You are on page 1of 17

AVAASA ONE @ KAKINADA

CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA


DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
1 A-01 600 03/01/23 99.99 96.10 70 29.99 27.10 7.66 7.50 -0.16 -2.1%
2 A-02 600 04/01/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
3 A-03 600 05/01/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
4 BC-04 600 29/12/22 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
5 BC-05 600 06/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
6 BC-06 600 30/12/22 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
7 BC-07 600 28/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
8 BC-08 600 03/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
9 D-09 600 02/06/22 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
10 D-10 600 14/06/22 99.85 96.10 70 29.85 27.10 7.66 8.00 0.34 4.4%
11 D-11 600 04/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
12 EF-01-12 600 28/12/22 99.96 96.05 70 29.96 27.05 7.65 8.00 0.35 4.6%
13 EF-01-13 600 21/06/22 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%
14 EF-01-14 600 26/12/22 100.00 96.05 70 30.00 27.05 7.65 8.00 0.35 4.6%
15 F-15 600 18/06/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
16 F-16 600 20/06/22 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
17 F-17 600 12/06/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
18 F-18 600 31/05/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
19 H-01-19 600 17/06/22 100.75 97.10 70 30.75 28.10 7.95 8.00 0.05 0.7%
20 H-01-20 600 23/12/22 99.77 95.45 70 29.77 26.45 7.48 7.50 0.02 0.3%
21 H-01-21 600 31/05/22 99.78 96.50 70 29.78 27.50 7.78 8.00 0.22 2.9%
22 K-01-22 600 14/12/22 99.74 96.05 70 29.74 27.05 7.65 8.00 0.35 4.6%
23 K-01-23 600 16/12/22 99.64 96.05 70 29.64 27.05 7.65 8.00 0.35 4.6%
24 K-01-24 600 28/05/22 99.75 97.50 70 29.75 28.50 8.06 8.00 -0.06 -0.7%
25 L-01-25 600 20/06/22 99.88 96.30 70 29.88 27.30 7.72 8.00 0.28 3.6%
26 L-01-26 600 28/07/22 99.76 96.30 70 29.76 27.30 7.72 8.00 0.28 3.6%
27 L-01-27 600 30/05/22 98.97 96.50 70 28.97 27.50 7.78 8.00 0.22 2.9%
28 L-01-28 600 01/06/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
29 M-29 600 03/06/22 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
30 M-30 600 17/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
31 M-31 600 30/05/22 99.70 96.50 70 29.70 27.50 7.78 8.00 0.22 2.9%
32 N-32 500 15/12/22 99.90 95.70 70 29.90 26.70 5.24 5.50 0.26 4.9%
33 N-33 500 12/08/22 99.68 95.75 70 29.68 26.75 5.25 6.00 0.75 14.2%
34 N-34 500 24/07/22 99.62 95.75 70 29.62 26.75 5.25 5.50 0.25 4.7%
35 P-01-35 600 16/06/22 99.88 96.10 70 29.88 27.10 7.66 8.00 0.34 4.4%
36 P-01-36 600 18/06/22 99.86 96.10 70 29.86 27.10 7.66 8.00 0.34 4.4%
37 P-01-37 600 03/06/22 99.80 96.10 70 29.80 27.10 7.66 8.00 0.34 4.4%
38 Q-01-38 600 05/07/22 99.95 96.10 70 29.95 27.10 7.66 8.00 0.34 4.4%
39 Q-01-39 600 25/07/22 99.44 95.55 70 29.44 26.55 7.51 8.00 0.49 6.6%
40 Q-01-40 600 02/07/22 99.40 96.40 70 29.40 27.40 7.75 8.00 0.25 3.3%
41 R-01-41 600 28/05/22 99.90 96.50 70 29.90 27.50 7.78 8.00 0.22 2.9%
42 R-01-42 600 15/12/22 99.95 95.45 70 29.95 26.45 7.48 7.50 0.02 0.3%
43 R-01-43 600 27/05/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
44 A-02-44 600 07/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
45 A-02-45 600 31/12/22 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%

Page 1 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
46 A-02-46 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
47 A-02-47 600 11/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
48 B-02-48 500 17/01/23 99.99 96.70 70 29.99 27.70 5.44 5.50 0.06 1.1%
49 B-02-49 500 18/01/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%
50 C-01-50 600 09/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
51 C-01-51 600 12/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
52 C-01-52 600 11/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
53 C-01-53 600 07/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
54 C-01-54 600 05/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
55 DE-01/02-55 500 01/01/23 99.97 97.05 70 29.97 28.05 5.51 5.50 -0.01 -0.1%
56 DE-01/02-56 500 03/01/23 99.98 97.05 70 29.98 28.05 5.51 5.50 -0.01 -0.1%
57 EF-01/01-57 500 29/12/22 99.92 96.45 70 29.92 27.45 5.39 5.50 0.11 2.0%
58 EF-01/01-58 500 30/12/22 99.99 96.45 70 29.99 27.45 5.39 5.50 0.11 2.0%
59 H-02-59 500 28/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
60 KL-02-60 500 26/12/22 99.77 96.45 70 29.77 27.45 5.39 5.50 0.11 2.0%
61 L-02-61 500 19/12/22 99.95 97.05 70 29.95 28.05 5.51 5.50 -0.01 -0.1%
62 LM-02-62 500 29/12/22 99.97 97.05 70 29.97 28.05 5.51 5.50 -0.01 -0.1%
63 MN-02-63 500 27/12/22 99.77 97.05 70 29.77 28.05 5.51 5.50 -0.01 -0.1%
64 N-02-64 500 20/12/22 99.98 97.05 70 29.98 28.05 5.51 5.50 -0.01 -0.1%
65 R-02-65 500 09/08/22 99.63 96.30 70 29.63 27.30 5.36 6.00 0.64 11.9%
66 R-02-66 500 28/07/22 99.80 96.30 70 29.80 27.30 5.36 5.50 0.14 2.6%
67 A-03-67 600 09/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
68 A-03-68 600 02/01/23 99.87 96.40 70 29.87 27.40 7.75 8.00 0.25 3.3%
69 A-03-69 600 Cancelled
70 A-03-70 600 13/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
71 A-03-71 600 20/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
72 C-03-72 600 20/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
73 C-03-73 600 21/01/23 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
74 C-03-74 600 Cancelled
75 C-03-75 600 17/01/23 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
76 C-03-76 600 18/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
77 DE-03-77 600 06/01/23 100.00 96.30 70 30.00 27.30 7.72 8.00 0.28 3.6%
78 DE-03-78 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
79 DE-03-79 600 06/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
80 DE-03-80 600 13/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
81 F-03-81 600 05/01/23 99.98 95.45 70 29.98 26.45 7.48 7.50 0.02 0.3%
82 F-03-82 600 13/01/23 99.97 95.45 70 29.97 26.45 7.48 7.50 0.02 0.3%
83 F-03-83 600 Cancelled
84 F-03-84 600 09/01/23 99.99 95.45 70 29.99 26.45 7.48 7.50 0.02 0.3%
85 F-03-85 600 12/01/23 99.98 95.45 70 29.98 26.45 7.48 7.50 0.02 0.3%
86 H-03-86 600 07/01/23 99.94 95.70 70 29.94 26.70 7.55 7.50 -0.05 -0.7%
87 H-03-87 600 12/01/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
88 H-03-88 600 04/01/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
89 H-03-89 600 13/01/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
90 K-03-90 600 30/12/22 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%

