16 14 17-Jul-16 30-Jul-16
4546 F&G Detection System Module 45 T 16-Jul-16 10 17-Jul-16 26-Jul-16
PROCESS SYSTEMS 20-Apr-16 86 22-May-16 15-Aug-16
3515 Carbon Bed Absorption pipework and instrumentation T 16-Jul-16 30 17-Jul-16 15-Aug-16
3540 Tail Gas Thermal Oxidation pipework and instrumentation T 16-Jul-16 30 17-Jul-16 15-Aug-16
3550 HP Steam and Condensate Collection System T 16-Jul-16 30 17-Jul-16 15-Aug-16
3560 SRU LP Steam Distribution System T 16-Jul-16 30 17-Jul-16 15-Aug-16
SEPARATI
SEPARATION FACILITIES 15-Jun-16 15 25-Jun-16 09-Jul-16
1110 HP Separator Includes Pipework and Instrumentation T 15-Jun-16 15 25-Jun-16 09-Jul-16
1120 MP Separator Includes Pipework and Instrumentation T 15-Jun-16 15 25-Jun-16 09-Jul-16
1130 LP Separator Includes Pipework and Instrumentation T 15-Jun-16 15 25-Jun-16 09-Jul-16
CONDENS
CONDENSATE STABILIZATION 15-Jun-16 15 25-Jun-16 09-Jul-16
1210 Condensate Preheaters, Stabilization Column, Stabilizer Overhead Cooler, Stabilizer Reboiler, Co T 15-Jun-16 15 25-Jun-16 09-Jul-16
PRODUCE WATER TREATMENT SYSTEM / SOUR WATER STRIPPER SYSTEM
PRODUCED 28-May-16 8 02-Jul-16 09-Jul-16
1610 HP, MP, LP Liquid Hydrocyclones, IGF Degassing Vessel, Rejection Oil Recycle Pump, Pipework T 28-May-16 8 02-Jul-16 09-Jul-16
1640 SWS (Sour Water Stripper) Feed pump, SWS Inlet Filter, Sour Water Stripper, SWS Stripped Wa T 28-May-16 8 02-Jul-16 09-Jul-16
1620 Demulsifier System Includes Tank, Pump, Pipework And Instrumentation T 15-Jun-16 8 02-Jul-16 09-Jul-16
1630 Floculent Chemical System includes tank, pump, pipework and instrumentation T 28-May-16 8 02-Jul-16 09-Jul-16
GAS DEHY
DEHYDRATION SYSTEM / TEG REGENERATION SYSTEM 16-Jun-16 20 07-Jul-16 26-Jul-16
3210 Gas Dehydration Contactor and Hydrogen Dew Point Control System pipework and instrumentat T 16-Jun-16 20 07-Jul-16 26-Jul-16
3220 TEG Regeneration System, pipework and instrumentation T 16-Jun-16 20 07-Jul-16 26-Jul-16
3230 GDU Chemical Injection System pipework and instrumentation T 16-Jun-16 20 07-Jul-16 26-Jul-16
GAS TREA
TREATMENT UNIT 16-Jul-16 20 17-Jul-16 05-Aug-16
3310 Gas Sweetening and Absorber System pipework and instrumentation T 16-Jul-16 20 17-Jul-16 05-Aug-16
3330 GTU Chemical Injection System pipework and instrumentation T 16-Jul-16 20 17-Jul-16 05-Aug-16
3320 Amine Regeneration System pipework and instrumentation T 16-Jul-16 20 17-Jul-16 05-Aug-16
MOLTEN S
SULPHUR SYSTEM 20-Apr-16 81 27-May-16 15-Aug-16
5662 Utility Air System to Heater Molten Sulphur T 20-Apr-16 5 27-May-16 31-May-16
9325 Bilge System includes Pneumatic pump and piping (COT 3S Void Space) M 15-Jun-16 2 25-Jun-16 26-Jun-16
