a ln hdl Ane Le ce om oe
scott icon mys
tre gan oes ees le gi
sles and gt oes eis a
$i ma tte ar ecie () ew m
smn ay cel snags wo ee ta ed
is ivel om The itive sty ening stg
» Titre aemens res eared et
‘ove ed hens ned vel cas By wing ges pln ee
ice sSced mcr hin ter brag tte eg
en sin ero dey he das apa @
ing vein equ LTV erent
so scram tn cpnencnt a Te Ta Wout en deo
Eigen Top coee sey oe
Ra pee ong Fae Toy hey sins
sh ey nee np: te ne oe
SESS SEE rp ltt
OTe ae whch eee legos
Saeed nee
Stead ee SI Hae ci,
‘adhspyiod slate eleshornnhc ney agorbotr ic
SCHEDULING IssUES
Schein eon ae eso ity bs co
Seg aN ESS SSSA sides ne ds ie
mn Peieesbacnce
Ee.
sy
om Seat
Sa
ih. See
in| Hoe
ibe end cine peed
oune)61,# Thin BenvenCney Panine. Anot Faig
Rita had, onl Suartom Sane
Seems
‘shud, we can cape heli ech (1) fred ching ad
(Gy backond chet
Fomvard and Backward Scheduling ~
Forward schotling wars the hell eon athe riements te kno Fore Fort hing
‘urd shading edn» varity ef nations sh ae hols, ces fe
ising retmran, and machine oot marten, In these Tifa we
‘sed cnc ne al dle fen epee as son pe ss
‘ard schedling uy dsc gre helt cane cl
‘ven if itm nt mang the os de. In any ins, aed ahah
{sts able wdc vee,
Bockward shes esis wth the dd, cheng the fal ogetton|
fs. Stes inthe job ar thenchedueleneaainyntevers ones By sce
tng the lel tine foreach nthe san tne fete: Hone the sence
necessary oncom the cho ay exit Ear! ching ede
‘many manufacturing evo well eve ronment io coe,
‘bang or chlo gern prac, acobinstion loreal nd aloo
‘ced fined da xeric wef teen viet cn be she
‘eked hag‘Scheduling Workers Who Fall
Aaleepon the Job Is Not Easy
Salita
paren ei a "ee
top ns Nene el pen” a
FEEDS la “ie tle alee ane
Tithe Rebiinsley meme yceay
See ees hat aan rue
Se a cn wah race
ce Bonced npr les cine
despre a ee nt
{ey al camel Fat perce
wind wg cn you
Bipmaeretateetemeee
A ee eee oeok
tn Fe “ ne
‘Tachi fe Darmen n
cml ccc ae
Seana pena Pt A
tial ke np Mola
seaminstna neat
ceases
Fe prt ing ee
2 a ha Lr dpl ow presen
Scheduling Ctra
“Teconac hedge on
hedge aa wel ares os neh
enon he lan for ioe
Seat mtarer
Mme Colon Te
Meee ech
“cnn by deen the ene
een ee Tsun by denne pons oh Ae
Sey ei
5, Moa Weer
eg ert
ie ci: The erly ei
Pip tence met
tee ovr
Fe cm thelower em
4 Ns Case
fie de
i rs eae ty eri he oe
aan eel in ds ch er we nny ene
a ce tap Sng aon re
ein ie nf ean pir eo re
sre eee coasting se
seater mane oo
ee _
SENN Wome cenrens
sen i abo ven tect or ia a ge
pen ee a era mmnne
da cry rm cf i tc one oe
ae rapt een lg
I hic Tope aban
af rhino ac a
ee mig ack wut ing pyc aa
1 Day at meee ding ok
1 Ptah ier ropes pit cl sa rt
(eclime
4, Gest eakingrgesarsimore awh es
{pe ec pnt pon tin
FUE Sal ern ts dn monte cp im a ol a
Era mis
‘her hliiegpcns ia r ate t ca onk
el Te et urs cn da eve inn ok
Hu the ii ie,
see 2 Soman he rm rh pr roe
‘rts homme oe tah ah and ae ce
Feet etre au i mk amey ah ac ln
Ca pets ms pane pn ech wk oS
SE is
LOADING 1005 IN WORK CENTERS
RoapING 3085 IN WORK CENTERS __
‘Lean cs agent fe 2 wk pring ce Opis
[OREE SE fe oot cana out tin compn inese
FeeS Tete tin wat ere fof One awe cae
‘the aml rl ogg pee Hook ene Fs we ee
ages
tentingat.320 standard hours, which i the assumed capacity. A. acklog of 300
eee 2a owener acta ott (TORO) iss
eet sn planed. Therefore, neither the input plan nor dhe output plan is being
ee ned: Tnded, the backlog of work in this work center has actualy incase by
Frere by weck 4. This increases workin-prcess inventory, complicating the
scheduling ak and indicating the need for manager action.
scheduled
“The options avilable to operations personnel to. manage facility work fw
include
1. correction of performances;
2. increasing facility sizes
3, increasing or reducing input to the work center by
(a) routing work to fom other work centers,
(b) increasing or decreasing subcontracting,
(c) prochucing les (or producing more).