Page 2 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
91 K-03-91 600 10/01/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
92 K-03-92 600 01/01/23 99.94 95.70 70 29.94 26.70 7.55 7.50 -0.05 -0.7%
93 K-03-93 600 11/01/23 99.97 95.70 70 29.97 26.70 7.55 7.50 -0.05 -0.7%
94 L-03-94 600 05/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
95 L-03-95 600 18/01/23 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
96 L-03-96 600 04/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
97 L-03-97 600 07/01/23 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
98 M-03-98 600 03/01/23 100.00 96.40 70 30.00 27.40 7.75 8.00 0.25 3.3%
99 M-03-99 600 09/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
100 M-03-100 600 31/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
101 M-03-101 600 10/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
102 N-03-102 600 30/12/22 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
103 N-03-103 600 12/01/23 99.96 95.80 70 29.96 26.80 7.58 7.50 -0.08 -1.0%
104 N-03-104 600 23/07/22 99.75 95.75 70 29.75 26.75 7.56 8.00 0.44 5.8%
105 N-03-105 600 06/01/23 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
106 P-03/04-106 600 04/01/23 99.92 95.80 70 29.92 26.80 7.58 7.50 -0.08 -1.0%
107 P-03/04-107 600 18/01/23 99.99 95.80 70 29.99 26.80 7.58 7.50 -0.08 -1.0%
108 P-03/04-108 600 27/07/22 99.83 95.75 70 29.83 26.75 7.56 8.00 0.44 5.8%
109 P-03/04-109 600 13/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
110 R-02/03-110 500 17/12/22 99.95 95.10 70 29.95 26.10 5.12 5.50 0.38 7.3%
111 R-02/03-111 500 26/05/22 99.80 96.50 70 29.80 27.50 5.40 8.00 2.60 48.2%
112 R-03/04-112 500 31/12/22 99.99 95.10 70 29.99 26.10 5.12 5.00 -0.12 -2.4%
113 R-03/04-113 500 02/01/23 99.96 95.10 70 29.96 26.10 5.12 5.50 0.38 7.3%
114 R-03/04-114 500 17/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
115 R-03/04-115 500 04/01/23 99.92 95.10 70 29.92 26.10 5.12 5.00 -0.12 -2.4%
116 R-03/04-116 500 20/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
117 R-03/04-117 500 22/05/22 99.70 96.50 70 29.70 27.50 5.40 5.50 0.10 1.9%
118 R-03/04-118 500 18/12/22 99.84 95.10 70 29.84 26.10 5.12 5.00 -0.12 -2.4%
119 A-04/05-119 600 10/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
120 A-04/05-120 600 03/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
121 A-04/05-121 600 Cancelled
122 A-04/05-122 600 23/01/23 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
123 A-04/05-123 600 25/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
124 AB-05/06-124 600 21/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
125 AB-05/06-125 600 24/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
126 AB-05/06-126 600 Cancelled
127 AB-05/06-127 600 31/12/22 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
128 AB-05/06-128 600 12/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
129 BC-04/05-129 600 28/01/23 99.91 96.40 70 29.91 27.40 7.75 8.00 0.25 3.3%
130 BC-04/05-130 600 27/01/23 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
131 BC-04/05-131 600 Cancelled
132 BC-04/05-132 600 26/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
133 BC-04/05-133 600 24/01/23 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
134 C-06-134 600 Cancelled
135 C-06-135 600 Cancelled

Page 3 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
136 C-06-136 600 Cancelled
137 C-06-137 600 Cancelled
138 AC-06/07-138 600 07/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
139 AC-06/07-139 600 19/01/23 99.90 96.50 70 29.90 27.50 7.78 8.00 0.22 2.9%
140 AC-06/07-140 600 03/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
141 AC-06/07-141 600 13/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
142 AC-06/07-142 600 26/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
143 AC-06/07-143 600 30/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
144 AC-06/07-144 600 26/01/23 99.92 96.50 70 29.92 27.50 7.78 8.00 0.22 2.9%
145 AC-06/07-145 600 28/01/23 99.89 96.50 70 29.89 27.50 7.78 10.00 2.22 28.6%
146 AC-07/08-146 600 23/01/23 99.84 96.20 70 29.84 27.20 7.69 8.00 0.31 4.0%
147 AC-07/08-147 600 25/01/23 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
148 AC-07/08-148 600 20/01/23 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
149 AC-07/08-149 600 23/01/23 99.97 96.20 70 29.97 27.20 7.69 8.00 0.31 4.0%
150 AC-07/08-150 600 13/01/23 99.98 96.20 70 29.98 27.20 7.69 8.00 0.31 4.0%
151 AC-07/08-151 600 11/01/23 99.97 96.20 70 29.97 27.20 7.69 7.50 -0.19 -2.5%
152 AC-07/08-152 600 30/12/22 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
153 AC-07/08-153 600 04/01/23 99.98 96.20 70 29.98 27.20 7.69 7.50 -0.19 -2.5%
154 AC-07/08-154 600 23/12/22 99.98 96.20 70 29.98 27.20 7.69 8.00 0.31 4.0%
155 AC-07/08-155 600 28/12/22 99.99 96.20 70 29.99 27.20 7.69 8.00 0.31 4.0%
156 DE-06-156 500 05/07/22 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
157 DE-06-157 500 31/01/23 99.95 96.70 70 29.95 27.70 5.44 5.50 0.06 1.1%
158 E-08-158 600 04/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
159 E-08-159 600 14/07/22 99.81 96.40 70 29.81 27.40 7.75 8.00 0.25 3.3%
160 E-08-160 600 02/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
161 E-08-161 600 04/02/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
162 E-08-162 600 02/07/22 99.33 96.40 70 29.33 27.40 7.75 8.00 0.25 3.3%
163 E-08-163 600 06/02/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
164 EF-04/07-164 600 19/01/23 99.97 94.70 70 29.97 25.70 7.27 7.50 0.23 3.2%
165 EF-04/07-165 600 25/01/23 99.98 94.70 70 29.98 25.70 7.27 7.50 0.23 3.2%
166 EF-04/07-166 600 11/12/22 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
167 EF-04/07-167 600 27/01/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
168 EF-04/07-168 600 01/02/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
169 EF-04/07-169 600 07/02/23 99.98 94.70 70 29.98 25.70 7.27 7.50 0.23 3.2%
170 EF-04/07-170 600 08/02/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
171 EF-04/07-171 600 03/02/23 99.99 94.70 70 29.99 25.70 7.27 7.50 0.23 3.2%
172 EF-04/07-172 600 23/01/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
173 EF-04/07-173 600 20/01/23 99.89 94.70 70 29.89 25.70 7.27 7.50 0.23 3.2%
174 EF-04/07-174 600 07/02/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
175 EF-04/07-175 600 25/01/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
176 EF-04/07-176 600 01/02/23 99.96 94.70 70 29.96 25.70 7.27 7.50 0.23 3.2%
177 EF-04/07-177 600 24/01/23 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
178 EF-04/07-178 600 21/01/23 99.89 94.70 70 29.89 25.70 7.27 7.50 0.23 3.2%
179 EF-04/07-179 600 10/12/22 99.95 94.70 70 29.95 25.70 7.27 7.50 0.23 3.2%
180 F-07-180 600 10/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%

Page 4 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
181 F-07-181 600 09/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
182 F-07-182 600 13/02/23 99.92 96.10 70 29.92 27.10 7.66 8.00 0.34 4.4%
183 F-08/09-183 600 03/07/22 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
184 F-08/09-184 600 01/07/22 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
185 F-08/09-185 600 12/07/22 99.74 96.40 70 29.74 27.40 7.75 8.00 0.25 3.3%
186 G-04-186 500 Cancelled
187 G-04-187 500 21/01/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
188 G-04-188 500 Cancelled
189 FG-04/07-189 600 Cancelled
190 FG-04/07-190 600 Cancelled
191 FG-04/07-191 600 03/02/23 99.95 93.95 70 29.95 24.95 7.05 7.00 -0.05 -0.8%
192 FG-04/07-192 600 31/01/23 99.92 93.95 70 29.92 24.95 7.05 7.00 -0.05 -0.8%
193 FG-04/07-193 600 06/02/23 99.96 93.95 70 29.96 24.95 7.05 7.00 -0.05 -0.8%
194 FG-04/07-194 600 04/02/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
195 FG-04/07-195 600 30/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
196 FG-04/07-196 600 28/01/23 99.91 93.95 70 29.91 24.95 7.05 7.00 -0.05 -0.8%
197 FG-04/07-197 600 Cancelled
198 FG-04/07-198 600 23/01/23 99.89 93.95 70 29.89 24.95 7.05 7.00 -0.05 -0.8%
199 FG-04/07-199 600 26/01/23 99.97 93.95 70 29.97 24.95 7.05 7.00 -0.05 -0.8%
200 FG-04/07-200 600 Cancelled
201 G-07/08-201 600 28/06/22 99.70 96.40 70 29.70 27.40 7.75 8.00 0.25 3.3%
202 G-07/08-202 600 03/07/22 99.91 96.40 70 29.91 27.40 7.75 8.00 0.25 3.3%
203 G-07/08-203 600 01/07/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
204 G-07/08-204 600 09/02/23 99.94 96.25 70 29.94 27.25 7.70 8.00 0.30 3.8%
205 G-07/08-205 600 11/02/23 99.94 96.25 70 29.94 27.25 7.70 8.00 0.30 3.8%
206 G-07/08-206 600 08/02/23 99.97 96.25 70 29.97 27.25 7.70 8.00 0.30 3.8%
207 JK-04/05-207 600 21/01/23 99.89 95.80 70 29.89 26.80 7.58 7.50 -0.08 -1.0%
208 JK-04/05-208 600 20/01/23 99.90 95.80 70 29.90 26.80 7.58 7.50 -0.08 -1.0%
209 JK-04/05-209 600 Cancelled
210 JK-04/05-210 600 18/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
211 JK-04/05-211 600 17/01/23 99.94 95.80 70 29.94 26.80 7.58 7.50 -0.08 -1.0%
212 JK-06/07-212 600 08/02/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
213 JK-06/07-213 600 01/02/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
214 JK-06/07-214 600 31/01/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
215 JK-06/07-215 600 25/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
216 JK-07/08-216 500 15/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
217 JK-07/08-217 500 10/02/23 99.99 96.60 70 29.99 27.60 5.42 5.50 0.08 1.5%
218 JK-07/08-218 500 Cancelled
219 JK-07/08-219 500 Cancelled
220 JK-07/08-220 500 07/02/23 99.99 96.60 70 29.99 27.60 5.42 5.50 0.08 1.5%
221 JK-07/08-221 500 10/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
222 KL-06/07-222 500 28/01/23 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%
223 KL-06/07-223 500 27/01/23 99.99 96.70 70 29.99 27.70 5.44 5.50 0.06 1.1%
224 KL-07-224 500 09/02/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%
225 KL-07-225 500 04/02/23 99.98 96.70 70 29.98 27.70 5.44 5.50 0.06 1.1%

