Professional Documents
Culture Documents
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
1 A-01 600 03/01/23 99.99 96.10 70 29.99 27.10 7.66 7.50 -0.16 -2.1%
2 A-02 600 04/01/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
3 A-03 600 05/01/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
4 BC-04 600 29/12/22 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
5 BC-05 600 06/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
6 BC-06 600 30/12/22 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
7 BC-07 600 28/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
8 BC-08 600 03/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
9 D-09 600 02/06/22 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
10 D-10 600 14/06/22 99.85 96.10 70 29.85 27.10 7.66 8.00 0.34 4.4%
11 D-11 600 04/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
12 EF-01-12 600 28/12/22 99.96 96.05 70 29.96 27.05 7.65 8.00 0.35 4.6%
13 EF-01-13 600 21/06/22 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%
14 EF-01-14 600 26/12/22 100.00 96.05 70 30.00 27.05 7.65 8.00 0.35 4.6%
15 F-15 600 18/06/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
16 F-16 600 20/06/22 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
17 F-17 600 12/06/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
18 F-18 600 31/05/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
19 H-01-19 600 17/06/22 100.75 97.10 70 30.75 28.10 7.95 8.00 0.05 0.7%
20 H-01-20 600 23/12/22 99.77 95.45 70 29.77 26.45 7.48 7.50 0.02 0.3%
21 H-01-21 600 31/05/22 99.78 96.50 70 29.78 27.50 7.78 8.00 0.22 2.9%
22 K-01-22 600 14/12/22 99.74 96.05 70 29.74 27.05 7.65 8.00 0.35 4.6%
23 K-01-23 600 16/12/22 99.64 96.05 70 29.64 27.05 7.65 8.00 0.35 4.6%
24 K-01-24 600 28/05/22 99.75 97.50 70 29.75 28.50 8.06 8.00 -0.06 -0.7%
25 L-01-25 600 20/06/22 99.88 96.30 70 29.88 27.30 7.72 8.00 0.28 3.6%
26 L-01-26 600 28/07/22 99.76 96.30 70 29.76 27.30 7.72 8.00 0.28 3.6%
27 L-01-27 600 30/05/22 98.97 96.50 70 28.97 27.50 7.78 8.00 0.22 2.9%
28 L-01-28 600 01/06/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
29 M-29 600 03/06/22 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
30 M-30 600 17/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
31 M-31 600 30/05/22 99.70 96.50 70 29.70 27.50 7.78 8.00 0.22 2.9%
32 N-32 500 15/12/22 99.90 95.70 70 29.90 26.70 5.24 5.50 0.26 4.9%
33 N-33 500 12/08/22 99.68 95.75 70 29.68 26.75 5.25 6.00 0.75 14.2%
34 N-34 500 24/07/22 99.62 95.75 70 29.62 26.75 5.25 5.50 0.25 4.7%
35 P-01-35 600 16/06/22 99.88 96.10 70 29.88 27.10 7.66 8.00 0.34 4.4%
36 P-01-36 600 18/06/22 99.86 96.10 70 29.86 27.10 7.66 8.00 0.34 4.4%
37 P-01-37 600 03/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
38 Q-01-38 600 05/07/22 99.95 96.10 70 29.95 27.10 7.66 8.00 0.34 4.4%
39 Q-01-39 600 25/07/22 99.44 95.55 70 29.44 26.55 7.51 8.00 0.49 6.6%
40 Q-01-40 600 02/07/22 99.40 96.40 70 29.40 27.40 7.75 8.00 0.25 3.3%
41 R-01-41 600 28/05/22 99.90 96.50 70 29.90 27.50 7.78 8.00 0.22 2.9%
42 R-01-42 600 15/12/22 99.95 95.45 70 29.95 26.45 7.48 7.50 0.02 0.3%
43 R-01-43 600 27/05/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
44 A-02-44 600 07/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
45 A-02-45 600 31/12/22 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
Page 1 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
46 A-02-46 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
47 A-02-47 600 11/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
48 B-02-48 500 17/01/23 99.99 96.70 70 29.99 27.70 5.44 5.50 0.06 1.1%
49 B-02-49 500 18/01/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%
50 C-01-50 600 09/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
51 C-01-51 600 12/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
52 C-01-52 600 11/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
53 C-01-53 600 07/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
54 C-01-54 600 05/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
55 DE-01/02-55 500 01/01/23 99.97 97.05 70 29.97 28.05 5.51 5.50 -0.01 -0.1%
56 DE-01/02-56 500 03/01/23 99.98 97.05 70 29.98 28.05 5.51 5.50 -0.01 -0.1%
57 EF-01/01-57 500 29/12/22 99.92 96.45 70 29.92 27.45 5.39 5.50 0.11 2.0%
58 EF-01/01-58 500 30/12/22 99.99 96.45 70 29.99 27.45 5.39 5.50 0.11 2.0%
59 H-02-59 500 28/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
60 KL-02-60 500 26/12/22 99.77 96.45 70 29.77 27.45 5.39 5.50 0.11 2.0%
61 L-02-61 500 19/12/22 99.95 97.05 70 29.95 28.05 5.51 5.50 -0.01 -0.1%
62 LM-02-62 500 29/12/22 99.97 97.05 70 29.97 28.05 5.51 5.50 -0.01 -0.1%
63 MN-02-63 500 27/12/22 99.77 97.05 70 29.77 28.05 5.51 5.50 -0.01 -0.1%
64 N-02-64 500 20/12/22 99.98 97.05 70 29.98 28.05 5.51 5.50 -0.01 -0.1%
65 R-02-65 500 09/08/22 99.63 96.30 70 29.63 27.30 5.36 6.00 0.64 11.9%
66 R-02-66 500 28/07/22 99.80 96.30 70 29.80 27.30 5.36 5.50 0.14 2.6%
67 A-03-67 600 09/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
68 A-03-68 600 02/01/23 99.87 96.40 70 29.87 27.40 7.75 8.00 0.25 3.3%
69 A-03-69 600 Cancelled
70 A-03-70 600 13/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
71 A-03-71 600 20/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
72 C-03-72 600 20/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
73 C-03-73 600 21/01/23 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
74 C-03-74 600 Cancelled
75 C-03-75 600 17/01/23 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
76 C-03-76 600 18/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
77 DE-03-77 600 06/01/23 100.00 96.30 70 30.00 27.30 7.72 8.00 0.28 3.6%
78 DE-03-78 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
79 DE-03-79 600 06/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
80 DE-03-80 600 13/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
81 F-03-81 600 05/01/23 99.98 95.45 70 29.98 26.45 7.48 7.50 0.02 0.3%
82 F-03-82 600 13/01/23 99.97 95.45 70 29.97 26.45 7.48 7.50 0.02 0.3%
83 F-03-83 600 Cancelled
84 F-03-84 600 09/01/23 99.99 95.45 70 29.99 26.45 7.48 7.50 0.02 0.3%
85 F-03-85 600 12/01/23 99.98 95.45 70 29.98 26.45 7.48 7.50 0.02 0.3%
86 H-03-86 600 07/01/23 99.94 95.70 70 29.94 26.70 7.55 7.50 -0.05 -0.7%
87 H-03-87 600 12/01/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
88 H-03-88 600 04/01/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
89 H-03-89 600 13/01/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
90 K-03-90 600 30/12/22 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
Page 2 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
91 K-03-91 600 10/01/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
92 K-03-92 600 01/01/23 99.94 95.70 70 29.94 26.70 7.55 7.50 -0.05 -0.7%
93 K-03-93 600 11/01/23 99.97 95.70 70 29.97 26.70 7.55 7.50 -0.05 -0.7%
94 L-03-94 600 05/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
95 L-03-95 600 18/01/23 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
96 L-03-96 600 04/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
97 L-03-97 600 07/01/23 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
