DEPARTMENT OF TRANSPORTATION
ROUTING/ACTION SLIP
V20201012
Document Information
Routing/Action Register
Action Action Undertaken
Transmitter Receiver
Requested by Receiver & Date
PMs OUR
DOTr Compound, Apo Court Pinatubo St., cor. Osmeña, Clark Freeport Zone, Pampanga
Trunk Line: (02) 790-8300
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF TRANSPORTATION
20 January 2021
We extend our sincere gratitude and appreciation for your support in our tree cutting and/or earth-
balling permit applications for Contract Packages No. 04 and 05 of the project. Similar to these two
earlier submissions, we would like to once again apply for the same permit for Contract Package No.
02 (“CP N-02”). The right-of-way (“ROW”) of CP N-02 is composed of trees that are within private
lands and Philippine National Railways (“PNR”) land. Since the acquisition of consent from private
landowners is still ongoing, we intend to proceed first with the application for trees within the PNR
ROW. Based on our tree inventory data, CP N-02 has 1,829 affected trees within the PNR ROW.
To facilitate this application for tree cutting and/or earth-balling permit, enclosed in this letter are the
following documents:
1. List of project-affected trees, including tally sheet and stand and stock table;
2. Geotagged photographs of project-affected trees;
3. Location map of project-affected trees, including the NSCR – Clark Extension Alignment
4. Copy of the project’s Environmental Compliance Certificate (“ECC”);
5. Endorsement and Certificate of No Objection (“CNO”) from various stakeholders and
agencies such as the Philippine National Railways (“PNR”) and affected Local Government
Units (“LGUs”); and
6. Detailed design (issued for construction) of the contract package
For further question or concerns, please do not hesitate to contact Jaena Naejan E. Tiongco of
DOTr at (0917) 808 6485 and nscr.envi@dotr.gov.ph.
Thank you very much and we look forward to your prompt and favorable response to our request.
Sincerely,
Enclosed:
Annex 1: List of project-affected trees, including tally sheet and stand and stock table;
Annex 2: Geotagged photographs of project-affected trees;
Annex 3: Location map of project-affected trees, including the NSCR – Clark Extension Alignment
Annex 4: Copy of the project’s Environmental Compliance Certificate (“ECC”);
Annex 5: Endorsement and Certificate of No Objection (“CNO”) from various stakeholders and agencies such as
the Philippine National Railways (“PNR”) and Affected local government units (“LGU”); and
Annex 6: Detailed design (issued for construction) of the contract package
DOTr Compound, Apo Court Pinatubo St., cor. Osmeña, Clark Freeport Zone, Pampanga
Trunk Line: (02) 790-8300
ANNEX 1
DATE REV
AUGUST 2020 30
Ver.27.1.0
14.Aug.2020
DATE
CONSULTANT AUGUST 2020
Last modified by Toru Sekiguchi
DATE
VERSIONSDATE DESCRIPTION CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
DEPARTMENT OF TRANSPORTATION JICA DESIGN TEAM (JDT) TITLE JDT SMEC (MCRP) SCALE
(DOTr) JAPAN INTERNATIONAL AS SHOWN IN A1
ORIENTAL CONSULTANTS CONSULTANTS FOR DESIGNER PACKAGE CP N-01, 02, 03, 04,05 : DETAILED DESIGN SHEET No.
GLOBAL CO., LTD. TRANSPORTATION CO., LTD.
CHECK
KATAHIRA & ENGINEERS TONICHI ENGINEERING DRG No.
PHILIPPINE NATIONAL RAILWAYS INTERNATIONAL CONSULTANTS INC.
KEYPLAN
TEAM LEADER
PACIFIC TOKYO METRO CO., LTD DRG S. REV
CONSULTANTS CO., LTD. P. MANAGER
30
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT AUGUST 2020
DEPARTMENT OF TRANSPORTATION JICA DESIGN TEAM (JDT) TITLE JDT SMEC (MCRP) SCALE
(DOTr) JAPAN INTERNATIONAL AS SHOWN IN A1
ORIENTAL CONSULTANTS CONSULTANTS FOR DESIGNER PACKAGE CP N-01, 02, 03, 04,05 : DETAILED DESIGN SHEET No.
GLOBAL CO., LTD. TRANSPORTATION CO., LTD.