Page 5 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
226 KL-10-226 500 17/02/23 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
227 KL-10-227 500 16/02/23 99.96 96.70 70 29.96 27.70 5.44 5.50 0.06 1.1%
228 KL-04-228 500 19/01/23 99.92 97.05 70 29.92 28.05 5.51 5.50 -0.01 -0.1%
229 L-05-229 600 21/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
230 L-05-230 600 70 - -
231 L-05-231 600 24/01/23 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
232 L-05-232 600 23/01/23 99.82 96.40 70 29.82 27.40 7.75 8.00 0.25 3.3%
233 KL-06/07-233 600 03/02/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
234 KL-06/07-234 600 01/02/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
235 KL-06/07-235 600 02/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
236 KL-06/07-236 600 31/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
237 KL-10-237 600 11/02/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
238 KL-10-238 600 13/02/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
239 KL-10-239 600 14/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
240 KL-10-240 600 23/07/22 99.64 95.85 70 29.64 26.85 7.59 8.00 0.41 5.4%
241 LM-04-241 500 18/01/23 99.90 97.05 70 29.90 28.05 5.51 5.50 -0.01 -0.1%
242 LM-05-242 500 20/01/23 99.97 94.05 70 29.97 25.05 4.92 5.00 0.08 1.7%
243 LM-06/07-243 500 28/01/23 99.90 94.05 70 29.90 25.05 4.92 5.00 0.08 1.7%
244 M-04-244 500 17/01/23 99.96 97.05 70 29.96 28.05 5.51 5.50 -0.01 -0.1%
245 M-05-245 600 Cancelled
246 M-05-246 600 Cancelled
247 M-05-247 600 24/01/23 99.98 93.35 70 29.98 24.35 6.88 7.00 0.12 1.7%
248 M-06/07-248 500 31/01/23 99.96 94.05 70 29.96 25.05 4.92 5.00 0.08 1.7%
249 LM-06/07-249 600 09/02/23 99.95 93.40 70 29.95 24.40 6.90 7.00 0.10 1.5%
250 LM-06/07-250 600 08/02/23 99.95 93.40 70 29.95 24.40 6.90 7.00 0.10 1.5%
251 LM-06/07-251 600 07/02/23 99.99 93.40 70 29.99 24.40 6.90 7.00 0.10 1.5%
252 LM-06/07-252 600 07/02/23 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
253 LM-10-253 600 11/02/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
254 LM-10-254 600 13/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
255 LM-10-255 600 07/07/22 99.83 96.20 70 29.83 27.20 7.69 8.00 0.31 4.0%
256 LM-10-256 600 09/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
257 LM-10-257 600 13/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
258 LM-10-258 600 11/02/23 99.99 95.70 70 29.99 26.70 7.55 7.50 -0.05 -0.7%
259 N-05-259 500 Cancelled
260 N-05-260 500 25/01/23 99.82 93.50 70 29.82 24.50 4.81 5.00 0.19 3.9%
261 N-05-261 500 Cancelled
262 N-06/07/262 500 02/02/23 99.99 94.05 70 29.99 25.05 4.92 5.00 0.08 1.7%
263 N-06/07/263 600 07/02/23 99.98 92.80 70 29.98 23.80 6.73 7.00 0.27 4.0%
264 N-06/07/264 600 26/05/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
265 N-06/07/265 600 08/02/23 99.95 92.80 70 29.95 23.80 6.73 7.00 0.27 4.0%
266 N-06/07/266 600 06/02/23 99.98 92.80 70 29.98 23.80 6.73 7.00 0.27 4.0%
267 N-06/07/267 600 31/01/23 99.99 92.80 70 29.99 23.80 6.73 7.00 0.27 4.0%
268 N-06/07/268 600 30/06/22 99.68 96.05 70 29.68 27.05 7.65 8.00 0.35 4.6%
269 P-04-269 600 23/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%
270 P-04-270 600 19/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%

Page 6 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
271 P-04-271 600 24/01/23 99.96 96.35 70 29.96 27.35 7.73 8.00 0.27 3.5%
272 P-04-272 600 31/07/22 99.78 96.05 70 29.78 27.05 7.65 8.00 0.35 4.6%
273 P-04-273 600 20/01/23 99.98 96.35 70 29.98 27.35 7.73 8.00 0.27 3.5%
274 O-05/06-274 500 25/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
275 O-05/06-275 500 28/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
276 O-05/06-276 500 27/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
277 OP-06/07-277 600 12/07/22 99.78 96.05 70 29.78 27.05 7.65 8.00 0.35 4.6%
278 OP-06/07-278 600 06/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
279 OP-06/07-279 600 31/01/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
280 OP-06/07-280 600 04/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
281 OP-06/07-281 600 30/01/23 99.90 95.70 70 29.90 26.70 7.55 7.50 -0.05 -0.7%
282 OP-10-282 600 09/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
283 OP-10-283 600 30/06/22 99.86 96.40 70 29.86 27.40 7.75 8.00 0.25 3.3%
284 OP-10-284 600 22/07/22 99.98 96.00 70 29.98 27.00 7.63 8.00 0.37 4.8%
285 OP-10-285 600 10/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
286 OP-10-286 600 18/07/22 99.73 96.00 70 29.73 27.00 7.63 8.00 0.37 4.8%
287 OP-10-287 600 09/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
288 R-04-288 600 18/12/22 99.85 95.75 70 29.85 26.75 7.56 7.50 -0.06 -0.8%
289 R-04-289 600 05/01/23 99.98 95.75 70 29.98 26.75 7.56 7.50 -0.06 -0.8%
290 R-04-290 600 16/12/22 99.90 95.75 70 29.90 26.75 7.56 7.50 -0.06 -0.8%
291 R-04-291 600 25/05/22 99.70 96.50 70 29.70 27.50 7.78 8.00 0.22 2.9%
292 R-04-292 600 18/07/22 99.43 95.90 70 29.43 26.90 7.61 8.00 0.39 5.2%
293 R-04-293 600 22/07/22 99.63 95.90 70 29.63 26.90 7.61 8.00 0.39 5.2%
294 Q-06/07-294 500 06/01/23 100.04 97.05 70 30.04 28.05 5.51 5.50 -0.01 -0.1%
295 R-05/06-295 600 21/02/23 100.40 97.05 70 30.40 28.05 7.93 8.00 0.07 0.9%
296 R-05/06-296 600 23/05/22 99.75 96.50 70 29.75 27.50 7.78 8.00 0.22 2.9%
297 R-05/06-297 600 09/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
298 R-05/06-298 600 29/06/22 99.66 96.05 70 29.66 27.05 7.65 8.00 0.35 4.6%
299 Q-06/07-299 500 06/01/23 99.92 97.05 70 29.92 28.05 5.51 5.50 -0.01 -0.1%
300 R-06/07-300 600 11/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
301 R-06/07-301 600 29/06/22 99.96 96.20 70 29.96 27.20 7.69 8.00 0.31 4.0%
302 R-06/07-302 600 19/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
303 R-08-303 500 20/05/22 99.40 96.50 70 29.40 27.50 5.40 5.50 0.10 1.9%
304 R-08-304 500 18/05/22 99.60 96.50 70 29.60 27.50 5.40 5.50 0.10 1.9%
305 R-08-305 500 21/12/22 99.85 96.30 70 29.85 27.30 5.36 5.50 0.14 2.6%
306 R-10-306 600 21/05/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
307 R-10-307 600 25/06/22 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
308 R-10-308 600 27/06/22 99.91 96.20 70 29.91 27.20 7.69 8.00 0.31 4.0%
309 R-10-309 600 23/05/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
310 R-10-310 600 11/02/23 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
311 R-10-311 600 09/02/23 99.96 95.70 70 29.96 26.70 7.55 7.50 -0.05 -0.7%
312 AC-10/11-312 600 27/12/22 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
313 AC-10/11-313 600 04/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
314 AC-10/11-314 600 29/12/22 99.99 96.50 70 29.99 27.50 7.78 8.00 0.22 2.9%
315 AC-10/11-315 600 07/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%

