You are on page 1of 1

M L K J.3 J.1 J H.

1 H F E D C B A

22' - 2" 8' - 4"


5'-0" WIDE POUR STRIP FULL 5' - 0" 2
75' - 2" WIDTH OF BUILDING ON ALL S528
2
T.O. CURB FLOORS 8"
S529 1' - 0"
74' - 7"

6' - 0"
7 7

4' - 2"
5' - 7"

UPTURNED BEAM

7' - 10"
TB59 (28x26) TB60 (28x26) TB2 (38x26) TB58 (28x36)
TB61 (16x26) 6.8
6.7

5' - 5"
" SHEAR WALL
10
TG6 (30x64)

TB20 (14X18)
Updated in 5' - 3" 7' - 3" 7' - 3" SCIENCE

2B8 (20x30)

SHEAR WALL

SHEAR WALL
SSK-5 STAIR #4 5 RFI 452.1
AND

C.
B.
S529 6' - 4" 4' - 0"

A.
C.
4' - 0" 6' - 4"

TB2 (38x26)
ENGINEERING

31' - 6"
20' - 8"

HSS8X3X1/4 RFI 725; Columns not

SHEAR WALL

SHEAR WALL
sloped from level 2-3 HALL
TB21 (18x24) 10
4' - 0" 5' - 3" ARCH CONC.
S204 8" S102.2
WALL BELOW 800 22nd Street, NW | Washington DC 20052
MATCHLINE
9" S102.1

4' - 4" 4' - 0"


2B14 (20x30) 2B15 (20x30) 2B16 (20x30) 8' - 10" 8' - 8" 8' - 8"
8" 8"
6.2

7' - 10"
HSS12X4X1/4 TYP. 2B13 (28x28)
7' - 3"

SHEAR WALL

5' - 3"
6
5.9 W.P.

7' - 10"
HSS12X4X1/4

HSS12X4X1/4

HSS12X4X1/4

HSS12X4X1/4
11' - 3"

5' - 3"
STRONG WALL
PROVIDE 2 EMBED PLATES 8" x 8" x 1/2"
ELEVATORS

8' - 6"
W/ (4) 1/2" x 6" STUDS AT BOTTOM OF

2B5 (18x23)
BEAM FOR BIFOLD DOOR MOTOR CONN. 1-5 1
S204

2B25 (77x27)
TB24 (24x30) HSS6X4X3/8 ALONG
36' - 9"

2B10 (24x30)
4' - 0" 4' - 0" 4' - 0" 3' - 6"

2B10 (24x30)
RFI 1046; Embed to be a SIDE EACH ELEVATOR

2B24 (38x27)
OPEN TO BELOW 4 Fireproof per FOR ELEVATOR RAIL
post-applied connection detail

31' - 6"
SEE S101.3 FOR INFO RFI 00982 SUPPORT, TYP.
29' - 2"

S202
6 CONSULTANTS:
S202 7" SLAB 9"

9"
TB29 (30x30) 5' - 3" 7' - 3"
Column 9" 9" 9"

moved 1029 Vermont Avenue, NW #810


Washington DC 20005
east .5" MONUMENTAL STAIR #5, RFI 1118; Pour column in 2 lifts

7' - 10"
P 202.628.1600 F 202.628.1800
5.1 per RFI W.P.
SEE S205 FOR FRAMING,

C.
HANGERS, ETC. 2" CL. COL.

B.
2B6 (18x33)
5 5
4"

5' - 0"
7' - 10"
4.8
1' - 3 1/2"
1 W.P. TO GRID E
S207 Shift Tube
Steel 3" south

2B9 (24x30)

2B9 (24x30)

2B25 (77x27)
21' - 0" 31' - 6" per RFI 1866 32' - 6" OPEN TO BELOW

31' - 6"
10" CONC. SLAB

2B24 (38x27)
1

TB2 (38x26)
S204

9" 3' - 0"

7' - 10"
2
S202
2B23 (30x30)
4
WALL BELOW

7' - 10"
7
S526

TB2 (38x26)
OPP.
2B21 (38x34)

9"

31' - 6"
7' - 6" RFI 889; Construction joint is acceptable centered in bay
9"

RFI 725; sloping 7' - 3"


9" 9"
column locations
see SSK-145 (S529)

7' - 10"
2B23 (30x30)
3

O"
7' - 10"
RFI 1104 1
S521
SEAL:
STRUCTURAL PLANS CERTIFIED AS
PROVIDED IN SECTION 106.1.4.1 OF THE
D.C. CONSTRUTION CODES AS AMENDED
5' - 1" 1' - 4" 1' - 4" 5' - 1"
2B21 (38x34)

TB1 (38x26)
TO DATE.