2145 Molten Sulphur Tank A & B M 30-Jun-16 8 01-Jul-16 08-Jul-16
5129 HVAC in Sulphur Compartment M 01-Jul-16 3 02-Jul-16 04-Jul-16
3510 Molten Sulphur Offloading System includes pumps, blower, Drain tank, instruments, flexible hose M 30-Jun-16 8 03-Jul-16 10-Jul-16
3520 Sulphur Recovery pipework and instrumentation T 16-Jul-16 30 17-Jul-16 15-Aug-16
3530 Sulphur Degassing System pipework and instrumentation T 16-Jul-16 30 17-Jul-16 15-Aug-16
LP / MP GAS
GA RECOMPRESSION TRAIN-1 15-Jun-16 7 10-Jul-16 16-Jul-16
3710 Train 1 Gas Compressor Driver T 15-Jun-16 7 10-Jul-16 16-Jul-16
3720 Train 1 First Stage and Second Stage Compressor T 15-Jun-16 7 10-Jul-16 16-Jul-16
3730 Train 1 Scrubber, Cooler and Recycle pump, pipework and instrumentation T 15-Jun-16 7 10-Jul-16 16-Jul-16
3740 Train 1 Vent and Drain System T 15-Jun-16 7 10-Jul-16 16-Jul-16
LP / MP GAS
GA RECOMPRESSION TRAIN-2 15-Jun-16 7 17-Jul-16 23-Jul-16
3810 Train 2 Gas Compressor Driver T 15-Jun-16 7 17-Jul-16 23-Jul-16
3820 Train 2 First Stage and Second Stage Compressor T 15-Jun-16 7 17-Jul-16 23-Jul-16
3830 Train 2 Scrubber, Cooler and Recycle pump, pipework and instrumentation T 15-Jun-16 7 17-Jul-16 23-Jul-16
3840 Train 2 Vent and Drain System T 15-Jun-16 7 17-Jul-16 23-Jul-16
CHEMICAL INJECTION SYSTEM 20-Apr-16 5 22-May-16 26-May-16
6820 Pour Point Depressant System includes Tank, Pump, Pipework and Instrumentation T 20-Apr-16 5 22-May-16 26-May-16
6810 Corrossion Inhibitor System includes Tank, Pump, Pipework and Instrumentation T 20-Apr-16 5 22-May-16 26-May-16
6830 MEG Chemical Tank, Pump, Pipework and Instrumentation T 20-Apr-16 5 22-May-16 26-May-16
FLARE SYS
SYSTEM 16-May-16 10 02-Jul-16 11-Jul-16
1710 HP Flare Distribution System pipework and instrumentation T 24-Jun-16 10 02-Jul-16 11-Jul-16
1720 HP Flare Condensate Knockout Drum, pump, pipework and instrumentation T 16-May-16 10 02-Jul-16 11-Jul-16
1810 LP / Acid Flare Distribution System, pipework and instrumentation T 24-Jun-16 10 02-Jul-16 11-Jul-16
1820 LP Flare Condensate Knockout Drum, pump, pipework and instrumentation T 16-May-16 10 02-Jul-16 11-Jul-16
1730 Flare Stack, Relief/Vent to HP & LP Flare Manifold, Flare Tip and Flare Ignition Control Panel T 24-Jun-16 10 02-Jul-16 11-Jul-16
EARTHING 08-Apr-16 18 30-Jun-16 17-Jul-16
7410 Intrinsic / Instrument Earth (Topside) T 08-Apr-16 2 30-Jun-16 01-Jul-16
7420 Normal / Dirty Earth (Topside) T 08-Apr-16 2 16-Jul-16 17-Jul-16
MISC. TOPSIDE
TOP SYSTEMS 30-May-16 57 02-Jun-16 28-Jul-16
5150 Packaged HVAC Units Topside Workshop T 30-May-16 3 02-Jun-16 04-Jun-16