Page 7 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
316 AC-10/11-316 600 09/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
317 AC-10/11-317 600 17/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
318 AC-10/11-318 600 11/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
319 AC-10/11-319 600 18/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
320 AC-11-320 600 19/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%
321 AC-11-321 600 17/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
322 AC-11-322 600 12/01/23 99.97 96.50 70 29.97 27.50 7.78 8.00 0.22 2.9%
323 AC-11-323 600 10/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
324 AC-11-324 600 06/01/23 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
325 AC-11-325 600 31/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
326 AC-11-326 600 02/01/23 99.95 96.50 70 29.95 27.50 7.78 8.00 0.22 2.9%
327 AC-11-327 600 22/12/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
328 AC-12-328 600 09/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
329 AC-12-329 600 13/01/23 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
330 AC-12-330 600 06/01/23 99.99 95.50 70 29.99 26.50 7.49 8.00 0.51 6.8%
331 AC-12-331 600 05/01/23 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
332 AC-12-332 600 28/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
333 AC-12-333 600 29/12/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
334 AC-12-334 600 27/12/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
335 AC-12-335 600 19/01/23 99.96 96.50 70 29.96 27.50 7.78 8.00 0.22 2.9%
336 AB-13-336 600 02/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
337 AB-13-337 600 03/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
338 AB-13-338 600 22/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
339 AB-13-339 600 24/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
340 C-13-340 600 07/07/22 99.83 96.20 70 29.83 27.20 7.69 8.00 0.31 4.0%
341 C-13-341 600 13/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
342 C-13-342 600 10/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
343 C-13-343 600 28/06/22 99.60 96.20 70 29.60 27.20 7.69 8.00 0.31 4.0%
344 E-11/12-344 600 25/01/23 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
345 E-11/12-345 600 26/01/23 99.97 96.10 70 29.97 27.10 7.66 8.00 0.34 4.4%
346 E-11/12-346 600 24/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
347 E-11/12-347 600 26/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
348 E-11/12-348 600 23/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
349 E-11/12-349 600 25/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
350 E-11/12-350 600 21/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
351 E-13/14-351 600 23/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
352 E-13/14-352 600 21/01/23 99.98 95.80 70 29.98 26.80 7.58 7.50 -0.08 -1.0%
353 E-13/14-353 600 21/01/23 99.90 95.80 70 29.90 26.80 7.58 7.50 -0.08 -1.0%
354 E-13/14-354 600 02/07/22 99.68 95.90 70 29.68 26.90 7.61 8.00 0.39 5.2%
355 E-13/14-355 600 29/06/22 99.68 95.90 70 29.68 26.90 7.61 8.00 0.39 5.2%
356 EF-11/12-356 600 31/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
357 EF-11/12-357 600 31/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
358 EF-11/12-358 600 28/01/23 99.99 96.30 70 29.99 27.30 7.72 7.50 -0.22 -2.8%
359 EF-11/12-359 600 27/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
360 EF-13/14-360 500 24/01/23 99.96 95.90 70 29.96 26.90 5.28 5.50 0.22 4.1%

Page 8 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
361 EF-13/14-361 500 30/01/23 99.97 95.90 70 29.97 26.90 5.28 5.50 0.22 4.1%
362 EF-13/14-362 500 25/01/23 99.96 95.90 70 29.96 26.90 5.28 5.50 0.22 4.1%
363 F-11/12-363 500 02/02/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
364 F-11/12-364 500 08/02/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
365 F-11/12-365 500 01/02/23 99.97 95.70 70 29.97 26.70 5.24 5.50 0.26 4.9%
366 F-11/12-366 500 06/02/23 99.96 95.70 70 29.96 26.70 5.24 5.50 0.26 4.9%
367 F-11/12-367 500 03/02/23 99.96 95.70 70 29.96 26.70 5.24 5.50 0.26 4.9%
368 F-11/12-368 500 08/02/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
369 F-13/14-369 500 11/02/23 99.97 95.85 70 29.97 26.85 5.27 5.50 0.23 4.3%
370 F-13/14-370 500 31/01/23 99.99 96.50 70 29.99 27.50 5.40 5.50 0.10 1.9%
371 F-13/14-371 500 14/02/23 99.95 95.85 70 29.95 26.85 5.27 5.50 0.23 4.3%
372 F-13/14-372 500 06/02/23 99.95 95.85 70 29.95 26.85 5.27 5.50 0.23 4.3%
373 F-13/14-373 500 Cancelled
374 F-13/14-374 500 15/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
375 F-13/14-375 500 07/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
376 F-13/14-376 500 13/02/23 99.95 95.85 70 29.95 26.85 5.27 6.00 0.73 13.8%
377 F-13/14-377 500 10/02/23 99.96 95.85 70 29.96 26.85 5.27 5.50 0.23 4.3%
378 G-11/12-378 500 15/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
379 G-11/12-379 500 14/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
380 G-11/12-380 500 09/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
381 G-11/12-381 500 Cancelled
382 G-11/12-382 500 Cancelled
383 G-11/12-383 500 11/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
384 G-13/14-384 500 07/02/23 99.96 96.45 70 29.96 27.45 5.39 5.50 0.11 2.0%
385 G-13/14-385 500 16/02/23 99.95 96.45 70 29.95 27.45 5.39 5.50 0.11 2.0%
386 G-13/14-386 500 13/02/23 99.87 96.45 70 29.87 27.45 5.39 6.00 0.61 11.3%
387 G-13/14-387 500 05/07/22 99.93 96.45 70 29.93 27.45 5.39 5.50 0.11 2.0%
388 G-13/14-388 500 16/02/23 99.94 96.45 70 29.94 27.45 5.39 5.50 0.11 2.0%
389 G-13/14-389 500 08/02/23 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
390 G-13/14-390 500 18/02/23 99.98 96.45 70 29.98 27.45 5.39 6.00 0.61 11.3%
391 G-13/14-391 500 17/02/23 99.97 96.45 70 29.97 27.45 5.39 5.50 0.11 2.0%
392 JK-11/12-392 500 16/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
393 JK-11/12-393 500 17/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
394 JK-11/12-394 500 17/02/23 99.96 96.60 70 29.96 27.60 5.42 6.00 0.58 10.7%
395 JK-11/12-395 500 Cancelled
396 JK-11/12-396 500 Cancelled
397 JK-11/12-397 500 17/02/23 99.95 96.60 70 29.95 27.60 5.42 5.50 0.08 1.5%
398 JK-13/14-398 500 30/01/23 99.89 96.60 70 29.89 27.60 5.42 5.50 0.08 1.5%
399 JK-13/14-399 500 01/02/23 99.97 96.60 70 29.97 27.60 5.42 5.50 0.08 1.5%
400 JK-13/14-400 500 03/02/23 99.93 96.60 70 29.93 27.60 5.42 5.50 0.08 1.5%
401 JK-13/14-401 500 02/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
402 JK-13/14-402 500 07/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
403 JK-13/14-403 500 04/02/23 99.92 96.60 70 29.92 27.60 5.42 5.50 0.08 1.5%
404 L-11/12-404 500 15/02/23 99.90 96.65 70 29.90 27.65 5.43 5.50 0.07 1.3%
405 L-11/12-405 500 16/02/23 99.96 96.65 70 29.96 27.65 5.43 5.50 0.07 1.3%