98 M-03-98 600 03/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
99 M-03-99 600 09/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
100 M-03-100 600 31/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
101 M-03-101 600 10/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
102 N-03-102 600 30/12/22 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
103 N-03-103 600 12/01/23 99.96 95.80 70 29.96 26.80 7.58 7.50 -0.08 -1.0%
104 N-03-104 600 23/07/22 99.75 95.75 70 29.75 26.75 7.56 8.00 0.44 5.8%
105 N-03-105 600 06/01/23 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
106 P-03/04-106 600 04/01/23 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
107 P-03/04-107 600 18/01/23 99.99 95.80 70 29.99 26.80 7.58 7.50 -0.08 -1.0%
108 P-03/04-108 600 27/07/22 99.83 95.75 70 29.83 26.75 7.56 8.00 0.44 5.8%
109 P-03/04-109 600 13/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
110 R-02/03-110 500 17/12/22 99.95 95.10 70 29.95 26.10 5.12 5.50 0.38 7.3%
111 R-02/03-111 500 26/05/22 99.80 96.50 70 29.80 27.50 5.40 8.00 2.60 48.2%
112 R-03/04-112 500 31/12/22 99.99 95.10 70 29.99 26.10 5.12 5.00 -0.12 -2.4%
113 R-03/04-113 500 02/01/23 99.96 95.10 70 29.96 26.10 5.12 5.50 0.38 7.3%
114 R-03/04-114 500 17/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
115 R-03/04-115 500 04/01/23 99.92 95.10 70 29.92 26.10 5.12 5.00 -0.12 -2.4%
116 R-03/04-116 500 20/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
117 R-03/04-117 500 22/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
118 R-03/04-118 500 18/12/22 99.84 95.10 70 29.84 26.10 5.12 5.00 -0.12 -2.4%
119 A-04/05-119 600 10/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
120 A-04/05-120 600 03/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
121 A-04/05-121 600 Cancelled
122 A-04/05-122 600 23/01/23 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
123 A-04/05-123 600 25/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
124 AB-05/06-124 600 21/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
125 AB-05/06-125 600 24/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
126 AB-05/06-126 600 Cancelled
127 AB-05/06-127 600 31/12/22 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
128 AB-05/06-128 600 12/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
129 BC-04/05-129 600 28/01/23 99.91 96.40 70 29.91 27.40 7.75 8.00 0.25 3.3%
130 BC-04/05-130 600 27/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
131 BC-04/05-131 600 Cancelled
132 BC-04/05-132 600 26/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
133 BC-04/05-133 600 24/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
134 C-06-134 600 Cancelled
135 C-06-135 600 Cancelled
Page 3 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
136 C-06-136 600 Cancelled
137 C-06-137 600 Cancelled
138 AC-06/07-138 600 07/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
139 AC-06/07-139 600 19/01/23 99.90 96.50 70 29.90 27.50 7.78 8.00 0.22 2.9%
140 AC-06/07-140 600 03/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
141 AC-06/07-141 600 13/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
142 AC-06/07-142 600 26/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
143 AC-06/07-143 600 30/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
144 AC-06/07-144 600 26/01/23 99.92 96.50 70 29.92 27.50 7.78 8.00 0.22 2.9%
145 AC-06/07-145 600 28/01/23 99.89 96.50 70 29.89 27.50 7.78 10.00 2.22 28.6%
146 AC-07/08-146 600 23/01/23 99.84 96.20 70 29.84 27.20 7.69 8.00 0.31 4.0%
147 AC-07/08-147 600 25/01/23 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
148 AC-07/08-148 600 20/01/23 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
149 AC-07/08-149 600 23/01/23 99.97 96.20 70 29.97 27.20 7.69 8.00 0.31 4.0%
150 AC-07/08-150 600 13/01/23 99.98 96.20 70 29.98 27.20 7.69 8.00 0.31 4.0%
151 AC-07/08-151 600 11/01/23 99.97 96.20 70 29.97 27.20 7.69 7.50 -0.19 -2.5%
152 AC-07/08-152 600 30/12/22 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
153 AC-07/08-153 600 04/01/23 99.98 96.20 70 29.98 27.20 7.69 7.50 -0.19 -2.5%
154 AC-07/08-154 600 23/12/22 99.98 96.20 70 29.98 27.20 7.69 8.00 0.31 4.0%
155 AC-07/08-155 600 28/12/22 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
156 DE-06-156 500 05/07/22 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
157 DE-06-157 500 31/01/23 99.95 96.70 70 29.95 27.70 5.44 5.50 0.06 1.1%
158 E-08-158 600 04/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
159 E-08-159 600 14/07/22 99.81 96.40 70 29.81 27.40 7.75 8.00 0.25 3.3%
160 E-08-160 600 02/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
161 E-08-161 600 04/02/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
162 E-08-162 600 02/07/22 99.33 96.40 70 29.33 27.40 7.75 8.00 0.25 3.3%
163 E-08-163 600 06/02/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
164 EF-04/07-164 600 19/01/23 99.97 94.70 70 29.97 25.70 7.27 7.50 0.23 3.2%
165 EF-04/07-165 600 25/01/23 99.98 94.70 70 29.98 25.70 7.27 7.50 0.23 3.2%
166 EF-04/07-166 600 11/12/22 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
167 EF-04/07-167 600 27/01/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
168 EF-04/07-168 600 01/02/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
169 EF-04/07-169 600 07/02/23 99.98 94.70 70 29.98 25.70 7.27 7.50 0.23 3.2%
170 EF-04/07-170 600 08/02/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
171 EF-04/07-171 600 03/02/23 99.99 94.70 70 29.99 25.70 7.27 7.50 0.23 3.2%
172 EF-04/07-172 600 23/01/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
173 EF-04/07-173 600 20/01/23 99.89 94.70 70 29.89 25.70 7.27 7.50 0.23 3.2%
174 EF-04/07-174 600 07/02/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
175 EF-04/07-175 600 25/01/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
176 EF-04/07-176 600 01/02/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
177 EF-04/07-177 600 24/01/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
178 EF-04/07-178 600 21/01/23 99.89 94.70 70 29.89 25.70 7.27 7.50 0.23 3.2%
179 EF-04/07-179 600 10/12/22 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
180 F-07-180 600 10/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
Page 4 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
181 F-07-181 600 09/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
182 F-07-182 600 13/02/23 99.92 96.10 70 29.92 27.10 7.66 8.00 0.34 4.4%
183 F-08/09-183 600 03/07/22 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
184 F-08/09-184 600 01/07/22 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
185 F-08/09-185 600 12/07/22 99.74 96.40 70 29.74 27.40 7.75 8.00 0.25 3.3%
186 G-04-186 500 Cancelled
187 G-04-187 500 21/01/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
188 G-04-188 500 Cancelled
189 FG-04/07-189 600 Cancelled
190 FG-04/07-190 600 Cancelled
191 FG-04/07-191 600 03/02/23 99.95 93.95 70 29.95 24.95 7.05 7.00 -0.05 -0.8%
192 FG-04/07-192 600 31/01/23 99.92 93.95 70 29.92 24.95 7.05 7.00 -0.05 -0.8%