CHECK
KATAHIRA & ENGINEERS TONICHI ENGINEERING ROLLING STOCK DRG No.
PHILIPPINE NATIONAL RAILWAYS INTERNATIONAL CONSULTANTS INC.
TEAM LEADER AND STRUCTURE GAUGE MCRP-DWG-GEN-TK-0020
PACIFIC TOKYO METRO CO., LTD DRG S. REV
CONSULTANTS CO., LTD. P. MANAGER
30
IP.53S IP.53 IP.53N
R=1804.000m R=1802.000m R=1800.000m
IA=51 46'41.20" IA=51 46'41.20" IA=51 46'41.20"
o=1 54'16.96" o=1 54'24.57" o=1 54'32.19"
TL=935.738m TL=934.767m TL=933.797m
CL=1750.330m CL=1748.522m CL=1746.715m
CCL=1510.330m CCL=1508.522m CCL=1506.715m
f=0.333m f=0.334m f=0.334m South bound
TCL=120.000m TCL=120.000m TCL=120.000m IP Name Coordinates X Coordinates Y
V=160km/h V=160km/h
C=100mm C=100mm IP.53S 1,654,764.8057 470,040.2192
North bound
IP Name Coordinates X Coordinates Y
To Solis IP.53N 1,654,767.2766 470,043.9156 To CIA
Line center
IP Name Coordinates X Coordinates Y
IP.53 1,654,766.0411 470,042.0674
CP N-01 CP N-02
L=16km921m L=15km770m
Section boundary
51km670m000
Ver.27.1.0
14.Aug.2020
To Solis To CIA
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
CO.,LTD.
Tokyo Metro Co.,Ltd.
P. MANAGER SHEET 1 30
IP.54S IP.54 IP.54N
South bound R=2500.000m R=2502.000m R=2504.000m
IP Name Coordinates X Coordinates Y IA=37 24'38.37" IA=37 24'38.37" IA=37 24'38.37"
IP.54S 1,658,507.0527 469,522.7997 o=0 54'59.87" o=0 54'57.23" o=0 54'54.60"
IP.55S 1,659,268.2588 468,754.0443 TL=886.503m TL=887.180m TL=887.857m
CL=1712.357m CL=1713.663m CL=1714.969m
IP.56S 1,659,437.5155 468,588.0099 CCL=1552.357m CCL=1553.663m CCL=1554.969m
IP.57S 1,659,701.9360 468,320.9670 f=0.107m f=0.107m f=0.107m
TCL=80.000m TCL=80.000m TCL=80.000m
V=160km/h V=160km/h
Line center C=65mm C=65mm
IP Name Coordinates X Coordinates Y
To Solis IP.54 1,658,507.9974 469,524.6881 To CIA
IP.55 1,659,269.6698 468,755.4618
IP.56 1,659,438.9264 468,589.4274 IP.55S IP.55 IP.55N
R=6004.000m R=6002.000m R=6000.000m
IP.57 1,659,703.3403 468,322.3912 IA=0 50'00.00" IA=0 50'00.00" IA=0 50'00.00"
o=0 08'35.32" o=0 08'35.49" o=0 08'35.66"
TL=58.663m TL=58.649m TL=58.634m
North bound CL=117.325m CL=117.296m CL=117.267m
IP Name Coordinates X Coordinates Y CCL=57.325m CCL=57.296m CCL=57.267m IP.57S IP.57 IP.57N
IP.54N 1,658,508.9421 469,526.5765 f=0.006m f=0.006m f=0.006m R=5004.000m R=5002.000m R=5000.000m
IP.55N 1,659,271.0807 468,756.8794 TCL=30.000m TCL=30.000m TCL=30.000m IA=1 22'04.34" IA=1 22'04.34" IA=1 22'04.34"
V=160km/h V=160km/h o=0 15'27.44" o=0 15'27.81" o=0 15'28.18"
IP.56N 1,659,440.3374 468,590.8450 C=25mm C=25mm TL=82.236m TL=82.212m TL=82.188m
IP.57N 1,659,704.7447 468,323.8154 CL=164.465m CL=164.418m CL=164.370m
CCL=74.465m CCL=74.418m CCL=74.370m
f=0.017m f=0.017m f=0.017m
TCL=45.000m TCL=45.000m TCL=45.000m
V=160km/h V=160km/h
C=35mm C=35mm
To Solis To CIA
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
by Toru Sekiguchi
CO.,LTD.