Page 9 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
406 L-14-406 500 27/01/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
407 L-14-407 500 30/01/23 99.98 96.65 70 29.98 27.65 5.43 5.50 0.07 1.3%
408 L-11/12-408 500 15/02/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
409 L-11/12-409 500 16/02/23 99.98 96.65 70 29.98 27.65 5.43 6.00 0.57 10.5%
410 L-14-410 500 24/01/23 99.99 96.65 70 29.99 27.65 5.43 5.50 0.07 1.3%
411 L-14-411 500 26/01/23 99.97 96.65 70 29.97 27.65 5.43 5.50 0.07 1.3%
412 O-11/12-412 500 14/02/23 99.93 96.65 70 29.93 27.65 5.43 5.50 0.07 1.3%
413 O-11/12-413 500 14/02/23 99.92 96.65 70 29.92 27.65 5.43 5.50 0.07 1.3%
414 op-14-414 500 24/01/23 99.96 96.65 70 29.96 27.65 5.43 5.50 0.07 1.3%
415 op-14-415 500 25/01/23 99.98 96.65 70 29.98 27.65 5.43 5.50 0.07 1.3%
416 R-11/12-416 500 11/02/23 99.90 96.75 70 29.90 27.75 5.45 5.50 0.05 0.9%
417 R-11/12-417 500 13/02/23 99.95 96.75 70 29.95 27.75 5.45 5.50 0.05 0.9%
418 R-12/13-418 500 26/01/23 99.87 96.90 70 29.87 27.90 5.48 5.50 0.02 0.4%
419 R-12/13-419 500 15/02/23 99.92 96.75 70 29.92 27.75 5.45 5.50 0.05 0.9%
420 R-14/15-420 500 21/01/23 99.97 96.90 70 29.97 27.90 5.48 5.50 0.02 0.4%
421 R-14/15-421 500 21/01/23 99.81 96.90 70 29.81 27.90 5.48 5.50 0.02 0.4%
422 A-14/15-422 600 26/12/22 99.73 96.30 70 29.73 27.30 7.72 8.00 0.28 3.6%
423 A-14/15-423 600 28/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
424 A-14/15-424 600 30/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
425 A-14/15-425 600 31/12/22 100.30 96.30 70 30.30 27.30 7.72 8.00 0.28 3.6%
426 A-14/15-426 600 26/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
427 A-14/15-427 600 29/12/22 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
428 A-14/15-428 600 19/07/22 99.87 96.05 70 29.87 27.05 7.65 8.00 0.35 4.6%
429 A-14/15-429 600 28/06/22 99.88 96.05 70 29.88 27.05 7.65 8.00 0.35 4.6%
430 A-14/15-430 600 23/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
431 A-18/19-431 600 14/07/22 99.83 96.30 70 29.83 27.30 7.72 8.00 0.28 3.6%
432 A-18/19-432 600 16/07/22 99.95 96.00 70 29.95 27.00 7.63 8.00 0.37 4.8%
433 A-18/19-433 600 11/07/22 99.94 96.30 70 29.94 27.30 7.72 8.00 0.28 3.6%
434 A-18/19-434 600 08/07/22 99.82 96.30 70 29.82 27.30 7.72 8.00 0.28 3.6%
435 A-18/19-435 600 27/06/22 99.87 96.30 70 29.87 27.30 7.72 8.00 0.28 3.6%
436 C-14/15-436 600 12/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
437 C-14/15-437 600 09/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
438 C-14/15-438 600 07/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
439 C-14/15-439 600 16/07/22 99.79 96.10 70 29.79 27.10 7.66 8.00 0.34 4.4%
440 C-14/15-440 600 15/07/22 99.79 96.05 70 29.79 27.05 7.65 8.00 0.35 4.6%
441 C-14/15-441 600 14/07/22 99.74 96.05 70 29.74 27.05 7.65 8.00 0.35 4.6%
442 C-14/15-442 600 05/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
443 C-14/15-443 600 17/07/22 99.69 96.05 70 29.69 27.05 7.65 8.00 0.35 4.6%
444 C-15/16-444 600 05/01/23 100.00 96.10 70 30.00 27.10 7.66 8.00 0.34 4.4%
445 C-15/16-445 600 06/01/23 99.97 96.10 70 29.97 27.10 7.66 7.50 -0.16 -2.1%
446 C-15/16-446 600 09/07/22 99.84 96.05 70 29.84 27.05 7.65 8.00 0.35 4.6%
447 C-18-447 600 10/07/22 99.85 96.20 70 29.85 27.20 7.69 8.00 0.31 4.0%
448 C-18-448 600 15/07/22 99.87 96.10 70 29.87 27.10 7.66 8.00 0.34 4.4%
449 C-18-449 600 26/07/22 99.81 96.10 70 29.81 27.10 7.66 8.00 0.34 4.4%
450 C-18-450 600 04/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%

Page 10 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
451 A-19/20-451 600 09/12/22 99.73 96.50 70 29.73 27.50 7.78 8.00 0.22 2.9%
452 A-19/20-452 600 03/12/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
453 A-19/20-453 600 03/12/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
454 A-19/20-454 600 25/11/22 100.35 96.40 70 30.35 27.40 7.75 8.00 0.25 3.3%
455 A-19/20-455 600 24/11/22 100.17 96.50 70 30.17 27.50 7.78 8.00 0.22 2.9%
456 A-19/20-456 600 22/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
457 A-19/20-457 600 20/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
458 A-19/20-458 600 19/11/22 100.10 96.50 70 30.10 27.50 7.78 8.00 0.22 2.9%
459 A-20/21-459 600 18/12/22 99.84 96.50 70 29.84 27.50 7.78 8.00 0.22 2.9%
460 A-20/21-460 600 28/06/22 99.68 96.10 70 29.68 27.10 7.66 8.00 0.34 4.4%
461 A-20/21-461 600 13/12/22 99.84 96.50 70 29.84 27.50 7.78 8.00 0.22 2.9%
462 A-20/21-462 500 06/12/22 99.95 96.50 70 29.95 27.50 5.40 5.50 0.10 1.9%
463 A-20/21-463 500 01/12/22 99.94 96.50 70 29.94 27.50 5.40 6.00 0.60 11.1%
464 A-20/21-464 500 17/02/23 99.98 96.10 70 29.98 27.10 5.32 5.50 0.18 3.4%
465 A-20/21-465 500 29/11/22 99.94 96.50 70 29.94 27.50 5.40 5.50 0.10 1.9%
466 A-20/21-466 500 21/11/22 100.10 96.50 70 30.10 27.50 5.40 5.50 0.10 1.9%
467 A-20/21-467 500 28/11/22 99.94 96.50 70 29.94 27.50 5.40 5.50 0.10 1.9%
468 E-15/17-468 600 29/06/22 99.93 96.20 70 29.93 27.20 7.69 8.00 0.31 4.0%
469 E-15/17-469 600 04/07/22 99.86 96.15 70 29.86 27.15 7.68 8.00 0.32 4.2%
470 E-15/17-470 600 20/01/23 99.92 95.70 70 29.92 26.70 7.55 7.50 -0.05 -0.7%
471 E-15/17-471 600 06/07/22 99.57 96.15 70 29.57 27.15 7.68 8.00 0.32 4.2%
472 E-15/17-472 600 29/06/22 99.82 97.40 70 29.82 28.40 8.03 8.00 -0.03 -0.4%
473 E-15/17-473 600 18/01/23 99.89 95.70 70 29.89 26.70 7.55 7.50 -0.05 -0.7%
474 DE-18-474 500 03/01/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
475 DE-18-475 500 13/01/23 99.98 95.70 70 29.98 26.70 5.24 5.50 0.26 4.9%
476 DE-18-476 500 06/07/22 99.78 96.70 70 29.78 27.70 5.44 5.50 0.06 1.1%
477 DE-18-477 500 03/01/23 99.90 95.70 70 29.90 26.70 5.24 5.50 0.26 4.9%
478 DE-18-478 500 18/02/23 99.96 95.70 70 29.96 26.70 5.24 6.50 1.26 24.0%
479 DE-19/20-479 500 08/07/22 99.92 96.70 70 29.92 27.70 5.44 5.50 0.06 1.1%
480 DE-19/20-480 500 29/07/22 99.75 96.50 70 29.75 27.50 5.40 5.00 -0.40 -7.4%
481 E-21-481 600 07/07/22 99.10 96.20 70 29.10 27.20 7.69 8.00 0.31 4.0%
482 E-21-482 600 27/12/22 99.98 95.90 70 29.98 26.90 7.61 8.00 0.39 5.2%
483 E-21-483 600 21/12/22 99.95 95.90 70 29.95 26.90 7.61 7.50 -0.11 -1.4%
484 E-21-484 600 23/12/22 99.80 95.90 70 29.80 26.90 7.61 7.50 -0.11 -1.4%
485 E-21-485 600 02/07/22 98.78 96.20 70 28.78 27.20 7.69 8.00 0.31 4.0%
486 EF-18/20-486 500 20/07/22 99.66 94.30 70 29.66 25.30 4.97 5.50 0.53 10.7%
487 EF-18/20-487 500 27/07/22 99.82 94.30 70 29.82 25.30 4.97 5.50 0.53 10.7%
488 EF-18/20-488 500 05/01/23 99.92 94.70 70 29.92 25.70 5.05 5.00 -0.05 -0.9%
489 EF-18/20-489 500 10/01/23 99.99 94.70 70 29.99 25.70 5.05 5.00 -0.05 -0.9%
490 EF-18/20-490 500 05/08/22 99.92 96.40 70 29.92 27.40 5.38 5.50 0.12 2.2%
491 EF-18/20-491 500 20/07/22 99.70 94.30 70 29.70 25.30 4.97 5.50 0.53 10.7%
492 EF-18/20-492 500 31/12/22 99.92 94.70 70 29.92 25.70 5.05 5.00 -0.05 -0.9%
493 EF-18/20-493 500 01/01/23 99.91 94.70 70 29.91 25.70 5.05 5.00 -0.05 -0.9%
494 EF-18/20-494 500 03/08/22 99.75 94.30 70 29.75 25.30 4.97 5.50 0.53 10.7%
495 EF-18/20-495 500 02/08/22 99.88 94.30 70 29.88 25.30 4.97 5.50 0.53 10.7%