193 FG-04/07-193 600 06/02/23 99.96 93.95 70 29.96 24.95 7.05 7.00 -0.05 -0.8%
194 FG-04/07-194 600 04/02/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
195 FG-04/07-195 600 30/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
196 FG-04/07-196 600 28/01/23 99.91 93.95 70 29.91 24.95 7.05 7.00 -0.05 -0.8%
197 FG-04/07-197 600 Cancelled
198 FG-04/07-198 600 23/01/23 99.89 93.95 70 29.89 24.95 7.05 7.00 -0.05 -0.8%
199 FG-04/07-199 600 26/01/23 99.97 93.95 70 29.97 24.95 7.05 7.00 -0.05 -0.8%
200 FG-04/07-200 600 Cancelled
201 G-07/08-201 600 28/06/22 99.70 96.40 70 29.70 27.40 7.75 8.00 0.25 3.3%
202 G-07/08-202 600 03/07/22 99.91 96.40 70 29.91 27.40 7.75 8.00 0.25 3.3%
203 G-07/08-203 600 01/07/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
204 G-07/08-204 600 09/02/23 99.94 96.25 70 29.94 27.25 7.70 8.00 0.30 3.8%
205 G-07/08-205 600 11/02/23 99.94 96.25 70 29.94 27.25 7.70 8.00 0.30 3.8%
206 G-07/08-206 600 08/02/23 99.97 96.25 70 29.97 27.25 7.70 8.00 0.30 3.8%
207 JK-04/05-207 600 21/01/23 99.89 95.80 70 29.89 26.80 7.58 7.50 -0.08 -1.0%
208 JK-04/05-208 600 20/01/23 99.90 95.80 70 29.90 26.80 7.58 7.50 -0.08 -1.0%
209 JK-04/05-209 600 Cancelled
210 JK-04/05-210 600 18/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
211 JK-04/05-211 600 17/01/23 99.94 95.80 70 29.94 26.80 7.58 7.50 -0.08 -1.0%
212 JK-06/07-212 600 08/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
213 JK-06/07-213 600 01/02/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
214 JK-06/07-214 600 31/01/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
215 JK-06/07-215 600 25/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
216 JK-07/08-216 500 15/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
217 JK-07/08-217 500 10/02/23 99.99 96.60 70 29.99 27.60 5.42 5.50 0.08 1.5%
218 JK-07/08-218 500 Cancelled
219 JK-07/08-219 500 Cancelled
220 JK-07/08-220 500 07/02/23 99.99 96.60 70 29.99 27.60 5.42 5.50 0.08 1.5%
221 JK-07/08-221 500 10/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
222 KL-06/07-222 500 28/01/23 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%
223 KL-06/07-223 500 27/01/23 99.99 96.70 70 29.99 27.70 5.44 5.50 0.06 1.1%
224 KL-07-224 500 09/02/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%
225 KL-07-225 500 04/02/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%
Page 5 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
226 KL-10-226 500 17/02/23 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
227 KL-10-227 500 16/02/23 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
228 KL-04-228 500 19/01/23 99.92 97.05 70 29.92 28.05 5.51 5.50 -0.01 -0.1%
229 L-05-229 600 21/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
230 L-05-230 600 70 - -
231 L-05-231 600 24/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
232 L-05-232 600 23/01/23 99.82 96.40 70 29.82 27.40 7.75 8.00 0.25 3.3%
233 KL-06/07-233 600 03/02/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
234 KL-06/07-234 600 01/02/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
235 KL-06/07-235 600 02/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
236 KL-06/07-236 600 31/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
237 KL-10-237 600 11/02/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
238 KL-10-238 600 13/02/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
239 KL-10-239 600 14/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
240 KL-10-240 600 23/07/22 99.64 95.85 70 29.64 26.85 7.59 8.00 0.41 5.4%
241 LM-04-241 500 18/01/23 99.90 97.05 70 29.90 28.05 5.51 5.50 -0.01 -0.1%
242 LM-05-242 500 20/01/23 99.97 94.05 70 29.97 25.05 4.92 5.00 0.08 1.7%
243 LM-06/07-243 500 28/01/23 99.90 94.05 70 29.90 25.05 4.92 5.00 0.08 1.7%
244 M-04-244 500 17/01/23 99.96 97.05 70 29.96 28.05 5.51 5.50 -0.01 -0.1%
245 M-05-245 600 Cancelled
246 M-05-246 600 Cancelled
247 M-05-247 600 24/01/23 99.98 93.35 70 29.98 24.35 6.88 7.00 0.12 1.7%
248 M-06/07-248 500 31/01/23 99.96 94.05 70 29.96 25.05 4.92 5.00 0.08 1.7%
249 LM-06/07-249 600 09/02/23 99.95 93.40 70 29.95 24.40 6.90 7.00 0.10 1.5%
250 LM-06/07-250 600 08/02/23 99.95 93.40 70 29.95 24.40 6.90 7.00 0.10 1.5%
251 LM-06/07-251 600 07/02/23 99.99 93.40 70 29.99 24.40 6.90 7.00 0.10 1.5%
252 LM-06/07-252 600 07/02/23 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
253 LM-10-253 600 11/02/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
254 LM-10-254 600 13/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
255 LM-10-255 600 07/07/22 99.83 96.20 70 29.83 27.20 7.69 8.00 0.31 4.0%
256 LM-10-256 600 09/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
257 LM-10-257 600 13/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
258 LM-10-258 600 11/02/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
259 N-05-259 500 Cancelled
260 N-05-260 500 25/01/23 99.82 93.50 70 29.82 24.50 4.81 5.00 0.19 3.9%
261 N-05-261 500 Cancelled
262 N-06/07/262 500 02/02/23 99.99 94.05 70 29.99 25.05 4.92 5.00 0.08 1.7%
263 N-06/07/263 600 07/02/23 99.98 92.80 70 29.98 23.80 6.73 7.00 0.27 4.0%
264 N-06/07/264 600 26/05/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
265 N-06/07/265 600 08/02/23 99.95 92.80 70 29.95 23.80 6.73 7.00 0.27 4.0%
266 N-06/07/266 600 06/02/23 99.98 92.80 70 29.98 23.80 6.73 7.00 0.27 4.0%
267 N-06/07/267 600 31/01/23 99.99 92.80 70 29.99 23.80 6.73 7.00 0.27 4.0%
268 N-06/07/268 600 30/06/22 99.68 96.05 70 29.68 27.05 7.65 8.00 0.35 4.6%
269 P-04-269 600 23/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%
270 P-04-270 600 19/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%
Page 6 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
271 P-04-271 600 24/01/23 99.96 96.35 70 29.96 27.35 7.73 8.00 0.27 3.5%
272 P-04-272 600 31/07/22 99.78 96.05 70 29.78 27.05 7.65 8.00 0.35 4.6%
273 P-04-273 600 20/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%
274 O-05/06-274 500 25/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
275 O-05/06-275 500 28/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
276 O-05/06-276 500 27/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
277 OP-06/07-277 600 12/07/22 99.78 96.05 70 29.78 27.05 7.65 8.00 0.35 4.6%
278 OP-06/07-278 600 06/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
279 OP-06/07-279 600 31/01/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
280 OP-06/07-280 600 04/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
281 OP-06/07-281 600 30/01/23 99.90 95.70 70 29.90 26.70 7.55 7.50 -0.05 -0.7%
282 OP-10-282 600 09/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
283 OP-10-283 600 30/06/22 99.86 96.40 70 29.86 27.40 7.75 8.00 0.25 3.3%
284 OP-10-284 600 22/07/22 99.98 96.00 70 29.98 27.00 7.63 8.00 0.37 4.8%
285 OP-10-285 600 10/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
286 OP-10-286 600 18/07/22 99.73 96.00 70 29.73 27.00 7.63 8.00 0.37 4.8%
287 OP-10-287 600 09/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
288 R-04-288 600 18/12/22 99.85 95.75 70 29.85 26.75 7.56 7.50 -0.06 -0.8%
289 R-04-289 600 05/01/23 99.98 95.75 70 29.98 26.75 7.56 7.50 -0.06 -0.8%