Tokyo Metro Co.,Ltd.
P. MANAGER SHEET 2 30
IP.60S IP.60 IP.60N
R=6004.000m R=6002.000m R=6000.000m
IA=1 23'40.52" IA=1 23'40.52" IA=1 23'40.52"
o=0 08'35.32" o=0 08'35.49" o=0 08'35.66"
TL=88.073m TL=88.049m TL=88.024m
CL=176.138m CL=176.090m CL=176.041m
CCL=116.138m CCL=116.090m CCL=116.041m
f=0.006m f=0.006m f=0.006m
TCL=30.000m TCL=30.000m TCL=30.000m
V=160km/h V=160km/h
C=25mm C=25mm
TCL=20.000m
To Solis V=55km/h To CIA
C=20mm
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
CO.,LTD.
Tokyo Metro Co.,Ltd.
P. MANAGER SHEET 3 30
IP.Sa03S
R=800.000m
IA=5 46'00.00"
o=0 42'58.14"
IP.Sa02S TL=50.295m
R=800.000m CL=100.519m
IA=5 46'00.00" CCL=60.519m
o=0 42'58.14" f=0.021m
TL=50.295m TCL=20.000m
CL=100.519m V=55km/h
CCL=60.519m C=20mm IP.Sa04S
f=0.021m R=2200.000m
TCL=20.000m IA=1 00'00.00"
V=55km/h o=0 03'54.39"
C=20mm TL=21.699m
CL=43.397m
CCL=33.397m
f=0.001m
TCL=5.000m
V=55km/h
C=5mm
IP.Sa04N
R=2200.000m Sub Track North Bound Sub Track South Bound
IA=1 00'00.00" IP Name Coordinates X Coordinates Y IP Name Coordinates X Coordinates Y
o=0 03'54.39"
TL=21.699m IP.Sa01N 1,661,929.9464 466,217.6002 IP.Sa01S 1,661,920.4730 466,206.2263
CL=43.397m IP.Sa02N 1,662,016.7118 466,159.0226 IP.Sa02S 1,661,993.7746 466,131.4837
IP.Sa02N IP.Sa03N CCL=33.397m
R=800.000m R=800.000m f=0.001m IP.Sa03N 1,662,232.0048 465,979.7046 IP.Sa03S 1,662,209.0676 465,952.1657
IA=5 46'00.00" IA=5 46'00.00" TCL=5.000m IP.Sa04N 1,662,305.3064 465,904.9621 IP.Sa04S 1,662,295.8330 465,893.5881
o=0 42'58.14" o=0 42'58.14" V=55km/h 12#SN-56 1,662,351.6205 465,859.3577 12#SN-55 1,662,349.0602 465,856.2844
TL=50.295m TL=50.295m C=5mm
CL=100.519m CL=100.519m EP 1,662,370.3967 465,843.7190 12#SN-52b 1,662,400.6962 465,813.2766
CCL=60.519m CCL=60.519m 12#SN-52a 1,662,440.1151 465,785.6503
f=0.021m f=0.021m EP 1,662,458.8913 465,770.0115
TCL=20.000m TCL=20.000m
V=55km/h V=55km/h
C=20mm C=20mm
To Solis To CIA
IP.64S IP.64 IP.64N
R=2504.000m R=2502.000m R=2500.000m
IA=4 42'39.82" IA=4 42'39.82" IA=4 42'39.82"
o=0 54'54.60" o=0 54'57.23" o=0 54'59.87"
TL=143.010m TL=142.928m TL=142.846m
CL=285.897m CL=285.732m CL=285.568m
CCL=125.897m CCL=125.732m CCL=125.568m
f=0.107m f=0.107m f=0.107m
TCL=80.000m TCL=80.000m TCL=80.000m
V=160km/h V=160km/h
C=65mm C=65mm
Line center
IP Name Coordinates X Coordinates Y
IP.64 1,663,287.4265 465,077.3200
To Solis To CIA
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
CO.,LTD.
Tokyo Metro Co.,Ltd.
