Professional Documents
Culture Documents
Photo Essay Construction Rogue Power Drift Boat
Photo Essay Construction Rogue Power Drift Boat
Victor, Idaho
July 2016
Frame Build
July 2016
Frame Assembly
Bilge Water Holes
Keelson Placement
Transom Attachment
Chine Log Attachments
Stem Attachment & Plywood Prep
Ply Covering
August 2016
Fiber Glassing of Hull
Plywood Hull Trimming
Sheer Clamp & Rub Rail
Attachment
Seat & Interior
Construction
Used a paintable
bed liner with
Kevlar for a durable
textured layer.
September – October 2016
Seating, Casting Deck
& Decking Completion
November-December 2016
Oar Construction &
Used Trailer
Refurbishment
Purchased used
boat trailer for
$600. Now looks
like new.
Initial Boat Launch &
Pond Maiden Voyage