290 R-04-290 600 16/12/22 99.90 95.75 70 29.90 26.75 7.56 7.50 -0.06 -0.8%
291 R-04-291 600 25/05/22 99.70 96.50 70 29.70 27.50 7.78 8.00 0.22 2.9%
292 R-04-292 600 18/07/22 99.43 95.90 70 29.43 26.90 7.61 8.00 0.39 5.2%
293 R-04-293 600 22/07/22 99.63 95.90 70 29.63 26.90 7.61 8.00 0.39 5.2%
294 Q-06/07-294 500 06/01/23 100.04 97.05 70 30.04 28.05 5.51 5.50 -0.01 -0.1%
295 R-05/06-295 600 21/02/23 100.40 97.05 70 30.40 28.05 7.93 8.00 0.07 0.9%
296 R-05/06-296 600 23/05/22 99.75 96.50 70 29.75 27.50 7.78 8.00 0.22 2.9%
297 R-05/06-297 600 09/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
298 R-05/06-298 600 29/06/22 99.66 96.05 70 29.66 27.05 7.65 8.00 0.35 4.6%
299 Q-06/07-299 500 06/01/23 99.92 97.05 70 29.92 28.05 5.51 5.50 -0.01 -0.1%
300 R-06/07-300 600 11/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
301 R-06/07-301 600 29/06/22 99.96 96.20 70 29.96 27.20 7.69 8.00 0.31 4.0%
302 R-06/07-302 600 19/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
303 R-08-303 500 20/05/22 99.40 96.50 70 29.40 27.50 5.40 5.50 0.10 1.9%
304 R-08-304 500 18/05/22 99.60 96.50 70 29.60 27.50 5.40 5.50 0.10 1.9%
305 R-08-305 500 21/12/22 99.85 96.30 70 29.85 27.30 5.36 5.50 0.14 2.6%
306 R-10-306 600 21/05/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
307 R-10-307 600 25/06/22 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
308 R-10-308 600 27/06/22 99.91 96.20 70 29.91 27.20 7.69 8.00 0.31 4.0%
309 R-10-309 600 23/05/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
310 R-10-310 600 11/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
311 R-10-311 600 09/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
312 AC-10/11-312 600 27/12/22 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
313 AC-10/11-313 600 04/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
314 AC-10/11-314 600 29/12/22 99.99 96.50 70 29.99 27.50 7.78 8.00 0.22 2.9%
315 AC-10/11-315 600 07/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%
Page 7 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
316 AC-10/11-316 600 09/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
317 AC-10/11-317 600 17/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
318 AC-10/11-318 600 11/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
319 AC-10/11-319 600 18/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
320 AC-11-320 600 19/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%
321 AC-11-321 600 17/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
322 AC-11-322 600 12/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
323 AC-11-323 600 10/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
324 AC-11-324 600 06/01/23 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
325 AC-11-325 600 31/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
326 AC-11-326 600 02/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%
327 AC-11-327 600 22/12/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
328 AC-12-328 600 09/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
329 AC-12-329 600 13/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
330 AC-12-330 600 06/01/23 99.99 95.50 70 29.99 26.50 7.49 8.00 0.51 6.8%
331 AC-12-331 600 05/01/23 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
332 AC-12-332 600 28/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
333 AC-12-333 600 29/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
334 AC-12-334 600 27/12/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
335 AC-12-335 600 19/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
336 AB-13-336 600 02/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
337 AB-13-337 600 03/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
338 AB-13-338 600 22/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
339 AB-13-339 600 24/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
340 C-13-340 600 07/07/22 99.83 96.20 70 29.83 27.20 7.69 8.00 0.31 4.0%
341 C-13-341 600 13/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
342 C-13-342 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
343 C-13-343 600 28/06/22 99.60 96.20 70 29.60 27.20 7.69 8.00 0.31 4.0%
344 E-11/12-344 600 25/01/23 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
345 E-11/12-345 600 26/01/23 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
346 E-11/12-346 600 24/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
347 E-11/12-347 600 26/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
348 E-11/12-348 600 23/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
349 E-11/12-349 600 25/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
350 E-11/12-350 600 21/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
351 E-13/14-351 600 23/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
352 E-13/14-352 600 21/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
353 E-13/14-353 600 21/01/23 99.90 95.80 70 29.90 26.80 7.58 7.50 -0.08 -1.0%
354 E-13/14-354 600 02/07/22 99.68 95.90 70 29.68 26.90 7.61 8.00 0.39 5.2%
355 E-13/14-355 600 29/06/22 99.68 95.90 70 29.68 26.90 7.61 8.00 0.39 5.2%
356 EF-11/12-356 600 31/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
357 EF-11/12-357 600 31/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
358 EF-11/12-358 600 28/01/23 99.99 96.30 70 29.99 27.30 7.72 7.50 -0.22 -2.8%
359 EF-11/12-359 600 27/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
360 EF-13/14-360 500 24/01/23 99.96 95.90 70 29.96 26.90 5.28 5.50 0.22 4.1%
Page 8 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
361 EF-13/14-361 500 30/01/23 99.97 95.90 70 29.97 26.90 5.28 5.50 0.22 4.1%
362 EF-13/14-362 500 25/01/23 99.96 95.90 70 29.96 26.90 5.28 5.50 0.22 4.1%
363 F-11/12-363 500 02/02/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
364 F-11/12-364 500 08/02/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
365 F-11/12-365 500 01/02/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
366 F-11/12-366 500 06/02/23 99.96 95.70 70 29.96 26.70 5.24 5.50 0.26 4.9%
367 F-11/12-367 500 03/02/23 99.96 95.70 70 29.96 26.70 5.24 5.50 0.26 4.9%
368 F-11/12-368 500 08/02/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
369 F-13/14-369 500 11/02/23 99.97 95.85 70 29.97 26.85 5.27 5.50 0.23 4.3%
370 F-13/14-370 500 31/01/23 99.99 96.50 70 29.99 27.50 5.40 5.50 0.10 1.9%
371 F-13/14-371 500 14/02/23 99.95 95.85 70 29.95 26.85 5.27 5.50 0.23 4.3%
372 F-13/14-372 500 06/02/23 99.95 95.85 70 29.95 26.85 5.27 5.50 0.23 4.3%
373 F-13/14-373 500 Cancelled
374 F-13/14-374 500 15/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
375 F-13/14-375 500 07/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
376 F-13/14-376 500 13/02/23 99.95 95.85 70 29.95 26.85 5.27 6.00 0.73 13.8%
377 F-13/14-377 500 10/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
378 G-11/12-378 500 15/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
379 G-11/12-379 500 14/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
380 G-11/12-380 500 09/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
