You are on page 1of 1

SCHEDULE OF COLUMN

NO OF COLUMN C1=2Nos C2=1Nos C3=6Nos


15"x19" 18"x18" 18"x18"

L/4
BELLOW GL UP
TO
1ST FLOOR
4-Ø20mm+4-Ø16mm 4-Ø20mm+4-Ø16mm 10-Ø20mm
CLEAR COVER =3" CLEAR COVER =3" CLEAR COVER =3"
Ø10mm @ 4" C/C Ø10mm @ 4" C/C Ø10mm @ 4" C/C

12"x16" 15"x15" 15"x15" 10Ø Stirrup @4"C/C.

L/4
2ND FLOOR
TO
TOP FLOOR
8-Ø16mm 8-Ø16mm 4-Ø20+6-Ø16mm
CLEAR COVER =1.5" CLEAR COVER =1.5" CLEAR COVER =1.5"
Ø10mm @ 4"/6"/4" C/C Ø10mm @ 4"/6"/4" C/C Ø10mm @ 4"/6"/4" C/C

10Ø Stirrup @6"C/C.


L/2
L

NOTE:
Reinforcement 72 grade deformed bar (fy=72,000 psi)
Casting Ratio = 1:1.5:3 (f'c=3500 psi);
Stone Chips 19mm Down Graded
Min preferred Clear cover level = 1.5"
Soil contact side must be applied 3" clear cover
L/4

10Ø Stirrup @4"C/C.

COLUMN TIE SPACING


DWG TITLE

JOB NO

CONSULTANT ENGINEER 01
PROJECT.

PROJECT LOCATION

S DAG NO-SABEK-195, S-A-17


MOUZA-UTTAR KHAN ,C-S-1004,S-A-1581, SOPNER BARI DESIGN & CONSTRUCTOON
Md. Suruz Uddin
BSc in Civil Engineer ARCHITECTURE DWG
ARCHITECT
SUBMISSION DATE-

UTTAR KHAN , DIS-DHAKA. Mobile : 01729-999949


Md. Shamim Sardar Sabrina Rahman Seba
CLIENT.

P-06 Md. Mahabub Alom


BSc in Civil Engineer 18-03-2023
Mobile : + 8801757-757040
CAD

Mobile : 01792-716906

You might also like