Page 11 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
496 496 500 Cancelled
497 EF-18/20-497 500 01/08/22 99.95 94.30 70 29.95 25.30 4.97 5.50 0.53 10.7%
498 EF-18/20-498 500 28/07/22 99.97 94.30 70 29.97 25.30 4.97 5.50 0.53 10.7%
499 EF-18/20-499 500 30/07/22 99.81 94.30 70 29.81 25.30 4.97 5.50 0.53 10.7%
500 EF-18/20-500 500 05/08/22 99.98 94.30 70 29.98 25.30 4.97 5.50 0.53 10.7%
501 EF-18/20-501 500 17/01/23 99.90 94.70 70 29.90 25.70 5.05 5.00 -0.05 -0.9%
502 EF-18/20-502 500 31/07/22 99.88 94.30 70 29.88 25.30 4.97 5.00 0.03 0.7%
503 EF-18/20-503 500 06/08/22 99.99 94.30 70 29.99 25.30 4.97 5.50 0.53 10.7%
504 F-15/16-504 600 24/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
505 F-15/16-505 600 27/01/23 99.87 96.25 70 29.87 27.25 7.70 8.00 0.30 3.8%
506 F-15/16-506 600 26/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
507 F-15/16-507 600 27/01/23 99.97 96.25 70 29.97 27.25 7.70 8.00 0.30 3.8%
508 F-15/16-508 600 25/01/23 99.98 96.25 70 29.98 27.25 7.70 8.00 0.30 3.8%
509 F-15/16-509 600 28/01/23 99.92 96.25 70 29.92 27.25 7.70 8.50 0.80 10.3%
510 G-15-510 500 26/01/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
511 G-15-511 500 28/01/23 99.95 96.30 70 29.95 27.30 5.36 5.50 0.14 2.6%
512 G-15-512 500 09/02/23 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
513 G-16-513 500 20/01/23 99.97 96.50 70 29.97 27.50 5.40 5.50 0.10 1.9%
514 G-16-514 500 23/07/22 99.64 94.50 70 29.64 25.50 5.01 5.50 0.49 9.8%
515 FG-18/19-515 600 18/02/23 99.93 93.95 70 29.93 24.95 7.05 7.00 -0.05 -0.8%
516 FG-18/19-516 600 29/12/22 100.10 93.95 70 30.10 24.95 7.05 7.00 -0.05 -0.8%
517 FG-18/19-517 600 31/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
518 FG-18/19-518 600 03/02/23 99.96 93.95 70 29.96 24.95 7.05 7.00 -0.05 -0.8%
519 FG-18/19-519 600 22/07/22 99.77 94.50 70 29.77 25.50 7.21 7.50 0.29 4.0%
520 FG-18/19-520 600 30/12/22 99.84 93.95 70 29.84 24.95 7.05 7.00 -0.05 -0.8%
521 FG-18/19-521 600 09/01/23 99.92 93.95 70 29.92 24.95 7.05 7.00 -0.05 -0.8%
522 FG-18/19-522 600 10/01/23 99.99 93.95 70 29.99 24.95 7.05 7.00 -0.05 -0.8%
523 FG-18/19-523 600 04/02/23 99.93 93.95 70 29.93 24.95 7.05 7.00 -0.05 -0.8%
524 FG-18/19-524 600 31/12/22 99.89 93.95 70 29.89 24.95 7.05 7.00 -0.05 -0.8%
525 FG-18/19-525 600 21/07/22 99.69 94.50 70 29.69 25.50 7.21 7.50 0.29 4.0%
526 FG-18/19-526 600 25/07/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
527 FG-18/19-527 600 13/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
528 FG-18/19-528 600 19/01/23 99.98 93.95 70 29.98 24.95 7.05 7.00 -0.05 -0.8%
529 G-20-529 500 02/08/22 99.95 96.40 70 29.95 27.40 5.38 5.50 0.12 2.2%
530 G-20-530 500 24/12/22 99.95 96.30 70 29.95 27.30 5.36 5.50 0.14 2.6%
531 G-20-531 500 25/07/22 99.63 96.40 70 29.63 27.40 5.38 5.50 0.12 2.2%
532 J-15-532 500 19/01/23 99.87 96.30 70 29.87 27.30 5.36 5.50 0.14 2.6%
533 J-15-533 500 23/01/23 99.86 96.30 70 29.86 27.30 5.36 5.50 0.14 2.6%
534 J-16-534 600 Cancelled
535 J-16-535 600 20/01/23 99.87 96.30 70 29.87 27.30 7.72 8.00 0.28 3.6%
536 J-16-536 600 Cancelled
537 J-16-537 600 21/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
538 J-18/19-538 600 03/01/23 99.94 96.30 70 29.94 27.30 7.72 8.00 0.28 3.6%
539 J-18/19-539 600 07/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
540 J-18/19-540 600 04/01/23 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%

Page 12 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
541 J-18/19-541 600 07/01/23 99.92 96.30 70 29.92 27.30 7.72 8.00 0.28 3.6%
542 J-18/19-542 600 12/01/23 99.97 96.30 70 29.97 27.30 7.72 8.00 0.28 3.6%
543 J-20-543 500 26/12/22 99.84 96.30 70 29.84 27.30 5.36 5.50 0.14 2.6%
544 J-20-544 500 30/12/22 99.89 96.30 70 29.89 27.30 5.36 5.50 0.14 2.6%
545 J-20-545 500 28/12/22 99.84 96.30 70 29.84 27.30 5.36 5.50 0.14 2.6%
546 L-15/16-546 600 17/01/23 99.92 96.30 70 29.92 27.30 7.72 8.00 0.28 3.6%
547 L-15/16-547 600 18/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
548 L-15/16-548 600 Cancelled
549 L-15/16-549 600 Cancelled
550 L-18/19-550 600 01/01/23 99.92 96.40 70 29.92 27.40 7.75 8.00 0.25 3.3%
551 L-18/19-551 600 06/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
552 L-18/19-552 600 04/01/23 99.93 96.30 70 29.93 27.30 7.72 8.00 0.28 3.6%
553 L-18/19-553 600 10/01/23 99.99 96.30 70 29.99 27.30 7.72 8.00 0.28 3.6%
554 L-20-554 600 21/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
555 L-20-555 600 24/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
556 L-20-556 600 Cancelled
557 L-20-557 600 Cancelled
558 MN-16-558 600 13/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
559 MN-16-559 600 18/01/23 99.87 96.10 70 29.87 27.10 7.66 7.50 -0.16 -2.1%
560 MN-16-560 600 19/01/23 99.98 96.10 70 29.98 27.10 7.66 7.50 -0.16 -2.1%
561 MN-19-561 600 09/01/23 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
562 MN-19-562 600 05/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
563 MN-19-563 600 12/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
564 MN-19-564 600 11/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
565 MN-20-565 600 24/12/22 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
566 MN-20-566 600 Cancelled
567 MN-20-567 600 28/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
568 MN-20-568 600 Cancelled
569 N-21-569 500 15/12/22 99.96 96.30 70 29.96 27.30 5.36 5.50 0.14 2.6%
570 N-21-570 500 22/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
571 N-21-571 500 16/12/22 99.96 96.30 70 29.96 27.30 5.36 5.50 0.14 2.6%
572 OP-15-572 600 12/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
573 OP-15-573 600 17/01/23 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
574 OP-15-574 600 19/01/23 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
575 OP-15-575 600 20/01/23 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
576 OP-19-576 600 03/01/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
577 OP-19-577 600 10/01/23 99.91 96.30 70 29.91 27.30 7.72 8.00 0.28 3.6%
578 OP-19-578 600 Cancelled
579 OP-19-579 600 Cancelled
580 Q-17/18-580 500 05/01/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
581 Q-17/18-581 500 07/01/23 99.91 96.60 70 29.91 27.60 5.42 5.50 0.08 1.5%
582 Q-19/20-582 500 30/12/22 99.91 93.60 70 29.91 24.60 4.83 5.00 0.17 3.5%
583 Q-19/20-583 500 31/12/22 99.91 93.60 70 29.91 24.60 4.83 5.00 0.17 3.5%
584 PQ-20-584 600 22/12/22 99.90 93.40 70 29.90 24.40 6.90 7.00 0.10 1.5%
585 PQ-20-585 600 24/12/22 99.79 93.40 70 29.79 24.40 6.90 7.00 0.10 1.5%