381 G-11/12-381 500 Cancelled
382 G-11/12-382 500 Cancelled
383 G-11/12-383 500 11/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
384 G-13/14-384 500 07/02/23 99.96 96.45 70 29.96 27.45 5.39 5.50 0.11 2.0%
385 G-13/14-385 500 16/02/23 99.95 96.45 70 29.95 27.45 5.39 5.50 0.11 2.0%
386 G-13/14-386 500 13/02/23 99.87 96.45 70 29.87 27.45 5.39 6.00 0.61 11.3%
387 G-13/14-387 500 05/07/22 99.93 96.45 70 29.93 27.45 5.39 5.50 0.11 2.0%
388 G-13/14-388 500 16/02/23 99.94 96.45 70 29.94 27.45 5.39 5.50 0.11 2.0%
389 G-13/14-389 500 08/02/23 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
390 G-13/14-390 500 18/02/23 99.98 96.45 70 29.98 27.45 5.39 6.00 0.61 11.3%
391 G-13/14-391 500 17/02/23 99.97 96.45 70 29.97 27.45 5.39 5.50 0.11 2.0%
392 JK-11/12-392 500 16/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
393 JK-11/12-393 500 17/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
394 JK-11/12-394 500 17/02/23 99.96 96.60 70 29.96 27.60 5.42 6.00 0.58 10.7%
395 JK-11/12-395 500 Cancelled
396 JK-11/12-396 500 Cancelled
397 JK-11/12-397 500 17/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
398 JK-13/14-398 500 30/01/23 99.89 96.60 70 29.89 27.60 5.42 5.50 0.08 1.5%
399 JK-13/14-399 500 01/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
400 JK-13/14-400 500 03/02/23 99.93 96.60 70 29.93 27.60 5.42 5.50 0.08 1.5%
401 JK-13/14-401 500 02/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
402 JK-13/14-402 500 07/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
403 JK-13/14-403 500 04/02/23 99.92 96.60 70 29.92 27.60 5.42 5.50 0.08 1.5%
404 L-11/12-404 500 15/02/23 99.90 96.65 70 29.90 27.65 5.43 5.50 0.07 1.3%
405 L-11/12-405 500 16/02/23 99.96 96.65 70 29.96 27.65 5.43 5.50 0.07 1.3%
Page 9 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
406 L-14-406 500 27/01/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
407 L-14-407 500 30/01/23 99.98 96.65 70 29.98 27.65 5.43 5.50 0.07 1.3%
408 L-11/12-408 500 15/02/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
409 L-11/12-409 500 16/02/23 99.98 96.65 70 29.98 27.65 5.43 6.00 0.57 10.5%
410 L-14-410 500 24/01/23 99.99 96.65 70 29.99 27.65 5.43 5.50 0.07 1.3%
411 L-14-411 500 26/01/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
412 O-11/12-412 500 14/02/23 99.93 96.65 70 29.93 27.65 5.43 5.50 0.07 1.3%
413 O-11/12-413 500 14/02/23 99.92 96.65 70 29.92 27.65 5.43 5.50 0.07 1.3%
414 op-14-414 500 24/01/23 99.96 96.65 70 29.96 27.65 5.43 5.50 0.07 1.3%
415 op-14-415 500 25/01/23 99.98 96.65 70 29.98 27.65 5.43 5.50 0.07 1.3%
416 R-11/12-416 500 11/02/23 99.90 96.75 70 29.90 27.75 5.45 5.50 0.05 0.9%
417 R-11/12-417 500 13/02/23 99.95 96.75 70 29.95 27.75 5.45 5.50 0.05 0.9%
418 R-12/13-418 500 26/01/23 99.87 96.90 70 29.87 27.90 5.48 5.50 0.02 0.4%
419 R-12/13-419 500 15/02/23 99.92 96.75 70 29.92 27.75 5.45 5.50 0.05 0.9%
420 R-14/15-420 500 21/01/23 99.97 96.90 70 29.97 27.90 5.48 5.50 0.02 0.4%
421 R-14/15-421 500 21/01/23 99.81 96.90 70 29.81 27.90 5.48 5.50 0.02 0.4%
422 A-14/15-422 600 26/12/22 99.73 96.30 70 29.73 27.30 7.72 8.00 0.28 3.6%
423 A-14/15-423 600 28/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
424 A-14/15-424 600 30/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
425 A-14/15-425 600 31/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
426 A-14/15-426 600 26/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
427 A-14/15-427 600 29/12/22 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
428 A-14/15-428 600 19/07/22 99.87 96.05 70 29.87 27.05 7.65 8.00 0.35 4.6%
429 A-14/15-429 600 28/06/22 99.88 96.05 70 29.88 27.05 7.65 8.00 0.35 4.6%
430 A-14/15-430 600 23/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
431 A-18/19-431 600 14/07/22 99.83 96.30 70 29.83 27.30 7.72 8.00 0.28 3.6%
432 A-18/19-432 600 16/07/22 99.95 96.00 70 29.95 27.00 7.63 8.00 0.37 4.8%
433 A-18/19-433 600 11/07/22 99.94 96.30 70 29.94 27.30 7.72 8.00 0.28 3.6%
434 A-18/19-434 600 08/07/22 99.82 96.30 70 29.82 27.30 7.72 8.00 0.28 3.6%
435 A-18/19-435 600 27/06/22 99.87 96.30 70 29.87 27.30 7.72 8.00 0.28 3.6%
436 C-14/15-436 600 12/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
437 C-14/15-437 600 09/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
438 C-14/15-438 600 07/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
439 C-14/15-439 600 16/07/22 99.79 96.10 70 29.79 27.10 7.66 8.00 0.34 4.4%
440 C-14/15-440 600 15/07/22 99.79 96.05 70 29.79 27.05 7.65 8.00 0.35 4.6%
441 C-14/15-441 600 14/07/22 99.74 96.05 70 29.74 27.05 7.65 8.00 0.35 4.6%
442 C-14/15-442 600 05/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
443 C-14/15-443 600 17/07/22 99.69 96.05 70 29.69 27.05 7.65 8.00 0.35 4.6%
444 C-15/16-444 600 05/01/23 100.00 96.10 70 30.00 27.10 7.66 8.00 0.34 4.4%
445 C-15/16-445 600 06/01/23 99.97 96.10 70 29.97 27.10 7.66 7.50 -0.16 -2.1%
446 C-15/16-446 600 09/07/22 99.84 96.05 70 29.84 27.05 7.65 8.00 0.35 4.6%
447 C-18-447 600 10/07/22 99.85 96.20 70 29.85 27.20 7.69 8.00 0.31 4.0%
448 C-18-448 600 15/07/22 99.87 96.10 70 29.87 27.10 7.66 8.00 0.34 4.4%
449 C-18-449 600 26/07/22 99.81 96.10 70 29.81 27.10 7.66 8.00 0.34 4.4%
450 C-18-450 600 04/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
Page 10 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
451 A-19/20-451 600 09/12/22 99.73 96.50 70 29.73 27.50 7.78 8.00 0.22 2.9%
452 A-19/20-452 600 03/12/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
453 A-19/20-453 600 03/12/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
454 A-19/20-454 600 25/11/22 100.35 96.40 70 30.35 27.40 7.75 8.00 0.25 3.3%
455 A-19/20-455 600 24/11/22 100.17 96.50 70 30.17 27.50 7.78 8.00 0.22 2.9%
456 A-19/20-456 600 22/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
457 A-19/20-457 600 20/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
458 A-19/20-458 600 19/11/22 100.10 96.50 70 30.10 27.50 7.78 8.00 0.22 2.9%
459 A-20/21-459 600 18/12/22 99.84 96.50 70 29.84 27.50 7.78 8.00 0.22 2.9%
460 A-20/21-460 600 28/06/22 99.68 96.10 70 29.68 27.10 7.66 8.00 0.34 4.4%
461 A-20/21-461 600 13/12/22 99.84 96.50 70 29.84 27.50 7.78 8.00 0.22 2.9%
462 A-20/21-462 500 06/12/22 99.95 96.50 70 29.95 27.50 5.40 5.50 0.10 1.9%
463 A-20/21-463 500 01/12/22 99.94 96.50 70 29.94 27.50 5.40 6.00 0.60 11.1%
464 A-20/21-464 500 17/02/23 99.98 96.10 70 29.98 27.10 5.32 5.50 0.18 3.4%
465 A-20/21-465 500 29/11/22 99.94 96.50 70 29.94 27.50 5.40 5.50 0.10 1.9%
466 A-20/21-466 500 21/11/22 100.10 96.50 70 30.10 27.50 5.40 5.50 0.10 1.9%
467 A-20/21-467 500 28/11/22 99.94 96.50 70 29.94 27.50 5.40 5.50 0.10 1.9%
468 E-15/17-468 600 29/06/22 99.93 96.20 70 29.93 27.20 7.69 8.00 0.31 4.0%
469 E-15/17-469 600 04/07/22 99.86 96.15 70 29.86 27.15 7.68 8.00 0.32 4.2%
470 E-15/17-470 600 20/01/23 99.92 95.70 70 29.92 26.70 7.55 7.50 -0.05 -0.7%
471 E-15/17-471 600 06/07/22 99.57 96.15 70 29.57 27.15 7.68 8.00 0.32 4.2%
472 E-15/17-472 600 29/06/22 99.82 97.40 70 29.82 28.40 8.03 8.00 -0.03 -0.4%
473 E-15/17-473 600 18/01/23 99.89 95.70 70 29.89 26.70 7.55 7.50 -0.05 -0.7%