Producing less i nat 2 popular solution for many managers, but the
‘can be substantial. First, the eustomer service level may improve because
prevlyced on time. Second, efficiency may atwaly improve because of fess work-in-
Process clutteriny the wok center axl eklng to overicad cass. Third quality ey
Tinprove because less work-in-process hides fewer problems
Gantt Charts
Gantt charts ae vi
derived fom Henry Ga
tlectbe the we of source,
‘When ised in aang, G
departments, machines or Beis They display the re
terwao thatthe manager knows what adjstments ae apyoprite. For example, when
ome work center becomes overonled,empoyees fom Tow kal center can be trane-
feted temporal to incense the werk fore, Or if waiting jobs can be proces at
Allert wrk enters seme jbs a high-end centers can be transfered to low-load
transfer ong centers. Example 2 ill
aids thar are useful in loading and scheduling. Their name is Gantt charts
who developed them inthe Tate 1800s, The charts help
has work centers and overtime.
‘charts show the loading and idle time of several
wwe worklonl in. the sys
centers. Versatile equipment may aso
trates a simple Gantt load chart
FEE e
‘A New Orleans washing machine manufcrrer acceps pecial order for mar
chines tobe wed in unigue faites sich as submarines bosptale and lange Ind
twa laundries "The prohiction of cach machine requis varying tke and
Sein Powe 163 thaws thd ht rth wc of Mh 8
3 four work contr proces several obs daring the week This particular
chart indicates that the Metal Works and Painting centers are comer leaded
forthe ie eck. Ths Meche an etc cates ee see
scattered during the week. We also note that the Metal Works center is IC
able on Tuesday, perhaps for preventive maintenance. a aaaaE | wnay | Ter ei Ty | Fay
Fone edo
“Cpl resin an Fon to
sds ta see alder
SOCSEORI RTs Stunned cont
jobs and revwod time estimates.
im
Can se edi ns nh
leo gine he hc coe eV as
rear oe et smduacendetececiae
-
1s Copa Si aie tg
atte onto f= el win The el
Seepeeelrms ripen dc bloom, tan
Noe Coors ee vou come he cee
Mamas Seta eee
HGUREIGA Cae Sling Char rob A, and
Sra
eye
—1s-
7
‘aaabed Nore =
ao
nese
‘The AsignmentMethod =
‘The asigamet sth i
ols asigning ts oo to reac Exe nla asonng js oor
oes, coats bens people to wots and skp otto The
‘sti mat of tomate toa ease eel top he alo
an Gu ipo chraceii of asi bles aot co ee
woke) tana ane machine (or poet).
ich asiment proc ses tile. The sues in the ale wil be the
SReeeE Moat wih cach paral asiguaeat Rvesampl i xy es
"hes avaible machines (A, Ban C) an de ow jb tobe compete aol
tng spall The dr eas sees he estate of whaskh
‘sot frac ab tobe eongletedon cach nti,
‘Cet an le hau ap tlhe Fagen
excl chs oh nest prognmming med hat n- Ange modumbexin the ow at
sunber
fate
eee
The ‘Bown cron sist is
ec lgnent of obs to machines wing =P
|
mt -
ce [9
aaa » Le
Step th sng he son ale brat he alt brn che
cannery ter clr The ro dwn
‘Step 2 Draw the iim suber of amit nes ned to cove al
eto: Beene oo ines fie slant
‘Step 3. Sars the mle uncovered mbes (2 hs he) fom every
‘ier uncovered ito number atheist oft ie.