Page 13 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
586 PQ-20-586 600 Cancelled
587 PQ-20-587 600 30/12/22 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
588 PQ-20-588 600 29/12/22 99.98 93.40 70 29.98 24.40 6.90 7.00 0.10 1.5%
589 PQ-21-589 600 18/12/22 99.90 96.40 70 29.90 27.40 7.75 8.00 0.25 3.3%
590 PQ-21-590 600 20/12/22 99.99 96.40 70 29.99 27.40 7.75 8.00 0.25 3.3%
591 PQ-21-591 600 Cancelled
592 PQ-21-592 600 21/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
593 PQ-21-593 600 27/12/22 99.84 96.40 70 29.84 27.40 7.75 8.00 0.25 3.3%
594 R-15-594 600 Cancelled
595 R-15-595 600 Cancelled
596 R-15-596 600 07/01/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
597 R-17-597 500 03/01/23 99.90 96.30 70 29.90 27.30 5.36 5.50 0.14 2.6%
598 R-17-598 500 28/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
599 R-17-599 500 04/01/23 99.89 96.30 70 29.89 27.30 5.36 5.50 0.14 2.6%
600 R-19-600 600 Cancelled
601 R-19-601 600 Cancelled
602 R-19-602 600 04/01/23 99.92 96.10 70 29.92 27.10 7.66 7.50 -0.16 -2.1%
603 R-19-20-603 600 20/12/22 99.85 92.75 70 29.85 23.75 6.72 7.00 0.28 4.2%
604 R-19-20-604 600 24/12/22 99.85 92.75 70 29.85 23.75 6.72 7.00 0.28 4.2%
605 R-19-20-605 600 29/12/22 99.84 92.75 70 29.84 23.75 6.72 7.00 0.28 4.2%
606 R-20-606 600 17/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
607 R-20-607 600 19/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
608 R-20-608 600 21/12/22 99.95 93.05 70 29.95 24.05 6.80 7.00 0.20 2.9%
609 R-21-609 500 10/12/22 99.95 96.35 70 29.95 27.35 5.37 5.50 0.13 2.4%
610 R-21-610 500 14/12/22 99.57 96.35 70 29.57 27.35 5.37 5.50 0.13 2.4%
611 R-21-611 500 30/07/22 99.82 96.30 70 29.82 27.30 5.36 5.50 0.14 2.6%
612 AC-22/23-612 500 19/11/22 100.05 96.50 70 30.05 27.50 5.40 5.50 0.10 1.9%
613 AC-22/23-613 500 24/11/22 99.83 96.30 70 29.83 27.30 5.36 5.50 0.14 2.6%
614 AC-22/23-614 500 30/11/22 99.83 96.30 70 29.83 27.30 5.36 5.50 0.14 2.6%
615 AC-22/23-615 500 09/12/22 99.91 96.30 70 29.91 27.30 5.36 5.50 0.14 2.6%
616 AC-22/23-616 500 10/12/22 99.90 96.30 70 29.90 27.30 5.36 5.50 0.14 2.6%
617 AC-22/23-617 500 22/12/22 99.84 96.30 70 29.84 27.30 5.36 6.00 0.64 11.9%
618 AC-22/23-618 500 15/12/22 99.85 96.30 70 29.85 27.30 5.36 5.50 0.14 2.6%
619 AC-22/23-619 500 28/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
620 AC-22/23-620 500 29/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
621 AC-22/23-621 500 28/12/22 99.99 96.30 70 29.99 27.30 5.36 5.50 0.14 2.6%
622 AB-23-622 500 22/11/22 99.90 96.45 70 29.90 27.45 5.39 5.50 0.11 2.0%
623 AB-23-623 500 07/12/22 99.83 96.45 70 29.83 27.45 5.39 5.50 0.11 2.0%
624 AB-23-624 500 08/12/22 99.85 96.45 70 29.85 27.45 5.39 5.50 0.11 2.0%
625 AB-23-625 500 16/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
626 AB-23-626 500 19/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
627 AB-23-627 500 20/12/22 99.98 96.45 70 29.98 27.45 5.39 5.50 0.11 2.0%
628 C-23-628 600 21/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
629 C-23-629 600 26/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
630 C-23-630 600 09/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%

Page 14 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
631 C-23-631 600 23/12/22 99.84 96.30 70 29.84 27.30 7.72 8.00 0.28 3.6%
632 AC-24-632 600 22/11/22 100.00 96.50 70 30.00 27.50 7.78 8.00 0.22 2.9%
633 AC-24-633 600 24/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
634 AC-24-634 600 26/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
635 AC-24-635 600 29/11/22 99.86 96.50 70 29.86 27.50 7.78 8.00 0.22 2.9%
636 AC-24-636 600 26/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
637 AC-24-637 600 19/11/22 99.89 96.50 70 29.89 27.50 7.78 8.00 0.22 2.9%
638 AC-24-638 600 29/11/22 99.85 96.50 70 29.85 27.50 7.78 8.00 0.22 2.9%
639 AC-24-639 600 25/11/22 100.16 96.50 70 30.16 27.50 7.78 8.00 0.22 2.9%
640 D-24 500 28/11/22 99.93 96.90 70 29.93 27.90 5.48 5.50 0.02 0.4%
641 D-24 500 01/12/22 99.93 96.90 70 29.93 27.90 5.48 5.50 0.02 0.4%
642 E-22-642 600 06/07/22 99.95 96.00 70 29.95 27.00 7.63 8.00 0.37 4.8%
643 E-22-643 600 09/07/22 99.90 96.00 70 29.90 27.00 7.63 8.00 0.37 4.8%
644 E-22-644 600 17/12/22 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
645 E-22-645 600 20/12/22 99.70 96.30 70 29.70 27.30 7.72 8.00 0.28 3.6%
646 E-23-646 500 09/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
647 E-23-647 500 07/12/22 99.98 96.30 70 29.98 27.30 5.36 5.50 0.14 2.6%
648 E-23-648 500 14/12/22 99.77 96.30 70 29.77 27.30 5.36 5.50 0.14 2.6%
649 E-24-649 600 18/11/22 99.83 96.50 70 29.83 27.50 7.78 8.00 0.22 2.9%
650 E-24-650 600 26/11/22 100.01 95.65 70 30.01 26.65 7.54 8.00 0.46 6.2%
651 E-24-651 600 30/11/22 99.70 95.65 70 29.70 26.65 7.54 7.50 -0.04 -0.5%
652 E-24-652 600 21/11/22 99.83 95.65 70 29.83 26.65 7.54 8.00 0.46 6.2%
653 E-24-653 600 29/11/22 99.98 95.65 70 29.98 26.65 7.54 7.50 -0.04 -0.5%
654 E-24-654 600 02/12/22 99.70 95.65 70 29.70 26.65 7.54 7.50 -0.04 -0.5%
655 E-24-655 600 20/11/22 99.98 96.50 70 29.98 27.50 7.78 8.00 0.22 2.9%
656 E-24-656 600 25/11/22 100.01 95.65 70 30.01 26.65 7.54 8.00 0.46 6.2%
657 E-24-657 600 05/12/22 99.88 95.65 70 29.88 26.65 7.54 7.50 -0.04 -0.5%
658 F-23-658 500 Cancelled
659 F-23-659 500 Cancelled
660 F-23-660 500 08/12/22 99.74 96.30 70 29.74 27.30 5.36 5.50 0.14 2.6%
661 F-24-661 600 22/11/22 99.89 96.40 70 29.89 27.40 7.75 8.00 0.25 3.3%
662 F-24-662 600 01/12/22 99.71 96.40 70 29.71 27.40 7.75 8.00 0.25 3.3%
663 F-24-663 600 24/11/22 99.93 96.40 70 29.93 27.40 7.75 8.00 0.25 3.3%
664 F-24-664 600 18/11/22 100.10 96.50 70 30.10 27.50 7.78 8.00 0.22 2.9%
665 F-24-665 600 28/11/22 99.71 96.40 70 29.71 27.40 7.75 8.00 0.25 3.3%
666 GH-22-666 600 15/12/22 99.92 96.40 70 29.92 27.40 7.75 8.00 0.25 3.3%
667 GH-22-667 600 19/12/22 99.97 96.40 70 29.97 27.40 7.75 8.00 0.25 3.3%
668 GH-22-68 600 04/07/22 99.93 96.20 70 29.93 27.20 7.69 8.00 0.31 4.0%
669 GH-22-669 600 14/12/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
670 GH-22-670 600 17/12/22 99.95 96.40 70 29.95 27.40 7.75 8.00 0.25 3.3%
671 GH-24-671 500 20/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
672 GH-24-672 500 09/12/22 99.87 96.70 70 29.87 27.70 5.44 5.50 0.06 1.1%
673 GH-24-673 500 26/11/22 100.19 96.70 70 30.19 27.70 5.44 5.50 0.06 1.1%
674 GH-24-674 500 04/12/22 99.92 96.70 70 29.92 27.70 5.44 5.50 0.06 1.1%
675 GH-24-675 500 06/12/22 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%