474 DE-18-474 500 03/01/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
475 DE-18-475 500 13/01/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
476 DE-18-476 500 06/07/22 99.78 96.70 70 29.78 27.70 5.44 5.50 0.06 1.1%
477 DE-18-477 500 03/01/23 99.90 95.70 70 29.90 26.70 5.24 5.50 0.26 4.9%
478 DE-18-478 500 18/02/23 99.96 95.70 70 29.96 26.70 5.24 6.50 1.26 24.0%
479 DE-19/20-479 500 08/07/22 99.92 96.70 70 29.92 27.70 5.44 5.50 0.06 1.1%
480 DE-19/20-480 500 29/07/22 99.75 96.50 70 29.75 27.50 5.40 5.00 -0.40 -7.4%
481 E-21-481 600 07/07/22 99.10 96.20 70 29.10 27.20 7.69 8.00 0.31 4.0%
482 E-21-482 600 27/12/22 99.98 95.90 70 29.98 26.90 7.61 8.00 0.39 5.2%
483 E-21-483 600 21/12/22 99.95 95.90 70 29.95 26.90 7.61 7.50 -0.11 -1.4%
484 E-21-484 600 23/12/22 99.80 95.90 70 29.80 26.90 7.61 7.50 -0.11 -1.4%
485 E-21-485 600 02/07/22 98.78 96.20 70 28.78 27.20 7.69 8.00 0.31 4.0%
486 EF-18/20-486 500 20/07/22 99.66 94.30 70 29.66 25.30 4.97 5.50 0.53 10.7%
487 EF-18/20-487 500 27/07/22 99.82 94.30 70 29.82 25.30 4.97 5.50 0.53 10.7%
488 EF-18/20-488 500 05/01/23 99.92 94.70 70 29.92 25.70 5.05 5.00 -0.05 -0.9%
489 EF-18/20-489 500 10/01/23 99.99 94.70 70 29.99 25.70 5.05 5.00 -0.05 -0.9%
490 EF-18/20-490 500 05/08/22 99.92 96.40 70 29.92 27.40 5.38 5.50 0.12 2.2%
491 EF-18/20-491 500 20/07/22 99.70 94.30 70 29.70 25.30 4.97 5.50 0.53 10.7%
492 EF-18/20-492 500 31/12/22 99.92 94.70 70 29.92 25.70 5.05 5.00 -0.05 -0.9%
493 EF-18/20-493 500 01/01/23 99.91 94.70 70 29.91 25.70 5.05 5.00 -0.05 -0.9%
494 EF-18/20-494 500 03/08/22 99.75 94.30 70 29.75 25.30 4.97 5.50 0.53 10.7%
495 EF-18/20-495 500 02/08/22 99.88 94.30 70 29.88 25.30 4.97 5.50 0.53 10.7%
Page 11 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
496 496 500 Cancelled
497 EF-18/20-497 500 01/08/22 99.95 94.30 70 29.95 25.30 4.97 5.50 0.53 10.7%
498 EF-18/20-498 500 28/07/22 99.97 94.30 70 29.97 25.30 4.97 5.50 0.53 10.7%
499 EF-18/20-499 500 30/07/22 99.81 94.30 70 29.81 25.30 4.97 5.50 0.53 10.7%
500 EF-18/20-500 500 05/08/22 99.98 94.30 70 29.98 25.30 4.97 5.50 0.53 10.7%
501 EF-18/20-501 500 17/01/23 99.90 94.70 70 29.90 25.70 5.05 5.00 -0.05 -0.9%
502 EF-18/20-502 500 31/07/22 99.88 94.30 70 29.88 25.30 4.97 5.00 0.03 0.7%
503 EF-18/20-503 500 06/08/22 99.99 94.30 70 29.99 25.30 4.97 5.50 0.53 10.7%
504 F-15/16-504 600 24/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
505 F-15/16-505 600 27/01/23 99.87 96.25 70 29.87 27.25 7.70 8.00 0.30 3.8%
506 F-15/16-506 600 26/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
507 F-15/16-507 600 27/01/23 99.97 96.25 70 29.97 27.25 7.70 8.00 0.30 3.8%
508 F-15/16-508 600 25/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
509 F-15/16-509 600 28/01/23 99.92 96.25 70 29.92 27.25 7.70 8.50 0.80 10.3%
510 G-15-510 500 26/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
511 G-15-511 500 28/01/23 99.95 96.30 70 29.95 27.30 5.36 5.50 0.14 2.6%
512 G-15-512 500 09/02/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
513 G-16-513 500 20/01/23 99.97 96.50 70 29.97 27.50 5.40 5.50 0.10 1.9%
514 G-16-514 500 23/07/22 99.64 94.50 70 29.64 25.50 5.01 5.50 0.49 9.8%
515 FG-18/19-515 600 18/02/23 99.93 93.95 70 29.93 24.95 7.05 7.00 -0.05 -0.8%
516 FG-18/19-516 600 29/12/22 100.10 93.95 70 30.10 24.95 7.05 7.00 -0.05 -0.8%
517 FG-18/19-517 600 31/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
518 FG-18/19-518 600 03/02/23 99.96 93.95 70 29.96 24.95 7.05 7.00 -0.05 -0.8%
519 FG-18/19-519 600 22/07/22 99.77 94.50 70 29.77 25.50 7.21 7.50 0.29 4.0%
520 FG-18/19-520 600 30/12/22 99.84 93.95 70 29.84 24.95 7.05 7.00 -0.05 -0.8%
521 FG-18/19-521 600 09/01/23 99.92 93.95 70 29.92 24.95 7.05 7.00 -0.05 -0.8%
522 FG-18/19-522 600 10/01/23 99.99 93.95 70 29.99 24.95 7.05 7.00 -0.05 -0.8%
523 FG-18/19-523 600 04/02/23 99.93 93.95 70 29.93 24.95 7.05 7.00 -0.05 -0.8%
524 FG-18/19-524 600 31/12/22 99.89 93.95 70 29.89 24.95 7.05 7.00 -0.05 -0.8%
525 FG-18/19-525 600 21/07/22 99.69 94.50 70 29.69 25.50 7.21 7.50 0.29 4.0%
526 FG-18/19-526 600 25/07/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
527 FG-18/19-527 600 13/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
528 FG-18/19-528 600 19/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
529 G-20-529 500 02/08/22 99.95 96.40 70 29.95 27.40 5.38 5.50 0.12 2.2%
530 G-20-530 500 24/12/22 99.95 96.30 70 29.95 27.30 5.36 5.50 0.14 2.6%
531 G-20-531 500 25/07/22 99.63 96.40 70 29.63 27.40 5.38 5.50 0.12 2.2%
532 J-15-532 500 19/01/23 99.87 96.30 70 29.87 27.30 5.36 5.50 0.14 2.6%
533 J-15-533 500 23/01/23 99.86 96.30 70 29.86 27.30 5.36 5.50 0.14 2.6%
534 J-16-534 600 Cancelled
535 J-16-535 600 20/01/23 99.87 96.30 70 29.87 27.30 7.72 8.00 0.28 3.6%
536 J-16-536 600 Cancelled
537 J-16-537 600 21/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
538 J-18/19-538 600 03/01/23 99.94 96.30 70 29.94 27.30 7.72 8.00 0.28 3.6%
539 J-18/19-539 600 07/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
540 J-18/19-540 600 04/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
Page 12 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
541 J-18/19-541 600 07/01/23 99.92 96.30 70 29.92 27.30 7.72 8.00 0.28 3.6%
542 J-18/19-542 600 12/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
543 J-20-543 500 26/12/22 99.84 96.30 70 29.84 27.30 5.36 5.50 0.14 2.6%
544 J-20-544 500 30/12/22 99.89 96.30 70 29.89 27.30 5.36 5.50 0.14 2.6%
545 J-20-545 500 28/12/22 99.84 96.30 70 29.84 27.30 5.36 5.50 0.14 2.6%
546 L-15/16-546 600 17/01/23 99.92 96.30 70 29.92 27.30 7.72 8.00 0.28 3.6%
547 L-15/16-547 600 18/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
548 L-15/16-548 600 Cancelled
549 L-15/16-549 600 Cancelled
550 L-18/19-550 600 01/01/23 99.92 96.40 70 29.92 27.40 7.75 8.00 0.25 3.3%
551 L-18/19-551 600 06/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
552 L-18/19-552 600 04/01/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
553 L-18/19-553 600 10/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
554 L-20-554 600 21/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
555 L-20-555 600 24/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
556 L-20-556 600 Cancelled
557 L-20-557 600 Cancelled
558 MN-16-558 600 13/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
559 MN-16-559 600 18/01/23 99.87 96.10 70 29.87 27.10 7.66 7.50 -0.16 -2.1%
560 MN-16-560 600 19/01/23 99.98 96.10 70 29.98 27.10 7.66 7.50 -0.16 -2.1%
561 MN-19-561 600 09/01/23 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
562 MN-19-562 600 05/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
563 MN-19-563 600 12/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
564 MN-19-564 600 11/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
565 MN-20-565 600 24/12/22 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
566 MN-20-566 600 Cancelled
567 MN-20-567 600 28/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
568 MN-20-568 600 Cancelled
569 N-21-569 500 15/12/22 99.96 96.30 70 29.96 27.30 5.36 5.50 0.14 2.6%
