You are on page 1of 1

A3

SHEET
10'-10"

S03
A
10'-0"
10" 9'-2" 10"

DRAWN BY: KHABIR UDDIN


10" 10" 10" 10" 10" 10" 10" 10" 10" 10" 10"

DATE :- 27-09-2022
JOB NO :-
5" 5"
10" 9'-2" 10"
INSIDE

A
PLAN (stretcher brick)
SCALE: NOT TO SCALE

ELEVATION (INSIDE)
DRG. TITLE :-
EXPANTION EXPANTION
JOINT(1" GAP) JOINT(1" GAP)
5" 5"

1'-
6 "

5"X10" RCC BARBED WIRE

1'-6"
Beam
5" MACHINE-MADE
EXPOSED BRICK
AS-CAST WITH POINTING

10" 5"

10" 5"
CONCRETE
BRICK ON
FINISHING
EDGE-KHADRI

5" 3"3"3"3"3"3"3" 3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"3"2"


AS-CAST CC(1:2:4)
CONCRETE

2"
FINISHING

ENGINEER :
INSIDE OUTSIDE

4'-3"
PLASTER

8'-0"
6'-9"
8'-0"

2"
CC(1:2:4)

S/O Mir ASIF UDDIN


Mir Towa Sunan
1'-9"2"
GL FROM GL FROM
Grade

CLIENT:
RL. (+5") RL. (+5") Beam
(10"X12")

ARSHED ALI ROAD, PO- BARISHAL SADAR, 11 WARD, BARISHAL


5"

PROPOSED BOUNDARY WALL AT MOUZA-SOUTH ALEKANDA,


RL. (±0'-0")

Soil Soil
ELEVATION (INSIDE)

CITY CORPORATION, BARISHAL, BANGLADESH.


SCALE: NOT TO SCALE

FOOTING DESIGN
AND DEPTH- AS
PER STRUCTURAL
DESIGN

PROJECT:-
SECTION A-A
SCALE: NOT TO SCALE