You are on page 1of 1

SHOP MATERIAL LIST FOR 1 ASSEMBLY

MARK Size Grade No. Length Area Weight


(mm) (m 2) (kg)

3 FLT8*100 S235 4 100 0.050 1.2


7 PL12*185 S235 2 456 0.368 15.9
b3 UB254*146*37 S275 1 2572 2.752 95.7
Total 3.170 112.8

2596 (UB254*146*37 x 2572)


GRID LOCATION LEVEL
B5 1-2/A +3.600
B5 1-2/C +3.600
2472 100 B5 1-2/A +7.100
B5 1-2/C +7.100
B5 1-2/A +10.600
A A B5 1-2/C +10.600
53 52
3
47
3
b3 ( 256*146.6 )
53

356
125
125

100
7

A-A
A A
12 2572 12

456
100
53 125 125 100 53
3 ( 8*100 )

40
7 ( 12*185 )

100
185
105

15
15

40

-
6 No. BEAM REQUIRED AS DRAWN MARKED B5
LOT 0
PRELIM
DESC BEAM
FINISH
PHASE 1
Client:
Tekla
Project:
Tekla Model
General Notes: Drawn:
Struct
ALL HOLES 22 DIAM UNO
Checked:
ALL WELDS 6mm CONT FILLET Job No. / Dwg No. / Rev A2
TOTAL WEIGHT 112.8
Scale:
STEEL GRADE S275 N.T.S. 500-1 / B5 /
Rev By Date Details Rev By Date Details

You might also like