Page 15 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
676 GH-24-676 500 23/11/22 100.00 96.70 70 30.00 27.70 5.44 5.50 0.06 1.1%
677 GH-24-677 500 08/12/22 99.87 96.70 70 29.87 27.70 5.44 5.50 0.06 1.1%
678 KL-22-678 500 13/12/22 99.97 96.56 70 29.97 27.56 5.41 5.50 0.09 1.6%
679 KL-22-679 500 15/12/22 99.93 96.45 70 29.93 27.45 5.39 5.50 0.11 2.0%
680 KL-22-680 600 05/08/22 99.93 96.05 70 29.93 27.05 7.65 8.00 0.35 4.6%
681 KL-22-681 500 19/12/22 99.85 96.45 70 29.85 27.45 5.39 5.50 0.11 2.0%
682 KL-22-682 600 08/08/22 99.98 96.05 70 29.98 27.05 7.65 8.00 0.35 4.6%
683 KL-22-683 600 16/12/22 99.84 96.45 70 29.84 27.45 7.76 8.00 0.24 3.1%
684 JK-24-684 500 30/11/22 99.86 96.70 70 29.86 27.70 5.44 5.50 0.06 1.1%
685 JK-24-685 500 06/12/22 99.85 96.70 70 29.85 27.70 5.44 5.50 0.06 1.1%
686 JK-24-686 500 01/12/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
687 JK-24-687 500 28/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
688 JK-24-688 500 03/12/22 99.88 96.70 70 29.88 27.70 5.44 5.50 0.06 1.1%
689 JK-24-689 500 22/11/22 100.10 96.70 70 30.10 27.70 5.44 5.50 0.06 1.1%
690 JK-24-690 500 08/12/22 99.83 96.70 70 29.83 27.70 5.44 5.50 0.06 1.1%
691 L-23-691 600 06/12/22 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
692 L-23-692 600 13/12/22 99.96 96.30 70 29.96 27.30 7.72 8.00 0.28 3.6%
693 L-23-693 600 05/12/22 99.85 96.30 70 29.85 27.30 7.72 8.00 0.28 3.6%
694 L-23-694 600 07/12/22 99.95 96.30 70 29.95 27.30 7.72 8.00 0.28 3.6%
695 L-24-695 600 15/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
696 L-24-696 600 20/11/22 100.08 96.30 70 30.08 27.30 7.72 8.00 0.28 3.6%
697 L-24-697 600 19/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
698 L-24-698 600 18/11/22 100.08 96.50 70 30.08 27.50 7.78 8.00 0.22 2.9%
699 M-24-699 500 21/11/22 100.15 96.90 70 30.15 27.90 5.48 5.50 0.02 0.4%
700 M-24-700 500 26/11/22 100.15 96.70 70 30.15 27.70 5.44 5.50 0.06 1.1%
701 N-22-701 600 23/07/22 99.71 96.00 70 29.71 27.00 7.63 8.00 0.37 4.8%
702 N-22-702 600 29/07/22 99.78 96.00 70 29.78 27.00 7.63 7.50 -0.13 -1.8%
703 N-22-703 600 17/12/22 99.84 96.40 70 29.84 27.40 7.75 8.00 0.25 3.3%
704 N-22-704 600 30/07/22 99.76 96.00 70 29.76 27.00 7.63 8.00 0.37 4.8%
705 N-22-705 600 02/08/22 99.86 96.00 70 29.86 27.00 7.63 8.00 0.37 4.8%
706 N-23-706 600 03/08/22 99.87 96.05 70 29.87 27.05 7.65 8.00 0.35 4.6%
707 N-23-707 600 06/08/22 99.93 96.05 70 29.93 27.05 7.65 8.00 0.35 4.6%
708 N-23-708 600 05/08/22 99.97 96.05 70 29.97 27.05 7.65 8.00 0.35 4.6%
709 PQ-22-709 600 28/07/22 99.85 96.15 70 29.85 27.15 7.68 8.00 0.32 4.2%
710 PQ-22-710 600 01/08/22 99.94 96.15 70 29.94 27.15 7.68 8.00 0.32 4.2%
711 PQ-22-711 600 23/07/22 99.95 96.15 70 29.95 27.15 7.68 8.00 0.32 4.2%
712 P-23-712 600 04/08/22 99.81 96.05 70 29.81 27.05 7.65 8.00 0.35 4.6%
713 P-23-713 600 07/12/22 99.93 96.10 70 29.93 27.10 7.66 7.50 -0.16 -2.1%
714 P-23-714 600 06/02/23 99.96 96.10 70 29.96 27.10 7.66 8.00 0.34 4.4%
715 NO-24-715 600 18/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
716 NO-24-716 600 20/11/22 100.13 95.70 70 30.13 26.70 7.55 7.50 -0.05 -0.7%
717 NO-24-717 600 19/11/22 100.19 96.50 70 30.19 27.50 7.78 8.00 0.22 2.9%
718 NO-24-718 600 29/11/22 100.05 95.70 70 30.05 26.70 7.55 7.50 -0.05 -0.7%
719 NO-24-719 600 02/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
720 NO-24-720 600 30/11/22 100.05 95.70 70 30.05 26.70 7.55 7.50 -0.05 -0.7%

Page 16 of 17
AVAASA ONE @ KAKINADA
CR TRUE BUILD INFRASTRUCTURE LLP PILE - MASTER DATA
DATE: 28-02-2023

Conc.
Date of Cut off Pile Toe Depth of Concrete Conc. Conc
Pile No. Grid Pile Dia Casting GL level Level pile Depth The. Qty. Actual Conc. Diff Diff % Remarks
Qty.
721 PQ-24-721 600 02/12/22 99.95 95.70 70 29.95 26.70 7.55 7.50 -0.05 -0.7%
722 PQ-24-722 600 04/02/23 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
723 PQ-24-723 600 03/12/22 99.98 95.70 70 29.98 26.70 7.55 7.50 -0.05 -0.7%
724 R-22-724 600 22/07/22 99.77 94.80 70 29.77 25.80 7.29 7.50 0.21 2.8%
725 R-22-725 600 27/07/22 99.94 94.80 70 29.94 25.80 7.29 8.00 0.71 9.7%
726 R-22-726 600 26/07/22 99.88 94.80 70 29.88 25.80 7.29 8.00 0.71 9.7%
727 R-23-727 600 13/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
728 R-23-728 600 18/02/23 99.90 96.15 70 29.90 27.15 7.68 8.00 0.32 4.2%
729 R-23-729 600 10/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
730 R-23-730 600 14/12/22 99.90 96.30 70 29.90 27.30 7.72 8.00 0.28 3.6%
731 R-24-731 600 05/12/22 99.98 96.40 70 29.98 27.40 7.75 7.50 -0.25 -3.2%
732 R-24-732 600 08/12/22 99.98 96.40 70 29.98 27.40 7.75 8.00 0.25 3.3%
733 R-24-733 600 Cancelled
734 R-24-734 600 06/12/22 99.82 96.40 70 29.82 27.40 7.75 8.00 0.25 3.3%
735 R-24-735 600 09/12/22 99.85 96.40 70 29.85 27.40 7.75 8.00 0.25 3.3%
736 736 600 Cancelled
737 737 500 08/02/23 99.95 96.75 70 29.95 27.75 5.45 5.50 0.05 0.9%
738 738 600 07/02/23 99.99 93.25 70 29.99 24.25 6.86 7.00 0.14 2.1%
739 739 600 06/02/23 99.98 96.60 70 29.98 27.60 7.80 8.00 0.20 2.5%
740 740 600 04/02/23 99.98 96.10 70 29.98 27.10 7.66 8.00 0.34 4.4%
741 741 600 04/02/23 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%
742 742 600 03/02/23 99.99 96.70 70 29.99 27.70 7.83 8.00 0.17 2.1%
743 743 600 01/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
744 744 600 02/02/23 99.99 96.10 70 29.99 27.10 7.66 8.00 0.34 4.4%
745 745 500 15/02/23 99.95 96.25 70 29.95 27.25 5.35 5.50 0.15 2.8%
746 746 500 16/02/23 99.96 96.60 70 29.96 27.60 5.42 5.50 0.08 1.5%
747 747 500 14/02/23 99.98 96.60 70 29.98 27.60 5.42 5.50 0.08 1.5%
748 748 600 01/02/23 99.99 96.70 70 29.99 27.70 7.83 8.00 0.17 2.1%
749 749 600 02/02/23 99.98 96.30 70 29.98 27.30 7.72 8.00 0.28 3.6%
750 750 600 03/02/23 99.98 93.70 70 29.98 24.70 6.98 7.00 0.02 0.2%
751 751 500 04/02/23 99.95 93.50 70 29.95 24.50 4.81 5.00 0.19 3.9%
753 753 500 06/02/23 99.93 96.15 70 29.93 27.15 5.33 5.50 0.17 3.2%
754 754 600 27/06/22 99.80 96.20 70 29.80 27.20 7.69 8.00 0.31 4.0%
755 755 600 01/07/22 99.96 96.40 70 29.96 27.40 7.75 8.00 0.25 3.3%
756 756 600 25/06/22 99.96 96.20 70 29.96 27.20 7.69 8.00 0.31 4.0%
757 757 500 18/02/23 99.96 96.82 70 29.96 27.82 5.46 6.00 0.54 9.8%
758 758 500 18/02/23 99.85 96.62 70 29.85 27.62 5.42 5.50 0.08 1.4%
759 759 500 18/02/23 99.98 96.82 70 29.98 27.82 5.46 5.50 0.04 0.7%
760 760 500 19/02/23 99.98 96.82 70 29.98 27.82 5.46 6.50 1.04 19.0%
761 761 600 11/07/22 99.59 96.05 70 29.59 27.05 7.65 8.00 0.35 4.6%
762 762 600 22/05/22 99.80 96.50 70 29.80 27.50 7.78 8.00 0.22 2.9%
763 763 500 06/08/22 99.97 94.30 70 29.97 25.30 4.97 5.50 0.53 10.7%
13A 13a 600 18/02/23 99.89 96.10 70 29.89 27.10 7.66 8.00 0.34 4.4%

Page 17 of 17