570 N-21-570 500 22/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
571 N-21-571 500 16/12/22 99.96 96.30 70 29.96 27.30 5.36 5.50 0.14 2.6%
572 OP-15-572 600 12/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
573 OP-15-573 600 17/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
574 OP-15-574 600 19/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
575 OP-15-575 600 20/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
576 OP-19-576 600 03/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
577 OP-19-577 600 10/01/23 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
578 OP-19-578 600 Cancelled
579 OP-19-579 600 Cancelled
580 Q-17/18-580 500 05/01/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
581 Q-17/18-581 500 07/01/23 99.91 96.60 70 29.91 27.60 5.42 5.50 0.08 1.5%
582 Q-19/20-582 500 30/12/22 99.91 93.60 70 29.91 24.60 4.83 5.00 0.17 3.5%
583 Q-19/20-583 500 31/12/22 99.91 93.60 70 29.91 24.60 4.83 5.00 0.17 3.5%
584 PQ-20-584 600 22/12/22 99.90 93.40 70 29.90 24.40 6.90 7.00 0.10 1.5%
585 PQ-20-585 600 24/12/22 99.79 93.40 70 29.79 24.40 6.90 7.00 0.10 1.5%
Page 13 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
586 PQ-20-586 600 Cancelled
587 PQ-20-587 600 30/12/22 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
588 PQ-20-588 600 29/12/22 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
589 PQ-21-589 600 18/12/22 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
590 PQ-21-590 600 20/12/22 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
591 PQ-21-591 600 Cancelled
592 PQ-21-592 600 21/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
593 PQ-21-593 600 27/12/22 99.84 96.40 70 29.84 27.40 7.75 8.00 0.25 3.3%
594 R-15-594 600 Cancelled
595 R-15-595 600 Cancelled
596 R-15-596 600 07/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
597 R-17-597 500 03/01/23 99.90 96.30 70 29.90 27.30 5.36 5.50 0.14 2.6%
598 R-17-598 500 28/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
599 R-17-599 500 04/01/23 99.89 96.30 70 29.89 27.30 5.36 5.50 0.14 2.6%
600 R-19-600 600 Cancelled
601 R-19-601 600 Cancelled
602 R-19-602 600 04/01/23 99.92 96.10 70 29.92 27.10 7.66 7.50 -0.16 -2.1%
603 R-19-20-603 600 20/12/22 99.85 92.75 70 29.85 23.75 6.72 7.00 0.28 4.2%
604 R-19-20-604 600 24/12/22 99.85 92.75 70 29.85 23.75 6.72 7.00 0.28 4.2%
605 R-19-20-605 600 29/12/22 99.84 92.75 70 29.84 23.75 6.72 7.00 0.28 4.2%
606 R-20-606 600 17/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
607 R-20-607 600 19/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
608 R-20-608 600 21/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
609 R-21-609 500 10/12/22 99.95 96.35 70 29.95 27.35 5.37 5.50 0.13 2.4%
610 R-21-610 500 14/12/22 99.57 96.35 70 29.57 27.35 5.37 5.50 0.13 2.4%
611 R-21-611 500 30/07/22 99.82 96.30 70 29.82 27.30 5.36 5.50 0.14 2.6%
612 AC-22/23-612 500 19/11/22 100.05 96.50 70 30.05 27.50 5.40 5.50 0.10 1.9%
613 AC-22/23-613 500 24/11/22 99.83 96.30 70 29.83 27.30 5.36 5.50 0.14 2.6%
614 AC-22/23-614 500 30/11/22 99.83 96.30 70 29.83 27.30 5.36 5.50 0.14 2.6%
615 AC-22/23-615 500 09/12/22 99.91 96.30 70 29.91 27.30 5.36 5.50 0.14 2.6%
616 AC-22/23-616 500 10/12/22 99.90 96.30 70 29.90 27.30 5.36 5.50 0.14 2.6%
617 AC-22/23-617 500 22/12/22 99.84 96.30 70 29.84 27.30 5.36 6.00 0.64 11.9%
618 AC-22/23-618 500 15/12/22 99.85 96.30 70 29.85 27.30 5.36 5.50 0.14 2.6%
619 AC-22/23-619 500 28/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
620 AC-22/23-620 500 29/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
621 AC-22/23-621 500 28/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
622 AB-23-622 500 22/11/22 99.90 96.45 70 29.90 27.45 5.39 5.50 0.11 2.0%
623 AB-23-623 500 07/12/22 99.83 96.45 70 29.83 27.45 5.39 5.50 0.11 2.0%
624 AB-23-624 500 08/12/22 99.85 96.45 70 29.85 27.45 5.39 5.50 0.11 2.0%
625 AB-23-625 500 16/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
626 AB-23-626 500 19/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
627 AB-23-627 500 20/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
628 C-23-628 600 21/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
629 C-23-629 600 26/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
630 C-23-630 600 09/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
Page 14 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
631 C-23-631 600 23/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
632 AC-24-632 600 22/11/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
633 AC-24-633 600 24/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
634 AC-24-634 600 26/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
635 AC-24-635 600 29/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
636 AC-24-636 600 26/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
637 AC-24-637 600 19/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
638 AC-24-638 600 29/11/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
639 AC-24-639 600 25/11/22 100.16 96.50 70 30.16 27.50 7.78 8.00 0.22 2.9%
640 D-24 500 28/11/22 99.93 96.90 70 29.93 27.90 5.48 5.50 0.02 0.4%
641 D-24 500 01/12/22 99.93 96.90 70 29.93 27.90 5.48 5.50 0.02 0.4%
642 E-22-642 600 06/07/22 99.95 96.00 70 29.95 27.00 7.63 8.00 0.37 4.8%
643 E-22-643 600 09/07/22 99.90 96.00 70 29.90 27.00 7.63 8.00 0.37 4.8%
644 E-22-644 600 17/12/22 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
645 E-22-645 600 20/12/22 99.70 96.30 70 29.70 27.30 7.72 8.00 0.28 3.6%
646 E-23-646 500 09/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
647 E-23-647 500 07/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
648 E-23-648 500 14/12/22 99.77 96.30 70 29.77 27.30 5.36 5.50 0.14 2.6%
649 E-24-649 600 18/11/22 99.83 96.50 70 29.83 27.50 7.78 8.00 0.22 2.9%
650 E-24-650 600 26/11/22 100.01 95.65 70 30.01 26.65 7.54 8.00 0.46 6.2%
651 E-24-651 600 30/11/22 99.70 95.65 70 29.70 26.65 7.54 7.50 -0.04 -0.5%
652 E-24-652 600 21/11/22 99.83 95.65 70 29.83 26.65 7.54 8.00 0.46 6.2%
653 E-24-653 600 29/11/22 99.98 95.65 70 29.98 26.65 7.54 7.50 -0.04 -0.5%
654 E-24-654 600 02/12/22 99.70 95.65 70 29.70 26.65 7.54 7.50 -0.04 -0.5%
655 E-24-655 600 20/11/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
656 E-24-656 600 25/11/22 100.01 95.65 70 30.01 26.65 7.54 8.00 0.46 6.2%
657 E-24-657 600 05/12/22 99.88 95.65 70 29.88 26.65 7.54 7.50 -0.04 -0.5%
658 F-23-658 500 Cancelled
659 F-23-659 500 Cancelled
660 F-23-660 500 08/12/22 99.74 96.30 70 29.74 27.30 5.36 5.50 0.14 2.6%
661 F-24-661 600 22/11/22 99.89 96.40 70 29.89 27.40 7.75 8.00 0.25 3.3%
662 F-24-662 600 01/12/22 99.71 96.40 70 29.71 27.40 7.75 8.00 0.25 3.3%
663 F-24-663 600 24/11/22 99.93 96.40 70 29.93 27.40 7.75 8.00 0.25 3.3%
664 F-24-664 600 18/11/22 100.10 96.50 70 30.10 27.50 7.78 8.00 0.22 2.9%
665 F-24-665 600 28/11/22 99.71 96.40 70 29.71 27.40 7.75 8.00 0.25 3.3%
666 GH-22-666 600 15/12/22 99.92 96.40 70 29.92 27.40 7.75 8.00 0.25 3.3%
667 GH-22-667 600 19/12/22 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
668 GH-22-68 600 04/07/22 99.93 96.20 70 29.93 27.20 7.69 8.00 0.31 4.0%