4150 PAGA Speaker and Cablin g - Topside Module T 16-Jul-16 4 17-Jul-16 20-Jul-16
4228 LAN / PABX System (Topside & Fwd Area) T 16-Jul-16 12 17-Jul-16 28-Jul-16
AREA ACCEPTANCE
ACCE 09-Apr-16 61 01-Jun-16 31-Jul-16
9720 Topside Workshop T 31-May-16 5 01-Jun-16 05-Jun-16
9017 Module 55 includes Structure T 16-Jun-16 1 29-Jul-16 29-Jul-16
9019 Module 65 includes Structure T 09-Apr-16 1 29-Jul-16 29-Jul-16
9020 Module 70 includes Structure T 01-May-16 1 29-Jul-16 29-Jul-16
9010 Module 10 includes Structure T 10-Jun-16 1 29-Jul-16 29-Jul-16
9011 Module 15 includes Structure T 24-Jun-16 1 29-Jul-16 29-Jul-16
9012 Module 20 includes Structure T 16-May-16 1 29-Jul-16 29-Jul-16
9013 Module 30 includes Structure T 15-Jun-16 1 29-Jul-16 29-Jul-16
9014 Module 35 Includes Structure T 28-May-16 1 29-Jul-16 29-Jul-16
9021 Module 91 Includes Structure T 21-May-16 1 29-Jul-16 29-Jul-16
9016 Module 45 includes Structure T 16-Jul-16 1 29-Jul-16 29-Jul-16
9015 Module 40 includes Structure T 16-Jul-16 1 31-Jul-16 31-Jul-16

STAND-ALONE
STAND-AL 20-Apr-16 39 29-May-16 06-Jul-16

CRANES, WINCHES
W & MISC. MATERIAL HANDLING 15-Jun-16 12 16-Jun-16 27-Jun-16
9610 Aft Crane M 15-Jun-16 12 16-Jun-16 27-Jun-16
9620 Fwd Crane M 15-Jun-16 12 16-Jun-16 27-Jun-16
9640 Monorail Crane (Aft Side) M 15-Jun-16 5 16-Jun-16 20-Jun-16
9650 Portable Lifting Equipment M 15-Jun-16 3 16-Jun-16 18-Jun-16
9660 Padeyes and Lifting Beam M 15-Jun-16 4 16-Jun-16 19-Jun-16
9670 Provision Crane M 15-Jun-16 4 16-Jun-16 19-Jun-16
LIFEBOATS RESCUE BOATS & DAVITS
LIFEBOATS, 30-Apr-16 32 05-Jun-16 06-Jul-16
8210 Lifeboat & Davit (Port) M 30-Apr-16 6 05-Jun-16 10-Jun-16
8211 Lifeboat & Davit (Stbd) M 30-Apr-16 6 05-Jun-16 10-Jun-16
8220 Rescue Boat and Davit M 30-Apr-16 6 05-Jun-16 10-Jun-16
8230 Lifejacket / Storage / Lifebuoys / Liferaft / Misc M 30-Jun-16 6 01-Jul-16 06-Jul-16
COMMMISSIONING SCHEDULE KARAPAN ARMADA STERLING III FPSO

Activity ID Activity Name Area MC Date Actual Original Start Finish 2016
SMCC Duration March April May June July August
2 011230122 0112001230 1220112
FIREWATER LINES & PUMPS 20-Apr-16 35 29-May-16 02-Jul-16
8140 SW General Service Pump includes includes Pipe Work M 16-May-16 5 29-May-16 02-Jun-16
8130 Jockey Pump, Pipework and Instrumentation M 30-May-16 5 02-Jun-16 06-Jun-16
8110 Fire Pump (Aft) includes Lift Pump, Deluge, Pipework and Instrumentation M 30-May-16 10 15-Jun-16 24-Jun-16
8120 Fire Pump (Fwd) includes Lift Pump, Deluge, Pipework and Instrumentation M 30-May-16 10 17-Jun-16 26-Jun-16
8112 Fire Water Distribution and Ring Main Cross Over Line M 30-May-16 7 17-Jun-16 23-Jun-16