TB17 (28x26)

31' - 6"
SECOND FLOOR PLAN NOTES
1. LIVE LOAD = 100 P.S.F., U.O.N. 6' - 10" 5' - 7"
2. TOP OF SECOND FLOOR STRUCTURAL SLAB ELEVATION SHALL BE 72'-3".
SEE ARCHITECTURAL DRAWINGS FOR FINISH FLOOR ELEVATION AND FINISH MATERIAL. 9"
3. SECOND FLOOR FRAMING SHALL BE 10" THICK CIP CONCRETE FLAT SLAB WITH DROP PANELS SUPPORTED BY RFI 1021; Add 2" to
CONCRETE COLUMNS. SEE PLAN FOR DROP PANEL DIMENSIONS. south side of beam to 7
4. SLAB CONCRETE SHALL HAVE A MINIMUM STRENGTH OF Fc=5,000 PSI U.O.N. align with slab S526

7' - 10"

7' - 10"
EDWARD J. ZINSKI P.E. #904769
5. REFER TO DWG. 102.1B FOR SLAB REINFORCING.
6. COORDINATE WITH CONTROL PLANS, ARCHITECTURAL & MEP DRAWINGS AS APPLICABLE FOR EXACT LOCATION AND 2B23 (30x30) KEY PLAN: N
SIZE OF DEPRESSIONS, SLOPES, PENETRATIONS & EQUIPMENT PADS.
7. THE DIFFERENCE BETWEEN THE TOP OF STRUCTURAL SLAB AT DEPRESSIONS AND FINISH FLOOR SHALL BE FILLED
2
WITH ARCHITECTURAL FINISHES AS APPLICABLE AND FIBER REINFORCED LIGHT WEIGHT CONCRETE. WALL BELOW
7' - 4"

7' - 4"

8. POUR STRIPS SHALL BE POURED AT LEAST 30 DAYS AFTER THE SLABS ON BOTH SIDES HAVE BEEN POURED.
9. REFER TO: 7' - 3"
S001 FOR STRUCTURAL GENERAL NOTES 2"
RFI 1021; Align slab
S30X & S40X FOR BUILDING SECTIONS POST ABOVE FOR edge w/ beam below
S50X FOR SECTIONS & DETAILS
TB52 (24x30)
STAIR LANDING

2B18 (24x30)

2B18 (24x30)
TB53 (24x30)

S60X FOR COLUMN & BEAM SCHEDULES SUPPORT


2B20 (38x34)

BEAMS ARE SHOWN THUSLY: TB10

29' - 4"
2B17 (24x30)
10. DENOTES THICKNESS OF DROP PANEL.
8"

TB54 (24x26)

11. INDICATES ANTICIPATED LONG TERM DEFLECTION AT LOCATIONS SHOWN.


=3/4"

B.
MAX OF =1/2" BETWEEN COLUMNS AT ALL EXTERIOR WALL LOCATIONS NOT SPECIFICALLY IDENTIFIED. 1.3

C.
TB30 (8x16)

6 x 12 CONDITION OF USE
1' - 2" 7" CONC. SLAB 1' - 2"
12. "SHEAR WALLS" NOTED ON PLAN RESIST OVERALL BUILDING WIND AND SEISMIC LOADS WHEN THIS DOCUMENT IS SUPPLIED TO EITHER OWNER OR
CONTRACTOR, IN EITHER PAPER OR ELECTRONIC FORM, THE

COLS. ABOVE
SUBSEQUENT USE OF THE INFORMATION CONTAINED ON THE
DOCUMENT IS SUBJECT TO THE CONDITIONS OF THE AGREEMENT
2B11 (38x26) 2B12 (38x26)
2" CL. OF
BETWEEN THE OWNER AND BALLINGER AND TO BALLINGER'S
2B19 (38x34) STAIR #3 COPYRIGHT AND OTHER SUCH RIGHTS IN THIS DOCUMENT.
CONTRACTOR MAY MAKE ELECTRONIC FILES OF THIS DOCUMENT
1 AVAILABLE TO SUBCONTRACTORS, SUBJECT TO THIS STATEMENT
OF CONDITIONS OF USE, SOLELY AS A CONVENIENCE TO SUCH
SUBCONTRACTORS IN THEIR PREPARATION OF SHOP DRAWINGS.
SHEAR WALL 1 THE PROVISION OF THIS DOCUMENT BY BALLINGER SHALL NOT
MAKE BALLINGER RESPONSIBLE IN ANY WAY FOR ANY ASPECT OF
7' - 4" S522 THE SUBCONTRACTOR'S SHOP DRAWINGS, NOR RELIEVE

SSK-4 - Interior 2" SUBCONTRACTORS FROM FULL RESPONSIBILITY FOR


PREPARATION OF THEIR REQUIRED SHOP DRAWINGS.

Stair Gap reduced

RFI 1020 - Drop Panels 7


S204
in size.
RFI 1109; Splayed column -Z lifts
Horizontal Joint - perpendicular to column plane
DATE:
10/19/2011
12/13/2011
ISSUE#:
ISSUE NO. 4
ISSUE NO. 5

Dimensions and 30' - 6" 29' - 8" 21' - 4" 22' - 6" 22' - 6" 21' - 4" 28' - 8" 01/20/2012
02/20/2012
04/09/2012
ADDENDUM NO. 2
ISSUE NO. 6
ISSUE NO. 7

Revisions. 08/27/2012
09/14/2012
09/17/2012
ISSUE NO. 8
BULLETIN NO.11
NO. 11

J H F E D C B A PROJECT:
10041.00
SCALE:
1/8" = 1'-0"
1/8" = 1'-0" SECOND FLOOR FRAMING PLAN
1
STRUCTURAL

TITLE:

SECOND FLOOR
1/8"
FRAMING PLAN
0' 4' 8' 16' 24' SOUTH

NUMBER:

PCO 810066 BULLETIN


BULLETIN NO.1111 -09/17/2012
NO. 09/14/2012 S102.1