669 GH-22-669 600 14/12/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
670 GH-22-670 600 17/12/22 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
671 GH-24-671 500 20/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
672 GH-24-672 500 09/12/22 99.87 96.70 70 29.87 27.70 5.44 5.50 0.06 1.1%
673 GH-24-673 500 26/11/22 100.19 96.70 70 30.19 27.70 5.44 5.50 0.06 1.1%
674 GH-24-674 500 04/12/22 99.92 96.70 70 29.92 27.70 5.44 5.50 0.06 1.1%
675 GH-24-675 500 06/12/22 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%
Page 15 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
676 GH-24-676 500 23/11/22 100.00 96.70 70 30.00 27.70 5.44 5.50 0.06 1.1%
677 GH-24-677 500 08/12/22 99.87 96.70 70 29.87 27.70 5.44 5.50 0.06 1.1%
678 KL-22-678 500 13/12/22 99.97 96.56 70 29.97 27.56 5.41 5.50 0.09 1.6%
679 KL-22-679 500 15/12/22 99.93 96.45 70 29.93 27.45 5.39 5.50 0.11 2.0%
680 KL-22-680 600 05/08/22 99.93 96.05 70 29.93 27.05 7.65 8.00 0.35 4.6%
681 KL-22-681 500 19/12/22 99.85 96.45 70 29.85 27.45 5.39 5.50 0.11 2.0%
682 KL-22-682 600 08/08/22 99.98 96.05 70 29.98 27.05 7.65 8.00 0.35 4.6%
683 KL-22-683 600 16/12/22 99.84 96.45 70 29.84 27.45 7.76 8.00 0.24 3.1%
684 JK-24-684 500 30/11/22 99.86 96.70 70 29.86 27.70 5.44 5.50 0.06 1.1%
685 JK-24-685 500 06/12/22 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%
686 JK-24-686 500 01/12/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
687 JK-24-687 500 28/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
688 JK-24-688 500 03/12/22 99.88 96.70 70 29.88 27.70 5.44 5.50 0.06 1.1%
689 JK-24-689 500 22/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
690 JK-24-690 500 08/12/22 99.83 96.70 70 29.83 27.70 5.44 5.50 0.06 1.1%
691 L-23-691 600 06/12/22 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
692 L-23-692 600 13/12/22 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
693 L-23-693 600 05/12/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
694 L-23-694 600 07/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
695 L-24-695 600 15/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
696 L-24-696 600 20/11/22 100.08 96.30 70 30.08 27.30 7.72 8.00 0.28 3.6%
697 L-24-697 600 19/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
698 L-24-698 600 18/11/22 100.08 96.50 70 30.08 27.50 7.78 8.00 0.22 2.9%
699 M-24-699 500 21/11/22 100.15 96.90 70 30.15 27.90 5.48 5.50 0.02 0.4%
700 M-24-700 500 26/11/22 100.15 96.70 70 30.15 27.70 5.44 5.50 0.06 1.1%
701 N-22-701 600 23/07/22 99.71 96.00 70 29.71 27.00 7.63 8.00 0.37 4.8%
702 N-22-702 600 29/07/22 99.78 96.00 70 29.78 27.00 7.63 7.50 -0.13 -1.8%
703 N-22-703 600 17/12/22 99.84 96.40 70 29.84 27.40 7.75 8.00 0.25 3.3%
704 N-22-704 600 30/07/22 99.76 96.00 70 29.76 27.00 7.63 8.00 0.37 4.8%
705 N-22-705 600 02/08/22 99.86 96.00 70 29.86 27.00 7.63 8.00 0.37 4.8%
706 N-23-706 600 03/08/22 99.87 96.05 70 29.87 27.05 7.65 8.00 0.35 4.6%
707 N-23-707 600 06/08/22 99.93 96.05 70 29.93 27.05 7.65 8.00 0.35 4.6%
708 N-23-708 600 05/08/22 99.97 96.05 70 29.97 27.05 7.65 8.00 0.35 4.6%
709 PQ-22-709 600 28/07/22 99.85 96.15 70 29.85 27.15 7.68 8.00 0.32 4.2%
710 PQ-22-710 600 01/08/22 99.94 96.15 70 29.94 27.15 7.68 8.00 0.32 4.2%
711 PQ-22-711 600 23/07/22 99.95 96.15 70 29.95 27.15 7.68 8.00 0.32 4.2%
712 P-23-712 600 04/08/22 99.81 96.05 70 29.81 27.05 7.65 8.00 0.35 4.6%
713 P-23-713 600 07/12/22 99.93 96.10 70 29.93 27.10 7.66 7.50 -0.16 -2.1%
714 P-23-714 600 06/02/23 99.96 96.10 70 29.96 27.10 7.66 8.00 0.34 4.4%
715 NO-24-715 600 18/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
716 NO-24-716 600 20/11/22 100.13 95.70 70 30.13 26.70 7.55 7.50 -0.05 -0.7%
717 NO-24-717 600 19/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
718 NO-24-718 600 29/11/22 100.05 95.70 70 30.05 26.70 7.55 7.50 -0.05 -0.7%
719 NO-24-719 600 02/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
720 NO-24-720 600 30/11/22 100.05 95.70 70 30.05 26.70 7.55 7.50 -0.05 -0.7%
Page 16 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023
Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
721 PQ-24-721 600 02/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
722 PQ-24-722 600 04/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
723 PQ-24-723 600 03/12/22 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
724 R-22-724 600 22/07/22 99.77 94.80 70 29.77 25.80 7.29 7.50 0.21 2.8%
725 R-22-725 600 27/07/22 99.94 94.80 70 29.94 25.80 7.29 8.00 0.71 9.7%
726 R-22-726 600 26/07/22 99.88 94.80 70 29.88 25.80 7.29 8.00 0.71 9.7%
727 R-23-727 600 13/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
728 R-23-728 600 18/02/23 99.90 96.15 70 29.90 27.15 7.68 8.00 0.32 4.2%
729 R-23-729 600 10/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
730 R-23-730 600 14/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
731 R-24-731 600 05/12/22 99.98 96.40 70 29.98 27.40 7.75 7.50 -0.25 -3.2%
732 R-24-732 600 08/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
733 R-24-733 600 Cancelled
734 R-24-734 600 06/12/22 99.82 96.40 70 29.82 27.40 7.75 8.00 0.25 3.3%
735 R-24-735 600 09/12/22 99.85 96.40 70 29.85 27.40 7.75 8.00 0.25 3.3%
736 736 600 Cancelled
737 737 500 08/02/23 99.95 96.75 70 29.95 27.75 5.45 5.50 0.05 0.9%
738 738 600 07/02/23 99.99 93.25 70 29.99 24.25 6.86 7.00 0.14 2.1%
739 739 600 06/02/23 99.98 96.60 70 29.98 27.60 7.80 8.00 0.20 2.5%
740 740 600 04/02/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
741 741 600 04/02/23 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%
742 742 600 03/02/23 99.99 96.70 70 29.99 27.70 7.83 8.00 0.17 2.1%
743 743 600 01/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
744 744 600 02/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
745 745 500 15/02/23 99.95 96.25 70 29.95 27.25 5.35 5.50 0.15 2.8%
746 746 500 16/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
747 747 500 14/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
748 748 600 01/02/23 99.99 96.70 70 29.99 27.70 7.83 8.00 0.17 2.1%
749 749 600 02/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
750 750 600 03/02/23 99.98 93.70 70 29.98 24.70 6.98 7.00 0.02 0.2%
751 751 500 04/02/23 99.95 93.50 70 29.95 24.50 4.81 5.00 0.19 3.9%
753 753 500 06/02/23 99.93 96.15 70 29.93 27.15 5.33 5.50 0.17 3.2%
754 754 600 27/06/22 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
755 755 600 01/07/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
756 756 600 25/06/22 99.96 96.20 70 29.96 27.20 7.69 8.00 0.31 4.0%
757 757 500 18/02/23 99.96 96.82 70 29.96 27.82 5.46 6.00 0.54 9.8%
758 758 500 18/02/23 99.85 96.62 70 29.85 27.62 5.42 5.50 0.08 1.4%
759 759 500 18/02/23 99.98 96.82 70 29.98 27.82 5.46 5.50 0.04 0.7%
760 760 500 19/02/23 99.98 96.82 70 29.98 27.82 5.46 6.50 1.04 19.0%
761 761 600 11/07/22 99.59 96.05 70 29.59 27.05 7.65 8.00 0.35 4.6%
762 762 600 22/05/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
763 763 500 06/08/22 99.97 94.30 70 29.97 25.30 4.97 5.50 0.53 10.7%
13A 13a 600 18/02/23 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%
Page 17 of 17