RH 3
36 ° |ePequENcING JOBS IN WORK CENTERS
Stato nei emcee
a ac paeat tote sve thon who ated ac one
weet cme Senge rch a
iorty Rules for Dispatching Jobs
eae ce ng i ei he ea ee
Pi et pn pcs ly ch sh
‘ture enh tl ra
“See posting sine Tess le ft don
‘Tener
IT Logs peeing te To ba
gga 2
nl Seng hae
woe
Sted eqs pepsin SISO)
EER Sng Pt see gran ce
escent he tor eck ubiraemon eay|
fess orc ww 6 dop tt Ac,
‘Ril asdf nin ne ke abe can
(be ake edn
“Th fo come fre filing meas lie
smd tine
Toa
Taw
(0) Avge cpl i=0 dee
Be a
7
emo ow tie _
(0 Aen bert in he n= me tl doin
Be ase
1 Avenged 1
-~st0 Arenge a enen = Salle =
2 The SPT ule el nthe eres B-D-A-C me boi ae
‘eyenced sng fo pce ne, ih teh oy ee
esioret
Bas
(0 Ustinica = 8.1%
6
(ey Avenger fein the spn = = 232
(8) Avege tenes = 2= 18 ar
5
1 The EDD nl gies the sepece B-A-D-C-E. Not tht ob ae ok
pest de dae
(0) Agent tine 06 dy
0 tan Ba
(6) Ave tenn inthe n= 22
(2) Avera ob ene $1. a
4 The LPT ene nee RD
if
t
o 2 B ‘ 2
Uatinton= 2: -282%
(0 vataaon= 28 <8
(0 Areog ume tin teem = 1S 368
(2 Aen = 96a
“There tthe fr ea smal ow
Siviesmn _uneeou
ba at 2 i
Fo we a ae a
ay 26 m2 a %
Ace caniee in ample, LTiethe et fesire mexremeat fen
ing forthe Aj Compony. SPT te ser hace meine scl EDD i the la
(Goer tenes). Ths ype tein the ewer als dha en emby nmr of sinalton experienc? W
‘eden nen ot i no cee seamen ie bay
1 Siti de tae en es teh le
Shieh amreerenlemenenpnes
‘nent for gerbe as ote mde, | mimes Pens hae
Soya rere am ts
Critical Ratio
Anaherp of steing ue te ea ti: The ae atl (CR 9
{tds mur coon! hy devin the me emg el ue date he wa
Line eaining he eppel tothe by ae ee a dey
‘pseu tn RS SETEDD LT oe meme
“ec etal eato ves roy jo hae mt be dane 1 beep i om
choles Ajo wih ow cal ran es ha.) te dn fling Bind
‘Shslule IFER en 1th ob coe ole, ACR get hae 1 mee
Tie be ahead fckeul nha soe tak
"The mul renal to
ee
ape 6 shows ow 1 the eel 0
“Goa ead ine ens
con chee Ts va ore
“Taps day 25 0S Oo Food Fo
Since blow
3 Ps 5
¢ ” 2
‘We compute he ei atin sng oral for CR
ewe te unless expe
jah Abasome dock.
Job Bas erica ai es chan 1, meaning
“Thus cho the highest roy. Job Cn ie a
ot ean ng tothe
Ir Deane von ecph
3. Rehr ah on tor oncom
‘Ato ts nd eect) ema fr ane a bah Se
Sones
5. Dymmaly ek poean ein,
‘Sequencing Jos on Two Machines: Johnsons Rule
"Toe nest step cml cae ware ob oe 2 re mat
Pipes a ese or hs el et
gent le an be wed opine pcan er een Hm de
poole taht sie? munis tool Metin me
aot delve
1 Al ja at be ed ad ech regis on 8 mie to be
2. Wen he ob with he she activ si he she ine sh
Te RekGatlite epee ow Hake shoteene le wih
Coli hl ec on ve ine
5, Onc ajo ahold nit
44 Aly sep ad 30h eemaiing i, wg toma center fhe
sample 7 shows bow ply Jinn Ral,
Tove ec lca Fao New Yo, ol hp we ceed
noah te come (ll chine ate ote The ie 9
‘Sangalo
: 4 °
a : ‘
b & :
t 2 a
Mail Yat he Soe Pin Sieh Sy Tee al? Nad
each aan DS ae “1. We wish tos the equnc hat wl minimis the tol reeig i
‘he fee jobs The wth hese eeingine tA eer
(tha tine 07 hour). Bee eth wal cone, nce & ae
Eliminate fm concen
2 Job B asthe nee shore tne (3) Beet ne te ft wk
cee we shel fi anc fm carte
3+ The ext shows ine el (4) 0 he and machine Tene,
phd ae pole
1. Theale ron co machine ate et the ee dan
2. Thelin mani hea bt on
/ Baglin isco
Cmdr th ting ind errs wand oc
be T= Tes Te Ta
“The sequent tines ne
“The time hed ow ohio sequence best red api
tt
“Thuy the ive ob ate camped in 35 os, The sca wok cee will
a ry sed lao wait | owt ater comeing
‘Sequencing N Jobs on Three Machines
“The pti sli to seeing Nob ce machines aie cme
Fee er exo the following conditions ae met, thescaton ros
4. There fa (a7 hou) forthe shots remaining oh We Hae 5 A x 1
‘ch ns ome fs wo cence se Then Ded het g G 4 5
We wont to me Jnr rae to Gl the opines. Beco th
dita f ebmna fe eet we con ly Fes frm sew bee
Blown
Now sing esol forthe NP rem, we ge the optinaseqenceB, A,
eb.
neatly, nner conver at NPS poe oa NE lem eo:
ded it cei cain are mee Eve thee tos te ot et ale
sil provides nero laton
Sequencing N Jobson M Machines
‘When sera toe res though man fe niga pil
quence tole a compler arch proce An fice eutte proce
noms the CDS lath. The CDS ali exec he NP eet eo
a
1 stsneal NM poem nl provi nepal cn
eH) Mai Se