8144 Deluge Distribution System Module 30 T 15-Jun-16 2 27-Jun-16 28-Jun-16
8145 Deluge Distribution System Module 35 T 28-May-16 2 27-Jun-16 28-Jun-16
8149 Deluge Distribution System Module 70 T 20-Apr-16 2 27-Jun-16 28-Jun-16
8142 Deluge Distribution System Module 15 T 24-Jun-16 2 27-Jun-16 28-Jun-16
8143 Deluge Distribution System Module 20 T 16-May-16 2 27-Jun-16 28-Jun-16
8148 Deluge Distribution System Module 55 T 16-Jun-16 2 27-Jun-16 28-Jun-16
8150 Deluge Distribution System Module 91 T 20-Apr-16 2 27-Jun-16 28-Jun-16
8146 Deluge Distribution System Module 40 T 30-Jun-16 2 01-Jul-16 02-Jul-16
8147 Deluge Distribution System Module 45 and M10 T 30-Jun-16 2 01-Jul-16 02-Jul-16
FIRE SUPPRESSION
SUPP SYSTEM 20-Apr-16 20 17-Jun-16 06-Jul-16
8340 High Expansion Foam System to Engine Room M 20-Apr-16 10 17-Jun-16 26-Jun-16
8315 High Expansion Foam System (Package) includes Eductor, Storage tank, pipework and instrume M 20-Apr-16 10 17-Jun-16 26-Jun-16
8345 High Expansion Foam System to Cargo Pump Room M 30-May-16 10 17-Jun-16 26-Jun-16
8352 Foam System Misc. Space M 20-Apr-16 10 17-Jun-16 26-Jun-16
8353 Paint Store M 20-Apr-16 5 19-Jun-16 23-Jun-16
8310 Low Expansion Foam System (Package) includes Eductor, Storage tank, pipework and instrume M 20-Apr-16 10 25-Jun-16 04-Jul-16
8330 Foam System Helideck M 20-Apr-16 10 27-Jun-16 06-Jul-16
8320 Low Expansion Foam Distribution Main Deck Forward and Aft including foam monitors and hydra T 20-Apr-16 2 03-Jul-16 04-Jul-16
8329 Low Expansion Foam Distribution Underneath M91 T 20-Apr-16 2 03-Jul-16 04-Jul-16
8321 Low Expansion Foam Distribution Underneath M20 T 16-May-16 2 03-Jul-16 04-Jul-16
8322 Low Expansion Foam Distribution Underneath M30 T 15-Jun-16 2 03-Jul-16 04-Jul-16
8323 Low Expansion Foam Distribution Underneath M35 T 28-May-16 2 03-Jul-16 04-Jul-16
8324 Low Expansion Foam Distribution Underneath M45 T 30-Jun-16 2 03-Jul-16 04-Jul-16
8325 Low Expansion Foam Distribution Underneath M55 T 16-Jun-16 2 03-Jul-16 04-Jul-16
8326 Low Expansion Foam Distribution Underneath M65 T 20-Apr-16 2 03-Jul-16 04-Jul-16
8327 Low Expansion Foam Distribution Underneath M70 T 20-Apr-16 2 03-Jul-16 04-Jul-16
CO2 SYSTEMS
SYSTE 20-Apr-16 29 02-Jun-16 30-Jun-16
8354 Emergency Diesel Generator (CO2) M 20-Apr-16 5 02-Jun-16 06-Jun-16
8360 CO2 System Flare M 24-Jun-16 6 25-Jun-16 30-Jun-16
AREA ACCEPTANCE
ACCE 21-Apr-16 21 16-Jun-16 06-Jul-16
9730 Stores M 21-Apr-16 2 16-Jun-16 17-Jun-16
9031 Void Tank and Void Space M 31-May-16 1 27-Jun-16 27-Jun-16
9910 Helideck Area Acceptance includes Helideck Lighting and DB M 31-May-16 3 04-Jul-16 06-Jul-16