You are on page 1of 1

A B C D E F G R.C.C.

COLUMN
39'
12'-9" 2'-9" 7'-6" 1'-3" 11'-6" 3'-3" COL.TIES TYP.

3'-9" 4'-3" 4'-3" 3'-9" PLINTH BEAM


2'-1.5" 2'-1.5" 2'-1.5" 2'-1.5"
NGL/FGL

2'-4.5" 2'-4.5"

2'-4.5" 2'-4.5"
N.G.L WHICHEVER IS LOWER
F2 F2

2'-1.5"

2'-1.5"
W1 V1 V1 W1 4.5" 4.5" 4.5" 4.5"

4'-3"

4'-9"

4'-9"

4'-3"
7.5"

7.5"

7.5"

7.5"
A A F2A F2A

2'-1.5"

2'-1.5"
ATT.TOI ATT.TOI
4'6"X8'0" 4'6"X8'0"
COL.REINFORCEMENT.
W1 BED ROOM BED ROOM W1

12'-6"
12'0" X 12'0" 12'0" X 12'0" REINFORCEMENT "A"
D3 D3
6' 18" REINFORCEMENT "B"
4'-9" 5'-6" 4'-3"
3'-3" 2'-9" 2'-6" 3' 2'-1.5" 2'-1.5"
2'-1.5" 2'-7.5" P.C.C. (1:4:8)
D2 D2 F1A F2

2'-7.5"
2'-1.5"
F1 4.5"

2'-9" 2'-9"

2'-6"
4.5" F2 4.5" 4.5" TYPICAL FOOTING DETAILS

4'-9"
5

4'-3"

5'-6"
O

5'

10.5"
4.5"

4.5"

4.5"
2'-6"

2'-1.5"
W3 O

5'-3"
BATH / W.C
V1

2'-1.5"

2'-1.5"
7'6" X 4'6"
D3 F2
4.5" F2A4.5"

35'-9"
4

4'-3"

3'-9"
DINING

2'-1.5"
19'0"X10'0"

4.5"

4.5"
5'-6" 5'
FOOTINGS

35'-9"
2'-6" 3' 2'-6" 2'-6"

5'-6"
UP
D2 F1
2'-1.5" 2'-7.5" 2'-4.5" 1'-10.5" TYPES
O F1 4'-9" 4'-3" A B

2'-6"

2'-6"
4.5" 4.5"
3

5'-6"
D2

5'

23'-3"
F1A 6'0" 5'6"

2'-6"

4.5"

4.5"
HALL

3'
D2 14'0" X 13'3" W1
5'-6"
5'6" 5'0"

18'
5' F1

8'-3"
D2 2'-9" 2'-9" 2'-6" 2'-6"

12'-6"
UTILITY
KITCHEN F1A F1
W2 4'9" 4'3"

7.5"
F2

2'-9" 2'-9"
10'0"X12'0" 4.5"

3'
4'0"X12'0" 4.5"
BED ROOM 5' 5'
2

5'-6"
6'
8'0"X10'0" D1 2'-6" 2'-6" 2'-6" 2'-6"

7.5"
W1
F2A 4'3" 3'9"

3'
4'-3"

4'-3"
SIT OUT F1 F1

2'-9" 2'-9"

2'-9" 2'-9"
14'9"X4'3" 4.5" 4.5"

5'-6"

5'-6"
7.5"

7.5"
W2 W1

12'-9"
15'-6"
24'-3"
35'-9"
39' PROPOSED CONSTRUCTION OF RESIDENTIAL
BUILDING AT SHIRVA
NOTE:
1) CONCRETE GRADE SHALL BE M20 FOR FOOTING & M25 FOR COLUMN .
FOOTING EXCAVATION DWG.
2) ALL REINFORCEMENT SHALL BE HYSD BARS OF GRADE Fe500.
CONFIRMING TO IS:1786. SCALE NTS DRG.NO 01
3) STRUCTURE IS DESIGNED FOR GROUND+2 FLOORS ONLY.
DATE 11/01/2017 REV. NO. 00
4) SBC=23T/SQM (ASSUMED)
5) CLEAR COVER FOR FOOTING=75MM, COLUMN=40MM. DELT BY KR CHECKED BY RAVI