P. MANAGER SHEET 4 30
IP.65S IP.65 IP.65N
R=2204.000m R=2202.000m R=2200.000m
IA=8 00'45.36" IA=8 00'45.36" IA=8 00'45.36"
o=1 06'16.79" o=1 06'20.40" o=1 06'24.02"
TL=196.878m TL=196.738m TL=196.598m
CL=393.235m CL=392.955m CL=392.676m IP.Ma02-01
CCL=223.235m CCL=222.955m CCL=222.676m R=120.000m
f=0.137m f=0.137m f=0.137m IA=9 32'00.00" Maintenance Track
TCL=85.000m TCL=85.000m TCL=85.000m TL=10.006m
CCL=19.967m IP Name Coordinates X Coordinates Y
V=160km/h V=160km/h
C=70mm C=70mm BP 1,665,161.2430 463,823.0119
IP.Ma02-01 1,665,220.0946 463,792.9384
6#_temp 1,665,250.6085 463,783.2975
6#_temp 1,665,277.3619 463,769.6263
6#_temp 1,665,300.3911 463,762.3502
EP 1,665,308.8132 463,758.0465
IP.66S
R=1800.000m IP.66 IP.66N
IA=8 09'58.53" R=1802.000m R=1804.000m
Main Track South Bound o=1 54'32.19" IA=8 09'58.53" IA=8 09'58.53"
IP Name Coordinates X Coordinates Y TL=188.543m o=1 54'24.57" o=1 54'16.96"
IP.65S 1,664,795.0427 464,016.0945 CL=376.608m TL=188.686m TL=188.829m
CCL=136.608m CL=376.893m CL=377.178m
IP.66S 1,665,579.5860 463,615.1879 f=0.334m CCL=136.893m CCL=137.178m
IP.67S 1,666,827.7144 462,733.6340 TCL=120.000m f=0.334m f=0.333m
To Solis IP.68S 1,666,997.9844 462,617.0467 V=160km/h TCL=120.000m TCL=120.000m To CIA
C=100mm V=160km/h
C=100mm
Line Center
IP Name Coordinates X Coordinates Y
IP.65 1,664,796.0776 464,017.8117 IP.67S IP.67 IP.67N
IP.66 1,665,580.6232 463,616.9038 R=5004.000m R=5002.000m R=5000.000m
IP.67 1,666,828.8564 462,735.2760 IA=0 50'00.00" IA=0 50'00.00" IA=0 50'00.00"
o=0 15'27.44" o=0 15'27.81" o=0 15'28.18"
IP.68 1,666,999.1263 462,618.6887 TL=58.891m TL=58.877m TL=58.862m
CL=117.781m CL=117.752m CL=117.722m
CCL=27.781m CCL=27.752m CCL=27.722m
Main Track North Bound f=0.017m f=0.017m f=0.017m
IP Name Coordinates X Coordinates Y TCL=45.000m TCL=45.000m TCL=45.000m
IP.65N 1,664,797.1124 464,019.5289 V=160km/h V=160km/h
IP.66N 1,665,581.6604 463,618.6198 C=35mm C=35mm
IP.67N 1,666,829.9983 462,736.9180
IP.68N 1,667,000.2683 462,620.3307
To Solis To CIA
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
m
6
7
4
4
0
0
0
0
k
To Solis To CIA
CP N-02 CP N-03
L=15km770m L=12km240m
Section boundary
Ver.27.1.0
14.Aug.2020
To Solis To CIA
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
CO.,LTD.
Tokyo Metro Co.,Ltd.
P. MANAGER SHEET 6 30
m
m
5
1
6
7
0
0
0
0
k
CP N-01 CP N-02
L=16km921m L=15km770m
Section boundary
Legend
: Line center : R.O.W
: Track : PNR R.O.W
Plan : Edge of Formation
To Solis SCALE 1:2000 : Station of future : Roof of station To CIA
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi
m
6
7
4
4
0
0
0
0
k
Section boundary
Legend
: Line center : R.O.W
: Track : PNR R.O.W
Plan : Edge of Formation
To Solis SCALE 1:2000 : Station of future : Roof of station To CIA
Gradient
Kilometerage
Rail Elevation
Elevation
Straight/Curve
South Bound
Straight/Curve
Line Center
Straight/Curve
North Bound
Ver.27.1.0
PROFILE
SCALE 1:2000
DATE
VERSIONS DATE DESCRIPTION
CONSULTANT MALOLOS - CLARK RAILWAY PROJECT AUGUST 2020
Last modified by Toru Sekiguchi